Professional Documents
Culture Documents
Te c h n i c a l m a n u a l
cod. 97071236 - rev. 02 / 10.06.19
tel.+39 0542 653111 / fax +39 0542 653344 tel.+39 0542 653742 / service.radiology@cefla.it
97071236
r e v. 0 2
10.06.2019
EN
NewTom GiANO HR - TECHNICAL MANUAL
Contents
1. GENERAL WARNINGS................................................................................................................................................................3
1.1 Foreword...............................................................................................................................................................................3
1.2 Safety instructions.................................................................................................................................................................3
2. PACKAGING AND HANDLING....................................................................................................................................................7
2.1 Handling and storage............................................................................................................................................................7
2.2 Damage during shipment......................................................................................................................................................7
3. PREINSTALLATION.....................................................................................................................................................................9
4. DEVICE INSTALLATION AND CALIBRATION......................................................................................................................... 11
4.1 Assembly instructions.......................................................................................................................................................... 11
4.1.1 Removal of packaging............................................................................................................................................. 11
4.1.2 Transport with cart...................................................................................................................................................12
4.1.3 Wall mounting..........................................................................................................................................................12
4.1.4 Support base floor mounting instructions................................................................................................................13
4.1.5 Transport with handles............................................................................................................................................13
4.1.6 Safety screws removal............................................................................................................................................13
4.1.7 Patient arm installation............................................................................................................................................14
4.1.8 Electrical connecions on Mainboard........................................................................................................................17
4.1.9 Electrical connections on the PFC board................................................................................................................18
4.1.10 Ethernet connections and X-Ray emission key.....................................................................................................19
4.1.11 CEPH arm installation............................................................................................................................................20
4.1.12 Electrical connecions on Mainboard......................................................................................................................25
4.1.13 Patient arm’s handles assembly............................................................................................................................26
4.1.14 Check during the assembling................................................................................................................................27
4.1.15 Checking after mechanical installation..................................................................................................................27
4.2 Cover installation.................................................................................................................................................................29
4.3 PC configuration .................................................................................................................................................................41
4.3.1 System requirements..............................................................................................................................................41
4.3.2 Preliminary operations.............................................................................................................................................41
4.3.3 Operating system settings.......................................................................................................................................41
4.3.3.1 Power management settings....................................................................................................................43
4.3.3.2 Operating system optimization settings....................................................................................................45
4.3.3.3 Disabling “Windows Auto-Update Service”...............................................................................................48
4.3.3.4 Disabling Windows update sharing over the network (low data traffic)....................................................50
4.3.3.5 Firewall Settings.......................................................................................................................................51
4.3.3.6 “Windows Defender” settings...................................................................................................................51
4.3.3.7 Device installation settings.......................................................................................................................54
4.3.4 PC-Device connection ............................................................................................................................................58
4.3.4.1 Case 1 - Device-PC direct connection (Setting a static IP address on the network card)........................58
4.3.4.2 Case 2 - Device-PC connection over the network (Setting a dynamic IP address on the network card).60
4.3.5 “Intel Gigabit” network card configuration................................................................................................................62
4.3.6 “Acquisition Server Plus” software installation........................................................................................................67
4.3.7 “Acquisition Server Plus” configuration...................................................................................................................69
4.3.7.1 Device search and connection.................................................................................................................71
4.3.7.2 Sensor search and connection.................................................................................................................74
4.3.8 CBCT panel installation (Only for 3D).....................................................................................................................78
4.3.9 Pleora driver installation (Only for 3D)....................................................................................................................78
4.3.10 Driver installation checks.......................................................................................................................................83
4.3.11 NNT software installation and configuration..........................................................................................................85
4.3.12 Onboard console connection.................................................................................................................................95
4.4 2D Calibration.....................................................................................................................................................................99
4.4.1 Tube head warm-up................................................................................................................................................99
4.4.2 Preliminary actions................................................................................................................................................102
4.4.3 Machine configuration...........................................................................................................................................104
4.4.4 Column calibration.................................................................................................................................................106
4.4.5 PAN verify XRay alignement................................................................................................................................. 110
4.4.5.1 Collimator manual rotation..................................................................................................................... 118
4.4.5.2 Horizontal adjustment.............................................................................................................................121
4.4.6 PAN Verify Sensor Compliance.............................................................................................................................123
4.4.7 PAN Verify Sensor Calibration...............................................................................................................................125
4.4.8 PAN Verify Mechanical Centering..........................................................................................................................128
4.4.9 Laser Calibration...................................................................................................................................................132
4.4.10 CEPH Verify X-ray Alignment..............................................................................................................................136
4.4.10.1 Manual rotation.....................................................................................................................................144
4.4.10.2 Manual adjustment of vertical position.................................................................................................147
4.4.11 CEPH Verify Sensor Compliance .......................................................................................................................149
4.4.12 CEPH Verify Sensor Calibration .........................................................................................................................152
EN CONTENTS 1
NewTom GiANO HR - TECHNICAL MANUAL
2 CONTENTS EN
NewTom GiANO HR - TECHNICAL MANUAL
1. GENERAL WARNINGS
1.1 FOREWORD
The device described in this manual is manufactured by CEFLA s.c. - via Selice Provinciale 23/A - 40026 Imola (BO)
Italia, which is the manufacturer, in compliance with the applicable European Directives detailed in the declaration of
conformity.
These technical instructions are addressed to the personnel in charge of repair and/or maintenance operations of
CEFLA s.c. equipment and contain all the necessary information.
CEFLA s.c. shall be responsible for the safety, reliability and efficiency of the equipment provided that:
• installation, any modifications, settings or repairs are made by authorised technical personnel using CEFLA s.c.
original spare parts
• In case of installation in medical locations: the electrical installation of the relevant location complies with IEC 60364-
7-710:2002 Standards (Standards on electrical installations of medical locations) or with the equivalent Standards in
force in the country of installation
• the equipment is used as outlined in User Manual
• in case of installation of an X-ray unit: The room where the X-ray unit is installed complies with the official Directives
on protection from radiation in the country of use
SYMBOL DESCRIPTION
EN GENERAL WARNINGS 3
NewTom GiANO HR - TECHNICAL MANUAL
SYMBOL DESCRIPTION
WARNING: Failure to observe instructions may result in equipment damage or injury to the user
4 GENERAL WARNINGS EN
NewTom GiANO HR - TECHNICAL MANUAL
SYMBOL DESCRIPTION
WARNING!
ALWAYS DISCONNECT power supply before performing any maintenance or cleaning operation.
The packed device must be handled using, where possible, suitable mechanical means (forklift, pallet
truck, etc.) and following the indications on the package.
In case of manual handling, the device must be lifted by several persons using the suitable available
means and, if possible, it must be moved with a truck or similar means.
EN GENERAL WARNINGS 5
NewTom GiANO HR - TECHNICAL MANUAL
6 GENERAL WARNINGS EN
NewTom GiANO HR - TECHNICAL MANUAL
b) relative humidity from 10 to 90%
5
c) atmospheric pressure from 710 to 1060 hPa.
It is recommended to transport and store the device at a temperature not lower than that indicated on the
packing. A prolonged exposure to a low temperature can damage the device.
In case of manual handling, it must be lifted by two or more persons using the
suitable available means.
If the packages are found to be damaged on delivery, accept them with reserve by signing the delivery note and indicating
that the “CONTENTS ARE ACCEPTED BUT THEY NEED TO BE CHECKED”.
If the contents are actually damaged, notify the shipping agent and request insurance compensation for damage within
five work days. The claim is to be made by the person who commissioned the shipping agent.
I.e.:
• if the goods are delivered “carriage forward”, the receiver shall notify the shipping agent
• if the goods are shipped “carriage free” or “free delivered”, the consigner shall notify the shipping agent and file a
claim for damages. In this case, CEFLA s.c. shall be informed as soon as possible.
The damaged parts returned to CEFLA s.c. for replacement shall be placed inside the same damaged package.
Return to CEFLA s.c. shall be “carriage free” (at the expense of the consigner), while shipment back to the customershall
be at the expense of CEFLA s.c. (carriage free).
3. PREINSTALLATION
Follow instructions described in the supplied INSTALLATION PLAN.
EN PREINSTALLATION 9
NewTom GiANO HR - TECHNICAL MANUAL
10 PREINSTALLATION EN
NewTom GiANO HR - TECHNICAL MANUAL
The following instruments are necessary to perform all the procedure properly:
COVERS
PATIENT
ARM
x4
wheels;
MIN 1030 / MAX 1820
x4
Mainboard
CEPH_VCC
nKLED1
nKLED4
ROW3
ROW2
CEPH_GND
TRIM_CEPH_B
TRIM_CEPH_A
COL7
COL3
COL4
COL5
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_DRV_MIN
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_DRV_MIN
FC_DRV_MIN
K39
K1
K47
K42
K34
K43 MA-
MB-
MB+
MA+
K2
COL+
K19
COLT
COLS
COL-
MA-
MB-
GND_OUT
K3 MB+
MA+
EXP_OK+
USER_ENB+ K8
EX P_OK-
GND_OUT
VCC_OUT
USER_SYNC+
USER_ENB-
USER_SYNC-
DET
Mainboard
GND_OUT
Console power
VCC_OUT
USER_SYNC+
USER_ENB-
USER_SYNC-
DET
K20
MA-
MB-
MB+
MA+
K48
K52
K4 K46
K44
FC_DRV_MIN
FC_DRV_MIN
FC_IN_MIN
FC_IN_MIN
LAS_GND
FC_VCC
FC_VCC
nKLED3
nkLED2
nkLED
ROW0
ROW1
LAS0
COL6
COL0
COL1
COL2
CONSOLE BOARD
CANH
CANS
CANL
K1 POWER SUPPLY
(optional)
K16 KEYBOARD
K21 LASER
Be particularly careful when laying the wires in the area around the mainboard. Use cable ties to secure
the wires/leads on the holes in the metallic side member so that any excess loose wiring does not
interfere with the mobile chain during rotation/transfer of the cinematic group.
K2
K3
97522482 (20A)
MAIN SWITCH
K8
K4
K7
K6
K5
RDY_LAMP-
XRY_LAMP-
XRY_LAMP+
RDY_LAMP+
PE
VCC
EMG_EXT
VCC
ILOCK
READY
BUTTON
STDBY
VCC
XRAY
VEE
MAIN SUPPLY
115-240Vac
K4 MAIN SUPPLY
K6 INTERLOCK
K7 EMERGENCY STOP
X-RAY BUTTON
K5 (1: VCC / 2: BUTTON /
3: READY / 4: X-RAY)
K4 K6 K7 K8
4 3 2 1
L N PE
ERGENC
M
Y
E
STOP
COMPULSORY OPTIONAL
REMOTE SWITCH
SENSORS
PC LAN
CONNECTOR FUNCTION
RED VCC
BROWN X-RAY Emission
WHITE Green “Ready” LED
BLUE Orange “X-Ray” LED
2 RIGHT
x4
LEFT
x4
x4
x3
5 Mainboard
6
x2
x4
CLICK!
CEPH_VCC
nKLED1
nKLED4
ROW3
ROW2
CEPH_GND
TRIM_CEPH_B
TRIM_CEPH_A
COL7
COL3
COL4
COL5
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_DRV_MIN
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_DRV_MIN
FC_DRV_MIN
K39
K1
K47
K42
K34
K43 MA-
MB-
MB+
MA+
K2
COL+
K19
COLT
COLS
COL-
MA-
MB-
GND_OUT
K3 MB+
MA+
EXP_OK+
USER_ENB+ K8
EX P_OK-
GND_OUT
VCC_OUT
USER_SYNC+
USER_ENB-
USER_SYNC-
DET
MA-
MB-
MB+
K36 MA+
GND_OUT
EX P_OK+ K14
USER_ENB+
EX P_OK-
GND_OUT
VCC_OUT
USER_SYNC+
USER_ENB-
USER_SYNC-
DET
MA-
MB-
MB+
MA+
K20
MA-
MB-
MB+
MA+
K48
K52
K4 K46
K44
FC_DRV_MIN
FC_DRV_MIN
FC_IN_MIN
FC_IN_MIN
LAS_GND
FC_VCC
FC_VCC
nKLED3
nkLED2
nkLED
ROW0
ROW1
LAS0
COL6
COL0
COL1
COL2
CANH
CANS
CANL
Be particularly careful when laying the wires in the area around the mainboard. Use cable ties to secure
the wires/leads on the holes in the metallic side member so that any excess loose wiring does not
interfere with the mobile chain during rotation/transfer of the cinematic group.
x2
1) that the column has no clearance/end float relative to the fastening system used (stand or wall-mount) or relative
to the metal base installed on the column. If this is not true, contact the manufacturer.
2) that the patient’s arm is properly fastened by means of the 4 supplied screws; make sure it has no clearance or
end float.
3) that the cephalometry arm (if any) is assembled with the 2 support pins and that the 4 retaining screws are duly
tightened; make sure there is no clearance or end float.
Screw kit
SYMBOL DESCRIPTION
A T/BOMB M4x8
B T/BOMB M4x14
C TCEI M4x12
D WASHER D 4.3 x9
E TPSEI M4x16
G CLIP M4 MAX 2.5 mm
H TCEI SCREW M4X20 STAINLESS
A
x4
3
2
G
2 x2
G
x2
Cover assembly tasks must be carried out in the order illustrated in the drawing above.
The screws C must only be placed in position: they must only be tightened after positioning the cover on the
unit so these screws line up with the slots highlighted in the subsequent diagrams (in the second image they
are not visible but they are analogous to those in the first image).
C
x4
A
x4
C
x1
CLICK!
C
x2
CLICK!
4.3 PC CONFIGURATION
WARNING: for the video card drivers, use the pack available on the Extranet.
2 3
4
5
4 5
In case they cannot be disabled, it is nevertheless necessary to add the following exceptions:
UDP PORT 12232: always allow incoming/outgoing traffic from the LAN for all the programs
UDP PORT 12233: always allow incoming/outgoing traffic from the LAN for all the programs
UDP PORT 12234: always allow incoming/outgoing traffic from the LAN for all the programs
TCP PORT 12235: always allow incoming/outgoing traffic from the LAN for all the programs
TCP PORT 12236: always allow incoming/outgoing traffic from the LAN for all the programs
TCP/UDP PORT 1947: always allow incoming/outgoing traffic from the LAN for all the programs
TCP PORT 13234: always allow incoming/outgoing traffic from the LAN for all the programs
TCP PORT 5790: always allow incoming/outgoing traffic from the LAN for all the programs
AFTER SOFTWARE
INSTALLATION
(see paragraphs
4.3.6, 4.3.11)
10
11
gpedit.msc 6
7
56 DEVICE INSTALLATION AND CALIBRATION » PC configuration EN
NewTom GiANO HR - TECHNICAL MANUAL
x2
10
11
Therefore, at this point of the installation, it is not necessary to set any IP address on the INTEL GIGABIT board, as it
will be set autonomously during the software installation procedure described in the following chapters.
The network card dedicated to the communication with the device must be configured as follows:
It is necessary to set a static IP address for the network card dedicated to PC - device communication and it must be
compatible with the device’s default address (192.168.1.160).
1->254
7 160 (IP Device)
161 (IP Console)
It is necessary to set a dynamic IP address for the network card dedicated to PC – device communication.
1
60 DEVICE INSTALLATION AND CALIBRATION » PC configuration EN
NewTom GiANO HR - TECHNICAL MANUAL
10
WARNING: maybe the “Receive Buffers” item is not displayed directly in this window. If it is not
displayed, search for the “Performance Options” item and click on “Properties”. The “Receive
Buffers” value is displayed there.
12
WARNING: maybe the “Interrupt 11
Moderation” item is not
displayed directly in this window.
If it is not displayed, search for
the “Performance Options” item
and click on “Properties”. The
“Interrupt Moderation” value is
displayed there.
13
16
17
18
19
x2
20
Avoid using
192.168.2.xxx 21
subnet for other
network adapters
in the PC
22
Software
x2
2
3
WARNING: Drivers for communication with 2D sensors will be installed during this installation.
USER MODE:
5
cefla 7
8
SERVICE MODE:
10
11
12
13
14
15
NOTE: should it be necessary to change the device IP address for any need, it is possible to
change it from the menu “Settings -> Device Options”
16
17
A fixed IP can be set in this window in the field “Fall back Ip address”. Removing the tick from
“DHCP” will make it impossible for the device to obtain a dynamic address by a router.
Click on “OK”. The IP change becomes effective when the device is restarted.
18
19
20
21
22
WARNING
IN CASE OF CEPH SENSORS: In case of a configuration with a mobile sensor, move it from “PAN” to “CEPH”
position.
23
24
25
26
Under normal operating conditions, the lower box may be red: this does NOT indicate a connection
problem since PAN/CEPH sensors are usually off. They are on only when they are being used.
5
cefla 7
8
CBCT Panel ON
7
8
EN DEVICE INSTALLATION AND CALIBRATION » PC configuration 81
NewTom GiANO HR - TECHNICAL MANUAL
The installer will check whether a previous version of Pleora Driver is already present and will uninstall it if necessary.
WARNING: this procedure may take a long time, do not interrupt the process. During the procedure the PC
will restart and resume installation. If this does not happen, it is necessary to manually run “Updater.exe” and
reselect the installation steps which are not yet completed.
WARNING: During this procedure do not disconnect or switch off the device. Failure of panel firmware update
may compromise its functionality. If dialogs appear, follow the instructions.
INSTALLATION COMPLETED:
2D 3D
3
3
3a
4
4
WARNING: perform the procedures (1 -> 5) for all the network cards that may be present on the PC, except for
the one dedicated to the communication with sensors (INTEL GIGABIT).
2D 3D
7
7
7a
8
8
If items (8 -> 9) are missing, this indicates that the driver installation was not successful and it must be repeated.
Missing item 8 (only in case of 3D!): see chapter “Pleora driver intallation”
Missing item 9: see chapter “Acquisition Server Plus software installation“
Software
The software used to manage the images downloaded from the device is NNT, installed in the version MAIN
WORKSTATION in case of 3D device, or in the version NNT Station in case of 2D device only.
x2
2D ONLY 3a
3D ONLY 3b
x2
10
11
METHOD 1
12
METHOD 2
13
14
306090
15
3D ONLY
336699
16
17
18
2D - 3D
12345
19
172 20 34 42
20
21
3D ONLY
172 20 34 42
22 23
DEVICE CONNECTED
25
Under normal operating conditions, the lower box may be red: this does NOT indicate a connection
problem since PAN/CEPH sensors are usually off. They are on only when they are being used.
PC
26
4
96 DEVICE INSTALLATION AND CALIBRATION » PC configuration EN
NewTom GiANO HR - TECHNICAL MANUAL
DO
LL
NE
WE
4.4 2D CALIBRATION
REQUIRED INSTRUMENTS
•• Support plate
•• Dentition phantom
•• Aluminium filter
•• Laser reference sheet
PERFORM THIS OPERATION ONLY IF THE DEVICE REMAINS UNUSED FOR MORE
THAN THREE MONTHS
2
3
Shot Parameters
kV 70
mA 2
3
kV mA Time (ms) Repetitions
a 60 2 1000 2
b 70 2 1000 2
5 4 c 80 2 1000 2
d 85 2 1000 2
e 85 7 1000 2
f 85 14 1000 2
g 85 14 5000 1
h 74 16 5000 1
3D ONLY
6 cefla
CHECK / 2D Model
/ ABSENT
NO CBCT = NULL
√ always √ always
√ only 3D device √ always
√ always
N
√ device with CEPH arm
√ device with left CEPH arm
√ always
√ always
CLICK!
BITEWING
POSITION
4 1015
min. 3
CLICK!
BITEWING
POSITION
max 6
Set SW limits: these values add a further tolerance to the limit switch: it is recommended to remove 10 mm from the
upper limit and add 10 mm to the lower one.
10
TA R G E T 1
MOTORISED HORIZONTAL COLLIMATOR: with the first acquisitions, the procedure searches for sensor sides and
asks to evaluate the correct rotation; then it refines lower and upper collimation.
5
6
10
11
12
13
14
15
16
17
18
19
20
21
22
R
C
1/2 C
1
2 TARGET
6 3
5 4
C
7
1/2 C
2D ONLY
1/2 C
1/2 C
H
2
3
4
TA R G E T
5 3
C
C
3 3
12’
A
B
A
B
F C
E D
IF
CHECK!
» 4.1.7
If the laser turns off, any of the movement buttons of the column can be pressed to turn it on again.
HE
TA R G E T
TA R G E T
6
7
10
11
12
13
14
15
16
17
If the image is not vertically centred, follow the instructions in paragraph “Manual
adjustment of vertical position”
18
19
20
21
22
23
Ø 2,5mm
1 3
x4
C
1/2
1
1/2 C
1st
R
R 2A
R
2nd
2nd
R 2B
1st
3
4
TA R G E T
5 3
C 6
C
1/2
C 1
1/2
C
1/2
R 2
TA R G E T
2 3
4
C
12’
TA R G E T
IF » 4.1.11
CHECK!
3
4
1 1.95 1.95
+ 2
TARGET
1
5 2
4 3
3
4
1 1.75 2 1.75
-
1 TARGET
5 2
4 3
TARGET
HORIZONTAL ALIGNMENT
1/2
1/2
TARGET
VERTICAL ALIGNMENT
4.5 3D CALIBRATION
Required instruments
3D calibration kit, including:
•• support plate
x2
8
10
8
10
TA R G E T
11b
Up Up Up
8 11 11
Left 10,5 14 Right Left 10,5 14 Right Left 10,5 14 Right Positioning
11
5,5 5,5 5,5
11c
Down Down Down
11a
[13 x 8] [13 x 8] [13 x 8]
Up Up
15,5 ±0,5 15,7 ±0,1
13
12
11 a
c d
13 12
a b c d
Up
5,5 Left 10,5 14 Right
11
Down
b
8
14 9 c
d
e
13 10
f
14
g
12 11 h
i
l
When passing from one FOV to the next, remove the tick from “Enable Manual Tuning” to allow the
collimator to reposition itself according to the chosen FOV.
16
15
17
Test Status
Test n° 1 Running...
Test n° 2
Test n° 3
Test n° 4
Test n° 5
Test n° 6
Test Status
Test n° 1 Completed
Test n° 2 Completed
Test n° 3 Running...
Test n° 4
Test n° 5
Test n° 6
Test Status
Test n° 1 Completed
Test n° 2 Completed
Test n° 3 Completed
Test n° 4 Completed
Test n° 5 Completed
Test n° 6 Completed
TARGET
8
The software has a certain tolerance: even if the spheres are not inside the respective positions, the
important thing is that the Mattarellum does not generate a software error and that it is therefore possible
to proceed with calibration.
TARGET
10
11
12
EN DEVICE INSTALLATION AND CALIBRATION » 3D calibration 187
NewTom GiANO HR - TECHNICAL MANUAL
13
0.26
1.82
CLOSE
PDF
TARGET
Backup 3D
RESTORE
Backup 3D Software
TARGET
a b
Ctrl
d e
Ctrl
10
11
12
13
14
15
EN DEVICE INSTALLATION AND CALIBRATION » 3D calibration 199
NewTom GiANO HR - TECHNICAL MANUAL
16
17
27.20
0.47
CLOSE
PDF
TARGET
4 5
17 6
16 7
15 8 a
b
c
14 9 d
e
13 10
12 11
The number of available FOV will vary from 2 to 6, depending on the device model.
DO
LL
NE
WE
COLUMN UPWARD
CONFIRMATION MOVEMENT
COLUMN
DOWNWARD
MOVEMENT
X-RAY EMISSION
ON
STANDBY
X-RAY READY
INTERLOCK
COLUMN
UPWARD MOVEMENT
ON
STANDBY COLUMN
DOWNWARD MOVEMENT
X-RAY READY
INTERLOCK
6. SERVICE MENU
Method 1
Method 2
306090
EN
(F)
AURICOLARI NASION
GLAN4
(G)
K13 K12 5 PORT SWITCH
GLAN1
97600164
GLAN5
craniostato laterale
Finecorsa rotazione
craniostato centrale
GLAN3
Finecorsa rotazione
(D)
97521114
97521114
97521104
97522206
96600427 PAN (150)
97522211
CEPH TERMINAL
97522213
96600426 CEPH/PAN (220) 96600427 PAN (150)
BLOCK
K2 K2 97522209
K14 K1 + K11 97522209 CEPH / PAN (E)
97661912 97661911 PAN 97661912 97661911
97522440 97522207 97522207 SENSOR 97521763 3D PANEL
97661913 K1 SENSOR K1
M M
97522214
97522217
(B) REVOLVER
FOTOCELL.
FOTOCELL.
1 - REVOLV.
2 - REVOLV.
7. CIRCUIT BOARDS
MONOBLOCCO
CEPH
COLLIMOTORE
MOTORIZZATO
97750183
COLL.
ASSE X
97521086
SLIDER CHIN REST GRUPPO CINEMATICO 3D INTERFACE
97661579 FEEDBACK FILAMENT POWER M
ASSE S FC-S ASSE X ASSE Y ASSE R FC-X FC-Y FC-R
ASSE H FC-H K48 K49 K2 K8 K14 K5 K9 K15 K28 K29 K31
K20 K22 97521103
FOTOCELLULA COLL. X
FOTOCELLULA COLL. Y
UNIT BLOCK DIAGRAM
97522205
97522210
97522269
97522271
97522275
97522267
97522202
97522274
97522266
97522268
97522270
97522212
97522204
97522203
K2 K8 K14 K5 K9 K15 K28 K29 K31
NewTom GiANO HR - TECHNICAL MANUAL
97522277
97522281
97522279
97522276
97522280
97522282
97522278
BACKLIGHT K49
LOGO K48 K3
97522272
K2
97522273
97661539 K36 K8
K3
K7 + K42 K5
SCH. CONVERTER K9
K22
EMERG. BUTTON SCH. MAIN 97661807
K20 97522199 K17
97600119 K1 K35 K14
97522216 K44
97661808 97522198 K15
97522483 K4 K36
K39
K30 K34 K37 K32
K21 + K16
K10 97522283
K19
K43 97521707
K34 K13
97522201
97522192
LASER
LASER
LASER
97522193
CIRCUIT BOARDS
POTENZ.
97522219
97522223
97522189
97522432
J12
X2
97522194
K9 + K8
(C) 97521709
SCH. INVERTER
K3 M
97661954
UP
975222197
DOWN
COLUMN
FOTOCELL.
FOTOCELL.
97217500
LAN4
97522220 LAN3 K2 J15 X1 K4 K6 K7
disconnect/reconnect wires or leads with the machine on.
97522191
97522190
LAN
97522218
KEYBOARD K10 K1
(A)
LASER
K1
97661914
J1 97520839 K9 SCH. PFC
97521704
K7 97661806 K8
97522492
K6 K5
97522195
97521705
SENS.
MENT. K2 K3 K4
97522484
97522482 (20A)
RJ45 8/8 RJ45 8/8 EXT. EMERG. INTERLOCK RJ11 6/6 READY LAMP X-RAY LAMP
97661163 97661163 97661209
209
IMPORTANT: Before carrying out any maintenance work on electronic boards or wiring it is
necessary to switch off the machine and wait until all the LEDs on the boards go out. Do not
NewTom GiANO HR - TECHNICAL MANUAL
Mainboard
CEPH_VCC
nKLED1
nKLED4
ROW3
ROW2
CEPH_GND
TRIM_CEPH_B
TRIM_CEPH_A
COL7
COL3
COL4
COL5
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_DRV_MIN
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_IN_MIN
FC_VCC
FC_DRV_GND
FC_DRV_MIN
FC_DRV_MIN
K39
K1
K47
K42
K34
K43 MA-
ASSE X
MB-
K2
SCH. INVERTER 97661954 K3
MB+
97522267
MA+
K2
K19 97522432
POTENZ.
COL+
COLT
COLS
97522283 COL-
97522269
MA+
EXP_OK+
K8
PAN INTERFACE 97661912 K1
USER_ENB+
EX P_OK-
GND_OUT
VCC_OUT
97522205
USER_SYNC+
USER_ENB-
USER_SYNC-
DET
MA- ASSE R
K36
MB-
MB+
MA+
K14
97522271
GND_OUT
EX P_OK+ K14
USER_ENB+
97522210
USER_SYNC+
USER_ENB-
USER_SYNC-
DET
ASSE H
K20
CEPH SLIDER
MA-
MB-
MB+
MA+
K20
97522273
ASSE S
K48
MA-
MB-
MB+
MA+
CHIN REST
K48
97522274
K52
K4 K46
FC_DRV_MIN
FC_DRV_MIN
LAS_GND
FC_VCC
FC_VCC
nKLED3
nkLED2
nkLED
ROW0
ROW1
97522216
LAS0
COL6
COL0
COL1
COL2
PFC
CIRCUIT BOARDS
K6 ILOCK
INTERLOCK
VCC
97521705
K1 K7 EMG_EXT EXT. EMERG.
B VCC 97521704
VEE
SCH. INVERTER 97661954 X1 STDBY
XRAY
97522191 RJ11 6/6 XRAY BUTTON
READY
BUTTON 97661209
VCC
K5
K10
NewTom GiANO HR - TECHNICAL MANUAL
CAN L
SCH. INVERTER 97661954 J15 CAN S RDY_LAMP+
97522190 CAN H READY LAMP
RDY_LAMP-
DRIVE XRY_LAMP+
OUT
SCHEDA MAIN 97661808 K43 XRY_LAMP- X-RAY LAMP
97522189
K9 K8
DL1: CAN DL11: EMG
C
DL2: ERR DL12: ON
DL3: CPU DL13: PC
DL4: VCC CAN DL14: VAC
DL5: OUT DL15: VDC
DL6: DRIVE DL16: 12V EXT
EN
DL7: RDYL DL17: 24V
DL8: XRYL DL18: 12V
DL9: BUT DL19: 3.3V
DL10: ILK DL20: FUSE
DL21: FUSE
NewTom GiANO HR - TECHNICAL MANUAL
7.3.3 FUSES
NAME DESCRIPTION NOTES
FH1 - FH2 390V toward Inverter board (for column) FUSE 8 AF 600VDC 10.3X38
FUSE 15 AF 250v 6.3X32 115V
FH3 - FH4 Main Power supply protection
FUSE 10 AF 250v 6.3X32 230V
Inverter
EN
K2
4 OUT
P.S. 97662070 K34
1 97522218
SCH. CONVERTER 97661807 K30 DRIVE K3
97522192 6 SCH. MAIN 97661808 K34
3
97522432
4
CIRCUIT BOARDS
1 CANL J15
SCH. PFC 97661806 K1 GND
SCH. PFC 97661806 K10
97522191 6 CANH
97522190
3
W GND
SPEED MOTOR COLUMN
GND
VDDF 97217500
MOTOR COLUMN V
97217500 4 K9 FC_IN_MAX
4 K8 FC_IN_MIN
3 FC_VCC FOTOCELLULE COLUMN
U 2
1 K8
FC_GND
FC_DRV_MIN 97522194
1 K9 FC_DRV_MAX
POT_TRIM
POT_GND
POT_VCC
MOTOR COLUMN
97217500
218
NewTom GiANO HR - TECHNICAL MANUAL
Converter
USER_SYNC+
USER_SYNC-
USER_ENB+
USER_ENB-
GND_OUT
GND_OUT
VCC_OUT
EXP_OK+
EXP_OK-
DET
K30
K35 K3
1 MA-
MB- STEPPER MOT. A (COLLIMAT.)
K2 MB+
MA+
97522277
1 MA-
MB- STEPPER MOT. U (COLLIMAT.)
K8 MB+
MA+
97522279
1 MA-
MB- STEPPER MOT. V (REVOLVER)
K14 MB+
MA+
97522281
1
K20
1 CANH
FC_IN_MIN
FC_VCC
FC_GND
FOTOCELL. STEPPER MOT. A (COLLIMAT.)
K7-6-5 1 FC_DRV_MIN 97522276
1
FC_IN_MIN
FC_VCC
FC_GND
FOTOCELL. STEPPER MOT. U (COLLIMAT.)
K12-11-9 1 FC_DRV_MIN 97522278
1
FC_IN_MIN
FC_VCC FOTOCELL. STEPPER MOT. V (REVOLVER)
FC_GND
K18-17-15 1 FC_DRV_MIN 97522280 + 97522282
1
K31 K27-25-22 1
K28 K29
K34 K37 K32 1
K33
1 1 1 1 1 1
LAS_GND
4 5 6
AUX1
LAS2
LAS1
TOIL
GNDF
SEL
HV+
HV-
LASER
GND
KVM
KVP
FIL+
FIL-
3 2 1 97522201
MONOBLOCK MONOBLOCK MONOBLOCK
97522202 97522203 97522204
CEPH Terminal
Block
TRIM1_OUT
TRIM0_OUT
VCC 5V
GND
GND
TRIM1_IN POTENZIOMETRO AURICOLARI
VCC 5V 97521114
K13
GND
TRIM0_IN POTENZIOMETRO NASION
VCC 5V 97521114
K12
K11
K14
COL2
COL1
COL0
DATA 1
DISEGNO RISERVATO A NORMA DI LEGGE VIETATA LA RIPRODUZIONE E LA DIVULGAZIONE
Console
RN1
CN1 U1
R1
CN2 R2
RN2
R3
R4
R5
C1
R6
KLED1
KLED0
KLED2
ROW0
ROW1
COL2
COL0
COL1
C3
D1
D2
FB1
C2
C4
C5
C6
R7
R8
U2
R10
R11
R12
R13
R14
R15
Y1 R9
Y2
DL1
U3
R16
R17
R18
FB2
C10
R19
R20
C11
C12
R21
C7
U4
C8
J1
D3
R22 R27
R23 R28
C9
DL2
DL3
Q1 Q2
J2 CN3
C13
C14
C15
FB3
R24
C16
C17
R25
R26
U6
CN4
DL4
DL5
U5
Q3 Q4
J3
230
24
26
2
CN5
CN6
229
23
25
1
R29
R30
R31
R32
R33
R34
R35
R36
R38
R39
C18
R40
R41
R37
R43
R42 R45
C19
C20
C21
C22
C23
R44 R46
D4 RN3 RN4
C24
C25 C26
C27
C28
7
C30
C31
U
C29
C32
R47
R48 C33
C34
C35
C36
L1
D5
D6 D7
Q5
C37 R49 C38 R50
R53 R54
C39 R51 R52
FB4
C40
FB5
Q6 Q7
C41
C42
Q8 Q9
R55 R56
C43
R57 R58 C44 R59 C45
R60
R61
R62
R63 Q11
C46
R64 R69
R70
R65
FB6
FB7
C48 R72
R66
R67 FB8
R68
C47
U8
Q10
R71
C49 C50
C51
R73
C52
U9
C53
FB9
FB10
MEC1 D8 MEC2
CN7
PE1
LF1
LF2
C54
C55
L2
PE2
LF3
LF4
L3
PE3
LF5
PZ1
CN8
D9
R74
R75
R76
R77
RT1
L4 C56
R78 R81
CN9
U11
U10 C57
R79
PE4
R80
F1
PE5
R82
C58
C59
R83
C60
C61
R84
R85
R86
D10
C62
CN10
FB11
FB12
R87
DL6
CN11
PE6
C63
CN12
C64
D11
U12
CN13
C65 L5
D12 F2
C67
R88 LF6
C68
C66
R89
R92
C69
R90
CN14
R93
R94
R95
CN15
C71
C72
R97
R98
C73
FB14
R99
C74
R96
DL7
DL8
D13
D14
C75
CN19
R100
CN17 Q12 CN18
Sensor interface
CONVERTER K3
1 6 2 7 3 8 10
K1
DL1
K2
DL3
DL2
K3
3
2
5
1
VCC / VDD
VCC / VDD
EXP_OK+
EXP_OK-
SYNC+
SYNC-
ENB+
ENB-
GND
GND
3D PANEL 3D PANEL
5-Port Switch
5V 3D PANEL (GLAN3)
(SWITCH GIGABIT)
from K30 - MAINBOARD PC - INTEL GIGABIT (GLAN1)
MAIN (LAN4)
2 CONSOLE (GLAN3)
5V
(SWITCH LAN)
from K3 - CONSOLE
POWER SUPPLY BOARD PC - COMMUNICATION (LAN)
8. CONNECTIVITY
2
SELECT
3
EDIT
CONTACT
SERVICE
FW
UPDATE
UPDATE
x2
SERVICE
In order to ensure the operational safety and functional reliability of the equipment installed, at least once a year.
2
1
2 3