You are on page 1of 1

Bill Of Quantities and Quatation For Wadi Al-Aggab Medical Building Construction, in

Wadi Al-Aggab Village, Al-Mawasit District, Taiz Governorate

‫ﺳﻌر اﻟوﺣدة‬ ‫اﺟﻣﺎﻟﻲ اﻟﺳﻌر‬


‫اﻟﺒﻨﺪ‬ ‫اﻟﻮﺣﺪة‬ ‫اﻟ ﻤ ﺔ‬ Unit Price Total Price
Work Description ‫ﺑ ـ ـ ـ ــﺎن اﻷﻋﻤﺎل‬
Item Unit Quantity
USD $ ‫ دوﻻر‬USD $ ‫دوﻻر‬

1 First, the coordination, excavation, backfilling and leveling works: ‫ اﻋﻣﺎل اﻟﺣﻔر واﻟردم واﻟﺗﺳوﯾﺔ واﻟﺗﻧﺳﯾﻖ‬: ‫اوﻻ‬

‫ ﻋن طرﯾﻖ ﺣﻔر‬، ‫أﻋﻣﺎل اﻟﺗﺟرﯾف واﻟﺗﺳوﯾﺔ ﺑﺎﻟﻣوﻗﻊ‬


The site strepping and levelling work, by excavation of existing comulative soil ، (‫ ﺣﺻﻰ‬، ‫ رﻣل‬، ‫ﻣواد اﻟﺗرﺑﺔ اﻟﺗراﻛﻣﯾﺔ اﻟﻘﺎﺋﻣﺔ )ﺻﺧور‬
(Rocks, sand, gravels) materials works, the price include excavation of the part
× ‫ م‬6) ‫ﻣﻘﻄﻮﻋ ﺔ اﻟﺳﻌر ﯾﺷﻣل ﺣﻔر ﺟزء ﻣن ﻣﻧطﻘﺔ اﻟﺻﺧر ﺑﺄﺑﻌﺎد‬
1.1 of the rock area with dimentions of (6mx5mx4m), the price also include 1 $1,500.0 $1,500.0
disposal of the excavated materials and transfer to suitable specified place as ‫ اﻟﺳﻌر ﯾﺷﻣل أﯾﺿﺎ اﻟﺗﺧﻠص ﻣن اﻟﻣواد‬، (‫ م‬4 × ‫ م‬5 L.S
per the direction of supervisor Engineer. ‫اﻟﻣﺣﻔورة وﻧﻘﻠﮭﺎ إﻟﻰ ﻣﻛﺎن ﻣﺣدد ﻣﻧﺎﺳب ﺣﺳب‬
.‫ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
By cubic meters, excavation of mixed soil (silty, sandy, graveley, rock soil) for
foundations, bases and inside buildings, with the dimensions indicated on the ، ‫ اﻟرﻣﻠﯾﺔ‬، ‫ ﺣﻔر اﻟﺗرﺑﺔ اﻟﻣﺧﺗﻠطﺔ )اﻟطﯾﻧﯾﺔ‬، ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
drawings, with reinforcement of the excavation sides, and according to ‫ اﻟﺗرﺑﺔ اﻟﺻﺧرﯾﺔ( ﻟﻸﺳﺎﺳﺎت واﻟﻘواﻋد واﻟﻣﺑﺎﻧﻲ‬، ‫اﻟﺣﺻوﯾﺔ‬
‫ﻣ ﻣﻜﻌﺐ‬
1.2 drawings, BOQs, and the instruction of Supervisor Engineer. ‫ ﻣﻊ ﺗدﻋﯾم ﺟواﻧب‬، ‫ ﺑﺎﻷﺑﻌﺎد اﻟﻣوﺿﺣﺔ ﻓﻲ اﻟرﺳوﻣﺎت‬، ‫اﻟداﺧﻠﯾﺔ‬ 80 $15.0 $1,200.0

‫ و ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬، ‫ ﺟداول اﻟﻛﻣﯾﺎت‬، ‫ ووﻓﻘًﺎ ﻟﻠرﺳوﻣﺎت‬، ‫اﻟﺣﻔر‬
.‫اﻟﻣﺷرف‬

By cubic meters, backfill with good, clean soil, either from the excavation ‫ اﻟردم ﺑﺗرﺑﺔ ﺟﯾدة وﻧظﯾﻔﺔ ﺳواء ﻣن ﻣﻧﺗﺟﺎت‬، ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
products or import from outside the site on layers not exceeding 30 cm and 30 ‫اﻟﺣﻔر أو اﻻﺳﺗﯾراد ﻣن ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎت ﻻ ﺗزﯾد ﻋن‬
according to the dimensions shown in the drawings with good tamping and ‫ﺳم وﺣﺳب اﻷﺑﻌﺎد اﻟﻣوﺿﺣﺔ ﺑﺎﻟرﺳوﻣﺎت ﻣﻊ دك ﺟﯾد ورش ﺣﺗﻰ‬
spraying until obtaining a compaction ratio of not less than 90%, with taking ‫ ﻣﻊ اﻷﺧذ ﺑﻌﯾن‬، ٪90 ‫ﻣ ﻣﻜﻌﺐ اﻟﺣﺻول ﻋﻠﻰ ﻧﺳﺑﺔ ﺿﻐط ﻻ أﻗل ﻣن‬
1.3 50 $10.0 $500.0
into considration the appropriate slopping to drain the water away from the ‫اﻻﻋﺗﺑﺎر اﻻﻧﺣدار اﻟﻣﻧﺎﺳب ﻟﺗﺻرﯾف اﻟﻣﯾﺎه ﺑﻌﯾدًا ﻋن ﺟﺳم اﻟﻣﻧﺷﺄة‬ M³
body of the facility according to the specified proportions on the drawings and ‫وﻓﻘًﺎ ﻟﻠﻧﺳب اﻟﻣﺣددة ﻋﻠﻰ اﻟرﺳوﻣﺎت وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﺧﺎرج‬
transfer the exces soil off site, all the works muszt be according to the ، .‫ وﺗﻛون ﺟﻣﯾﻊ اﻷﻋﻣﺎل ﺣﺳب اﻟﻣﺧططﺎت واﻟﻣواﺻﻔﺎت‬، ‫اﻟﻣوﻗﻊ‬
drawings, specifications, BOQs, and instructions of the supervising engineer. .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬، ‫ﺟداول اﻟﻛﻣﯾﺎت‬

Total the coordination, excavation, backfilling and leveling works ‫اﺟﻤﺎ اﻋﻤﺎل اﻟﺤﻔﺮ واﻟﺮدم واﻟ ﺴ ﺔ واﻟﺘ ﺴﻴﻖ‬ ‫رﻗﻤ ـ ــﺎ‬ $3,200.00

"Secondly, the cement concrete mixs works: the concrete mixs must ‫ ﯾﺟب ﻋﻣل‬:‫ أﻋﻣﺎل اﻟﺧﻠطﺎت اﻟﺧرﺳﺎﻧﯾﺔ اﻷﺳﻣﻧﺗﯾﺔ‬:ً ‫ﺛﺎﻧﯾﺎ‬
be done by using michanical mixers, the price include all the related ‫اﻟﺧﻠطﺎت اﻟﺧرﺳﺎﻧﯾﺔ ﺑﺎﺳﺗﺧدام ﺧﻼطﺎت ﻣﯾﻛﺎﻧﯾﻛﯾﺔ اﻟﺳﻌر‬
works, labours and all the materials to complete and finished the ‫ﯾﺷﻣل ﺟﻣﯾﻊ اﻷﻋﻣﺎل اﻟﻣﺗﻌﻠﻘﺔ ﺑﮭﺎ واﻟﻣواد ﻹﻧﺟﺎز ﺑﻧد‬
work item according to drawings, BOQs, and Technical specification. ‫اﻟﻌﻣل ﺣﺳب اﻟﻣﺧططﺎت وﺟداول اﻟﻛﻣﯾﺎت واﻟﻣواﺻﻔﺎت‬
The materials specification for it's components are as follows:- .‫اﻟﻔﻧﯾﺔ‬
The Cement is Alwahdah sulfite recistant Cement for all foundation - :‫ﺗﻛون ﻣواﺻﻔﺎت اﻟﻣواد ﻟﻣﻛوﻧﺎﺗﮭﺎ ﻛﻣﺎ ﯾﻠﻲ‬
2
works, and Al Wahdah ordenary cement for the other works, The ‫اﻷﺳﻣﻧت ھو أﺳﻣﻧت اﻟوﺣدة اﻟﻣﻘﺎوم ﻟﻠﻛﺑرﯾت ﻟﺟﻣﯾﻊ‬
Aggregate is from Crushere plants, The sand is Tor-Al Baha sand, and ‫ وأﺳﻣﻧت اﻟوﺣدة اﻟﻌﺎدي ﻟﻸﻋﻣﺎل‬، ‫أﻋﻣﺎل اﻷﺳﺎﺳﺎت‬
the Rienforcement steel bars are first quality Turkish steel ‫ واﻟرﻣل ھو رﻣل‬، ‫ واﻟرﻛﺎم ﻣن ﻣﺻﺎﻧﻊ اﻟﻛﺳﺎرة‬، ‫اﻷﺧرى‬
reinforcement bars." ‫ وﻗﺿﺑﺎن ﺣدﯾد اﻟﺗﺳﻠﯾﺢ ھﻲ ﻗﺿﺑﺎن ﺣدﯾد‬، ‫طور اﻟﺑﺎﺣﺔ‬
. .‫اﻟﺗﺳﻠﯾﺢ اﻟﺗرﻛﯾﺔ ذات اﻟﺟودة اﻷوﻟﻰ‬

By cubic meters: supply and construct of ordinary cement concrete 10 cm thick


and of compressive resistance strength of 200 kg /cm² (after 28 days ), for the 10 ‫ ﺗورﯾد وإﻧﺷﺎء ﺧرﺳﺎﻧﺔ أﺳﻣﻧﺗﯾﺔ ﻋﺎدﯾﺔ ﺑﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
works of beneath the foundations and bases.The price includes dayly water ‫ ﯾوم( ﻟﻸﻋﻣﺎل‬28 ‫ )ﺑﻌد‬2 ‫ ﺳم‬/ ‫ ﻛﺟم‬200 ‫ﺳم وﻣﻘﺎوﻣﺔ ﺿﻐط‬
spraying for not less than 2 weeks, the price also include all the related ‫ﻣ ﻣﻜﻌﺐ ﺗﺣت اﻷﺳﺎﺳﺎت واﻷﺳﺎﺳﺎت وﯾﺷﻣل اﻟﺳﻌر رش اﻟﻣﯾﺎه ﯾوﻣﯾﺎ ً ﺑﻣﺎ ﻻ‬
2.1 4 $140.0 $560.0
materials and works that is needed to finish the work item according to the ‫ ﯾﺷﻣل اﻟﺳﻌر أﯾﺿًﺎ ﺟﻣﯾﻊ اﻟﻣواد ذات اﻟﺻﻠﺔ‬، ‫ﯾﻘل ﻋن أﺳﺑوﻋﯾن‬ M³
drawings, Technical specifications,BOQs, and the instructions of the supervisor ‫واﻷﻋﻣﺎل اﻟﻼزﻣﺔ ﻹﻧﮭﺎء ﺑﻧد اﻟﻌﻣل وﻓﻘًﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
engineer. .‫اﻟﻔﻧﯾﺔ وﺟداول اﻟﻛﻣﯾﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

"By Square meter: Supply and construction of flatining standard cement ‫ ﺗورﯾد وﺑﻧﺎء اﻟﺧرﺳﺎﻧﺔ اﻷﺳﻣﻧﺗﯾﺔ اﻟﻣﺳطﺣﺔ‬:‫"ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
concrete for flooring with 10 cm thickness and with a compressive resistance ، 2 ‫ ﺳم‬/ ‫ ﻛﺟم‬200 ‫ ﺳم وﻣﻘﺎوﻣﺔ ﺿﻐط‬10 ‫ﻟﻸرﺿﯾﺎت ﺑﺳﻣك‬
of 200 kg/cm², the price included putting hard broken stones soling covering, ‫وﯾﺷﻣل اﻟﺳﻌر وﺿﻊ ﻏطﺎء ﻣن اﻟﺣﺟر اﻟﺻﻠب اﻟﻣﻛﺳور أﺳﻔل‬
underneath the concrete, with a thickness of 10cm, with water spraying and ‫ ﯾﺗم‬، ‫ ﻣﻊ أﻋﻣﺎل رش اﻟﻣﯾﺎه واﻟﺗﺷطﯾب‬، ‫ ﺳم‬10 ‫اﻟﺧرﺳﺎﻧﺔ ﺑﺳﻣك‬ ‫ﻣ ﻣ ــﻊ‬
2.2 105 $18.0 $1,890.0
finishing works, all of that is to be put below floor's tiles for the ground floor ‫وﺿﻊ ﻛل ذﻟك أﺳﻔل ﺑﻼط اﻷرﺿﯾﺔ ﻟﻠطﺎﺑﻖ اﻷرﺿﻲ وﻓﻘًﺎ‬ M²
according drawings, BOQs, technical specification, and the instruction of to ‫ﻟﻠرﺳوﻣﺎت وﺟداول اﻟﻛﻣﯾﺎت واﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ وﺗﻌﻠﯾﻣﺎت‬
the supervisor engineer. .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

By cubic meter, supply and construction of reinforced cement concrete for the ‫ ﺗورﯾد وﺑﻧﺎء اﻟﺧرﺳﺎﻧﺔ اﻷﺳﻣﻧﺗﯾﺔ اﻟﻣﺳﻠﺣﺔ‬، ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
foundation's footings, columns necks, and for ground's tie beams using sulfite ‫ وﻋوارض رﺑط اﻷرض‬، ‫ وأﻋﻧﺎق اﻷﻋﻣدة‬، ‫ﻟﻘواﻋد اﻷﺳﺎس‬
recistance Cement of Alwahdah brand, the concrete mix should be with a ‫ ﯾﺟب أن‬، ‫ﺑﺎﺳﺗﺧدام اﻷﺳﻣﻧت اﻟﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻣن ﻣﺎرﻛﺔ اﻟوﺣده‬
compressive resistance strength of not less than 250 kg/cm², the price ‫ ﻛﺟم‬250 ‫ﯾﻛون اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔ ذات ﻣﻘﺎوﻣﺔ ﺿﻐط ﻻ ﺗﻘل ﻋن‬
includes (Shuttering works, reinforcing iron bars, labours, mechanical casting ، ‫ اﻟﻌﻣﺎﻟﺔ‬، ‫ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ‬، ‫ اﻟﺳﻌر ﯾﺷﻣل )اﻋﻣﺎل اﻟﻐﻠﻖ‬²‫ ﺳم‬/
‫ﻣ ﻣﻜﻌﺐ‬
2.3 and shaking with Vibrators, water spraying (twice a day) for not less than 3 ‫ رش اﻟﻣﺎء )ﻣرﺗﯾن‬، ‫اﻟﺻب اﻟﻣﯾﻛﺎﻧﯾﻛﻲ و اﻻھﺗزاز ﺑﺎﻻھﺗزاز‬ 18 $380.0 $6,840.0

weeks, the price also include constructing a layer from graveley materials for ‫ اﻟﺳﻌر ﯾﺷﻣل اﯾﺿﺎ اﻧﺷﺎء طﺑﻘﺔ‬، ‫ اﺳﺎﺑﯾﻊ‬3 ‫ﯾوﻣﯾﺎ( ﻟﻣدة ﻻ ﺗﻘل ﻋن‬
the ground ties's beams foundation, with a thickness 15 cm with all finishing ‫ ﺳم ﻣﻊ‬15 ‫ اﻷﺳﺎس ﺑﺳﻣك‬.‫ﻣن ﻣواد اﻟﺣﺻﻰ ﻟﻌوارض ارﺿﯾﺔ‬
works), the works must be according to the drawings, BOQs, the technical ‫ ﯾﺟب أن ﺗﻛون اﻷﻋﻣﺎل طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬، (‫ﻛﺎﻓﺔ أﻋﻣﺎل اﻟﺗﺷطﯾب‬
specification, and the instructions of Supervisor Engineer. .‫وﺟداول اﻟﻛﻣﯾﺎت واﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

You might also like