Name: CALIGIORE CARMELO

Present Position: Construction Manager


Birth Date: 06/08/1956
Gender: Male
Nationality: Italian
Education: Civil Engineer- Informatics Eng.
Master in Marketing & Business

Languages: English, Italian, French

SUMMARY OF EXPERIENCE:

Consortium Site Director Tanjung Bin, Malaysia


Consortium Site Director Maritza, Bulgaria
Consortium Site Director Shoaiba, Saudi Arabia
Site Manager Kuwait, Kuwait
General Manager Sohar, Oman
Site Manager Barka, Oman
Site Manager Castleford, UK & Brindisi Italy
Construction Manager Hanoi, VietNam.
Construction Manager Bandar Abbas, Iran
Construction Manager Augusta & Priolo Italy
Site Manager Basrah, Baiji, Iraq
Mechanical Superintendent Montaldo Di Castro, Italy
Mechanical Supervisor Creys Malville, France
Mechanical Supervisor Riyadh, Saudi Arabia

WORK EXPERIENCE:
From: 2020 till date
BAC HAI VIET NAM. JSC

• Manage worksites for new-construction as well as remodeling projects, coordinating activities and

ensuring that all work is in sync with project goals and objectives
• Provide direction to general contractors, subcontractors, and vendors when doing groundwork to

ensure that quality standards are being met

• Liaise with engineers, architects, and others working on a project

• Prepare and manage estimates, budgets, timetables, and resources

• Identify, mitigate, and track recurring construction issues

• Adhere to legal regulations, building and safety codes, and other requirements

From: 2007 -2020


ALSTOM
CONSORTIUM SITE DIRECTOR

• The Overall management and leadership of Projects


• Development and prioritizing Site Safety Culture and awareness in-line with ALSTOM EHS Road
map during site execution.
• Adhering to ALSTOM standard quality procedures and ensuring proper Project implementation.
• Achieving all major project milestones by strategic execution and management of Cost Control
Program in conjunction with Site Schedule, progress of works and resource drawdown
• Maintaining an intensive Customer relationship and a high level of Customer satisfaction.
• Representation of the company to the Customer and local Authorities.
• Closeout of all Site Subcontracts with fair and proper allocation of costs
Construction Manager – Caligiore Carmelo.doc Page 1 of 7
• Maintaining and enhancing the professional image and reputation of ALSTOM at all times.

Project Name: Tanjung Bin - Malaysia Project


Description: 1.000 MW EPC Turnkey Project Coal Fired Super Critical
With the purpose of achieving the specific Contract objectives and in particular:
i. Managing and coordinating Partners: Mudajaya for Civil scope and Eversendai for mechanical scope
ii. Managing and coordinating Constructability and feasibility erection stage.
iii. Managing and coordinating the preparation of the Project MTS (Master Time Schedule)
iv. Managing Project acceleration proposal to Client- Malakoff
v. Managing Site Project Risks and opportunities
Project Value : 960 Million Euro

Project Name: Maritza East 1 TPP

Construction Manager – Caligiore Carmelo.doc Page 2 of 7


Project Description: 2 x 300 MW EPC Turnkey Project Coal Fired
With the purpose of achieving the specific Contract objectives and in particular:
i. Completion of Outstanding issues, Test’s on Completion, focusing PAC target’s.
ii. Managing Close-out of pending NCR’s, Punch List and FDC’s
iii. Managing Warranty and extensions where applicable.
iv. Managing Project Claims (with Costumer and Insurers)
Project Value : 800 Million Euro

Project Name: Shoaiba Stage#3 Oil Fired SPP – Saudi Arabia


Project Description: 3 x 397 MW EPC Turnkey Project
Project Brief: Shoaibah Stage 3 is a 1,200 MW Oil-fired Power plant located in the eastern part of the
Kingdom of Saudi Arabia. Shoaiba is the largest steam power plant in the Gulf and already consists of 11 x
400 MW units. The further three units now being built will bring the plant’s total generating capacity to 5.6
GW. Due to high growing demand for electricity in the kingdom, the contractual completion dates for the
first two units were mitigated to meet SEC request of electricity production during the summer of year
2011. This challenge was accepted by ALSTOM to show the organization's commitment in supporting the
development of the Kingdom.
Project Value : 2.2 Billion Euro

Project Name: Shoaiba Stage#2 Project Phase 1 & 2. – Saudi Arabia


Project Description: 6 x 370 MW Oil Fired SPP.
With the purpose of achieving the specific Contract objectives and in particular:
i. Completion of Outstanding issues, Test’s on Completion, balance PAC’s and focusing FAC target.
ii. Managing Close-out of pending NCR’s, Punch List and FDC’s
iii. Managing Guaranty Inspections Activities during winter outage period.
iv. Managing Warranty and extensions where applicable.
v. Recovery of Performance Bond
vi. Managing Project Claims (with Costumer and Insurers)
Project Value : 1.8 Billion Euro

From: 2005 to 2006


SGCCC (Suez Global Construction Contracting Company)
GENERAL MANAGER

• Managing and interfacing with Doosan (EPC) for all construction-commissioning and Final Tests
activities, organizing the Project priorities with Engineering and Procurement in Order to achieve
the milestones of the Power & Water Plant Project.

The Process unit includes:


i. Gas Turbines 3 Units Siemens 94.2 (6) and Generators
ii. Steam Turbine 1 Unit Alstom 220MW and Generator
iii. HRSG 3 Units Doosan
iv. MSF Evaporators 4 Units 8.4 MIGD
v. Water Demineralization Unit
vi. Fuel Gas PRT Unit
vii. Fuel Oil Unloading & Forwarding Station

The Plant facilities include but are not limited to:


i. Tanks (Fire Water, Service water, Demi-water, Fuel oil)
ii. Waste Water Treatment Unit
iii. Steam Condenser Unit
iv. Auxiliary and Step-up Transformers
v. Plant buildings (Control, Demi-water, Administration)
vi. Other Interface Facilities with Port and Ministry Authority

Location: Sultanate of Oman Sohar (Client S.P.C Owned By Suez)


Project : Power Comb. Cycle 585 MW & 33 MIGD Water, approx. value US$ 450 million

Construction Manager – Caligiore Carmelo.doc Page 3 of 7


2004
ENEL / BLNG (Company shared, 50% from Enel & 50% from British Gas)
SITE MANAGER

• In charge of the Technical Evaluation for the EPC selection, construction-commissioning activities
and Team member for Permits development V/s Italian Authorities during the FEED, Soil
Investigations and start of detail Engineering.

The Process Unit included:


i. Land Reclamation 180.000 square meters
ii. One jetty 500 m long
iii. Two LNG Tanks 160.000 cm capacity
iv. Regasification Train 8 bcma Capacity

Location : Italy Brindisi


Project value approx. : US$ 500 million

From: 2001 to 2003


ENELPOWER S.P.A
SITE MANAGER

• Managing all construction and commissioning activities and coordinating the entire mechanical,
civil, electrical and instrumentation disciplines for organizing the job priorities in order to achieve
the milestones of the Power Plant Project.

The Process unit includes:


i. Gas Turbines 2 Units Ansaldo 94.2 and Generators
ii. Steam Turbine 1 Unit ABB 220MW and Generator
iii. HRSG 2 Units Ansaldo
iv. MSF Evaporators 3 Units 8.4 MIGD Hitachi
v. Re-mineralization Plant
vi. Water Demineralization Plant
vii. Fuel Gas PRT Unit
viii. Fuel Oil Unloading & Forwarding Station

The Plant facilities include but are not limited to:


i. Tanks (Fire Water, Service water, Demi-water, Fuel oil)
ii. j. Waste Water Treatment Unit
iii. k. Steam Condenser Unit
iv. l. Auxiliary and Step-up Transformers
v. m. Plant buildings (Control, Demi-water, Administration, Workshop Etc…)
vi. n. Other Interface Facilities with Ministry Authority

Location : Sultanate of Oman (Barka Power and Desalination Project )


Project value approx. : US$ 400 million

From: 1999 to 2001


ENELPOWER S.P.A
SITE MANAGER

• Managing all activities and coordinating the entire mechanical, civil, electrical and instrumentation
disciplines, organizing the job priorities in order to achieve the milestones of the Power Plant
Project.

The Process unit included :


i. HRSG 1 Unit CCGT & NE
ii. Gas Turbines 1 Unit GE Frame 6 & Generator
iii. Steam Turbine 1 Unit 70 MW & Generator

Construction Manager – Caligiore Carmelo.doc Page 4 of 7


iv. Water Demineralization Plant
v. Fuel Gas PRT Unit
vi. Fuel Oil Unloading & Forwarding Station

The Offsite Unit included:


i. Water Intake
ii. Tanks (Fire Water, Service water, Demi-water, Fuel oil)
iii. Waste Water Treatment Unit
iv. Steam Condenser Unit
v. Auxiliary and Step-up Transformers
vi. Plant buildings (CCR – Substation – Demin)

Location : United Kingdom (CHP Plant, H&W - Castleford)


Project value approx. : US$ 120 million

From: 1998 to 1999


SNAMPROGETTI S.P.A
CONSTRUCTION MANAGER

• Supervising and coordinating the entire mechanical, civil, electrical and instrumentation disciplines,
organizing the job priorities to achieve the targeted milestones of the Project.

The Process unit includes:


i. Condensate Distillation Unit 1 & 2
ii. Naphtha Stabilizer Unit 1 & 2
iii. Kerosene Sweetening Unit 1 & 2
iv. LPG Amine Treating Sweetening Unit
v. Fresh Caustic and Fuel Gas Unit
vi. LPG Dehydration Unit

The Offsite Unit includes but not limited to:


i. Tanks Farms (MTBE, LGO/HGO, GASOIL, CONDENSATE NAPTHA, KEROSENE)
ii. Hydrocarbon Flare Unit
iii. Waste Water Treatment Unit
iv. Sea Water Intake Unit
v. Jetty Unit
vi. Other Common Facilities Unit

Location : UNITED ARAB EMIRATES Ruwais Expansion Refinery


Project value approx. : US$ 750 million

From: 1995 to 1998


SNAMPROGETTI S.P.A
CONSTRUCTION MANAGER

• Management of all discipline construction team, sub-contractors and vendors involved in


construction, pre-commissioning and commissioning activities including checking and monitoring
the progress status of fabrication, assembling, erection and final tests under quality assurance
programs.

The Process Unit included:


i. Hydro-cracker Unit
ii. Hydrogen Unit
iii. Topping and vacuum distillation unit
iv. De-sulfur unit
v. Asphalt Unit

The Offsite Unit included:

Construction Manager – Caligiore Carmelo.doc Page 5 of 7


i. 3 Units 30 MW Gas turbine Frame 5 comb. cycle & HRSG
ii. MSF Desalination Plant 25 MIGD
iii. 2 Units Auxiliary and Waste Heat Boilers
iv. Water Treatment Plant
v. Sea Water Intake Unit 40 MIGD

Location : IRAN (BANDAR ABAS REFINERY PROJECT)


Project value approx. : US$ 2 Billion

From: 1994 to 1995


SNAMPROGETTI S.P.A
CONSTRUCTION MANAGER
Location : Augusta, ITALY
Project value approx. : US$ 75 million

• “TURNAROUND FCCU.ALKY.LUBE” for Major shutdown & maintenance works of the plants in “ESSO
ITALIANA” Factory of Augusta
• Detailed engineering of storage Tanks and Transfer lines for the implementation of a new
Propylene Oxide Plant in Enichem (SR)
• Execution of detailed engineering revamping of piperack for new control room of FCCU-
VISBREAKING-VACUUM plants at Praoil / Agip Priolo ( local, surveys, sizing, bulk materials, final
check)

From: 1993 to 1994


SNAMPROGETTI S.P.A
CONSTRUCTION MANAGER
Location: Priolo, ITALY

• In PRAOIL Factory Priolo (SR) with PROIND Local general contract.


• Check the feasibility studies relevant to modifications, implementations and revamping of PRAOIL
existing plants.
• Routine Shutdown and maintenance works relevant to machineries, piping, equipment, structures,
painting and insulation.

From: 1990 to 1993


SNAMPROGETTI S.P.A
CONSTRUCTION MANAGER
Location: Priolo, ITALY

• In PRAOIL for maintenance, revamping and scheduled Major shutdown of plants in Enichem and
Montedipe – Priolo (SR)

From: 1978 TO 1990


FOCHI S.P.A

SITE MANAGER
Location : BASRAH, IRAQ

• Execution of a Water Treatment Plant as per EDR IONICS process and Water Intake Plant.
Assembling , erection and commissioning of 2 (Two) Macchi Boilers (HRSG type).

CONSTRUCTION MANAGER
Location : BAIJI, IRAQ

• Construction of Fertilizer No. 4 Ammonia / Urea plant in Baiji Iraq (Kellogg process)

MECHANICAL SUPERINTENDENT

Construction Manager – Caligiore Carmelo.doc Page 6 of 7


Location : MONTALDO DI CASTRO (ITALY)

• Responsible for Outside Reactor and Auxiliary building in Nuclear power plant ( Ansaldo Project)

CONSTRUCTION MANAGER
Location : Riyadh, SAUDI ARABIA

• Construction Manager for the implementation of the bulk plants in Riyadh airport and Riyadh town

MECHANICAL SUPERVISOR
Location : Creys Malville, FRANCE

• Mechanical supervisor for Nuclear Power Plant of Super-Phoenix in Creys Malville (Nira – Ansaldo)

MECHANICAL SUPERVISOR
Location : Riyadh, SAUDI ARABIA

• Mechanical Supervisor for Pump Station Division No. 3 in Saudi Arabia

MECHANICAL SUPERVISOR
Location : Priolo & Augusta, ITALY

• Mechanical Supervisor for Plant Expansions in Esso Augusta and Montedison Priolo (SR)

Construction Manager – Caligiore Carmelo.doc Page 7 of 7