MAT FOUNDATION SCHEDULE

MARK MEMBER THICK (MM)

MF1 MAT FOUNDATION 850


TYPE-1

MF2 MAT FOUNDATION 650


TYPE-2

1 2 3 4 5 6 7 8 9 10 11 12 13
47800
1700 4250 5550 5050 4900 4900 4900 3330 1420 5390 4710 1700

6660.00 10715.00 12250.00 10014.98 7520.02

2600
8037.50

1090
SEQUENCE 6
CONCRETE VOLUME = 64 M3
3850

1700.00

1700.00

SLAB THICKNESS SEQUENCE 1


SEQUENCE 3
3690

SLAB THICKNESS 9960.00 650 MM ( TYPE-S2) CONCRETE VOLUME = 135 M3


CONCRETE VOLUME = 121 M3 650 MM ( TYPE-S2)

10240.00 25320.00 25320.00 10240.00


25810

SEQUENCE 2
3330

SEQUENCE 4 SLAB THICKNESS CONCRETE VOLUME = 178 M3


6940.00
CONCRETE VOLUME = 190 M3 850 MM ( TYPE-S1) 13878.49
5200

SEQUENCE 5
CONCRETE VOLUME = 148.2 M3

1
S.04-02
2800

12249.99

SEQUENCE 6
CONCRETE VOLUME = 54.3 M3
3250

6820.00

3420.00 3420.00

5795.00
5955.00

GENERAL NOTES
1. Concrete Strenght for Mat Foundation
(fc') 25 MPa
2. Yield Stenght (fy)
D > 10, 420 MPa, Deformed Bar
D < 10, 420 MPa, Plain Bar
MAT FOUNDATION CONCRETE POURING PLAN

CONTRACTOR : CONSULTANT : REPUBLIC DEMOCRATIC OF TIMOR-LESTE PROJECT TITLE DRAWING TITLE DWG NO.
Ministry Of State Administration
PREPARED BY CHECKED BY CHECKED BY : APPROVED BY :

Date: Date: CHECKED BY : APPROVED BY : MAT FOUNDATION


New Construction of STR
CONCRETE POURING
Ministry of State 02.01.03r
PLAN
Administration in
Manatuto Municipality

Eng. Cesaltino A. Martins Arch. ROGELIO E. PENAFLOR,UAP.UIA Eng. RANI HENDRIKUS, M.Sc Arch. PILIPUS JERAMAN,MT Eng. Armando J. das N. R. Amaral
Cad Operator Team Leader - JLC, LDA Structure Engineer Team Leader Consultant Eng. DNAIPDI - MAE Director DNAIPDI, Ponto Focal CAFI-MAE
Date: Date: