Professional Documents
Culture Documents
concrete vibrators
Skilled Labourer
concrete mixers
Concrete Mixer
wheelbarrrows
Tipper /Truck
Water Bowser
EQUIPMENTS PERSONEL
Drum Roller
CONTRACT PERIOD:4 MONTHS
scaffolding
Site Agent
exacators
Surveyor
Foreman
QUANTITY UNIT BID ACTIVITY
Stripper
backhoe
Trowels
Casuals
Pickup
shovel
UNIT M1 M2 M3 M4
picks
IN BOQ RATE (Ksh) (MONTHs)
ACTIVITY
BILL NO 0.2
MOBILIZATION
22-63-008 Crawler Tractor (e.g. D4/D5) : 90 - 100 HP (Road Formation) EH 24.00 5,000.00
DEMOBILIZATION 0.2
CASH FLOW STATEMENT
MONTHLY CASH FLOW PROJECTION (16 % VAT INCLUSIVE) 779,810.00 779,810.00 779,810.00 779,810.00
MONTHLY CASH FLOW (KSH IN MILLIONS) 0.78 0.78 0.78 0.78
CUMULATIVE CASH FLOW
779,810.00 1,559,620.00 2,339,430.00 3,119,240.00
CUMULATIVE CASH FLOW (KSH IN MILLIONS)
0.78 1.56 2.34 3.12
NOTES
VALUE OF INTERIM PAYEMENT CERTIFICATES (16 % VAT IPC 1 IPC 2 contigency sum will be utilised when and where
INCLUSIVE )
2,339,430.00 #VALUE! instructed by the Engineer within the contract period
to achieve 100% progress
LESS 5% RETENTION MONEY (KSH) 116,971.50 #VALUE!
NET PAYMENT (Ksh) 2,222,458.50 #VALUE!
2.50 2.34
2.00
1.56
1.50
1.00
0.78
0.78
0.78
0.78
0.50
------
-
0 5 TIME
10 (MONTHS
15 20 25 30