Risk Management
Load Flow/SC/Stability/TNA
SCADA & IT Interface • Executed all aspects of New & Life Extension
Smart Metering, Grid, Modernization (LE)/Physical & Efficiency Upgrade of EPC/Non-
P&C EPC Power Generation (PG) and Power Delivery
Procurement (PD)/Grid Modernization Projects in the US and
Asset Management Globally (35 Utilities &13 countries), Combined
Underground Cables 35 GW+ as AE/ Owner’s Engineer, Adviser,
Testing &Commissioning Subject Matter Expert (SME) or a Contractor
• Power Generation (PG- 1 new Nuclear, 15 New &
Finance 25 Existing Coal, 6 Hydro, 10 Solar, 30 Wind
Expert Witness including Fluidized 200MW Fluidized Bed boiler
plant at Point Aconi in Canada-15 GW+, 20 Gas
Turbines Cogeneration/combined cycles
1|Page
Master of Science, Electrical MW Capacity, Equipment Procurement, required
Engineering P&C, Interconnection Compliance, OATT,
Testing & Commissioning, Close outs. OH and
DETAILED EXPERINCE: UG Cable Transmissions up to 345 KV.
1) Partner/Owner in the foremost US Architect Development of Utility Standards for Varying
Engineering firm, Sargent & Lundy; 2) Global Director in ranges of DER in compliance with IEEE1547-
Siemens /Westinghouse in Europe and US; 3) Global 2018, UL1741, IEEE2030, NEC
Director in Dynegy for US and global operations.
Currently, 4) a Principal of Utility Consulting Services. • Worked with PSEG, JCPL, ConEd, GE, Nextera,
PG&E, Municipalities, Atlantic City Electric,
Panda Energy, Alliant/RMT, Enernex and many
other firms
CLIENTS:
Underground Cable Usage, Analytical Studies,
Exelon, Ameren, PSI, NIPSCO, AMOCO, SHELL, Schedule, Outage, ISO Compliance and
TXU, Canadian utilities, Cook County, Sempra Regulations, Risk mitigations, savings limiting
Energy, Dynegy, ComEd, PEPCO, ConEd, NYPA, scope/ due to on-time energization. Experience
Alliant Energy, NextEra, RMT, ATC, KPL and in all aspects up to 765 KV T- Line and
many other utility systems in the US and Globally Substation Projects-Over 35 infrastructure –See
including China, India, Malaysia, Thailand, Mexico, Next Page. Voted the “Best” Program Manager-
Brazil, Europe Exelon $200M infrastructure expansion plans.
•Developed utility Valuation/PG & PD
separation, Asset Management and Expansion
strategy for
four companies
•Developed 360-degree savings/engineering
3|Page
replication approaches, Detailed Project
Management Manual, Procurement strategies,
financial projections, and budgets/processes
with risk mitigation/ probability analysis.
Developed unique approaches for on time
construction completion for major Exelon and
ConEd projects
•Developed Detailed Design Control
Documents, Responsibility Matrices, Check
Lists, IPP/EPC interconnections for Substations,
Protection & Controls, Transmission Lines,
Construction, Generations to Utilities including
updating of Major Utility Standards & creation of
new standards
•Accomplished in Financial forecasting and
Reporting, Cash flows, Earned Value and
Budget Development, Asset Mapping and
Valuations, statistical analysis of cost estimates
& confidence levels/ P&L responsibility.
•Acted as Expert Witness /Subject Matter Expert
on T-lines, Losses/Perf. /Grid interconnection,
Generation and modernization issues
Global Director
3)Dynegy
Jan 2001 - Jan 2004 (3 years 1 month)
Operations/Performance Enhancement,
Client Feedbacks: Valuations/Separation of T-Line and PG
Assets / sale
•All Firms& Clients I had worked with in the past and Regulatory Compliance
provided written feedbacks on my performance as Performed as a Subject Matter Expert
10 out of 10 in Technical, Program/Project (SME)/Consultant to lead resource planning,
Management, Co-Worker Relationship, and operational/ technical/financial management of
Communication and on other arenas. I was also in power generation fleet, environmental issues,
multiple ANSI Committees, co-authored T&S work in the US and FERC/NERC
standards/guidelines. Won $Billions of Dollars of Compliance, MISO/NYISO/PJM interface.
Projects and Saved $Millions of Dollars for the Radically overhauled asset management
Clients Worldwide in their executions. including value mapping. Formulated Life PG
&PD Extension/Renovation/Efficiency Upgrade,
Regulatory impacts, and identified Technical
and Financial risks/controls/value at risk (VaR)
and proper reporting. Accomplished revenue
increase and reduced operational /maintenance
costs significantly as specifically itemized below.
•Spearheaded the valuation/sale of $2B T&SD
assets, improved $5 billion generation portfolio
performance and developed investment criteria
based on reliability, ROI and market trading
returns including Portfolio Analysis.
•Led as a single point of contact with FERC,
4|Page
MISO, PJM, and MAIN & NERC resolving
regulatory issues/protocol and trained
production staff of 100 increasing plant revenue
by 10%.
•Developed financial/technical plan for an $800
million new Generation and T& S expansion
project including Bank Financing, Procurement
Global Director
2)Siemens /Westinghouse
Jan 1996 - Jan 2001 (5 years 1 month)
Global Supply Management and Business
Development
Led the first Global Supply Division for the entire
SW for worldwide value sourcing of Generation,
all BOP equipment and commodities for new
Power Plants and T&SD. Implemented
Acquisition/Joint Venture (JV) creative supply
plans broadening procurement with drastic
reduction in costs through post- merger
integration. Led a dual role in participating in
new Business Development in these countries
in co-ordination with the regional sales staff and
developing bids with locally sourced quality
equipment/ materials to optimize costs.
Managed staff of 50 direct and 5 indirect reports
in the USA & Worldwide for
Design/Specification/ Alternate Material/QA/QC/
Vendor Selection/Monitoring& Control and on
time Quality Production/ Delivery-Worked with
McKinsey in strategy and Supply Chain
Development and Processes in the US, Mexico,
Europe and Asia.
•Accomplished average annual savings of $170
million on a total procurement budget of $ 800
million.
•Developed strategic supply management
offices in 8 countries, trained staff, and
maintained quality/ Schedule-Developed
Business all over Asia, US and South America
•Performed M&A, valuations/ROI/risk analysis
for JV with 3 firms with savings of $ 30
million/yr.
5|Page
•Participated in five major EPC projects- bids to
Partner
1)Sargent & Lundy
Jan 1973 - Jan 1996 (23 years 1 month)
Managed Business Development,
cost/performance/risk optimization,
budget/finance. Developed New Plant/
Transmission /Substation/ Modernization
projects. Performed due diligence as owner’s
engineer in the US and internationally. Directed
financial and technical Engineering,
Procurement, Project & Construction
management. Progressed from Engineer/Project
Mgr./Associate/Director to Partner.
6|Page
profitable; generated in excess of 20% ROI.
•Commissioned/tested and troubleshot five
plants/ 20 substations during construction
management work, expanding beyond the usual
design scope that created unique opportunities
for the firm and the clients.
7|Page