Contractor to prepare method statement for the project/ activity assigned to them in the
following template & should print it either on their letterheads or on blank sheets with their
sign and seal.
Date:
Section 1 – General
a) Client Name and Address: b) Contractor Name, Address, contact
<Site Address> details:
d) Work Location:
j) Details of LOTO, power tools and other electrically powered equipment to be used,
with their power rating:
N.B. - All workers must be trained in the safe use of all chemicals and provided with the PPE required when using and
storing these chemicals. Disposal is to be as per the waste disposal methods in the MSDS. Spillage and leaks are to be
cleaned up as per the spill/leak procedures identified in the MSDS.
d) Waste Disposal
Sr
Waste Description Disposal Method Approval
No.