INTERNATIONAL SEWAGE POLLUTION PREVENTION SURVEY


CHECKLIST
Name of Ship: IMO Number: Flag: Port of Registry:

Assignment No: Port of Survey: Date Survey Commenced: Date Survey Completed:

Notes:

1. Complete relevant sections as applicable for the surveys carried out. Mark boxes ‘Y’ to indicate YES, ‘N‘to
indicate NO and “N/A” to indicate NOT APPLICABLE.

2. This checklist is applicable to ship’s sewage pollution prevention system in accordance with provisions of Annex
IV of the International Convention for the Prevention of Pollution from Ships, 1973, as modified by the Protocol
of 1978 relating thereto and as amended by resolution MEPC 115(51)

A GENERAL Y N N/A
Have any changes been made which would affect the validity of the international sewage
1
pollution prevention certificate?
Were all other Statutory Certificates and the Class Certificate (if vessel is classed) valid at the
2
time of survey?

B SURVEY REQUIREMENTS Y N N/A


1 Is the vessel equipped with any of the following?
A sewage treatment plant which shall be of a type approved by the Administration under the
(a) terms of Resolution MEPC.2(VI) as amended (For existing ships i.e. ships built before 27th
September 2003, national specifications are acceptable)

(b) A sewage comminuting and disinfecting system approved by the Administration

A holding tank of the capacity to the satisfaction of the Administration for the retention of all
(c) sewage, having regard to number of persons onboard.
Capacity of the tank in cubic meters

For the vessels fitted with holding tank, is the discharge rate of untreated sewage approved by
(d)
administration as per IMO resolution MEPC 157(55)? ( Copy of approval to be sent to THO)

If the vessel is fitted with a sewage treatment plant or a sewage comminuting and disinfecting
2
system, confirm whether the equipment is well maintained and is in proper working condition?

(a) Verify proper operation of the plant and structural integrity

(b) Confirm that plant and pipelines have no leakages

If the vessel has a sewage plant, confirm that a type approval certificate of the plant is available
3 onboard? (A copy of type approval to be submitted to the head office; otherwise full term will
not be issued)
Has the vessel equipped with a pipeline and standard shore discharge connection to enable
4
pipes of reception facilities to be connected?

PAGE 1/2
F-SPS-01c
Is the dimensions of standard shore discharge connection is as per Regulation 10 of Annex IV
5
Marpol 73/78?

C FIRST SURVEY BY CONARINA Y N N/A

Has copy of previous international sewage pollution prevention certificate been forwarded to
1 HO along with survey reports? (Where previous certificate is not available, HO permission
must be obtained before issue of interim certificates)

Does the present international sewage pollution prevention certificate comply with Annex
2 IV of International Convention for the Prevention of Pollution from Ships, 1973, as modified by
the Protocol of 1978 relating thereto and as amended by resolution MEPC 115(51)

Have all outstanding surveys/recommendations, if any, imposed by the previous


3 society/organization, been dealt with satisfactorily? If not, Interim certificate is not to be issued
unless HO has agreed postponement.

D MODIFICATIONS / ALTERATIONS

Details:

E REMARKS / DEFICIENCIES

Details:

THIS IS TO CERTIFY THAT:

(a) International Sewage Pollution Prevention Certificate Initial survey* has been carried out in
accordance with the relevant regulations and as described above;

(b) Minor deficiencies, if any, are described in section E;

(c) An Interim* International Sewage Pollution Prevention certificate No has been issued on
and valid until .

(d) A full term International Sewage Pollution Prevention certificate may be issued by HO.
A full term International Sewage Pollution Prevention Certificate should not be issued by HO until
the deficiencies noted at E above have been rectified.

(e) The full term international sewage pollution prevention certificate No has been endorsed for the
renewal survey on at .

Signature of Surveyor
Surveyor to CONARINA
Port
Date

*Select as appropriate