Template
Contents
1. D1 - Team.....................................................................................................................................
7. D7 – Recurrence Prevention......................................................................................................
1. D1 - Team
Name Function Project responsibility
Non-conformity owner
Coordinator
Resolution owner
Affected Customer
Production Date
Issue description
RA.1
RA.2
RA.3
Verification
CA.1
CA.2
CA.3
CA.1
CA.2
CA.3
7. D7 – Recurrence Prevention
Review Documents/Systems
Work Instructions
Technical Specifica-
tion
Methods Provisions /
Standard
Operating Procedures
Statistical Process
Control /
Process Capability
Technical Drawing
Incoming Inspection
Plans
Design FMEA
Process FMEA
Delivery Instructions
Engineering Change
Approval
Management System
Manual
Alternative / Second
Sources
[…]
[…]
X X
Signature 1 Signature 2