47800
1700 4250 5550 5050 4900 4900 4900 3330 1420 5390 4710 1700
2600
8037.50
1090
SEQUENCE 6
CONCRETE VOLUME = 64 M3
3850
1700.00
1700.00
SEQUENCE 2
3330
SEQUENCE 5
CONCRETE VOLUME = 148.2 M3
1
S.04-02
2800
12249.99
SEQUENCE 6
CONCRETE VOLUME = 54.3 M3
3250
6820.00
3420.00 3420.00
5795.00
5955.00
GENERAL NOTES
1. Concrete Strenght for Mat Foundation
(fc') 25 MPa
2. Yield Stenght (fy)
D > 10, 420 MPa, Deformed Bar
D < 10, 420 MPa, Plain Bar
MAT FOUNDATION CONCRETE POURING PLAN
CONTRACTOR : CONSULTANT : REPUBLIC DEMOCRATIC OF TIMOR-LESTE PROJECT TITLE DRAWING TITLE DWG NO.
Ministry Of State Administration
PREPARED BY CHECKED BY CHECKED BY : APPROVED BY :
Eng. Cesaltino A. Martins Arch. ROGELIO E. PENAFLOR,UAP.UIA Eng. RANI HENDRIKUS, M.Sc Arch. PILIPUS JERAMAN,MT Eng. Armando J. das N. R. Amaral
Cad Operator Team Leader - JLC, LDA Structure Engineer Team Leader Consultant Eng. DNAIPDI - MAE Director DNAIPDI, Ponto Focal CAFI-MAE
Date: Date: