Post control are applied after the fact A good control system :
Directed toward improving the chance for future projects o Should be flexible
meet their goals o Should be cost effective
It is applied through a relatively formal document that o Must be truly useful
contains four distinct sections : o Must satisfy the real needs of the project
o The project objectives o Must operate in a timely manner
o Milestones, checkpoints, and budgets o Sensors and monitors should be sufficiently accurate and
o The final report the project precise to control the project within the limits that are
o Recommendations for performance and process functional for the client and parent organization
improvement
A good control system All control systems use feedback as a control process
o Should be as simple as possible The control of performance, cost, and time usually require different
o Should be easy to maintain input data :
o Should be capable of being extended or o Performance – engineering change notices, test result,
otherwise altered quality checks, rework ticket, scrap rates
o Should be fully documented when installed o Cost – budget to actual cash flows, purchase orders,
The documentation should include a absenteeism, income reports, labour hour charge,
complete training program in system accounting variance reports
operation o Schedule – benchmark report, status reports, PER/CPM
networks, Gantt charts, WBS , and action plans
Amalan-amalan terbaik dan kunci-kunci kepada Control as a function of management
kejayaan
The purpose of controlling is always the same : to
• Terdapat empat kawasan utama ditemui untuk bring the actual schedule, budget, and deliverable
membantu projek dalam pertubuhan-pertubuhan of the project into reasonably close congruence
with the planned schedule, budget, and
fungsian :
deliverables
o Promosi faedah-faedah pengurusan projek The job of the project manager is to set controls
that will encourage those behaviours that are
o Tepukan kakitangan untuk kemahiran-kemahiran deemed desirable and discourage those that are
pengurusan projek dan projek-projek risiko tinggi not
bonus terus, opsyen saham, dan insentif-insentif lain
o Kaedah