1 First, the coordination, excavation, backfilling and leveling works: اﻋﻣﺎل اﻟﺣﻔر واﻟردم واﻟﺗﺳوﯾﺔ واﻟﺗﻧﺳﯾﻖ: اوﻻ
By cubic meters, backfill with good, clean soil, either from the excavation اﻟردم ﺑﺗرﺑﺔ ﺟﯾدة وﻧظﯾﻔﺔ ﺳواء ﻣن ﻣﻧﺗﺟﺎت، ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
products or import from outside the site on layers not exceeding 30 cm and 30 اﻟﺣﻔر أو اﻻﺳﺗﯾراد ﻣن ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎت ﻻ ﺗزﯾد ﻋن
according to the dimensions shown in the drawings with good tamping and ﺳم وﺣﺳب اﻷﺑﻌﺎد اﻟﻣوﺿﺣﺔ ﺑﺎﻟرﺳوﻣﺎت ﻣﻊ دك ﺟﯾد ورش ﺣﺗﻰ
spraying until obtaining a compaction ratio of not less than 90%, with taking ﻣﻊ اﻷﺧذ ﺑﻌﯾن، ٪90 ﻣ ﻣﻜﻌﺐ اﻟﺣﺻول ﻋﻠﻰ ﻧﺳﺑﺔ ﺿﻐط ﻻ أﻗل ﻣن
1.3 50 $10.0 $500.0
into considration the appropriate slopping to drain the water away from the اﻻﻋﺗﺑﺎر اﻻﻧﺣدار اﻟﻣﻧﺎﺳب ﻟﺗﺻرﯾف اﻟﻣﯾﺎه ﺑﻌﯾدًا ﻋن ﺟﺳم اﻟﻣﻧﺷﺄة M³
body of the facility according to the specified proportions on the drawings and وﻓﻘًﺎ ﻟﻠﻧﺳب اﻟﻣﺣددة ﻋﻠﻰ اﻟرﺳوﻣﺎت وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﺧﺎرج
transfer the exces soil off site, all the works muszt be according to the ، . وﺗﻛون ﺟﻣﯾﻊ اﻷﻋﻣﺎل ﺣﺳب اﻟﻣﺧططﺎت واﻟﻣواﺻﻔﺎت، اﻟﻣوﻗﻊ
drawings, specifications, BOQs, and instructions of the supervising engineer. . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، ﺟداول اﻟﻛﻣﯾﺎت
Total the coordination, excavation, backfilling and leveling works اﺟﻤﺎ اﻋﻤﺎل اﻟﺤﻔﺮ واﻟﺮدم واﻟ ﺴ ﺔ واﻟﺘ ﺴﻴﻖ رﻗﻤ ـ ــﺎ $3,200.00
"Secondly, the cement concrete mixs works: the concrete mixs must ﯾﺟب ﻋﻣل: أﻋﻣﺎل اﻟﺧﻠطﺎت اﻟﺧرﺳﺎﻧﯾﺔ اﻷﺳﻣﻧﺗﯾﺔ:ً ﺛﺎﻧﯾﺎ
be done by using michanical mixers, the price include all the related اﻟﺧﻠطﺎت اﻟﺧرﺳﺎﻧﯾﺔ ﺑﺎﺳﺗﺧدام ﺧﻼطﺎت ﻣﯾﻛﺎﻧﯾﻛﯾﺔ اﻟﺳﻌر
works, labours and all the materials to complete and finished the ﯾﺷﻣل ﺟﻣﯾﻊ اﻷﻋﻣﺎل اﻟﻣﺗﻌﻠﻘﺔ ﺑﮭﺎ واﻟﻣواد ﻹﻧﺟﺎز ﺑﻧد
work item according to drawings, BOQs, and Technical specification. اﻟﻌﻣل ﺣﺳب اﻟﻣﺧططﺎت وﺟداول اﻟﻛﻣﯾﺎت واﻟﻣواﺻﻔﺎت
The materials specification for it's components are as follows:- .اﻟﻔﻧﯾﺔ
The Cement is Alwahdah sulfite recistant Cement for all foundation - :ﺗﻛون ﻣواﺻﻔﺎت اﻟﻣواد ﻟﻣﻛوﻧﺎﺗﮭﺎ ﻛﻣﺎ ﯾﻠﻲ
2
works, and Al Wahdah ordenary cement for the other works, The اﻷﺳﻣﻧت ھو أﺳﻣﻧت اﻟوﺣدة اﻟﻣﻘﺎوم ﻟﻠﻛﺑرﯾت ﻟﺟﻣﯾﻊ
Aggregate is from Crushere plants, The sand is Tor-Al Baha sand, and وأﺳﻣﻧت اﻟوﺣدة اﻟﻌﺎدي ﻟﻸﻋﻣﺎل، أﻋﻣﺎل اﻷﺳﺎﺳﺎت
the Rienforcement steel bars are first quality Turkish steel واﻟرﻣل ھو رﻣل، واﻟرﻛﺎم ﻣن ﻣﺻﺎﻧﻊ اﻟﻛﺳﺎرة، اﻷﺧرى
reinforcement bars." وﻗﺿﺑﺎن ﺣدﯾد اﻟﺗﺳﻠﯾﺢ ھﻲ ﻗﺿﺑﺎن ﺣدﯾد، طور اﻟﺑﺎﺣﺔ
. .اﻟﺗﺳﻠﯾﺢ اﻟﺗرﻛﯾﺔ ذات اﻟﺟودة اﻷوﻟﻰ
"By Square meter: Supply and construction of flatining standard cement ﺗورﯾد وﺑﻧﺎء اﻟﺧرﺳﺎﻧﺔ اﻷﺳﻣﻧﺗﯾﺔ اﻟﻣﺳطﺣﺔ:"ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
concrete for flooring with 10 cm thickness and with a compressive resistance ، 2 ﺳم/ ﻛﺟم200 ﺳم وﻣﻘﺎوﻣﺔ ﺿﻐط10 ﻟﻸرﺿﯾﺎت ﺑﺳﻣك
of 200 kg/cm², the price included putting hard broken stones soling covering, وﯾﺷﻣل اﻟﺳﻌر وﺿﻊ ﻏطﺎء ﻣن اﻟﺣﺟر اﻟﺻﻠب اﻟﻣﻛﺳور أﺳﻔل
underneath the concrete, with a thickness of 10cm, with water spraying and ﯾﺗم، ﻣﻊ أﻋﻣﺎل رش اﻟﻣﯾﺎه واﻟﺗﺷطﯾب، ﺳم10 اﻟﺧرﺳﺎﻧﺔ ﺑﺳﻣك ﻣ ﻣ ــﻊ
2.2 105 $18.0 $1,890.0
finishing works, all of that is to be put below floor's tiles for the ground floor وﺿﻊ ﻛل ذﻟك أﺳﻔل ﺑﻼط اﻷرﺿﯾﺔ ﻟﻠطﺎﺑﻖ اﻷرﺿﻲ وﻓﻘًﺎ M²
according drawings, BOQs, technical specification, and the instruction of to ﻟﻠرﺳوﻣﺎت وﺟداول اﻟﻛﻣﯾﺎت واﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ وﺗﻌﻠﯾﻣﺎت
the supervisor engineer. .اﻟﻣﮭﻧدس اﻟﻣﺷرف
By cubic meter, supply and construction of reinforced cement concrete for the ﺗورﯾد وﺑﻧﺎء اﻟﺧرﺳﺎﻧﺔ اﻷﺳﻣﻧﺗﯾﺔ اﻟﻣﺳﻠﺣﺔ، ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
foundation's footings, columns necks, and for ground's tie beams using sulfite وﻋوارض رﺑط اﻷرض، وأﻋﻧﺎق اﻷﻋﻣدة، ﻟﻘواﻋد اﻷﺳﺎس
recistance Cement of Alwahdah brand, the concrete mix should be with a ﯾﺟب أن، ﺑﺎﺳﺗﺧدام اﻷﺳﻣﻧت اﻟﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻣن ﻣﺎرﻛﺔ اﻟوﺣده
compressive resistance strength of not less than 250 kg/cm², the price ﻛﺟم250 ﯾﻛون اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔ ذات ﻣﻘﺎوﻣﺔ ﺿﻐط ﻻ ﺗﻘل ﻋن
includes (Shuttering works, reinforcing iron bars, labours, mechanical casting ، اﻟﻌﻣﺎﻟﺔ، ﺣدﯾد اﻟﺗﺳﻠﯾﺢ، اﻟﺳﻌر ﯾﺷﻣل )اﻋﻣﺎل اﻟﻐﻠﻖ² ﺳم/
ﻣ ﻣﻜﻌﺐ
2.3 and shaking with Vibrators, water spraying (twice a day) for not less than 3 رش اﻟﻣﺎء )ﻣرﺗﯾن، اﻟﺻب اﻟﻣﯾﻛﺎﻧﯾﻛﻲ و اﻻھﺗزاز ﺑﺎﻻھﺗزاز 18 $380.0 $6,840.0
M³
weeks, the price also include constructing a layer from graveley materials for اﻟﺳﻌر ﯾﺷﻣل اﯾﺿﺎ اﻧﺷﺎء طﺑﻘﺔ، اﺳﺎﺑﯾﻊ3 ﯾوﻣﯾﺎ( ﻟﻣدة ﻻ ﺗﻘل ﻋن
the ground ties's beams foundation, with a thickness 15 cm with all finishing ﺳم ﻣﻊ15 اﻷﺳﺎس ﺑﺳﻣك.ﻣن ﻣواد اﻟﺣﺻﻰ ﻟﻌوارض ارﺿﯾﺔ
works), the works must be according to the drawings, BOQs, the technical ﯾﺟب أن ﺗﻛون اﻷﻋﻣﺎل طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت، (ﻛﺎﻓﺔ أﻋﻣﺎل اﻟﺗﺷطﯾب
specification, and the instructions of Supervisor Engineer. .وﺟداول اﻟﻛﻣﯾﺎت واﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف