NEW BRIDGE
CBS MODULAR BRIDGE DESIGN REQUIREMENTS
BRIDGE No: 1. THE FOLLOWING STRUCTURAL ELEMENTS ARE NOT COVERED IN THIS
DESIGN FILE No: STANDARD DESIGN AND SHALL BE DESIGNED, VERIFIED AND CERTIFIED IN ACCORDANCE
AS/RMS 5100.5 INTERIM - MAY 2015 · PILES, PILE CAPS, COLUMNS, WALL UNDER ABUTMENT SILL BEAM AND FOOTINGS.
· ANCHORAGE REINFORCEMENT FROM PILES, COLUMNS, FOOTINGS, WALLS AND PILE CAPS
MAXIMUM No OF VEHICLES PER DAY: 150
INTO HEADSTOCK AND SILL BEAM RECESSES.
CARRIAGEWAY WIDTH: 4200mm
· RESTRAINT AND HOLDING DOWN BRACKETS FOR BRIDGES WHERE THE ULTIMATE
WATER FLOW VELOCITY EXCEEDS 4m/s AND WHERE THE OVERTOPPING EXCEEDS 5m.
ROAD TRAFFIC LOADING: SM1600
· THE PIER HEADSTOCK SUPPORTING UNEQUAL SPANS ON EACH SIDE.
NUMBER OF DESIGN LANES: 1
· TRAFFIC BARRIER, RAILING, ATTACHMENTS, RESTRAINT BRACKET, REINFORCEMENTS
DESIGN TRAFFIC SPEED:
IN THE PRECAST MODULES AND WINGWALLS FOR BARRIERS WITH HIGHER
ACCOMPANYING LANE FACTORS: 1
PERFORMANCE LEVEL THAN LOW.
FATIGUE LOADING:
· TEMPORARY SUPPORTS AND BRACINGS FOR ALL PRECAST ELEMENTS.
NUMBER OF HEAVY VEHICLES PER LANE PER DAY: MAXIMUM 20
· ANY REQUIRED EMBANKMENT/SCOUR PROTECTION.
ROUTE FACTOR: 0.5 LOCALITY PLAN 2. THE SUBSTRUCTURES ARE DESIGNED FOR MAXIMUM OUT OF POSITION
+
-
OF PILES MEASURED AT CUT OFF LEVELS OF PILES OF 75mm.
TRAFFIC BARRIER PERFORMANCE LEVEL: LOW
THE DESIGN BARRIER PERFORMANCE LEVEL IS LOW. IF ANY OTHER
PERFORMANCE LEVEL IS REQUIRED FOR A SPECIFIC SITE, THE DESIGN SHALL REFERENCE DOCUMENTS:
CBS OVERARCHING GUIDE
BE ADJUSTED IN ACCORDANCE WITH AS 5100.
CBS SUITABILITY AND INVESTIGATION GUIDE
WIND LOADING REFERENCE DOCUMENTS PARTICULARLY THE DESIGN GUIDE AND TO BE OCCURS AT EACH JACKING POINT AT ALL TIMES DURING THE JACKING OPERATION.
DESIGN SPEED = m/sec at SLS CONSTRUCTED IN ACCORDANCE WITH RMS QA CONSTRUCTION SPECIFICATIONS. AT PIERS BOTH ENDS OF GIRDERS SHALL BE JACKED SIMULTANEOUSLY.
= m/sec at ULS ANY VARIATION TO THIS STANDARD DRAWING SHALL NOT BE USED STEEL PLATES SHALL BE PLACED BETWEEN CONCRETE BEARING SURFACES AND
WITHOUT THE APPROVAL OF THE RMS PRINCIPAL ENGINEER BRIDGES. JACK TO ENSURE CONCRETE BEARING STRESS AT SLS DOES NOT EXCEED 18 MPa.
WATER FLOW DATA DENOTES DESIGN DATA RELEVANT TO THE SPECIFIC SITE TO BE DETERMINED
ARI
(i) ABUTMENT A
PREPARED BY
(ii) PIER 1 BRIDGE ENGINEERING
DIFFERENTIAL SETTLEMENT:
DESIGNED AND PRODUCED UNDER A QUALITY SYSTEM CERTIFIED AS REGISTRATION No OF PLANS
mm TOTAL BETWEEN BRIDGE SUPPORTS
COMPLYING WITH ISO/AS 9001 BY AN ACCREDITED CERTIFICATION BODY
W Ariyaratne
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS:
07.10.2016 SHEET No MB8SL01 No OF SHEETS 40 ISSUE
DATE
MB8SL03 GENERAL ARRANGEMENT - SHEET A B30 EXCAVATION AND BACKFILL FOR BRIDGEWORKS.
MB8SL05 GENERAL ARRANGEMENT - SHEET C B58 BORED CAST-IN-PLACE REINFORCED CONCRETE PILES (WITH PERMANENT CASING).
MB8SL06 GENERAL ARRANGEMENT - SHEET D B59 BORED CAST-IN-PLACE REINFORCED CONCRETE PILES (WITHOUT PERMANENT CASING).
MB8SL07 PRECAST ABUTMENT SILL BEAMS CONCRETE B80 CONCRETE WORK FOR BRIDGES.
MB8SL08 PRECAST ABUTMENT WINGWALL CONCRETE - SHEET A B110 SUPPLY OF PRESTENSIONED PRECAST CONCRETE MEMBERS.
MB8SL09 PRECAST ABUTMENT WINGWALL CONCRETE - SHEET B B115 PRECAST CONCRETE MEMBERS (NOT PRETENSIONED).
MB8SL10 PRECAST ABUTMENT SILL BEAM REINFORCEMENT B150 ERECTION OF PRETENSIONED PRECAST CONCRETE MEMBERS.
MB8SL11 PRECAST ABUTMENT WINGWALL REINFORCEMENT - SHEET A B153 ERECTION OF PRECAST CONCRETE MEMBERS (NOT PRETENSIONED).
MB8SL12 PRECAST ABUTMENT WINGWALL REINFORCEMENT - SHEET B B204 WELDING OF BRIDGES AND OTHER ROAD STRUCTURES.
MB8SL13 PRECAST ABUTMENT WINGWALL REINFORCEMENT - SHEET C B220 PROTECTIVE TREATMENT OF BRIDGE STEELWORK.
MB8SL14 PIERS PRECAST HEADSTOCK - 2 COLUMNS - CONCRETE B240 SUPPLY OF BOLTS, NUTS, SCREWS AND WASHERS.
MB8SL15 PIERS PRECAST HEADSTOCK - 2 COLUMNS - REINFORCEMENT B241 MANUFACTUREAND SUPPLY OF MINOR STEEL ITEMS.
MB8SL16 PIERS PRECAST HEADSTOCK - 3 COLUMNS - CONCRETE B264 ERECTION OF BARRIER RAILINGS AND MINOR COMPONENTS.
MB8SL17 PIERS PRECAST HEADSTOCK - 3 COLUMNS - REINFORCEMENT B281 LAMINATED ELASTOMERIC BEARINGS.
MB8SL18 PIERS PRECAST HEADSTOCK - 4 COLUMNS - CONCRETE B284 INSTALLATION OF BRIDGE BEARINGS.
MB8SL19 PIERS PRECAST HEADSTOCK - 4 COLUMNS - REINFORCEMENT B312 COLD APPLIED ELASTOMERIC JOINT SEALANTS.
MB8SL20 PIERS PRECAST HEADSTOCK - 4 PILES - CONCRETE B344 SPRAYED BITUMENOUS WATERPROOFING MEMBRANES.
NATED PROJECT
MB8SL60 DECK ASSEMBLY - SHEET C
\
opm ent
MB8SL61 RESTRAINT AND HOLDING DOWN BRACKET - SHEET A ISSUE DATE ADMENDMENT DESCRIPTION PREP CHECK AUTH
MB8SL65 TRAFFIC BARRIER RAILING - SHEET B SCHEDULE OF DRAWINGS AND LIST OF SPECIFICATIONS
MB8SL66 TRAFFIC BARRIER RAILING - SHEET C
andar
PREPARED BY
www.rms.gov.au
MB8SL68 BAR SHAPES DIAGRAM
\ i
Br
No OF PLANS
NOTE: SHEETS No MB8SL22, MB8SL25 TO MB8SL49, MB8SL54 AND MB8SL63 NOT USED SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
51 AM
ISSUE No SHEETS
40 SHEET No MB8SL02
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
REQUIREMENTS OF
END OF END OF
RMS SPECIFICATION B30 (TYP)
SUPERSTRUCTURE SUPERSTRUCTURE
THRIE BEAM OR HIGHER
295 25 25 295
LEVEL TO SUIT RMS ROAD
R R R R R R
CL CL
END OF DECK
ABUTM ENT A
END OF DECK
ABUTM ENT B
SHOWN. FOR OTHER FOUNDATION TYPES
ER 1
ER 2
APPROX NATURAL
SURFACE LEVEL
PI
PI
DATUM RL (INDICATIVE)
SITE PLAN
DESIGN SURFACE LEVEL
CHAINAGE
ELEVATION
CH CH
RL CH CH RL
1
4 RL RL
1%
1%
1%
1%
BEARING OF BRIDGE GENERAL NOTES
AND CONTROL LINE 0 1 2 3 4 5m
SCALE OR AS SHOWN.
1%
1%
1 0.5
1%
dgn
SUBSTRUCTURE - OPTION 1
NATED PROJECT
CIRCULAR COLUMNS ON REINFORCED CONCRETE FOOTINGS/PILE CAPS AND PILES AT PIERS
\
opm ent
AND REINFORCED CONCRETE FOOTINGS/PILE CAPS AND PILES AT ABUTMENTS. COUNTRY BRIDGE SOLUTIONS
dsi
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
52 AM
ISSUE No SHEETS
40 SHEET No MB8SL03
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
BRACKET(TYP) BRACKET(TYP)
800 600
CAST-IN-SITU CAST-IN-SITU
REINFORCED REINFORCED
REINFORCED CONCRETE REINFORCED CONCRETE
CONCRETE COLUMN CONCRETE COLUMN
FOOTING / PILE CAP FOOTING / PILE CAP
SECTION 1 SECTION 1
3 3
2 100 2 100
BARRIER (TYP)
8M _SL_T3\
GENERAL NOTES
PRECAST MODULE 0 500 1 000 1 500mm
CONCRETE (TYP) 2% SCALE OR AS SHOWN
NGLE LANE\
500 250
RESTRAINT AND
HOLDING DOWN FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 3.
BRACKET(TYP) DENOTES COLUMNS AND FOOTINGS OR PILE CAP AND PILES TO BE
SI
DGE\
PRECAST REINFORCED
CONCRETE HEADSTOCK
NATED PROJECT
\
opm ent
600
CAST-IN-SITU
COUNTRY BRIDGE SOLUTIONS
REINFORCED
dsi
CONCRETE COLUMN
FOOTING / PILE CAP
TYPE 3 - 1 LANE - 8m SPAN
St
ds_2015\
PREPARED BY
www.rms.gov.au
\ i
Br
SECTION 1 No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
ISSUE STATUS
OPTION 1 WITH THREE CIRCULAR COLUMNS ON PRINCIPAL ENGINEER BRIDGES
S DRAW I
53 AM
ISSUE No SHEETS
40 SHEET No MB8SL04
THI
REINFORCED CONCRETE FOOTING/PILE CAP AND PILES DATE BRIDGE ENGINEER (NEW DESIGN)
11:
R R R R R R
CL CL
APPROX NATURAL
END OF DECK
END OF DECK
ABUTM ENT A
ABUTM ENT B
CL CL
SURFACE LEVEL
(INDICTIVE)
ER 1
ER 2
SITE PLAN
PI
PI
DATUM RL
CHAINAGE
ELEVATION
CH CH
RL CH CH RL
2
6 RL RL
GENERAL NOTES
0 1 2 3 4 5m
SCALE OR AS SHOWN.
1 0.5
1%
BEARING
1%
OF BRIDGE DIMENSIONS ARE IN MILLIMETRES.
AND CONTROL LINE CHAINAGES AND REDUCED LEVELS ARE IN METRES.
1%
1%
dgn
PLAN
SPILL THROUGH BATTER, CONTOURS, WATER FLOW DIRECTION AND NORTH DIRECTION
NATED PROJECT
SUBSTRUCTURE - OPTION 2
\
opm ent
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
54 AM
ISSUE No SHEETS
40 SHEET No MB8SL05
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
2 100 2 100
PRECAST MODULE
CONCRETE (TYP) 2%
RESTRAINT AND
HOLDING DOWN
BRACKET(TYP)
CAST-IN-SITU CONCRETE
PRECAST REINFORCED
CONCRETE HEADSTOCK
450 x 450
PRECAST REINFORCED
CONCRETE PILES
APPROX SURFACE LEVEL
CL
SECTION 2
5
GENERAL NOTES
dgn
SCALE OR AS SHOWN
500 250
REINFORCED CONCRETE PILES DENOTES THE CONTRACT LEVEL AND THE DESIGN OF THE PRECAST
8M _SL_T3\
NATED PROJECT
\
opm ent
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
55 AM
ISSUE No SHEETS
40 SHEET No MB10SL06
MB8SL06
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
735
735
SURFACE IN ACCORDANCE
FORMED RECESS FORMED RECESS
RL WITH B80 TO MATCH
RL (TYP) (TYP)
DECK SURFACE (TYP)
2% FOR DETAILS FOR DETAILS
CJ
CJ SEE SHEET No 51 CJ SEE SHEET No 51
550 x 550 VOID FOR
9
0
50
50
° CAST-IN-SITU CONCRETE
T
Y
900
FOR SPACING
RL
900
900
2 450 2 450
50 x 50
15 NOM
ELEVATION CEMENT MORTAR
CHAMFER
75
(TYP)
(TYP)
1
2 - 3
OF BRIDGE AND
8,9 8,9
CONTROL LINE 255 550 175
WINGWALL (TYP)
END OF DECK
OF VOIDS SECTION 1 SECTION 1
(TYP)
1 000
CH LIFTING ANCHOR - -
(TYP)
OPTION 1 - WITH CAST IN-SITU OPTION 2 WITH PRECAST
150
250
220 300
0 250 500 750mm
230
540
250 125
500 250
280 280 280 280 OF BEARINGS
A
PRECAST - VOIDS ARE SHOWN FOR THE OPTIONS OF FOUR PILES/COLUMNS OR FOUR
B
ABUTMENT 1 075 1 075
- ANCHORAGE GROUPS FROM FOOTING/WALL.
NGS\
SILL BEAM
OF BEARING (TYP) VOIDS FOR OTHER OPTIONS ARE SIMILAR EXCEPT AS SHOWN IN THE TABLE
OF JACKING
STD DRAW I
3 1695
PLAN
2 3 DENOTES TO BE SPECIFIED TO SUIT BRIDGE DESIGN.
NGLE LANE\
OF BEARING
DGE\
135
220
160
NATED PROJECT
4 4
\
opm ent
COUPLER EL25S13
andar
PREPARED BY
AND N24 REBAR OR
DETAIL B DETAIL A BRIDGE ENGINEERING SECTION
St
APPROVED
- - www.rms.gov.au
i
Br
EQUIVALENT (TYP)
\
0 100 200 300 400 500mm 0 100 200 300 400 500mm No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
100 50 100 50
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
57 AM
ISSUE No SHEETS
40 SHEET No MB8SL07
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
RL RL
OF BEARING OF BEARING
6 8
- - 9
RL RL
1 635
1 635
-
5
-
RL RL
RL RL
980 980
GENERAL NOTES
VIEW 2 SCALE
0 250 500 750mm
OR AS SHOWN.
0 200 400 600 800 1 000mm EDGES SHALL BE CHAMFERED 20x20 AND RE-ENTRANT ANGLES
200 100
STITCH POUR ABUTMENT
FILLETED 20x20 UNLESS SPECIFIED OTHERWISE.
200 100
CURTAIN WALL
ALL SURFACES OF VOIDS IN PRECAST SILL BEAM AND IN WING WALL TO
500
BE IN CONTACT WITH CONCRETE IN STITCH POUR SHALL BE
250 250
ROUGHENED DURING MANUFACTURE AS CONSTRUCTION JOINT IN
87100
25
11.5 ACCORDANCE WITH RMS SPECIFICATION B80.
1
THE PROPOSED METHOD OF MANUFACTURE OF PRECAST SILL BEAM
600
313
2 WEEKS PRIOR TO THE COMMENCEMENT OF ANY WORK ON THESE
( 2% )
325
MEMBERS.
2%
200
100
MASS OF PRECAST 4.6m WINGWALL IS APPROXIMATELY 6.3 TONNES
-
DENOTES LEVELING MORTAR PLACED, EXCEPT FOR AREA UNDER VOIDS,
STD DRAW I
VIEW 7 SIMILAR EXCEPT WHERE IN ACCORDANCE WITH AS 1597.2 OR APPROVED ALTERNATIVE METHOD
SHOWN IN BRACKETS SUCH AS PLACING THE HEADSTOCK ON SHIMS AND FILL GAP WITH
-
8M _SL_T3\
2 REQUIRED OPPOSITE HAND LESS THAN 15mm THICK AFTER THE SILL BEAM IS PLACED IN POSITION.
25 325 25 325
THE SILL BEAM SHALL BE PLACED IN POSITION BEFORE THE MORTAR HAS
90 120 115 90 120 115 SET SO THAT UNIFORM BEARING IS OBTAINED.
( TYP)
SI
DGE\
150
NATED PROJECT
SHALL BE FILLED WITH GROUT AFTER
5
5
(TYP).
ERECTION OF RAILINGS
\
opm ent
150
150
ISSUE DATE ADMENDMENT DESCRIPTION PREP CHECK AUTH
FOR GROUTING DETAILS SEE SHEET No 59
2%
(TYP).
M24 ANCHOR BOLT COUNTRY BRIDGE SOLUTIONS
600
600
(TYP) .
M24 ANCHOR BOLT
TYPE 3 - 1 LANE - 8m SPAN
St
ds_2015\
PREPARED BY
VARIES VARIES BRIDGE ENGINEERING SECTION
St
No OF PLANS
VIEW 5 SECTION 6 SECTION 9 SECTION 8 SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
- - - - BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
0 100 200 300 400 500mm 0 100 200 300 400 500mm 0 100 200 300 400 500mm 0 100 200 300 400 500mm
S DRAW I
58 AM
ISSUE No SHEETS
40 SHEET No MB8SL08
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
RL RL
OF BEARING OF BEARING
12 13
RL RL 14 15
1 635
1 635
- -
- -
RL RL
RL RL
980 980
VIEW 2 VIEW 3 25 325
7 7 90 120 115
85
TRAFFIC BARRIER NOT SHOWN TRAFFIC BARRIER NOT SHOWN
5
0 200 400 600 800 1 000mm 0 200 400 600 800 1 000mm
150
200 100 200 100
2%
87100
25
11.5
1
600
5
5
150
600
150
313
( 2% )
2%
2%
2%
325
278
100
60 60
PREACAST WING WALL VARIES
(TYP) (TYP)
2 000 425 1 000
VARIES
VARIES
BOLT GROUP SECTION 15
dgn
3 700 300
-
8M AA3_SL_T3.
(TYP).
ERECTION OF RAILINGS
85
5
90
SHEET No 59 200 SPACING OF 10 HOLES: 6 SPACES AT 550 = 3 300 190
2% FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEETS No 7 AND 8.
50
16 FORMWORK
10 AIR HOLE
ATTACHMENT HOLES 25
NATED PROJECT
ROUNDED TO R10
50
\
50
opm ent
90
ISSUE DATE ADMENDMENT DESCRIPTION PREP CHECK AUTH
(TYP).
M24 ANCHOR BOLT
600
(TYP) .
M24 ANCHOR BOLT SHEAR CONNECTORS
FOR DETAILS SEE 60 SPACING OF 16 HOLES: 2 AT 1 790 = 3 580 50 TYPE 3 - 1 LANE - 8m SPAN
St
ds_2015\
PREPARED BY
-
VARIES 16 BRIDGE ENGINEERING SECTION
St
-
ELEVATION 0 100 200 300mm PHONE (02) 8837-0811
dge\
100 50
\
DENTI
APPROVED FOR USE DESIGN
-
2016
S CONFI
BRIDGE No
10/
DRAWING
0 100 200 300 400 500mm W Ariyaratne D.G.C. ADey
7/
2 REQUIRED
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
100 50
00 AM
ISSUE No SHEETS
40 SHEET No MB8SL09
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
S14 5-N20-V-150 FF
210 1 270 S8 4-N16-LL LAPPED
S8 4-N16-LL LAPPED S13 5-N16-V-150 NF
(TYP) (TYP) WITH S3 BARS
WITH S3 BARS 5 5
CJ - -
S10
S10
S12 6-N20-V-150 FF
115 115 115 115 115 115 115 115 115
S4 3-N16-HT-150
4 4
S5 3-N16-HH-150 S4 3-N16-HT-150
- -
S5 3-N16-HH-150
S11 6-N16-S-150 NF
S7 4-N16-LL
6
S15
LAPPED WITH S2 S6 4-N16-DZ-150 -
S6 4-N16-DZ-150 S1 S7 4-N16-LL
S6 4-N16-DZ-150
VIEW 3
S4 4-N16-HT-150 S4 4-N16-HT-150 LAPPED WITH S2 SHOWN
3
S6 4-N16-DZ-150
-
S5 4-N16-HH-150 S5 4-N16-HH-150
-
ELEVATION VIEW 6 SIMILAR
S1 6-N24-S NF AND BUT OPPOSITE HAND
1 2 -
S9 S3 S2 S1 5-N24-S FF SPACED
- - 1
AS SHOWN IN SECTION
-
950
S10 5-N16-E LAPPED
S4 AND S5
150
83
S14
S7 S7
162150
438
S13
650
162
S4 AND S6 S6 S4 AND S6 S4 AND
S6
S5 S4 AND S15 2-N24-LL S5 S5
S5 PRECAST WINGWALL
S15 2-N24-LL REINFORCEMENT GENERAL NOTES
PLAN
0 200 400 600 800 1 000mm
1 REFER TO SHEETS SCALE OR AS SHOWN.
2 1 REQUIRED FOR ABUTMENT A
- - No 11 AND 12
SECTION 5 200 100
1 REQUIRED FOR ABUTMENT B
- NOMINAL COVER TO REINFORCEMENT NEAREST TO THE CONCRETE SURFACE SHALL
75 COVER 40 COVER 75 COVER BE 35 mm UNLESS SPECIFIED OTHERWISE.
700 UNLESS OTHERWISE SPECIFIED, THE LAP LENGTH SHALL BE AS FOLLOWS:
PRECAST
BAR SIZE: N12 N16 N20 N24 N28 N32 N36
dgn
S12
CONCRETE WINGWALL
8M SR1_SL_T3.
COVER
a) HORIZONTAL BARS WITH >300mm OF
30
3 EQUAL SPACES
3 EQUAL SPACES
S9 S9 CONCRETE CAST BELOW THE BAR: 510 650 880 1190 1520 1870 2760
83
NGS\
438
STD DRAW I
162
162
COUPLERS, DOWELS, ANCHOR BOLTS, HOLES AND RECESSES.
160 385 PRECAST WINGWALL REINFORCEMENT FOR OPTION 1 WITH FOUR PILES/COLUMNS IS SHOWN.
8M _SL_T3\
S11
180 180 130
CJ CJ REINFORCEMENT REINFORCEMENT FOR OTHER OPTIONS ARE SIMILAR EXCEPT AS NOTED
SECTION 4 DENOTES LENTON BOLT COUPLER EL25S13 AND N24 REBAR TO BE THREADED
NFORCEM ENT
S15
COLUM N
510
DGE\
750
B1000_M ODULAR BRI
S2
LE/
S2
S6
FROM TOP OF PI
NG REI
S5
NATED PROJECT
PROTRUDI
TYP
270
\
opm ent
480
ds_2015\
PREPARED BY
S1
BRIDGE ENGINEERING SECTION
St
www.rms.gov.au
- REINFORCING BARS INTO SILL BEAM -
\ i
Br
DENTI
0 100 200 300 400 500mm DEVELOPMENT LENGTH OF THESE BARS 0 100 200 300 400 500mm APPROVED FOR USE DESIGN
2016
S CONFI
100 50 SHALL BE DETERMINED BY THE DESIGNER 100 50 BRIDGE No
10/
DRAWING
TO SUIT SUBSTRUCTURE DESIGN. W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
01 AM
ISSUE No SHEETS
40 SHEET No MB8SL10
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
REINFORCEMENT PROJECTED
2 2
- -
REINFORCEMENT PROJECTED
W5 11-N16-A-150
REINFORCEMENT PROJECTED
18 BUNDLES
1 BUNDLES
W11 1-N16-LL-200
3 W13 1-N16-LL
13 W1 1-N12-LL-200 W2 5-N16-S-200 EF
W14 1-N12-LL
4 5
13 13
ELEVATION
950 950
40 GAP
W13 W12
W8 PROTRUDING
W16 AND W17
INTO STICH POUR
REINFORCEMENT PROJECTED
115
REFER TO SHEET No 10
0 250 500 750mm
215
SCALE OR AS SHOWN.
250 125
dgn
8M W A_SL_T3.
40 GAP
SURFACE SHALL BE 35 mm UNLESS SPECIFIED OTHERWISE.
BARS EMBEDED
- INTO PRECAST SILL BEAM THE DEVELOPMENT LENGTHS SHALL BE 80% OF THE VALUE TABULATED
950 950 REFER TO SHEET No 10 ABOVE.
NGLE LANE\
W4
NATED PROJECT
W5
\
opm ent
REFER TO SHEET No 10
ds_2015\
W2
W11
andar
PREPARED BY
- www.rms.gov.au
\ i
Br
No OF PLANS
4.6m PRECAST WINGWALL SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
02 AM
ISSUE No SHEETS
40 SHEET NoMB8SL11
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
REINFORCEMENT PROJECTED
8 8
- -
REINFORCEMENT PROJECTED
W5 7-N16-A-150
REINFORCEMENT PROJECTED
13 BUNDLES
1 BUNDLES
W11 1-N16-LL-200
3 W13 1-N16-LL
13 W1 1-N12-LL-200 W2 5-N16-S-200 EF
W14 1-N12-LL
4 5
13 13
ELEVATION
950 950
40 GAP
W12
W13
W8 PROTRUDING
W16 AND W17
INTO STICH POUR
REINFORCEMENT PROJECTED
dgn
115
REFER TO SHEET No 10
215
W15
NGS\
40 GAP
STD DRAW I
W18
8M _SL_T3\
W3
REINFORCEMENT PROJECTED
W12
W8
NATED PROJECT
W4
\
opm ent
W13
W3 PRECAST ABUTMENT WINGWALL REINFORCEMENT - SHEET B
BARS EMBEDED
PREPARED BY
www.rms.gov.au
i
-
\Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
3.7m PRECAST WINGWALL
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
02 AM
ISSUE No SHEETS
40 SHEET NoMB8SL12
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
W6
W19
W16
W7 W7
CJ CJ
W15
530
W8
W17
W11
W11
W4 W3
W4 W3 W4 W3
W12
W2
W2
REINFORCEMENT PROJECTED
W1 W1
FROM PRECAST SILL BEAM TYP
W16
NGS\
STD DRAW I
8M _SL_T3\
W7
NGLE LANE\
GENERAL NOTES
SECTION 6 100 50
DGE\
11,12 FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 11.
B1000_M ODULAR BRI
NATED PROJECT
\
opm ent
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
03 AM
ISSUE No SHEETS
40 SHEET No MB8SL13
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
UPSTREAM
2 450 2 450
C OF BEARINGS
C OF BRIDGE
LIFTING ANCHOR
AND CONTROL LINE RL
RL
2% C OF BEARINGS
210
PRECAST REINFORCED
900
°
T
210
Y
550 x 550 VOID P
FOR CAST-IN-SITU
OF COUPLER C OF BEARINGS
CONCRETE STITCH
105 105 GROUP (TYP)
POUR (TYP)
LENTON BOLT
800
COUPLER EL25S13
COLUMN (TYP) RL AND N24 REBAR
RL 80 x 70 DEEP
160
755 1 695 1 695 755 OR APPROVED
FORMED RECESS (TYP)
EQUIVALENT TYP
OF PILE AND DETAIL B
125
VOIDS (TYP) ELEVATION
C OF PIER -
125
0 100 200 300 400 500mm
3
C OF BRIDGE 100 50
-
160
AND CONTROL LINE
1 075 1 075
B
LIFTING ANCHORS PIER 1 CH OF COUPLER
1 -
PIER 2 CH GROUP (TYP)
-
GENERAL NOTES
450
C OF BEARINGS
330
210 210
-
450
100 50 40 MPa.
300 280 280 280 280 300 EDGES SHALL BE CHAMFERED 20x20 AND RE-ENTRANT ANGLES FILLETED
3 A 20x20 UNLESS SPECIFIED OTHERWISE.
1 -
- ALL SURFACES OF VOIDS IN PRECAST HEADSTOCK IN CONTACT
- 1 130 510 510 1 130
WITH CONCRETE STITCH POUR SHALL BE ROUGHENED DURING
OF THE PRINCIPLE.
80 x 70 DEEP 80 x 70 DEEP
THE LOCATIONS MAY VARY TO SUIT THIS DESIGN.
NGLE LANE\
SPECIFICATION B240.
DGE\
B1000_M ODULAR BRI
HEADSTOCK HEADSTOCK
FOR CAST-IN-SITU
CONCRETE STITCH
B
POUR (TYP)
23
NATED PROJECT
\
50 X 50 CHAMFER
opm ent
33
COLUMN SECTION 3
TYPE 3 - 1 LANE - 8m SPAN
St
-
ds_2015\
PREPARED BY
- 100 50
BRIDGE ENGINEERING SECTION
St
100 50
\
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
04 AM
ISSUE No SHEETS
40 SHEET No MB8SL14
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
H3 3-N16-HH-150
H7 H7
80 80
H6 4-N16-LL 120
150 120 150 H6 4-N16-LL LAPPED
LAPPED WITH H5
WITH H5
H2 19-N16-HT-150
H8 H3 19-N16-HH-150
H8 H1 4-N16-HZ-150
H4 H5 4-N20-S-EF SPACED
1
H1 4-N16-HZ-150 AS SHOWN IN SECTION
-
ELEVATION
1 H8 2-N24-LL
H7 4-N16-E 2
- -
LAPPED WITH H4 H1 H5 H8 2-N24-LL H1 H7 4-N16-E LAPPED
WITH H4
H6 H6
2 H8 2-N24-LL
H2 AND H5 H2 AND - H2 AND
H3 H3 H4 6-N24-S-FF H3
1 H8 2-N24-LL H4 6-N24-S-NF
-
SPACED AS SHOWN
2
PLAN IN SECTION
-
GENERAL NOTES
0 200 400 600 800 1 000mm
SCALE OR AS SHOWN.
200 100
H3
COUPLERS, DOWELS, ANCHOR BOLTS, HOLES AND RECESSES.
FROM TOP OF COLUM N
4 SPACES AT 150
750
NGLE LANE\
OTHERWISE.
H1
NG REI
TYP
270
NATED PROJECT
\
opm ent
H4 H4
115 285 100 285 115 400 100 285 115
TYPE 3 - 1 LANE - 8m SPAN
St
ds_2015\
0 100 200 300 400 500mm DEVELOPMENT LENGTH OF THESE BARS 0 100 200 300 400 500mm www.rms.gov.au
\ i
Br
100 50 100 50
No OF PLANS
TO SUIT SUBSTRUCTURE DESIGN.
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
OPTION 1 WITH TWO CIRCULAR COLUMNS ON W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
05 AM
ISSUE No SHEETS
40 SHEET No MB8SL15
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
C OF BRIDGE
LIFTING ANCHOR
AND CONTROL LINE RL
RL
2% C OF BEARINGS
210
PRECAST REINFORCED
900
°
T
210
Y
550 x 550 VOID P
FOR CAST-IN-SITU
OF COUPLER C OF BEARINGS
CONCRETE STITCH
105 105 GROUP (TYP)
POUR (TYP)
LENTON BOLT
600 COUPLER EL25S13
COLUMN (TYP) RL AND N24 REBAR
RL 80 x 70 DEEP
160
755 1 695 1 695 755 OR APPROVED
FORMED RECESS (TYP)
EQUIVALENT TYP
OF PILE AND DETAIL B
125
VOIDS (TYP) ELEVATION
C OF PIER -
125
0 100 200 300 400 500mm
2
- C OF BRIDGE 100 50
160
AND CONTROL LINE
1 075 1 075
B
LIFTING ANCHORS PIER 1 CH OF COUPLER
1 -
PIER 2 CH GROUP (TYP)
- GENERAL NOTES
0 200 400 600 800 1 000mm
SCALE OR AS SHOWN.
200 100
450
C OF BEARINGS
330
210 210
-
450
C OF BEARINGS 40 MPa.
0 100 200 300 400 500mm EDGES SHALL BE CHAMFERED 20x20 AND RE-ENTRANT ANGLES FILLETED
100 50
20x20 UNLESS SPECIFIED OTHERWISE.
300 280 280 280 280 300 ALL SURFACES OF VOIDS IN PRECAST HEADSTOCK IN CONTACT
2
A WITH CONCRETE STITCH POUR SHALL BE ROUGHENED DURING
-
1 - MANUFACTURE AS CONSTRUCTION JOINT, IN ACCORDANCE WITH RMS
- 1 130 510 510 1 130 SPECIFICATION B80.
175 275 275 175 LIFTING ANCHORS SHALL BE SWIFT LIFT OR APPROVED EQUIVALENT
STD DRAW I
HEADSTOCK HEADSTOCK
FOR CAST-IN-SITU
CONCRETE STITCH
POUR (TYP)
NATED PROJECT
\
opm ent
COLUMN
SECTION 2 TYPE 3 - 1 LANE - 8m SPAN
St
ds_2015\
PREPARED BY
100 50
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
06 AM
ISSUE No SHEETS
40 SHEET No MB8SL16
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
H7 H7
80
H6 4-N16-LL
150 100 95 95 100 150
LAPPED WITH H5 H6 4-N16-LL LAPPED
WITH H5
H4
H8
H5 4-N20-S-EF SPACED
2 SETS OF 1
AS SHOWN IN SECTION -
H2 8-N16-HT-150
H8
H3 8-N16-HH-150
ELEVATION
2
1 H8 2-N24-LL - H8 2-N24-LL
H7 4-N16-E
-
LAPPED WITH H4 H1 H5 H1 H7 4-N16-E LAPPED
WITH H4
H6 H6
2 H2 AND
H2 AND H2 AND H5 H1 -
H3
H3 H3 H2 AND
H8 2-N24-LL H3
1
H8 2-N24-LL H4 6-N24-S-FF
- GENERAL NOTES
H4 6-N24-S-NF
0 200 400 600 800 1 000mm
PLAN SPACED AS SHOWN SCALE OR AS SHOWN.
1
IN SECTION 200 100
-
270 100 270 130 BAR SIZE: N12 N16 N20 N24 N28 N32 N36
dgn
OTHERWISE.
4 SPACES AT 150
4 SPACES AT 150
750
H2 DENOTES NUMBER OF BARS TO BE ADJUSTED TO SUIT THE NUMBER OF VOIDS.
NGLE LANE\
PROTRUDI
TYP
270
B1000_M ODULAR BRI
65
65
NATED PROJECT
\
opm ent
PREPARED BY
- ARE INDICATIVE ONLY. THE NUMBER AND - BRIDGE ENGINEERING SECTION
St
0 100 200 300 400 500mm 0 100 200 300 400 500mm
www.rms.gov.au
SHALL BE DETERMINED BY THE DESIGNER
i
Br
100 50 100 50
\
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
OPTION 1 WITH THREE CIRCULAR COLUMNS ON W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
07 AM
ISSUE No SHEETS
40 SHEET No MB8SL17
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
2 450 2 450
C OF BEARINGS
C OF BRIDGE
LIFTING ANCHOR
AND CONTROL LINE RL
RL
C OF BEARINGS
2%
210
PRECAST REINFORCED
750
9
0
°
T
210
Y
550 x 550 VOID P
FOR CAST-IN-SITU
OF COUPLER C OF BEARINGS
CONCRETE STITCH
105 105 GROUP (TYP)
POUR (TYP) RL
RL LENTON BOLT
600 COUPLER EL25S13
755 1 130 565 565 1 130 755 COLUMN (TYP) AND N24 REBAR
80 x 70 DEEP
160
OR APPROVED
OF PILE AND FORMED RECESS (TYP)
EQUIVALENT TYP
VOIDS (TYP) ELEVATION DETAIL B
125
C OF PIER -
125
0 100 200 300 400 500mm
2
C OF BRIDGE 100 50
-
160
AND CONTROL LINE
1 075 1 075
B
LIFTING ANCHORS PIER 1 CH OF COUPLER
1 -
PIER 2 CH GROUP (TYP)
-
450
C OF BEARINGS
GENERAL NOTES
330
210 210
-
450
C OF BEARINGS
CONCRETE EXPOSURE CLASSIFICATION: B1
0 100 200 300 400 500mm
MINIMUM 28 DAY COMPRESSIVE STRENGTH OF ALL CONCRETE SHALL BE
100 50
40 MPa.
300 280 280 280 280 300
EDGES SHALL BE CHAMFERED 20x20 AND RE-ENTRANT ANGLES FILLETED
A
20x20 UNLESS SPECIFIED OTHERWISE.
1 2
-
- - ALL SURFACES OF VOIDS IN PRECAST HEADSTOCK IN CONTACT
1 130 510 510 1 130 WITH CONCRETE STITCH POUR SHALL BE ROUGHENED DURING
DENOTES JACKING PLATE LOCATIONS SHALL BE AS SUBMITTED TO THE PRINCIPAL MIN 2 WEEKS PRIOR TO THE
175 275 275 175 DURING STORAGE, TRANSPORT AND HANDLING, PRECAST HEADSTOCKS
STD DRAW I
FORMED RECESS (TYP) FORMED RECESS (TYP) THE LOCATIONS MAY VARY TO SUIT THIS DESIGN.
FOR DETAILS SEE SHEET No 51 FOR DETAILS SEE SHEET No 51 DENOTES DATA TO BE SPECIFIED TO SUIT BRIDGE DESIGN.
750
FOR CAST-IN-SITU
B1000_M ODULAR BRI
50 X 50 CHAMFER
NATED PROJECT
(TYP)
\
opm ent
COLUMN
SECTION 2 COUNTRY BRIDGE SOLUTIONS
dsi
-
ds_2015\
100 50
PIERS PRECAST HEADSTOCK - 4 COLUMNS - CONCRETE
0 100 200 300 400 500mm
andar
PREPARED BY
100 50
BRIDGE ENGINEERING SECTION
St
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
08 AM
ISSUE No SHEETS
40 SHEET No MB8SL18
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
H7 H7
80
H6 3-N16-LL
150 115 115 115 115 115 115 150
LAPPED WITH H5 H6 3-N16-LL LAPPED
WITH H5
H4
H8
H5 3-N20-S-EF SPACED
3 SETS OF 1
AS SHOWN IN SECTION -
H2 4-N16-HT-150
H8
H3 4-N16-HH-150
ELEVATION 2
-
1 H8 2-N24-LL H8 2-N24-LL
H7 4-N16-E
-
LAPPED WITH H4 H1 H5 H2 AND H1 H1 H7 4-N16-E LAPPED
H3 WITH H4
H6 H6
2 H2 AND
H2 AND H2 AND H5 H1
- H3
H3 H3 H2 AND
H8 2-N24-LL H3
H4 6-N24-S-FF
1
H8 2-N24-LL
- H4 6-N24-S-NF
SPACED AS SHOWN
1
GENERAL NOTES
PLAN IN SECTION - 0 200 400 600 800 1 000mm
SCALE OR AS SHOWN.
200 100
H8 H8
REINFORCEMENT FOR OTHER OPTIONS ARE SIMILAR EXCEPT AS NOTED
FROM TOP OF COLUM N
H3
4 EQUAL SPACES
4 EQUAL SPACES
OTHERWISE.
NGLE LANE\
570
DENOTES NUMBER OF BARS TO BE ADJUSTED TO SUIT THE NUMBER OF VOIDS.
H2
DENOTES LENTON BOLT COUPLER EL25S13 AND N24 REBAR TO BE THREADED
H1
NG REI
H5 H5
AT ENDS AND TIGHTENED INTO COUPLERS IN ACCORDANCE WITH
SI
DGE\
TYP
225
55
NATED PROJECT
\
opm ent
PREPARED BY
- ARE INDICATIVE ONLY. THE NUMBER AND
- BRIDGE ENGINEERING SECTION
St
0 100 200 300 400 500mm DEVELOPMENT LENGTH OF THESE BARS 0 100 200 300 400 500mm
www.rms.gov.au
i
Br
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
OPTION 1 WITH FOUR CIRCULAR COLUMNS ON W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
09 AM
ISSUE No SHEETS
40 SHEET No MB8SL19
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
2% C OF BEARINGS
210
PRECAST REINFORCED
CONCRETE HEADSTOCK 9
0 C OF PIER
900
°
T
Y
550 x 550 VOID P
210
FOR CAST-IN-SITU
RL
LENTON BOLT
RL
COUPLER EL25S13
450 x 450 PRECAST
AND N24 REBAR
755 1 130 565 565 1 130 755 CONCRETE PILES 80 x 70 DEEP
160
OR APPROVED
FORMED RECESS (TYP)
EQUIVALENT TYP
ELEVATION DETAIL B
125
C OF PIER -
125
0 100 200 300 400 500mm
2 C OF BRIDGE
- AND CONTROL LINE 100 50
160
1 075 1 075
B
LIFTING ANCHORS PIER 1 CH OF COUPLER
1 -
- PIER 2 CH GROUP (TYP)
GENERAL NOTES
0 200 400 600 800 1 000mm
450
200 100
210 210
900
C OF BEARINGS -
40 MPa.
0 100 200 300 400 500mm
EDGES SHALL BE CHAMFERED 20x20 AND RE-ENTRANT ANGLES FILLETED
175 550 175 900 DURING STORAGE, TRANSPORT AND HANDLING, PRECAST HEADSTOCKS
STD DRAW I
FORMED RECESS (TYP) FORMED RECESS (TYP) THE LOCATIONS MAY VARY TO SUIT THIS DESIGN.
NGLE LANE\
FOR DETAILS SEE SHEET No 32 FOR DETAILS SEE SHEET No 32 DENOTES DATA TO BE SPECIFIED TO SUIT BRIDGE DESIGN.
SPECIFICATION B240.
DGE\
FOR CAST-IN-SITU
900
CONCRETE STITCH
B1000_M ODULAR BRI
POUR (TYP)
( TYP)
HEADSTOCK HEADSTOCK
25
NATED PROJECT
50 x 50 CHAMFER
\
opm ent
0 100 200 300 400 500mm 0 100 200 300 400 500mm PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
OPTION 2 WITH FOUR PRECAST REINFORCED CONCRETE PILES BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
11 AM
ISSUE No SHEETS
40 SHEET No MB8SL20
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
H7 H7
80
H6 4-N16-LL
150 115 115 115 115 115 150 H6 4-N16-LL LAPPED
LAPPED WITH H5 115
WITH H5
H4
H8
H8 H5 4-N20-S-EF SPACED
3 SETS OF
1
AS SHOWN IN SECTION -
H2 4-N16-HT-150
H3 4-N16-HH-150
ELEVATION
2
-
1 H8 2-N24-LL H8 2-N24-LL
H7 4-N16-E
-
LAPPED WITH H4 H1 H5 H2 AND H1 H1 H7 4-N16-E LAPPED
H3 WITH H4
H6 H6
2 H2 AND
H2 AND H2 AND H5 H1
- H3
H3 H3 H2 AND
H8 2-N24-LL H3
H4 6-N24-S-FF
1
H8 2-N24-LL
- H4 6-N24-S-NF
SPACED AS SHOWN
1
GENERAL NOTES
PLAN IN SECTION - 0 200 400 600 800 1 000mm
SCALE OR AS SHOWN.
200 100
4 SPACES AT 150
FROM TOP OF PI
750
4 SPACES AT 150
OTHERWISE.
NG REI
65
65
NATED PROJECT
\
opm ent
H4
H4
400 100 285 115 TYPE 3 - 1 LANE - 8m SPAN
115 285 100 285 115
St
ds_2015\
PREPARED BY
100 50
TO SUIT SUBSTRUCTURE DESIGN. No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
ISSUE STATUS
OPTION 2 WITH FOUR PRECAST REINFORCED CONCRETE PILES PRINCIPAL ENGINEER BRIDGES
S DRAW I
12 AM
ISSUE No SHEETS
40 SHEET No MB8SL21
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
15 x 15
140 15
CHAMFER(TYP)
18
OF PIER 1 OF PIER 2
18mm BGC FIBRE
CEMENT OR APPROVED
RL 'x'
RL 'x' CH
EQUIVALENT
2 4
1 695
1 695
N
MI
15
15 NOM LEVELING
OF BRIDGE AND
CEMENT MORTAR
15
1 695
1 695
CONTROL LINE
(TYP) COLUMN
2% 1 CH 3 DETAIL B
2 2 14
- - THE TEMPORARY SUPPORTS DETAILED ON
100 50
COLUMN LAYOUT
2 COLUMN OPTION
REFER TO TABLES 1 AND 2
0 1 2 3 4 5m
1 0.5
H'
3 3
'
- -
TABLE 1
COLUMN No RL 'x' RL 'y' H
1 AND 3
2 AND 4
RL 'y' (PIER 1)
RL 'y' (PIER 1)
RL 'y' (PIER 2)
RL 'y' (PIER 2)
GENERAL NOTES
50
50
SECTION 1 THE HEADSTOCK SHALL BE PLACED IN POSITION BEFORE THE MORTAR HAS
FLUSHING TOP OF
OF PIER AND VOID
COLUMN AFTER CLEANING
900 x 900 x 18 THICK
SI
APPROVED EQUIVALENT
B1000_M ODULAR BRI
NATED PROJECT
\
opm ent
800 COLUMN
ds_2015\
PREPARED BY
-,14 - www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
13 AM
ISSUE No SHEETS
40 SHEET No MB8SL23
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
C4 14-N'Y'-S-SPACED
AS SHOWN IN
2
SECTION
-
800
C4
2 2
- -
C3 4-N12-LL-SPACED C3
430
2
AS SHOWN IN SECTION
-
C2 5-N12-HT-150 C2
1 440
C'X'
C'X' 12-N'Y'-S-SPACED
3
AS SHOWN IN SECTION -
C1 'a'-N12-Y-150 3 C1 3
- -
GENERAL NOTES
910
0 250 500 750mm
SCALE OR AS SHOWN.
250 125
TYPICAL REINFORCEMENT TYPICAL REINFORCEMENT
PROJECTED FROM PROJECTED FROM NOMINAL COVER TO REINFORCEMENT NEAREST TO THE CONCRETE SURFACE
CJ CJ
FOOTING FOOTING SHALL BE 40mm UNLESS SPECIFIED OTHERWISE.
BE AS FOLLOWS:
1
THE DEVELOPMENT LENGTH SHALL BE 80% OF THE VALUE TABULATED ABOVE.
STD DRAW I
-
ELEVATION SECTION 1 DENOTES VARIABLE LENGTH BAR.
HEADSTOCK AND COLUMNS AND LAP LENGTHS ARE INDICATIVE ONLY AND
NGLE LANE\
PIER 1
B1000_M ODULAR BRI
PIER 2
OF VOID C1 OF VOID
C1
AND COLUMN AND COLUMN
C3
NATED PROJECT
C3 C2
\
opm ent
TYP TYP
TYPE 3 - 1 LANE - 8m SPAN
St
ds_2015\
PREPARED BY
- - www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
OPTION 1 WITH TWO CIRCULAR COLUMNS ON
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
13 AM
ISSUE No SHEETS
40 SHEET No MB8SL24
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
4 8 12 16 20 24 TEMPORARY SUPPORTS.
7. ADJUST NYLON SCREWS UNDER EACH BEARING PLATE SO THAT BEARING
IS PRESSED FIRMLY AND EVENLY UP INTO THE RECESS IN SOFFIT OF
MODULE AND BEARING PLATE AND SOFFIT OF MODULE ARE PARALLEL.
8. FORM AND GROUT UNDER BEARING PLATE.
OF PIER 1 OF PIER 2
9. ONCE GROUT HAS REACHED MINIMUM STRENGTH OF 30 MPa AND IT IS AT
LEAST 7 DAYS OLD TRANSFER LOAD TO PERMANENT BEARINGS AND
BEARING LAYOUT
NOT TO SCALE 10mm
THREADED
HOLE
NOM
33
COF BEARING AND DOWEL STAINLESS STEEL
PRECAST MODULE
TOP OF HEADSTOCK FOR BEARING
OR SILL BEAM
2%
LAMINATED ELASTOMERIC
2% BEARING
dgn
8M BA_SL_T3.
20NOM
250 x 10 PLATE x 280 LONG
140 140
TYP
NGS\
STAINLESS STEEL DOWEL FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 51.
8M _SL_T3\
100 50
SI
DGE\
B1000_M ODULAR BRI
TABLE 1
NATED PROJECT
BEARING TOP OF BEARING BEARING TOP OF BEARING BEARING TOP OF BEARING
LOCATION LOCATION LOCATION
No. RL "X" No. RL "X" No. RL "X"
\
opm ent
2 10 18
ABUTMENT A PIER 1 PIER 2 COUNTRY BRIDGE SOLUTIONS
3 11 19
SPAN 1
SPAN 2
SPAN 3
dsi
5 13 21
TYPE 3 - 1 LANE - 8m SPAN
St
6 14 22
ds_2015\
8 16 24
andar
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
14 AM
ISSUE No SHEETS
40 SHEET No MB8SL50
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
200
TABLE 2 THE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF GROUT SHALL BE 40MPa.
LONGITUDINAL GRADE ON TOP OF BEARING BASEPLATE STEEL PLATE SHALL BE STAINLESS STEEL GRADE 304 TO ASTM A276.
200
COF BEARING
MEASURED HOG Ma Mb THE WELD CATEGORY SHALL BE 1C, IN ACCORDANCE WITH AS/NZS 1554.6.
COF BEARING
5 0.24% 0.24% WELDNG SYMBOLS COMPLY WITH AS 1101.3.
SPAN No 10 0.48% 0.48% DENOTES THE MINIMUM AND MAXIMUM THICKNESS OF GROUT SHALL BE 15mm
20 0.95% 0.95%
DENOTES THE GROUT USED TO FILL FORMED RECESSES AND CONSTRUCT
HOGS SHALL BE MEASURED TWO WEEKS PRIOR TO GROUT PADS AND SHALL BE SHRINKAGE COMPENSATED HIGH FLOW
THE ERECTION OF THE PRECAST MODULE AND THE CEMENTITIOUS GROUT EPIREZ SUPERFLOW HF OR CONBEXTRA HS
Ma DETERMINED FROM THE FIGURES IN TABLE 2 MINIMUM COMPRESSIVE STRENGTH OF GROUT SHALL BE 40MPa.
33 NOM
ABUTMENT A END THE FORMWORK FOR THE GROUT PADS MUST REMAIN IN PLACE FOR A
33 NOM
MINIMUM OF 3 DAYS AND CURING COMPOUNDS SHALL BE APPLIED TO
10
0 100 200 300 400 500mm
DOWEL GRADE 304 TO ASTM A276
100 50
INTERNAL STEEL
PLATES
6
97
BEARING GROUT DOWEL
AND PRECAST MODULE -
N EM BEDM ENT
PAD
10
10 THICK STAINLESS STEEL
N RECESS
STEEL PLATE IN ELASTOMER FOR DOWEL
MODULE FOR BEARING
50 M I 15 125 125 15
TOP OF BEARING SECTION 3
15
TOP OF HEADSTOCK RL 'x' - SEE TABLE 1 6 21 HOLE FOR 20 STAINLESS
I
-
OR SILL BEAM ON SHEET No 50 STEEL DOWEL
C
ON OF TRAFFI
dgn
20 NOM
COVER
110
2%
STAINLESS STEEL
´80
LAMINATED 230 BEARING BASE PLATE
250
70DEEP
ELASTOMERIC BEARING
B 115 115
NGS\
FORMEDRECESS 2 2
110
-
RECTI
- -
STD DRAW I
C
0
ON OF TRAFFI
DI
-
°0
'0
4/ 10mm
"
8M _SL_T3\
100
0 50 100 150mm PLAN THREADED HOLE
200
BEARING GROUT PAD 3 3
50 25
BEARING BASE PLATE ASSEMBLY
NGLE LANE\
- -
100
RECTI
0 100 200 300mm
SI
100 50
DI
DGE\
SECTION 1
LAMINATED ELASTOMERIC BEARING
-
AS PART No 020906R-5
NATED PROJECT
0 100 200 300 400 500mm
24 REQUIRED - MODIFIED AS SHOWN
\
opm ent
BEARINGS - SHEET B
andar
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
15 AM
ISSUE No SHEETS
40 SHEET No MB8SL51
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
TYP
300
TYP
LIFTING
90
AND IS 7mm AT 28 DAYS, ASSUMING:
ANCHOR
- DENSITY = 2550 kg/m³
TYP
90
TEMPERATURE AND RELATIVE HUMIDITY IN RANGE 50% - 75%
EACH END.
2
dgn
53
LIFTING ANCHOR FABRICATION.
200 200
OF LIFTING ANCHOR (TYP) PLAN LIFTING ANCHORS SHALL BE SWIFT LIFT OR APPROVED EQUIVALENT
1
53 DESIGNED BY THE PRECAST MODULE MANUFACTURE TO THE SATISFACTION
340
8M _SL_T3\
OF THE PRINCIPLE.
TYP
THE LOCATIONS MAY VARY TO SUIT THIS DESIGN.
NATED PROJECT
\
opm ent
PREPARED BY
DETAIL A No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
16 AM
150 75
07.10.2016 SalahAssi 07.10.2016
23:
ISSUE No SHEETS
40 SHEET No MB8SL52
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
DRAINAGE TYP
300 25
PIPE (TYP)
LENTON BOLT
5
COUPLER EL25S13
150
APPROVED
EQUIVALENT(TYP)
335
FOR JOINT DETAILS
SEE SHEET No 60
10
160
180
180
160 ( TYP)
755
600
20 x 20 FILLET (TYP)
300
15 x 15
420
70
1
15
M10 x 45 LONG REID
20 x 20 CHAMFER (TYP) 45 45 50 FORMED VENT HOLE
GALVANIZED ELEPHANT
SECTION 1
52
SECTION 3
-
60 x 60 x 20 DEEP FORMED RECESS
0 100 200 300mm
SHALL BE FILLED WITH GROUT AFTER
100 50
ERECTION OF RAILINGS (TYP)
M24 ANCHOR BOLT.
75
637 776 354 328
TYP
85
375
3
50 FORMED
150
- 70 70
VENT HOLE
DRAINAGE PIPE
390
125 x 75 x 4 RHS
18 REQUIRED
300
"
'0
°0
P
9
dgn
Y
T
100 50
8M C1C_SL_T3.
600
M24 ANCHOR
3
90 90
365
BOLT. FOR
-
300
40 x 40
8M _SL_T3\
DETAILS SEE
17.6
SHEET No 65 FILLET
(TYP)
NGLE LANE\
18 ELASTOMERIC BEARING FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No
VIEW 2
NATED PROJECT
52
\
opm ent
150 75
MODULAR BRIDGE DRAWINGS
andar
LOCATION OF VENT HOLES MAY BE DISPLACED SLIGHTLY TO CLEAR TYPE 3 - 1 LANE - 8m SPAN
St
ds_2015\
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 52. www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
17 AM
ISSUE No SHEETS
40 SHEET NoMB10SL53
MB8SL53
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
120 120
120
120
A
B
57
57
59 BUNDLES OF
2 SETS OF 2 SETS OF
FOR END OF MODULE E5 1-N12-S-120 FF
E3 6-N20-S-FF SPACED E1 23-N12-AZ-120
1 2 3
REINFORCEMENT 2 E7 1-N12-S-120 FF
56 AS SHOWN IN SECTION 56 56
56 E6 1-N12-LL AND FOR END OF MODULE
REFER TO SHEET No 57
E10 1-N12-L-120NF REINFORCEMENT
REFER TO SHEET No 57
PLAN
GENERAL NOTES
NGLE LANE\
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No. 57.
B1000_M ODULAR BRI
NATED PROJECT
\
opm ent
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
17 AM
ISSUE No SHEETS
40 SHEET No MB8SL55
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
35 COVER
84 2 EQUAL 2 EQUAL 75 8 EQUAL SPACES 75 2 EQUAL 3 EQUAL
E10
2 EQUAL SPACES
E5
2/12.7mm STRANDS 2/12.7mm STRANDS
E7
120 120
TOP OF MODULE
E18
E6
140
100
E17 E1
E4
100
E4
E1
2/12.7mm STRANDS
71 71
205
E3 E3
CENTRELINE
55
6/12.7mm STRANDS
2 EQUAL SPACES
35 COVER
E9
50
E22
55
E19
2/12.7mm STRANDS
2/12.7mm STRANDS 120 120 90
45 120 120
2 EQUAL SPACES
E15 E20
425 E15
E8 6/12.7mm STRANDS
(TYP) E16 110 50 50 110
E18
3 SPACES AT 100
E3 E3
6/12.7mm STRANDS
55
dgn
3 GENERAL NOTES
VIEW SIMILAR BUT OPPOSITE HAND
8M R1B_SL_T3.
A
DGE\
AND
A BENDS
INFORMATION FOR PLACING
HOOKS
B1000_M ODULAR BRI
NATED PROJECT
C C
A
AZ
C
L LL FITMENT
\
opm ent
175
A E1 10-N16-S-300EF APPROX
FITMENT TYPE 3 - 1 LANE - 8m SPAN
St
C
ds_2015\
BENDS
CZ
A
D = INTERNAL DIA
D Q PRECAST MODULE REINFORCEMENT - SHEET B
B
AND FITMENT
BENDS
andar
B HOOKS PREPARED BY
C D
B BRIDGE ENGINEERING SECTION
St
B FITMENT www.rms.gov.au
i
Br
A
\
No OF PLANS
SAssi ADey
DENTI
DESIGN
KZ C APPROVED FOR USE
B
D
2016
S CONFI
175
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
C E
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
18 AM
ISSUE No SHEETS
40 SHEET No MB8SL56
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
E17
E13
E11 3-N12-LL AND E14 1-N12-KZ E14 1-N12-KZ REINFORCEMENT MAY BE DISPLACED SLIGHTLY WHERE NECESSARY TO
E4
E19 3-N32-S-NF SPACED CLEAR FORMED HOLE, RECESS, COUPLERS AND BOLT.
E9 E20 2-N24-L-NF
AS SHOWN IN SECTION 5 UNLESS OTHERWISE SPECIFIED, THE MINIMUM LENGTHS OF LAPS
-
SHALL BE AS FOLLOWS:
E8 3-N32-S-FF, E11 3-N12-LL
4 E20 2-N24-L-NF 4
- - AND E19 3-N32-S-NF BAR SIZE: N12 N16 N20 N24 N28 N32 N36
5
E16 1-N20-LL SPACED AS SHOWN IN SECTION -
2 EQUAL SPACES a) HORIZONTAL BARS WITH >300mm OF
CONCRETE CAST BELOW THE BAR: 460 620 820 1100 1400 1720 ...
E9 E19
5 5 E16 1-N20-LL E10 b) OTHER BARS: 350 470 630 850 1080 1320 ...
- E20 2-N24-L-NF - E8
E20 2-N24-L-NF
E12 8-N16-HT SPACED
1
AS SHOWN IN VIEW 56 E12 8-N16-HT SPACED THE DEVELOPMENT LENGTH SHALL BE 80% OF THE VALUE TABULATED IN THE
E4 1
AS SHOWN IN VIEW 56 TABLE UNLESS NOTED OTHERWISE.
240
SUPPLIERS RECOMMENDATIONS OR APPROVED EQUIVALENT.
E12
E1
E15 1-N12-C E15 1-N12-C SPACED E7
1
AS SHOWN IN VIEW 56 E16
160 145
E12 3-N16-HT-120 E12 3-N16-HT-120
REINFORCEMENT NOTES
400
2 EQUAL SPACES 2 EQUAL SPACES THE OUTSIDE FACES OF THE BARS AND ARE IN MILLIMETRES.
E7 E7
E20 9 BAR BENDING AND HOOK DETAILS SHALL BE IN ACCORDANCE WITH
B1000_M ODULAR BRI
STRANDS STRANDS
E12
E6
NATED PROJECT
E4 E4
E15
\
opm ent
E2
12.7mm 12.7mm
COUNTRY BRIDGE SOLUTIONS
dsi
E3
PRECAST MODULE REINFORCEMENT - SHEET C
andar
PREPARED BY
www.rms.gov.au
i
Br
80 70 5 SPACES AT 60
\
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
SECTION 5 SECTION 6
2016
S CONFI
BRIDGE No
10/
DRAWING
- - W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
0 150 300 450mm 0 150 300 450mm
S DRAW I
19 AM
ISSUE No SHEETS
40 SHEET No MB8SL57
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
OF PIER OF PIER
7 990 8 000 7 990
CH CH
25 1 25
59
CH
OF BRIDGE BEARING 2
2
60 AND CONTROL LINE 60
RESTRAINT AND
HOLDING DOWN
BRACKET (TYP)
1
59
PLAN
dgn
8M DCA_SL_T3.
GENERAL NOTES
8M _SL_T3\
NATED PROJECT
\
opm ent
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
19 AM
ISSUE No SHEETS
40 SHEET No MB8SL58
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
PAD ( TYP)
M24 ANCHOR BOLT FOR
60 x 60 x 20 DEEP
C OF BRIDGE
FORMED RECESSES
- AND CONTROL LINE
SHALL BE FILLED
2% WITH GROUT AFTER
DETAIL C
-
0 100 200 300mm
100 50
10 NOMINAL GAP
SECTION 1
58
D
61
2%
dgn
8M DCB_SL_T3.
GENERAL NOTES
0 150 300 450mm
SCALE OR AS SHOWN
150 75
NGS\
OR APPROVED EQUIVALENT.
8M _SL_T3\
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 60.
SI
DGE\
B1000_M ODULAR BRI NGLE LANE\
NATED PROJECT
AT ABUTMENTS AND PIERS
\
opm ent
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
21 AM
ISSUE No SHEETS
40 SHEET No MB10SL59
MB8SL59
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
295 SUPERSTRUCTURE
B
A NOMINAL 20 THICK
-
- CELLULAR POLYSTYRENE
BACKER ROD
SEALANT (ST OR 15
20 x 20 CHAMFER
GN TYPES B OR C TO
SPECIFICATION B312)
SEALANT (GT OR
GN TYPES B OR C TO
SPECIFICATION B312)
C
-
BACKER ROD
OR APPROVED
20
ELASTOMERIC JOINT DETAIL AT PARAPET
EQUIVALENT(TYP)
BEARING
C OF PIER
SECTION 2
58
SEALANT 10 25 10 SEALANT 10 25 10
(ST OR GT TYPE C (ST OR GT TYPE C
7
3
3
GENERAL NOTES
20
20
SURFACES PRIMED IN SURFACES PRIMED IN SCALE OR AS SHOWN.
150 75
ACCORDANCE WITH ACCORDANCE WITH
dgn
40
40
MANUFACTURER'S MANUFACTURER'S MAXIMUM JOINT MOVEMENT ± 10mm.
8M DCC_SL_T3.
INSTRUCTIONS - TYP INSTRUCTIONS - TYP ALL SEALANTS SHALL CONFORM TO ROADS AND MARITIME SERVICES QA
SPECIFICATION B312.
BACKER ROD REGIONS WEST OF THE GREAT DIVIDING RANGE. UNLESS COMPLETE
BACKER ROD
CURING IS GUARANTEED BEFORE OPENING TRAFFIC.
STD DRAW I
15mm CELLULAR 15mm CELLULAR BACKER RODS SHALL BE NON ABSORBENT, CLOSED CELL POLYETHYLENE
POLYSTYRENE SHEET POLYSTYRENE SHEET OR NEOPRENE (PARBURY'S EXPANDAFOAM BACKER ROD OR APPROVED
8M _SL_T3\
- -
B1000_M ODULAR BRI
0 20 40 60 80 100mm 0 20 40 60 80 100mm
20 x 20 CHAMFER 15
SEALANT (GT OR GN 20 10 20 10
SEALANT (ST OR GT TYPES B OR C TO
NATED PROJECT
TYPES B OR C TO SPECIFICATION B312)
3 SPECIFICATION B312) 3
\
opm ent
20 15
- - SEALANT (ST OR GT ISSUE DATE ADMENDMENT DESCRIPTION PREP CHECK AUTH
20x20 CHAMFER
15
SPECIFICATION B312)
25
CELLULAR
ds_2015\
PREPARED BY
www.rms.gov.au
i
- - No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
0 20 40 60 80 100mm BRIDGE No
0 20 40 60 80 100mm
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
20 10
NG I
20 10 PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
22 AM
ISSUE No SHEETS
40 SHEET No MB8SL60
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
GALVANIZED ELEPHANTS
( 9
0
T ° FOOT FERRULES (TO BE FILLED
70
Y
P 80
) M10 X 175 WITH GROUT AFTER REMOVAL
315
185
RESTRAINT AND
70 70
HOLDING DOWN 33 HOLE FOR
40
A
M30 THREADED ROD
60
- BRACKET. FOR
80
130
RESTRAINT AND
DETAILS SEE
HOLDING DOWN
SHEET No 62
1 1 TEMPORARY BRACKET. FOR
- - GROUT SUPPORT TIMBER DETAILS SEE
NOM
25
SHEET No 62
TEMPORARY
°
0
)
NUT AND WASHER
9
0 50 100 150mm
P
Y
T
MODULE RESTRAINT AND HOLDING DOWN BRACKET
(
50 25
STRENGTH BOLTS
105 105 TEMPORARY SUPPORT ASSEMBLY
N24 REBAR
PROPERTY CLASS 8.8 TO BE FIXED TO THE MODULE IN THE CASTING YARD AND SHALL
WITH M30 HIGH STRENGTH NOT BE USED FOR TEMPORARY SUPPORT OF PRECAST MODULE.
DETAIL D DENOTES OR SUITABLE ALTERNATIVE TEMPORARY SUPPORT AND
WASHER TO AS/NZS 1252
LENTON BOLT COUPLERS 59 TO BE REMOVED AFTER GROUTING AND FIXING BRACKET ON SITE
EL25S13 OR APPROVED
125
STEEL SECTIONS SHALL CONFORM TO AS/NZS 3679.1-300.
70 70
( TYP) ( TYP)( TYP) ( TYP)
25
125
RODS SHALL BE 8.8/S IN ACCORDANCE WITH AS 5100.6.
OF PIER
HIGH STRENGTH STEEL NUTS FOR STRUCTURAL BOLTING SHALL BE
100
SPECIFICATION B204.
130
SECTION 2
8M DT_SL_T3.
SPECIFICATION B240.
NGS\
-
AFTER ASSEMBLY DAMAGED GALVANISED SURFACES SHALL BE
RESTRAINT AND HOLDING DOWN BRACKET RENOVATED WITH TWO PACK ORGANIC ZINC-RICH PRIMER.
8M _SL_T3\
SPECIFICATION B241.
RECESS TO BE FILLED WITH
NGLE LANE\
THIN NUTS
DGE\
RECESS IN MODULE
FACE OF CURTAIN WALL
B1000_M ODULAR BRI
OR APPROVED EQUIVALENT.
10mm POLYSTYRENE
100
RESTRAINT AND
CLASS M
HEXAGON THIN NUT
HOLDING DOWN
ISO 4035-M30-05 TO 80 x 80 x 1.5 HDPE WITH
NATED PROJECT
160
BRACKET
AS/NZS 1112.4. 33 HOLE
\
opm ent
PLATE
COUNTRY BRIDGE SOLUTIONS
M30 HIGH STRENGTH
dsi
PREPARED BY
DETAIL A BRIDGE ENGINEERING SECTION
St
-
SECTION 1 www.rms.gov.au
i
Br
-
No OF PLANS
100 50
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
LAYOUT AT ABUTMENTS PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
23 AM
ISSUE No SHEETS
40 SHEET No MB8SL61
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
110 90 90 110
25
130 160 100
70 70
170
32 PLATE
80
TYP
76
12 x 12
8
TYP 10 THREADED
8 20 CHAMFER
400
HOLE ELEVATION
170 x 32 PL x 346
RESTRAINT PLATE
3 25 3 33 FOR M30 BOLTS. HOLES TO BE
- - MATCH DRILLED USING A
160
HEADSTOCK/SILL BEAM
346
TYP 100 160 130
95 105 105 95
MODIFIED
400
WELDED COLUMN
108
400 WC 212
END ELEVATION
ELEVATION
PLAN
RESTRAINT AND HOLDING
RESTRAINT PLATE
DOWN BRACKET 48 REQUIRED
24 REQUIRED 0 100 200 300mm
100 50
400 400
110 x 20 x 350
40 x 50 LONG SLOTTED HOLES. 100 100 STIFFENER 200
60
PLACEMENT OF COUPLERS IN THE
16 x 32 PLATE
100
100
PRECAST MODULE
346 LONG 30 30
PLATE
160
160
346
390
390
48 REQUIRED
dgn
8M DTB_SL_T3.
100 50
130
130
40
NGS\
GENERAL NOTES
STD DRAW I
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 61.
180
NGLE LANE\
TOP VIEW
SECTION 3
110 x 20 x 350 400
SI
DGE\
STIFFENER
-
70 FOR M30 BOLTS. HOLES IN BOTTOM
B1000_M ODULAR BRI
HEADSTOCK/SILL BEAM
NATED PROJECT
346 LONG
\
opm ent
70 FOR M30
130
ds_2015\
PREPARED BY
www.rms.gov.au
210
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
SECTION 2
S CONFI
BRIDGE No
10/
DRAWING
- W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
24 AM
ISSUE No SHEETS
40 SHEET No MB8SL62
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
ABUTM ENT A
ABUTM ENT B
OF BRIDGE
ER 1
ER 2
PI
PI
TYPE C TYPE A1 TYPE A2 TYPE A1 TYPE A2 TYPE A1 TYPE A2 TYPE B
EJ EJ EJ EJ
PANEL LAYOUT
0 1 500 3 000 4 500mm
1 500 750
4 820 3 960
FOR DETAILS PLAN FOR DETAILS FOR DETAILS PLAN FOR DETAILS
NGLE LANE\
SCALE OR AS SHOWN
4 820 3 960 200 100
B1000_M ODULAR BRI
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 65.
1 720 2 500 600 980 2 000 980
NATED PROJECT
\
opm ent
PREPARED BY
www.rms.gov.au
\ i
Br
DENTI
APPROVED FOR USE DESIGN
2016
PLAN
S CONFI
FOR DETAILS PLAN FOR DETAILS FOR DETAILS FOR DETAILS BRIDGE No
10/
DRAWING
SEE SHEET No 66 SEE SHEET No 66 SEE SHEET No 66 W Ariyaratne D.G.C. ADey
7/
SEE SHEET No 67
NG I
PANEL TYPE C PANEL TYPE A1 PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
24 AM
ISSUE No SHEETS
40 SHEET No MB8SL64
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
15
RECTANGULAR HOLLOW SECTIONS SHALL CONFORM TO
AS/NZS 1163-C350LO.
75
ALL FASTENERS MUST CONFORM TO THE REQUIREMENTS OF ROADS AND
CUT FROM MARITIME SERVICES QA SPECIFICATION B240.
175 x 16 PL x 595 LONG DIMENSIONS AND SHAPE FOR CUP HEAD BOLTS SHALL BE IN ACCORDANCE
R
WITH AS/NZS 1390.
300
40
TYP
5 HIGH STRENGTH STEEL CUP HEAD BOLTS SHALL BE PROPERTY CLASS 8.8
225
WITH MATERIAL AND MECHANICAL PROPERTIES IN ACCORDANCE WITH
150 x 75 x 5 SHS RAILS AS/NZS 1252 AND SHALL BE MARKED DURING MANUFACTURE TO DESIGNATE
595
630
HIGH STRENGTH STEEL NUTS FOR STRUCTURAL BOLTING SHALL BE
75
PROPERTY CLASS 8 TO AS/NZS 1252.
BOLTING CATEGORY FOR HIGH STRENGTH STEEL CUP HEAD BOLTS AND
310
225 AS 5100.6.
SPECIFICATION B204.
20
RAILINGS AND CONNECTORS SHALL BE HOT-DIP GALVANIZED AFTER
-
FABRICATION.
15 135 135 15 PTFE SPACER SHALL BE 100% VIRGIN POLYTETRAFLUOROETHYLENE
SEAM WELD INSIDE RHS TO BE GROUND OFF FOR 250mm MINIMUM FROM
END OF RAIL.
INSIDE ELEVATION CONNECTORS TO BE TRIAL FITTED BEFORE GALVANIZING TO ENSURE
SECTION 8 LOOSE FIT.
POST SHALL BE PERPENDICULAR TO BASE PLATE
- THE LONGITUDINAL SEAM IN RHS MEMBERS SHALL BE ON THE UNDERSIDE
OF THE RAILS.
BASE PLATE STEEL WASHER SHALL CONFORM TO AS 1237.1 PRODUCT GRADE A.
225 x 20 PL 225 SUPPLY OF BOLTS, NUTS AND WASHERS SHALL BE IN ACCORDANCE
4/ 30 X 34 LONG
x 300 LONG 55 120 50 WITH ROADS AND MARITIME SERVICES SPECIFICATION B240.
SLOTTED HOLES TYP
EDGES TO BE PROTECTIVE TREATED SHALL BE ROUNDED TO A RADIUS
15
30
OF 1.5mm UNLESS SPECIFIED OTHERWISE.
90
dgn
8M BRB_SL_T3.
300
M24 NUT AND WASHER FABRICATION IN ACCORDANCE WITH ROADS AND MARITIME SERVICES
34
135
HIGH-STRENGTH STEEL PROPERTY CLASS 8 BOLTS NUTS AND WASHERS SHALL BE HOT DIP GALVANIZED IN
STD DRAW I
15
TYP 15 175 35
4/60 x 4 PL x 60 WASHERS HEXAGON THIN NUT ISO 4035-M24-04 HEXAGON THIN NUT ISO 4035-M24-04
NGLE LANE\
- M24 x 320 LONG HIGH-STRENGTH BOLT FOR M24 x 380 LONG HIGH-STRENGTH BOLT FOR
SI
DGE\
WITH THREAD LENGTH 100 PROPERTY CLASS 8.8 WITH THREAD LENGTH 100 PROPERTY CLASS 8.8
TO AS/NZS 1252
B1000_M ODULAR BRI
TO AS/NZS 1252
NATED PROJECT
\
opm ent
PREPARED BY
www.rms.gov.au
\ i
Br
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
25 AM
ISSUE No SHEETS
40 SHEET No MB8SL65
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
CONNECTION
1
61
61
53
R10 TYP
-
SQUARE COLLAR ON BOLT
520
8 CUT AND BENT FROM
20 10
75
=
150
3 3
- -
CONNECTION
51
5
- 4/ 22 SLOTTED REGULAR 280 x 120 x 3 REGULAR 280 x 120 x 3
ELEVATION 7
PTFE SPACER 2/ 40 HOLE PTFE SPACER 2/ 40 HOLE
dgn
HOLES
- REGULAR 280 x 120 x 3
8M BRC_SL_T3.
75
=
110
150
NGLE LANE\
6 6
=
- -
GENERAL NOTES
SI
DGE\
PLAN 100 50
IN TOP AND BOTTOM FACE PLAN
RAIL CONNECTOR FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 65.
ASSEMBLY AT RAIL CONNECTION
REQUIRED
CUP HEAD BOLTS NOT SHOWN
NATED PROJECT
280
\
opm ent
2/ 40 HOLE
COUNTRY BRIDGE SOLUTIONS
120
dsi
51
8
CUT AND BENT FROM
65 150 65
TRAFFIC BARRIER RAILING - SHEET C
8 PLATE x 670 LONG(TYP)
andar
PREPARED BY
PTFE SPACER BRIDGE ENGINEERING SECTION
St
VIEW 5 www.rms.gov.au
\ i
Br
-
No OF PLANS
SAssi ADey
DENTI
APPROVED FOR USE DESIGN
2016
S CONFI
BRIDGE No
10/
DRAWING
W Ariyaratne D.G.C. ADey
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
26 AM
ISSUE No SHEETS
40 SHEET No MB8SL66
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
FROM 8 PLATE
51
390
43
10
390 LONG (TYP)
6
8
6
10
8
102
22
51 22
10
35
110
176
176
8
DETAIL A
-
249
249
0 20 40 60 80 100mm
TYP 14
540
520
540
530
- 20 10
190
190
13 13
8
- - 10 10
51
35
340
8
THRIE BEAM
151
154
GUARDRAIL
161
164
14 2/ 40 HOLE
120
-
3 THICK
10
10
20 NOM. GAP REGULAR 340 x 120 x 3
10
6/ 18 HOLES FOR
PTFE SPACER 2/ 40 HOLE 95 150 95
M16 BOLTS GRADE 8.8 123 108 108 71 50 NOM. GAP 60 80
PTFE SPACER
10
ELEVATION
11 SECTION 10 SECTION 11
- -
- -
20
70 70
M20 x 115 HIGH STRENGTH STEEL CUP HEAD
TYP TYP
BOLTS, THREAD LENGTH 60 WITH HIGH
110
2 ASSEMBLIES REQUIRED PER CONNECTION
20
2/ 22x70 LONG
VIEW 12
NGS\
SEE DETAIL
20
70 70 -
TYP TYP
70
0 20 40 60 80 100mm
800
55
NGLE LANE\
110
535
20 10
10
55
80
GENERAL NOTES
SI
20
DGE\
SLOTTED HOLES
410 20 140 150 100 100 50
IN TOP AND BOTTOM
FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 65.
820 FACE(TYP)
NATED PROJECT
SECTION 13
\
opm ent
150x75x5 RHS
TYPE 3 - 1 LANE - 8m SPAN
St
ds_2015\
PREPARED BY
www.rms.gov.au
\ i
Br
DENTI
DESIGN
PLAN APPROVED FOR USE
2016
2/ 22 HOLES IN BOTTOM
S CONFI
BRIDGE No
10/
DRAWING
FACE OF RAIL W Ariyaratne D.G.C. ADey
7/
NG I
ASSEMBLY AT END CONNECTION PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
S DRAW I
27 AM
ISSUE No SHEETS
40 SHEET No MB8SL67
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11:
BENDS
A
A
AZ HZ
A
S LL VL
A
D
270
270
C
A
FITMENT
B
BENDS B
A B FITMENT
175
175
BENDS
A C C
A
A
CZ KZ
A
FITMENT
B
D
H SH XT
A
FITMENT
175
BENDS
B BENDS
B C
B ELEVATION END VIEW
B
FITMENT
A C BENDS
E
D
DZ
D
A
HH VV CT
A
D = OD
270
270
B
B
D
A = LAP
E A
B
A
A
D
C FZ E FITMENT
B
V J HT
D
FITMENT
A
D
B
BENDS F BENDS
C B C C
A C
A
BAR MARKING LEGEND
B
A
D
L JJ R THE METHOD USED TO LABEL REINFORCEMENT STRUCTURE ELEMENT DENOTATIONS USED FOR PRECAST MODULES ARE:
D
ON THE DRAWINGS IS AS FOLLOWS: E FOR EXTERNAL PRECAST MODULE
B E
A1 10-N16-S-300EF T FOR INTERNAL PRECAST MODULE
R = EXT RADIUS
B
LH A SP RC BAR SIZE IN MILLIMETRES B FOR ABUTMENT B FOOTINGS
B
BAR STRUCTURAL PROPERTIES INCLUDING STITCH POUR REINFORCEMENT NOTES
A C
NUMBER OF BARS IN THE SET R FOR ABUTMENT B 1 AUSTRALIAN STANDARD BAR SHAPES ARE IN ACCORDANCE WITH
dgn
A A
B STRUCTURE ELEMENT DENOTATION F FOR FOOTING AT PIERS 2 BAR SIZE IS THE NOMINAL DIAMETER IN MILLIMETRES, OR THE
'A' IS IN THE WHERE THE BAR SPACING IS APPROXIMATE C FOR COLUMNS AT PIERS AS/NZS 4671 FABRIC NUMBER.
B
D = BEND DIA. DIRECTION FITMENT W FOR WINGWALLS 3 THE GRADE OF REINFORCEMENT, IF NOT STATED ON THE DRAWINGS,
U F T ONLY, THE FOLLOWING FORMAT SHALL BE USED:
B
A
OF THE MAIN BENDS A1 10-N16-S-300EF APPROX INCLUDING STITCH POUR SHALL BE D500N TO AS/NZS 4671.
C
NGS\
C WIRES H FOR PIER HEADSTOCK 4 WHERE SHOWN ON THE DRAWINGS, "W" SHALL DENOTE PLAIN ROUND
STD DRAW I
S FOR ABUTMENT SILL BEAMS REINFORCING BARS EQUIVALENT TO GRADE R500L TO AS/NZS 4671.
D FOR DECK 5 WHERE SHOWN ON THE DRAWINGS, RL AND SL SHALL DENOTE WELDED
E B C A NO DIMENSION SHOWN.
FITMENT FITMENT 8 BARS OF DIAMETER GREATER THAN 24mm SHALL NOT BE REBENT.
FITMENT
SI
BENDS BENDS
D
A
DGE\
XH
B
A E N
D
BENDS SECTION 5.13 OF AS 5100-BRIDGE DESIGN.
BENDS AND AND
B1000_M ODULAR BRI
B C HOOKS HOOK
B B C
B C D C
NATED PROJECT
FITMENT FITMENT
B
\
opm ent
BENDS HOOKS
B
A
B G P Y
B
AND
A A
FITMENT TYPE 3 - 1 LANE - 8m SPAN
St
FITMENT
ds_2015\
BENDS
BENDS
BAR SHAPES DIAGRAM
B
C K Q
B
AND
E
andar
PREPARED BY
C E B C D C D
PHONE (02) 8837-0811
dge\
www.rms.gov.au
i
Br
B A
\
A No OF PLANS
FITMENT
SAssi ADey
DENTI
FITMENT APPROVED FOR USE DESIGN
2016
A
C
BENDS BENDS
S CONFI
D = INTERNAL DIA
B
BRIDGE No
D M W
10/
DRAWING
W Ariyaratne D.G.C. ADey
D
AND
7/
NG I
PRINCIPAL ENGINEER BRIDGES ISSUE STATUS
B HOOKS
S DRAW I
28 AM
C
C D
07.10.2016 SalahAssi 07.10.2016
23:
ISSUE No SHEETS
40 SHEET No MB10SL68
MB8SL68
THI
DATE BRIDGE ENGINEER (NEW DESIGN)
11: