CP07-B Lusail Plaza Infrastructure, LRT Station, Public Car Parks and Landscape, Lusail, Qatar

Underground Utilities Bedding and Surround Checklist Contract No.: 5297

Location: Road E14 Date: 19/06/2021

Type of Utilities Telecom Drawing Ref:


Formation level for Telecom Line From TEL
Description: Material Ref. No. INR-SUR-85496
manhole TEL-024 to TEL-039 at West Road E14
Temporary Work Team
# Inspection Acceptance Criteria Remarks
Accepted Rejected

1. Material on site has been inspected and Tested

Trench formation Level has been cleaned


2.
inspected /approved
Check if geotextile has been laid properly and
3.
required overlapping maintain

4. Check thickness as required

5.
Check Foreign materials has been removed

6. Check if the bedding is being done levelled and


compacted (if required)
7. Check if the surround is being done levelled and
compacted (if required)
8.

9.

Comments:

Status -> Approved ☐ Approved with comments ☐ Revise & resubmit ☐


Company Construction Dept. QDSBG Quality Consultant

Sign

Name Rakan

Date

CP07B-F632-Rev.0-Apr-19 Page 1 of 1 QA/QC Department


1 2 3 4 5 6 7 8

LUS-CP7B-QDSBG-SDW-TL-72770-014
FOR CONTINUATION REFER TO DWG. NO.

N=406957.386
E=229023.931
CP7B-TEL-020 N=406966.587
G
IL=+2.00QND E=228972.184 IL=+1.40QND 05
2 WAYx96.5mm (12M) N=406957.606

CP7C-1B

CP07B
IL=+2.20QND E=228973.257
N=406953.085 E=229025.337
IL=+2.00QND N=406959.973
IL=+1.50QND
E=228976.408
N=406950.770
6 WAYx96.5mm (30M) IL=+2.00QND 6 WAYx96.5mm (78M)
OVERALL COORDINATION DWG REF:
COMPOSITE UTILITIES LAYOUT PLAN DWG NO
LUS-CP7B-QDSBG-SDW-UT-75070-006(REV-0)
E=229027.843

ROAD F3
F N=406948.188
X-021 IL=+1.50QND
E=229029.150
IL=+2.0522QND N=406940.103
MH SHIFTED IL=+1.50QND
CP7B-TEL-021 E=229029.873
N=406935.632
IL=+1.50QND
IL=+2.058QND
E=229030.802
6 WAYx96.5mm (38M) N=406931.263
IL=+0.90QND
PTZ

RWIS

E E=229030.994
N=406927.475 X-025 E=229135.284

0+200
IL=+0.90QND E=229036.897 N=406914.398
E=229033.957 N=406907.589 IL=+1.30QND
X-022
N=406913.453 CP7B-TEL-025
TIP-D-TN-0106 E=228987.095
IL=+0.90QND E=229036.434
E=228974.570 N=406890.690 E=229071.418
E=229034.527 N=406906.241
CP7C-1B

IL=+1.86QND N=406901.400
CP07B

N=406895.406 N=406910.895 E=229037.462


IL=+2.003TOPQND E=228988.671 IL=+1.10QND E=229123.674
IL=+0.90QND N=406904.095
N=406890.539 N=406912.549
TIP-D-TN-0066 E=229035.821 IL=+1.20QND E=229073.092 KEY PLAN
IL=+1.90QND IL=+1.458QND IL=+1.30QND
E=228960.070 N=406901.520

FOR CONTINUATION REFER TO DWG. NO.


N=406908.071

LUS-CP7B-QDSBG-SDW-TL-72770-020
1
CP05B

CP7B

E=229118.001

CP7B

CP07A1B
CP05B

CP7B

CP02N

CP7B
N=406885.898 TIP-D-TN-0063 E=229041.282

CP02N

CP7B
IL=+1.90QND IL=+1.10QND 2

C.8a. HOT
20676 m2
E=228989.984 N=406902.084 N=406910.363 3

11156 m2
C.13.OS

C.14. OS
9857 m2
CP7B
CP02N

C.6c. COF
6206m2
CP7A1B
CP7B
CP7B
CP02N

OUT

IN
X-035

OUT
IN
GENERATOR
7
A

ROOM

11471m2
ESS1

C.7. MIX
IN

OUT
IN
ROOM
ELECTRICAL
MAIN 6 A

ESS1
4
B

BATTERY
A

TRANSFORMER

ROOM

CENTRAL

UPS
ROOM
5

&
4

ESS1

CP7B ESS1

CP7A1B
UP

3
A

200
FM
ESS1

ROOM 1
MV A

ESS1

TELECOM
2
A

ESS1

C.6b. COF
5977m2
C.6a. COF
9
4 A

TELECOM
ESS2

6280m2
IL=+1.30QND
A

FM200
ESS2
5

6
MV A

ROOM
ESS2

CENTRAL
BATTERY
3
A

TRANSFORMER
ESS2
7
B
ROOM

OUT
IN
ESS2
200
FM

ELECTRICAL
MAIN 2
A

ROOM

OUT
ESS2

IN
IL=+1.20QND

GENERATOR
A

ROOM
N=406890.775
ESS2
1

8
CP07A1B

CP7B

CP07A1B

CP7B

2 WAYx96.5mm (20M)
CP02N

6
CP7B
CP02N
CP02N
CP7B
CP7B

CP02N

CP7B

E=229074.087 5

CP7C-1B

CP7B
10
11

CP7C-1B

CP7B
6 WAYx96.5mm (49M)
12

CP7C-1B

CP7B
E=229043.583
13
A

CP7C-1B
17

CP7B
16

CP7C-1B

CP7B
N=406901.986

CL
15
B
REFER TO RC-017A A B
14 18

CP7C-1B

CP7B
E=229115.184
19

CP7C-1B

CP7B
20

N=406901.590 21

CP7C-1B

CP7B
CP7B

CP07A1A

D
CP7B

CP07A1A

CP7B
CP7C-1B
C

A
ROOM ESS3
7

22
GENERATOR

6
A

MAIN
ROOM

ESS3
ELECTRICAL

TRANSFORMER
6a A 3
ROOMESS3

ROOM AND
UPS 5 ESS3

CENTRAL

BATTERY
A

TELECOM
2 ESS3

A 4

200
ESS3
FM
1
A

ROOM

ESS3
MV

CP7B

CP02S
CP7B

CP02S

CP7B

E A
CP02S

CP7B-TEL-035

CP7C-1B
G C

CP7B
CP7B

CP02S

N=406910.677

E
D
IL=+1.20QND
23

6 WAYx96.5mm (30M)

CP7B
CP02S

CP02S

CP7B
24
H F D B

F
E=229050.128 E=229075.458 IL=+1.30QND 25

CP7A1A
CP7B

CP7A1A
CP7B
26

N=406897.529 N=406901.765

CP7A1A
CP7B
05
27

CP7A1A
CP7B
CP7B
CP02S
SECTION - F

CP7B
CP02S
REFER TO RC-017
CP7B

CP07A1A

IL=+1.10QND

CP7B
CP07A1A

IL=+1.70QND CP7B-TEL-022 1 WAYx96.5mm (12 M)


A B
REF-DWG-LUS-CP7B-
E=228986.876 REFERENCE DRAWINGS

N=406889.320
QDSBG-SDW-TL-72773-040 DRAWING NO. TITLE
TSC-CP07-B/04
FORTRAFFICSIGNAL C D
IL=+1.70QND E=229093.194
QDSBG-SDW-TL-72773-040

CONTROLLER 6 WAYx96.5mm (37M)


N=406906.155
TIP-D-TN-0064
E=229062.039 IL=+1.10QND E=229132.780
REF-DWG-LUS-CP7B-

E=228987.260
A B N=406899.398 N=406914.435
N=406890.093 1 WAYx96.5mm (46M) E=229080.850
REFER TO RC-020 IL=+1.10QND IL=+1.30QND
IL=+2.005TOPQND N=406903.609
SECTION -G

E=229059.282 6 WAYx96.5mm (63M)


C
6 WAYx96.5mm (62 M) IL=+1.10QND Certified for co-ordination with contract documents (QD-SBG)
N=406897.920
QDSBG-SDW-TL-72773-040

ARCH CV/ST TEL/MV/SSD ELEC. PL&FF HVAC


SIGN SIGN SIGN SIGN SIGN SIGN
IL=+1.10QND E=229077.556
IL=+1.346QND
E=229052.129 N=406902.469
REF-DWG-LUS-CP7B-

DATE DATE DATE DATE DATE DATE


REFER TO RC-020A 21-09-2020 21-09-2020 21-09-2020 21-09-2020
N=406896.410 IL=+1.10QND
IL=+1.10QND IL=+2.2QND 5 ISSUED FOR APPROVAL 21-09-2020 JTG

6 WAYx96.5mm (58M)
ROAD E14 4 ISSUED FOR APPROVAL 31-03-2020 B JTG
SECTION -H

3 REVISED AS PER COORDINATION 08-10-2019 B JTG

0+100 2 REVISED AS PER CLOUDED 23-01-2019 B JTG


IL=+2.1QND 1 REVISED AS PER CLOUDED 26-11-2018 B JTG
REFER TO RC-018
0+000 X-024
E=229056.791 X-039 0 ISSUED FOR APPROVAL 09-09-2017 B M.K.

No. REVISION DATE STATUS APP.


TIP-D-TN-0067 C D N=406857.561 CP7B-TEL-038 CLIENT
Lusail Real Estate Development Co
E=228969.77 CP7B-TEL-024 E=229095.4409 Doha, State of Qatar
N=406862.7201 8 WAYx96.5mm (35M) CP7B-TEL-039
N=406840.11 E F
E=229058.161 PROJECT MANAGEMENT CONSULTANT
X-038
N=406857.340 E=229096.5876
B E=229088.766 E=229092.680
6 WAYx96.5mm (35M) G H
N=406863.928 N=406862.250 N=406863.5026 SUPERVISION CONSULTANT

E=229060.1135
N=406857.7895 IL=+1.70QND IL=+1.70QND E=229101.6646
IL=+1.58QND 6 WAYx96.5mm (43M) N=406864.3430 CONTRACTOR
J

A
I IL=+1.875QND

B
C D DESIGNER

C D
IL=+1.71QND

E F
IL=+1.721QND
CP7B-TEL-023 2 WAYx96.5mm (13M)
E=229001.215 IL=+1.34QND E=229059.5970 E=229094.9376 REFER TO RC-021 MEP SUB-CONTRACTOR
OMEGA ENGINEERING WLL
IL=+1.721QND N=406834.987 N=406853.4521 N=406860.8197 (MEP DIVISION)
PO BOX: 37951,DOHA, QATAR

IL=+1.80QND 2 WAYx96.5mm (10M) PH: 40054222, FAX: 40061694


IL=+1.80QND Email: info@omegaqatar.com
Web: www.omegaqatar.com

E X3 X1 C A E=229053.1843 2 WAYx96.5mm (14M) PROJECT

IL=+1.721QND IL=+2.1QND DESIGN & CONSTRUCTION OF CP-07B


F X4 X2 D B N=406850.2807 LUSAIL PLAZA INFRASTRUCTURE, LRT
REFER TO RC-019 8 WAYx96.5mm (47M) E=229075.5569 STATION, CAR PARK AND LANDSCAPE.
IL=+1.60QND
N=406861.0900 CP07B CP07B DRAWING TITLE
A X-023 6 WAYx96.5mm (14M)
CP7C-1B

IL=+1.413QND TELECOM DISTRIBUTION NETWORK PLAN


CP07B

E=229001.973 X-097 SHEET ( 21 OF 27 )


N=406833.823 E=229050.2891
IL=+1.10QND N=406844.1341
CP02S CP02S DRAWN: SHA DESIGNED: SHA SCALE @A1

1:250
CHECKED. J.T.G APPROVED: J.T.G

1 METER EXCAVATION OFFSET TO BE PROVIDED AROUND MANHOLES' BLINDING AS A WORKING SPACE SHOP DRAWING DATE: 21-09-2020

DWG NO: SHEET No. Rev


LUS-CP7B-QDSBG-SDW-TL-72770-021 21 of 27 5
1 2 3 6 7 8
NOTES:

07

07

KEY PLAN
CP07B
CP05B

CP07B

CP07A1B
CP05B

CP07B

CP02N

CP07B
CP02N

CP07B
2

C.8a. HOT
20676 m2
3

11156 m2
C.13.OS

C.14. OS
9857 m2
CP07B
CP02N

C.6c. COF
6206m2
CP07B

CP7A1B
CP07B
CP02N

OUT

IN
SUBSTATION 1
@ GRADE

OUT
LEVEL IN

GENERATOR
A

11471m2
ROOM

UNDER GROUND FUEL TANK


ESS1
7

C.7. MIX
F.R.L.
+0.00

IN
MM
DWGS. X 4000

OUT
6000

IN
ELECTRICAL

TO LOUVERS
MECH.
A

EXHAUST
MAIN
ROOM

DWGS
REFER
ESS1

MM
6

STRUCTURAL

4000
CONCRETE PAD

DWGS.6000 X
TO

TO LOUVERS
REFER

T.O.S.
+0.35

MECH.
GENERATOR
A

TRAP
ROOM
T.O.S.

REFER
SAND
+0.15

7
ESS1

mm DEPTH

STEEL LADDER
DWGS.
TRANSFORMER

1500
TO ELEC.
ELEC TRENCH
B
5

&CENTRAL
BATTERY
A
4

ROOM

ROOM
UPS

REFER

ELECTRICAL
CP07B
ESS1 ESS1 A
6

ROOM
MAIN
CP7A1B
ESS1 T.O.S.
+0.15

UP
A
3 F.R.L.
+0.00

FM 200

TRANSFORMER
ESS1
A B
5

ROOM

ROOM
TO

T.O.GR. T.O.S.
+0.40
MV

REFER
TELECOM
1 A ESS1

CENTRAL
BATTERY
A

UPS

ROOM
MM
ESS1

+0.25
X 800
2

LIMITS

&
4

8
A

STRUCTURAL DWGS
2100
ESS1

TRANSFORMER

ESS1

200
PAD

FM
REFER TO ELEC. DWGS
ESS1

CONCRETE

LADDER
T.O.CU

T.O.S.
+0.40

STEEL
+0.15

PROVISIONAL
T.O.S.
+0.15

FM 200
UP

A
3

ESS1
A

ROOM

T.O.CU
+0.15
MV

TELECOM
1
ESS1
T.O.S.
+0.40 A

ESS1
9

ELEC TRENCH 1500*1500

DWGS.
ELEC.
+0.00 F.R.L.

TO
REFER
67

C.6b. COF
65

5977m2
63 66
61
64 CF

C.6a. COF
A 59 62 N36

TELECOM
57

6280m2
ESS2 4

CE

FM200
5 A

55

ESS2
A A 53 60

TELECOM
ROOM
58

MV
6 ESS2

4
ESS2
51 56 N35 CD

A
7 8

FM200
5

49 N37

ESS2
A

CENTRAL
BATTERY
ESS2

52 54 N38

3
B

ROOM
47 CC

OUT
ESS2
7
TRANSFORMER A

IN
ROOM
N39

MV
ESS2 6 T.O.S.
+0.40

200 45 50 UP
48

ELECTRICAL

FM
SUBSTATION 2

MAIN
ROOM A
2 A
3 T.O.S.
+0.40

43

CENTRAL
BATTERY

TRANSFORMER
ESS2

+0.00

OUT
ESS2 B F.R.L.

IN
41 46

+0.40

ROOM
T.O.S. ESS2

7
@ GRADE

GENERATOR
1 A +0.25

N34 CB

T.O.GR.
ROOM
ESS2

39 LEVEL 44

ELECTRICAL

ROOM
CP07A1B

MAIN
37 CA

+0.15
A
2

ESS2

T.O.S.
35
+0.35 T.O.S.

42 CP07B

GENERATOR
ROOM A
1

40

ESS2
T.O.S.
+0.15

33
38 AA

+0.15
F.R.L.

31 36 CP07A1B
29
27 34 CP07B N33 AB
32
30
28 AC
26
AD
N28 N32

AE
N27 N31

5 6
CP02N
AF
3
CP02N CP07B PLOT N26
CP02N TOWER AG
CP07B
CP07B
N25 AH
CP02N

CP07B N24 AJ
AK
N23

CP7C-1B

CP07B
AL

0
N22
AM
N21

11 1
N20
AN

AP
N19
3 AR
PLOT N15 N17
N18
TOWER
AS
N16
N13
N14

D
AT

CP7C-1B

CP07B
N11 AU

N9 N12

13 12
AV
N10
AW
1
PLOT N7
TOWER
N8 AX
STORM WATER N3 UP
1 BA
PLOT PUMPING N1 N6
TOWER STATION N5

CP7C-1B

CP07B
LEVEL -2 N2 N4 BB

BC

7
BD
BE

16 1
BF

CP7C-1B

CP07B
BG

BH

N 407102272.843
BJ
E 229005122.205

BK

BL

CP7C-1B

CP07B
LRT BM

CL
S5 BN
STATION S7
S9
Plant Room BELOW S1 S11
S3 BP
GRADE LEVEL S20
S8 BR

14
S10 S14 S21
S2 S4 S6 S16
S13 BS
S12

18
S15 BT
S17
BU
S18 S19
BV
S21

N 407081935.589
4 S20 BW
E 229002033.940 PLOT

9
TOWER S22 S23 BX

1
S24 DA

CP7C-1B

CP07B
DB
S25
4
PLOT

21 20
TOWER S26 DC
DD
2 S27
PLOT
TOWER S28 DE

CP7C-1B

CP07B
2
PLOT DF
TOWER

FIRE FIGHTING

6
67
PUMPING 65
STATION 63
LEVEL -1 61 66
59 64
57

CP7C-1B

CP07B
62
55 60
53 58
51 56
49 54
CP07B
47 52
45
CP07A1A
50
43 48
41 46
39 44
CP07B 37 42

22
CP07A1A
35 40
33 38
31 36

CP7C-1B

CP07B
29 34
27 32
25 30

TANK

FUEL
GENERATOR
A
7
ROOM ESS3

GROUND
28

UNDER
26

F.R.L.
+0.00
F.R.L.
ELECTRICAL
A
6 +0.00 A

ROOM

ESS3

GENERATOR
MAIN 7
ROOM ESS3

+0.15

T.O.S.
T.O.S.
+0.35

TRANSFORMER

LADDER

STEEL
6a

B
3
ROOM ESS3

CENTRAL A
ROOMESS3
5

BATTERY
AND

T.O.S.
UPS +0.15 F.F.L.

+0.150
TELECOM
A
2

ELECTRICAL
A
6

ROOM
ESS3

ESS3
A
4 MAIN

FM 200
ESS3

A B

DEPTH

TO
mm

REFER

TRANSFORMER
ESS3
1

1500
ROOM
MV A ROOM ESS3
3

TRENCH

MM
DWGS.

800

T.O.GR.
ELEC.

X
TO

ELEC

2100
BATTERY
REFER 5
ROOM
UPS
ESS3 +0.25 A

PAD
CENTRAL

TELECOM
CONCRETE
AND
DWGS

A +0.15 T.O.S. ESS3

2
DWGS.
T.O.S. STRUCTURAL +0.15

CP07B

ENCLOSURE

MECH.
10
FM 200 ESS3

TO
MECHANICAL
200x200mm

T.O.S.
REFER
4 A +0.15 F.R.L.
+0.00

200
ESS3
FM
CP02S
CP07B
A T.O.S.

SUBSTATION 3

ROOM

+0.40
1
MV ESS3

200x200mm
@ GRADE

ENCLOSURE
CP02S

MECHANICAL
DWGS.
MECH.

DWGS.
TO
REFER

ELEC.
F.R.L.

1500*1500

TO

REFER
+0.00

TRENCH
LEVEL

ELEC
CP07B

CP02S

CP7C-1B

CP07B
CP07B

CP02S

23

CP07B
CP02S
24

CP02S

CP07B
25

CP7A1A
CP07B

CP7A1A
CP07B
26

CP7A1A
27

CP07B

CP7A1A
CP07B
CP07B
CP02S

CP07B
CP02S
CP07B

CP07A1A

CP07B

CP07A1A

REFERENCE DRAWINGS
DRAWING NO. TITLE
TELECOM DISTRIBUTION NETWORK
LUS-CP7B-QDSBG-SDW-TL-72779-001 Rev.01
MASTER LAYOUT

WF:148365 Certified for co-ordination with contract documents (QD-SBG)


ARCH CV/ST TEL/ELV/SSD ELEC. PL&FF HVAC
SIGN SIGN SIGN SIGN SIGN SIGN
C
DATE DATE DATE DATE DATE DATE
21-09-2020 21-09-2020 21-09-2020 21-09-2020

7 ISSUED FOR APPROVAL 21-09-2020 JTG

7B
6 ISSUED FOR APPROVAL 31-03-2020 B JTG
MANHOLE DETAILS ADDED
5 03-12-2019 B JTG
AS PER THE EXISTING TIP .
4 REVISED AS PER COORDINATION 08-10-2019 B JTG

3 REVISED AS CLOUDED 03-03-2019 B JTG

2 REVISED AS CLOUDED 23-01-2019 B JTG

1 REVISED AS CLOUDED 24-10-2018 B JTG

0 ISSUED FOR APPROVAL 09-09-2017 B M.K.

No. REVISION DATE


STATUS APP.
CLIENT
Lusail Real Estate Development Co
Doha, State of Qatar

PROJECT MANAGEMENT CONSULTANT

SUPERVISION CONSULTANT

Darley Joseph
13 October 2020
CONTRACTOR

DESIGNER

MEP SUB-CONTRACTOR
OMEGA ENGINEERING WLL
(MEP DIVISION)
PO BOX: 37951,DOHA, QATAR
PH: 40054222, FAX: 40061694
Email: info@omegaqatar.com
Web: www.omegaqatar.com

PROJECT
DESIGN & CONSTRUCTION OF CP-07B
LUSAIL PLAZA INFRASTRUCTURE, LRT
STATION, CAR PARK AND LANDSCAPE.
DRAWING TITLE
A
TELECOM DISTRIBUTION NETWORK
SCHEDULES ( 1 0F 2 )
DRAWN: ST DESIGNED: ST SCALE @A1

N.T.S
CHECKED. J.T.G APPROVED: J.T.G

SHOP DRAWING DATE: 21-09-2020

DWG NO: SHEET No. Rev


LUS-CP7B-QDSBG-SDW-TL-72772-001 1 of 2 07