You are on page 1of 5

Feasibility Statement

Request number: Part number: Revision Date:


Customer: Drawing no. / index: Date of issue:
Program name: Drawing released on: Industry type:
Multipart program (Y/N): Specification no. / index:
Part name: Spec. released on:

The production for that part is planned for years: N/A Yes No
1. The product information contains gerber files, CAD drawings, detailed and frozen drawings, controlled prices, frozen BOM and customer´s specific requirements?
2. Is the part currently in production?
3. Is the product currently in development stage?
4. Is the product adequately described by drawings and / or specifications mentioned above for a feasibility statement?
5. Specific Customer´s Requirement could be reach by the company?
Technology / Process capability:
6. Can the product be manufactured according to tolerances given on the drawing and / or in the specification?
7. Are all sub-suppliers and material l (including products provided by customer) internally released (evidence) and a material certificate available?
8. Is the required measurement equipment for the specification’s evidence available?
9. Can the product be manufactured with the required process capabilities Cmk, Ppk, and Cpk?
10. Are similar products with similar requirements already subject to statistical process control?
11. Is the process flow and the rough test planning done and internally documented?
12. Does the product requires special equipment not available in the facility?
13. Does the equipment life is suitable to manufacture the product?
Production capacity / logistics:
14. Is there an adequate production capacity for the manufacturing of the parts? (Considering a max of 6 days production)
15. Have the requirements for logistics and packaging been known and respected?
16. Does the specification allow the use of efficient handling and manufacturing equipment?
17. Does the specification allow the use of tooling with an economic life?
18. Is the product unrestricted storable for months with the specified packaging, and doesn’t it lose its specified characteristics?
If not, the product is storable for months in original packing without losing its specified characteristics.
19. Does the facility have enough space to get additional projects?
20. Is it required to build an additional facility to manufacture this product?
21. Is it required to buy additional equipment to have enough production capacity?
Human Resources:
22. Personnel with special skills is required to build the product?
23. Is additional personnel required to manufacture the product?
24. Is personnel required for special shifts?
Environment / Recycling:
25. Can the product be manufactured according to RoHS guideline (Restriction of the use of certain hazardous substances in electrical and electronic equipment)?
26. If the used material needs registration according to REACH, is this done already?
27. Can the MDS (Material Data Sheet) be entered in the IMDS, if required?
28. Special installations are required to manufacture the product?
29. Product requires chemical material identified as dangerous that can affect personnel?
30. Noise generated in the product assembly requires special personal protection or special work stations?
Dates:
31. Is the planed due date known and can the lead times for samples and tooling be kept?
32. The process time for the Initial Samples -(PPAP) (without deviation) is weeks.
33. Customer Initial Sample Approval-(PPAP)-Requirements known and understood?
Finantial:
34. Project investment is under business development strategy?
35. Target price can be reached?
Certifications:
37. ISO 9001?
38. IATF16949?
39. ISO 14000?
40. Other: Specify:

Conclusion:
Feasible: Product can be manufactured under full process capability according to requirements in all characteristics and available equipment.
Limited feasibility: Product can be manufactured under some process capability according to attached modifications and equipment list.
Not feasible: Fundamental changes in design are necessary for the manufacturing of the product, equipment availability, space availability, material allocation or finantial constraints.

Notes:

Signature Business Development Manager: Signature Commercial Manager: Signature Engineering Manager:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Signature Quality Manager: Signature Key Account Manager: Signature Program Management:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Technical Specifications
Request number: 0 Part number: 0 Revision Date: 0
Customer: 0 Drawing no. / index: 0 Date of issue: 0
Program name: 0 Drawing released on: 0 Industry type: 0
Multipart program (Y/N): 0 Specification no. / index: 0
Part name: 0 Spec. released on: 0

Critical Characteristics:
1.
2.
3.
4.
5.
Special Characteristics:
6.
7.
8.
9.
10.
Special Process:
11.
12.
13.
14.
15.
Referential Drawings

Paste drawing here

Notes:

Signature Business Development Manager: Signature Commercial Manager: Signature Engineering Manager:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Signature Quality Manager: Signature Key Account Manager: Signature Program Management:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Equipment and Installations Requirement
Request number: 0 Part number: 0 Revision Date: 0
Customer: 0 Drawing no. / index: 0 Date of issue: 0
Program name: 0 Drawing released on: 0 Industry type: 0
Multipart program (Y/N): 0 Specification no. / index: 0
Part name: 0 Spec. released on: 0

List of Equipment Required:

Paste information here

Notes:

Signature Business Development Manager: Signature Commercial Manager: Signature Engineering Manager:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Signature Quality Manager: Signature Key Account Manager: Signature Program Management:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Space Requirement
Request number: 0 Part number: 0 Revision Date: 0
Customer: 0 Drawing no. / index: 0 Date of issue: 0
Program name: 0 Drawing released on: 0 Industry type: 0
Multipart program (Y/N): 0 Specification no. / index: 0
Part name: 0 Spec. released on: 0

Space Required:
1. Production area required: square meters.
2. Avalialable production area: square meters.
3. Warehouse space required: cubic meters.
4. Avalialable warehouse area: cubic meters.

Lay-Out Drawing:

Paste drawing here

Notes:

Signature Business Development Manager: Signature Commercial Manager: Signature Engineering Manager:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Signature Quality Manager: Signature Key Account Manager: Signature Program Management:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Personnel Requirements
Request number: 0 Part number: 0 Revision Date: 0
Customer: 0 Drawing no. / index: 0 Date of issue: 0
Program name: 0 Drawing released on: 0 Industry type: 0
Multipart program (Y/N): 0 Specification no. / index: 0
Part name: 0 Spec. released on: 0

Personnel Requirement:

Direct Personnel: Headcount


1. Operators:

Indirect Labor Services


2. Leader:
3. Quality Inspector:
4. Materials Handler:
5. Maintenance Technician:

Indirect Labor Administration


6. Supervisor:
7. Manufacturing Engineer:
8. Process Engineer:
9. Test Engineer:
10. Quality Engineer:
11. PC&L Engineer:
12. Purchasing Engineer:

Positions Diagram:

Paste drawing here

Notes:

Signature Business Development Manager: Signature Commercial Manager: Signature Engineering Manager:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date


Signature Quality Manager: Signature Key Account Manager: Signature Program Management:

Name / Responsibility / Date Name / Responsibility / Date Name / Responsibility / Date

You might also like