You are on page 1of 1

Project Title Refinery Heater Replacement

Technical Bid Evaluation for Diesel Storage Tanks (47-TK-03)

Bidder Response
SR.
DESCRIPTION UNITS SPECIFIED DATA Confirmed / Not
NO. Remarks
Confirmed
1.0 GENERAL
1.1 Offer Number VTA
1.2 Name of sub-supplier if any VTA
1.3 Quantity required One (1)
1.4 Comply with vessel D/S (KU-TWK-20-ME-DTS-0006-Rev A) VTC
2.0 Proces/ Design Data
2.1 Fluid Diesel Confirmed
2.2 Design Code UL-142 Latest Edition Confirmed
2.3 Sour Service N/A
2.4 Lethal Service N/A
2.5 Density kg/m3 850-880 Confirmed
2.6 Operating Pressure ATM Confirmed
Full of Water + 5 mbarg / -2.5
2.7 Design Pressure (int./ext.) confirmed
mbarg
2.8 Operating Temperature °C -10 / 55 confirmed
2.9 Design Temperature (Int/ Ext) °C 85 / 85 confirmed
2.10 MDMT °C -10 confirmed
2.11 MAWP barg VTA
2.12 Radiography / UT As per UL 142 confirmed
2.13 Post Weld Heat Treatment NA
2.14 Insulation No
2.15 Fire Proofing No
3.0 Mechanical Data
3.1 Capcaity m3 5 Confirmed
3.2 Size mm ID 1500 x 3062L Confirmed
3.3 Orientation Horizontal Confirmed

Not Confirmed. for this


3.4 Design Life 15Y FEA analaysis will be done
and it will cost you extra.

3.5 Thickness of Shell mm 8(Min) Confirmed

3.6 Thickness Dished Head mm 8(Min) Confirmed

3.7 Thickness of Bund Wall mm 8(Min) Confirmed

4.0 Material of Construction


4.1 Shell SA-36 / SA-285 Gr.C Confirmed
4.2 Dished Head SA-36 / SA-285 Gr.C Confirmed
4.3 Nozzles A106 Gr.B Confirmed
4.4 Nozzle Flange SA-105 Confirmed

4.5 Bolts/Nuts SA-193 Gr. B7 / SA-194 Gr. 2H Confirmed

4.6 All other materials As per KU-TWK-20-ME-DTS-0006 Confirmed

5.0 Scope of Supply / Services


5.1 Mechanical Design Required Confirmed
5.2 Anchor Bolts Design Required
5.3 Supply of Shell, Head, Nozzles, Manways, Supports Required Confirmed
5.4 Bund Wall Required Confirmed
5.5 Vent and Drain Connections Required Confirmed
5.6 Piping and Valves within Battery Limit Required
5.7 Ladder, Platform Required Confirmed
5.8 Flame Arrestor with Bird Screen Required
5.9 Level Gauge Required
5.10 Overfill prevention float valve Required
5.11 Dip Pipes Required Confirmed
5.12 Ball valve, Check Valve and Quick Coupling Required
5.13 Vortex Breaker Required Confirmed
Seaworthy Packing, Marking, Forwarding, Preservation of
5.14 Required
Materials
5.15 Transportation to site Ex-Works
5.16 Erection at site By Others
5.17 Surface preparation and painting As per KURD-PRO-INSP-014 Confirmed
5.18 Internal Coating in accordance with System P-103 As per KURD-PRO-INSP-014 Confirmed
5.19 Any other item specified in data sheet and MR Required
5.0 Inspection and Testing
5.1 Inspection and Testing including Hydrostatic Test In accordance with approved ITP

EN 10204 Type 3.1 for Pressure


5.2 Material Certificate
Parts & Type 2.2 for Others

6.0 Documentation
6.1 Documentation as per Data Sheet Required
7.0 Guarantees
7.1 Mechanical Design Guarantee Required Confirmed

12 mo after commissioning and 24


7.2 Warranty Period
Months from Date of Delivery

8.0 Deviation to the Technical Specification / Data Sheet


8.1 List of Deviation to the Data Sheet Vendor to Submit (If any)
9.0 Delivery Time and Fabrications Schedule

9.1 Completion Period VTA

9.2 Workshop Location for Pre-fabrication (City / Country) VTA

Notes / Observations (TBE 1st stage)

Technical Acceptance

Page 3 of 3