concrete vibrators
Skilled Labourer
Concrete Mixer
concrete mixers
DENASIRI INVESTMENT LIMITED
wheelbarrrows
CONTRACTOR
Water Bowser
Tipper /Truck
Drum Roller
scaffolding
Site Agent
ACTIVIT EQUIPMENTS PERSONEL
exacators
Foreman
Surveyor
CONTRACT PERIOD:4 MONTHS
backhoe
Stripper
Trowels
QUANTITY UNIT BID Y
Casuals
Pickup
shovel
UNIT M1 M2 M3 M4 M12
picks
IN BOQ RATE (Ksh) (MONTHs
ACTIVITY )
BILL NO 0.2
MOBILIZATION
DEMOBILIZATION 0.2
CASH FLOW STATEMENT
MONTHLY CASH FLOW PROJECTION (16 % VAT INCLUSIVE) 833,460.00 833,460.00 833,460.00 833,460.00
MONTHLY CASH FLOW (KSH IN MILLIONS) 0.83 0.83 0.83 0.83
CUMULATIVE CASH FLOW
833,460.00 1,666,920.00 2,500,380.00 3,333,840.00
CUMULATIVE CASH FLOW (KSH IN MILLIONS)
0.83 1.67 2.50 3.33
NOTES
VALUE OF INTERIM PAYEMENT CERTIFICATES (16 % VAT IPC 1 IPC 2 IPC 4 contigency sum will be utilised when and where
INCLUSIVE )
2,500,380.00 #REF! instructed by the Engineer within the contract period
LESS 5% RETENTION MONEY (KSH) to achieve 100% progress
125,019.00 #REF!
NET PAYMENT (Ksh) 2,375,361.00 #REF!
CUMULATAVE NET PAYMENT(ksh) 2,500,380.00 3,333,840.00
TENDER SUM
12.00
10.00
MILLIONS
8.00
6.00
4.00 3.33
2.50
2.00 1.67
0.83
0.83
0.83
0.83
- -- -0.00
- - - -- - - - - -- - - - - -
-
0 10 20 30
(2.00)
TIME (MONTHS