KEY PLAN:

GOLF
310

DISTRICT
GDW-01
GOLF

580.326
COURSE

WEST
213593.8
GCR-01
RESIDEN
06
TIAL

T 1/6 R50
T 1/6 R50

RESIDENTIAL
WFR-03
WATERFRONT
212097.142

T 1/6 R50
T 1/6 R50

WATERFRONT092.967
211
WFR-02
RESIDENTIAL
GSD-03 DISTRICT
T 1/6 R50

GOLF
GSD-03
030.712
612

GOLF
T 1/6 R50

611GDS-02
DISTRICT
233.550

T 1/6 R50

FOX
412
FXH-05
HILLS
321.987

WATERFRONT
210046.655
WFR-01
RESIDENTIAL
GOLF
610 DISTRIC

GDS-01
485.738
T

T 1/6 R50

R50
1/6
T
EDUCATION
510 844.130
EDD-03
MEDICAL

DISTRICT
312 728.251

MEC-01
DISTRICT
T 1/6 R50

R50
1/6
T
T 1/6 R50

T 1/6 R50

FOX
411
FXH-04
HILLS
843.970
T 1/6 R50

DISTRICT
EDUCATION
EDD-02
313 342.335

TCL = 10266 kVA

WATERFR
TCL = 10345kVA

112 WFC-04
ONT
416.575
T 1/6 R50

COMMER
T 1/6 R50

CIAL
411

FOX
FXH-03
337.899

HILLS
MDL = 6522 kVA

05R 6/1 T
MDL = 6554 kVA
SS.40477 (DISTRIBUTION SS)

EDUCATION

T 1/6 R50
314 176.193
EDD-01

05R 6/1 T
DISTRICT
SS.40474 (DISTRIBUTION SS)

WATERFRONT
111 799.483
WFC-03
CENTRAL

810 000.000

COMMERCIAL
PZC-01
PZC-01
PLAZA
NORTH
BLN-01
BOULEVARD
810 921.731

T 1/6 R50

T 1/6 R50
410 850.520

FOX HILLS
FXH-02
NORTH
BLN-02
BOULEVARD
264.678
811

810 911.858
BLS-01
SOUTH
BOULEVARD

T 1/6 R50
811 254.805
T 1/6 R50 BLS-02 SOUTH
BOULEVARD

T 1/6 R50
T 1/6 R50 T 1/6 R50

05R 6/1 T
05R 6/1 T

T 1/6 R50
T 1/6 R50

R50
1/6
T

WATER
T
1/6
R50
T
6/
1
05R 6/1 T

05
R
T 1/6 R50

FRONT
111
WFC-02

COMME
196.254

RCIAL
05R 6/1 T

410 355.752

FOX HILLS
FXH-01
TCL = 5736 kVA TCL = 4609 kVA TCL = 5400 kVA

05R 6/1 T

WATERF
ENERGY

RONT
512 678.033
EC2-01

110

WFC-01

COMME
786.935
CITY

RCIAL
MDL = 3631 kVA MDL = 2923 kVA MDL = 3428 kVA

QATAR
ENTERTAINMEN
110

QEC-02
231.879

T CITY
NOTES:
- THE LOCATION OF PRIVATE SUBSTATIONS ARE
INDICATIVE ONLY. THE EXACT LOCATION SHALL BE
FINALIZED DURING RESPECTIVE BP PROCESSING.
- ALL 11KV CABLES ARE 3C-300mm² XLPE+ FO CABLES.
THE 3C-300mm² CABLES ARE LAID AT A SPACING OF
50CM THUS REDUCING THE CURRENT CARRYING
CAPACITY TO THAT OF 3C-240mm².
- IN ALL SECONDARY SUBSTATION FEEDER BREAKERS
SHALL BE PROVIDED WITH DIRECTIONAL
OVER CURRENT AND DIRECTIONAL EARTH FAULT
PROTECTION (TYPE4).
- THE LOCATION OF ALL ELECTRICAL EQUIPMENT SUCH
AS FEEDER PILLAR, KWHR METER, SERVICE CABINET,
TCL = 9770 kVA TCL = 9934 kVA
MDL = 6206 kVA MDL = 6304 kVA MINI PILLAR ETC, ARE INDICATIVE ONLY. THE EXACT
SS.40476 (DISTRIBUTION SS) SS.40473 (DISTRIBUTION SS) LOCATION WILL BE AS PER THE AS-BUILT DRAWINGS.
TCL = 5392 kVA TCL = 4378 kVA TCL = 4830 kVA TCL = 5104 kVA - IN CASE DETAILS/ MATERIALS ON THE DRAWINGS
MDL = 3434 kVA MDL = 2772kVA MDL = 3066 kVA MDL = 3238 kVA
CONTRADICT WITH KM STANDARDS AND
SPECIFICATION, THEN THE LATER SHALL PREVAIL.
- COMPLETE DISTRIBUTION DESIGN RESPONSIBILITY TO
THE INFRASTRUCTURE CONSULTANT.
- CLIENT TO APPOINT A KM APPROVED
CONTRACTOR TO EXECUTE WORK AT SITE.
- TARIFF METERING FOR ALL LUSAIL PROJECTS ARE AT
THE LV SIDE, EXCEPT OTHERWISE STATED.
- LV CABLES ARE LAID AT A SPACING OF 40CM.
- ALL PERMANENT SECONDARY SUBSTATIONS ARE
INDOOR TYPE.
- ALL 11KV SWITCHGEARS SHOULD BE KM STANDARD
WITH 31.5 KA/3SEC FAULT RATING.
- THIS SCHEME IS SUBJECT TO ALL CONDITIONS
MENTIONED IN THE APPROVAL LETTER REF.NO.
EP/MO/3378/2023. DATED: 24-09-2023.
- ALL DISTRIBUTION SUBSTATIONS ARE STANDARD
DOUBLE INDOOR TYPE WITH 4x 1600 KVA OIL TYPE Tx,
4x 6W FSFP, WITH NATURAL VENTILATION,
STANDALONE AT GROUND FLOOR.

INFRASTRUCTURE PROJECT.
TCL = 10245 kVA TCL = 10717 kVA ALL MATERIAL & LABOR BY CLIENT.
MDL = 6524 kVA MDL = 6824 kVA ALL COST TO CLIENT. NO COST TO KM.
SS.40472 (DISTRIBUTION SS) SS.40467 (DISTRIBUTION SS)
TCL = 5185 kVA TCL = 5060 kVA TCL = 5271 kVA TCL = 5446 kVA
MDL =3312 kVA MDL = 3212 kVA MDL = 3355 kVA MDL = 3469 kVA * A DIVERSITY OF (0.8x0.8) IS APPLIED
FOR TRANSFORMER SIZING PURPOSE.
2023 10:28

LUS-CP28B-QDSBG-DWG-EL-01303-001
3O
:T
L
LUSAIL 4-415-2023 4-415-2023-P5-P7.

TCL = 12029 kVA


TCL = 11273 kVA MDL = 7640 kVA

SS.40469 (DISTRIBUTION SS).


MDL = 7254 kVA SS.40470 (DISTRIBUTION SS)
TCL = 6357 kVA TCL = 5672 kVA
TCL = 5973 kVA TCL = 5300 kVA MDL =4044 kVA MDL = 3596 kVA
MDL = 3780 kVA MDL = 3474 kVA

SUPPLY TO HUZOOM DISTRCIT PHASE 1


IN LUSAIL CITY
S

11KV SCHEMATIC OF S/S 40467 40469 40470


01 R

40472 40473 40474 40476 & 40477


AN/SSS 26-09-2023 N.T.S
YA HW

AA For/ MM
4-415-2023
CAD R :

ZONE: 69

0 5/158

IN CO-OPERATION WITH ALL GIS AGENCIES