You are on page 1of 6

CP07-B Lusail Plaza Infrastructure, LRT Station, Public Car Parks and Landscape, Lusail, Qatar

Underground Utilities Bedding and Surround Checklist Contract No.: 5297

Location: Road E14 Date: 19/06/2021

Type of Utilities ELV Drawing Ref:


Formation level for ELV Line From ELV
Description: Material Ref. No. INR-SUR-85492
manhole ELV-038 to ELV-041 at West Road E14
Temporary Work Team
# Inspection Acceptance Criteria Remarks
Accepted Rejected

1. Material on site has been inspected and Tested

Trench formation Level has been cleaned


2.
inspected /approved
Check if geotextile has been laid properly and
3.
required overlapping maintain

4. Check thickness as required

5.
Check Foreign materials has been removed

6. Check if the bedding is being done levelled and


compacted (if required)
7. Check if the surround is being done levelled and
compacted (if required)
8.

9.

Comments:

Status -> Approved ☐ Approved with comments ☐ Revise & resubmit ☐


Company Construction Dept. QDSBG Quality Consultant

Sign

Name Rakan

Date

CP07B-F632-Rev.0-Apr-19 Page 1 of 1 QA/QC Department


N=406969.971 NOTES:
I.L=1.30
50mm FOR CONTINUATION REFER TO DWG. NO.
E=229024.476 LUS-CP7B-QDSBG-SDW-TL-72570-014
UPVC Conduit
N=406967.738
NOTES:

CP7C-1B

CP07B
I.L=1.19
E=229025.621
N=406962.237

6Wx110mm (66m) I.L=1.30


E=229028.206 LEGEND:
N=406950.074

ROAD F3
1 METER EXCAVATION OFFSET TO BE PROVIDED AROUND MANHOLES' BLINDING AS A WORKING SPACE

I.L=1.10
E=229031.335
N=406935.349
I.L=0.73
E=229031.562
N=406931.219
I.L=1.50
E=229034.576 I.L=2.0 PTZ

RWIS

N=406916.989 E=229034.906
N=406914.727
MEDIA
HYDRANT

0+200
CP7B-ELV-033

I.L=0.80
I.L=1.0 E=229037.005
CP7C-1B

N=406908.279
CP07B

KEY PLAN
CP05B

CP7B

CP7B

CP07A1B
CP05B

CP7B

CP02N
I.L=1.55

CP7B
A C E G A D E

CP02N

CP7B

C.8a. HOT
20676 m2
B D F H B C F B A
E=229134.219

11156 m2
C.13.OS

C.14. OS
9857 m2
CP7B
CP02N

C.6c. COF
6206m2
CP7B

CP7A1B
CP7B
CP02N

OUT

IN

OUT
IN

GENERATOR
A

ROOM

11471m2
7
ESS1

C.7. MIX
IN

OUT
IN
ELECTRICAL
6
A

ROOM
MAIN
ESS1

TRANSFORMER

CENTRAL
5
B

BATTERY
& UPS 4
ROOM A

ROOM

ESS1

ESS1

CP7B

CP7A1B
UP A

FM 200
3

ESS1
1 A

ROOM
MV
ESS1 A

TELECOM

2
ESS1

C.6b. COF
5977m2
C.6a. COF
TELECOM

6280m2
4
A

ESS2
5
A

FM200
ESS2

6
A
MV
ROOM

ESS2
7 8

CENTRAL
BATTERY
3

TRANSFORMER
ESS2

OUT
7
B
ROOM

IN
ESS2

200
FM

MAIN
ELECTRICAL
N=406915.165
2
ROOM A

ESS2

OUT
IN
GENERATOR

ROOM 1
A

ESS2

CP07A1B

CP7B

CP07A1B

CP7B

5 6
CP02N

CP7B
CP02N
CP02N
CP7B
CP7B

CP02N

CP7B

CP7C-1B

CP7B
0
11 1

CP7C-1B

CP7B
13 12

CP7C-1B

CP7B
7
16 1

CP7C-1B

CP7B
5

CP7C-1B

CP7B
1

LC
14 9 18
1

CP7C-1B

CP7B
21 2 0

CP7C-1B

CP7B
6

CP7C-1B

CP7B
CP7B

CP07A1A

CP7B

CP07A1A

CP7C-1B

CP7B

GENERATOR
7
A

ROOM
ESS3
A

ROOM
ELECTRICAL
6
MAIN ESS3

TRANSFORMER
6a 3
B

ROOM
ESS3
A 5

BATTERY
AND
CENTRAL UPS

ROOM
ESS3
2
A

TELECOM
ESS3
A

FM 200
4
ESS3

A
MV
ROOM ESS3
1

CP7B

CP02S
CP7B

CP02S

CP7B

CP02S

CP7C-1B

CP7B
CP7B

CP02S

CP02S

CP7B

CP02S

CP7B

CP7A1A
CP7B

CP7A1A
CP7B
C A
A B

CP7A1A
E

CP7B

CP7A1A
CP7B
D B

CP7B
CP02S

CP7B
CP02S
CP7B

CP07A1A

F C D CP7B

CP07A1A

G A G E C A
C
E REFERENCE DRAWINGS
G H E G A I G B H F D B
C A E C D
F
DRAWING NO. Rev. TITLE
H D B J H G H
D B F
4 ELV DISTRIBUTION NETWORK
F H
LUS-CP07B-QDSBG-DWG-TL-44100 ROUTING GENERAL LAYOUT
J
I LUS-CP07B-QDSBG-DWG-TL-44101
B A ELV DISTRIBUTION NETWORK
LUS-CP07B-QDSBG-DWG-TL-44102 6 ROUTING LAYOUT
LUS-CP07B-QDSBG-DWG-TL-44109 SHEET # 1, 2, 9,10 & 11
E F LUS-CP07B-QDSBG-DWG-TL-44110
LUS-CP07B-QDSBG-DWG-TL-44111
D C
LUS-CP07B-QDSBG-DWG-TL-44103
H LUS-CP07B-QDSBG-DWG-TL-44104 ELV DISTRIBUTION NETWORK
G 5 ROUTING LAYOUT
LUS-CP07B-QDSBG-DWG-TL-44105
LUS-CP07B-QDSBG-DWG-TL-44106 SHEET # 3, 4, 5, 6, 7 & 8
C D
LUS-CP07B-QDSBG-DWG-TL-44107
E F LUS-CP07B-QDSBG-DWG-TL-44108
Certified for co-ordination with contract documents (QD-SBG)
ARCH CV/ST TEL/ELV/SSD ELEC. PL&FF HVAC

D
ROAD E14 SIGN SIGN SIGN SIGN SIGN SIGN

0+100
C F E
A DATE DATE DATE DATE DATE DATE
A B B 21-09-2020 21-09-2020 21-09-2020 21-09-2020
R R

F
G

E
0+000 G H
5 ISSUED FOR APPROVAL 21-09-2020 J.T.G

4 ISSUED FOR APPROVAL 04-04-2020 B J.T.G

3 REVISED AS PER SITE CONDITION 27-07-019 B J.T.G

2 REVISED AS PER COORDINATION DWG 22-01-019 B J.T.G


E F 1 ISSUED FOR APPROVAL 11-09-017 B M.K.

H G 0 ISSUED FOR APPROVAL 04-06-017 C M.K.

D C
3 C D
SECTION - H No.
CLIENT
REVISION DATE STATUS APP.

REF-DWG-LUS-CP7B- Lusail Real Estate Development Co


Doha, State of Qatar

I
QDSBG-SDW-EL-71970-028 PROJECT MANAGEMENT CONSULTANT
J A
B A B
D A D
D C
C B C SUPERVISION CONSULTANT
A B

FOR CONTINUATION REFER TO DWG. NO.


B

LUS-CP7B-QDSBG-SDW-TL-72570-020
G E C A E C A CONTRACTOR
H F D B F D B

DESIGNER
3
C A MEP SUB-CONTRACTOR
E X3 X1 OMEGA ENGINEERING WLL
D B
F X4 X2

CP07B CP07B
PO BOX: 37951,DOHA, QATAR
PH: 40054222, FAX: 40061694
Email: info@omegaqatar.com
CP7C-1B

Web: www.omegaqatar.com
CP07B

PROJECT
DESIGN & CONSTRUCTION OF CP-07B
LUSAIL PLAZA INFRASTRUCTURE, LRT
CP02S CP02S STATION, CAR PARK AND LANDSCAPE.
DRAWING TITLE

ELV DISTRIBUTION NETWORK


CP07B CP07B PLAN ROAD-F3 & E14

DRAWN: KK.N DESIGNED: KK.N SCALE @ A1

1:250
CHECKED. J.T.G APPROVED: J.T.G
OVERALL COORDINATION DWG REF:
CP02S R
CP02S COMPOSITE UTILITIES LAYOUT PLAN DWG NO SHOP DRAWING DATE: 21-09-2020
LUS-CP7B-QDSBG-SDW-UT-75070-006(REV-0) DWG NO: SHEET No. Rev
0+100

LUS-CP7B-QDSBG-SDW-TL-72570-021 21 of 27 5
NOTES:
FOR CONTINUATION REFER TO DWG. NO.
LUS-CP7B-QDSBG-SDW-TL-72570-015
NOTES:

LEGEND:
G H

PTZ

G RWIS

F E
MEDIA
HYDRANT

I.L=2.1067 I.L=1.75 D
I.L=1.70 E=229201.413 SHORING WALL C
A

E=229171.546 N=406935.917 OPENING


B

N=406923.108 I.L=2.10 KEY PLAN


E=229199.923
CP7B-ELV-042
CP05B

CP7B

CP7B

CP07A1B
I.L=1.70
CP05B

CP7B

CP02N

CP7B
N=406929.273

CP02N

CP7B
I.L=1.55

C.8a. HOT
20676 m2
E=229162.131 I.L=2.20

11156 m2
C.13.OS

C.14. OS
9857 m2
CP7B
CP02N
I.L=1.80

C.6c. COF
6206m2
CP7B

CP7A1B
CP7B
CP02N

OUT

IN

OUT
IN

E=229134.219

GENERATOR
A

ROOM

11471m2
7
ESS1

C.7. MIX
IN

OUT
IN
ELECTRICAL
6
A

ROOM
MAIN
ESS1

TRANSFORMER

CENTRAL
5
B

BATTERY
& UPS 4
ROOM A

ROOM

ESS1

ESS1

CP7B

CP7A1B
UP A

FM 200
3

ESS1
1 A

ROOM
MV
ESS1 A

TELECOM

2
ESS1

C.6b. COF
5977m2
E=229205.017

C.6a. COF
TELECOM

6280m2
4
A

ESS2
5
A

FM200
ESS2

6
A
MV
ROOM

ESS2
N=406921.119 7 8

CENTRAL
BATTERY
3

TRANSFORMER
ESS2

OUT
7
B
ROOM

IN
ESS2

200
FM

MAIN
ELECTRICAL
2
ROOM A

ESS2

OUT
1Wx50mm (71m)

IN
GENERATOR

ROOM 1
A

ESS2

CP07A1B

CP7B

CP07A1B

E=229198.240
CP7B

5 6
CP02N

CP7B
CP02N
CP02N
CP7B
CP7B

CP02N

CP7B

N=406915.165

CP7C-1B

CP7B
0
5 11 1

CP7C-1B

CP7B
N=406930.744 13 12

CP7C-1B

CP7B
7
N=406928.915 16 1

CP7C-1B

CP7B
5

CP7C-1B

CP7B
1

LC
14 9 18
1

CP7C-1B

CP7B
21 2 0

CP7C-1B

CP7B
6

CP7C-1B

CP7B
CP7B

CP07A1A

CP7B

CP07A1A

CP7C-1B

CP7B

GENERATOR
7
A

ROOM
ESS3
E
A

ROOM
ELECTRICAL
6
MAIN ESS3

TRANSFORMER
6a 3
B

ROOM
ESS3
A 5

BATTERY
AND
CENTRAL UPS

ROOM
ESS3
2
A

TELECOM
ESS3
A

FM 200
4
ESS3

A
MV
ROOM ESS3
1

CP7B

CP02S
CP7B

D
CP02S

F A
CP7B

D
CP02S

CP7C-1B

CP7B
CP7B

CP02S

A D
B C

CP02S

CP7B
B

CP02S

CP7B
C B
C

CP7A1A
CP7B

CP7A1A
CP7B
C D

CP7A1A
CP7B

CP7A1A
CP7B
CP7B
CP02S

CP7B
CP02S
CP7B

I.L=1.80
CP07A1A

CP7B

CP07A1A

E=229197.334 REFERENCE DRAWINGS


N=406928.556 A DRAWING NO. Rev. TITLE

A
D B A B
LUS-CP07B-QDSBG-DWG-TL-44100 4 ELV DISTRIBUTION NETWORK
ROUTING GENERAL LAYOUT
B A B C LUS-CP07B-QDSBG-DWG-TL-44101
ELV DISTRIBUTION NETWORK
H E D LUS-CP07B-QDSBG-DWG-TL-44102 6 ROUTING LAYOUT
LUS-CP07B-QDSBG-DWG-TL-44109 SHEET # 1, 2, 9,10 & 11
G FC LUS-CP07B-QDSBG-DWG-TL-44110
A B
LUS-CP07B-QDSBG-DWG-TL-44111
F E
LUS-CP07B-QDSBG-DWG-TL-44103
LUS-CP07B-QDSBG-DWG-TL-44104 ELV DISTRIBUTION NETWORK
LUS-CP07B-QDSBG-DWG-TL-44105 5 ROUTING LAYOUT
LUS-CP07B-QDSBG-DWG-TL-44106 SHEET # 3, 4, 5, 6, 7 & 8
LUS-CP07B-QDSBG-DWG-TL-44107
H G

ROAD E14 J I
0+891
LUS-CP07B-QDSBG-DWG-TL-44108
Certified for co-ordination with contract documents (QD-SBG)
ARCH CV/ST TEL/ELV/SSD ELEC. PL&FF HVAC
SIGN SIGN SIGN SIGN SIGN SIGN

0+200 0+000 DATE DATE DATE


21-09-2020
DATE
21-09-2020
DATE DATE
21-09-2020 21-09-2020
D C
L K
R
E F ISSUED FOR APPROVAL 21-09-2020 J.T.G
A B 5
H G
4 ISSUED FOR APPROVAL 04-04-2020 B J.T.G
D
C
3 REVISED AS PER COORDINATION DWG 17-10-019 B J.T.G
C B
A 2 REVISED AS PER COORDINATION DWG 22-01-019 B J.T.G
D
1 ISSUED FOR APPROVAL 11-09-017 B M.K.

0 ISSUED FOR APPROVAL 04-06-017 C M.K.

No. REVISION DATE STATUS APP.


F E CLIENT
Lusail Real Estate Development Co
D C
Doha, State of Qatar
B
D C
A PROJECT MANAGEMENT CONSULTANT
D C
B A
C

D
B A SUPERVISION CONSULTANT
FOR CONTINUATION REFER TO DWG. NO.

FOR CONTINUATION REFER TO DWG. NO.


LUS-CP7B-QDSBG-SDW-TL-72570-021

LUS-CP7B-QDSBG-SDW-TL-72570-019
B

B A

A CONTRACTOR

A DESIGNER
C D B

PTZ
D C
D A MEP SUB-CONTRACTOR
OMEGA ENGINEERING WLL
C B
PO BOX: 37951,DOHA, QATAR
PH: 40054222, FAX: 40061694
E Email: info@omegaqatar.com
F Web: www.omegaqatar.com

DA PROJECT
CB
DESIGN & CONSTRUCTION OF CP-07B
LUSAIL PLAZA INFRASTRUCTURE, LRT
D C R
STATION, CAR PARK AND LANDSCAPE.
A A B DRAWING TITLE
R
B
1 METER EXCAVATION OFFSET TO BE PROVIDED AROUND MANHOLES' BLINDING AS A WORKING SPACE ELV DISTRIBUTION NETWORK
PLAN ROAD-E14

DRAWN: KK.N DESIGNED: KK.N SCALE @ A1

1:250
CHECKED. J.T.G APPROVED: J.T.G
OVERALL COORDINATION DWG REF:
FOR CONTINUATION REFER TO DWG. NO. COMPOSITE UTILITIES LAYOUT PLAN DWG NO SHOP DRAWING DATE: 21-09-2020
LUS-CP7B-QDSBG-SDW-UT-75070-006(REV-0) DWG NO: SHEET No. Rev
LUS-CP7B-QDSBG-SDW-TL-72570-020 20 of 27 5
NOTES:

07

07

07
KEY PLAN
CP05B

CP7B

CP7B

CP07A1B
CP05B

CP7B

CP02N

CP7B
CP02N

CP7B

C.8a. HOT
20676 m2
11156 m2
C.13.OS

C.14. OS
9857 m2
CP7B
CP02N

C.6c. COF
6206m2
CP7A1B
CP7B
CP7B
CP02N

OUT

IN

OUT
IN
A

ROOM

11471m2
GENERATOR
7

C.7. MIX
ESS1

IN

OUT
IN
ELECTRICAL
A

ROOM
ESS1
MAIN
6

TRANSFORMER
5
B

BATTERY
4
A

CENTRAL

ROOM
UPS
ROOM
ESS1

&
ESS1

CP7B

CP7A1B
UP
3
A

FM 200
ESS1
A

ROOM
MV
1 A

TELECOM
ESS1
2

ESS1
9

C.6b. COF
5977m2
C.6a. COF
TELECOM
4
A

6280m2
ESS2

FM200
ESS2 5

6
A
MV

ROOM
ESS2

7 8

CENTRAL
3 A

BATTERY

TRANSFORMER

ROOM
ESS2
7
B

OUT
ESS2

IN
200
FM

ELECTRICAL
MAIN A

ROOM

OUT
ESS2

IN
GENERATOR
A

ROOM
ESS2
1

CP07A1B

CP7B

CP07A1B

CP7B

5 6
CP02N

CP7B
CP02N
CP02N
CP7B
CP7B

CP02N

CP7B

CP7C-1B

CP7B
0
11 1

CP7C-1B

CP7B
13 12

CP7C-1B

CP7B
7
16 1

CP7C-1B

CP7B
CP7C-1B

CP7B
1 5

CL
14 9 18
1

CP7C-1B

CP7B
21 2 0

CP7C-1B

CP7B
6

CP7C-1B

CP7B
CP7B

CP07A1A

CP7B

CP07A1A

CP7B
CP7C-1B
A

ROOM
GENERATOR
ESS3
7

ELECTRICAL
A
ROOM
ESS3 6

MAIN
3
B

TRANSFORMER
ROOM
6a A 5 ESS3

ROOM
UPS
AND ESS3

CENTRAL
BATTERY
A

TELECOM
ESS3
2

A
4
FM 200
ESS3

A 1

ROOM
ESS3
MV
CP7B

CP02S
CP7B

CP02S

CP7B

CP02S

CP7C-1B

CP7B
CP7B

CP02S

CP02S

CP7B

CP02S

CP7B

CP7A1A
CP7B

CP7A1A
CP7B

CP7A1A
CP7B

CP7A1A
CP7B
CP7B
CP02S

CP7B
CP02S
CP7B

CP07A1A

CP7B

CP07A1A

REFERENCE DRAWINGS
DRAWING NO. Rev. TITLE

LUS-CP07B-QDSBG-DWG-TL-44100 4 ELV DISTRIBUTION NETWORK


ROUTING GENERAL LAYOUT
LUS-CP07B-QDSBG-DWG-TL-44101
ELV DISTRIBUTION NETWORK
LUS-CP07B-QDSBG-DWG-TL-44102 6 ROUTING LAYOUT
LUS-CP07B-QDSBG-DWG-TL-44109 SHEET # 1, 2, 9,10 & 11
LUS-CP07B-QDSBG-DWG-TL-44110
LUS-CP07B-QDSBG-DWG-TL-44111
LUS-CP07B-QDSBG-DWG-TL-44103
LUS-CP07B-QDSBG-DWG-TL-44104 ELV DISTRIBUTION NETWORK
LUS-CP07B-QDSBG-DWG-TL-44105 5 ROUTING LAYOUT
LUS-CP07B-QDSBG-DWG-TL-44106 SHEET # 3, 4, 5, 6, 7 & 8
LUS-CP07B-QDSBG-DWG-TL-44107
LUS-CP07B-QDSBG-DWG-TL-44108
LUS-CP07B-QDSBG-SDW-UT- 0 COMPOSITE UTILITIES
7509-001 OVERALL LAYOUT PLAN

Certified for co-ordination with contract documents (QD-SBG)


ARCH CV/ST TEL/ELV/SSD ELEC. PL&FF HVAC
SIGN SIGN SIGN SIGN SIGN SIGN

DATE DATE DATE DATE DATE DATE


21-09-2020 21-09-2020 21-09-2020 21-09-2020

7 ISSUED FOR APPROVAL 21-09-2020 J.T.G

6 ISSUED FOR APPROVAL 31-03-2020 B J.T.G


MANHOLE DETAILS ADDED AS PER THE
5 03-12-019 B J.T.G
EXISTING TIP .
4 REVISED AS PER COORDINATION DWG 08-10-019 B J.T.G

3 REVISED AS PER COORDINATION DWG 30-03-019 B J.T.G

2 ISSUED FOR APPROVAL 04-02-019 B J.T.G

1 ISSUED FOR APPROVAL 11-09-017 C M.K.

0 ISSUED FOR APPROVAL 04-06-017 B M.K.

No. REVISION DATE STATUS APP.


CLIENT
Lusail Real Estate Development Co
Doha, State of Qatar

PROJECT MANAGEMENT CONSULTANT

SUPERVISION CONSULTANT

CONTRACTOR

07
DESIGNER

MEP SUB-CONTRACTOR
OMEGA ENGINEERING WLL
PO BOX: 37951,DOHA, QATAR
PH: 40054222, FAX: 40061694
Email: info@omegaqatar.com
Web: www.omegaqatar.com

PROJECT
DESIGN & CONSTRUCTION OF CP-07B
LUSAIL PLAZA INFRASTRUCTURE, LRT
STATION, CAR PARK AND LANDSCAPE.
DRAWING TITLE

ELV DISTRIBUTION NETWORK


SCHEDULE

DRAWN: ST DESIGNED: ST SCALE @ A1

1:250
CHECKED. J.T.G APPROVED: J.T.G

SHOP DRAWING DATE: 21-09-2020


07 DWG NO: SHEET No. Rev
LUS-CP7B-QDSBG-SDW-TL-72572-001 01 of 05 7

You might also like