The document describes a bridge with the following details: - It has 5 spans on the Kallakudi side measuring 8.42m each and 9 spans on the Muthuvathur side in a skewed alignment. - The bridge has a total length of 51.4m and a roadway width of 9.95m with a 7.5m wide carriageway. - It provides elevations for various points along the bridge including the approach levels, road level, mud mat level and foundation bottom levels.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
249 views1 page

GAD Model

The document describes a bridge with the following details: - It has 5 spans on the Kallakudi side measuring 8.42m each and 9 spans on the Muthuvathur side in a skewed alignment. - The bridge has a total length of 51.4m and a roadway width of 9.95m with a 7.5m wide carriageway. - It provides elevations for various points along the bridge including the approach levels, road level, mud mat level and foundation bottom levels.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

KALLAKUDI SIDE 5 SPANS OF 8.42 m c/c IN SQUARE(10.

280m c/c IN SKEW) , MUTHUVATHUR SIDE


9.95m ROADWAY HAVING 7.50m CARRIAGEWAY WITH 0.75m WIDE
SAFETY KERB & CRASH BARRIER 0.475m ON EITHER SIDE.
SKEW BRIDGE IN SKEW ALIGNMENT
(Length of bridge = 51.400m )

A1 P1 P2 P3 P4 A2

CL OF EXP. JOINT

CL OF EXP. JOINT

CL OF EXP. JOINT

CL OF EXP. JOINT

CL OF EXP. JOINT

CL OF EXP. JOINT
CH:202.390
CH:181.830

CH:212.670
CH:192.110

CH:222.950
CH:171.550
LEVEL LEVEL
PORTION LENGTH OF BRIDGE PORTION
15.000m 53.250m 15.000m

AS PER IRC GUIDELINES, AS PER IRC GUIDELINES,


102.000 APPROACHES SHALL BE ROAD LEVEL AT CENTRE RL(+)101.840 APPROACHES SHALL BE
MERGED SUITABLY MERGED SUITABLY
BOD RL (+)101.065
101.000
MFL RL (+)100.015
100.000

99.000 98.788
98.188 98.218 98.398
98.000 SILL LEVEL RL (+)98.015
97.288
97.000
NOTES:-
96.000
1. ALL DIMENSIONS AND LEVELS ARE IN " m ".
BOTTOM OF FOUNDATION 2. ALL CHAINAGES ARE IN " m ".
95.000
RL (+) 95.000 3. CHAINAGES AT CENTRE LINE OF EXPANSION JOINTS OF ABUTMENT
94.000 AND PIERS ARE FIXED BAESD ON FIELD PARTICULARS. HOWEVER,
DURING EXECUTION, THESE MAY BE CORRECTLY ASSESSED TO SUIT
93.000 THE SITE CONDITION AND MAY BE MODIFIED IF NECESSARY.
92.000 4. BOTTOM LEVELS OF FOUNDATIONS ARE FIXED, BASED ON
AVAILABLE BORE LOG PARTICULARS . IF THERE IS ANY VARIATION
91.000 90.688 90.718 90.778 90.708 90.898 IN THE FOUNDATION LEVEL, THE REVISED DESIGN MAY BE GOT
APPROVED FROM THE COMPETENT AUTHORITY BEFORE EXECUTION.
90.000 89.788 5. APPROACHES SHALL BE SUITABLY MERGED WITH EXISTING ROAD
AS PER IRC GUIDELINES .
89.000
LEGEND 6. EMBANKMENT SHALL BE CONTINUED BEYOND THE RETURN WALL
88.000 AS PER SITE CONDITIONS AND REVETMENT SHALL BE PROVIDED
ACCORDINGLY.
87.000 GRAVELLY SAND 7. EXPOSURE :- SEVERE AS PER Cl.14.3.1 OF IRC:112-2020.
8. SEISMIC ZONE :- II
86.000 SDR 9. SUITABLE PROTECTIVE WORKS SUCH AS QUADRANT
85.000 84.898 REVETMENT AND SIDE SLOPE REVETMENT SHALL BE
84.688 84.718 84.778 84.708
SOFT ROCK PROVIDED AS WARRANTED BY SITE CONDITION.
84.000 83.788 REMOVE THE OBSTRUCTIONS IN RIVER ON BOTH U/S & D/S
MEDIUM ROCK SIDE OF PROPOSED BRIDGE LOCATION FOR THE ENTIRE WIDTH.
83.000 10. SILT CLEARANCE IN BOTH U/S & D/S SHALL BE DONE TO
KEEP THE WATER WAY FULLY EFFECTIVE
82.000
11. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE OTHER
81.000 RELEVANT DRAWINGS OF THIS WORK.

80.000

79.000
BENCH MARK :
78.000
TBM 1: RL(+)100.598 IS MARKED OVER RETAINING WALL AT CH:2+388
77.000

76.000 TBM 2: RL(+)100.554 IS MARKED OVER RETAINING WALL AT CH: 2+407

75.000
TBM 3: RL(+)101.302 IS MARKED OVER THE ROAD AT CH: 2+134
74.188
74.000
73.288
73.000 72.718 72.778 72.708 72.898

72.000
CH:225.000
CH:218.000
CH:186.000

CH:194.000

CH:201.000
CH:179.000

BORE:3
BORE:2

BORE:4

BORE:5

BORE:6
BORE:1

OFFICE OF THE
DATUM CHIEF ENGINEER(H)
AE (H) PLANNING,DESIGNS AND INVESTIGATION,GUINDY,CHENNAI 600 025

CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 2/4


PROPOSED LEVEL
OF KALLAKUDI- MUTHUVATHUR
ADE(H) -XIV ROAD IN LIEU OF EXISTING CAUSEWAY
101.049

100.985

100.930

100.649

100.326

100.186

100.053

100.049

100.159

100.339

100.519

100.676

100.718

100.626

100.625
EXISTING LEVEL
220.910

GENERAL ARRANGEMENT DRAWING


218.058
203.854
173.390
177.640

184.188

211.410
197.250
190.585

DE(H) - IV
240

260

300

320
220
100

120

140

160

280
200
180
60

80

ALIGNMENT CHAINAGE
DRG.No. 49 / 2023-2024 / Dn-IV/ HLB - 01
JCE(H) P,D&I
2180.000

2200.000

2220.000

2240.000

2260.000

2280.000

2300.000

2320.000

2340.000

2360.000

2380.000

2400.000

2420.000

2440.000

2460.000
SCALE REV
H=1:500
CHIANAGES -
V=1:100 CHIEF ENGINEER (H), PD&I, CHENNAI -25

You might also like