Selected Experience in Asia and Pacific Rim

China, Guam, India, Indonesia, Japan, Korea,


Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Harbin Electric International Eggborough China EPC bid support for new combined-cycle gas turbine project.
Company, Ltd.

ABB Energy Ventures and Changshu China Owner’s engineer for 2x640-MW coal-fired plant. Included reviewing the engineering,
Intercontinental Energy Group procurement, and construction (EPC) specification and assisting with contract negotiations;
monitoring early site work; and performing design reviews and construction monitoring.

Asian Development Bank Fuyang China Independent review of feasibility study and environmental assessment of 2x600-MW
(ADB)/Anhui Electric Power supercritical coal-fired units; in addition to validating the technical and economic feasibility of
Corporation project, Sargent & Lundy worked with ADB to formulate plans for development of preliminary
engineering and design.

Anhui Electric Power Hefei China Provided input to owner's group; main plant EPC consortium; and BOP-EPC consortium to
Corporation/J. P. Morgan resolve open items related to design and construction which were identified during due
diligence review for 2x350 coal-fired units.

ARCO Asia Pacific, Ltd. Zhuhai China Technical due diligence of documentation and contracts for 2x700-MW combined cycle gas
(ARCO) turbine units for potential purchase by ARCO.

CEA Asia -- China Study of Central China electrical grid.

Carr Indosuez Jingyuan 5,6 China Technical due diligence of design and construction, including technical reviews of
Asia/Community Energy environmental compliance, unit performance, transmission system capability, project
Alternatives contracts, fuel availability, and project economic performance; scope expanded to include
construction and startup test monitoring for 2x300-MW coal-fired units, Gansu.

260-019e_Asia-Pacific Rim.docx
050220 1 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

China International Water & Wujing 7,8 China Assist client with major contract negotiation and contract preparation.
Electric Corporation
Review consortium proposal received by client and provide report summarizing findings.

Provide technical consulting services for two 300-MW subcritical units, including review,
assistance, and preparation of conceptual designs and drawings, bid documents, bid
evaluation and reports, and contract negotiations.

Provide guidance and coordination of island interface activities.

Review critical vendor drawings and design calculations.

China International Water & Yanshi 3,4 China Design review of 2x300-MW pulverized coal units; assist in preparation and review of bid
Electric Corporation specifications for boiler, turbine-generator, and instrumentation and control work packages;
negotiate with vendors; draft final contract; assistance with contract negotiations; construction
management of boiler, turbine, and control and instrumentation islands; and assistance with
commissioning.

China National Technical Beilungang 3-5 China Member of consortium consisting of Sargent & Lundy, Mitsui & Co., Ltd., Ishikawajima-
Import & Export Corporation Harima Heavy Industries Co., Ltd., and Toshiba for the 3X600-MW boiler island and turbine
island for the Zhejiang Provincial Electric Power Bureau. Scope included engineering for BOP
for boiler island and plant instrumentation and controls (I&C) and shared responsibility for
equipment procurement. Also provided site services for construction and commissioning and
testing, startup, and operational assistance. (1999-2001)
Additionally, Sargent & Lundy was technical consultant for FGD retrofit of all 5 of the
Beilungang units in 2004.

China Nuclear Energy Industry 300-MW PWR China Provide consulting services on development of an improved 300-MW commercial pressurized
Corporation water reactor (PWR) unit, including reviewing design and major concerns; providing technical
comments and recommendations; and providing guidance and assistance to client engineers.

Community Energy Jingyuan 5,6 China Technical review of two 300-MW coal-fired units under construction in Gansu Province,
Alternatives, Inc. China; interim Phase II report in support of CEA's request for interim financing.

260-019e_Asia-Pacific Rim.docx
050220 2 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Credit Suisse First Boston Luannan China Due diligence for five plants, 150-MW to 1200-MW.
(CSFB)

Deutsche Bank/Sithe Shunyi China Due diligence for 2x250-MW coal-fired cogeneration units.

ENSERCH Development Shenhua China Due diligence technical review for this plant under construction. Review included O&M plans
Corporation Shenmu 1,2 and testing of the first unit.

Frank Russel Group Various China Technical consultant for client to evaluate the quality of the plants.

Fujian Electric Power Survey Various China Consulting services for 1000-MW ultra-supercritical coal fired plants.
& Design Institute, Hebei
Electric Power Design &
Research Institute and Inner-
Mongolia Power Exploration &
Design Institute

Henan Provincial Power Qinbei China Assist owner by preparing various island specifications, performing bid evaluations, and
Bureau construction supervision as owner's AE for two 600-MW coal-fired units.

Huaneng Power International, Dalian 3,4 China Teamed with Babcock Energy Ltd. for the boiler island and with Westinghouse for the steam
Inc. (formerly Huaneng turbine and auxiliaries. Responsible for BOP engineering, including design, turbine island
International Power equipment and commodities procurement, and project management support for project at an
Development Corporation) existing site for this 2x350-MW coal-fired extension project at an existing site. (1998-1999)

Huaneng Power International, Dandong 1,2 China Teamed with Babcock Energy Ltd. for the boiler island and with Westinghouse for the steam
Inc. (formerly Huaneng turbine and auxiliaries. Responsible for BOP engineering, including design, turbine island
International Power equipment and commodities procurement, and project management support for project at an
Development Corporation) existing site for this 2x350-MW coal-fired extension project at a new site. (1998-1999)

260-019e_Asia-Pacific Rim.docx
050220 3 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Huaneng Power International, Shidongkou II China Served as consortium leader, responsible for consortium management, and coordination of
Inc. (formerly Huaneng Units 1,2 project activities, such as BOP design and engineering, procurement, vendor inspection
International Power services, delivery, commissioning, testing, and training. Had responsibility for
Development Corporation) conceptualization of the entire 2x660-MW supercritical coal-fired power plant and the
coordination of the design activities of all the consortium members. Also constructed a site
model and power block model and prepared the architectural rendering.

Provided technical assistance during bid evaluations for turnkey proposal, as well as
assistance in contract negotiations with turbine island, boiler island, and BOP contractors.

Provided expediting services for manufacturing and shipping activities, including coordination
of other consortium partners and BOP sub-vendors.

Supplied field engineers at the site to serve in advisory capacity for the construction
management, testing, startup, and commissioning activities. These were the first supercritical
coal units placed in operation in China. (1992)

Huaneng Power International, Shidongkou 1,2 China Provide conceptual design and coordinate and review turnkey design/supply project for
Inc. (formerly Huaneng 500 kV and 500 kV indoor and 220 kV outdoor GIS.
International Power 220 kV gas-
Development Corporation) insulated
substation (GIS)

Shanghai Municipal Electric Shidongkou China Owner’s consultant for the Phase 2 retrofit of FGD systems at 2x300-MW subcritical coal-
Power Bureau fired power plant. Scope included assisting the owner in the preparation of the FGD
specification, bid evaluation, and contract negotiation with the successful bidder. Also
assisted SMEPC in preparing a detailed bid evaluation methodology and approach to be
used for the technical review and bidders’ short-list selection.

Huaneng Power International, Various China Technical due diligence review of four 350-MW coal-fired power plants and one 100-MW oil-
Inc. and Lehman Brothers fired combined cycle power plant.

260-019e_Asia-Pacific Rim.docx
050220 4 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Jiangsu Electric Power Ligang 3,4 China Engineering and design, including turbine island conceptual and detailed design and
Company engineering of turbine island for two 350-MW coal-fired units. consisting of two steam turbine
generators provided by Westinghouse, integrated with boiler island under the responsibility of
the owner. Scope included preparing specifications for procurement, including inspection for
procured equipment, and substation engineering. (1997-1998)

Jiangsu Ligang Electric Power Yangzhou 1,2 China For the new 2x660-MW coal-fired units, teamed with Babcock & Wilcox for the boiler island,
Company and Westinghouse Electric Corporation for the turbine and control island. As the design AE
for both islands, scope included detailed design and participating in BOP equipment supply
and procurement of equipment and commodities. Fuel delivery and handling was not part of
the scope and was provided through a separate contact.

Jiaxing Owner's Group Jiaxing 1-4 China Served as owner's AE for four 700-MW coal-fired units. Phase 1 scope consisted of assisting
consortium to review EPC proposal and financing applications; Phase 2 scope consisted of
assisting owner to monitor progress of EPC contract; Phase 3 scope consists of assisting
owner to oversee the operation as related to the EPC contract warranty.

KEB (Asia) Finance, Ltd. Tangshan China Limited technical review, including unit design, environmental compliance, unit performance,
costs, and project contracts for 3x50-MW cogeneration boilers with 2 turbines.

Kepple Fels, Ltd./Zunhua City Zunhua City China Phase 1 due diligence technical review of 2x50-MW coal-fired units under construction in
Hebei province.

Marathon Power Company 2x300-MW plant China Third-party review of maintenance costs for a 2x300-MW plant.

Pec-Tech/Pacific Oil & Gas Xiamen China Basic engineering for 4x382-MW liquefied natural gas (LNG) combined cycle plant. Included
Company development of plot plans, general arrangement, P&IDs, single-line diagram, heat balances,
tender specification, and plant costs, and review support for detail engineering.

SMEPC/Bear Stearns Various China Due diligence and asset valuation for various coal-fired plants in Shanghai.

SMEPC/GE Capital Zhabei China Due diligence for 4x100-MW (GE 9E) simple cycle turbines.

Shandong Provincial Electric Heze China Turbine island engineering and design, procurement, and project management for two 350-
Power Bureau MW pulverized coal-fired units (boiler scope currently under negotiation).

260-019e_Asia-Pacific Rim.docx
050220 5 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Shandong Province Rezhao 1,2 China Served as owner's AE for 350-MW coal-fired units.

Shandong Provincial Electric Liaocheng 1,2 China Turbine island engineering and design, procurement, and project management for two 600-
Power Bureau/State Energy MW coal-fired units (boiler scope currently under negotiation).
Investment Corporation

Shandong Provincial Electric Zouxian 5,6 China Review of design; evaluation of bids; assistance with contract negotiations; construction
Power Bureau/State Energy management of boiler, turbine, and control and instrumentation islands; and assistance with
Investment Corporation commissioning for two 600-MW coal-fired units.

Shanghai Municipal Electric Waigaoqiao II China Addition of two supercritical coal-fired generating units, each ranging in size from 900- to
Power Bureau 1,2 1000-MW.

Shanghai Municipal Electric Waigaoqiao II China Phase 2, Stage 1 conceptual design and bid document review, includes compiling design
Power Bureau 1,2 data, reviewing conceptual design and optimizing plant layout, providing technical
specifications and bid evaluation criteria, reviewing bid specifications, and finalizing bid
documents; Stage 2 includes performing interface coordination between engineering and
design, reviewing vendors' drawings, and conducting liaison meetings.

Shanghai Municipal Electric Waigaoqiao China Support for installation of an FGD system at this Chinese-designed 2x300 coal-fired station.
Power Bureau Our assignment for this World Bank project includes reviewing the specifications and
assisting the owner with the bid evaluations.

Shanghai Nuclear Engineering Qin Shan 1 China Independent design review of selected parts of 300-MW PWR plant and conduct seminar on
Research and Design Institute preparation of final safety analysis report for 300-MW nuclear unit.

Shanghai Nuclear Engineering -- China Review of control room design.


Research and Design Institute

Shanghai Nuclear Engineering Qin Shan 2 China Review optimized design.


Research and Design Institute

Shanghai Nuclear Engineering -- China Technology transfer of piping analysis computer program.
Research and Design Institute

260-019e_Asia-Pacific Rim.docx
050220 6 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Shanghai Nuclear Engineering -- China Technology transfer of software.


Research and Design Institute

Shell Investment Holdings Zhangjiagang China Mechanical support on Phase I technical due diligence for 2x375-MW combined cycle.
(China) Ltd.

Taiwan Atomic Energy Council -- China Technical training of engineers and resident inspectors in plant construction and operation.

Taiwan Atomic Energy -- China Review volume reduction plan for administration.
Commission, Radwaste
Administration

Taiwan Power Chin Shan 1,2 China Perform plant walkdowns for equipment verification, Q-list update, systems review and
classification of components, environmental qualification, parts classification, and response to
Inspection and Enforcement Bulletin 79-01 and Generic Letter 87-02.

Review of radwaste volume reduction program.

Perform full scope walkdown and analysis related to Nuclear Regulatory Commission
Generic Letter 87-02 (Unresolved Safety Issue A-46), develop equipment list, compare
seismic criteria with design, perform walkdown, and categorize equipment as acceptable.

Taiwan Power Chin Shan, China Provide equipment qualification training for client head office staff and three nuclear plant
Kuosheng, staffs, including training course materials, three weeks in Taiwan, examination, certificate,
Maanshan and final letter report.

Provide meteorology and air quality training of client personnel.

Taiwan Power Lungmen 1,2 China Site selection study review.

260-019e_Asia-Pacific Rim.docx
050220 7 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Taiwan Power Kuosheng 1,2 China Review core openings in concrete walls of seismic Category I structures excluding primary
containments, containment internal structures, fuel pool of fuel storage building, and water
pool of emergency pump house.

Review of radwaste volume reduction program.

Provide component-level Q-list based on station piping and instrumentation diagrams and
plant walkdown.

Taiwan Power Maanshan 1,2 China Review of radwaste volume reduction program.

Wing Consortium Jiangsu China Served as owner's AE for 2400-MW combustion turbine/combined cycle units using liquefied
natural gas (LNG) from the Philippines.

Wing Consortium Jiaozuo 1-6 China Engineering assessment of 6x200-MW coal-fired plant in Henan Province.

Wing Consortium Various China Assistance with all technical matters from preliminary engineering through contract
preparation, negotiation and site support for a 2x300-MW pulverized coal-fired units.

Zhejiang Beilun Power Beilun 1-5 China Owner’s engineer for wet limestone flue gas desulfurization system.
Generation, Limited

Zhejiang Beilun Power Beilun 1-5 China Study for NOX reduction and specification for low- NOX burners.
Generation, Limited

Zhongshan Jiaming Power Zhongshan 1,2 China Operations monitoring review to ensure operator compliance with project budgets and
Limited maintenance schedules.

Zhuzhou Nanfang Zhuzhou China Owner's AE and construction monitoring for cogeneration plant.
Cogeneration Power Co.,
Ltd./Illinova

United States Navy Piti 4,5 Guam Design of two 22-MW oil-fired units.

260-019e_Asia-Pacific Rim.docx
050220 8 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Andhra Pradesh Power Krishnapatnam, India Sargent & Lundy reviewed critical design documents in support of L&T-S&L’s detailed design.
Development Company 2x800-MW
Limited, India (Owner) supercritical

CMS Generation Neyveli India Study to evaluate the most cost-effective form of SO2 abatement equipment and the
associated downstream equipment effects for this lignite-fired plant in Tamil Nadu.

Community Energy Ib Valley India Perform design and construction due diligence review for 2x210-MW coal-fired units in
Alternatives Orissa.

Goa Department of Goa India Development of business plans and technical approach to the privatization of transmission
Energy/IFC and distribution system.

Gujarat Electricity Board in Dhuvaran India Larsen & Toubro-Sargent & Lundy Limited review of M/S Techno Sources offer for the supply
Baroda of an existing boxed 200-MW combined cycle power plant currently located in the US and
making the feasibility report for the installation of the plant being offered or for a 100-MW
combined cycle plant.

Gujarat Industries Power Surat 1,2 India Phase 1-3 lender’s engineering services for lignite-fired plant.
Company, Ltd.

GVK Industries Jegurupadu India Due diligence for 235-MW gas-fired combined cycle for lenders and GVK Industries; owner's
engineer, including review of EPC bids, bidders' facilities, and determination of life cycle
costs.

Heard Energy Ghogha India Prepare a feasibility report, including cost estimate and provide support to project developer
for 2x250-MW coal-fired fluidized bed combustion units in Gujarat.

Indeck Energy Services Bomlai India Serve as owner's AE for 2x250-MW coal-fired units in Orissa.

Intercontinental Energy Cuddalore India Prepare a feasibility report and provide support to project developer for a 2x660-MW coal-
Corporation fired generating units near Madras.

Larsen & Toubro Limited Bhilai India Support to project developer as AE on EPC project for 2x250-MW coal-fired units; preliminary
and detailed engineering, site liaison-construction management, and startup and testing.

260-019e_Asia-Pacific Rim.docx
050220 9 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Larsen & Toubro Limited Haldia India L&T-Sargent & Lundy (L&T-S&L) will perform for L&T the detailed engineering on a build-
own-operate (BOO) basis for the project to be operated in parallel with the West Bengal
Electricity Board (WBSEB) India to ensure reliable power for the Haldia Petrochemical
Complex at Haldia, Bengal, India (HPL Limited).

Larsen & Toubro - EPC Power Pipavev India Detailed engineering, including review and assistance in several key areas of engineering,
such as cycle optimization, layout, and piping engineering in the PLADES environment for
100-MW Naphtha, combined cycle plant.

Larsen & Toubro- Sargent & Solar chimney India Technical and economic feasibility report and design of all BOP mechanical, electrical,
Lundy Joint Venture Limited plant instrumentation and controls, architectural and structural systems and components for 200-
MW solar chimney plant in Thar Desert, Rajasthan (world's largest solar energy project).

Nabha Power Limited, India Rajpura, 2x700- India Sargent & Lundy reviewed critical design documents in support of L&T-S&L’s detailed design.
(Owner) MW supercritical

Overseas Private Investment ReNew 150-MW India Independent engineer for a 100-MW solar PV project and a 50-MW solar PV project in India.
Corporation (OPIC) Solar Portfolio Services included independent solar energy yield assessment, technical due diligence in
support of funding, construction monitoring, and performance testing oversight.

Pioneer Energy Services and Lapanga India Produce a feasibility report and provide support to project developer for 2x250-MW units in
Panda Energy Orissa.

PowerGen/Indo-Gulf Rosa India Provide support to project developer and serve as AE for 2x250-MW pulverized coal units.

Rain Calcining Visakhapatnam, India Full EPC services, including engineering design, equipment procurement, construction, and
Limited/Houston Industries India cogeneration commissioning for 50-MW circulating fluidized bed boiler.
Energy Incorporated project

STI Power Guna India Owner's engineer to review EPC bids and EPC contract documents, support CEA clearance
meeting, life cycle costs, and load flow study for 350-MW combined cycle plant.

260-019e_Asia-Pacific Rim.docx
050220 10 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Mitsui & Co. Ltd. and Adaro 660-MW coal fired Indonesia Technical Advisor to Mitsui and Adaro Power. Prepared EPC functional specification,
Power plant in West Java assessment of numerical site evaluations prepared by a local consultant, independent
for PLN evaluation of environmental, economic, and site development issues, and identification of
potential transmission line routes. Evaluated the most promising sites, assisted in selection of
two preferred site, Visited the sites, prepared GAs, preliminary cost estimates, and then
specified site survey, including soils (onshore and offshore), bathymetry, seismicity, and
topographic investigations. Also assisted select local consultant prepare environmental
impact assessment for final site. Visited boiler and turbine vendor shops in China as part of
due diligence.

Mitsui & Co. Ltd. 2000-MW Indonesia Technical Advisor to Mitsui. Assisted in preparation of EPC functional specification,
supercritical coal- assessment of numerical site evaluations prepared by a local consultant, independent
fired plant for PLN evaluation of environmental, economic, and site development issues, and identification of
in Central Java potential transmission line routes. Evaluated the most promising sites, assisted in selection of
two preferred sites, and then reviewed detailed site survey results including soils (on-shore
and off-shore), bathymetry, seismicity, and topographic investigations. Also assisted select
local consultant to prepare environmental impact assessment for final site. Also attended
several meetings with EPC Consortium and provided responses to EPC contractor questions.

Toyo Engineering & PLTU Sumsel 6- Indonesia EPC proposal development phase in support of developer team of Mitsui, DH Energy, and PT
Construction 2x300-MW IPP Bumi. Sargent & Lundy’s services included technical support with the review of vendor
lignite-fired mine- documents, technical advice, firm price proposal support services, and providing reference
mouth CFB, South plant design information from similar Sargent & Lundy project assignments, including P&IDs,
Sumatra electrical-single lines, heat balance diagrams, and BOP material take-offs.

AES (Jakarta) Musi Rawas Indonesia Owner’s engineer services. Deliverables included site general arrangement, heat balance
Regency – South diagram, electrical single-line diagram, plant design pressures and temperatures, level 1 EPC
Sumatra - cost estimate, EPC schedule, EPC specification, and indicative plant performance and
2x600-MW IPP emission guarantee levels.
coal-fired plant

Atomic Energy Agency of First Indonesian Indonesia Independent evaluation of three potential power plant sites on the island of Java, Indonesia.
Indonesia (BATAN) Nuclear Power Included technical issues for the passive plant design and the transmission system expansion
Plant, 1000-MW and compliance with International Atomic Energy Agency guidelines.

260-019e_Asia-Pacific Rim.docx
050220 11 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Community Energy Pontiniak Indonesia Perform feasibility study for 4x25-MW coal-fired steam units.
Alternatives (CEA)

Mission Energy/ PT. Tanjung Indonesia Owner's engineering services, including technical feasibility study, conceptual design,
Envirodrindo Energitama environmental analysis, and EPC cost estimates for 2x100-MW coal-fired plant.

PT. Asrigita Prasarana East Palembang Indonesia Owner's engineering services, including preparation of the feasibility study, terms of
reference, and preliminary EPC cost estimate; and evaluation of EPC bids for 130-MW
combined cycle plant.

Perusahaan Umum Listrik Central Java Indonesia Perform feasibility study, including 500 kV system interconnections, for three sites being
Negara considered for a 400-MW coal-fired steam plant in Central Java.

Perusahaan Umum Listrik Merak 1,2 Indonesia Performed feasibility study for two 200-MW coal-fired steam plants.
Negara

Perusahaan Umum Listrik Paiton 1,2 Indonesia Design of two 400-MW coal-fired units, including site work, major plant foundations, and
Negara structural steel; coordination with vendor and review of vendor design drawings; and
assistance to client in site supervision.

Perusahaan Umum Listrik Paiton 500 kV and Indonesia Provide total electrical and structural design for 500 kV gas-insulated substation at the Paiton
Negara 150 kV GIS site.

Perusahaan Umum Listrik Paiton-Krian Indonesia Prepare design report and provide structural engineering services (500 kV, 75-mile, one
Negara transmission line circuit).

Perusahaan Umum Listrik Probalinggo- Indonesia Provide structural engineering services (150 kV, 78 miles, two circuits).
Negara Situbondo
transmission line

Perusahaan Umum Listrik Tambak Lorok, Indonesia Owner's engineering services, including EPC bid preparation support, conceptual design,
Negara Blocks I,II project schedule preparation, cost estimating for entire turnkey bid, and construction
management advisory services for Block I and II combined cycle 500-MW units.

Mission Energy Paiton 7,8 Indonesia Conceptual engineering support for 2x600-MW pulverized coal units.

260-019e_Asia-Pacific Rim.docx
050220 12 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Rolls-Royce Power Ventures Tanjung Batu, Indonesia Owner's engineering services, including technical feasibility study, conceptual design,
combined cycle, environmental analysis, and EPC cost estimates for a 126-MW combined cycle project.
126-MW

Rolls-Royce Power Ventures Ujung Pandang, Indonesia Owner's engineering services, including, technical feasibility study, conceptual design,
combined cycle, environmental analysis, and EPC cost estimates for 2x65-MW combined cycle units.
65-MW

Schroders International Paiton 5,6 Indonesia Prepare due diligence report for 2x600-MW pulverized coal units.
Finance/Jawa Power
Company

Tanjung Jati "A" Consortium Tanjung Jati "A", Indonesia Owner's engineering services, including feasibility study, cost estimate, preparation of EPC
coal, 2x660-MW bid document, preparation of power purchase agreement for 2x660-MW coal-fired units.

Southern Electric International Tarahan 1,2 Indonesia Prepared feasibility report for two 100-MW coal-fired units.

Union Bank of Switzerland/ PT Freeport Indonesia Independent review of power generation assets, including small diesels and transmission
Prudential Power Funding lines considered for acquisition.
Associates

Japan Atomic Power -- Japan Technical advisory services on O&M issues.


Company

Toyo Engineering Corporation 2x1000-MW Japan Home office engineering support starting in July 2015 for development of general
ultrasupercritical arrangements for 2x1000-MW IPP ultrasupercritical coal facility.
coal

Mitsui & Co. -- Japan Feedwater heater drain study.

Daewoo Engineering & Nigeria 450 Mwe Korea Provide EPC proposal support, including mechanical, electrical, I&C, civil/structural
Construction, Co., Ltd. Combined Cycle preliminary engineering design and estimating.
Project

KAERI/NEMAC -- Korea Spent fuel disposal and radwaste management study.

260-019e_Asia-Pacific Rim.docx
050220 13 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Korea Electric Power Six separate Korea Independent evaluation of six separate power stations, including thermal, combined cycle,
Corporation power facilities: combined heat and power, and hydro facilities for potential purchase. Reviewed mechanical,
Bundang, Muju, electrical, and plant control equipment; operating and maintenance (O&M) costs; capital
Samchonpo, expenditures; spare parts; performance; site expansion capabilities; and projected capital
Youngdong, expenditures for the next five years.
Youngheung, and
Yosu

Korea Electric Power Ulchin 3,4 Korea Provide architect-engineering and design services for two identical slide-along PWR units,
Corporation including 345 kV GIS switchyard.

Korea Electric Power Yonggwang 3,4 Korea Provide architect-engineering and design services for two identical slide-along PWR units,
Corporation including 345 kV GIS switchyard.

Develop 97 technology transfer program courses, taught in Chicago and Korea, covering all
aspects of nuclear power plant design.

Korea Electric Power Yonggwang 5,6 Korea Contract initiated (sole source) for 2x1,000-MW nuclear units.
Corporation

Korea Power Engineering -- Korea Training and seminars for the Korea Hydro & Nuclear Power Company (KHNP) personnel for
Company, Inc. (KOPEC) seismic analysis, project management, and cost management.

Korea Power Engineering Light Water Korea Advisor to KOPEC on new LWR nuclear units sponsored by the United Nations.
Company, Inc. (KOPEC) Reactor (LWR)
Nuclear Units 1,2
Korean Peninsula Energy
Development Organization
(KEDO)

Meiya Power Company KIECO, combined Korea Technical due diligence for 2x2x1 (four blocks), including review of input assumptions and
cycle data to financial model, Power Purchase Agreement, and Fuel Supply Agreement.

260-019e_Asia-Pacific Rim.docx
050220 14 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Singapore International Power Anyang and Korea Independent assessment of the facilities' design bases, the quality of the facilities as
Company Buchon combined constructed, the operation and maintenance practices, the performance history, and the
cycle and district environmental permitting and compliance history.
heating facilities
and Bugok
combined cycle

Asian Development Fauji Pakistan Perform review of gas turbine design for 144-MW gas-fired combined cycle unit.
Bank/Karbiwala

Bank of Tokyo/International Lal Pir I Pakistan Provide full-time onsite support during 362-MW oil unit startup reliability run for review of
Finance Corporation/AES testing and compliance with lenders’ requirements. Subsequently served as independent
Corporation lender's engineer for design and environmental compliance review, and construction and
performance test monitoring.

Bank of Tokyo/International Lal Pir II (PakGen) Pakistan Provide complete due diligence review and construction monitoring for 365-MW oil-fired
Finance Corporation/AES power plant, with flue gas desulfurization, near Multan.
Corporation

Confidential Confidential Wind Pakistan Lender’s technical advisor for the financing of the 50-MW project. Scope included pre-
Project construction due diligence.

Confidential Confidential Pakistan Lender’s technical advisor for the financing of the project. Scope included pre-construction
Hydroelectric due diligence.
Project

Export Development Saba Pakistan Provide complete due diligence review for 125-MW oil-fired power plant.
Corporation/Cogen
Technologies/Saba Power
Company

260-019e_Asia-Pacific Rim.docx
050220 15 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

International Finance Rupali Pakistan Prepare due diligence report for 450-MW oil-fired power plant.
Corporation/Rupali
Power/Export Development
Corporation

International Finance Gul Ahmed Pakistan Provide due diligence services on 125-MW diesel-generator plant near Karachi.
Corporation/Tomen
Corporation/Gul Ahmed
Energy

International Finance Kohinoor Pakistan Provide due diligence services on 120-MW diesel-generator plant near Lahore.
Corporation/Tomen
Corporation/Kohinoor Energy

Overseas Private Investment Master Wind Pakistan Lender’s technical advisor for the financing of the 50-MW Master Wind Project. Scope
Corporation (OPIC) Project included pre-construction due diligence, construction monitoring, environmental and social
reviews and monitoring, and operations monitoring.

Overseas Private Investment Jhimpir Wind Pakistan Lender’s technical advisor for the financing of the 50-MW Jhimpir Wind Project. Scope
Corporation (OPIC) Project included pre-construction due diligence, construction monitoring, environmental and social
reviews and monitoring, and operations monitoring.

Overseas Private Investment Hawa Wind Pakistan Lender’s technical advisor for the financing of the 50-MW Hawa Wind Project. Scope
Corporation (OPIC) Project included pre-construction due diligence, construction monitoring, environmental and social
reviews and monitoring, and operations monitoring.

AES Masinloc Philippines Owner’s engineer, including preparation of feasibility study, EPC specification, and
conceptual cost estimate and review of EPC bids for 400-MW coal plant. (2012-2014)

AES Masinloc Power Partners Masinloc Philippines Consulting services to study plant output rating for 400-MW coal plant. (2008-2009)

AES Corporation Masinloc Philippines Consulting services to provide input to precipitator contract for 400-MW coal plant. (2008)

GN Power Mariveles Coal Mariveles Philippines Generator and AVR electrical studies, metallurgy evaluations, and development of flow-
Plant Ltd accelerated corrosion (FAC) program for 650-MW coal plant. (2014-2015)

260-019e_Asia-Pacific Rim.docx
050220 16 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

International Finance Thomas Lloyd Philippines Independent engineer for a 70-MW portfolio of three biomass projects being financed by the
Corporation (IFC) and World Portfolio of IFC. Services included technical due diligence in support of funding and construction
Bank Biomass Projects monitoring. (2019, 2016)

International Finance Thomas Lloyd Philippines Independent engineer for a 70-MW portfolio of three solar PV projects by the IFC. Services
Corporation (IFC) and World Portfolio of Solar include independent solar energy yield assessment, technical due diligence in support of
Bank PV Projects funding, and construction monitoring. (2013-2016)

International Finance -- Philippines Review of capability to manufacture power equipment in People's Republic of China for
Corporation (IFC) and World Pinamuccan project in Philippines.
Bank

First Gas Power Corporation Santa Rita, Philippines Technical support during construction of 230-kV transmission line from Santa Rita to Colaca,
(Subsidiary of First Gas Batangas, Luzon which interconnects 1000-MW combined-cycle power plant with the national utility
Holdings Corporation of the (NAPOCOR) grid. Review of construction plans, schedules and field change requests
Philippines) submitted by the construction contractor.

Mitsui & Co., Ltd. Batangas Philippines Conceptual design and EPC cost estimate for 500-MW combined-cycle plant using GE
Frame 7FA combustion turbines and one steam turbine.

Ogden Edison Bataan Philippines Due diligence, condition assessment, construction monitoring for 10x6.7-MW heavy oil diesel
engines. (1997)

Harza Engineering Company -- Philippines Provide training services to support client training of the National Power Corporation of the
Republic of Philippines (NAPOCOR) estimators in thermal power plant capital cost
estimating.

Hopewell Holdings of Hong Pagbilao 1,2 Philippines Independent review of detailed engineering drawings, documents, and specification, and
Kong environmental review and construction monitoring for 2x385-MW pulverized-coal units.
(2002)

Magellan Utilities Pinamucan 1,2 Philippines Independent review of detailed engineering drawings, documents, and specification and
Development Corporation construction monitoring for two 300-MW pulverized-coal units. (1992)

260-019e_Asia-Pacific Rim.docx
050220 17 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Northern Mindanao Power North Philippines Independent review of detailed engineering drawings, documents, and specifications for two
Company Mindanao 1,2 100-MW unit diesel project. (1994)

Samsung C&T Corporation GMR Energy Singapore Detailed engineering for 800-MW combined-cycle EPC project, the first of Sargent & Lundy’s
collaborative engineering efforts under the Transfer of Technology program.

Public Utility Board of TUAS Singapore EPC proposal support for 2x600-MW oil facility, issuance of BOP equipment specifications,
Singapore - Public Utility evaluations and bidder selection, development of BOP equipment prices.
Board of Singapore

Asian Development Bank Kelanitissa, Sri Lanka Technical and commercial due diligence services, including construction reviews;
combined cycle performance testing; operations reviews; EPC contract and contractor evaluation; fuel supply;
transmission interconnection evaluation; equipment reliability; etc., for investment decision by
the Bank.

Samsung Corporation Kerawalapitiya, Sri Lanka Provided preliminary engineering services and cost estimates to Samsung in preparation of
combined cycle EPC bid.
BOOT

Electricity Generating 47 operating Thailand Evaluated the design, operation, condition, and any associated liabilities of 47 units at 9
Authority of Thailand (EGAT) power units at 9 stations, consisting of multiple generating technologies - thermal mine-mouth lignite-fired,
stations (multiple thermal oil and gas, simple-cycle gas turbine, combined-cycle, and mining operations. Report
generating on this detailed technical assessment of the assets will then be used by EGAT financial
technologies) advisors to prepare the investment prospectuses.

Electricity Generating Mae Moh Complex Thailand Evaluation of retrofit alternative air pollution controls to reduce emissions from complex
Authority of Thailand (EGAT) consisting of 12 coal-fired units, 2000-MW total. Scope included technical and economic
evaluation of pollution control equipment; computer modeling of air quality impacts;
evaluation of potential air pollution health effects; evaluation of solid waste disposal options;
and preparation of report for submittal to government of Thailand.

Electricity Generating Tup Sa Khae Thailand Scope for 2x660-MW coal plant included assessment of environmental impacts; computer
Authority of Thailand (EGAT) modeling of air quality impacts and air pollution controls; evaluation of water pollution
controls; and preparation of report for submittal to government of Thailand.

260-019e_Asia-Pacific Rim.docx
050220 18 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Electricity Generating Bang Pakong 3,4 Thailand Develop EPC combined cycle balance-of-plant (BOP) cost estimate for proposal by client;
Authority of Thailand (EGAT) provide BOP engineering services and procurement assistance for two 300-MW combined-
(subcontractor to Mitsui) cycle projects; provide electrical field engineering services at site.

Electricity Generating Khanom, GE 9E Thailand Bid preparation support, conceptual design, project schedule preparation, cost estimate for
Authority of Thailand (EGAT) entire 600-MW combined-cycle EPC/turnkey bid, procurement assistance, construction
(subcontractor to Mitsui) management, and startup services.

Electricity Generating South Bangkok, Thailand Bid preparation support, conceptual design, project schedule preparation, cost estimate for
Authority of Thailand (EGAT) GE 9FA entire 300-MW combined-cycle EPC/turnkey bid, procurement assistance, construction
(subcontractor to Mitsui) management, and startup services.

Assistance in the field for the resolution of BOP equipment issues, engineering assistance in
the home office for field-related BOP equipment issues, and procurement of bulk material,
such as fiber optic cable, etc., not in original scope.

Italthai Development Generic Thailand Produce feasibility report for generic 700-MW coal-fired plant in anticipation for Thailand's
Corporation independent power project program.

Sumitomo Corporation Van Phong Vietnam Owner’s engineering and advisory services related to the development and negotiation of
various “island” EPC contracts for 1200-MW supercritical coal project. Sargent & Lundy’s
services included preparation of the six island bid packages, including performance
guarantee requirements, interface points, and contract term sheets. Review and evaluation of
bids received, and support for contract negotiations. Reviewed contracts and environmental
studies and provided site reconnaissance/evaluation. (2009-2011)

AES-VCM Mong Duong Power Mong Duong Vietnam Owner’s engineering services in support of the development, concession, and contracting for
Company, Ltd. the EPC turnkey implementation of the IPP project. Included subsequent technical reviews of
crane girder, ESP, piping, fuel tank, steam turbine bypass, and electrical systems. (2005-
2011)

260-019e_Asia-Pacific Rim.docx
050220 19 of 20
Selected Experience in Asia and Pacific Rim
China, Guam, India, Indonesia, Japan, Korea,
Pakistan, Philippines, Singapore, Sri Lanka, Thailand, Vietnam

Client-Owner Project Location Scope

Mitsui & Co., Ltd and Griffen Nghi Son Vietnam Pre-feasibility study for 2x600-MW IPP coal plant, including (1) establishment of transport
Coal Co. route and economics of utilizing coal from Australia; (2) estimate of expected EPC capital
cost; (3) plant emissions; (4) initial plant performance heart rate; and (5) budgetary pro forma
and initial indicative tariff. (2008)

BP Holdings; Sembcorp; Phu My 3 Vietnam Independent engineering review for 2x2x1 natural gas combined-cycle, 700-MW.
Kyushu Electric Power; Nissho (2005, 2002)
Iwai Corporation

Phu My BOT Company, Ltd. Phu My 3 Vietnam Lender’s technical advisor, including evaluation of issues related to project term sheet and
initial LTSA reviews in support of financial close for loan for 700-MW 2x2x1 natural gas
combined cycle. Our scope of work was extended to include construction completion
monitoring. (2002-2003)

Vung Tau Energy Company, Ba Ria Vietnam Independent engineering review and Phase 1 due diligence extension for 120-MW diesel
Ltd./ IFC/Wartsila NSD Power engine. (1998-2000)

260-019e_Asia-Pacific Rim.docx
050220 20 of 20

You might also like