Professional Documents
Culture Documents
Water In Flocculation
O erflo rain
Si e Pipe Line: 4'-2"x5'-5"x5'-0"
Sl dgePipe
(1) Air Header NB-50mm (MS)
(2) Air Distributor NB-50mm (Pvc)
RAS Pump
mm P c
Q-7m3/hr. (3) Filter Unit NB-50mm (MS) Speed: 35RPM
H-6m, P-0.5hp (4) RO Unit NB-50mm (Pvc/SS/MS) O erflo rain P-1hp,Fan-8"
Si e Sludge Pump
R S Pipe mm P c (5) Air Main Header NB-150mm (MS)
Q-5m3/hr.
(6) Sludge Pipe NB-50/40mm (Pvc) H-6m, P-0.5hp
(7) Lifting Pipe NB-50mm (MS/Pvc) Flash Mixing
(8) Back Wash Pipe NB-50mm (Pvc) 4'-2"x5'-5"x5'-0"
(9) Filter-Strainer NB-50mm (SS/Pvc)
Secondary Clarifier Drain Up
(10) Dryer Bed Pipe NB-50mm (Pvc) Primary Clarifier
12'-0"x11'-0"x15'-0" 11'-0"x11'-0"x15'-0" Speed: 93RPM
icron ilter P-1hp, Fan-8"
Feeding
Si e Water, Q-9KLH
Acid Doses
Filter Feed Pump Dosing
Pump
MF Q-9m3/hr. Electric Warring
MGF Electric Control
ACF H-36m, P-3hp Lime
Dosing
Polymer
Dosing
Acid
Dosing
Panel Board
Q-9KLH Q-9KLH Tank 300ltr Tank 300ltr Tank 300ltr
MF
Air Sub-Header Dosing Unit Dosing Pump & Tank
MS Pipe Line, 50mm Q-12LPH, H-4/5Bar
Back Wash Pipe, NB-50mm
U-Trap
Feeding Pump
Air Header
NB-75mm
Blower
Roots Blower Q-9KHL, H-6m, P-1HP
RO Plant Electric Q-210m3/hr.
7'-6"x4'-0"x5'-0"
Lifting Tank
RO Pump Cable RAS Pipe, 40mm Pressure:0.6Bar, P-5.5hp
Operation Room
16'-4"x15'-0"
Hole
Reject Water
RO Booster Pump
Table
Capacity:9m3/hr.
RO Water Delivery
Position (Optional)
Q-9m3/hr.
Lifting Pump
H-112m, P-11hp
Operation Walk Way 2'-6"
Chair
Window
Reject & Back Wash Line
Up Up