You are on page 1of 1

MAT FOUNDATION SCHEDULE

MARK MEMBER THICK (MM)

MF1 MAT FOUNDATION 850


TYPE-1

1 2 3 4 5 6 7 8 9 10 11 12 13 MF2 MAT FOUNDATION


TYPE-2
650

47800
1700 4250 5550 5050 4900 4900 4900 3330 1420 5390 4710 1700

2600
1090

17118.85 9894.65
3850

13060.02
3690

17279.96
25810

SLAB THICKNESS
3330

SLAB THICKNESS 100 MM ( TYPE-S1)


SLAB THICKNESS
100 MM ( TYPE-S1)
8340.00 100 MM ( TYPE-S1) 10040.00
1550.00
17279.96
5200

17120.02
11360.02
1700.00
2800

9110.00 REINFORCED
CONCRETE
3250

LEAN
CONCRETE
3270.00
5540.02 5699.96
GENERAL NOTES
1. Concrete Strenght for Mat Foundation
LEAN CONCRETE MAT FOUNDATION PLAN (fc') 25 MPa
2. Yield Stenght (fy)
D > 10, 420 MPa, Deformed Bar
D < 10, 420 MPa, Plain Bar

CONTRACTOR : CONSULTANT : REPUBLIC DEMOCRATIC OF TIMOR-LESTE PROJECT TITLE DRAWING TITLE DWG NO.
Ministry Of State Administration
PREPARED BY CHECKED BY CHECKED BY : APPROVED BY :

Date: Date: CHECKED BY : APPROVED BY : MAT FOUNDATION


New Construction of STR
LONGITUDINAL BAR
Ministry of State 02.01.03f
BENDING SCHEDULE
Administration in
Manatuto Municipality

Eng. Cesaltino A. Martins Arch. ROGELIO E. PENAFLOR,UAP.UIA Eng. RANI HENDRIKUS, M.Sc Arch. PILIPUS JERAMAN,MT Eng. Armando J. das N. R. Amaral
Cad Operator Team Leader - JLC, LDA Structure Engineer Team Leader Consultant Eng. DNAIPDI - MAE Director DNAIPDI, Ponto Focal CAFI-MAE
Date: Date: