Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field

Permeability Testing QA Form


Verification Boring Number: TO3-VB-001 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3986584 & Borehole Logger's Name: Adam Dornacker Start Date, Time, Water Depth: 4/22/2020; 16:53; 12'
P3986507
Panel Completion Date: 3/27/2020 USACE Representative(s): Lisa Perks/Zac Reese/Laura End Date, Time, Water Depth: 4/23/2020; 16:53; not taken
Sanchez
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.2
Northing: 910539.3714 Actual Depth of VB Hole (ft)*: 57.8 Depth to Paywall from top of PVC (ft): 10.6
Easting: 628996.7181 CT #: 00043
HHD Station: 3986+53.76 AT #: 0010 Falling Head Test
Ground Elevation (ft): 34.4 Decommission Date Start Date & Time: abandoned due to deviation out of wall
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time:
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft):
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.4 Top 1/3 9.4 25.4 End (ft):
Depth to Bottom of Pay Wall (ft): 59.4 Middle 2/3 25.4 41.4 Manual Cutoff Wall Reading:
Planned Depth of VB Hole (ft): 57.4 Bottom 3/3 41.4 57.4 Automatic Cutoff Wall Reading**:

Descriptions
Date Run (ft) Start End Recovery (%) RQD (%) QA Sample QC Sample
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.4-14.4 8:22 100 100 10.2, 13, 14.1 LS: 12.3-12.7

14.4-19.4 100 100


21.8-22.6
19.4-24.3 9:19 9:25 100 100 21.0-21.8
4 LS inclusions larger
24.3-29.3 100 100 than 3 in Soil Inclusion 28-28.3
LS: 29.8-30.05, 32.1-
29.3-34.3 9:43 9:50 100 100 30.5-31.3 29.6, 32.6, 33.7 32.4 Vug at 29.7
4/22/2020
34.3-39.4 100 100 31.3-32.1 37 Vug at 34.9

39.4-44.4 100 100 41, 43, 44.3

44.4-49.3 100 100 47.3, 48.2, 49

49.3-54.3 100 100 49.8, 51.2, 54.2


52.3-53.1
54.3-57.8 11:32 11:38 100 100 56.0-57.8- vertical soil inclusion

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10-6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are
(< 0.25") (0.25" to diameter (Larger than the core diameter)
observed or low core recover <85%", correct drilling procedures. of core)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/22/2020 VB Boring Number:TO3-VB-001 VB Boring Depth (ft):57.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft):0.98 NE Northing:+0.60 +0.73

OPTV Start Time:14:41 OPTV End Time:15:29 OPTV Final Depth (ft):56.32

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

0-56.32 Minor pitting throughout; no fractures

Hole was topped up with water at before the OPTV was placed in the hole. At 14:52 water level was observed in image at 22 ft.

52-56.32 Sandy soil inclusion that "V'd" in downward direction.

(GFA performed a second OPTV the next day with a different instrument to confirm the deviation. The readings were very similar. The hole was sanded-in at 50.5 feet.)

CCTV OBSERVATIONS:

CCTV Start Time:16:07 CCTV End Time:16:39 CCTV Final Depth (ft):28

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

GFA tried to pump the water out of the hole but the pump wasn't strong enough to keep up with the rising water. They could only pump out the water to ~28 feet.
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-001R Driller's Name: Saturation of Borehole

Panel Number(s): S3986584 & Borehole Logger's Name: Start Date, Time, Water Depth:
P3986507
Panel Completion Date: 3/27/2020 USACE Representative(s): End Date, Time, Water Depth:
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft):
Northing: Actual Depth of VB Hole (ft)*: Depth to Paywall from top of PVC (ft):

Easting: CT #: No samples taken. Using VB-1


HHD Station: 3986+53.76 AT #: UCS results Falling Head Test
Ground Elevation (ft): 34.4 Decommission Date Start Date & Time:
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time:
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft):
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.4 Top 1/3 9.4 25.4 End (ft):
Depth to Bottom of Pay Wall (ft): 59.4 Middle 2/3 25.4 41.4 Manual Cutoff Wall Reading:
Planned Depth of VB Hole (ft): 57.4 Bottom 3/3 41.4 57.4 Automatic Cutoff Wall Reading**:

Descriptions
Date Run (ft) Start End Recovery (%) RQD (%) QA Sample QC Sample
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)

No samples taken. Using VB-1


UCS results

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10-6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are
(< 0.25") (0.25" to diameter (Larger than the core diameter)
observed or low core recover <85%", correct drilling procedures. of core)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date: VB Boring Number:TO3-VB-001R VB Boring Depth (ft):

OPTV OBSERVATIONS:

Total Vector Deviation (ft): Northing:

OPTV Start Time: OPTV End Time: OPTV Final Depth (ft):

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

CCTV OBSERVATIONS:

CCTV Start Time: CCTV End Time: CCTV Final Depth (ft):

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-002 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3987812 & Borehole Logger's Name: David Hewitt Start Date, Time, Water Depth: 04/17/2020; 15:56, 11.95
P3987736
Panel Completion Date: 3/24/2020 USACE Representative(s): Lisa Perks/Zac Reeves/Laura End Date, Time, Water Depth: 04/20/20; 14:49; 9.85
Sanchez
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 3.25 PVC Casing Stick-up (ft): 1.25
Northing: 910584.8045 Actual Depth of VB Hole (ft)*: 58.3 Depth to Paywall from top of PVC (ft): 10.82
Easting: 628882.5457 CT #: 00042
HHD Station: 398776.64 AT #: 009 Falling Head Test
Ground Elevation (ft): 34.57 Decommission Date Start Date & Time: 04/21/2020; 15:21 (redo, 1st test rose)
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 4/22/2020: 15:21
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 10.89
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.57 Top 1/3 9.6 25.6 End (ft): 10.95

Depth to Bottom of Pay Wall (ft): 59.57 Middle 2/3 25.6 41.6 Manual Cutoff Wall Reading: 5.82 x 10-10
Planned Depth of VB Hole (ft): 57.57 Bottom 3/3 41.6 57.6 Automatic Cutoff Wall Reading**: 3.72 x 10-10

Descriptions
Date Run (ft) Start End Recovery (%) RQD (%) QA Sample QC Sample
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.6-14.3 8:14 100 100 12.3 10.2 (small peat)

14.3-19.3 100 100 17.5-18.3 16.6 15.6 (small peat)


18.3-19.1
19.3-24.3 8:49 8:52 100 100 22.2

24.3-29.1 100 100 26.6

29.1-34.2 100 100 31.0-31.8 none


4/17/2020
34.2-39.4 100 100 32.6-33.4 35.7, 37.9

39.4-44.4 10:13 100 100 43.6

44.4-49.4 10:36 100 100 45.4-46.2 49.2

49.4-54.5 100 100


44.6-45.4
Multiple fractures and core discing due to drilling
54.5-58.3 12:12 100 100 Many (13) (OPTV did not show fractures).

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10-6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are
(< 0.25") (0.25" to diameter (Larger than the core diameter)
observed or low core recover <85%", correct drilling procedures. of core)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/17/2020 VB Boring Number:TO3-VB-002 VB Boring Depth (ft): 58.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft):0.07 Northing:+0.03 +0.07

OPTV Start Time:13:54 OPTV End Time: OPTV Final Depth (ft):57.83

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

26 LS inclusion (~2")

0-57.83 Small pitting throughout

No fractures
0-57.83
Vertical tool marks throught
0-57.83

CCTV OBSERVATIONS:

CCTV Start Time:15:05 CCTV End Time:15:47 CCTV Final Depth (ft):56.30

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

52.06 small leak

55.78 small leak


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-003 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): P3988504 Borehole Logger's Name: David Hewitt Start Date, Time, Water Depth: 4/15/2020; 16:47; 11.05'

Panel Completion Date: 3/20/2020 USACE Representative(s): Lisa Perks & Zac Reeves End Date, Time, Water Depth: 4/16/2020; 15:57; 9.95'
Center (non-hydrated
Center of Panel, Overlap, or Joint: panel) Hole Diameter (in): 3.25 PVC Casing Stick-up (ft): 1.75
Northing: 910612.0595 Actual Depth of VB Hole (ft)*: 58.1 Depth to Paywall from top of PVC (ft): 11.42
Easting: 628814.0543 CT #: 00041
HHD Station: 398850.36 AT #: 008 Falling Head Test
Ground Elevation (ft): 34.67 Decommission Date Start Date & Time: 4/17/2020; 16:25 (redo, 1st test rose)
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 4/18/2020; 16:25

Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Manual Water Depth (from top of casing) at 9.98
Start (ft):
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.67 Top 1/3 9.7 25.7 End (ft):
Depth to Bottom of Pay Wall (ft): 59.67 Middle 2/3 25.7 41.7 Manual Cutoff Wall Reading: 6.76 x 10-10
Planned Depth of VB Hole (ft): 57.67 Bottom 3/3 41.7 57.7 Automatic Cutoff Wall Reading**: 2.18 x 10-10

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.7-14.5 9:16 9:21 100 100 11,13.1, 14.2
15.3, 16.3, 17.1, 18.2,
14.5-19.5 9:33 100 100 18.9 Helper dropped the core before logging
20.8-21.6
19.5-24.5 10:24 10:29 100 100 20.0-20.8 23.8

24.5-29.4 100 100 28.3

29.4-34.4 100 100 none solid stick


4/15/2020
34.4-39.4 100 100 36.8-37.6 36.0-36.8 38.9

39.4-44.4 11:39 11:45 100 100 none solid stick

44.4-49.3 100 100 46.0-46.8 none solid stick


Vug 54.1-54.2 (probably from a dislodged rock
49.3-54.5 100 100 52.8, 53.2 inclusion
45.2-46
54.3-58.1 13:29 100 100 55.2, 57.6

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/15/2020 VB Boring Number:TO3-VB-003 VB Boring Depth (ft): 58.1

OPTV OBSERVATIONS:
Total Vector Deviation (ft): 0.08 Northing:-0.061 -0.035

OPTV Start Time:14:59 OPTV End Time:15:46 57.78

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

0-57.78 No problems

No pits/vugs/voids

No fractures

CCTV OBSERVATIONS:

CCTV Start Time:16:02 CCTV End Time:16:35 CCTV Final Depth (ft):56.33

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

0-56.33 No visible problems


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-004 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3989656 & Borehole Logger's Name: David Hewitt Start Date, Time, Water Depth: 4/10/2020, 16:56, 12.3'
P3989579
Panel Completion Date: 3/17/2020 USACE Representative(s): Lisa Perks & Zac Reeves End Date, Time, Water Depth: 4/13/2020, 11:58, 12.1'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4 PVC Casing Stick-up (ft): 1.5
Northing: 910652.954 Actual Depth of VB Hole (ft)*: 58 Depth to Paywall from top of PVC (ft): 10.9
Easting: 628711.2871 CT #: 00040
HHD Station: 3989+60.96 AT #: 0007 Falling Head Test
Ground Elevation (ft): 34.4 Decommission Date Start Date & Time: 4/13/2020, 12:12
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 4/14/2020, 12:12
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 10.9
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.4 Top 1/3 9.4 25.4 End (ft): 11.03

Depth to Bottom of Pay Wall (ft): 59.4 Middle 2/3 25.4 41.4 Manual Cutoff Wall Reading: 1.82 x 10-9
Planned Depth of VB Hole (ft): 57.4 Bottom 3/3 41.4 57.4 Automatic Cutoff Wall Reading**: 2.48 x 10-9

Descriptions
Date Run (ft) Start End Recovery (%) RQD (%) QA Sample QC Sample
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
LS: 12.3-12.65 and 14.0-
9.5-14.5 9:43 9:50 100 100 14.4
14.5-19.5 100 100 14.8-15.6 1.5 17.8, 19.3
15.6-16.4
19.5-24.5 100 100 23.2, 23.9, 24.1

24.5-29.5 100 100 25.6, 27, 28.1

29.5-34.3 100 100 31.3-32.1 none


4/10/2020
34.3-39.4 100 100 32.1-33.2

39.4-44.7 100 100 42.8, 43.2, 43.8 LS: 40.7-41.3

44.7-49.6 100 100 45.9

49.6-54.4 100 100 51.4-52.2 54.1, 52.8


50.6-51.4
54.4-58 13:25 100 100 55.6, 55.9, 57.6

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10-6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are
(< 0.25") (0.25" to diameter (Larger than the core diameter)
observed or low core recover <85%", correct drilling procedures. of core)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/10/2020 VB Boring Number:TO3-VB-004 VB Boring Depth (ft): 58

OPTV OBSERVATIONS:

Total Vector Deviation (ft): Northing:

OPTV Start Time:14:47 OPTV End Time:15:30 OPTV Final Depth (ft):57.39

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

0-57 minor pitting throughout

0-57 No fractures

Limestone inclusion
40.1-40.7

CCTV OBSERVATIONS:

CCTV Start Time:15:50 CCTV End Time:16:27 CCTV Final Depth (ft):55.88

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

24.87 small amount of water leaking in

36.43 small amount of water leaking in


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-005 Driller's Name: Greg Cole Saturation of Borehole
P3990500 & S3990424
Panel Number(s): (P3990462R) Borehole Logger's Name: Adam Dornacker Start Date, Time, Water Depth: 04/23/2020; 15:42; 11.5

Panel Completion Date: 3/28/2020 USACE Representative(s): Lisa Perks & Zac Reese End Date, Time, Water Depth: 04/24/2020; 14:42; 9.5
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.25
Northing: 910684.4684 Actual Depth of VB Hole (ft)*: 57.8 Depth to Paywall from top of PVC (ft): 10.8
Easting: 628632.0921 CT #: 0045
HHD Station: 399046.2 AT #: 012 Falling Head Test
Ground Elevation (ft): 34.54 Decommission Date Start Date & Time: 04/24/2020; 14:59
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 04/25/2020; 14:59
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 10.79
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.54 Top 1/3 9.5 25.5 End (ft): 21.2

Depth to Bottom of Pay Wall (ft): 59.54 Middle 2/3 25.5 41.5 Manual Cutoff Wall Reading: 3.21 x 10-7
Planned Depth of VB Hole (ft): 57.54 Bottom 3/3 41.5 57.5 Automatic Cutoff Wall Reading**: 3.21 x 10-7

Descriptions
Date Run (ft) Start End Recovery (%) RQD (%) QA Sample QC Sample
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.5-14.5 8:08 8:12 100 100 10.0, 11.7 smaller and less aggregates throughout

14.5-19.5 100 100 15.3


21.4-22.2
19.5-24.5 100 100 20.6-21.4 none

24.5-29.5 100 100 none

29.5-34.5 9:13 9:16 100 100 30.9, 33.1


4/23/2020
34.5-39.5 100 100 35.3-36.1 34.5-35.3 37.1

39.5-44.5 10:06 10:10 100 100 43.4

44.5-49.6 10:20 10:25 100 100 48.0, 49.3 horizontal tool marks-44.5-45.5

49.6-54.7 10:39 100 100 45.7-46.5 53.1


46.5-47.3
54.7-57.8 10:57 100 100 none

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10-6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are
(< 0.25") (0.25" to diameter (Larger than the core diameter)
observed or low core recover <85%", correct drilling procedures. of core)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/23/2020 VB Boring Number:TO3-VB-005 VB Boring Depth (ft):57.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft):0.05 Northing:-0.01 Easting+0.05

OPTV Start Time:12:44 OPTV End Time:13:33 OPTV Final Depth (ft):57.08

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

0-57.08 minor pitting throughout; no fractures

CCTV OBSERVATIONS:

CCTV Start Time:14:16 CCTV End Time:15:17 CCTV Final Depth (ft):53.88

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

53.88 slight trickle of water coming in

53.16 2 to 3 small water leaks

40.2 bubbling

37.25 2 water leaks

18.71 semi-fracture or tool mark


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-006 Driller's Name: Greg Cole Saturation of Borehole
S3970381 &
Panel Number(s): P3970304 Borehole Logger's Name: Christina McCoy, John Egelston Start Date, Time, Water Depth: 8/27/20 10:18 0' from ToC
Lisa Perks, Alberto Rodriguez, Zac
Panel Completion Date: 7/14/2020 USACE Representative(s): End Date, Time, Water Depth: 8/28/20 10:05 .27' from ToC
Reeves
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 14.5"
Northing: 909965.21 Actual Depth of VB Hole (ft)*: 58.8 Depth to Paywall from top of PVC (ft): 11.3'
Easting: 630511.75 CT #: 00226
HHD Station: 3970+33.53 AT #: 0015 Falling Head Test
Ground Elevation (ft): 35.135 Decommission Date 10/1/2020 Start Date & Time: 8/28/20; 10:20
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 8/29/2020; 10:20
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) .27'
Start (ft):
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10.135 Top 1/3 10.1 26.1 End (ft): 3.54'

Depth to Bottom of Pay Wall (ft): 60.135 Middle 2/3 26.1 42.1 Manual Cutoff Wall Reading: 3.48x10^-8
Planned Depth of VB Hole (ft): 58.135 Bottom 3/3 42.1 58.1 Automatic Cutoff Wall Reading**: 3.46x10^-8

Descriptions
Date Run (ft) Start End Recovery (%) RQD (%) QA Sample QC Sample
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
10.1-10.3 9:55 100 100

10.3-15.3 100 100 10.5, 13.9


19.0-19.8
15.3-20.3 10:36 10:42 100 100 18.2-19.0

20.3-25.3 100 100 23.9

25.3-30.3 100 100 30.7 (LS)


8/26/2020
30.3-35.3 100 100 36.0-36.8 cut but not sampled - saw issues

35.3-40.3 100 100 36.8-37.6 40.2

40.3-45.3 13:12 13:18 100 100 42.7

45.3-50.4 100 100 45.7, 45.9


54.4-55.2
50.4-55.2 100 100 52.1-52.9 51.7, 52.1, 53.0, 54.5 vug- 52.9

55.2-58.8 14:15 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are
(< 0.25") (0.25" to diameter (Larger than the core diameter)
observed or low core recover <85%", correct drilling procedures. of core)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:8/27/2020 VB Boring Number:TO3-VB-006 VB Boring Depth (ft): 58.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .35 Northing:.18 Easting -.30

OPTV Start Time:8:11 OPTV End Time:8:55 OPTV Final Depth (ft): 58.26

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

16.5 tool marks

28.4 vug

vug
39.3
minor pitting
41-41.3
vug
47
vug
53.3

CCTV OBSERVATIONS:

CCTV Start Time:9:07 CCTV End Time:10:05 CCTV Final Depth (ft): 56.35

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

sporatic minor pitting and tool marks

39 vug

53.5 vug

53.85 inclusion?

53.37 vug

39.9 vug

19.5 vug
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-007 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): 3970612 Borehole Logger's Name: John Egelston Start Date, Time, Water Depth: N/A

Panel Completion Date: 7/11/2020 USACE Representative(s): Alberto Rodriguez, Zac Reeves End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): N/A
Northing: 909974.94 Actual Depth of VB Hole (ft)*: 35.3 Depth to Paywall from top of PVC (ft): N/A
Easting: 630485.83 CT #: 00229
HHD Station: 3970+61.18 AT #: 0016 Falling Head Test
Ground Elevation (ft): 34.8 Decommission Date Start Date & Time: N/A
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: N/A
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.8 Top 1/3 9.8 25.8 End (ft): N/A

Depth to Bottom of Pay Wall (ft): 59.8 Middle 2/3 25.8 41.8 Manual Cutoff Wall Reading: N/A
Planned Depth of VB Hole (ft): 57.8 Bottom 3/3 41.8 57.8 Automatic Cutoff Wall Reading**: N/A

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
0-5 - overburden 8:00 0 0 sand, no recovery

5-10 - overburden 8:27 8:31 0 0

10.3-15.3 8:49 8:52 16 0

15.3-20.3 9:02 9:08 0 0

20.3-25.3 9:17 9:22 48 0


8/27/2020
25.3-30.3 9:35 9:39 100 100 31.0-31.8

30.3-35.3 9:50 9:56 100 100 soft, sandy, sample collected but unstable

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date: VB Boring Number:TO3-VB-007 VB Boring Depth (ft):35.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

N/A

CCTV OBSERVATIONS:

CCTV Start Time:N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

N/A
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-008 Driller's Name: Brian McCord Saturation of Borehole

Panel Number(s): S3963944 & Borehole Logger's Name: John Egelston Start Date, Time, Water Depth: 9/18/20 16:08 0'
P3964009
Panel Completion Date: 8/12/2020 USACE Representative(s): Lisa Perks End Date, Time, Water Depth: 9/21/20 8:40 1.59'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.13
Northing: 909738.27 Actual Depth of VB Hole (ft)*: 57.7 Depth to Paywall from top of PVC (ft): 10.41
Easting: 631105 CT #: 00273
HHD Station: 3963+98.35 AT #: 00018 Falling Head Test
Ground Elevation (ft): 34.28 Decommission Date 10/31/2020 Start Date & Time: 9/21/2020 8:40
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 9/22/2020 8:40
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.59'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.28 Top 1/3 9.3 25.3 End (ft): 1.64'

Depth to Bottom of Pay Wall (ft): 59.28 Middle 2/3 25.3 41.3 Manual Cutoff Wall Reading: 5.75x10^-10
Planned Depth of VB Hole (ft): 57.28 Bottom 3/3 41.3 57.3 Automatic Cutoff Wall Reading**: 4.14x10^-10

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.3-10.4 8:10 8:15 100 100 9.5, 10.1

10.4-15.4 8:24 8:31 96 100 12.1, 14.8 12.9 vug - 11.1, 11.4, 15.0
23.2-24.0
15.8, 16.6, 17.2,
15.4-20.4 8:40 8:46 106 99 24.0-24.8 17.6,18.4, 19.1 vug - 17.9, 18.4, 19.6, 20.3

20.4-25.4 8:59 9:04 98 100 20.9, 24.1, 25.0

25.4-30.4 9:14 9:20 78 0 26.0,26.4,26.8,27.1, 27.5 27.8, 28.1, 28.3, 28.7, 29.1 Hor. Tool Marks - 27.3, fishing
9/18/2020
30.4-35.4 9:50 9:55 100 100 32.2-33.2 34.0-34.8 32.0, 33.7, 34.9 28, 28.3, 28.4, 28.8 vug 31.1, org 31.5

35.4-41.2 10:08 84 20 35.8, 36.1, 36.4, 36.9, 37.4, 37.7, 38.1, 38.4, 38.7, 39.2 Hor. TM - 39.2 to 41.2

41.2-45.5 11:12 93 100 43

45.5-50.5 11:19 11:24 100 100 48.5-49.3 46.5, 49.7 change teeth in catcher, fishing
47.7-48.5
50.5-55.5 11:48 94 100 53.5 52.0 Pit

55.5-57.7 11:56 11:58 100 100 56.0,56.5,57.5 56.5 57.6 Vug

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/18/2020 VB Boring Number:TO3-VB-008 VB Boring Depth (ft):57.7

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .14 Northing:-.14 Easting-.05

OPTV Start Time:13:30 OPTV End Time:14:15 OPTV Final Depth (ft):56.56

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

32.6 Pit

44.5 Horizontal Tool Marks

Pit
49.6

CCTV OBSERVATIONS:

CCTV Start Time:14:40 CCTV End Time:15:50 CCTV Final Depth (ft):55.27

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

Vug 9.8, 11.4, 11.8, 12.7, 15.9, 16.6, 17.6, 18.4, 18.9, 20.7, 22.7, 24.0, 26.1, 26.8, 27.2, 29.6, 29.9, 30.4, 32.9, 37.2, 48.9, 52.4, 52.5, 52.9, 54, 54.6, 55, 55.1, 55.2

Leak 54.96

Pit 10.5, 11.3, 12.3, 16.2, 16.3, 16.9

Horizontal Tool Marks 20, 30, 40


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-009 Driller's Name: Brian McCord Saturation of Borehole

Panel Number(s): P3966491 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 9/17/20 15:47 0'

Panel Completion Date: 8/8/2020 USACE Representative(s): Lisa Perks/Crystal Velasquez End Date, Time, Water Depth: 9/18/20 15:56 0'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.98
Northing: 909829.08 Actual Depth of VB Hole (ft)*: 58 Depth to Paywall from top of PVC (ft): 10.63
Easting: 630871.29 CT #: 00270
HHD Station: 3966+49.09 AT #: 00017 Falling Head Test
Ground Elevation (ft): 34.65 Decommission Date 10/31/2020 Start Date & Time: 9/18/20 15:56
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 9/19/2020 15:56
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .21'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.65 Top 1/3 9.6 25.7 End (ft): 1.7'

Depth to Bottom of Pay Wall (ft): 59.65 Middle 2/3 25.7 41.7 Manual Cutoff Wall Reading: 1.63X10^-8
Planned Depth of VB Hole (ft): 57.65 Bottom 3/3 41.7 57.7 Automatic Cutoff Wall Reading**: 1.65x10^-8

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.7-10.6 8:26 8:32 100 100

10.6-15.6 8:43 96 100 12.9, 14.0


12.9-14.0
15.6-20.6 8:52 8:58 102 100 14.0-14.8 19.6

20.6-25.6 9:09 9:16 100 100 25

25.6-30.6 9:23 9:30 100 100 28.7 Missing End - Fishing


9/17/2020
30.6-35.6 9:43 9:47 96 100 33.8-34.6 34.6

35.6-40.6 9:54 9:59 104 100 34.6-35.4 37.1

40.6-45.6 10:08 10:14 98 100 42.3,42.7,44.5 Void at 42.7

45.6-50.6 10:21 10:26 98 100 49.3


48.5-49.3
50.6-55.6 10:33 10:40 104 100 49.3-50.6 52.9,54.7 H-TM at 50.7

55.6-58.0 10:51 10:55 100 100 56.2,57.5

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/17/2020 VB Boring Number:TO3-VB-009 VB Boring Depth (ft):58

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .22 Northing:-.20 Easting.09

OPTV Start Time:13:25 OPTV End Time:14:10 OPTV Final Depth (ft):57.03

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

21.6 Dark spot (Pit?)

51 Pit

CCTV OBSERVATIONS:

CCTV Start Time:14:40 CCTV End Time:15:27 CCTV Final Depth (ft):55.20

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

11.2 vug

11.4 2 small vugs

13.1 vug

13.9 vug

16.3 few organics

21.4 black - organics?

35.5 pit

42.2 vug

43 pit

30, 39.7, 44.8, 49.9 Horizontal tool marks


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-10 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3969303 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 9/29/20 1610 0'
P3969365
Panel Completion Date: 9/2/2020 USACE Representative(s): Lisa Perks, Zac Reeves End Date, Time, Water Depth: 9/30/20 1625 0'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.04
Northing: 909930.27 Actual Depth of VB Hole (ft)*: 58.2 Depth to Paywall from top of PVC (ft): 11.11
Easting: 630604.71 CT #: 00297
HHD Station: 3969+34.22 AT #: 020 Falling Head Test
Ground Elevation (ft): 35.07 Decommission Date 10/31/2020 Start Date & Time: 9/30/20 16:29
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/1/2020 16:29
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 0.21
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10.07 Top 1/3 10.1 26.1 End (ft): 2.51

Depth to Bottom of Pay Wall (ft): 60.07 Middle 2/3 26.1 42.1 Manual Cutoff Wall Reading: 2.56x10^-8
Planned Depth of VB Hole (ft): 58.07 Bottom 3/3 42.1 58.1 Automatic Cutoff Wall Reading**: 2.39x10^-8

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
10.1-10.3 9:10 100 100
11.2, 11.7,13.2,13.8,
10.3-15.3 100 100 15.0
24.7-25.3 23.9-24.7
16.2,17.2,17.7,18.6,
15.3-20.3 9:43 9:49 100 70 18.8,19,19.4 run got stuck in casing, 19.4-20.3 crumbled

20.3-25.5 100 100 21.8,22.2,25.0

25.5-30.5 100 100 30

30.5-35.5 100 100 37.3-38.1 36.5-37.3 31.9, 32.5, 35.2 Vug-31.9

9/29/2020 35.5-40.5 11:20 11:24 100 100 37.3,38.5,38.9,40.1

40.5-45.5 100 100 41.3,43.5,44.9


46.6,47.9,48.7,49.3,
45.5-50.5 100 100 50.1
51.8-52.6 51.0-51.8
50.5-55.6 100 100 55.2

55.6-58.2 12:25 100 100 56.6,58.0 Vug-56.2

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/29/2020 VB Boring Number:TO3-VB-10 VB Boring Depth (ft):58.2

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .16 Northing:.12 Easting.13

OPTV Start Time:14:02 OPTV End Time:14:33 OPTV Final Depth (ft):57.36

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

sporatic minor pitting throughout

computer issue after down run, no issues noted

CCTV OBSERVATIONS:

CCTV Start Time:14:59 CCTV End Time:15:50 CCTV Final Depth (ft):55.67

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

Vug 11.3,11.7,12.84,13.44,13.23,14.2,14.3,14.44,15.08,15.18,15.65,16.13,17.04,17.44,17.60,18.58,19.12,19.49,20.15,21.59,21.62,22.29,23.64,25.65,27.36,27.52,30.07,32.82,

33.65,34.52,42.30,45.66,47.55,47.98,50.41,51.96,52.92,54.67

Aggregate 14.70,35.41
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-11 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3961202 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 9/29/20 10:28 .92'
P3961267
Panel Completion Date: 8/27/2020 USACE Representative(s): Lisa Perks, Zac Reeves End Date, Time, Water Depth: 9/30/20 14:42 1.09'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.96
Northing: 909638.95 Actual Depth of VB Hole (ft)*: 57.7 Depth to Paywall from top of PVC (ft): 10.32
Easting: 631360.65 CT #: 00294
HHD Station: 3961+24.0 AT #: 019 Falling Head Test
Ground Elevation (ft): 34.36 Decommission Date 10/31/2020 Start Date & Time: 9/30/20 14:50
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/1/2020 14:50
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.09'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.36 Top 1/3 9.4 25.4 End (ft): 2.54'

Depth to Bottom of Pay Wall (ft): 59.36 Middle 2/3 25.4 41.4 Manual Cutoff Wall Reading: 1.73x10^-8
Planned Depth of VB Hole (ft): 57.36 Bottom 3/3 41.4 57.4 Automatic Cutoff Wall Reading**: 1.72x10^-8

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.4-10.5 9:48 100 100
11.6,12.4,13.0,13.7,
10.5-15.5 100 100 14.3, 15.0
18.5-19.3 19.3-20.1
15.8,16.5,17.6,17.8,
15.5-20.5 10:22 10:28 100 88 18.2,19.5 Vug-15.8

20.5-25.5 100 100 21.0,23.6,24.9 Limestone-20.8 Vug-23.9

25.5-30.3 100 100 27.3,29.0,30.0

30.3-35.3 100 100 30.8-31.6 31.6-32.4 31.7,34.1,34.6 Vug-34.1

9/28/2020 35.3-40.3 100 100 38.7 Vug-37.5,39.5

40.3-45.3 100 100 Vug-44.4

45.3-50.3 100 100 45.6,48.8


45.6-46.4 46.4-47.2
50.3-55.3 100 100 50.8 Piece of Metal 54.8

55.3-57.7 12:52 100 100 57.0,57.6

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/28/2020 VB Boring Number:TO3-VB-11 VB Boring Depth (ft):57.7

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .4 Northing:.19 Easting.34

OPTV Start Time:14:52 OPTV End Time:15:34 OPTV Final Depth (ft):57.19

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

minor pitting throughout

29.8 pit

pit
43.5

CCTV OBSERVATIONS:

CCTV Start Time:16:02 CCTV End Time:16:53 CCTV Final Depth (ft):55.22

Approx. Depth (ft) Description (leaks, fracture, pitting, inclusions, etc.)

Vug 10.53, 10.86, 11.57, 13.16, 13.76, 13.87, 15.04, 15.67, 16.18, 17.89, 19.81, 20.76, 23.26, 26.46, 29.3, 33, 33.09, 36.1, 36.37x2, 40.60, 41.63, 42.37, 43.73, 46.77, 53.49, 54.7

11.43 aggregate

20.76 aggregate

35.75 tool mark


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-12 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): P3955000 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 10/21/20 9:47 0'

Panel Completion Date: 9/17/2020 USACE/AECOM Representative(s): Crystal Velasquez/Zac Reeves End Date, Time, Water Depth: 10/22/20 11:08:00 1.16'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.08
Northing: 909413.78 Actual Depth of VB Hole (ft)*: 57.9 Depth to Paywall from top of PVC (ft): 10.48
Easting: 631942.7 CT #: 00373
HHD Station: 3955+00.01 AT #: 0022 Falling Head Test
Ground Elevation (ft): 34.4 Decommission Date 11/17/2020 Start Date & Time: 10/22/20 11:09
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/23/20 11:09
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.16'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.4 Top 1/3 9.4 25.4 End (ft): 1.62

Depth to Bottom of Pay Wall (ft): 59.4 Middle 2/3 25.4 41.4 Manual Cutoff Wall Reading: 5.50x10^-9
Minimum Depth of VB Hole (ft): 57.4 Bottom 3/3 41.4 57.4 Automatic Cutoff Wall Reading**: 5.35x10^-9

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.4-10.6 9:18 100 100

10.6-15.6 9:32 9:37 100 100 12.6, 13.6, 15.1


12.5-13.3 11.7-12.5
15.6-20.6 100 100 17.7

20.6-25.6 100 100 23.1,24.3, 25.2, 25.5 Fished ~1.3'

25.6-30.6 100 100 27.2, 29.1 27.3 (LS)

30.6-35.6 10:51 10:54 100 100 31.5-32.4 30.6-31.5 32.5,33.0,34.8

10/20/2020 35.6-40.6 100 100 37.0,40.1

40.6-45.6 100 100 43.6,44.6

45.6-50.6 100 100 46.8,47.9


48.0-48.8 48.8-49.6
50.6-55.5 100 100

55.5-57.9 12:20 100 100 56.6

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/20/2020 VB Boring Number:TO3-VB-12 VB Boring Depth (ft):57.9

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .17 Northing:.05 Easting-.16

OPTV Start Time:15:02 OPTV End Time:15:44 OPTV Final Depth (ft):56.9

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting sporatic throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:8:40 CCTV End Time:9:35 CCTV Final Depth (ft):54.99

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 44.6, 11.06

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-13 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3952453 & Borehole Logger's Name: Adam Dorneker Start Date, Time, Water Depth: 10/21/20 15:53 0'
P3952519
Panel Completion Date: 9/21/2020 USACE/AECOM Representative(s): Crystal Velasquez, Zac Reeves End Date, Time, Water Depth: 10/26/20 08:44 1.39'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.125
Northing: 909323.96 Actual Depth of VB Hole (ft)*: 57.4 Depth to Paywall from top of PVC (ft): 10.175
Easting: 632176.79 CT #: 00380
HHD Station: 3952+49.28 AT #: 0023 Falling Head Test
Ground Elevation (ft): 34.05 Decommission Date 11/17/2020 Start Date & Time: 10/26/2020 8:45
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/27/20 8:45
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.39'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.05 Top 1/3 9.0 25.0 End (ft): 1.80'

Depth to Bottom of Pay Wall (ft): 59.05 Middle 2/3 25.0 41.1 Manual Cutoff Wall Reading: 5.09x10^-9
Minimum Depth of VB Hole (ft): 57.05 Bottom 3/3 41.1 57.1 Automatic Cutoff Wall Reading**: 5.29x10^-9

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.1-10.5 8:36 100 100 10 10.1-LS

10.5-15.5 8:47 8:51 100 100 12.6,13.6,14.4


12.3-13.4 14.5-15.5
17.3,18.1,19.5,19.9,
15.5-20.5 100 100 20.3
20.5-25.6 100 100 22.1,23.4,24.1

25.6-30.6 100 100 27.2,30.2 Vug-28.3,28.5


30.7,31.1,32.7,34.1,
30.6-35.6 100 100 28.0-29.0 29.0-30.0 34.9
10/21/2020 35.6-40.6 100 100 38.1 Vug-38.1

40.6-45.6 10:44 10:47 100 100 41.1,42.6,44,45.1 41.3-LS

45.6-50.6 100 100 47.7,48.4,49.3,49.7 fishing ~2.9'


42.8-44.0 44.0-45.2
50.8,51.3,52.3,52.9
50.6-55.3 83 44 53.3,53.8,53.9,54.2
55.3-57.4 11:58 100 100 56.6

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/21/2020 VB Boring Number:TO3-VB-13 VB Boring Depth (ft):57.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .26 Northing:-.25 Easting.23

OPTV Start Time:13:43 OPTV End Time:14:24 OPTV Final Depth (ft):56.45

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:14:47 CCTV End Time:15:48 CCTV Final Depth (ft):54.97

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 48.16, 46.12, 40.33, 35.9, 31.3, 30.61, 29.6, 27.14

Vugs 24, 32, 36.3, 52.77, 51.92, 42.32, 36.71, 32.84, 32.63, 32.46, 32.31-32.05, 31.9, 29.9, 28.27, 25.49, 25.30, 23.96, 19.58, 14.35, 12.64, 12.57, 11.57, 10.79

Leaks

Aggregate 37

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-14 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3944440 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 11/21/20 17:20 0'
&P3944362
Panel Completion Date: 10/28/2020 USACE/AECOM Representative(s): Isaac Garcia/Laura Sanchez End Date, Time, Water Depth: 11/23/20 8:02 .19'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.625
Northing: 908960.73 Actual Depth of VB Hole (ft)*: 57.3 Depth to Paywall from top of PVC (ft): 10.585
Easting: 632897.89 CT #: 00537
HHD Station: 3944+39.41 AT #: 0027 Falling Head Test
Ground Elevation (ft): 33.96 Decommission Date 12/21/20 Start Date & Time: 11/23/20 8:14
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 11/24/20 8:14
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .19'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 8.96 Top 1/3 9.0 25.0 End (ft): 2.27'

Depth to Bottom of Pay Wall (ft): 58.96 Middle 2/3 25.0 41.0 Manual Cutoff Wall Reading: 2.47x10^-8
Minimum Depth of VB Hole (ft): 56.96 Bottom 3/3 41.0 57.0 Automatic Cutoff Wall Reading**: 2.47x10^-8

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.0-10.4 8:00 8:05 100 100 9.3,9.9,10.2

10.4-15.4 8:13 8:18 102 100 11.4 Horiz. Tool Marks - 10.7, Pitting-12.7, Vug-13.9
21.9-22.7 23.5-24.3
15.4-20.4 8:26 8:33 98 100 15.8,17.8 Pitting 17.0

20.4-25.4 8:39 8:46 98 100 23.6,24.7 Pitting 20.6-20.7

25.4-30.4 9:00 102 100 30.1 Vug - 27

30.4-35.4 9:18 9:25 102 100 33.5-34.3 34.3-35.0 31.3,32.0,34.3,35.0 Vug - 32.3, Fished

11/21/2020 35.4-40.0 9:40 9:46 90 100 37.3,38.1,38.5,39.9 Fished ~ 1.1'

40.0-45.3 10:16 10:22 100 100 43.8 Horiz. Tool Marks -40.4, Vug - 43.8, Fished ~ .6'

45.3-50.3 10:40 10:46 102 100 48.9,49.9 48.6, 48.0 Vug - 48.1, 48.7, 49.0, 50.0
51.0-51.8 51.8-52.6
50.3-55.3 11:00 100 100

55.3-57.3 11:07 11:10 100 100

9 Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:11/21/2020 VB Boring Number:TO3-VB-14 VB Boring Depth (ft):57.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .77 Northing:.76 Easting-.09

OPTV Start Time:13:31 OPTV End Time:14:20 OPTV Final Depth (ft):56.55

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 15.7,20.5,21.4,32.2,37.1,37.4,38.3,52.4

Vugs 11.9,12.5,14.0,22.6,38.6,41.1,44.4

Leaks

Aggregate

Soil Inclusions 48

Fractures

Other (Explain)

Horizontal Tool Marks 10.7,15.2,34.2,35.3,35.5,40.3,49.9,54.9

Vertical Tool Marks 34-36.2

CCTV OBSERVATIONS:

CCTV Start Time:15:15 CCTV End Time:16:45 CCTV Final Depth (ft):55.14

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 50.1,49.9,48.8,46.3,44.3,42.8,39.1,36.8,35.1,32.6,30.9,29.8,28.4,23.5,21.8,21.5,20.8,19.9,18.3,18.0,17.3,15.5,14.8,14.4,13.3,13.2,12.2

Vugs 53.4,52.9,52.1,50.3,48.9,48.4,48.3,47.9,38.5,35.4,32.2,28.8,28.1,25,23.7,22.9,22.2,19.6,19.3,18.7,18.3,18,17.5,15.8,13.7,13.3,12,11.5,11.3,11.2,10.8,9.8

Leaks

Aggregate 49.6,31.3,30.1,28.8,23.0,19.3

Soil Inclusions 22.5-organic(?)

Fractures

Other (Explain)

Vertical Tool Marks 36,34,26

Horizontal Tool Marks 37.3,40.5,9.7,13.1,22.5


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-15 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3947374 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 10/28/20 16:07 0'
P3947439
Panel Completion Date: 10/2/2020 USACE/AECOM Representative(s): Alberto Rodriguez/Zac Reeves End Date, Time, Water Depth: 10/29/2020 15:07 2.72'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.42
Northing: 909129.7 Actual Depth of VB Hole (ft)*: 57.5 Depth to Paywall from top of PVC (ft): 10.82
Easting: 632646.69 CT #: 00407
HHD Station: 3947+41.34 AT #: 0024 Falling Head Test
Ground Elevation (ft): 34.4 Decommission Date 11/17/2020 Start Date & Time: 10/29/20 15:12
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/30/20 15:12
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 2.72'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.4 Top 1/3 9.4 25.4 End (ft): 3.49'

Depth to Bottom of Pay Wall (ft): 59.4 Middle 2/3 25.4 41.4 Manual Cutoff Wall Reading: 9.90x10^-9
Minimum Depth of VB Hole (ft): 57.4 Bottom 3/3 41.4 57.4 Automatic Cutoff Wall Reading**: 1.01x10^-8

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.4-10.5 9:11 100 100

10.5-15.5 100 100 12.2,14.9 Vug - 10.9, 11.7


10.9-11.7 13.1-13.9
15.5-20.5 100 100 16.2,17.9,18.5

20.5-25.5 10:07 10:11 100 100 20.9,21.3,22.7,24.8 Soil Inclusion - 24.2

25.5-30.5 100 100 26.8,27.8

30.5-35.5 100 100 31.3-32.2 33.5-34.3 30.9,31.3,32.1

10/28/2020 35.5-40.5 100 100 36.1,37.0,39.1 Vug - 38.1, 40.3

40.5-45.5 11:17 11:23 100 100 41.6,42.0 Limestone-42.6

45.5-50.5 100 100 50.3


48.7-49.5 49.5-50.3
50.5-55.6 100 100 54.7

55.6-57.5 12:12 100 100 56.5 Vug - 56.8

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/28/2020 VB Boring Number:TO3-VB-15 VB Boring Depth (ft):57.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .27 Northing:.12 Easting-.24

OPTV Start Time:13:49 OPTV End Time:14:31 OPTV Final Depth (ft):56.71

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs 18.35

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) Tool Marks - 21.0

CCTV OBSERVATIONS:

CCTV Start Time:14:55 CCTV End Time:16:03 CCTV Final Depth (ft):55.51

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 44.26
55.37,55.14,55.05,54.84,54.77,52.04,51.28,51.14,51.06,50.78,49.91,49.25,49.04,46.31,45.24,44.61,44.06,42.97,42.48,40.70,39.15,38.79,38.32,38.08,36.41,36.08,35.58,33.64,
Vugs
33.4,32.45,30.47,30.33,29.93,29.22,28.55,28.02,27.7,26.83,24.68,23.32,22.62,21.93,21.41,20.5,20.34,20.2,19.39,18.98,18.42,17.04,15.88,14.93,14.51,14.09,12.95,12.13,11.30
10.86, 10.85

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-16 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3972838 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 11/16/20 14:56 0'
P3972761
Panel Completion Date: 10/19/2020 USACE/AECOM Representative(s): Lisa Perks/Zac Reeves End Date, Time, Water Depth: 11/17/2020 13:56 .33'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.1875
Northing: 910051.95 Actual Depth of VB Hole (ft)*: 58.1 Depth to Paywall from top of PVC (ft): 10.7575
Easting: 630281 CT #: 00493
HHD Station: 3972+79.97 AT #: 0026 Falling Head Test
Ground Elevation (ft): 34.57 Decommission Date 12/21/20 Start Date & Time: 11/17/20 13:58
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 11/18/20 13:58
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .33'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.57 Top 1/3 9.6 26.2 End (ft): .71'

Depth to Bottom of Pay Wall (ft): 59.57 Middle 2/3 26.2 42.9 Manual Cutoff Wall Reading: 4.33x10^-9
Minimum Depth of VB Hole (ft): 57.57 Bottom 3/3 42.9 59.6 Automatic Cutoff Wall Reading**: 4.39x10^-9

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.6 - 10.7 8:30 100 100 9.9

10.7-15.6 100 100


24.8-25.6 24.0-24.8
15.6-20.6 100 100 19.7,20.4

20.6-25.6 9:15 9:20 100 100 24.8 Vug-23.4

25.6-30.6 100 100

30.6-35.7 100 100 35.7-36.5 36.5-37.3 30.9,34.9 Fish~.7'

11/16/2020 35.7-40.7 100 100

40.7-45.7 100 100 41.7,44.1

45.7-50.7 100 100


54.8-55.6 54.0-54.8
50.7-55.6 10:48 10:52 100 100

55.6-58.1 11:06 100 100 56.5,57.5

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:11/16/2020 VB Boring Number:TO3-VB-16 VB Boring Depth (ft):58.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .29 Northing:.07 Easting.28

OPTV Start Time:12:50 OPTV End Time:13:35 OPTV Final Depth (ft):57.36

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs 9.7

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:13:46 CCTV End Time:14:25 CCTV Final Depth (ft):56.29

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 49.2

Vugs 41.7,50.68,50.35,44.20,41.78,40.93,39.98,38.4,36.83,35.35,31.86,31,29.5,26.9,24.87,24.28,22.39,19.63,16.83,13.83,10.49,10.18

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Tool Marks 51.2


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-17 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3974681 & Borehole Logger's Name: Jeff Dhuvetter Start Date, Time, Water Depth: 11/13/20 18:05 0'
P3974759
Panel Completion Date: 10/14/2020 USACE/AECOM Representative(s): Lisa Perks/Zac Reeves End Date, Time, Water Depth: 11/16/20 8:06 2.63'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.5
Northing: 910119.75 Actual Depth of VB Hole (ft)*: 57.7 Depth to Paywall from top of PVC (ft): 10.65
Easting: 630100.63 CT #: 00477
HHD Station: 3974+72.67 AT #: 0025 Falling Head Test
Ground Elevation (ft): 34.15 Decommission Date 12/21/20 Start Date & Time: 11/16/20 8:10
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 11/17/20 8:10
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 2.63'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.15 Top 1/3 9.1 25.8 End (ft): 2.72'

Depth to Bottom of Pay Wall (ft): 59.15 Middle 2/3 25.8 42.5 Manual Cutoff Wall Reading: 1.14'x10^-9
Minimum Depth of VB Hole (ft): 57.15 Bottom 3/3 42.5 59.2 Automatic Cutoff Wall Reading**: 1.33x10^-9

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
9.2-10.5 9:37 100 100 9.4 Soil - 9.4

10.5-15.5 100 100 15.3 Soil - 15.3


16.5-17.3 15.5-16.5
15.5-20.5 10:07 10:11 100 100 19.2 Vug - 19.2, 19.4

20.5-25.5 100 100 25.2 Vug - 21.5

25.5-30.7 100 100 29,30.2 Soil 31.4 Vug 29.0

30.7-35.7 10:57 11:02 100 100 28.2-29.0 27.4-28.2 Vug 35.1

11/13/2020 35.7-40.5 100 100

40.5-45.5 11:32 11:38 100 100

45.5-50.5 100 100 46.3, 49.8 Vug 47.4


46.4-47.3 45.5-46.4
50.5-55.6 100 100 51.9,52.2

55.6-57.7 12:16 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:11/13/2020 VB Boring Number:TO3-VB-17 VB Boring Depth (ft):57.7

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .11 Northing:-.04 Easting.11

OPTV Start Time:15:55 OPTV End Time:16:41 OPTV Final Depth (ft):56.83

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting sporatic, minor

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:17:08 CCTV End Time:17:58 CCTV Final Depth (ft):55.56

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 50.9,36.8,36.2,33.5,32.5,31.8,30.9,30.6,30.5,29.0,28.8,28.7,26.2,26.0,25.3,25.0,24.5,24.0,22.6,22.4,21.5,20.1,19.5,19.4,19.1,18.3,17.6,16.9,16.2,15.3,11.7,11.5

Vugs 54.5,53.4,44.2,29.8,27.5,26.8,24.2

Leaks

Aggregate 49.3,39.5,38.5,21.5,19.9,19.6,18.9,18.3,17.7,16.3

Soil Inclusions

Fractures

Other (Explain) Inclusion - 15.8 (possibly clay),14.9 (soil ~ 3")


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-18 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3941482 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 12/8/20 16:22 0'
P3941560
Panel Completion Date: 11/3/2020 USACE/AECOM Representative(s): Stephen Spangler/Zac Reeves End Date, Time, Water Depth: 12/9/20 15:25 3.31'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.17
Northing: 908758 Actual Depth of VB Hole (ft)*: 57 Depth to Paywall from top of PVC (ft): 10.08
Easting: 633101.19 CT #: 00567
HHD Station: 3941+52.77 AT #: 0028 Falling Head Test
Ground Elevation (ft): 33.91 Decommission Date 1/6/2021 Start Date & Time: 12/9/20 15:33
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 12/10/20 16:47
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 3.31'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 8.91 Top 1/3 8.9 25.6 End (ft): 22.69'

Depth to Bottom of Pay Wall (ft): 58.91 Middle 2/3 25.6 42.2 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 56.91 Bottom 3/3 42.2 58.9 Automatic Cutoff Wall Reading**: 9.41x10^-6

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
8.9-9.7 8:55 100 100 9.5

9..7-14.7 DT=3:30 100 100 11 Vug-13.7


21.9-22.7 23.8-24.7
14.7-19.7 100 100 17.7,19.3 Vug-19

19.7-24.7 100 100 20.9,22,22.7,23.1

24.7-29.7 100 100 28.1,29.5 Vug-25.5

29.7-34.5 DT=4:06 100 100 37.7-38.5 38.5-39.3 30.7,32.5,33.1,34.3 small soil pits-32.3,32.6

12/8/2020 34.5-39.5 100 100 36,37.7,38.5,39.3

39.5-44.5 100 100 41.6,43.2

44.5-49.7 100 80 46.3,46.6,47.3


47.2-48.0 48.0-48.8
49.7-54.7 100 100 51.3

54.7-57.0 11:19 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:12/8/2020 VB Boring Number:TO3-VB-18 VB Boring Depth (ft):57

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .41 Northing:.15 Easting-.39

OPTV Start Time:12:59 OPTV End Time:13:46 OPTV Final Depth (ft):56.43

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

water level at 4.6'

CCTV OBSERVATIONS:

CCTV Start Time:14:12 CCTV End Time:16:10 CCTV Final Depth (ft):53.44

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 31.24,27.9,27.53,27.46,26.96,26.16,25.28,25.26,23.09,21.50,21.3,20.78,20.11,19.96,19.52,18.7,15.67,14.7,12.43,10.09,43.53,41.06,40.24

Leaks 44.17,44.45,52.61,50.51,47.12,48.62,46.9

Aggregate 31.4,31.6

Soil Inclusions

Fractures

Other (Explain) Rising water at 35 feet, 1st run stopped at 34.5'

rising water again with small pump, 2nd run stopped at 47.17

3rd run got to depth with large pump in the hole at the same time
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-18E Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): S3941482 Borehole Logger's Name: Dave Hewitt/Christina McCoy Start Date, Time, Water Depth: 2/3/21 13:33 0'

Panel Completion Date: 11/3/2020 USACE/AECOM Representative(s):


Lisa Perks/Zac Reeves/Austin End Date, Time, Water Depth: 2/4/21 13:16 1.26'
Sagul
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.33
Northing: 908755.65 Actual Depth of VB Hole (ft)*: 57.3 Depth to Paywall from top of PVC (ft): 10.57
Easting: 633103.07 CT #: 00960
HHD Station: 3941+49.77 AT #: 0045 Falling Head Test
Ground Elevation (ft): 34.24 Decommission Date 2/26/2021 Start Date & Time: 2/4/21 13:16
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 2/5/21 13:!6
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.26'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.24 Top 1/3 9.2 25.9 End (ft): 2.31'

Depth to Bottom of Pay Wall (ft): 59.24 Middle 2/3 25.9 42.6 Manual Cutoff Wall Reading: 1.30x10^-8
Minimum Depth of VB Hole (ft): 57.24 Bottom 3/3 42.6 59.2 Automatic Cutoff Wall Reading**: 1.31x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.2-10.4 8:51 100 100 10.1 heated water to 72

10.4-15.4 100 100 13.7


14.5-15.4 13.7-14.5
15.4-20.4 100 100 16.6

20.4-25.4 5:00 100 100 21.2,23.7

25.4-30.4 100 100

30.4-35.4 100 100 25.4-26.2 27.0-27.8 33.3,34.6,35.2

2/3/2021 35.4-40.4 100 100 35.5,37.0,38.8,39.8

40.4-45.3 100 100 43.2 fished ~.4' unsuccessfully


45.9,46.6,47.3,47.9,
45.3-50.3 100 70 48.3,48.6
51.5-52.3 52.3-53.1
50.3-55.4 4:57 100 100 51.6,54.2

55.4-57.3 12:06 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:2/5/2021 VB Boring Number:TO3-VB-18E VB Boring Depth (ft):57.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .44 Northing:-.39 Easting-.21

OPTV Start Time:13:27 OPTV End Time:14:08 OPTV Final Depth (ft):56.60

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting consistent pitting throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:14:19 CCTV End Time:15:09 CCTV Final Depth (ft):55.41

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 35.55,32.67,26.26,21.25,17.10,12.27

Leaks

Aggregate 51.9,18.21

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-18W Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): P3941560 Borehole Logger's Name: Dave Hewitt/Christina McCoy Start Date, Time, Water Depth: 1/25/2021 14:20 0'

Panel Completion Date: 11/3/2020 USACE/AECOM Representative(s): Lisa Perks/Zac Reeves End Date, Time, Water Depth: 1/26/21 12:50 .87'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.4
Northing: 908760.35 Actual Depth of VB Hole (ft)*: 58 Depth to Paywall from top of PVC (ft): 9.66
Easting: 633099.32 CT #: 00909
HHD Station: 3941+55.77 AT #: 0041 Falling Head Test
Ground Elevation (ft): 34.26 Decommission Date 2/26/2021 Start Date & Time: 1/26/21 12:59
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 1/27/21 13:00
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .70'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.26 Top 1/3 9.3 25.9 End (ft): 0.98

Depth to Bottom of Pay Wall (ft): 59.26 Middle 2/3 25.9 42.6 Manual Cutoff Wall Reading: 3.41x10^-9
Minimum Depth of VB Hole (ft): 57.26 Bottom 3/3 42.6 59.3 Automatic Cutoff Wall Reading**: 4.64x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.3-10.4 9:23 100 100 water headed to at least 70F

10.4-15.4 7:14 100 100 11.6,12.8,15.0


14.2-15.0 13.4-14.2
15.4-20.4 100 100 17.0,17.6,18.5,19.1

20.4-25.4 100 100 21.8,22.4,23.4

25.4-30.4 100 100 27.5,29.0

30.4-35.3 5:35 100 100 28.2-29.0 27.5-28.2 31.1,32.7,34.4

1/25/2021 35.3-40.3 100 100 37.9,39.6

40.3-45.3 100 100 41.1,43.4


46.4,46.5,47.4,48.6,
45.3-50.3 4:38 100 100 49.6,50
47.5-48.3 46.7-47.5
50.3-55.3 100 80 53.1,54.4,54.6,55.0 53.1-55.0 stuck to sleeve

55.3-58.0 12:23 100 88 56.9,57.3

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:1/27/2021 VB Boring Number:TO3-VB-18W VB Boring Depth (ft):58

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .08 Northing:.06 Easting.05

OPTV Start Time:13:15 OPTV End Time:14:00 OPTV Final Depth (ft):57.29

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:14:16 CCTV End Time:15:00 CCTV Final Depth (ft):56.18

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 44.47,36.74,33.85,19.12,13.10

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-19 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): P3939052 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 12/9/20 15:55 0'

Panel Completion Date: 11/14/2020 USACE/AECOM Representative(s): Crystal Velasquez/Zac Reeves End Date, Time, Water Depth: 12/10/20 17:07 0'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.29
Northing: 908563.85 Actual Depth of VB Hole (ft)*: 57.1 Depth to Paywall from top of PVC (ft): 10.29
Easting: 633255.61 CT #: 00661
HHD Station: 3939+05.20 AT #: 0029 Falling Head Test
Ground Elevation (ft): 34 Decommission Date 2/10/2021 Start Date & Time: 12/10/20 17:08
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 12/11/20 17:08
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 0'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9 Top 1/3 9.0 25.7 End (ft): 1.09'

Depth to Bottom of Pay Wall (ft): 59 Middle 2/3 25.7 42.3 Manual Cutoff Wall Reading: 1.28x10^-8
Minimum Depth of VB Hole (ft): 57 Bottom 3/3 42.3 59.0 Automatic Cutoff Wall Reading**: 1.23x10^-8

Descriptions
Start End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
8.8-9.8 8:45

9.8-14.8 12.4,14.1
12.3-13.2 13.2-14.0
14.8-19.8 DT=3:19 16.1,17.0 Vug=18.4

19.8-24.8 21.7,22.5 Vug=21.7

24.8-29.8 DT=4:06 25.9,27.2,28.1,29.3

29.8-34.8 27.2-28.1 28.1-29.3 31.6,33.3

12/9/2020 34.8-39.7

39.7-44.7 41.3,42.9,44.5

44.7-49.8
42.8-43.6 43.6-44.5
49.8-54.7 DT=4:12 51.0,52.3,53.8

54.7-57.1 11:49

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:12/9/2020 VB Boring Number:TO3-VB-19 VB Boring Depth (ft):57.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .36 Northing:.19 Easting-.31

OPTV Start Time:13:!5 OPTV End Time:13:59 OPTV Final Depth (ft):56.11

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:14:19 CCTV End Time:15:15 CCTV Final Depth (ft):55.17

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 38.31,38.0,25.91,18.16

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-20 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3936055 & Borehole Logger's Name: Christina McCoy Start Date, Time, Water Depth: 12/16/20 16:02 0'
P3935978
Panel Completion Date: 11/19/2020 USACE/AECOM Representative(s): Alberto Rodriguez/Zac Reeves End Date, Time, Water Depth: 12/17/20 15:35 .87'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1
Northing: 908319.98 Actual Depth of VB Hole (ft)*: 57.8 Depth to Paywall from top of PVC (ft): 10.6
Easting: 633437.75 CT #: 00713
HHD Station: 3936+00.99 AT #: 0030 Falling Head Test
Ground Elevation (ft): 34.6 Decommission Date 2/10/2021 Start Date & Time: 12/17/20 15:43
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 12/18/20 15:43
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .87'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.6 Top 1/3 9.6 26.3 End (ft): 1.23'

Depth to Bottom of Pay Wall (ft): 59.6 Middle 2/3 26.3 42.9 Manual Cutoff Wall Reading: 4.17x10^-9
Minimum Depth of VB Hole (ft): 57.6 Bottom 3/3 42.9 59.6 Automatic Cutoff Wall Reading**: 4.18x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.6-10.9 9:08 100 100

10.9-15.9 3:51 100 100 12.2,13.2,13.7,14.7


15.9-16.8 16.8-17.6
15.9-20.9 100 88 17.9,18.2,18.5,20.5

20.9-25.9 100 100 22.0,23.2,24.1

25.9-30.9 100 100 27.4,29.1,30.7

30.9-35.9 100 100 32.9-33.6 34.3-35.2 32.9,34.3

12/16/2020 35.9-40.9 4:00 100 100 38.9,39.6,40.5

40.9-45.9 100 100 43.7,44.9,45.7

45.9-50.9 100 100 48.7


46.1-46.9 46.9-47.6
50.9-55.7 100 100 54.4,55.3 Fished 1.5'

55.7-57.8 12:22 100 100 57 core fell from barrel, catcher replaced, fished out core

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:12/16/2020 VB Boring Number:TO3-VB-20 VB Boring Depth (ft):57.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .36 Northing:.11 Easting.35

OPTV Start Time:14:02 OPTV End Time:14:49 OPTV Final Depth (ft):57.20

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:15:08 CCTV End Time:15:58 CCTV Final Depth (ft):56.02

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 55.36,55.04,54.69,54.20,50.68,49.93,18.65,16.55,15.33,12.64,12.23

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-21 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3933594 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 12/18/20 16:45 0', (Retry-12/21/20 8:47 0')

Panel Completion Date: 11/23/2020 USACE/AECOM Representative(s): Isaac Garcia/Zac Reeves End Date, Time, Water Depth: 12/21/20 8:40 22' (Retry-12/22/20 8:14 10.40')
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.46
Northing: 908128.59 Actual Depth of VB Hole (ft)*: 57.8 Depth to Paywall from top of PVC (ft): 10.86
Easting: 633584.99 CT #: 00751
HHD Station: 3933+59.40 AT #: 0031 Falling Head Test
Ground Elevation (ft): 34.4 Decommission Date 1/20/2021 Start Date & Time: 12/22/20 8:18
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 12/23/20 8:18
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 10.40'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.4 Top 1/3 9.4 26.1 End (ft): 22.67'

Depth to Bottom of Pay Wall (ft): 59.4 Middle 2/3 26.1 42.7 Manual Cutoff Wall Reading: N/A - Below Lake Level
Minimum Depth of VB Hole (ft): 57.4 Bottom 3/3 42.7 59.4 Automatic Cutoff Wall Reading**: 1.58x10^-6

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.4-10.4 8:35 90 100 9.4-9.5-soil, fished ~.5'

10.4-15.4 3:08 100 100


17.3-18.4 18.4-19.2
15.4-20.4 100 100 17.4,18.5

20.4-25.4 100 86 22.3,22.7,23.0,23.7

25.4-30.4 100 100 28.0,30.0 27.4- ~1" soft inclusion

30.4-34.9 100 100 32.0-32.8 32.8-33.6 tried to fish .5' - unsuccessful

12/18/2020 34.9-40.2 4:07 100 100 37.4,39.4

40.2-45.2 100 100 42.9,43.9,44.8 41.2 - ~1" inclusion - soft

45.2-50.2 100 100 48.3 fished for entire run, vug-48.4


48.3-49.2 49.2-50.2
50.2-55.0 100 100 top of run - sand lens

55.0-57.8 12:03 100 100 Vug - organics - 56.3,57.4

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:12/18/2020 VB Boring Number:TO3-VB-21 VB Boring Depth (ft):57.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .06 Northing:.05 Easting.04

OPTV Start Time:14:19 OPTV End Time:15:09 OPTV Final Depth (ft):57.16

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

44.14 weird dark spot

9.4-9.8 cavity

water level 2.5'

CCTV OBSERVATIONS:

CCTV Start Time:15:25 CCTV End Time:16:33 CCTV Final Depth (ft):56.02

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 48.30, 36.85, 36.96, 33.31, 32.46, 28.41, 23.74, 16.80,14.65,13.12,11.98

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

2 cavities, 9.84-9.68, 9.79-8.85

paused at 52' to end VB20 falling head

green piece of plastic at 20.78


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-21E Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): S3933594 Borehole Logger's Name: Dave Hewitt/Christina McCoy Start Date, Time, Water Depth: 2/4/21 14:45 0'

Panel Completion Date: 11/23/2020 USACE/AECOM Representative(s):


Lisa Perks/Zac Reeves/Austin End Date, Time, Water Depth: 2/5/21 13:45 0'
Sagul
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1
Northing: 908126.23 Actual Depth of VB Hole (ft)*: 57.6 Depth to Paywall from top of PVC (ft): 10.48
Easting: 633586.84 CT #: 00966
HHD Station: 3933+56.4 AT #: 0046 Falling Head Test
Ground Elevation (ft): 34.48 Decommission Date 2/26/2021 Start Date & Time: 2/5/21 13:51
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 2/6/21 13:51
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .99'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.48 Top 1/3 9.5 26.1 End (ft): 2.72'

Depth to Bottom of Pay Wall (ft): 59.48 Middle 2/3 26.1 42.8 Manual Cutoff Wall Reading: 1.98x10^-8
Minimum Depth of VB Hole (ft): 57.48 Bottom 3/3 42.8 59.5 Automatic Cutoff Wall Reading**: 1.99x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.5-10.7 9:00 100 100 heated water to 74

10.7-15.7 100 100 14.5 fishing~1.2', vug-11.3' (soil)


17.0-17.8 16.2-17.0
15.7-20.7 6:01 100 100 17.8 fished entire run, vug-16.5,19.1
replaced catcher, fished 2.1', vugs-
20.7-25.7 100 100 23.6,25.0 20.8,21.3,21.7,22.8,23.4,23.6,23.8,24.7
25.7-30.7 100 100

30.7-35.0 100 100 34.2-35.0 33.5-34.2 35 fished~.4' unsuccessfully, vug 31.9

2/4/2021 35.0-40.0 4:05 100 100 37.7,38.8,39.7 vug-36.5 (soil),38.1

40.0-44.6 100 100 42.9,43.9,44.3 fished ~.6' unsuccessfully

44.6-45.7 100 100 45.1


49.9-50.7 49.1-49.9
45.7-50.7 5:48 100 100

50.7-55.6 100 100 vug filled with soil -52.9

55.6-57.6 13:05 100 100 fished entire run, teeth of catcher in core-56.9,57.2

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:2/5/2021 VB Boring Number:TO3-VB-21E VB Boring Depth (ft):57.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .20 Northing:.10 Easting.18

OPTV Start Time:12:00 OPTV End Time:12:43 OPTV Final Depth (ft):57.06

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting consistent pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:13:25 CCTV End Time:14:25 CCTV Final Depth (ft):55.7

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 13.7, 14.8x3,15.2,15.8,16.5,18.9,20.2,20.5,21.3,21.7,21.8,22.0,24.9,30.2,35.7,35.9,38.7,39.4,50.5

Vugs 12.8,13.6,14.5,15.0x2,15.4,15.5,15.8x2,15.9,16.6,17.1,17.4,17.7x4,18.6x2,19.7,20.3,21.0,22.4,37.4,38.5,38.7,39.6x2,39.8

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) Horizontal tool marks - 14.9,19.4,24.9,29.9,35.2,39.7,44.7,50.2

Vertical tool marks - throughout entire run

CCTV run on 2/6/21


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-21W Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3933594 Borehole Logger's Name: Christina McCoy Start Date, Time, Water Depth: 1/26/21 13:26 0'

Panel Completion Date: 11/23/2020 USACE/AECOM Representative(s):


Alberto Rodriguez/Zac End Date, Time, Water Depth: 1/27/21 12:26 1.76'
Reeves/Austin Sagul
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.71
Northing: 908130.97 Actual Depth of VB Hole (ft)*: 58.2 Depth to Paywall from top of PVC (ft): 10.09
Easting: 633583.15 CT #: 00919
HHD Station: 3933+62.40 AT #: 0042 Falling Head Test
Ground Elevation (ft): 34.38 Decommission Date 2/26/2021 Start Date & Time: 1/27/21 12:34
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 1/28/21 12:34
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.76
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.38 Top 1/3 9.4 26.0 End (ft): 2.79'

Depth to Bottom of Pay Wall (ft): 59.38 Middle 2/3 26.0 42.7 Manual Cutoff Wall Reading: 1.31x10^-8
Minimum Depth of VB Hole (ft): 57.38 Bottom 3/3 42.7 59.4 Automatic Cutoff Wall Reading**: 1.31x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.4-10.6 9:17 100 100 heated water up to 72

10.6-15.6 100 100 heated water up to 72


12.8-13.6 14.5-15.3
15.6-20.6 5:01 100 100

20.6-25.6 100 100 24.8

25.6-30.6 100 100

30.6-35.6 5:52 100 100 26.0-26.8 26.8-27.6 35.2

1/26/2021 35.6-40.6 100 100

40.6-45.6 100 100

45.6-50.6 100 100


46.6-47.4 47.4-48.2
50.6-55.5 4:43 100 100 53.1

55.5-58.2 12:28 100 100 56.3 Limestone-56.5

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:1/28/2021 VB Boring Number:TO3-VB-21W VB Boring Depth (ft):58.2

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .42 Northing:.30 Easting.29

OPTV Start Time:12:46 OPTV End Time:13:30 OPTV Final Depth (ft):57.40

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks entire run down to ~55

CCTV OBSERVATIONS:

CCTV Start Time:13:42 CCTV End Time:14:34 CCTV Final Depth (ft):56.17

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 52.67,52.35,50.84,45.63,40.44,38.43,29.33,25.35,23.28,16.65,15.40,9.82

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) cavity at 3.5'


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-22 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3931134 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 1/6/21 13:41 0'
P3931057
Panel Completion Date: 12/3/2020 USACE/AECOM Representative(s):
Alberto Rodriguez/Zac End Date, Time, Water Depth: 1/7/21 12:41 0'
Reeves/Austin Sagul
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1
Northing: 907930.09 Actual Depth of VB Hole (ft)*: 57.8 Depth to Paywall from top of PVC (ft): 10.49
Easting: 633737.93 CT #: 00808
HHD Station: 3931+08.80 AT #: 0032 Falling Head Test
Ground Elevation (ft): 34.49 Decommission Date 5/12/2021 Start Date & Time: 1/7/21 12:42
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 1/8/21 12:42
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .22'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.49 Top 1/3 9.5 26.2 End (ft): 22.63'

Depth to Bottom of Pay Wall (ft): 59.49 Middle 2/3 26.2 42.8 Manual Cutoff Wall Reading: N/A (reached 10% threshold around 12 hours)
Minimum Depth of VB Hole (ft): 57.49 Bottom 3/3 42.8 59.5 Automatic Cutoff Wall Reading**: 1.09x10^-6

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.5-10.4 9:05 100 100

10.4-15.4 100 100 12.4,14.1


19.4-20.4 18.6-19.4
15.4-20.4 4:39 100 100 19.7

20.4-25.4 100 100 23.3,24.6 20.5,24.5,24.8-soil inclusions~1"

25.4-30.4 6:19 100 100 26.9

30.4-34.9 100 100 34.1-34.9 33.3-34.1 32.3 fished~.9' unsuccessfully

1/6/2021 34.9-40.9 100 100

40.9-44.9 100 100 43.8

44.9-49.9 4:17 100 100 46.9,49.5


46.9-47.7 46.1-46.9
49.9-54.9 100 100

54.9-57.8 11:55 100 100 56.4 57.0-soil

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:1/8/2021 VB Boring Number:TO3-VB-22 VB Boring Depth (ft):57.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .33 Northing:.26 Easting-.19

OPTV Start Time:15:49 OPTV End Time:16:41 OPTV Final Depth (ft):57.20

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 22.05,24.3

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures 37.55-42.30 and multiple after 38.35 to depth

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:14:01 CCTV End Time:15:40 CCTV Final Depth (ft):54.06

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 26.72,26.26,25.02,22.97,22.00,21.91,21.51,21.16,19.64,16.13,15.75,14.99,10.15

Leaks ~45.3,47.5,48.1,48.5,48.7x2,52.0,52.7,53.3x2,53.9,46.26,44.62 - many leaks, hard to tell exactly

Aggregate

Soil Inclusions

Fractures

Other (Explain)

1st run 29.47'

crack ~51.2-43.5
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-23 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): P3928598 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 1/7/21 14:38 0'

Panel Completion Date: 12/7/2020 USACE/AECOM Representative(s):


Lisa Perks/Zac Reeves/Austin End Date, Time, Water Depth: 1/8/21 13:38 0'
Sagul
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.21
Northing: 907732.55 Actual Depth of VB Hole (ft)*: 58.2 Depth to Paywall from top of PVC (ft): 10.87
Easting: 633889.63 CT #: 00820
HHD Station: 3928+59.77 AT #: 0033 Falling Head Test
Ground Elevation (ft): 34.66 Decommission Date 2/10/2021 Start Date & Time: 1/8/21 13:40
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 1/9/21 13:40
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 2.34'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.66 Top 1/3 9.7 26.3 End (ft): 4.71'

Depth to Bottom of Pay Wall (ft): 59.66 Middle 2/3 26.3 43.0 Manual Cutoff Wall Reading: 2.97x10^-8
Minimum Depth of VB Hole (ft): 57.66 Bottom 3/3 43.0 59.7 Automatic Cutoff Wall Reading**: 2.91x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.7-10.3 8:25 100 100

10.3-15.6 100 100 10.4,14.8


14.8-15.6 14.0-14.8
15.6-20.8 4:01 100 100 17.8,20.2

20.8-25.8 100 100 24.6

25.8-30.8 100 100 29.3

30.8-35.8 4:17 100 100 29.3-30.0 30.0-30.8

1/7/2021 35.8-40.8 100 100

40.8-45.8 100 100 42.6,44.0,45.2

45.8-50.8 100 100


46.6-47.4 45.8-46.6
50.8-55.7 100 100 53.5

55.7-58.2 11:05 100 100 57.3,57.8

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:1/9/2021 VB Boring Number:TO3-VB-23 VB Boring Depth (ft):58.2

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .65 Northing:.41 Easting-.50

OPTV Start Time:14:01 OPTV End Time:14:46 OPTV Final Depth (ft):57.17

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout

CCTV OBSERVATIONS:

CCTV Start Time:15:12 CCTV End Time:16:00 CCTV Final Depth (ft):56.25

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 40.88,36.26,27.23,23.96,17.15,14.48,12.81,10.14

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-24 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3925906 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 1/8/21 12:01 0'
P3925830
Panel Completion Date: 12/11/2020 USACE/AECOM Representative(s):
Isaac Garcia/Zac Reeves/Austin End Date, Time, Water Depth: 1/11/21 8:49 1.83'
Sagul
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.96
Northing: 907514.6 Actual Depth of VB Hole (ft)*: 58.1 Depth to Paywall from top of PVC (ft): 10.66
Easting: 634054.01 CT #: 00824
HHD Station: 3925+86.78 AT #: 0034 Falling Head Test
Ground Elevation (ft): 34.7 Decommission Date 2/10/2021 Start Date & Time: 1/11/21 8:57
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 1/12/21 8:57
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.83
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.7 Top 1/3 9.7 26.4 End (ft): 1.88

Depth to Bottom of Pay Wall (ft): 59.7 Middle 2/3 26.4 43.0 Manual Cutoff Wall Reading: 5.89x10^-10
Minimum Depth of VB Hole (ft): 57.7 Bottom 3/3 43.0 59.7 Automatic Cutoff Wall Reading**: 9.13x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.7-10.5 8:46 100 100

10.5-15.5 100 100 11.2,12.2,14.3


23.0-23.8 23.8-24.6
15.5-20.5 3:58 100 100 17.7,18.5

20.5-25.5 100 100 23

25.5-30.5 100 100

30.5-35.5 100 100 39.1-40.0 38.3-39.1 31.9,32.9,34.7

1/8/2021 35.5-40.5 100 100 37.0,37.5,39.1,40.0

40.5-45.5 3:51 100 86 42.8,43.2,43.5,44.8 hairline cracks that didn't break-44.3,44.5,45.1,45.3

45.5-50.5 100 100 47.5,49.6


53.3-54.1 54.1-54.9
50.5-55.7 100 100 55.1

55.7-58.1 11:13 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:1/12/2021 VB Boring Number:TO3-VB-24 VB Boring Depth (ft):58.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .32 Northing:.12 Easting-.30

OPTV Start Time:9:18 OPTV End Time:9:58 OPTV Final Depth (ft):57.20

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) minor vertical tool marks and pitting throughout

CCTV OBSERVATIONS:

CCTV Start Time:10:19 CCTV End Time:11:06 CCTV Final Depth (ft):56.13

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 44

Vugs 53.20,51.00,49.13,32.79,18.31,18.94

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

cavity around 6' in the overburden

string or wire? ~41.04


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-25 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3923138 & Borehole Logger's Name: John Egelston Start Date, Time, Water Depth: 1/11/21 12:05 0'
P3923061
Panel Completion Date: 12/15/2020 USACE/AECOM Representative(s):
Lisa Perks/Zac Reeves/Austin End Date, Time, Water Depth: 1/12/2021 11:24 0'
Sagul
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1
Northing: 907293.05 Actual Depth of VB Hole (ft)*: 58.6 Depth to Paywall from top of PVC (ft): 11.21
Easting: 634221.12 CT #: 00851
HHD Station: 3923+09.24 AT #: 0035 Falling Head Test
Ground Elevation (ft): 35.21 Decommission Date 2/10/2021 Start Date & Time: 1/12/21 11:40
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 1/13/21 11:40
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 0.97
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10.21 Top 1/3 10.2 26.9 End (ft): 22.4

Depth to Bottom of Pay Wall (ft): 60.21 Middle 2/3 26.9 43.5 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 58.21 Bottom 3/3 43.5 60.2 Automatic Cutoff Wall Reading**: 7.78x10^-7

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
10.2-10.5 8:35 100 100

10.5-15.5 5:18 100 100 12.9,13.5,14.5 vug-11.3


13.5-14.4 14.4-15.2
15.5-20.5 100 100 19.5

20.5-25.5 100 100 24.3 vug-22.0

25.5-30.5 4:04 100 100 28.1 vug-26.3,29.7

30.5-35.5 100 100 37.5-38.3 38.3-39.1 32.7 vug-32.2

1/11/2021 35.5-40.5 100 100 36.5,37.5 Limestone-37.0

40.5-45.5 100 100 42.4-soil inclusion ~1", vug-41.8

45.5-50.5 100 100 47


50.8-51.6 51.6-52.2
50.5-55.6 4:12 100 100 52.3,55.2

55.6-58.6 10:58 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:1/13/2021 VB Boring Number:TO3-VB-25 VB Boring Depth (ft):58.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .36 Northing:.36 Easting-.05

OPTV Start Time:14:16 OPTV End Time:15:00 OPTV Final Depth (ft):57.73

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 17.2,24.75

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

vertical crack in wall from 47.5' to depth

CCTV OBSERVATIONS:

CCTV Start Time:12:12 CCTV End Time:13:41 CCTV Final Depth (ft):56.57

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting
~17,~25,51.62,51.44,50.26,48.86,48.74,48.27x2,48.05,43.55,42.78x2,42.71x2,41.48,40.85,37.37,36.50,30.24,28.22,26.22,25.79,25.25,24.95,23.78,23.27,19.80,17.58,15.73,
Vugs
15.17,14.65,14.62,13.58,12.77,12.62,12.46,12.07,12.00,11.64,11.49,11.42,11.19,11.10,11.00,10.59,10.50,10.31,10.36,10.08,54.6,51.90
Leaks 51.90,55.56,55.53

Aggregate

Soil Inclusions

Fractures

Other (Explain)

1st run to 51.90'

vertical cracks on opposite sides from depth to ~48


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-026 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3920525 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 1/14/21 15:00 0'

Panel Completion Date: 12/18/2020 USACE/AECOM Representative(s):


Lisa Perks/Zac Reeves/Austin End Date, Time, Water Depth: 1/15/21 14:56 1.33'
Sagul
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.29
Northing: 907086.87 Actual Depth of VB Hole (ft)*: 59.6 Depth to Paywall from top of PVC (ft): 12.56
Easting: 634374.26 CT #: 00873
HHD Station: 3920+52.5 AT #: 0036 Falling Head Test
Ground Elevation (ft): 36.27 Decommission Date 5/12/2021 Start Date & Time: 1/15/21 15:04
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 1/16/21 15:54
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.5
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.27 Top 1/3 11.3 27.9 End (ft): Not Observed

Depth to Bottom of Pay Wall (ft): 61.27 Middle 2/3 27.9 44.6 Manual Cutoff Wall Reading: Not Observed
Minimum Depth of VB Hole (ft): 59.27 Bottom 3/3 44.6 61.3 Automatic Cutoff Wall Reading**: 1.09x10^-6

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.3-15.6 10:08 100 100 14.8 vug 11.6, heated water to 70 degrees for drilling

15.6-20.6 100 100 19.6,20.2 Limestone-16.8


19.6-20.3 18.8-19.6
20.6-25.6 6:04 100 100 22.9

25.6-30.6 100 100 28.2

30.6-35.6 100 100

35.6-40.6 4:58 100 100 41.9-42.7 42.7-43.5 37.6,38.9

1/14/2021 40.6-45.6 100 100 41.9

45.6-50.4 100 86 49.4,49.7,50.1 fished~.3'

50.4-55.5 5:23 100 100 53.9,54.3


53.1-53.9 54.3-55.1
55.5-59.6 12:50 100 100 58.1

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:1/18/2021 VB Boring Number:TO3-VB-026 VB Boring Depth (ft):59.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.40 Northing:0.39 Easting-.11

OPTV Start Time:9:00 OPTV End Time:9:30 OPTV Final Depth (ft):58.58

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures twin cracks starting at 49.5 to bottom of camera (NE-SW orientation, perpendicular to cutoff wall)

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:9:45 CCTV End Time:11:00 CCTV Final Depth (ft):58.5

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor pitting throughout

Vugs

Leaks leaking from cracks at 55.7 to bottom of camera

Aggregate

Soil Inclusions

Fractures twin cracks starting at 49.5 to bottom of camera (NE-SW orientation, perpendicular to cutoff wall)

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-027 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3918064 & Borehole Logger's Name: Christina McCoy Start Date, Time, Water Depth: 1/18/21 13:10 0'
P3917988
Panel Completion Date: 12/20/2020 USACE/AECOM Representative(s): Lisa Perks/Austin Sagul End Date, Time, Water Depth: 1/19/21 12:21 2.15'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.15
Northing: 906886.06 Actual Depth of VB Hole (ft)*: 60.5 Depth to Paywall from top of PVC (ft): 13.1
Easting: 634523.01 CT #: 00878
HHD Station: 3918+02.6 AT #: 0039 Falling Head Test
Ground Elevation (ft): 36.95 Decommission Date 2/26/2021 Start Date & Time: 1/19/21 12:30
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 1/20/21 12:30
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.79
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.95 Top 1/3 12.0 28.6 End (ft): 2.49

Depth to Bottom of Pay Wall (ft): 61.95 Middle 2/3 28.6 45.3 Manual Cutoff Wall Reading: 7.45x10^-9
Minimum Depth of VB Hole (ft): 59.95 Bottom 3/3 45.3 62.0 Automatic Cutoff Wall Reading**: 6.68x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9:32
12.0-15.2 (6m30s) 100 100 12.1, 14.4

15.2-20.2 8m14s 100 100 18.1


16.5-17.3 17.3-18.1
20.2-peat/org, 20.4-
20.2-25.2 5m25s 100 100 23.9 limestone 27.5 - pit (org)

25.2-30.2 6m8s 100 100 25.9, 27.7, 29.1, 29.8 26.9, 29.1 - pit (org)

30.2-35.2 5m0s 100 100 31.0, 31.2, 33.0

35.2-40.2 6m5s 100 100 31.2-32.0 34.0-35.0 37.4, 38.5, 39.5 fished out 39.5-40.2

1/18/2021 40.2-45.2 100 100 42.1, 42.7

45.2-50.2 6m48s 100 100 47.4 46.0, 46.2, 46.9 - pit (org)

50.2-55.3 4m45s 100 100 52.5, 54.8 53.9 - pit (org)


55.3-56.1 56.1-56.9
57.5, 58.3, 58.6, 58.9,
55.3-60.5 5m30s 12:10 100 64 59.3, 59.7, 60.1

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:1/20/2021 VB Boring Number:TO3-VB-027 VB Boring Depth (ft):60.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .52 Northing:-.32 Easting-.41

OPTV Start Time:12:49 OPTV End Time:13:31 OPTV Final Depth (ft):59.93

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor pitting throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout, horizontal tool marks 46.50

CCTV OBSERVATIONS:

CCTV Start Time:13:44 CCTV End Time:14:50 CCTV Final Depth (ft):58.53

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 48.13,32.70,22.48,14.21,13.90

Vugs 55.56,53.58,52.62,51.96,51.52,51.25,50.09,49.90,49.66,47.32,46.32,38.75,29.78,29.88,22.48,17.19

Leaks

Aggregate 17.73,13.45

Soil Inclusions

Fractures

Other (Explain) two vertical tool marks from approximately 11 to 46 feet


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-028 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): S3916682 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 2/1/21 13:30 0'
P3916759
Panel Completion Date: 1/4/2021 USACE/AECOM Representative(s):
Isaac Garcia/Zac Reeves/Austin End Date, Time, Water Depth: 2/2/21 12:55 1.11'
Sagul
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.77
Northing: 906780.96 Actual Depth of VB Hole (ft)*: 59.5 Depth to Paywall from top of PVC (ft): 11.7
Easting: 634599.23 CT #: 00937
HHD Station: 3916+72.69 AT #: 0043 Falling Head Test
Ground Elevation (ft): 35.93 Decommission Date 2/26/2021 Start Date & Time: 2/2/21 12:55
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 2/3/21 12:55
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.11'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10.93 Top 1/3 10.9 27.6 End (ft): 2.83'

Depth to Bottom of Pay Wall (ft): 60.93 Middle 2/3 27.6 44.3 Manual Cutoff Wall Reading: 1.95x10^-8
Minimum Depth of VB Hole (ft): 58.93 Bottom 3/3 44.3 60.9 Automatic Cutoff Wall Reading**: 1.91x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.4,12.4,13.4,14.8,
10.9-15.4 9:24 100 100 15.0 water heated to 72, soil-12.4, fished~.4'

15.4-20.4 5:59 100 100 18


17.3-18.1 16.5-17.3
20.4-25.4 100 100 22.1 vug-22, 24.4-25.4 vertical fractures

25.4-30.4 100 100 30.1 full run-vertical fractures

30.4-35.4 100 100 31.6,34.9 fished~.6'

35.4-40.4 100 100 31.6-32.4 30.8-31.6 37.2,39.4,39.9 fished~.6'

2/1/2021 40.4-45.4 100 100 vug-41

45.4-50.4 100 100 48.1,49.9 fished~.5'

50.4-55.3 6:14 100 100


49.0-49.8 48.2-49.0
55.3-59.5 12:32 100 100 59 joint not observed

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:2/3/2021 VB Boring Number:TO3-VB-028 VB Boring Depth (ft):59.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .10 Northing:.09 Easting-.02

OPTV Start Time:13:24 OPTV End Time:14:14 OPTV Final Depth (ft):58.93

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) joint visible ~30'

CCTV OBSERVATIONS:

CCTV Start Time:14:34 CCTV End Time:15:24 CCTV Final Depth (ft):57.07

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 55.6,55.27,48.53,44.06,30.53,29.95,27.43,25.13,24.10,23.37,22.25,21.23,14.94

Leaks 32.56 very small

Aggregate

Soil Inclusions

Fractures

Other (Explain) cavity-14.64


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-29 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): P3914530 Borehole Logger's Name: Dave Hewitt/Christina McCoy Start Date, Time, Water Depth: 2/2/2021 13:05 0'

Panel Completion Date: 1/6/2021 USACE/AECOM Representative(s): Crystal Velazquez/Austin Sagul End Date, Time, Water Depth: 2/3/2021 12:25 0'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.35
Northing: 906605.03 Actual Depth of VB Hole (ft)*: 59.5 Depth to Paywall from top of PVC (ft): 12.25
Easting: 634730.97 CT #: 00940
HHD Station: 3914+52.96 AT #: 00044 Falling Head Test
Ground Elevation (ft): 35.9 Decommission Date 2/26/2021 Start Date & Time: 2/3/21 12:38
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 2/4/21 12:38
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 0.04
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10.9 Top 1/3 10.9 27.6 End (ft): 2.2'

Depth to Bottom of Pay Wall (ft): 60.9 Middle 2/3 27.6 44.2 Manual Cutoff Wall Reading: 2.30x10^-8
Minimum Depth of VB Hole (ft): 58.9 Bottom 3/3 44.2 60.9 Automatic Cutoff Wall Reading**: 2.29x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
water heated up to 72, 12.1, 13.7 - pit (org), 14.0-14.2
10.9-15.7 9:37 100 100 12.2 14.0, - vug (sand)
15.7-20.7 4m48s 100 100 17.9, 19.5 - vug (sand)
21.8-22.6 21.0-21.8
24.0 - pit (org), last 0.2 lost in boring, too small to be
20.7-25.7 4m48s 100 100 22.7 fished out
25.7-30.7 4m52s 100 100 27.1, 29.2 0.2 recovered from previous run

30.7-35.7` 4m49s 100 100 33.0, 34.2 34.1 - vug (sand)

35.7-40.7 5m3s 100 98 33.0-34.2 32.2-33.0 37.7, 39.1, 40.6 37.8 - vug, minor org throughout

2/2/2021 40.7-45.7 100 100 44.5, 45.1 last 0.2 lost in boring, too small to be fished out
46.9 - pit (org), 48.4 vug, 0.2 recovered from previous
45.7-50.7 100 100 48.3, 49.8 48.7 - (ls) run
50.7-55.8 4m45s 100 100 53.1 55.0 - vug (org)
48.3-49.1 49.1-49.9
55.8-59.3 12:11 100 100 57.8-58.1 - grey cement lense?

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date: VB Boring Number:TO3-VB-29 VB Boring Depth (ft):

OPTV OBSERVATIONS:

Total Vector Deviation (ft): Northing: Easting

OPTV Start Time: OPTV End Time: OPTV Final Depth (ft):

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time: CCTV End Time: CCTV Final Depth (ft):

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-30 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): P3910461 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 2/19/21 14:21 0'

Panel Completion Date: 1/12/2021 USACE/AECOM Representative(s):


Lisa Perks/Austin Sagul/Zac End Date, Time, Water Depth: 2/22/21 8:37 .51'
Reeves
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.58
Northing: 906279.37 Actual Depth of VB Hole (ft)*: 60.1 Depth to Paywall from top of PVC (ft): 11.89
Easting: 634974.9 CT #: 01031
HHD Station: 3910+46.08 AT #: 0047 Falling Head Test
Ground Elevation (ft): 36.31 Decommission Date 4/14/2021 Start Date & Time: 2/22/21 8:47
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 2/23/21 8:47
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .51'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.31 Top 1/3 11.3 28.0 End (ft): 3.94'

Depth to Bottom of Pay Wall (ft): 61.31 Middle 2/3 28.0 44.6 Manual Cutoff Wall Reading: 3.84x10^-8
Minimum Depth of VB Hole (ft): 59.31 Bottom 3/3 44.6 61.3 Automatic Cutoff Wall Reading**: 3.78x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.3-15.4 10:20 100 100 12.3 Temperature of water 78 - not heated

15.4-20.6 3:20 100 100 17.8


17.0-17.8 17.8-18.6
20.6-25.6 100 100 21.9,24.4

25.6-30.6 4:01 100 100

30.6-35.6 100 100 fished~.3'

35.6-40.5 100 100 36.7-37.5 37.5-38.3 37.5

2/19/2021 40.5-45.5 100 100 42.7

45.5-50.5 100 100 48.8

50.5-55.3 3:54 100 100


48.8-49.6 49.6-50.5
55.3-60.1 12:56 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:2/23/2021 VB Boring Number:TO3-VB-30 VB Boring Depth (ft):60.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .03 Northing:.03 Easting.004

OPTV Start Time:9:00 OPTV End Time:9:47 OPTV Final Depth (ft):59.47

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting pitting throughout

Vugs 37.1,49.6,49.9,50.6

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) sporatic vertical and horizontal tool marks

58.9-59.47 sediment?

water at 3.6'

CCTV OBSERVATIONS:

CCTV Start Time:10:14 CCTV End Time:11:20 CCTV Final Depth (ft):57.85

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 52.02, 50.40, 41.27, 30.87, 29.85, 29.07, 23.72, 18.25, 14.6, 11.89

Leaks

Aggregate 55.95

Soil Inclusions

Fractures

Other (Explain) vugs in the overburden

vertical tool marks throughout (ex: 45.55)

piece of tape? in water at bottom


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-31 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3715109 & Borehole Logger's Name: Dave Hewitt/Kristina McCoy Start Date, Time, Water Depth: 2/23/21 13:04 0'
P3715035
Panel Completion Date: 1/21/2021 USACE/AECOM Representative(s): Lisa Perks/Austin Sagul End Date, Time, Water Depth: 2/24/21 12:46 .42'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.58
Northing: 901886.82 Actual Depth of VB Hole (ft)*: 55.5 Depth to Paywall from top of PVC (ft): 13.22
Easting: 653524.33 CT #: 01044
HHD Station: 3715+07.21 AT #: 0048 Falling Head Test
Ground Elevation (ft): 36.64 Decommission Date 3/18/2021 Start Date & Time: 2/24/21 12:56
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 2/25/21 12:56
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): .42'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.64 Top 1/3 11.6 26.6 End (ft): .84'

Depth to Bottom of Pay Wall (ft): 56.64 Middle 2/3 26.6 41.6 Manual Cutoff Wall Reading: 4.45x10^-9
Minimum Depth of VB Hole (ft): 54.64 Bottom 3/3 41.6 56.6 Automatic Cutoff Wall Reading**: 4.26x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.6-15.5 9:26 100 100 12.6

15.5-20.5 100 100 15.6,16.5,17.7,18.6


20.5-21.3 21.3-22.1
20.5-25.5 100 100 23 22.9,23.0,23.1-organic inclusions(small)

25.5-30.5 10:08 10:12 100 100 26.4 small (1/4") organic inclusions throughout

30.5-35.5 10:27 100 100 33.4

35.5-40.5 100 100 39.6-40.3 38.0-38.8 40.2 1.5" piece of granite

2/23/2021 40.5-45.5 11:04 100 100 40.8-small organic inclusion


46.3-clay ~2", 47.8-48.1 clay and rock fragment
45.5-50.2 100 100 50.0,49.5 3x3.5" at 48' inclusion
50.2-55.5 12:00 100 100 50.6,51.6
50.6-51.5 51.5-52.4

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:2/25/2021 VB Boring Number:TO3-VB-31 VB Boring Depth (ft):55.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .38 Northing:-.36 Easting.14

OPTV Start Time:13:17 OPTV End Time:14:02 OPTV Final Depth (ft):55.00

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 47.6

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout

CCTV OBSERVATIONS:

CCTV Start Time:14:17 CCTV End Time:15:07 CCTV Final Depth (ft):53.76

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 52.86,50.64,48.14,44.68,44.01,43.01,42.70,41.50,39.44,36.34,32.02,31.67,30.90,27.47,21.70,19.55,18.30,16.57,15.80,15.05,11.07

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-32 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3718006 & Borehole Logger's Name: Christina McCoy Start Date, Time, Water Depth: 2/24/21, 12:57, 0'
P3717929
Panel Completion Date: 1/28/2021 USACE/AECOM Representative(s): Lisa Perks/Austin Sagul End Date, Time, Water Depth: 2/25/21 12:29 1.75'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.13
Northing: 901968.13 Actual Depth of VB Hole (ft)*: 54.4 Depth to Paywall from top of PVC (ft): 12.05
Easting: 653246.51 CT #: 1045
HHD Station: 3717+96.02 AT #: 049 Falling Head Test
Ground Elevation (ft): 35.92 Decommission Date 4/13/2021 Start Date & Time: 2/25/21 12:31
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 2/26/21 12:31
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.75'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10.92 Top 1/3 10.9 25.9 End (ft): 2.22

Depth to Bottom of Pay Wall (ft): 55.92 Middle 2/3 25.9 40.9 Manual Cutoff Wall Reading: 5.21x10^-9
Minimum Depth of VB Hole (ft): 53.92 Bottom 3/3 40.9 55.9 Automatic Cutoff Wall Reading**: 5.27x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
drill water not preheated, water temperature at 75.1,
10.9-15.5 9:01 100 100 11 approx 1.5" long clay agg
15.6- vug, 16.3- vug, 16.6 - ~1.5 " sand incl, 17.0- vug,
15.5-20.5 100 100 18.8- vug
20.5-21.4 21.4-22.2
20.5-25.5 6m18s 100 100 21.4, 22.9` 23.7 - Ls agg

25.5-30.5 6m4s 100 100 26 several ls agg <3", minor pitting throughout (org)
organic lense 30.9-31.1, ~0.3' fished, 30.8 - vug (org),
30.5-35.5 6m2s 100 100 35.3 21.7 - Ls pitting throughtout (org), vugs throughout
35.5-40.5 6m8s 100 100 33.5-34.3 34.3-35.3 35.9, 36.5, 39.6, 40.2 darker and ligter coloring (suggestive of joint)

2/24/2021 40.5-45.5 100 100 41.3, 44.5 minor pitting throughout (org)

45.5-50.3 100 100 minor pitting throughout (org), 46.0 - vug


minor pitting throughout (org) ~45.5-54.4 less
50.3-54.4 11:42 aggregate than previous runs
43.7-44.5 40.5-41.3

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:2/26/2021 VB Boring Number:TO3-VB-32 VB Boring Depth (ft):54.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .44 Northing:-.28 Easting.34

OPTV Start Time:12:49 OPTV End Time:13:31 OPTV Final Depth (ft):54

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting pitting throughout

Vugs 21.30,36.30,44.70,53.35

Leaks

Aggregate 24.9 (LS)

Soil Inclusions

Fractures

Other (Explain) horizontal tool marks - 14.1,29.1

sporadic vertical tool marks

possible jointing observed in first few feet of cameras (darker coloration towards center of optv) - 2.10-4.60

CCTV OBSERVATIONS:

CCTV Start Time:1:43 CCTV End Time:2:41 CCTV Final Depth (ft):52.89

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting pitting throughout


52.4,51.68,51.51,48.72,47.48,45.21,42.31,41.53,38.78,38.29,37.62,37.06,35.34,33.11,31.65,29.81,29.28,28.63,27.85,27.22,25.52,25.05,24.15,23.50,22.85,22.42,22.33,21.35,
Vugs
20.40,19.56,17.80,17.67,17.20,15.60,14.80,14.42,13.51,13.18,12.48,12.38,11.28
Leaks

Aggregate 19.65(LS)

Soil Inclusions

Fractures

Other (Explain) sporadic vertical tool marks


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-33 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): S3720711 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 3/15/21 12:47 0'

Panel Completion Date: 2/18/2021 USACE/AECOM Representative(s):


Lisa Perks/Zac Reeves/Austin End Date, Time, Water Depth: 3/16/21 12:02 1.61
Sagul
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.17
Northing: 902062.36 Actual Depth of VB Hole (ft)*: 59.4 Depth to Paywall from top of PVC (ft): 12.15
Easting: 652988.09 CT #: 01207
HHD Station: 3720+71.07 AT #: 0053 Falling Head Test
Ground Elevation (ft): 35.98 Decommission Date 4/13/2021 Start Date & Time: 3/16/21 12:08
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 3/17/21 12:08
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.61'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10.98 Top 1/3 11.0 27.6 End (ft): 3.04'

Depth to Bottom of Pay Wall (ft): 60.98 Middle 2/3 27.6 44.3 Manual Cutoff Wall Reading: 1.58x10^-8
Minimum Depth of VB Hole (ft): 58.98 Bottom 3/3 44.3 61.0 Automatic Cutoff Wall Reading**: 1.58x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.0-15.6 8:59 100 100 11.1 water not heated - 72F

15.6-20.6 4:55 100 100 18.9,19.8


18.9-19.8 18.1-18.9
20.6-25.6 100 100 21.8,22.8,23.6

25.6-30.6 100 100 27.9,30.4

30.6-35.5 5:52 100 100

35.5-40.5 100 100 31.8-32.6 31.0-31.8 vug-39.1

3/15/2021 40.5-45.5 100 100 44.9

45.5-50.5 100 100

50.5-55.6 4:48 100 100 soil inclusions - 50.9,54.5


51.8-52.6 51.0-51.8
55.6-59.4 11:22 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:3/17/2021 VB Boring Number:TO3-VB-33 VB Boring Depth (ft):59.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .37 Northing:.31 Easting-.20

OPTV Start Time:12:25 OPTV End Time:13:06 OPTV Final Depth (ft):59.18

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout

weird discoloration without any depth from ~30 to ~40

CCTV OBSERVATIONS:

CCTV Start Time:13:29 CCTV End Time:14:51 CCTV Final Depth (ft):57.65

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting
57.31,57.24,56.67,56.49,55.57,54.54,54.27,49.93,49.67,49.45,48.94,48.70,48.60,48.43,47.80,46.80,45.32,42.54,42.31,42.03,41.83,41.73,41.56,41.33,41.13,40.72,39.65,39.33,
Vugs
38.13,36.80,36.78,33.97,32.82,32.14,30.35,30.23,28.42,26.36,23.61,23.53,22.19,19.40,19.34,19.15,18.15,13.21,11.76
Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) pulled out at ~41 - dirt on camera

39.20 horizontal tool marks

28.47 - green thing, maybe plastic


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-34 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3723476 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 3/9/21 15:22 0'
P3723399
Panel Completion Date: 2/3/2021 USACE/AECOM Representative(s):
Crystal Velasquez/Zac End Date, Time, Water Depth: 3/10/21 14:22 .73'
Reeves/Austin Sagul
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.58
Northing: 902153.31 Actual Depth of VB Hole (ft)*: 59.4 Depth to Paywall from top of PVC (ft): 12.89
Easting: 652731.07 CT #: 01152
HHD Station: 3723+43.72 AT #: 0050 Falling Head Test
Ground Elevation (ft): 36.31 Decommission Date 4/13/2021 Start Date & Time: 3/10/21 14:23
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 3/11/21 14:23
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 0.73
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.31 Top 1/3 11.3 28.0 End (ft): 1.48

Depth to Bottom of Pay Wall (ft): 61.31 Middle 2/3 28.0 44.6 Manual Cutoff Wall Reading: 7.58x10^-9
Minimum Depth of VB Hole (ft): 59.31 Bottom 3/3 44.6 61.3 Automatic Cutoff Wall Reading**: 7.43x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.3-15.6 10:58 100 100 11.7,15.5 water not heated - 72.9

15.6-20.6 6:33 100 100 17.3


15.6-16.4 16.4-17.3
20.6-25.6 100 100

25.6-30.4 100 100 30.3 fished ~.3 - unsuccessful

30.4-35.4 100 100 33.1,34.0,34.4,35.2 vug-33.1

35.4-40.4 6:05 100 100 33.1-33.9 34.3-35.2 soil inclusion ~2" @ 36.1'

3/9/2021 40.4-45.4 100 100 43.6,44.5,45.0 fished ~.4'

45.4-50.4 100 100

50.4-55.5 6:05 100 100 vug-51.3,51.8


53.8-54.6 54.6-55.5
55.5-59.4 13:50 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:3/11/2021 VB Boring Number:TO3-VB-34 VB Boring Depth (ft):59.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .28 Northing:-.26 Easting-.09

OPTV Start Time:14:37 OPTV End Time:15:18 OPTV Final Depth (ft):58.83

Feature (Leaks, Vugs, Pitting, Etc)

Pitting throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:15:28 CCTV End Time:16:28 CCTV Final Depth (ft):57.56

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting
56.23,56.00,55.88,55.75,55.46,54.62,54.41,52.47,52.02,50.99,50.98,46.58,45.08,44.51,44.16,44.04,38.48,36.04,34.37,32.94,32.43,29.53,25.43,25.06,24.77,24.34,23.20,22.96,
Vugs 22.93x2,22.46,22.26,20.36,20.23,20.17,18.29x2,18.20,17.94,16.03,15.42,15.34,14.92,14.57,14.25,14.00,13.68,13.35,12.96x4,12.88,12.84,12.67,12.44,12.19,12.13x2,11.70,11.
68,11.64,11.61
Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-35 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3726192 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 3/10/21 14:22 0'
P3726115
Panel Completion Date: 2/8/2021 USACE/AECOM Representative(s):
Lisa Perks/Zac Reeves/Austin End Date, Time, Water Depth: 3/11/21 13:42 .71'
Sagul
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.625
Northing: 902265.11 Actual Depth of VB Hole (ft)*: 59.9 Depth to Paywall from top of PVC (ft): 12.935
Easting: 652483.64 CT #: 01178
HHD Station: 3726+14.6 AT #: 0051 Falling Head Test
Ground Elevation (ft): 36.31 Decommission Date 4/13/2021 Start Date & Time: 3/11/21 13:45
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 3/12/21 13:45
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .71'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.31 Top 1/3 11.3 28.0 End (ft): 1.44'

Depth to Bottom of Pay Wall (ft): 61.31 Middle 2/3 28.0 44.6 Manual Cutoff Wall Reading: 7.27x10^-9
Minimum Depth of VB Hole (ft): 59.31 Bottom 3/3 44.6 61.3 Automatic Cutoff Wall Reading**: 7.29x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.3-15.3 9:05 100 100 11.5,13.2,14.5 heated water to 73F

15.3-20.3 100 100 20.1 16.4-soil inclusion~1"


26.4-27.0 27.3-28.0
20.3-25.3 8:05 100 100 24.7 24.7-limestone~.4' 21.0-vug, organics-22.9,23.2,23.9,24.4
limestone-
25.3-30.3 8:13 100 100 27.2 26.0,26.2,27.1,30.0 organics-25.7,25.9,27.8

30.3-35.3 100 100


37.6-limestone~.6',
35.3-40.3 100 100 42.9-43.7 41.3-42.1 36.6-38.8 35.9-granite
limestone-
3/10/2021 40.3-45.3 100 100 44.2 40.6,41.1,43.6
45.3-50.3 6:50 100 100 49.9

50.3-55.3 100 100 vug-50.7,52.3,54.5,55.1


57.5-58.3 58.3-59.1
55.3-59.9 13:15 100 100 vug-59.5

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:3/12/2021 VB Boring Number:TO3-VB-35 VB Boring Depth (ft):59.9

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .22 Northing:.16 Easting-.15

OPTV Start Time:13:55 OPTV End Time:14:40 OPTV Final Depth (ft):59.02

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout

CCTV OBSERVATIONS:

CCTV Start Time:14:52 CCTV End Time:16:09 CCTV Final Depth (ft):57.65

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

52.65,57.34,57.07,57.01,57.00,56.83,56.82,56.22,56.12x2,55.61,55.52x2,55.05,54.66,54.57,54.59,54.56,54.47,53.77,53.59,53.47,52.90,52.88,52.55x2,51.92,51.1,50.77,50.84,
Vugs 50.50,50.37,50.13,49.96,49.30,48.78,48.31,48.13,47.61,47.15,45.23,43.94,42.58,41.57,40.57,39.52,38.86,38.88,38.8,38.23,37.91x3,36.82,36.42,35.63,35.34,34.87,34.27,33.78
,32.98,29.04,27.67,26.36,25.84,25.05,24.74,24.56,24.39,22.77,21.78,21.22,21.06,20.69,20.33,19.95,19.67,19.42,16.92,18.52,15.55,14.67,13.42,13.17,13.06x2,12.21,11.56

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) 24.10 - weird looking black spot, maybe a vug?


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-36 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): P3728730 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 3/11/2021, 13:22, 0'

Panel Completion Date: 2/10/2021 USACE/AECOM Representative(s):


Alberto Rodriguez/Zac End Date, Time, Water Depth: 3/12/2021 12:22 .70'
Reeves/Austin Sagul
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.5
Northing: 902354.74 Actual Depth of VB Hole (ft)*: 60.3 Depth to Paywall from top of PVC (ft): 13.11
Easting: 652241.32 CT #: 1191
HHD Station: 3728+73.00 AT #: 052 Falling Head Test
Ground Elevation (ft): 36.61 Decommission Date 4/13/2021 Start Date & Time: 3/12/21 12:23
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 3/13/21 12:23
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .70'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.61 Top 1/3 11.6 28.3 End (ft): .82'

Depth to Bottom of Pay Wall (ft): 61.61 Middle 2/3 28.3 44.9 Manual Cutoff Wall Reading: 1.16x10^-9
Minimum Depth of VB Hole (ft): 59.61 Bottom 3/3 44.9 61.6 Automatic Cutoff Wall Reading**: 1.17x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
just above paywall -
11.6-15.5 8:53 6m57s 100 100 12.6, 15.1 granite and sand lense water pre-heated to 75.6

15.5-20.5 4m24s 100 100 18.6 16.0 - vug, 17.4, 18.8 - vug )sand)
20.5-21.3 21.3-22.1
20.5-25.5 5m56s 100 100 25 fished ~0.6, 24.0, 25.5 vug (org)
attempted fish of ~0.3 failed, 26.3, 26.8, 27.8 - vug
25.5-30.5 6m13s 100 100 28.5 (sand)
30.5-35.5 6m32s 100 100 31.2

35.5-40.5 6m45s 100 100 31.3-32.1 32.1-33.1 37.5 - vug (sand)

3/11/2021 40.5-45.5 6m21s 100 100 43.1 - vug (sand)

45.5-50.5 100 100 46.5 - vug (sand)


54.6 - vug (shell), 51.1, 51.8, 52.3, 52.9, 52.1, 52.6,
50.5-55.3 6m8s 100 100 54.5, 55.2 - vug (sand)
50.5-51.3 53.2-54.0
55.3-60.3 5m44s 11:46 100 100 57.5, 57.7, 58.2, 58.6, 59.1, 59.7 - vugs (sand)

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:3/11/2021 (OPTV), 3/13/21 (CCTV) VB Boring Number:TO3-VB-36 VB Boring Depth (ft):60.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.07 Northing:-0.05 Easting-0.05

OPTV Start Time:14:16 OPTV End Time:3:01 OPTV Final Depth (ft):59.62

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 11.6, 12.6, 14.8, 16.2, 17.0, 18.9, 19.9, 20.9, 22.4, 26.6, 26.9, 27.5, 29.6, 30.1, 31.1, 32.6, 33.2, 34.9, 35.0, 38.2, 42.2, 43.2, 44.5, 44.6, 45.6, 46.5, 47.9, 52.3, 52.6, 55.3, 56.6, 59.1,

Vugs 23.1, 37.7, 40.0, 50.5, 50.6,

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) sporadic vertical tool marks, horizontal tool marks (example 20.40)

large vugs just above 11.6

CCTV OBSERVATIONS:

CCTV Start Time:12:44 CCTV End Time:14:01 CCTV Final Depth (ft):58.37

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths


57.14, 56.73, 56.68, 56.37,56.08, 55.90, 55.76, 55.57, 54.94, 54.65, 54.24, 54.05, 53.20, 53.13, 52.83, 52.12, 52.02, 50.99, 49.90, 49.05, 48.75, 47.63, 47.2, 46.96, 46.84, 46.02,
Pitting
45.59, 45.34, 44.84, 44.44, 42.66, 41.99, 38.61, 37.5, 36.68, 36.03, 35.37, 35.2, 32.90, 27.85, 26.01, 21.58, 18.95, 17.09, 14.54, 13.98, 13.50
Vugs 55.89,54.01,53.84,51.94,51.13,51.04,49.05,48.86,43.64,23.39,20.0,18.75,14.94,11.6

Leaks

Aggregate 28.2,27.12,13.50

Soil Inclusions 26.01,19.35

Fractures

Other (Explain) vertical tool marks

horizontal tool marks

~9 to ~11 large vug

CCTV run on 3/13/21


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-37 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3731419 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 3/25/21 13:30 0'
P3731342
Panel Completion Date: 2/23/2021 USACE/AECOM Representative(s): Isaac Garcia/Zac Reeves End Date, Time, Water Depth: 3/26/21 12:30 .75'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.29
Northing: 902447.32 Actual Depth of VB Hole (ft)*: 60.3 Depth to Paywall from top of PVC (ft): 13.39
Easting: 651992.89 CT #: 01267
HHD Station: 3731+38.09 AT #: 0055 Falling Head Test
Ground Elevation (ft): 37.1 Decommission Date 5/12/2021 Start Date & Time: 3/26/21 12:31
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 3/27/21 12:31
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .75'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.1 Top 1/3 12.1 28.8 End (ft): 2.42'

Depth to Bottom of Pay Wall (ft): 62.1 Middle 2/3 28.8 45.4 Manual Cutoff Wall Reading: 1.63x10^-8
Minimum Depth of VB Hole (ft): 60.1 Bottom 3/3 45.4 62.1 Automatic Cutoff Wall Reading**: 1.63x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.1-15.3 9:42 water not heated-74.9F, vug-14.8

15.3-20.4 5:19 vug-19.3


20.4-21.2 21.2-22.0
20.4-25.4 24.8-limestone

25.4-30.4 vug-28.4,28.8

30.4-35.4 vug-31.8

35.4-40.4 5:55 35.4-36.2 36.2-37.0 38.1-limestone

3/25/2021 40.4-45.4 40.6,43.9

45.4-50.4

50.4-55.4 5:45
54.6-55.4 53.8-54.6
55.4-60.3 12:04

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:3/26/2021 VB Boring Number:TO3-VB-37 VB Boring Depth (ft):60.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .07 Northing:.07 Easting-.01

OPTV Start Time:11:25 OPTV End Time:12:04 OPTV Final Depth (ft):59.84

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting moderate throughout

Vugs 27.5

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:8:50 CCTV End Time:10:07 CCTV Final Depth (ft):58.27

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 56.02,18.09.14.70,12.9
58.23,58.14,58.03,57.94,57.88,57.72,57.61,57.56,57.42,57.40,57.00,56.78,56.62,56.48,56.38,56.36x2,56.12x2,55.9,55.72x2,55.59x2,55.46,55.27,54.89,54.81,54.71,54.48,54.41,54.02,53.58,53.38,53.27,53.01,52.09,51.88,51.38,51.44,48.69x2,
48.34,48.15x2,48.14,47.62,47.03,45.98,45.14,44.40,43.58,43.48,42.81x2,39.87x2,39.78x2,38.56,38.54,38.55,38.78x2,37.59,37.28x2,37.15,35.97,35.87,35.45,35.08,33.64,32.96x2,32.91x2,32.5,32.09,31.72,30.90,30.12x2,29.87,29.63,29.27x2,
Vugs 28.72x2,27.69x2,27.60,27.49,27.47,27.31,26.77,25.82,25.45,25.38,24.90,24.75,24.53,24.15,23.00,22.98,22.16,21.58,20.80,20.30,20.36,19.92,19.83,19.69,19.67,19.53,19.02,18.92x2,18.41,18.20,18.15,17.98,17.33x2,17.38,17.13,17.03x2,16.54,
16.44,16.21,15.99,15.98,15.79,15.51x2,15.37x2,15.40x2,14.78,14.69x3,14.33x2,14.05,13.67x4,13.25,12.29x2,12.15x2

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) big vugs -38.24,13.09

Run on 3/29/21
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-38 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3734025 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 3/29/21 12:50 0'
P3734101
Panel Completion Date: 2/25/2021 USACE/AECOM Representative(s): Alberto Rodriguez/Austin Sagul End Date, Time, Water Depth: 3/30/21 12:28 1.59'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.06
Northing: 902536.98 Actual Depth of VB Hole (ft)*: 60.1 Depth to Paywall from top of PVC (ft): 12.37
Easting: 651738.64 CT #: 01268
HHD Station: 3734+06.97 AT #: 0056 Falling Head Test
Ground Elevation (ft): 36.31 Decommission Date 5/12/2021 Start Date & Time: 3/30/21 12:30
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 3/31/21 12:30
Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.59'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.31 Top 1/3 11.3 28.0 End (ft): 2.52'

Depth to Bottom of Pay Wall (ft): 61.31 Middle 2/3 28.0 44.6 Manual Cutoff Wall Reading: 9.67x10^-9
Minimum Depth of VB Hole (ft): 59.31 Bottom 3/3 44.6 61.3 Automatic Cutoff Wall Reading**: 9.57x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.3-15.6 8:40 100 100 11.8 water not heated - 74.8

15.6-20.6 6:35 100 100 vug-17.2, vug (sand)-19.0,19.8


20.6-21.4 21.4-22.2
20.6-25.6 6:24 100 100 22.6-limestone minor pitting throughout

25.6-30.6 6:20 100 100 30.4 30.2-sand/organics vug(sand) - 28.6, vug(organics)-29.8


32.5,33.3,33.6- vug(organics)-31.1,31.3,32.2,32.7,33.6,34.0,34.3,34.5,
30.6-35.4 6:13 100 100 limestone/sandstone 34.9
36.3-sandstone/ limestone
35.4-40.4 6:23 100 100 37.5-38.3 38.3-39.0 vug (sand)-35.6,38.3 vug(organics)-35.6,35.7,35.8,36.2 vug(sand)-39.0

3/29/2021 40.4-45.4 5:57 100 100 vug(sand)-40.8,43.7,44.8, vug(organics)-41.5, vug-42.6

45.4-50.4 5:55 100 100 vug-45.8, vug(sand)-47.6,49.1


50.4-organics/sand, minor pitting (organics) throughout, vug(sand)-
50.4-55.5 5:58 100 100 54.7-sand 51.4,53.8,55.1
52.4-53.2 53.2-54.0
vug-56.7, vug(sand)-
55.5-60.1 11:00 100 100 56.7-sand 55.8,56.4,57.1,57.7,58.2,58.3,58.4,58.8,59.7,59.8,59.9
joint not observed

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:3/31/2021 VB Boring Number:TO3-VB-38 VB Boring Depth (ft):60.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .59 Northing:-.49 Easting-.33

OPTV Start Time:13:10 OPTV End Time:14:00 OPTV Final Depth (ft):59.46

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting pitting throughout

Vugs 12.4,12.6,14.1,14.2,15.6,20.7,22.5,23.3,24.4,26.8,28.0,23.9,30.5,31.0,33.0,34.4,36.7,35.8,39.2,40.3,40.6,41.4,43.8,48.0,49.7,50.2,52.9,53.9,55.4,55.6,58.0

Leaks

Aggregate

Soil Inclusions 33.4,33.9,34.3,44.3

Fractures

Other (Explain)

CCTV OBSERVATIONS:

CCTV Start Time:2:17 CCTV End Time:16:01 CCTV Final Depth (ft):57.47

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

57.35,57.19,56.21,56.08,56.00,55.91,55.22,55.20,54.84,54.38,54.27,54.21,54.12,54.00,53.93,53.82,53.66,53.38,53.27,53.00,52.97,52.69,52.48,52.17,51.91,51.88,51.6,51.43,
50.83,50.32,49.75,49.48,48.95,48.49,48.29,48.21,47.64,47.08,46.9,46.31,46.06,45.95,45.75,45.44,45.15,44.93,44.87,44.72,44.62,44.60,44.37,44.29,43.43,42.94,42.74,41.69,
40.97,40.55,39.61,39.45,38.93,38.79,38.04,38.06,38.01,37.89,37.8,37.71,37.5,37.2,36.75,36.31,36.16,36.1,35.75,35.68,34.9,34.62,34.21,34.17,33.78,33.75,33.62,33.71,33.22,
Vugs
32.69,32.11,31.76,31.19,30.97,30.94,30.65,30.33,30.06,29.92,29.77,29.7,29.63,29.34,28.91,28.54,28.37,27.9,27.7,27.38,27.14,26.93,26.78,26.56,26.0,25.75,25.26,25.14,25.01
,24.87,24.82,24.55,24.42,24.39,23.30,23.05,22.59,22.55,21.27,21.21,20.94,20.68,20.47,20.38,20.31,20.15,19.83,19.79,18.88,18.76,18.48,17.98,17.66,17.31,17.07,16.78,16.75,
16.46,16.01,15.98,15.61,15.51,15.32,15.30,15.13,14.98,14.88,14.79,14.76,14.15,14.35,14.08,14.02,13.98,13.64,13.41,13.04,12.84,12.1,12.03

Leaks 57.47,57.43,57.19,56.1,55.67,55.36,55.24,55.18,55.15,54.81,45.17

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-39 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3736916 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 3/30/21 13:05 0'

Panel Completion Date: 3/4/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: 3/31/21 12:42 .33'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.85
Northing: 902606.85 Actual Depth of VB Hole (ft)*: 59.3 Depth to Paywall from top of PVC (ft): 11.54
Easting: 651460.46 CT #: 01269
HHD Station: 3736+91.60 AT #: 0057 Falling Head Test
Ground Elevation (ft): 35.69 Decommission Date 5/12/2021 Start Date & Time: 3/31/21 12:51
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 4/1/21 12:51
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .33'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10.69 Top 1/3 10.7 27.4 N-?F End (ft): 1.11'

Depth to Bottom of Pay Wall (ft): 60.69 Middle 2/3 27.4 44.0 Manual Cutoff Wall Reading: 8.0x10^-9
Minimum Depth of VB Hole (ft): 58.69 Bottom 3/3 44.0 60.7 Automatic Cutoff Wall Reading**: 7.71x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
10.7-15.6 8:40 100 100 12.5 not heated - unsure of temp

15.6-20.6 100 100


19.0-19.8 19.8-20.6
20.6-25.6 5:56 100 100

25.6-30.6 100 100

30.6-35.6 100 100 32.2,33.1,34.9

35.6-40.6 5:41 100 100 31.4-32.2 32.2-33.0 37.2 vug-39.8

3/30/2021 40.6-45.6 100 100

45.6-50.6 100 100 vug-49.1,49.6,50.1

50.6-55.5 100 100 50.8 soil inclusion-51.3


45.6-46.4 46.4-47.2
55.5-59.3 11:10 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/1/2021 VB Boring Number:TO3-VB-39 VB Boring Depth (ft):59.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.54 Northing:-0.54 Easting-0.07

OPTV Start Time:13:10 OPTV End Time:13:49 OPTV Final Depth (ft):58.98

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor pitting throughout

Vugs 12.9, 15.4, 17.6, 19.0, 25.0, 30.2, 30.7, 32.5, 34.0, 34.9, 35.7, 35.8, 39.3, 40.9, 42.2, 44.2, 45.9, 47.1, 48.4, 48.9, 50.0, 50.4, 51.8, 55.2, 55.4, 57.5, 57.8, 58.6

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout

horizontal tool marks - 14.5, 19.9, 32.8

Was there cracking? (Depths) N

CCTV OBSERVATIONS:

CCTV Start Time:14:14 CCTV End Time:15:33 CCTV Final Depth (ft):56.86

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor pitting throughout


56.78, 56.56, 56.41, 56.3,56.27, 56.07, 55.93, 55.75, 55.34, 55.22, 55.17, 54.72, 54.60, 54.52, 54.43, 54.32, 54.27, 54.15, 53.91, 53.66, 53.60, 53.14, 52.97, 52.80, 52.59, 52.31, 52.27, 52.18, 52.08, 51.89, 51.58, 51.36, 50.96, 50.90, 50.76, 50.66,
50.52, 50.09, 49.98, 49.89, 49.83, 49.69, 49.42, 49.31, 49.25, 49.12, 48.81, 48.78, 48.40, 48.28, 48.21, 48.17, 47.81, 47.74, 47.51, 47.28, 47.17, 46.73, 46.26, 46.17, 46.03, 45.66, 45.38, 45.12, 44.86, 44.75, 44.49, 43.93, 43.42, 43.39, 43.07,
Vugs 42.46, 42.20, 41.21, 40.46, 40.26, 39.57, 39.24, 38.50, 38.31, 37.73, 37.44, 37.27,37.12, 36.48, 36.07, 35.91, 35.46, 34.99, 34.33, 34.15, 33.06, 32.55, 32.31, 32.04, 31.80, 31.55, 30.79, 30.78, 29.84, 29.88, 28.00, 27.38, 27.30, 26.23, 24.59,
23.42, 22.75, 21.50, 21.43, 21.11, 19.83, 19.69, 19.02, 18.81, 17.71, 16.84, 15.19, 12.70, 11.56

Leaks 48.79

Aggregate

Soil Inclusions

Fractures

Other (Explain) horizontal tool mark - 14.0, 54.06

sporadic vertical tool marks - 19.11, 13.83


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-40 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3739655 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 4/6/21 13:53 0'
P3739579
Panel Completion Date: 3/10/2021 USACE/AECOM Representative(s): Lisa Perks/Zac Reeves End Date, Time, Water Depth: 4/7/21 12:53 1.20'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.23
Northing: 902630.26 Actual Depth of VB Hole (ft)*: 60.6 Depth to Paywall from top of PVC (ft): 12.71
Easting: 651189.11 CT #: 01270
HHD Station: 3739+61.70 AT #: 0058 Falling Head Test
Ground Elevation (ft): 36.48 Decommission Date 5/12/2021 Start Date & Time: 4/7/21 12:55
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 4/8/21 12:55
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.20'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.48 Top 1/3 11.5 28.1 Y-72F End (ft): 1.90'

Depth to Bottom of Pay Wall (ft): 61.48 Middle 2/3 28.1 44.8 Manual Cutoff Wall Reading: 6.84x10^-9
Minimum Depth of VB Hole (ft): 59.48 Bottom 3/3 44.8 61.5 Automatic Cutoff Wall Reading**: 6.75x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.5-15.4 9:22 100 100 13.2

15.4-20.5 5:49 100 100 16.7 vug-18.1


24.6-25.4 23.8-24.6
20.5-25.4 100 100 fished ~.4' unsuccessful, soil inclusion - 21.0,22.1

25.4-30.5 100 100 vug-28.1,28.2,29.3

30.5-35.5 100 100 32.1

35.5-40.3 100 100 43.0-43.8 42.2-43.0 38.3

4/6/2021 40.3-45.5 100 100 40.6,42.2 soil/clay-42.1

45.5-50.5 5:37 100 100 50.3

50.5-55.3 100 100 54.9


59.7-60.6 58.9-59.7
55.3-60.6 11:58 100 100 55.4,58.4,59.0 soil inclusion-56.6,57.9

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/8/2021 VB Boring Number:TO3-VB-40 VB Boring Depth (ft):60.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .56 Northing:.16 Easting-.56

OPTV Start Time:13:12 OPTV End Time:13:55 OPTV Final Depth (ft):60.04

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout

Was there Cracking? (Depths) N

Date: 4/8/21 CCTV OBSERVATIONS:

CCTV Start Time: 14:15 CCTV End Time:15:27 CCTV Final Depth (ft):58.28

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs lot of small vugs throughout, big vugs-56.25,55.53,54.68,54.36,52.34,51.80,44.00,40.88,40.39,29.52,26.13,26.09,22.89,20.22,15.52,14.05

Leaks 55.53

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-41 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3742395 & Borehole Logger's Name: Kristina McCoy/John Egelston Start Date, Time, Water Depth: 4/14/21 15:40 0'
P3742319
Panel Completion Date: 3/17/2021 USACE/AECOM Representative(s):
Crystal Velasquez/Zac End Date, Time, Water Depth: 4/15/21 14:40 .72'
Reeves/Austin Sagul
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.27
Northing: 902616.21 Actual Depth of VB Hole (ft)*: 60.3 Depth to Paywall from top of PVC (ft): 13.49
Easting: 650914.81 CT #: 1402
HHD Station: 3742+35.04 AT #: N/A Falling Head Test
Ground Elevation (ft): 37.22 Decommission Date 5/26/2021 Start Date & Time: 4/15/21 14:42
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 4/16/21 14:42
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): .72'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.22 Top 1/3 12.2 28.9 N-74F End (ft): 1.74'

Depth to Bottom of Pay Wall (ft): 62.22 Middle 2/3 28.9 45.6 Manual Cutoff Wall Reading: 9.59x10^-9
Minimum Depth of VB Hole (ft): 60.22 Bottom 3/3 45.6 62.2 Automatic Cutoff Wall Reading**: 9.86x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.2-15.0 9:35 100 80 12.6 fished ~2.5, sand inclusions 12.5,13.0

15.0-20.3 7:28 100 100


15.8-16.6 15.0-15.8
20.3-25.3 100 100

25.3-30.3 100 100

30.3-35.3 5:27 100 100

35.3-40.2 100 100 33.5-34.3 34.3-35.0 37.3,39.8 fished~3.0

4/14/2021 40.2-45.2 100 100 42.7

45.2-50.2 5:50 100 100 vug-49.3


slight back pressure, entire casing removed, ended up
50.2-55.2 100 100 soil inclusion - 53.7 being top connection piece to sleeve
48.0-48.8 48.8-49.6
55.2-60.3 14:05 100 100 55.3

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/15/2021 VB Boring Number:TO3-VB-41 VB Boring Depth (ft):60.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .27 Northing:-.26 Easting.06

OPTV Start Time:13:03 OPTV End Time:13:42 OPTV Final Depth (ft):59.52

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor pitting throughout

Vugs 31.70,40.8,48.6,54.3,58.3,36.5,22.0

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 4/16/21 CCTV OBSERVATIONS:

CCTV Start Time: NO CCTV End Time:NO CCTV Final Depth (ft):Not Observed

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) Not Observed


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-042 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): P3745070 Borehole Logger's Name: Kristina McCoy/John Eggleston Start Date, Time, Water Depth: 4/16/21, 13:57, 0'

Panel Completion Date: 3/22/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: 4/19/21, 10:11, 1.54'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.25
Northing: 902587.79 Actual Depth of VB Hole (ft)*: 60.5 Depth to Paywall from top of PVC (ft): 12.95
Easting: 650643.81 CT #: 01403
HHD Station: 3745+07.03 AT #: N/A Falling Head Test
Ground Elevation (ft): 36.7 Decommission Date 5/26/2021 Start Date & Time: 4/19/21, 10:12
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 4/20/21, 10:12
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.54'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.7 Top 1/3 11.7 28.4 N - 72.7F End (ft): 2.18'

Depth to Bottom of Pay Wall (ft): 61.7 Middle 2/3 28.4 45.0 Manual Cutoff Wall Reading: 6.28*10^-9
Minimum Depth of VB Hole (ft): 59.7 Bottom 3/3 45.0 61.7 Automatic Cutoff Wall Reading**: 6.68*10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9:32/
11.7-15.7 6m48s 100 100 drill water not pre-heated, 72.7 degrees F

15.7-20.7 5m39s 100 100 17.7, 18.4


11.7-12.5 12.5-13.3
20.7-25.7 5m07s 100 100 pitting throughout, 23.9 - vug (sand)

25.7-30.7 6m01s 100 100 26.6 -sand 25.8, 26.9, 27.9, 28.6 - vug (org)
31.6 - vug, several vugs (sand and org) between 33.3
30.7-35.7 100 100 and 35.5
35.7-40.7 100 100 31.5-32.3 30.7-31.5 38.6 38.6 - vug, 41.1, 39.5 - vug (sand)

4/16/2021 40.7-45.4 100 100

45.4-50.4 5m12s 100 100

50.4-55.6 4m36s 100 100 severall vugs between 52.7 and 55.1
49.6-50.4 48.8-49.6
55.6-60.5 12:12 100 100 58.1 - vug (sand)

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/20/2021 VB Boring Number:TO3-VB-042 VB Boring Depth (ft):60.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.17 Northing:-0.12 Easting-0.12

OPTV Start Time:10:33 OPTV End Time:11:13 OPTV Final Depth (ft):59.62

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor pitting throughout

Vugs 11.7, 20.8, 31.0, 43.5, 48.3, 53.0

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical and horizontal tool marks throughout

Was there Cracking? (Depths) N

Date: 4/20/21 CCTV OBSERVATIONS:

CCTV Start Time: 12:02 CCTV End Time:12:57 CCTV Final Depth (ft):59.02

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor pitting throughout

Vugs 55.74, 53.61, 53.51, 52.12, 51.15, 49.02, 45.82, 45.19, 44.15, 41.87, 40.54, 36.54, 25.30, 21.13, 13.46

Leaks

Aggregate

Soil Inclusions 26.90, 23.86 (org)

Fractures

Other (Explain) vertical(ex. 56.32) and horizontal tool marks throughout


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C1-JGTP-VB-01 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): JG1.1/JG1.2 Borehole Logger's Name: John Eggleston Start Date, Time, Water Depth: 4/20/2021, 16:56, 0'

Panel Completion Date: 3/24/2021 USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: 4/21/21 15:59 1.54'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.42
Northing: 909988.86 Actual Depth of VB Hole (ft)*: 58.1 Depth to Paywall from top of PVC (ft): 4.12
Easting: 630502.58 CT #: 1443
HHD Station: 3970+50.59 AT #: 060 Falling Head Test
Ground Elevation (ft): 34.7 Decommission Date 6/7/2021 Start Date & Time: 4/21/21 16:02
Top of Pay Wall (EL): 32 Core Samples Locations Ranges (ft) End Date & Time: 4/22/21 16:02
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.54'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 2.7 Top 1/3 2.7 21.7 4/19-N-71 F End (ft): 24.45'

Depth to Bottom of Pay Wall (ft): 59.7 Middle 2/3 21.7 40.7 4/20 - No - Manual Cutoff Wall Reading: N/A
70.0F
Minimum Depth of VB Hole (ft): 57.7 Bottom 3/3 40.7 59.7 Automatic Cutoff Wall Reading**: 3.31x10^-6

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
2.7-5.0 8:04 100 100

5.0-5.6 100 100


7.9-8.7 8.7-9.6
5.6-10.8 6m10s 100 100 7.9, 8.7, 9.6 9.7 - ss

10.8-15.8 6m37s 100 100 14.2

15.8-20.8 6m18s 100 100 19.7


21.6, 22.2, 23.3, 23.9,
20.8-25.8 6m15s 100 80 28.9-29.7 29.7-30.4 24.5, 25.3, 25.5, successfully fished bottom ~0.3'
4/19/2021 +
4/20/2021 25.8-30.8 3m48s 100 96 27.7, 29.7 bottom 0.2" broke upon retrieval

30.8-35.8 3m49s 100 100 31.9, 33.2, 34.3, 34.5

35.8-40.8 4m0s 100 100 37.4, 37.9, 39.3 bottom 0.2" broke upon retrieval
45.8-46.6 46.6-47.4
first few feet drilled on 4/19/21 before lightning
40.8-45.8 100 90 42.5, 44.8, 45.0, 45.3 shutdown. Remainder of core drilled on 4/20/21
45.8-50.3 12m25s 100 100 49.4 49.6
53.4 , 54.1 -
50.3-55.0 18m47s 100 100 51.2, 51.6, 52.9, soil/concrete
55.0-58.1 10m53s 9:20 100 100 56.3, 57.2 multiple vugs from 57.1 -58.1
*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/20/2021 VB Boring Number:TO3-C1-JGTP-VB-01 VB Boring Depth (ft):58.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.10 Northing:-0.08 Easting0.06

OPTV Start Time:14:18 OPTV End Time:14:55 OPTV Final Depth (ft):57.52

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting pitting throughout, in particular, at depth

Vugs 4.1, 12.8, 13.3, 18.6, 19.6, 21.4, 27.4, 28.1, 28.2, 29.1, 29.7, 31.3, 33.3, 40.4, 41.5, 43.9, 44.2, 44.5, 46.6, 47.1, 50.6, 53.0

Leaks

Aggregate

Soil Inclusions

Fractures 23.3-23.7 (did not appear to leak on CCTV)

Other (Explain) sporadic horizontal and vertical (example 11.1') tool marks throughout

"mottled" appearance 53.3-56.5', possible overlap at ~13'

Were there Cracks? N

Date: 4/20/21 CCTV OBSERVATIONS:

CCTV Start Time: 15:16 CCTV End Time:16:28 CCTV Final Depth (ft):42.58 / 54.67

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 54.59, 42.33, 33.48, 32.12, 30.43, 27.15, 21.77, 21.58, 19.57, 4.0, 2.7, and several additional vugs 50' depth

Leaks 48.50, 47.97, 42.51, 41.15, 40.94, and several additional leaks below 42' depth

Aggregate 4.18

Soil Inclusions

Fractures 23.7-23.4 - horizontal fracture, was not leaking on CCTV

Other (Explain) After pumping of the boring, water rose to 42.58' before cameras reached sufficient depth. A pump was inserted and used to reach a depth of 54.67' during the second run.

sporadic horizontal and vertical tool marks throughout


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C2-JGTP-VB-02 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): JG 2.1/JG 2.2 Borehole Logger's Name: John Egelston Start Date, Time, Water Depth: 04/22/21 15:55 0'

Panel Completion Date: 3/25/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.94
Northing: 909985.08 Actual Depth of VB Hole (ft)*: 57.8 Depth to Paywall from top of PVC (ft): 3.44
Easting: 630512.6 CT #: 1449
HHD Station: 3970+39.88 AT #: 062 Falling Head Test
Ground Elevation (ft): 34.5 Decommission Date 6/7/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 32 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 2.5 Top 1/3 2.5 21.5 N-?f/N-?F End (ft): N/A

Depth to Bottom of Pay Wall (ft): 59.5 Middle 2/3 21.5 40.5 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 57.5 Bottom 3/3 40.5 59.5 Automatic Cutoff Wall Reading**: N/A

Start or Descriptions
Drill End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Depths (ft)*** (>3")**** drill water color, etc.)
2.5-5.0 13:11 100 100 2.8,3.7

5.0-10.4 7:41 100 100 9.7 pitting throughout


15.4-16.2 16.2-17.0
10.4-15.4 100 100 10.9,12.6,15.1 sand inclusions - 12.7

15.4-20.4 100 100 16.1,17.7 joint visible?

20.4-25.5 10:37 100 100 21.3,22.2,23.6

25.5-30.5 100 100 28.9-29.7 29.7-30.5 26.5,27.1,28.2


4/21/21 -
4/22/21 30.5-35.5 100 100 31.3,32.4,34.1,34.7

35.5-40.5 8:34 100 100 36.5,38.5,39.1

40.5-45.5 13:43 (4/21/21) 100 100 42.5,44.9


45.5-46.3 46.3-47.1
8:13
45.5-50.5 (4/22/21) 100 100 47.8,48.4,49.8

50.5-55.3 11:09 100 100 51.8,53.3,54.3

55.3-57.8 7:18 9:07 100 100 55.9,57.5

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/22/2021 VB Boring Number:TO3-C2-JGTP-VB-02 VB Boring Depth (ft):57.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .36 Northing:.31 Easting.19

OPTV Start Time:13:19 OPTV End Time:13:59 OPTV Final Depth (ft):56.87

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 51.6-51.8

Vugs 55.2

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) joint visible ~15

Was there Cracking? (Depths) N

Date: 4/22/21 CCTV OBSERVATIONS:

CCTV Start Time: 14:18 CCTV End Time:15:00 CCTV Final Depth (ft):43.55

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 26.25, small vugs throughout

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) cavity~33.2 - big 33.82-34.40, sand/mud pouring into hole

run stops at 43.53 - sand/foam filling vb


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C5-JGTP-VB-03 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): JG 5.1 Borehole Logger's Name: John Egelston Start Date, Time, Water Depth: 4/21/21 16:05 0'

Panel Completion Date: 3/29/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: 4/22/21 15:20 1.05'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.02
Northing: 909973.91 Actual Depth of VB Hole (ft)*: 57.8 Depth to Paywall from top of PVC (ft): 3.47
Easting: 630540.72 CT #: 1447
HHD Station: 3970+09.63 AT #: 061 Falling Head Test
Ground Elevation (ft): 34.45 Decommission Date 6/7/2021 Start Date & Time: 4/22/21 15:21
Top of Pay Wall (EL): 32 Core Samples Locations Ranges (ft) End Date & Time: 4/23/21 15:21
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.05'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 2.45 Top 1/3 2.5 21.5 N-?F/N-?F End (ft): 5.94'

Depth to Bottom of Pay Wall (ft): 59.45 Middle 2/3 21.5 40.5 Manual Cutoff Wall Reading: 6.21x10^-8
Minimum Depth of VB Hole (ft): 57.45 Bottom 3/3 40.5 59.5 Automatic Cutoff Wall Reading**: 6.14x10^-8

Start or Descriptions
Drill End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Depths (ft)*** (>3")**** drill water color, etc.)
2.5-5.0 13:30 100 100 2.9

5.0-5.5 40 100
8.4-9.2 9.2-10.0
5.5-10.7 100 100 7.3,9.3,10.3

10.7-15.7 6:51 100 100

15.7-20.7 100 100 19.5 sand inclusion (cavities) - 17.0,17.4,18.2,18.8

20.7-25.7 100 100 28.4-29.2 29.2-30.0 sand cavity-21.2 to 21.4


4/20/2021-
4/21/21 25.7-30.7 12:15 100 100 26.3 vugs/pitting - 26.7-28.2
4:25
30.7-35.7 11:42 (4/20/21) 100 100 limestone-32.4 vug-31.4
8:15
35.7-40.7 (4/21/21) 15:14 DT 100 100 37.2,38.1,39.6
46.3-47.1 47.1-47.9
40.7-45.7 16:08 100 100 41.7,45.1

45.7-50.7 19:46 100 100 47.0,49.4,50.1

50.7-55.3 20:40 100 100 54.0,54.7

55.3-57.8 10:35 10:35 100 100 57.5


*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/21/2021 VB Boring Number:TO3-C5-JGTP-VB-03 VB Boring Depth (ft):57.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .07 Northing:-.07 Easting-.02

OPTV Start Time:12:42 OPTV End Time:13:26 OPTV Final Depth (ft):57.15

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout, 27.4-28.4

Vugs 18.5,48.3

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) Vertical tool marks throughout

Was there Cracking? (Depths) N

Date: 4/21/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:54 CCTV End Time:15:32 CCTV Final Depth (ft):53.87

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 4.5,11,20.8,28, small vugs throughout, 28.55x3,28.18,27.75,27.07,17.71-17.40,4.3,49.19

Leaks 17.0,21.05,25.1,17.91x2,53.19,42

Aggregate

Soil Inclusions

Fractures

Other (Explain) cavity- 16.5,22.5

first run - 36.28, water filled the hole

second run - water level back up to 21 before running camera with pump in hole
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C4-JG-W-VB-07 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): JG 4.1 Borehole Logger's Name: John Egelston Start Date, Time, Water Depth: N/A

Panel Completion Date: 3/29/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft):
Northing: 909980.71 Actual Depth of VB Hole (ft)*: 10.5 Depth to Paywall from top of PVC (ft): 2.5
Easting: 630529.03 CT #: 1454
HHD Station: 3970+22.98 AT #: N/A Falling Head Test
Ground Elevation (ft): 34.5 Decommission Date 6/7/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 32 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 2.5 Top 1/3 2.5 21.5 N-?F End (ft): N/A

Depth to Bottom of Pay Wall (ft): 59.5 Middle 2/3 21.5 40.5 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 57.5 Bottom 3/3 40.5 59.5 Automatic Cutoff Wall Reading**: N/A

Start or Descriptions
Drill End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Depths (ft)*** (>3")**** drill water color, etc.)
2.5-5.0 12:23 32 100 3.2,4.5 sand from 2.5-4.2

5.0-5.5 100 100


N/A N/A
pulled core barrels, 2.5' recovered - 2.0' were sand
5.5-10.5 11:19 10 100 and .5' wall

DONE NOT IN WALL

N/A N/A

4/22/2021

N/A N/A

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-C4-JG-W-VB-07 VB Boring Depth (ft):N/A

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N/A

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C1-W-VB-02 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): JG 1.1 & JG 1.2 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: N/A

Panel Completion Date: 3/24/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge of Overcut Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft):
Northing: 909987.72 Actual Depth of VB Hole (ft)*: 58.1 Depth to Paywall from top of PVC (ft): 2.7
Easting: 630502.14 CT #: 1455
HHD Station: 3970+50.59 AT #: N/A Falling Head Test
Ground Elevation (ft): 34.7 Decommission Date 7/1/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 32 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 2.7 Top 1/3 2.7 21.7 Y-74F End (ft): N/A

Depth to Bottom of Pay Wall (ft): 59.7 Middle 2/3 21.7 40.7 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 57.7 Bottom 3/3 40.7 59.7 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
2.7-5.0 8:13 100 100

5.0-5.7 60 100
N/A N/A
5.7-6.8 100 100

6.8-11.8 4:05 100 100 11.6

11.8-16.8 7:11 100 100 13.0,14.7,15.8

16.8-21.8 100 100 N/A N/A 17.8,20.0,21.2 Fished ~ .6' successfully


22.7,24.1,24.2,25.6,
4/23/2021 21.8-26.8 100 100 26.4
26.8-31.8 8:00 100 100 27.7,28.1,30.3

31.8-36.8 100 100 32.2,32.9


N/A N/A
36.8-41.8 8:00 100 100 40.1

41.8-46.8 8:23 100 100 Fished ~.5' successfully

46.8-51.8 100 100 47

51.8-56.7 11:40 100 100 53.7,55.8 Dark Green - 53.2-54.8 color/aggregate change - 54.6

56.7-58.1 12:24 100 100 57.7


**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/23/2021 VB Boring Number:TO3-C1-W-VB-02 VB Boring Depth (ft):58.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .37 Northing:-.24 Easting-.27

OPTV Start Time:14:55 OPTV End Time:15:22 OPTV Final Depth (ft):57.32

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-W-VB-08 Driller's Name: John Holdsworth Saturation of Borehole

Panel Number(s): JG 4.1 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: N/A

Panel Completion Date: 3/29/2021 USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): N/A
Northing: 909975.38 Actual Depth of VB Hole (ft)*: 13 Depth to Paywall from top of PVC (ft): N/A
Easting: 630530.43 CT #: 1489
HHD Station: 3970+19.76 AT #: N/A Falling Head Test
Ground Elevation (ft): 34.5 Decommission Date 6/7/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 32 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
not heated - Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 2.5 Top 1/3 2.5 21.5 77.7F End (ft): N/A

Depth to Bottom of Pay Wall (ft): 59.5 Middle 2/3 21.5 40.5 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 57.5 Bottom 3/3 40.5 59.5 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
2.5-5.0 8:08 100 100 0.5 - sand

5.0-5.5 100 100


N/A N/A
6.3-10.5 - when core flipped over, half of the core was
5.5-10.5 100 100 5.9, 7.2, 8.6, 9.2, 9.9 sand, half was grout.
sand with occasional clasts of grout cemented sand in
10.5-13.0 8:42 100 100 ~upper 1.5' of run
No recovery past 13.0'

4/27/2021

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-W-VB-08 VB Boring Depth (ft):13

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N/A

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-W-VB-10 Driller's Name: John Holdsworth Saturation of Borehole

Panel Number(s): JG 5.1 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: N/A

Panel Completion Date: 3/29/2021 USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): N/A
Northing: 909971.52 Actual Depth of VB Hole (ft)*: 15.7 Depth to Paywall from top of PVC (ft): N/A
Easting: 630539.18 CT #: 1492
HHD Station: 3970+10.2 AT #: N/A Falling Head Test
Ground Elevation (ft): 34.5 Decommission Date 6/7/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 32 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Not heated - Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 2.5 Top 1/3 2.5 21.5 81.1F End (ft): N/A

Depth to Bottom of Pay Wall (ft): 59.5 Middle 2/3 21.5 40.5 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 57.5 Bottom 3/3 40.5 59.5 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
2.5-4.3 9:53 100 100 0.3 of soil washed out from run

4.7-5.7 25s 100 100


N/A N/A
jet grout and sax mix from 7.6-8.9, sand below 9.6'
5.7-10.7 78 86 6.5, 7.5, 7.8, 8.2, 8.6, depth
10.7-15.7 10:33 0 0 sand and cemented sands, and limestone in casing

4/27/2021

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-W-VB-10 VB Boring Depth (ft):15.7

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N/A

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-W-VB-11 Driller's Name: John Holdsworth Saturation of Borehole

Panel Number(s): JG 5.1 Borehole Logger's Name: John Eggleston Start Date, Time, Water Depth: N/A

Panel Completion Date: 3/29/2021 USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): N/A
Northing: Not yet provided Actual Depth of VB Hole (ft)*: 20.7 Depth to Paywall from top of PVC (ft): N/A
Easting: Not yet provided CT #: 1493
HHD Station: Not yet provided AT #: N/A Falling Head Test
Ground Elevation (ft): 34.5 Decommission Date 6/7/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 32 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Not heated - Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 2.5 Top 1/3 2.5 21.5 81.1F End (ft): N/A

Depth to Bottom of Pay Wall (ft): 59.5 Middle 2/3 21.5 40.5 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 57.5 Bottom 3/3 40.5 59.5 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
2.5-5.0 12:21 100 100 4.7

5.0-5.7 100 100 drilling fluid was observed coming out of VB-10
N/A N/A
5.7-10.7 2m58s 100 100 7.0, 8.2, 9.8 significant fluid loss
12.2-14.2 - mixture of cemented sand, sandstone, and
10.7-15.7 7m46s 100 100 14 grout, last ~0.2' appears to be sand
15.-7- 16.6 - grout, 16.6-18.0 - sand, cemented sand,
15.7-20.7 6m45s 56 100 2.3-2.8 - grout, bottom ~2.2 washed out, flushed hole
following core extraction
Drilling was ceased after it became apparent no more
1:56 grout was being drilled. Subsequent recovery was 0.
4/27/2021

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-W-VB-11 VB Boring Depth (ft):20.7

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N/A

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-043 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): S3747915 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 4/28/21 14:00 0'
P3747992
Panel Completion Date: 3/31/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: 4/29/21 13:00 1.10'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.08
Northing: 902556.2 Actual Depth of VB Hole (ft)*: 60.3 Depth to Paywall from top of PVC (ft): 12.87
Easting: 650357.18 CT #: 01487
HHD Station: 3747+95.38 AT #: 063 Falling Head Test
Ground Elevation (ft): 36.79 Decommission Date 5/26/2021 Start Date & Time: 4/29/21 13:03
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 4/30/21 13:03
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.10'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.79 Top 1/3 11.8 28.5 N-75F End (ft): 2.04'

Depth to Bottom of Pay Wall (ft): 61.79 Middle 2/3 28.5 45.1 Manual Cutoff Wall Reading: 9.17x10^-9
Minimum Depth of VB Hole (ft): 59.79 Bottom 3/3 45.1 61.8 Automatic Cutoff Wall Reading**: 9.10x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.8-15.3 9:10 100 100 15

15.3-20.3 6:13 100 100 16.4


15.3-16.1 16.9-17.7
20.3-25.3 100 100

25.3-30.3 6:04 100 100 had to swap out a warped core barrel

30.3-35.3 100 100

35.3-40.3 100 100 30.3-31.1 31.1-31.9 37.5

4/28/2021 40.3-45.3 100 100 40.4,42.7

45.3-50.3 100 100 46.9

50.3-55.3 100 100 55


45.3-46.1 46.1-46.9
55.3-60.3 12:04 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/30/2021 VB Boring Number:TO3-VB-043 VB Boring Depth (ft):60.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .13 Northing:-.10 Easting-.08

OPTV Start Time:13:16 OPTV End Time:13:57 OPTV Final Depth (ft):59.68

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 48.3

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 4/30/21 CCTV OBSERVATIONS:

CCTV Start Time: 14:12 CCTV End Time:15:00 CCTV Final Depth (ft):56.70

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs ~29.6,48.9

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-044 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): S3750530 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 4/29/21 12:28 0'
P3750607
Panel Completion Date: 4/2/2021 USACE/AECOM Representative(s): Isaac Garcia/Zac Reeves End Date, Time, Water Depth: 4/30/21 11:49 .71'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.17
Northing: 902527.5 Actual Depth of VB Hole (ft)*: 55 Depth to Paywall from top of PVC (ft): 12.72
Easting: 650096.54 CT #: 01487
HHD Station: 3750+57.48 AT #: N/A Falling Head Test
Ground Elevation (ft): 36.55 Decommission Date 5/26/2021 Start Date & Time: 4/30/21 11:51
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 5/1/21 11:51
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): .71'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.55 Top 1/3 11.5 26.5 N-79F End (ft): 1.45'

Depth to Bottom of Pay Wall (ft): 56.55 Middle 2/3 26.5 41.6 Manual Cutoff Wall Reading: 7.78x10^-9
Minimum Depth of VB Hole (ft): 54.55 Bottom 3/3 41.6 56.6 Automatic Cutoff Wall Reading**: 7.94x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.6-15.6 8:37 100 100

15.6-20.6 5:54 100 100


20.6-21.4 21.4-22.3
20.6-25.6 100 100

25.6-30.6 100 100 30.5 fished~.1'

30.6-35.6 100 100 vug-31.1, soil inclusion-32.1

35.6-40.6 6:22 100 100 33.8-34.6 34.6-35.6

4/29/2021 40.6-45.6 100 100 44.9 fished~.7

45.6-50.6 6:08 100 100 50

50.6-55.0 10:57 100 100 51.4,54.6,54.8 soil inclusion - 51.5


50.6-51.4 52.0-52.8

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:4/30/2021 VB Boring Number:TO3-VB-044 VB Boring Depth (ft):55

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .65 Northing:-.28 Easting-.59

OPTV Start Time:10:57 OPTV End Time:11:39 OPTV Final Depth (ft):54.73

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 7.7

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 5/1/21 CCTV OBSERVATIONS:

CCTV Start Time: 12:08 CCTV End Time:12:56 CCTV Final Depth (ft):53.33

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs lot of small ones throughout, one at 28.85

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-045 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): P3753298 Borehole Logger's Name: Kristina McCoy/Dave Hewitt Start Date, Time, Water Depth: 5/7/2021, 13:34, 0'

Panel Completion Date: 4/9/2021 USACE/AECOM Representative(s): Lisa Perks/Austin Sagul End Date, Time, Water Depth: 5/10/2021 8:35 2.07'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.67
Northing: 902497.7 Actual Depth of VB Hole (ft)*: 55.2 Depth to Paywall from top of PVC (ft): 13.37
Easting: 649825.93 CT #: 01550
HHD Station: 3753+29.80 AT #: NA Falling Head Test
Ground Elevation (ft): 36.7 Decommission Date 6/7/2021 Start Date & Time: 5/10/21 8:35
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 5/11/21 8:35
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.07'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.7 Top 1/3 11.7 26.7 N-80.7F End (ft): 2.31'

Depth to Bottom of Pay Wall (ft): 56.7 Middle 2/3 26.7 41.7 Manual Cutoff Wall Reading: 2.45x10^-9
Minimum Depth of VB Hole (ft): 54.7 Bottom 3/3 41.7 56.7 Automatic Cutoff Wall Reading**: 2.66x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9:14:00
11.7-15.3 AM 100 100
(7m30s)
15.3-20.3 6m5s 96 100 18.9 minor pitting
11.7-12.5 12.5-13.3
20.3-25.3 6m3s 104 100 22.3

25.3-30.3 6m0s 100 100 30.0, 30.1 26.2. 27.8 - vug (sand)

30.3-35.3 6m40s 100 100 33.0, 35.2 final 0.1 broke during retrieval

35.3-40.3 6m20s 100 100 28.0-28.8 28.8-29.6 40 37.1 - shell 37.8, 39.5 - sand (vug), final 0.1 broke during retrieval
40.7, 41.8, 44.8 - vug (sand), final 0.2 broke during
5/7/2021 40.3-45.3 6m7s 100 100 42.3 retrieval
45.3-50.5 5m58s 100 100 46.9, 50.2 - sand (vug), minor pitting throughout
52.0, 53.1 - sand
50.5-55.2 5m21s 11:52 100 100 concretion 51.8, 54.3 - vug (sand)
45.3-46.1 46.1-46.9

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:5/11/2021 VB Boring Number:TO3-VB-045 VB Boring Depth (ft):55.2

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .35 Northing:-.31 Easting-.16

OPTV Start Time:8:56 OPTV End Time:9:33 OPTV Final Depth (ft):54.79

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 5/11/21 CCTV OBSERVATIONS:

CCTV Start Time: 9:48 CCTV End Time:10:47 CCTV Final Depth (ft):51.94

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 51.94,51.16,51.44,50.53,49.80,49.64,48.13,44.9,43.16,35.44,34.09,25.25,23.20,22.70,20.97,19.27,16.08

Leaks

Aggregate

Soil Inclusions 47.78,40.47,36.95,28.77,27.92,20.20

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-046 Driller's Name: Greg Cole/Grant Watson Saturation of Borehole

Panel Number(s): S3757140 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 5/11/21 12:55 0'
P3757063
Panel Completion Date: 4/14/2021 USACE/AECOM Representative(s): Isaac Garcia/Laura Sanchez End Date, Time, Water Depth: 5/12/2021 12:35 10.79'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.33
Northing: 902452.95 Actual Depth of VB Hole (ft)*: 55.7 Depth to Paywall from top of PVC (ft): 13.83
Easting: 649448.1 CT #: 01555
HHD Station: 3757+10.15 AT #: 064 Falling Head Test
Ground Elevation (ft): 37.5 Decommission Date 6/7/2021 Start Date & Time: 5/12/21 12:36
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 5/13/21 12:36
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 10.79'
N-79F (5/10) Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.5 Top 1/3 12.5 27.5 N-78F (5/11) End (ft): 11.13'

Depth to Bottom of Pay Wall (ft): 57.5 Middle 2/3 27.5 42.5 Manual Cutoff Wall Reading: 6.31x10^-9
Minimum Depth of VB Hole (ft): 55.5 Bottom 3/3 42.5 57.5 Automatic Cutoff Wall Reading**: 6.70x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
drilled 8' and had to install 8" casing, had to continue next day, 1st partial run
12.5-16.0 9:17 (5/11) 98 100 vug-13.6 with casing installed, appears to hold sand
16.0-21.0 5:27 98 100 16.1 vug - 20.2 soil inclusion - 18.5
21.0-21.8 21.8-22.6
21.0-26.0 6:30 100 100 vug - 23.3, soil inclusion - 25.0

26.0-31.0 6:20 98 100 vug-28.5

31.0-36.0 4:34 102 100 vug-34.5,35.0x2

36.0-41.0 6:20 100 100 31.0-31.8 31.8-32.6 vug-40.7


5/10 -
5/11/21 41.0-46.0 5:39 98 100 43.4,45.6 organics - 45.4

46.0-50.8 6:12 102 100 soil inclusion - 50.0


soil inclusion 51.2,51.6x2, pit - 52.2,53.8 vug -
50.8-55.7 6:16 11:25 100 100 52.4,53.0,54.2,54.6,55.3
42.8-43.6 44.2-45.0

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:5/13/2021 VB Boring Number:TO3-VB-046 VB Boring Depth (ft):55.7

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .48 Northing:-.04 Easting-.47

OPTV Start Time:12:55 OPTV End Time:13:10 OPTV Final Depth (ft):55.0

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 16.5,18.6,21.3,23.8,28.4,28.6,30.1,31.8,32.3x2,33.3,38.0,38.6,48.7,50.7 (shell), 53.5 (shell)

Vugs 14.0,15.6,17.0,21.9,22.4,25.5,26.4,26.6,30.9,33.7,35.10,41,46.9,48.1,49.6,50.1,51.5,52.3

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) Horizontal Tool Marks - 14.7,23.2,38.7,50.2,51,52.3,52.7

Vertical Tool Marks - 40.2 to 40.6, ~42 to ~44, 45.5-45.8

Was there Cracking? (Depths) N

Date: 5/13/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:40 CCTV End Time:14:39 CCTV Final Depth (ft):54.05

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting pitting throughout

Vugs vugs throughout, medium sized vugs - 51.5,54.0(shell),21.99,19.12,18.56,17.57,15.88,15.0,14.62,12.96

Leaks

Aggregate

Soil Inclusions 46.55,45.99,34.81,20.14,17.57

Fractures

Other (Explain) 1st run - reached 50.82 feet

2nd run - reached depth


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-47 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): S3759906 & Borehole Logger's Name: Dave Hewitt/Kristina McCoy Start Date, Time, Water Depth: 5/21/2021, 16:44, 0'
P3759830
Panel Completion Date: 4/26/2021 USACE/AECOM Representative(s): Lisa Perks/Austin Sagul End Date, Time, Water Depth: 5/24/2021, 8:39, 2.68'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.21
Northing: 902422.68 Actual Depth of VB Hole (ft)*: 55.4 Depth to Paywall from top of PVC (ft): 13.41
Easting: 649173.89 CT #: 01663
HHD Station: 3759+86.14 AT #: N/A Falling Head Test
Ground Elevation (ft): 37.2 Decommission Date 6/16/2021 Start Date & Time: 5/24/2021, 8:49
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 5/25/2021, 8:49
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.68'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.2 Top 1/3 12.2 27.2 N-74F End (ft): 3.81'

Depth to Bottom of Pay Wall (ft): 57.2 Middle 2/3 27.2 42.2 Manual Cutoff Wall Reading: 1.31*10-8
Minimum Depth of VB Hole (ft): 55.2 Bottom 3/3 42.2 57.2 Automatic Cutoff Wall Reading**: 1.30*10-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
13:31 fluid loss during the first two runs of overburden.
12.2-15.3 (5m47s) 100 100 Drilling fluid observed bubbling out of ground. 13.1 -
vug (org), 12.6, 13.3, 14.9 - vug
pitting throughout, 18.3, 18.4, 19.2 - vugs, 20.0 vug
15.3-20.3 6m2s 100 102 17.8, 19.6 - sand (sand)
21.5-22.3 20.7-21.5
20.3-25.3 6m11s 100 102 23.4 - sandstone 22.3, - vug (sand), 22.9 -vug (org), 23.3, 25.2 - vugs

25.3-30.3 6m5s 100 100 29.6 - sandstone 25.0 - vug(sand), 28.0, 28.6, 29.0, 29.3,30.0 - vugs

30.3-35.3 6m6s 100 96 30.3, 30.9, 33.8, 33.9 - vugs, pitting throughout

35.3-40.3 100 100 36.2-36.9 35.4-36.2 35.5, 40.2 36.7, 37.4, 37.7, 37.9, 38.3, 39.0, 39.2 - vugs

5/21/2021 40.3-45.3 6m45s 100 100 42.7 44.8 - sandstone 42.8 - vug (sand)

45.3-50.7 100 100 49.0 - vug (org), 49.5 - vug (sand), pitting throughout

50.7-55.4 16:33 100 100 50.8, 51.4, 52.1, 53.3, 54.9- vugs (sand)
45.3-46.1 46.1-46.9

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:5/25/2021 VB Boring Number:TO3-VB-47 VB Boring Depth (ft):55.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.00 Northing:-0.004 Easting-0.002

OPTV Start Time:9:13 OPTV End Time:9:46 OPTV Final Depth (ft):55.00

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting pitting throughout

Vugs 17.1, 17.3, 22.3, 35.5, 41.7 42.0, 43.6, 45.4, 48.8, 50.5, 51.0, 52.4, 54.6

Leaks

Aggregate 16.8, 22.6, 29.7, 38.2, 44.9,

Soil Inclusions 19.6

Fractures

Other (Explain) horiozontal tool marks throughout examples - 17.8, 17.9, etc

Was there Cracking? (Depths) N/A

Date: 5/25/21 CCTV OBSERVATIONS:

CCTV Start Time: 10:07 CCTV End Time:11:36 CCTV Final Depth (ft):50.54 / 53.20

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting pitting throughout


53.15, 53.04, 52.95, 52.70, 52.29, 52.47, 52.11, 51.93, 51.83, 51.77, 51.68, 51.64, 51.47, 50.88, 50.22, 49.82, 49.72, 49.17, 48.61, 48.26, 48.30, 47.89, 47.52, 47.35, 47.13,
45.79, 45.56, 45.14, 43.97, 43.66, 43.57, 43.17, 42.76, 42.19, 40.57, 40.30, 40.17, 39.80, 39.74, 39.42, 38.92, 38.55, 37.95, 37.85, 37.21, 37.01, 36.96, 36.85, 36.37, 36.29,
36.28, 36.06, 35.85, 35.21, 35.09, 34.90, 34.76, 34.14, 33.90, 33.71, 33.19, 33.09, 32.78, 32.66, 32.42, 32.33, 31.96, 31.87, 31.86, 31.18, 31.08, 30.84, 30.76, 30.31, 30.11,
Vugs
30.09, 29.70, 29.32, 29.21, 29.02, 28.98, 28.91, 28.89, 28.60, 28.55, 28.46, 27.80, 27.75, 27.38, 27.17, 26.44, 26.13, 25.92, 25.65, 25.46, 25.31, 25.18, 24.90, 24.20, 23.47,
23.39, 23.36, 22.87, 22.68, 22.03, 21.30, 20.92, 20.86, 20.52, 19.91, 19.82, 19.85, 18.93, 18.14, 17.44, 17.27, 17.13, 15.64, 15.24, 15.21, 14.83, 14.57, 14.24, 14.14,
13.98,13.40, 13.21, 12.91,, 12.67, 12.25,
Leaks 53.13

Aggregate 51.03, 33.34

Soil Inclusions 29.60, 19.94,

Fractures

Other (Explain) 12.83 - vertical tool mark


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-48 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): P3762598 Borehole Logger's Name: Dave Hewitt/Kristina McCoy Start Date, Time, Water Depth: 5/25/21 13:22 0'

Panel Completion Date: 4/29/2021 USACE/AECOM Representative(s): Lisa Perks/Zac Reeves End Date, Time, Water Depth: 5/26/21 12:35 1.37'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.29
Northing: 902392.76 Actual Depth of VB Hole (ft)*: 55.6 Depth to Paywall from top of PVC (ft): 13.52
Easting: 648901.81 CT #: 01678
HHD Station: 3762+59.80 AT #: 065 Falling Head Test
Ground Elevation (ft): 37.23 Decommission Date 6/16/2021 Start Date & Time: 5/26/21 12:42
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 5/27/21 12:42
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.37'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.23 Top 1/3 12.2 27.2 N-75F End (ft): 2.31'

Depth to Bottom of Pay Wall (ft): 57.23 Middle 2/3 27.2 42.2 Manual Cutoff Wall Reading: 9.38x10^-9
Minimum Depth of VB Hole (ft): 55.23 Bottom 3/3 42.2 57.2 Automatic Cutoff Wall Reading**: 9.28x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.2-15.6 9:03 100 100

15.6-20.6 6:48 100 100


19.8-20.6 19.0-19.8
20.6-25.6 100 100

25.6-30.6 100 100 vug-26.6,29.1

30.6-35.6 100 100 35.4 vug-32.6,35.5

35.6-40.6 7:21 100 100 30.6-31.4 31.4-32.2 vug-37.3,37.7,38.3

5/25/2021 40.6-45.6 100 100 45.3 soil - 42.4 vug-41.8,42.2


attempted to fish ~1.2, recovered ~.5, vug-
45.6-50.6 90 100 45.8,46.2,49.4,49.9 46.4,47.1,48.4,48.6
50.6-51.4 100 100 vug-50.8,51.0,51.2
52.0-52.8 54.2-55.0
51.4-55.6 11:57 100 100 vug-51.5,52.5,53.6,55.0,55.3

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:5/27/2021 VB Boring Number:TO3-VB-48 VB Boring Depth (ft):55.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .29 Northing:.29 Easting.04

OPTV Start Time:12:56 OPTV End Time:13:35 OPTV Final Depth (ft):55.11

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs small throughout

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 5/27/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:49 CCTV End Time:14:36 CCTV Final Depth (ft):52.14

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs large vugs - ~42.1, 52.05, 51.71, 51.67, 51.47, 50.62, 49.94, 49.64, 49.19, 47.57, 47.15, 42.00, 23.44 - small throughout

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-49 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3765444 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 6/2/2021, 13:05, 0'
P3765367
Panel Completion Date: 5/4/2021 USACE/AECOM Representative(s): Lisa Perks/Austin Sagul End Date, Time, Water Depth: 6/3/21 12:05 2.55'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.42
Northing: 902362.05 Actual Depth of VB Hole (ft)*: 55.4 Depth to Paywall from top of PVC (ft): 13.42
Easting: 648622.79 CT #: 01741
HHD Station: 3765+40.53 AT #: N/A Falling Head Test
Ground Elevation (ft): 37 Decommission Date 7/1/2021 Start Date & Time: 6/3/21 12:11
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 6/4/21 12:11
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.55'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12 Top 1/3 12.0 27.0 N-75.2 End (ft): 3.67'

Depth to Bottom of Pay Wall (ft): 57 Middle 2/3 27.0 42.0 Manual Cutoff Wall Reading: 1.16x10^-8
Minimum Depth of VB Hole (ft): 55 Bottom 3/3 42.0 57.0 Automatic Cutoff Wall Reading**: 1.14x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.0-15.4 9:21 100 100 12.3 12.4 - vug (org)

15.4-20.4 5m33s 100 100 19.5 Last 0.1 broken during retrieval
14.6-15.4 12.8-.13.6
20.4-25.4 5m13s 96 100 21.9-shell

25.4-30.4 6m49s 100 100 29.9 - shell

30.4-35.4 6m37s 100 100 32.5, 32.7 - vug (sand)

35.4-40.4 6m2s 104 100 29.6-30.4 28.8-29.6 39.9 37.6 - sand 37.1, 37.9 - vug (sand), last 0.2 broken during retrieval

6/2/2021 40.4-45.4 100 100 42


48.4, 49.0 - vugs (sand), final 0.1 broken during
45.4.50.4 6m35s 102 100 retrieval
50.4-55.4 5m3s 11:56 51.4, 51.9, 52.2, 52.9, 53.2, 53.9, 54.1, 54.6 - vug (clay)
45.4-46.2 46.2-47.0

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:6/4/2021 VB Boring Number:TO3-VB-49 VB Boring Depth (ft):55.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .39 Northing:.37 Easting.11

OPTV Start Time:12:21 OPTV End Time:13:02 OPTV Final Depth (ft):54.94

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor

Vugs small from ~40 to depth

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) horizontal tool marks -36.0,40.1

Was there Cracking? (Depths) N

Date: 6/4/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:23 CCTV End Time:14:06 CCTV Final Depth (ft):51.62

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 50.16, few small ones

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-50 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3768212 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 6/3/21 13:00 0'
P3768135
Panel Completion Date: 5/11/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: 6/4/21 12:00 1.04'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.5
Northing: 902331.88 Actual Depth of VB Hole (ft)*: 54.5 Depth to Paywall from top of PVC (ft): 12.69
Easting: 648348.35 CT #: 01747
HHD Station: 3768 + 16.72 AT #: 066 Falling Head Test
Ground Elevation (ft): 36.19 Decommission Date 7/1/2021 Start Date & Time: 6/4/21 12:03
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 6/5/21 12:03
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.04'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.19 Top 1/3 11.2 26.2 N-79F End (ft): 6.14'

Depth to Bottom of Pay Wall (ft): 56.19 Middle 2/3 26.2 41.2 Manual Cutoff Wall Reading: 5.67x10^-8
Minimum Depth of VB Hole (ft): 54.19 Bottom 3/3 41.2 56.2 Automatic Cutoff Wall Reading**: 5.73x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.2-15.4 9:22 100 100 12.6

15.4-20.4 6:34 100 100


15.4-16.1 16.1-16.8
20.4-25.4 100 100 24.7,25.0

25.4-30.4 100 100

30.4-35.4 100 100 32.9

35.4-40.4 6:21 100 100 30.4-31.1 31.1-31.8 40.2

6/3/2021 40.4-45.4 6:36 100 100 43.2

45.4-50.5 100 100 small vugs throughout

50.5-54.5 11:48 100 100


45.4-46.1 46.1-46.8

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:6/4/2021 VB Boring Number:TO3-VB-50 VB Boring Depth (ft):54.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .44 Northing:.44 Easting-.02

OPTV Start Time:10:58 OPTV End Time:11:34 OPTV Final Depth (ft):53.93

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 6/5/21 CCTV OBSERVATIONS:

CCTV Start Time: NO CCTV End Time:NO CCTV Final Depth (ft):

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) Will be watched on file from database


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-51 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3770981 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 6/7/21 12:50 0'

Panel Completion Date: 5/13/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: 6/8/21 12:02 1.29'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.5
Northing: 902302.28 Actual Depth of VB Hole (ft)*: 55.2 Depth to Paywall from top of PVC (ft): 13.31
Easting: 648068.66 CT #: 01775
HHD Station: 3770 + 98.09 AT #: N/A Falling Head Test
Ground Elevation (ft): 36.81 Decommission Date 7/1/2021 Start Date & Time: 6/8/21 12:03
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 6/9/21 12:03
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.29'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.81 Top 1/3 11.8 26.8 N-78F End (ft): 2.71'

Depth to Bottom of Pay Wall (ft): 56.81 Middle 2/3 26.8 41.8 Manual Cutoff Wall Reading: 1.43x10^-8
Minimum Depth of VB Hole (ft): 54.81 Bottom 3/3 41.8 56.8 Automatic Cutoff Wall Reading**: 1.42x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
11.8-15.4 9:29 100 100

15.4-20.4 6:22 100 100 18.2,19.5


18.7-19.5 19.5-20.4
20.4-25.4 5:03 100 100

25.4-30.4 100 100 27.7,29.5

30.4-35.4 100 100 32.1,33.1,34.1

35.4-40.4 100 100 32.1-33.1 33.1-34.0 soil inclusion - 40.2

6/7/2021 40.4-45.4 6:38 100 100

45.4-50.3 100 100

50.3-55.2 11:48 100 100


45.4-46.2 46.2-47.0

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:6/9/2021 VB Boring Number:TO3-VB-51 VB Boring Depth (ft):55.2

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .47 Northing:.08 Easting-.46

OPTV Start Time:12:17 OPTV End Time:12:55 OPTV Final Depth (ft):54.76

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 6/9/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:17 CCTV End Time:14:08 CCTV Final Depth (ft):53.09

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) first run down to 50.6


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-052 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3773773 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 6/15/21 13:40 0'
P3773851
Panel Completion Date: 5/18/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: 6/16/21 12:40 3.20'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.46
Northing: 902299.45 Actual Depth of VB Hole (ft)*: 55.4 Depth to Paywall from top of PVC (ft): 13.6
Easting: 647788.87 CT #: 01857
HHD Station: 3773+81.2 AT #: 067 Falling Head Test
Ground Elevation (ft): 37.14 Decommission Date 7/22/2021 Start Date & Time: 6/16/21 12:41
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 6/17/21 12:41
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 3.2'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.14 Top 1/3 12.1 27.1 N-75F End (ft): 4.64'

Depth to Bottom of Pay Wall (ft): 57.14 Middle 2/3 27.1 42.1 Manual Cutoff Wall Reading: 1.51x10^-8
Minimum Depth of VB Hole (ft): 55.14 Bottom 3/3 42.1 57.1 Automatic Cutoff Wall Reading**: 1.49x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.1-15.3 9:41 100 100 14.9

15.3-20.3 4:43 100 100 dropped core while in sleeve


15.3-16.1 16.1-16.9
20.3-25.3 100 100

25.3-30.3 100 100 clay-27.5

30.3-35.3 5:39 100 100

35.3-40.3 100 100 33.0-33.8 33.8-34.6

6/15/2021 40.3-45.3 100 100 44.9 fished~.4, .2' recovered

45.3-50.4 5:22 100 100 sand inclusion - 48.0

50.4-55.4 12:18 vug-52.0


48.8-49.6 49.6-50.4

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:6/17/2021 VB Boring Number:TO3-VB-052 VB Boring Depth (ft):55.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .19 Northing:-.02 Easting-.19

OPTV Start Time:12:56 OPTV End Time:13:35 OPTV Final Depth (ft):54.88

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting 32.3, minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) sporatic vertical tool marks

Was there Cracking? (Depths) N

Date: 6/17/21 CCTV OBSERVATIONS:

CCTV Start Time: 14:00 CCTV End Time:14:55 CCTV Final Depth (ft):54.81

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs ~23,46,49,54.81,54.40,54.15,53.89,53.64,52.96,52.75,52.31,52.27,51.69,51.47,51.11,50.55,50.13,49.29

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-053 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): S3776722 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 6/22/21 12:08 0'
P3776644
Panel Completion Date: 5/26/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: 6/23/21 11:08 2.39'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.15
Northing: 902334 Actual Depth of VB Hole (ft)*: 55.5 Depth to Paywall from top of PVC (ft): 13.49
Easting: 647508.03 CT #: 01862
HHD Station: 3776 + 67.53 AT #: N/A Falling Head Test
Ground Elevation (ft): 37.34 Decommission Date 7/22/2021 Start Date & Time: 6/23/21 11:10
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 6/24/21 11:10
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.39'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.34 Top 1/3 12.3 27.3 N-79F End (ft): 5.5'

Depth to Bottom of Pay Wall (ft): 57.34 Middle 2/3 27.3 42.3 Manual Cutoff Wall Reading: 3.28x10^-8
Minimum Depth of VB Hole (ft): 55.34 Bottom 3/3 42.3 57.3 Automatic Cutoff Wall Reading**: 3.23x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.3-15.5 8:38 100 100

15.5-20.5 100 100 19


20.5-21.4 21.4-22.3
20.5-25.5 4:31 100 100 22.4 joint visible

25.5-30.5 100 100 26.9,28.1

30.5-35.5 4:18 100 100 35.4

35.5-40.5 100 100 35.5-36.3 36.3-37.1 clay-38.0,39.5

6/22/2021 40.5-45.5 100 100 44.5,45.3

45.5-50.5 100 100 47.8,50.1,50.3

50.5-55.5 4:16 10:56 100 100 51.3,55.3 soil inclusion - 51.3,54.2


51.3-52.1 52.1-52.9

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:6/24/2021 VB Boring Number:TO3-VB-053 VB Boring Depth (ft):55.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .52 Northing:.26 Easting-.46

OPTV Start Time:12:00 OPTV End Time:12:47 OPTV Final Depth (ft):54.77

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 6/24/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:09 CCTV End Time:14:28 CCTV Final Depth (ft):52.49

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 42.81,25.70, minor throughout

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C9-JG-WVB-18 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): JG 9.1 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: N/A

Panel Completion Date: 5/27/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0
Northing: 909973.01 Actual Depth of VB Hole (ft)*: 12.6 Depth to Paywall from top of PVC (ft): 4.03
Easting: 630550.4 CT #: N/A
HHD Station: 3970+00.27 AT #: N/A Falling Head Test
Ground Elevation (ft): 35.03 Decommission Date 8/12/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 4.03 Top 1/3 4.0 22.7 N End (ft): N/A

Depth to Bottom of Pay Wall (ft): 60.03 Middle 2/3 22.7 41.4 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 58.03 Bottom 3/3 41.4 60.0 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
4.0-5.2 8:35 50 100 4.6 4.0-4.6 - fill/cement material

5.2-5.6 100 100


N/A N/A
5.6-10.6 8:12 28 100 sand filling bottom of hole - tag at 9.9'

10.6-12.6 9:30 0 100 drilled 2' - tag at 12.3'

N/A N/A

6/23/2021

N/A N/A

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-C9-JG-WVB-18 VB Boring Depth (ft):N/A

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C9-JG-WVB-19 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): JG 9.1 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: N/A

Panel Completion Date: 5/27/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0
Northing: 909968.57 Actual Depth of VB Hole (ft)*: 17.1 Depth to Paywall from top of PVC (ft): 4.03
Easting: 630548.21 CT #: N/A
HHD Station: 3970+00.72 AT #: N/A Falling Head Test
Ground Elevation (ft): 35.03 Decommission Date 8/12/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 4.03 Top 1/3 4.0 22.7 N/N End (ft): N/A

Depth to Bottom of Pay Wall (ft): 60.03 Middle 2/3 22.7 41.4 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 58.03 Bottom 3/3 41.4 60.0 Automatic Cutoff Wall Reading**: N/A

Descriptions
Start or Drill End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Depths (ft)*** (>3")**** drill water color, etc.)
4.0-4.9 6/23/2021 100 100 4.3

4.9-5.5 100 100 5.2


N/A N/A
5.5-10.6 100 100 8.3

10.6-15.6 8:45 100 100 13.7,14.8 tagged 15.5' next day

15.6-17.1 6/24/21 8:00 8:05 25 100

N/A N/A
6/23/2021 -
6/24/2021

N/A N/A

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28 days,
verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-C9-JG-WVB-19 VB Boring Depth (ft):N/A

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-JG-W-VB-21 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): JG 10.1 Borehole Logger's Name: Kristina McCoy/ John Egelston Start Date, Time, Water Depth: N/A

Panel Completion Date: 5/28/2021 USACE/AECOM Representative(s): Austin Sagul/Zac Reeves End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): N/A
Northing: 909958.77 Actual Depth of VB Hole (ft)*: 35.6 Depth to Paywall from top of PVC (ft): N/A
Easting: 630575.93 CT #: Not provided
HHD Station: 3969+71.33 AT #: N/A Falling Head Test
Ground Elevation (ft): 34.8 Decommission Date 11/11/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 3.8 Top 1/3 3.8 22.5 N-85.8F End (ft): N/A

Depth to Bottom of Pay Wall (ft): 59.8 Middle 2/3 22.5 41.1 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 57.8 Bottom 3/3 41.1 59.8 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
3.8-5.1 13:40 100 100 3.8-4.2 - sand, 4.2-5.1 - grout

5.1-5.6 32s 100 100 2.4-4.1 - sand/gravel

5.6-10.6 66 100 2.4-4.1 - sand/gravel


Not Observed - Done outside of USACE/AECOM Rep. was not present to observe
normal drilling hours drilling runs between 10.6 to 30.6' depth.
30.6-35.6 40 100 Sand recovered, boring terminated

7/1/2021 +
7/2/2021

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-JG-W-VB-21 VB Boring Depth (ft): N/A

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft): N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths)

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft): N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C6-JGTP-VB-04 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): JG6.1 & JG6.2 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 7/1/21, 14:04, 0'

Panel Completion Date: 6/1/2021 USACE/AECOM Representative(s): Austin Sagul/Zac Reeves End Date, Time, Water Depth: 7/2/21, 13:10, 2.06'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.5
Northing: 909992.41 Actual Depth of VB Hole (ft)*: 58.2 Depth to Paywall from top of PVC (ft): 5.2
Easting: 630492.78 CT #: 01886
HHD Station: 3970+60.99 AT #: 070 Falling Head Test
Ground Elevation (ft): 34.7 Decommission Date 8/12/2021 Start Date & Time: 7/2/21, 13:10
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: 7/3/21, 13:10
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 2.06
N - 79.1F (6/30), Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 3.7 Top 1/3 3.7 22.4 N-76.4F (7/1) End (ft): 15.92

Depth to Bottom of Pay Wall (ft): 59.7 Middle 2/3 22.4 41.0 Manual Cutoff Wall Reading: 1.99x10^-7
Minimum Depth of VB Hole (ft): 57.7 Bottom 3/3 41.0 59.7 Automatic Cutoff Wall Reading**: 1.97x10^-7

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
On 6/29, boring drilled to approximarely 3.5' depth.
3.7-5.3 11:07 100 100 Casing installed at ~3.25' depth according to GFA.
5.3-10.3 5m50s 100 100 8.8 ~600 rpm used for drilling
11.6-12.3 12.3-13.4
11.6, 12.4, 13.4, 14.4, bottom 0.1 fragmented during retrieval, final 3' fished
10.3-15.3 6m21s 98 86 14.9, 15.1 from borehole
15.3-20.3 8m17s 100 100 18.5 entire core fished from borehole

20.3-25.3 8m20s 102 100 23.0, 24.6

25.3-30.3 8m45s 98 100 25.3-26.3 26.3-27.1 26.3 joint observed


6/29/2021,
6/30/2021, 30.3-35.3 8m1s 100 100 32.8, 34.1 fished entire core of borehole
7/1/2021
drilling ceased due to tiem constraints, will resume
35.3-40.3 7m6s 100 100 36.3 tomorrow
40.3-45.3 7m53s 100 100 42.8 fished entire core of borehole
41.9-42.7 42.7-43.5
45.3-50.3 7m37s 102 100 46.8, 49.4 fished entire core of borehole

50.3-55.1 7m50s 100 100 50.6, 54.2 fished entire core of borehole

55.1-58.2 3m52s 9:34 100 100 57.0, 57.8

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/1/2021 VB Boring Number:TO3-C6-JGTP-VB-04 VB Boring Depth (ft):58.2

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.01 Northing:0.01 Easting0.00

OPTV Start Time:11:22 OPTV End Time:12:37 OPTV Final Depth (ft):57.69

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs several small vugs throughout

Leaks

Aggregate small pieces of aggregate throughout

Soil Inclusions

Fractures

Other (Explain) slight discoloration near the bottom of the borehole

Was there Cracking? (Depths) No

Date: 7/1/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:04 CCTV End Time:13:58 CCTV Final Depth (ft):56.33

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs small vugs throughout, 22.11, 5.42, 5.34, 5.25

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) reached 51.91 depth on descent, pumped borehole again to reach adequate depth
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C6-JGTP-VB-05 Driller's Name: Greg Cole Saturation of Borehole

Panel Number(s): JG8.1 & JG8.2 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 6/28/21, 11:40, 2'

Panel Completion Date: 6/3/2021 USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: 6/29/21, 11:04, 4.91'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.5'
Northing: 909999.32 Actual Depth of VB Hole (ft)*: 58.3 Depth to Paywall from top of PVC (ft): 4.1
Easting: 630473.3 CT #: 01887
HHD Station: 3970+81.66 AT #: 068 Falling Head Test
Ground Elevation (ft): 35.1 Decommission Date 9/3/2021 Start Date & Time: 6/29/21, 11:04
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: 6/30/21 11:04
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 4.91
N - 80.5F -6/24, Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 4.1 Top 1/3 4.1 22.8 N - 6/25 End (ft): 19.34'

Depth to Bottom of Pay Wall (ft): 60.1 Middle 2/3 22.8 41.4 Manual Cutoff Wall Reading: 2.61x10^-7
Minimum Depth of VB Hole (ft): 58.1 Bottom 3/3 41.4 60.1 Automatic Cutoff Wall Reading**: 2.57x10^-7

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
fluid loss in overburder starting at ~2' depth, drilling
4.1-5.8 11:56 100 100 ceased due to lighning shutdown on 6/24, resumed on
6/25. Casing installed at 3.7' depth
5.8-10.8 2m40s 100 100 6.6, 8.2, 8.8
19.0-19.7 19.7-20.5
10.8-15.8 6m13s 100 100 11.1, 11.6, 12.9, 14.6
16.1, 17.1, 17.7, 18.1,
15.8-20.8 6m20s 104 64 18.5, 18.9, 20.4
20.8-25.8 6m8s 96 100 21.7, 24.3, 25.2 fished final 0.4' from sample
26.1, 26.5, 28.1, 29.6, 28.2, 29.2 - deep tool mark, tub was cleared of
25.8-30.6 6m4s 96 100 31.7-32.6 32.6-33.5 30.0 cuttings following this run
6/24/2021 +
6/25/2021 30.6-35.6 6m21s 102 100 31.7, 33.6, 34.2, 35.5
37.2, 37.8 - horizontal tool marks, upper and bottom
35.6-40.6 6m32s 98 100 37.0, 38.8 0.1' of core fragmented
fragmenting of top 0.1' and bottom 0.2' of core, joint
40.6-45.6 6m35s 106 100 43.3, 44.4 observed from 43.1 -45.4'
47.3-48.1 48.1-49.0
rounding of some mechanical break sections, bottom
45.6-50.6 6m5s 96 100 47.0, 47.3, 49.1, 49.8 1.3' fished from hole
50.6-55.4 7m2s 100 100 53.6 small blue sandstone aggregate throughout

55.4-58.3 4m44s 17:02 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:6/28/2021 VB Boring Number:TO3-C6-JGTP-VB-05 VB Boring Depth (ft):58.3

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.33 Northing:-0.21 Easting0.26

OPTV Start Time:9:04 OPTV End Time:9:46 OPTV Final Depth (ft):57.66

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 4.1-5.0 - several small vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) horizonral tool marks- examples 3.7, 5.7

some sand appears to be leaking from bottomg of casing, several smal vugs throughout boring, vugs just above top of paywall

Was there Cracking? (Depths) N

Date: 6/28/21 CCTV OBSERVATIONS:

CCTV Start Time: 10:11 CCTV End Time:11:17 CCTV Final Depth (ft):55.89

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 30.28

Leaks

Aggregate small sandstone aggregrate throughout, in particularly bottom 10'

Soil Inclusions

Fractures

Other (Explain) after initial pumping, reached 51.5 depth, borehole pumped again to reach sufficient depth
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-054 Driller's Name: John Holdsworth Saturation of Borehole

Panel Number(s): P3779571 Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 6/29/21 10:45 0'

Panel Completion Date: 6/3/2021 USACE/AECOM Representative(s): Zac Reeves/Lisa Perks End Date, Time, Water Depth: 6/30/21 9:45 1.56'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.83
Northing: 902406.22 Actual Depth of VB Hole (ft)*: 56.4 Depth to Paywall from top of PVC (ft): 13.63
Easting: 647728.33 CT #: 01888
HHD Station: 3779+57.56 AT #: 069 Falling Head Test
Ground Elevation (ft): 37.8 Decommission Date 7/22/2021 Start Date & Time: 6/30/21 9:55
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 7/1/21 9:55
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.56'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.8 Top 1/3 12.8 27.8 N-89F/N-84F End (ft): 2.77'

Depth to Bottom of Pay Wall (ft): 57.8 Middle 2/3 27.8 42.8 Manual Cutoff Wall Reading: 1.20x10^-8
Minimum Depth of VB Hole (ft): 55.8 Bottom 3/3 42.8 57.8 Automatic Cutoff Wall Reading**: 1.17x10^-8

Start or Descriptions
Drill End Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Time (spec=90%) (spec=85%) Depths (ft) Depths (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Depths (ft)*** (>3")**** drill water color, etc.)
12.8-14.9 10:55 100 100

14.9-19.9 5:01 100 100 15.2


12.8-13.8 13.8-14.9
19.9-24.9 100 100 20.1,20.5,21.9

24.9-30.2 75 100 27.0,27.4,28.9 fished ~1' - nothing left to fish

30.2-35.2 100 100


12:30
35.2-40.3 (6/28/21) 30.5-31.3 31.3-32.1 37.8 vug - 38.7
6/28/2021 - 8:00
6/29/21 40.3-45.3 (6/29/21) 44.3

45.3-50.3 3:58 94 96 46.3,47.3,49.1,49.8

50.3-55.3 94 51.2 lots of small soil inclusions


45.3-46.3 46.3-47.3
55.3-56.4 9:20

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/1/2021 VB Boring Number:TO3-VB-054 VB Boring Depth (ft):56.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .34 Northing:-.21 Easting-.27

OPTV Start Time:10:20 OPTV End Time:11:05 OPTV Final Depth (ft):56.00

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor

Vugs 51.1

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 7/1/21 CCTV OBSERVATIONS:

CCTV Start Time: 11:35 CCTV End Time:12:57 CCTV Final Depth (ft):54.90

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs ~49,54.33,53.80,52.64,51.80-51.50,51.2,51.17,50.75,50.51,49.97,49.25,47.76,27.05,16.96,16.58

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-055 Driller's Name: Grant Watson/Greg Cole Saturation of Borehole

Panel Number(s): P3781418 & Borehole Logger's Name: Dave Hewitt/Kristina McCoy Start Date, Time, Water Depth: 7/9/2021, 12:50, 0'
S3781495
Panel Completion Date: 6/5/2021 & USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: 7/10/21 9:41 .42'
6/7/2021
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.36
Northing: 902455.09 Actual Depth of VB Hole (ft)*: 56.7 Depth to Paywall from top of PVC (ft): 14.76
Easting: 647046.4 CT #: 1926
HHD Station: 3781+45.96 AT #: 072 Falling Head Test
Ground Elevation (ft): 38.4 Decommission Date 8/17/2021 Start Date & Time: 7/12/21 10:01
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 7/13/21 10:01
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): .42'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 13.4 Top 1/3 13.4 28.4 N-77.9F End (ft): 5.13'

Depth to Bottom of Pay Wall (ft): 58.4 Middle 2/3 28.4 43.4 Manual Cutoff Wall Reading: 4.60x10^-8
Minimum Depth of VB Hole (ft): 56.4 Bottom 3/3 43.4 58.4 Automatic Cutoff Wall Reading**: 4.54x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
13.4-15.4 9:25 100 100 13.9

15.4-20.4 4m18s 100 100 20 Final 0.1' crushed during retrieval


16.7-17.5 17.5-18.3
20.4-25.4 4m21s 100 100

25.4-30.4 4m24s 94 100

30.4-35.5 4m25s 102 100 30.6 borehole tagged

35.5-40.5 4m21s 100 100 35.5-36.3 36.3-37.1

7/9/2021 40.5-45.5 4m14s 100 100 40.6 Final 0.1' crushed during retrieval

45.5-50.5 4m17s 102 100 several small vugs (clay)

50.5-55.6 4m15s 98 100 55.3 small vugs (clay) throughout


50.5-51.3 51.3-52.1
55.6-56.7 1m11s 11:31 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/13/2021 VB Boring Number:TO3-VB-055 VB Boring Depth (ft):56.7

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .17 Northing:.15 Easting.08

OPTV Start Time:10:15 OPTV End Time:10:49 OPTV Final Depth (ft):56.24

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) sporadic horizontal and vertical tool marks, some small pits

Was there Cracking? (Depths) N

Date: 7/13/21 CCTV OBSERVATIONS:

CCTV Start Time: 11:12 CCTV End Time:12:05 CCTV Final Depth (ft):55.11

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 50.07,49.38

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) reached 50.45 on first run


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-56 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3785650 & Borehole Logger's Name: Dave Hewitt/Christina McCoy Start Date, Time, Water Depth: 7/12/21 14:00 0'
P3785727
Panel Completion Date: 6/11/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: 7/14/21 09:15 2.48'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.4
Northing: 902564.97 Actual Depth of VB Hole (ft)*: 56.4 Depth to Paywall from top of PVC (ft): 14.3
Easting: 646637.22 CT #: 01933
HHD Station: 3785+69.66 AT #: 073 Falling Head Test
Ground Elevation (ft): 37.9 Decommission Date 8/17/2021 Start Date & Time: 7/14/21 9:16
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 7/15/21 9:16
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.48'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.9 Top 1/3 12.9 27.9 N-77F End (ft): 3.87'

Depth to Bottom of Pay Wall (ft): 57.9 Middle 2/3 27.9 42.9 Manual Cutoff Wall Reading: 1.43x10^-8
Minimum Depth of VB Hole (ft): 55.9 Bottom 3/3 42.9 57.9 Automatic Cutoff Wall Reading**: 1.39x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.9-15.5 9:04 100 100 13.2

15.5-20.5 4:12 100 100


13.2-14.0 14.0-14.8
20.5-25.5 100 100

25.5-30.5 100 100

30.5-35.5 100 100 35.2

35.5-40.5 4:12 100 100 30.5-31.3 31.3-32.1

7/12/2021 40.5-45.5 4:14 100 100

45.5-50.5 100 100 50.2

50.5-55.4 100 100


45.5-46.5 46.5-47.3
55.4-56.4 11:18 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/15/2021 VB Boring Number:TO3-VB-56 VB Boring Depth (ft):56.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .26 Northing:.12 Easting-.16

OPTV Start Time:~9:40 OPTV End Time:~10:20 OPTV Final Depth (ft):55.96

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor throughout

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Observed by USACE

Was there Cracking? (Depths) N

Date: 7/15/21 CCTV OBSERVATIONS:

CCTV Start Time: 10:38 CCTV End Time:11:20 CCTV Final Depth (ft):55.62

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 37.94

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Observed by USACE
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C9-JG-W-VB-22 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): JG 9.1 Borehole Logger's Name: Dave Hewitt/Christina McCoy Start Date, Time, Water Depth: 7/16/21 11:37 0'

Panel Completion Date: 5/27/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.46
Northing: 909972.3 Actual Depth of VB Hole (ft)*: 58.5 Depth to Paywall from top of PVC (ft): 4.76
Easting: 630549.8 CT #: not given
HHD Station: 3970+00.57 AT #: 074 Falling Head Test
Ground Elevation (ft): 35.3 Decommission Date 8/12/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 4.3 Top 1/3 4.3 23.0 N-77F End (ft): N/A

Depth to Bottom of Pay Wall (ft): 60.3 Middle 2/3 23.0 41.6 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 58.3 Bottom 3/3 41.6 60.3 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
4.3-5.5 7:50 100 100

5.5-10.5 6:53 100 100 7.8-8.3 - damaged, split along the core 8.8-10.5
14.7-15.5 13.9-14.7
10.5-15.5 100 100 10.6,12.1

15.5-20.5 100 100 16.6,16.9 18.7-limestone

20.5-25.5 7:13 94 100 22.1,23.0,23.1,24.7 soil inclusion 22.9

25.5-30.5 100 100 25.5-26.45 26.45-27.4 27.4

7/15/2021 30.5-35.5 100 100 31.8 cleaned out tub

35.5-40.5 12:03 100 100 36.7,36.8 drilled 1.2', stopped then continued

40.5-45.5 7:20 100 100 41.0,44.7 44.7-45.5 - split alongcore


50.5-51.3 51.3-52.1
47-48 - soil, 47.0-50.5- loss of ~15 gallons drilling fluid, split along length of
45.5-50.5 12:00 100 100 46.5,47.8 lot of aggregate core
50.5-55.5 10:36 100 100
drill teeth clogged, casing removed, bit cleaned, then
55.5-58.5 13:33 100 87 drilling continued

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/15/2021 VB Boring Number:TO3-C9-JG-W-VB-22 VB Boring Depth (ft):58.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .03 Northing:-.03 Easting-.02

OPTV Start Time:13:35 OPTV End Time:16:11 OPTV Final Depth (ft):57.75

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 18.7

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 7/16/21 CCTV OBSERVATIONS:

CCTV Start Time: 9:08 CCTV End Time:11:05 CCTV Final Depth (ft):54.75

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 24.05-23.5,22.9,22.5,18.9-18.68,11.05,8.21,7.69

Leaks ~30, 32.25,30.11,~32.5, lot of water leaking below 30', source point unclear

Aggregate

Soil Inclusions

Fractures

Other (Explain) first run - 31.75, second run ~42

lot of washed out soil inclusions - ~23 and ~30 in particular

repaired pump between runs 2 and 3


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-JG-W-VB-12 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): JG 6.1/6.2 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: NA

Panel Completion Date: 6/1/2021 USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: NA
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.5
Northing: 909991.44 Actual Depth of VB Hole (ft)*: 58.1 Depth to Paywall from top of PVC (ft): 5.41
Easting: 630491.85 CT #: Not provided
HHD Station: 3970+61.53 AT #: N/A Falling Head Test
Ground Elevation (ft): 34.91 Decommission Date 8/12/2021 Start Date & Time: NA
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: NA
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): NA
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 3.91 Top 1/3 3.9 22.6 NA End (ft): NA

Depth to Bottom of Pay Wall (ft): 59.91 Middle 2/3 22.6 41.2 Manual Cutoff Wall Reading: NA
Minimum Depth of VB Hole (ft): 57.91 Bottom 3/3 41.2 59.9 Automatic Cutoff Wall Reading**: NA

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
8" diameter casing installed with gel used to the casing
3.9-5.7 12:17 100 100 to approximately 3.8', sand from 3.9-4.2, 4.2-5.7 grout
6.1, 7.4, 8.4, 8.8, 9.0, only first 0.4 recovered on intial retrieval, remainder
5.7-10.2 6m50s 100 88 10.0 fished
NA NA
10.2-15.3 6m57s 100 100 12.2, 12.8, 15.1

15.3-15.8 34s 100 100

15.8-20.8 98 100

20.8-23.8 5m0s 100 100 NA NA 21.0, 22.2, 23.3 top 0.2' of core fractured

7/16/2021 23.8-25.8 2m43s 100 100 25.4

25.8-30.8 6m43s 96 100


31.6, 32.5, 33.1, 34.2,
30.8-35.8 7m37s 100 100 35.1, 35.5 coloration changes (joint?)
NA NA 36.5, 38.1, 38.4, 38.8,
35.8-40.8 8m2s 100 56 39.1, 39.3, 39.8, 39.9, only top 0.5' feet recovered, fished for remainder
40.3
40.8-51.8 USACE/AECOM Rep. not present

GFA indicated the final depth of the VB was 58.1'

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/19/2021 VB Boring Number:TO3-JG-W-VB-12 VB Boring Depth (ft):58.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.27 Northing:-0.16 Easting0.21

OPTV Start Time:10:15 OPTV End Time:11:00 OPTV Final Depth (ft):56.76

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting NA

Vugs NA

Leaks NA

Aggregate NA

Soil Inclusions NA

Fractures NA

Other (Explain) NA

Was there Cracking? (Depths) NA

Date: NA CCTV OBSERVATIONS:

CCTV Start Time: NA CCTV End Time:NA CCTV Final Depth (ft):NA

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting NA

Vugs NA

Leaks NA

Aggregate NA

Soil Inclusions NA

Fractures NA

Other (Explain) NA
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C8-JG-W-VB-16 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): JG 8.1 & JG8.2 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: N/A

Panel Completion Date: 6/1/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): N/A
Northing: 909998.6 Actual Depth of VB Hole (ft)*: 5 Depth to Paywall from top of PVC (ft): 4.6
Easting: 630473.1 CT #: undecided
HHD Station: 3970+81.64 AT #: n/a Falling Head Test
Ground Elevation (ft): 35.6 Decommission Date 11/11/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 4.6 Top 1/3 4.6 23.3 N-? End (ft): N/A

Depth to Bottom of Pay Wall (ft): 60.6 Middle 2/3 23.3 41.9 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 58.6 Bottom 3/3 41.9 60.6 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
all drilling fluid lost in adjacent boring - hole
4.6-5.0 8:00 8:01 100 100 4.7 abandoned

N/A N/A

N/A N/A

7/16/2021

N/A N/A

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-C8-JG-W-VB-16 VB Boring Depth (ft):N/A

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N/A

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C9-JGTP-VB-23 Driller's Name: Grant Watson (Brandon Gomez) Saturation of Borehole

Panel Number(s): JG9.1 Borehole Logger's Name: Dave Hewitt/ John Eggleston Start Date, Time, Water Depth: 7/29/21 10:35 0'

Panel Completion Date: 5/27/2021 USACE/AECOM Representative(s): Austin Sagul/Zac Reeves End Date, Time, Water Depth: 7/30/21 10:19 1.64'
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.46
Northing: 909970.54 Actual Depth of VB Hole (ft)*: 58.6 Depth to Paywall from top of PVC (ft): 5.86
Easting: 630549.46 CT #: 2010
HHD Station: 3970+00.10 AT #: 076 Falling Head Test
Ground Elevation (ft): 35.4 Decommission Date 8/12/2021 Start Date & Time: 7/30/21 10:20
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: 7/31/21 10:20
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.64'
Not measured - Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 4.4 Top 1/3 4.4 23.1 7/28/21 End (ft): 9.7'

Depth to Bottom of Pay Wall (ft): 60.4 Middle 2/3 23.1 41.7 Manual Cutoff Wall Reading: 1.22x10^-7
Minimum Depth of VB Hole (ft): 58.4 Bottom 3/3 41.7 60.4 Automatic Cutoff Wall Reading**: 1.20x10^-7

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
GFA representatives indicated an 8" casing was
4.4-4.9 9:00 100 100 4.7 installed on 7/21/21 to a depth of 4'. Drilling ceased
due to mechanical failure on drill rig.
Drilling resumed on 7/28/21, easting updated per
4.9-9.9 8:00 102 100 conversation with Bauer rep
9.9-10.7 10.7-11.5
9.9-14.9 5m30s 100 100 14.3

14.9-19.9 6m 100 100 Final 0.2' crushed upon removal from barrel

19.9-24.9 4m45s 98 100 several small vugs

24.9-29.9 4m37s 100 100 25.9-25.7 25.7-26.5 Final 0.05' fractured on retrieval
7/22/2021
& 7/28/21 29.9-34.9 4m55s 100 100 34.5-34.9 - vert. break 30.8 - vug

34.9-39.9 3m46s 92 48 37.3-39.9 - vert. break fished final ~1' from borehole
39.9-42.2 - poorly bonded grout, nearly half of core
39.9-44.9 5m 96 57 missing for interval
45.0-45.8 45.8-46.6
48.5-49.9 - several
44.9-49.9 9m29s 100 100 45 aggregate inclusions
incomplete vertical fracturing in bottom half of the
49.9-54.9 104 100 50.5, 54.5 51.9-52.7 - aggregate core, small aggregate throughout
54.9-58.6 10m42s 11:18 100 44 54.9-56.5 - vert. break 57.1-58.6 - several large aggregate

7/28/21, drilling RPMs ~420


*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/28/2021 and 7/29/2021 VB Boring Number:TO3-C9-JGTP-VB-23 VB Boring Depth (ft):58.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): -0.07 Northing:-0.05 Easting-0.05

OPTV Start Time:13:10 OPTV End Time:13:55 OPTV Final Depth (ft):58.33

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs several small vugs throughout

Leaks

Aggregate

Soil Inclusions 37.3-40.8, 47.4-54.8 - washed out soil inclusions

Fractures

Other (Explain) horizontal tool marks throughout

Was there Cracking? (Depths) N

Date: 7/29/21 CCTV OBSERVATIONS:

CCTV Start Time: 9:10 CCTV End Time:10:30 CCTV Final Depth (ft):56.52

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs several small vugs throughout

Leaks none

Aggregate more amounts of aggregates on bottom 1/3 of hole

Soil Inclusions many small inclusions throughout

Fractures
From 37 to 39.6' and 47.4 to 55', vertical anomaly that resembled a second 6" drill hole. It was void of material and had backing. This jet grout column was restroked at the end
Other (Explain)
a 2nd time during original jet grouting to remix the material. The anomaly may be a remnant of it.
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-57 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3788417 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 7/20/21 9:00 0'

Panel Completion Date: 6/25/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: 7/21/21 8:39 1.94'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.6
Northing: 902635.08 Actual Depth of VB Hole (ft)*: 56.4 Depth to Paywall from top of PVC (ft): 14.29
Easting: 646374.32 CT #: 01966
HHD Station: 3788 + 41.71 AT #: 075 Falling Head Test
Ground Elevation (ft): 37.69 Decommission Date 8/17/2021 Start Date & Time: 7/21/21 8:40
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 7/22/21 8:40
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.94'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.69 Top 1/3 12.7 27.7 N-79F End (ft): 6.03'

Depth to Bottom of Pay Wall (ft): 57.69 Middle 2/3 27.7 42.7 Manual Cutoff Wall Reading: 4.89x10^-8
Minimum Depth of VB Hole (ft): 55.69 Bottom 3/3 42.7 57.7 Automatic Cutoff Wall Reading**: 4.89x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.7 - 15.5 14:05 100 100 13.2 100 gallons of drilling fluid lost in the over burden

15.5-20.5 100 100 18.6,20.1 6" casing put in down to ~7'


13.1-13.9 13.9-14.7
20.5-25.5 100 100

25.5-30.5 100 100 27.8

30.5-35.5 5:57 100 100

35.5-40.5 100 100 31.3-32.1 30.5-31.3

7/19/2021 40.5-45.5 5:32 100 100 41.7

45.5-50.6 100 100

50.6-55.5 100 100 54.3 fishing ~1.2'


44.8-45.5 44.0-44.8
55.5-56.4 16:57 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/22/2021 VB Boring Number:TO3-VB-57 VB Boring Depth (ft):56.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .14 Northing:.09 Easting.11

OPTV Start Time:8:55 OPTV End Time:9:32 OPTV Final Depth (ft):55.75

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 18

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 7/22/21 CCTV OBSERVATIONS:

CCTV Start Time: 9:55 CCTV End Time:10:37 CCTV Final Depth (ft):54.18

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs ~18

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-58 Driller's Name: Grant Watson - Training Brandon Saturation of Borehole
Gomez
Panel Number(s): S3791185 & Borehole Logger's Name: John Egelston Start Date, Time, Water Depth: 7/26/21 12:30 0'
P3791262
Panel Completion Date: 6/30/2021 USACE/AECOM Representative(s): Zac Reeves/Austin Sagul End Date, Time, Water Depth: 7/27/21 12:12 0'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.4
Northing: 902707.24 Actual Depth of VB Hole (ft)*: 56.1 Depth to Paywall from top of PVC (ft): 14.05
Easting: 646103.08 CT #: 02038
HHD Station: 3791 + 22.39 AT #: 077 Falling Head Test
Ground Elevation (ft): 37.65 Decommission Date 9/3/2021 Start Date & Time: 7/27/21 12:13
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 7/28/21 12:13
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 0.0'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.65 Top 1/3 12.6 27.7 N-? End (ft): 3.51'

Depth to Bottom of Pay Wall (ft): 57.65 Middle 2/3 27.7 42.7 Manual Cutoff Wall Reading: 3.46x10^-8
Minimum Depth of VB Hole (ft): 55.65 Bottom 3/3 42.7 57.7 Automatic Cutoff Wall Reading**: 3.39x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.7-14.7 9:12 100 100

14.7-19.7 4:10 100 100 18.6


17.6-18.5 18.5-19.3
19.7-24.7 5:00 100 100

24.7-29.7 100 100

29.7-34.7 100 100

34.7-39.7 4:01 100 100 32.9-33.7 33.7-34.7 37.2,39.7

7/26/2021 39.7-44.7 100 100 43.5,44.6

44.7-49.6 100 100 49.3 vugs - 46.2 (organics), 47.7 (clay)

49.6-54.8 4:36 100 100 54.6 vugs - 50.4, 51.6, 52.8 - lot of clay
49.6-50.4 50.4-51.2
54.8-56.1 11:28 100 100 55.8

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:7/28/2021 VB Boring Number:TO3-VB-58 VB Boring Depth (ft):56.1

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .23 Northing:.17 Easting-.15

OPTV Start Time:12:33 OPTV End Time:13:15 OPTV Final Depth (ft):55.53

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 7/28/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:32 CCTV End Time:14:20 CCTV Final Depth (ft):53.67

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs ~33,~49,53.00, 52.37, 52.29, 51.99, 50.44, 36.75

Leaks bubbles (small leaks) - 53.22, 52.44, 52.37, 51.76, 49.03

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-C9-JG-WVB-25 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): JG 9.1 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: N/A

Panel Completion Date: 5/27/2021 USACE/AECOM Representative(s): Alberto Rodriguez/Zac Reeves End Date, Time, Water Depth: N/A
Center of Panel, Overlap, or Joint: Edge Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0
Northing: 909970.09 Actual Depth of VB Hole (ft)*: 20.5 Depth to Paywall from top of PVC (ft): 4.3
Easting: 630547.39 CT #: 02073
HHD Station: 3970 + 02.04 AT #: N/A Falling Head Test
Ground Elevation (ft): 35.3 Decommission Date 8/12/2021 Start Date & Time: N/A
Top of Pay Wall (EL): 31 Core Samples Locations Ranges (ft) End Date & Time: N/A
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): N/A
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 4.3 Top 1/3 4.3 23.0 N-? End (ft): N/A

Depth to Bottom of Pay Wall (ft): 60.3 Middle 2/3 23.0 41.6 Manual Cutoff Wall Reading: N/A
Minimum Depth of VB Hole (ft): 58.3 Bottom 3/3 41.6 60.3 Automatic Cutoff Wall Reading**: N/A

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
4.3-5.7 11:01 5 casing installed to 4.3' with bentonite chips

5.7-10.5 5:21 76 70 8.5 ~1.2' sand, ~30 gallons of drilling fluid lost
N/A N/A
10.5-15.5 9:27 100 82 13.2,13.6,14.1,14.8

15.5-20.5 12:30 40 ~3' sand, ~15 gallons of drilling fluid lost

drill bit clogged up, drilling ended

N/A N/A

8/4/2021

N/A N/A

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:N/A VB Boring Number:TO3-C9-JG-WVB-25 VB Boring Depth (ft):20.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): N/A Northing:N/A EastingN/A

OPTV Start Time:N/A OPTV End Time:N/A OPTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N/A

Date: N/A CCTV OBSERVATIONS:

CCTV Start Time: N/A CCTV End Time:N/A CCTV Final Depth (ft):N/A

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-059 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3793954 & Borehole Logger's Name: Dave Hewitt/Kristina McCoy Start Date, Time, Water Depth: 8/10/21, 12:44, 0'
P3794031
Panel Completion Date: 7/12/21 & 7/13/21 USACE/AECOM Representative(s): Austin Sagul/Zac Reeves End Date, Time, Water Depth: 8/11/21, 11:49, 2.81
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.08
Northing: 902778.62 Actual Depth of VB Hole (ft)*: 55.7 Depth to Paywall from top of PVC (ft): 13.36
Easting: 645834.82 CT #: 02093
HHD Station: 3793 + 99.95 AT #: 080 Falling Head Test
Ground Elevation (ft): 37.28 Decommission Date 9/3/2021 Start Date & Time: 8/11/21, 11:49
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 8/12/21, 11:49
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.81
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.28 Top 1/3 12.3 27.3 N - 79.3 F End (ft): 5.08

Depth to Bottom of Pay Wall (ft): 57.28 Middle 2/3 27.3 42.3 Manual Cutoff Wall Reading: 2.76x10^-8
Minimum Depth of VB Hole (ft): 55.28 Bottom 3/3 42.3 57.3 Automatic Cutoff Wall Reading**: 2.72x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
8:44
12.3-15.6 (5m10s) 100 100 Final 0.2 fractured upon retrieval

15.6-20.6 5m53s 102 100


17.4-18.2 18.2-19.0
20.6-25.6 5m27s 100 100

25.6-30.6 100 100 26.9, 29.5

30.6-35.6 5m34s 98 100 32.0-vug

35.6-40.6 5m53s 102 100 31.4-32.2 30.6-31.4 37.2-37.6 37.2-37.6 - vug (sand)

8/10/2021 40.6-45.6 5m38s 100 100


46.4-46.7, 46.9-47.2, 49.1-49.4 vugs (clay), numerous
45.6-50.6 6m 100 100 smaller vugs (clay), final 0.2 fractured on retrieval,
joint observed
50.6-55.7 11:15 100 100 54.7 numerous vugs (clay) under <3" in diameter
47.8-48.6 47.0-47.8

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:8/12/2021 VB Boring Number:TO3-VB-059 VB Boring Depth (ft):55.7

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.08 Northing:0.04 Easting0.07

OPTV Start Time:12:10 OPTV End Time:12:45 OPTV Final Depth (ft):55.24

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 54.0, 52.4, 50.8

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) sporadic horizontal tool marks

Was there Cracking? (Depths) No

Date: 8/12/21 CCTV OBSERVATIONS:

CCTV Start Time: 1:10 CCTV End Time:1:52 CCTV Final Depth (ft):53.37

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 52.96, 52.84, 51.15, 51.12, 50.65, 49.85,

Leaks 49.47 (seepage)

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-60 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): P3796568 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 8/17/21 15:38 0'

Panel Completion Date: 7/19/2021 USACE/AECOM Representative(s): Alberto Rodriguez/Zac Reeves End Date, Time, Water Depth: 8/19/21 8:51 1.5'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 2
Northing: 902844.66 Actual Depth of VB Hole (ft)*: 55.6 Depth to Paywall from top of PVC (ft): 14.52
Easting: 645586.61 CT #: 2133
HHD Station: 3796+56.82 AT #: 081 Falling Head Test
Ground Elevation (ft): 37.52 Decommission Date 9/17/2021 Start Date & Time: 8/19/21 8:52
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 8/20/21 8:52
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.5'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.52 Top 1/3 12.5 27.5 N End (ft): 3.75'

Depth to Bottom of Pay Wall (ft): 57.52 Middle 2/3 27.5 42.5 Manual Cutoff Wall Reading: 2.34x10^-8
Minimum Depth of VB Hole (ft): 55.52 Bottom 3/3 42.5 57.5 Automatic Cutoff Wall Reading**: 2.35x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.5-15.5 9:48 100 100 13.8,15.3

15.5-20.5 6:12 100 100


13.9-14.6 14.6-15.3
20.5-25.5 100 100 22.0,24.9

25.5-30.5 5:42 100 100

30.5-35.5 100 100

35.5-40.5 5:18 100 100 30.5-31.3 31.3-32.1

8/17/2021 40.5-45.5 5:42 100 100

45.5-50.6 6:02 100 100

50.6-55.6 5:45 100 100 54.1, 55.2


44.7-45.5 43.9-44.7

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:8/20/2021 VB Boring Number:TO3-VB-60 VB Boring Depth (ft):

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .03 Northing:.01 Easting-.03

OPTV Start Time:9:19 OPTV End Time:9:54 OPTV Final Depth (ft):55.08

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs small throughout

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 8/20/21 CCTV OBSERVATIONS:

CCTV Start Time: 10:16 CCTV End Time:10:56 CCTV Final Depth (ft):53.61

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs small

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-61 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3799337 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 8/23/21 13:34 0'
P3799260
Panel Completion Date: 7/27/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: 8/24/21 12:34 2.12'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.42
Northing: 902914.85 Actual Depth of VB Hole (ft)*: 55.8 Depth to Paywall from top of PVC (ft): 13.88
Easting: 645322.79 CT #: 02189
HHD Station: 3799+29.81 AT #: 082 Falling Head Test
Ground Elevation (ft): 37.46 Decommission Date 9/17/2021 Start Date & Time: 8/24/21 12:35
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 8/25/21 12:35
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.12'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.46 Top 1/3 12.5 27.5 N-81F End (ft): 3.69'

Depth to Bottom of Pay Wall (ft): 57.46 Middle 2/3 27.5 42.5 Manual Cutoff Wall Reading: 1.72x10^-8
Minimum Depth of VB Hole (ft): 55.46 Bottom 3/3 42.5 57.5 Automatic Cutoff Wall Reading**: 1.71x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.5-15.8 9:34 100 100 15.4

15.8-20.8 4:07 100 100 17.5, 18.7, 19.6 Fished ~1.2'


15.8-16.6 16.6-17.4
20.8-25.8 4:26 100 100 25.1
26.1,27.1,28.5,30.2,
25.8-30.5 5:12 94 100 30.5 Fished entire run, then fished 2.5'

30.5-35.7 100 100 30.7, 31.2

35.7-40.7 100 100 31.2-32.0 32.8-33.6 40.3 Fished ~ .4'

8/23/2021 40.7-45.7 4:24 100 100

45.7-50.5 4:55 100 100

50.5-55.8 12:23 100 100


45.7-46.5 47.3-48.1

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:8/26/2021 VB Boring Number:TO3-VB-61 VB Boring Depth (ft):55.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .21 Northing:.10 Easting.19

OPTV Start Time:9:10 OPTV End Time:9:50 OPTV Final Depth (ft):55.06

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting minor

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) N

Date: 8/26/21 CCTV OBSERVATIONS:

CCTV Start Time: 10:04 CCTV End Time:10:38 CCTV Final Depth (ft):53.45

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 19.69

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-62 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3801951 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 8/26/21, 13:36, 0'
P3802028
Panel Completion Date: 7/30/2021 USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: 8/27/21, 12:36, 1.15
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.04
Northing: 902984.25 Actual Depth of VB Hole (ft)*: 55.4 Depth to Paywall from top of PVC (ft): 13.14
Easting: 645061.96 CT #: 2218
HHD Station: 3801+99.71 AT #: 00083 Falling Head Test
Ground Elevation (ft): 37.1 Decommission Date 9/17/2021 Start Date & Time: 8/27/21, 12:36
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 8/28/21, 12:36
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.15
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.1 Top 1/3 12.1 27.1 N - 77.2F End (ft): 2.58

Depth to Bottom of Pay Wall (ft): 57.1 Middle 2/3 27.1 42.1 Manual Cutoff Wall Reading: 1.53x10^-8
Minimum Depth of VB Hole (ft): 55.1 Bottom 3/3 42.1 57.1 Automatic Cutoff Wall Reading**: 1.56x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9:47:00
12.1-15.5 (5m27s) 100 100 15.1
AM
15.5-20.5 4m20s 100 100 19.9 vug (sand) 19.5
24.7-25.5 23.9-24.7
20.5-25.5 5m15s 100 100

25.5-30.5 5m1s 100 100

30.5-35.5 5m17s 100 100

35.5-40.5 5m22s 98 100 39.7-40.5 38.9-39.7 vug (clay) 35.9

8/26/2021 40.5-45.5 6m12s 102 100 40.6, 45.1


fished for approximately bottom half of core (~2.6 in
45.5-50.1 4m59s 100 100 48.1, 49.9 length missing), all but ~0.4' retrieved, several small
vugs (clay) on bottom half of core
50.1-55.4 12:16 92 100 50.4, 53.1, 54.5 vug (clay) 52.2, numerous smaller vugs (clay)
48.2-49.0 49.0-49.9

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:8/26/2021 VB Boring Number:TO3-VB-62 VB Boring Depth (ft):55.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.19 Northing:-0.18 Easting0.07

OPTV Start Time:14:18 OPTV End Time:14:54 OPTV Final Depth (ft):54.82

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 50.6, 54.5

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) No

Date: 8/28/21 CCTV OBSERVATIONS:

CCTV Start Time: 12:58 CCTV End Time:13:40 CCTV Final Depth (ft):53.29

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 53.20,51.14

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

To be observed from database once uploaded.


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-63 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): P3977775 Borehole Logger's Name: Christina McCoy Start Date, Time, Water Depth: 9/1/21 12:30 0'

Panel Completion Date: 8/4/2021 USACE/AECOM Representative(s): Zac Reeves End Date, Time, Water Depth: 9/2/21 11:40 3.15'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.92
Northing: 910227.02 Actual Depth of VB Hole (ft)*: 56.9 Depth to Paywall from top of PVC (ft): 9.37
Easting: 629815.25 CT #: 02251
HHD Station: 3977 + 77.53 AT #: 084 Falling Head Test
Ground Elevation (ft): 33.45 Decommission Date 9/27/2021 Start Date & Time: 9/2/21 11:41
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 9/3/21 11:41
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 3.15'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 8.45 Top 1/3 8.5 25.1 N-74F End (ft): 8.17'

Depth to Bottom of Pay Wall (ft): 58.45 Middle 2/3 25.1 41.8 Manual Cutoff Wall Reading: 8.25x10^-8
Minimum Depth of VB Hole (ft): 56.45 Bottom 3/3 41.8 58.5 Automatic Cutoff Wall Reading**: 8.19x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
8.5-10.6 8:28 100 100 9.4,10.0 10.0-clay

10.6-15.6 4:44 100 100


15.6-16.4 16.4-17.2
15.6-20.6 4:12 100 100 20.3

20.6-25.6 3:52 100 100 21.8,25.4

25.6-30.6 100 100 28.8

30.6-35.6 100 100 37.2-38.0 36.4-37.2 35.2

9/1/2021 35.6-40.6 4:06 100 100 36.1

40.6-45.6 100 100

45.6-50.6 100 100 47.8,48.8 49.8-vug


48.8-49.8 47.8-48.8
50.6-55.5 6:00 100 100

55.5-56.9 11:22 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/3/2021 VB Boring Number:TO3-VB-63 VB Boring Depth (ft):56.9

OPTV OBSERVATIONS:

Total Vector Deviation (ft): .09 Northing:-.08 Easting-.04

OPTV Start Time:14:40 OPTV End Time:15:11 OPTV Final Depth (ft):56.14

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 9.6 vug (clay), 22.1, 29.2, 31.7, 32.6

Leaks

Aggregate small aggregate throughout, but in particular, at depth

Soil Inclusions

Fractures

Other (Explain) sporadic horizontal tool marks, vertical tool marks (ex:25.3,35.2)

Was there Cracking? (Depths) No Cracking

Date: 9/3/21 CCTV OBSERVATIONS:

CCTV Start Time: 15:28 CCTV End Time:16:34 CCTV Final Depth (ft):53.93

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 29.53, 22.25, multiple small vugs from 14.5 to 14.2, 9.57 vug (clay)

Leaks

Aggregate

Soil Inclusions 33.0 - organics

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-064 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): P3804948 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 9/9/21, 16:58, 1.88'

Panel Completion Date: 8/10/2021 USACE/AECOM Representative(s):


Alberto Rodriguez/Austin End Date, Time, Water Depth: 9/10/21, 15:59, 0.85'
Sagul/Luis Melo
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.71
Northing: 903061.06 Actual Depth of VB Hole (ft)*: 55.8 Depth to Paywall from top of PVC (ft): 13.84
Easting: 644777.01 CT #: 2280
HHD Station: 3804+94.83 AT #: 085 Falling Head Test
Ground Elevation (ft): 37.13 Decommission Date 10/5/2021 Start Date & Time: 9/10/21, 15:59
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 9/11/21, 15:59
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 0.85'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.13 Top 1/3 12.1 27.1 No - 82.1 F End (ft): 2.18'

Depth to Bottom of Pay Wall (ft): 57.13 Middle 2/3 27.1 42.1 Manual Cutoff Wall Reading: 1.37x10^-8
Minimum Depth of VB Hole (ft): 55.13 Bottom 3/3 42.1 57.1 Automatic Cutoff Wall Reading**: 1.29x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.1-15.5 9:11 100 100 14.5

15.5-20.5 4m3s 100 100 15.8


20.5-21.3 22.9-23.7
20.5-25.5 4m11s 104 100

25.5-30.5 4m8s 100 100 bottom 0.1' fractured during retrieval

30.5-35.5 96 100

35.5-40.5 4m13s 102 100 41.3-42.1 40.5-41.3 40.4

9/9/2021 40.5-45.5 4m12s 100 100 several small vugs (clay) - 42.8 to 45.5

45.5-50.7 4m10s 102 100 50.4 45.8 - vug (clay), bottom


53.3, 53.9 - vugs (clay), numerous small clay vugs
50.7-55.8 4m9s 11:31 100 100 throughout
50.7-51.5 51.5-52.3

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/9/2021 VB Boring Number:TO3-VB-064 VB Boring Depth (ft):55.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.11 Northing:0.11 Easting-0.03

OPTV Start Time:13:38 OPTV End Time:13:58 OPTV Final Depth (ft):55.14

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) sporadic horizontal tool marks (ex: 15.6, 25.4)

discoloration observed on the south side of the VB throught (joint?)

Was there Cracking? (Depths) No

Date: 9/9/21 CCTV OBSERVATIONS:

CCTV Start Time: 14:19 CCTV End Time:14:59 CCTV Final Depth (ft):53.72

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs a few small vugs (47.2-47.0)

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) sporadic horizontal tool marks (ex: 51.9,47.8),vertical tool makrs throughout (ex: 53.72-49.90 and higher)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-65 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3807794 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 9/14/2021, 15:31, 0'
P3807871
Panel Completion Date: 8/19/2021 USACE/AECOM Representative(s):
Alberto Rodriguez/Austin End Date, Time, Water Depth: 9/15/2021, 14:31, 2.40'
Sagul/Luis Melo
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.4
Northing: 903136.214 Actual Depth of VB Hole (ft)*: 55.9 Depth to Paywall from top of PVC (ft): 13.99
Easting: 644498.6 CT #: 2309
HHD Station: 3807+83.20 AT #: 086 Falling Head Test
Ground Elevation (ft): 37.59 Decommission Date 10/5/2021 Start Date & Time: 9/15/2021, 14:31
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 9/16/2021, 14:31
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.4
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.59 Top 1/3 12.6 27.6 84.5 F - No End (ft): 3.45

Depth to Bottom of Pay Wall (ft): 57.59 Middle 2/3 27.6 42.6 Manual Cutoff Wall Reading: 1.27x10^-8
Minimum Depth of VB Hole (ft): 55.59 Bottom 3/3 42.6 57.6 Automatic Cutoff Wall Reading**: 1.19x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.6-15.7 9:38 100 100 15.3

15.7-20.7 4m4s 94 100 16.6 final 0.3 not fished out, added onto next run
12.6-13.4 13.4-14.2
20.7-25.7 4m0s 100 100 21.4, 23.2

25.7-30.7 4m0s 100 100 29.5 - vug (clayey sand)

30.7-35.7 4m1s 102 100 33.7 - aggregate 34.8 - vug (clay)

35.7-40.7 4m5s 100 100 30.7-31.7 31.7-32.5

9/14/2021 40.7-45.7 4m4s 98 100


46.5 - vug (organic), 46.7 - vug (clay), bottom ~0.2
45.7-50.7 3m58s 102 100 fractured upon retrieval
50.7-55.9 4m3s 12:01 100 100 final ~0.3 feet fractured during retrieval, numerous
44.8-45.6 43.2-44.0 fractures on the core due to retrieval, small vugs (clay)
throughout

no joint observed

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/14/2021 VB Boring Number:TO3-VB-65 VB Boring Depth (ft):55.9

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.03 Northing:-0.03 Easting0.00

OPTV Start Time:13:48 OPTV End Time:14:43 OPTV Final Depth (ft):55.09

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) large vug in first ~4' feet of overburden

possible joint obseved throughout boring

Was there Cracking? (Depths) No

Date: 9/14/21 CCTV OBSERVATIONS:

CCTV Start Time: 14:48 CCTV End Time:15:27 CCTV Final Depth (ft):53.31

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks 52.49, 50.86, 49.88

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks (example: 52.00, 28.71)

16.0 - wire? (Observed on down run, not observed on up run)


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-66 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): P3810639 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 9/23/2021, 14:11, 0'
&S3810716
Panel Completion Date: 8/26/2021 USACE/AECOM Representative(s): Austin Sagul/Luis Melo End Date, Time, Water Depth: 9/24/2021, 13:19, 2.19'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.25
Northing: 903210.2 Actual Depth of VB Hole (ft)*: 55.6 Depth to Paywall from top of PVC (ft): 13.23
Easting: 644224.67 CT #: 2339
HHD Station: 3810+67.04 AT #: 087 Falling Head Test
Ground Elevation (ft): 36.98 Decommission Date Start Date & Time: 9/24/21 13:21
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 9/25/21, 13:21
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.19
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 11.98 Top 1/3 12.0 27.0 NM End (ft): 6.41

Depth to Bottom of Pay Wall (ft): 56.98 Middle 2/3 27.0 42.0 Manual Cutoff Wall Reading: 5.3x10^-8
Minimum Depth of VB Hole (ft): 54.98 Bottom 3/3 42.0 57.0 Automatic Cutoff Wall Reading**: 5.27x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.0-15.4 13:34 3m56s 100 100
15.6, 16.1, 17.0, 17.6- bottom ~3.5' fished from borehole, drilling ceased due
15.4-20.4 4m5s 106 72 18.2, 19.9-20.1 to lightning shutdown, remainder of core recovered
20.4-21.3 22.1-22.9 following day
20.4-25.4 3m21s 100 100 21.3, 20.4 bottom 0.1' fractured upon retrieval

25.4-30.4 4m45s 100 100 30.1

30.4-35.4 4m44s 98 100 37.8, 39.0, 40.2

35.4-40.4 5m49s 102 100 30.4-31.2 31.2-32.0 39.9


9/22/2021 +
9/23/2021 40.4-45.4 5m4s 100 100

45.4-50.7 4m48s 100 100 46 several small vugs (clay throughout)

50.7-.55.6 5m 10:27 100 100 55.4


49.9-50.7 49.1-49.9

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/23/2021 VB Boring Number:TO3-VB-66 VB Boring Depth (ft):55.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.04 Northing:0.04 Easting-0.02

OPTV Start Time:12:20 OPTV End Time:12:50 OPTV Final Depth (ft):55.09

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 50.5, 51.8

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) horioxntal tool marks throughout (ex. 44.66, 45.20, etc)

small vugs (clay) in particular in bottom 20'

Was there Cracking? (Depths) No

Date: 9/23/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:20 CCTV End Time:14:03 CCTV Final Depth (ft):53.55

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 52.27, 51.18,

Leaks 53.55, 51.57

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-67 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): P3980467 & Borehole Logger's Name: Dave Hewitt/Kristina McCoy Start Date, Time, Water Depth: 9/28/21, 16:58, 0'
S3980403
Panel Completion Date: 8/28/2021 USACE/AECOM Representative(s): Alberto Rodriguez/Austin Sagul End Date, Time, Water Depth: 9/29/21, 16:32, 1.82'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.25
Northing: 910322.82 Actual Depth of VB Hole (ft)*: 57.6 Depth to Paywall from top of PVC (ft): 10.36
Easting: 629567.2 CT #: 2390
HHD Station: 3980+43.58 AT #: 088 Falling Head Test
Ground Elevation (ft): 34.11 Decommission Date 11/11/2021 Start Date & Time: 9/29/21, 16:32
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 9/30/21, 16:32
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 1.82
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.11 Top 1/3 9.1 25.8 N - 77F End (ft): 21.6

Depth to Bottom of Pay Wall (ft): 59.11 Middle 2/3 25.8 42.4 Manual Cutoff Wall Reading: not calculated (water below lake level)
Minimum Depth of VB Hole (ft): 57.11 Bottom 3/3 42.4 59.1 Automatic Cutoff Wall Reading**: 8.08*10^-7

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.1-10.7 8:44 100 100 10.2

10.7-15.7 4m1s 98 100


14.8-15.6 14.0-14.8
15.7-20.7 4m9s 102 100 20.1

20.7-25.7 4m5s 100 100 22.5, 23.3, 24.1, 25.2

25.7-30.7 4m17s 100 100 30.5

30.7-35.7 4m24s 98 100 25.7-26.5 26.5-27.3 31.9, 35.5

9/28/2021 35.7-40.7 100 100 39.6

40.7-45.7 4m13s 100 100 45.5

45.7-50.7 4m19s 100 100 47.0, 49.0 fished for final ~0.5', final 0.2' broken upon retrieval
50.7-51.5 52.3-53.1
50.7-55.5 98 100 55.2 54.8-55.2 fractured upon retrieval

55.5-57.6 1m40s 12:26 88 100 55.6, 56

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/28/2021 VB Boring Number:TO3-VB-67 VB Boring Depth (ft):57.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.22 Northing:0.10 Easting-0.19

OPTV Start Time:14:20 OPTV End Time:14:55 OPTV Final Depth (ft):57.21

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate small aggregate throughout

Soil Inclusions

Fractures

Other (Explain) horizontal tool marks - (examples 45.5, 50.3, 55.2)

Two white lines from 24.4- 48.5

Was there Cracking? (Depths) No clear cracking observed.

Date: 9/28/21 CCTV OBSERVATIONS:

CCTV Start Time: 15:18 CCTV End Time:16:53 CCTV Final Depth (ft):53.90

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks 37.88, 37.72, 37.52, 37.37, 36.79, presumed more leaks but too difficult to source

Aggregate

Soil Inclusions

Fractures

Other (Explain) horizontal tool marks - (examples - 39.9

first attempt 50.96 depth reached, second attempt 53.01, waster still rising so larger pump used for final run - 53.90 reached on final attempt
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-068 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): P3813638 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 9/29/21, 15:56, 0'

Panel Completion Date: 8/31/2021 USACE/AECOM Representative(s): Alberto Rodriguez/Luis Melo End Date, Time, Water Depth: 9/30/21, 15:50, 2.96'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.125
Northing: 903287.56 Actual Depth of VB Hole (ft)*: 56.4 Depth to Paywall from top of PVC (ft): 14.125
Easting: 643938.1 CT #: 2426
HHD Station: 3813+63.85 AT #: 089 Falling Head Test
Ground Elevation (ft): 38 Decommission Date 10/21/2021 Start Date & Time: 9/30/21, 15:44
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/01/21, 15:44
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.96'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 13 Top 1/3 13.0 28.0 No - 82.1 F End (ft): 7.84

Depth to Bottom of Pay Wall (ft): 58 Middle 2/3 28.0 43.0 Manual Cutoff Wall Reading: 6.31 E -8
Minimum Depth of VB Hole (ft): 56 Bottom 3/3 43.0 58.0 Automatic Cutoff Wall Reading**: 6.27 E -8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
13.0-15.6 4:21 100 100

15.6-20.6 3:55 102 100 20.2


14.0-14.8 14.8-15.6
20.6-25.6 4:02 100 100

25.6-30.6 4:01 98 100

30.6-35.6 4:06 100 100 31.7-32.0, 33.1, 34.4

35.6-40.6 5:56 98 100 33.6-34.4 34.4-35.5

9/30/2021 40.6-45.6 6:14 98 100

45.6-50.6 5:16 100 100 45.7 50.1 - Vug (Clay inclusion)

50.6-55.5 5:30 100 100


47.2-48.0 48.0-48.8
55.5-56.4 1:07 12:18 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:9/29/2021 VB Boring Number:TO3-VB-068 VB Boring Depth (ft):56.4

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.07 Northing:-0.03 Easting-0.06

OPTV Start Time:14:00 OPTV End Time:14:35 OPTV Final Depth (ft):56.11

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) No

Date: 9/29/21 CCTV OBSERVATIONS:

CCTV Start Time: 15:06 CCTV End Time:16:00 CCTV Final Depth (ft):54.68

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs Medium vugs (51.27, 52.35, 52.59, 54.15, and 54.29)

Leaks 50.58, 50.61, 51.18, 51.35, 53.06, 53.10, and 53.70

Aggregate

Soil Inclusions

Fractures

Other (Explain) Wire at 51.01


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-69 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3816561 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 10/05/2021, 15:44, 0'
P3816638
Panel Completion Date: 9/9/2021 USACE/AECOM Representative(s): Luis Melo End Date, Time, Water Depth: 10/06/2021, 16:14, 2.55'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.66
Northing: 903364.76 Actual Depth of VB Hole (ft)*: 55.8 Depth to Paywall from top of PVC (ft): 12.95
Easting: 643652.76 CT #: 2459
HHD Station: 3816 + 59.92 AT #: 090 Falling Head Test
Ground Elevation (ft): 37.29 Decommission Date 11/3/2021 Start Date & Time: 10/06/2021, 16:14
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/7/21 16:14
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.55
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.29 Top 1/3 12.3 27.3 No - 91.3F End (ft): 5.41

Depth to Bottom of Pay Wall (ft): 57.29 Middle 2/3 27.3 42.3 Manual Cutoff Wall Reading: 3.70x10^-8
Minimum Depth of VB Hole (ft): 55.29 Bottom 3/3 42.3 57.3 Automatic Cutoff Wall Reading**: 3.68x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.3-15.7 9:28 100 100

15.7-20.7 5m31s 100 100


17.4-18.2 18.2-19.0
20.7-25.7 98 100 23.0 - sand several small vugs throughout

25.7-30.7 102 100 30.5 28.4, 30.3, 30.6 - vug

30.7-35.7 6m 100 100 30.8, 33.3 - limestone final ~0.1 broken upon retrieval

35.7-40.7 6m15s 100 100 35.7-36.5 36.5-37.3 37.7 final ~0.3 broken upon retrieval

10/5/2021 40.7-45.7 6m13s 100 100


vug (clay) - 50.4, several small vugs (clay) from 47.4 to
45.7-50.8 6m28s 100 100 50.8
50.8-55.8 6m20s 12:21 100 100 numerous small vugs (some clay-filled) throughout
45.7-46.5 46.5-47.3

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/5/2021 VB Boring Number:TO3-VB-69 VB Boring Depth (ft):55.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.14 Northing:-0.12 Easting0.05

OPTV Start Time:14:05 OPTV End Time:14:36 OPTV Final Depth (ft):54.92

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate 33.35

Soil Inclusions

Fractures

Other (Explain) vertical tool marks throughout (ex: 12..9), sporadic horizontal tool marks (ex: 26.9, 30.5, 40.4, etc)

large vugs in overburden

Was there Cracking? (Depths) No

Date: 10/5/21 CCTV OBSERVATIONS:

CCTV Start Time: 15:01 CCTV End Time:15:36 CCTV Final Depth (ft):53.20

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks ~12-14'

large vugs in overburden


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-70 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3819610 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 10/13/2021, 13:15, 0'
P3819533
Panel Completion Date: 9/14/2021 USACE/AECOM Representative(s): Alberto Rodriguez/Austin Sagul End Date, Time, Water Depth: 10/14/2021, 15:49, 1.16'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.21
Northing: 903429.17 Actual Depth of VB Hole (ft)*: 55.9 Depth to Paywall from top of PVC (ft): 13.77
Easting: 543362.54 CT #: 2505
HHD Station: 3819+56.41 AT #: 092 Falling Head Test
Ground Elevation (ft): 37.56 Decommission Date 11/3/2021 Start Date & Time: 10/14/2021, 15:49
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/15/2021, 15:49
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.16
10/12:N - Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.56 Top 1/3 12.6 27.6 83.1F, 10/13: N End (ft): 4.87
- 77.1F
Depth to Bottom of Pay Wall (ft): 57.56 Middle 2/3 27.6 42.6 Manual Cutoff Wall Reading: 4.34x10^-8
Minimum Depth of VB Hole (ft): 55.56 Bottom 3/3 42.6 57.6 Automatic Cutoff Wall Reading**: 4.30x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
several small vugs (sand and clay), and small aggregate
12.6-15.7 10:25 4m44s 100 100 13.6 throughout
15.7-20.7 5m31s 96 100 18.7 16.7-17.7 - sand
20.7-21.5 21.5-22.3
20.7-25.7 5m36s 104 100 20.7 several small vugs (clay) throughout

25.7-30.8 5m22s 100 100 26.4 drilling ceased due to illness with drilling operator

30.8-35.8 5m10s 100 100 drilling resumed on 10/13

35.8-40.8 5m18s 100 100 35.0-35.8 34.2-35.0 40.5 several small vugs (clay) throughout
10/12/2021
+ 40.8-45.8 6m27s 100 100 42.9-43.2 - sandy silt 44.2-44.6 - sandstone aggregate
10/13/2021
45.8-50.7 5m40s 98 100 45.6 47.8-48.1 - clay numerous small vugs (clay) throughout

50.7-55.9 9:14 98 100 51.5, 52.4 numerous small vugs (clay) throughout
53.6-54.4 52.8-53.6
QA Sample #3 broke during cutting, GFA indicated
enough sample is unbroken to perform testing

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/13/2021 VB Boring Number:TO3-VB-70 VB Boring Depth (ft):55.9

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.51 Northing:0.40 Easting0.31

OPTV Start Time:11:23 OPTV End Time:11:49 OPTV Final Depth (ft):55.34

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 16.5, 16.9, 55.2

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) Dark/light coloration, particularly at depth - possible jointing?

Was there Cracking? (Depths) No

Date: 10/13/21 CCTV OBSERVATIONS:

CCTV Start Time: 12:23 CCTV End Time:13:07 CCTV Final Depth (ft):53.74

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 17.29, 16.86, 16.56

Leaks 53.71, 53.68, 53.66, 53.54, 52.29, 52.14, 50.71

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-071 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): P3822455 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 10/13/21, 16:48:56, 0'

Panel Completion Date: 9/17/2021 USACE/AECOM Representative(s): Alberto Rodriguez/Luis Melo End Date, Time, Water Depth: 10/14/21, 15:50, 0.72'
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.08
Northing: 903504.54 Actual Depth of VB Hole (ft)*: 55.8 Depth to Paywall from top of PVC (ft): 13.45
Easting: 643083.42 CT #: 2518
HHD Station: 3822+45.53 AT #: 093 Falling Head Test
Ground Elevation (ft): 37.37 Decommission Date 11/3/2021 Start Date & Time: 10/14/21, 16:00
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/15/21, 16:00
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 0.72
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.37 Top 1/3 12.4 27.4 No - 82.1 F End (ft): 4.05

Depth to Bottom of Pay Wall (ft): 57.37 Middle 2/3 27.4 42.4 Manual Cutoff Wall Reading: 3.86 E -8
Minimum Depth of VB Hole (ft): 55.37 Bottom 3/3 42.4 57.4 Automatic Cutoff Wall Reading**: 3.83 E -8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.4-15.7 6:00 100 100 14.9

15.7-0.7 5:00 96 100 19.7, 20.0, 20.1


13.2-14.0 12.4-13.2
20.7-25.7 5:30 102 100 21.1

25.7-30.7 5:00 102 100 30.4, 30.6

30.7-35.7 5:53 98 100

35.7-40.7 5:01 100 100 34.1-34.9 34.9-35.7 39.6

9/30/2021 40.7-45.7 4:57 102 100 44.7 42.4 Vug

45.7-50.8 4:48 100 100

50.8-55.8 4:45 100 100 55.2, 55.8


46.5-47.3 45.7-46.5

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/13/2021 VB Boring Number:TO3-VB-071 VB Boring Depth (ft):55.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.08 Northing:0.16 Easting-0.07

OPTV Start Time:15:32 OPTV End Time:15:58:00 PM OPTV Final Depth (ft):55.37

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) No

Date: 10/13/21 CCTV OBSERVATIONS:

CCTV Start Time: 16:16 CCTV End Time:16:58 CCTV Final Depth (ft):54.01

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks 48.84 ft, 48.97 ft, 48.98 ft , 49.04 ft, 53.94 ft, and 53.98 ft

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-72 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3983223 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 10/06/2021, 15:44, 0'
P3983287
Panel Completion Date: 9/11/2021 USACE/AECOM Representative(s): Luis Melo End Date, Time, Water Depth: 10/07/2021, 15:36, 1.84'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.88
Northing: 910425.25 Actual Depth of VB Hole (ft)*: 57.2 Depth to Paywall from top of PVC (ft): 9.68
Easting: 629304.5 CT #: 2462
HHD Station: 3983+25.53 AT #: 091 Falling Head Test
Ground Elevation (ft): 33.8 Decommission Date 11/11/2021 Start Date & Time: 10/07/2021, 1536
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/08/2021 15:36 PM
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1,84
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 8.8 Top 1/3 8.8 23.8 No - 91.3F End (ft): 2.76

Depth to Bottom of Pay Wall (ft): 53.8 Middle 2/3 23.8 38.8 Manual Cutoff Wall Reading: 1.24 E - 8
Minimum Depth of VB Hole (ft): 51.8 Bottom 3/3 38.8 53.8 Automatic Cutoff Wall Reading**: 1.27 E - 8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
8.8-10.7 5:40 100 100 9.8

10.7-15.7 6:06 98 100


16.2-17.0-18.2 17.0-17.8
15.7-20.7 5:26 102 100 Organic Inclusion, 19.2, 19.8

20.7-25.7 5:22 100 100 23.2-23.3, 24.1, 24.6

25.7-30.7 5:27 100 100 Organic Inclusion 27.4

30.7-35.7 6:00 100 100 39.7-40.5 38.9-39.7

10/5/2021 35.7-40.7 5:58 96 100 36.9, 37.2, 37.3

40.7-45.7 6:07 100 100

45.7-50.7 6:34 100 100


55.7-56.45 56.45-57.2
50.7-55.7 6:16 100 100 55.2

55.7-57.2 1:43 12:23 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/6/2021 VB Boring Number:TO3-VB-72 VB Boring Depth (ft):57.2

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.03 Northing:-0.01 Easting-0.03

OPTV Start Time:13:41 OPTV End Time:15:00 OPTV Final Depth (ft):56.71

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate 33.35

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths) No

Date: 10/6/21 CCTV OBSERVATIONS:

CCTV Start Time: 15:09 CCTV End Time:15:36 CCTV Final Depth (ft):55.11

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-73 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3825454 & Borehole Logger's Name: DavePerks/Alberto


Hewitt/Kristina McCoy Start Date, Time, Water Depth: 10/20/2021, 15:25, 0'
P3825378 Lisa
Rodriguez/Isaias
Panel Completion Date: 9/22/2021 USACE/AECOM Representative(s): Enriquez/Andrew End Date, Time, Water Depth: 10/21/2021, 15:04, 2.42'
Aceves/Elisabeth Chang/Austin
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core)
Sagul PVC Casing Stick-up (ft): 0.98
Northing: 903581.72 Actual Depth of VB Hole (ft)*: 55.6 Depth to Paywall from top of PVC (ft): 13.38
Easting: 642797.59 CT #: 2557
HHD Station: 3825+41.16 AT #: 096 Falling Head Test
Ground Elevation (ft): 37.4 Decommission Date 11/11/2021 Start Date & Time: 10/21/2021, 15:04
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/22/2021, 15:04
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.42
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.4 Top 1/3 12.4 27.4 N - 73.9 F End (ft): 5.94'

Depth to Bottom of Pay Wall (ft): 57.4 Middle 2/3 27.4 42.4 Manual Cutoff Wall Reading: 4.94x10^-8
Minimum Depth of VB Hole (ft): 55.4 Bottom 3/3 42.4 57.4 Automatic Cutoff Wall Reading**: 4.89x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.4-15.6 9:05 4m33s 100 100

15.6-20.6 4m14s 98 100 17.8, 18.5


12.4-13.2 13.2-14.0
20.6-25.6 3m56s 102 100 20.8 23.3 - clay

25.6-30.6 3m56s 98 100 26.9 - sand

30.6-35.6 4m8s 102 100 35.2


numerous small vugs (organics and clay) throughout
35.6-40.6 4m9s 100 100 32.2-33.0 33.0-33.8 40.3 36.1, 36.8 - soil bottom ~3'
10/20/2021 40.6-45.6 4m10s 100 100 42.1, 45.1 43.0 - clay numerous small vugs (clay and organics) throughout
fished for bottom ~1.6', vug (clay) - 45.9, numerous
45.6-50.7 4m4s 98 100 49.9, 50.4 49.4 - clay small vugs (clay and organics) throughout
51.0 - vug (clay), numerous smaller vugs (clay)
50.7-55.6 4m13s 11:47 100 100 54.2 throughout
47.9-48.7 46.1-46.9

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/20/2021 VB Boring Number:TO3-VB-73 VB Boring Depth (ft):55.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.11 Northing:-0.10 Easting-0.06

OPTV Start Time:13:46 OPTV End Time:14:20 OPTV Final Depth (ft):54.60

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 42.5, 49.7, 50.2, 53.2

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) vertical tool marks - example: 12.9, 15.0, etc

horizontal tool marks - 23.0, 29.9, etc

Was there Cracking? (Depths) No

Date: 10/20/21 CCTV OBSERVATIONS:

CCTV Start Time: 14:38 CCTV End Time:15:18 CCTV Final Depth (ft):52.71

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 50.62, 50.20, 42.87, 36.62

Leaks 52.71, 52.45, 51.67, 51.44, 50.82, 50.78, 50.62, 50.43, 50.36, 48.23

Aggregate

Soil Inclusions

Fractures

Other (Explain)

vertical tool marks - 24.0-26.0, sporadic

sporadic horizontal tool marks


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-74 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3838377 & Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 10/27/2021,1517,0
P3838300
Panel Completion Date: 9/30/2021 USACE/AECOM Representative(s): Elisabeth Chang/Melo Luis End Date, Time, Water Depth: 10/28/2021,1500,2.46
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.9
Northing: 903657.71 Actual Depth of VB Hole (ft)*: 55.8 Depth to Paywall from top of PVC (ft): 13.27
Easting: 642516.2 CT #: 2606
HHD Station: 3828+33.16 AT #: 098 Falling Head Test
Ground Elevation (ft): 37.37 Decommission Date Start Date & Time: 10/28/2021,1500
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/29/2021,1500
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 2.46
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.4 Top 1/3 12.4 27.4 End (ft): 3.8

Depth to Bottom of Pay Wall (ft): 57.37 Middle 2/3 27.4 42.4 Manual Cutoff Wall Reading: 1.65E-08
Minimum Depth of VB Hole (ft): 55.37 Bottom 3/3 42.4 57.4 Automatic Cutoff Wall Reading**: 1.59E-08

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.4-15.7 4:00 98 100

15.7-20.7 4:00 102 100 20.2


15.7-16.5 16.5-17.3
20.7-25.7 4:02 100 100 25.2

25.7-30.7 3:59 102 100 26.5,28.3,29.8,30.3

30.7-35.7 4:04 100 100 34.9

35.7-40.7 3:57 100 100 34.9-35.7 34.1-34.9 40.4

10/27/2021 40.7-45.7 4:03 100 100 41.9, 45.0

45.7-50.8 4:02 100 100 50.4 50.4

50.8-55.8 4:00 12:10 100 100


44.2-45.0 43.4-44.2

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/27/2021 VB Boring Number:TO3-VB-74 55.8

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.03 Northing:-0.12 Easting0.06

OPTV Start Time:1:40 OPTV End Time:2:15 OPTV Final Depth (ft):55.43

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths)

Date: 10/27/21 CCTV OBSERVATIONS:

CCTV Start Time: 2:23 CCTV End Time:3:17 CCTV Final Depth (ft):53.86

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-75 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3993383 & Borehole Logger's Name: Dave Hewitt/Kristina McCoy Start Date, Time, Water Depth: 10/21/2021, 14:23, 0'
P3993446
Panel Completion Date: 9/15/2021 USACE/AECOM Representative(s): Austin Sagul/Alberto Rodriguez End Date, Time, Water Depth: 10/22/2021, 14:10, 0.104'
Center of Panel, Overlap, or Joint: Overlap Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.69
Northing: 910770.67 Actual Depth of VB Hole (ft)*: 57.6 Depth to Paywall from top of PVC (ft): 9.99
Easting: 628350.19 CT #: 2559
HHD Station: 3993+41.45 AT #: 097 Falling Head Test
Ground Elevation (ft): 34.3 Decommission Date Start Date & Time: 10/22/2021, 14:10
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/23/2021, 14:10
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 0.104'
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.3 Top 1/3 9.3 26.0 N - 75.1 F End (ft): 0.7'

Depth to Bottom of Pay Wall (ft): 59.3 Middle 2/3 26.0 42.6 Manual Cutoff Wall Reading: 7.22x10^-9
Minimum Depth of VB Hole (ft): 57.3 Bottom 3/3 42.6 59.3 Automatic Cutoff Wall Reading**: 6.55x10^-9

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.3-10.7 8:45 4m6s 100 100 9.3, 10.4

10.7-15.7 3m54s 100 100 11.9, 15.1


15.7-16.8 16.8-17.9
16.8, 17.9, 18.9, 19.6,
15.7-20.7 3m54s 98 100 20.3
20.7-25.7 3m45s 98 100 24.8

25.7-30.7 4m8s 104 100 30.5

30.7-35.7 4m8s 98 100 38.6-39.4 39.4-40.3 33.4


table was bumped and core rolled off table after
10/21/2021 35.7-40.7 4m14s 102 100 38.6, 39.4, 40.3 samples were collected
40.7-45.7 4m22s 98 100 44.4

45.7-50.7 4m17s 102 100 46.6, 50.0


50.7-51.5 51.5-52.3
50.7-55.8 4m8s 100 100 53.5, 54.6, 55.3

55.8-57.6 11:02 100 100

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/21/2021 VB Boring Number:TO3-VB-75 VB Boring Depth (ft):57.6

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.04 Northing:0.02 Easting-0.04

OPTV Start Time:12:46 OPTV End Time:13:18 OPTV Final Depth (ft):57.10

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) sporadic horizontal tool marks- examples: 46.4, 50.4, etc.

Was there Cracking? (Depths) No

Date: 10/21/21 CCTV OBSERVATIONS:

CCTV Start Time: 13:40 CCTV End Time:14:15 CCTV Final Depth (ft):55.65

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) No comments


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-17W Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3975789 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth: 10/28/2021, 5:10, 0

Panel Completion Date: 8/21/2021 USACE/AECOM Representative(s): Isaias Enrique/Luis M/ Penny End Date, Time, Water Depth: 10/29/2021,4:22, 2.56
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 9
Northing: 910157.13 Actual Depth of VB Hole (ft)*: 55.7 Depth to Paywall from top of PVC (ft): 17.7
Easting: 630001.2 CT #: 2617
HHD Station: 3975+78.88 AT #: 099 Falling Head Test
Ground Elevation (ft): 33.7 Decommission Date Start Date & Time: 10/29/2021, 4:22
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 10/30/2021, 4:22
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 2.56
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 8.7 Top 1/3 8.7 25.4 End (ft):
Depth to Bottom of Pay Wall (ft): 58.7 Middle 2/3 25.4 42.0 Manual Cutoff Wall Reading:
Minimum Depth of VB Hole (ft): 56.7 Bottom 3/3 42.0 58.7 Automatic Cutoff Wall Reading**:

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
8.7-10.5 3:53 100 100 9.1

10.5-15.5 3:58 100 100


14.7-15.5 13.1-13.9
15.5-20.5 3:48 100 100 17.2, 18.3, 19.6

20.5-25.5 3:16 102 100 20.4, 22.2

25.5-30.5 3:27 100 100 28.2, 29.6, 27.2

30.5-35.5 2:40 66 100 36.2-36.9 35.5-36.2

10/28/2021 35.5-40.5 2:49 104 100 36.7, 39.5

40.5-45.5 2:44 100 100 43

45.5-50.5 2:45 100 100 52.7-53.0


46.6-47.6 47.6-48.6
50.5-55.7 2:43 100 100

55.7-56.9 0:49 1:00 100 100 56.6

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28 days,
verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:10/29/2021 VB Boring Number:TO3-VB-17W VB Boring Depth (ft):56.9

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.11 Northing:-0.09 Easting0.05

OPTV Start Time:3:32 OPTV End Time:4:10 OPTV Final Depth (ft):55.88

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths)

Date: 10/28/21 CCTV OBSERVATIONS:

CCTV Start Time: 3:50 CCTV End Time:4:36 CCTV Final Depth (ft):54.77

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-76 Driller's Name: Grant Watson Saturation of Borehole

Panel Number(s): S3831299 Borehole Logger's Name: Dave Hewitt Start Date, Time, Water Depth:

Panel Completion Date: 8/21/2021 USACE/AECOM Representative(s): Isaias Enrique/Luis M/ Penny End Date, Time, Water Depth:
Center of Panel, Overlap, or Joint: Center Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft):
Northing: 903735.05 Actual Depth of VB Hole (ft)*: 55.9 Depth to Paywall from top of PVC (ft):

Easting: 642229.66 CT #: 2631


HHD Station: 3831+29.88 AT #: 100 Falling Head Test
Ground Elevation (ft): 37.5 Decommission Date Start Date & Time:
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time:
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft):
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.5 Top 1/3 12.5 27.5 End (ft):
Depth to Bottom of Pay Wall (ft): 57.5 Middle 2/3 27.5 42.5 Manual Cutoff Wall Reading:
Minimum Depth of VB Hole (ft): 55.5 Bottom 3/3 42.5 57.5 Automatic Cutoff Wall Reading**:

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.5-15.7 5:40 98 100 12.7

15.7-20.7 3:53 102 100 20.3


20.7-21.5 21.5-22.3
20.7-25.8 3:52 96 100 25.5

25.8-30.8 4:04 100 100 27.5

30.8-35.8 4:30 100 100

35.8-40.8 4:09 98 100 30.8-31.8 31.8-32.8

11/1/2021 40.8-45.8 4:26 100 100 42.6,44.6

45.8-50.8 4:13 96 100 49.3, 50.6

50.8-55.9 4:04 100 100


47.4-48.1 48.2-49.0

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28 days,
verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:11/2/2021 VB Boring Number:TO3-VB-76 VB Boring Depth (ft):55.9

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.11 Northing:-0.06 Easting0.09

OPTV Start Time:2:15 OPTV End Time:3:05 OPTV Final Depth (ft):55.38

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths)

Date: 11/1/21 CCTV OBSERVATIONS:

CCTV Start Time: 3:30 CCTV End Time:4:15 CCTV Final Depth (ft):54.01

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 47.09, 36.98, 35.60, 35.56, and 29.70

Leaks 52.71, 52.06, 51.17, 49.22

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-80 Driller's Name: Brian McCord and Brandon Saturation of Borehole
Gomez
Panel Number(s): P3986046 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 11/3/2021, 16:39, 0'
P3985978
Panel Completion Date: 10/6/2021 USACE/AECOM Representative(s): Austin Sagul End Date, Time, Water Depth: 11/4/2021, 16:08, 2.56'
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 0.92
Northing: 910520.16 Actual Depth of VB Hole (ft)*: 58 Depth to Paywall from top of PVC (ft): 10.32
Easting: 629045.02 CT #: 02655
HHD Station: 3986+01.76 AT #: 101 Falling Head Test
Ground Elevation (ft): 34.4 Decommission Date Start Date & Time: 11/4/2021, 16:08
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 11/5/2021, 16:08
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -25 Min. (ft) Max. (ft) Start (ft): 2.56
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 9.4 Top 1/3 9.4 26.1 N - 77.3F End (ft): 22.31

Depth to Bottom of Pay Wall (ft): 59.4 Middle 2/3 26.1 42.7 Manual Cutoff Wall Reading: No reading
Minimum Depth of VB Hole (ft): 57.4 Bottom 3/3 42.7 59.4 Automatic Cutoff Wall Reading**: 1.20x10^-6

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
9.4-14.4 10:55 4m20s 100 100 9.5, 10.8, 13.1, 14.2 apparent joint observed

14.4-19.4 4m50s 100 100 15.3, 16.1, 17.2, 19.3 apparent joint observed
14.4-15.3 15.3-16.1
20.3, 20.8, 21.3, 22.7,
19.4-24.4 4m31s 100 100 23.9 bottom 0.1' fragmented upon retrieval

24.9-29.4 4m30s 102 100 26.9, 27.5, 28.4


30.7, 32.0, 32.5, 33.3,
29.4-34.4 4m9s 98 100 33.7, bottom 0.1' fragmented upon retrieval

34.4-39.4 4m11s 98 100 27.5-28.4 28.4-29.3 36.3, 37.3, 38.0, 39.2


40.5, 40.9, 42.6, 43.2,
11/3/2021 39.4-44.4 98 100 44.0
45.8, 46.5, 46.7, 47.8,
44.4-49.4 4m19s 98 100 48.7, 49.1 bottom 0.2' fragmented upon retrieval

49.4-54.5 102 100 51.4, 52.4, 53.0


47.1-47.8 47.8-48.6
55.8, 56.4, 57.3, 57.6,
54.5-58.0 2m56s 13:52 100 100 57.8

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:11/3/2021 VB Boring Number:TO3-VB-80 VB Boring Depth (ft):58.0

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.17 Northing:-0.09 Easting-0.15

OPTV Start Time:15:27 OPTV End Time:15:51 OPTV Final Depth (ft):57.51

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) no remarks

Was there Cracking? (Depths) No

Date: 11/3/21 CCTV OBSERVATIONS:

CCTV Start Time: 16:02 CCTV End Time:16:37 CCTV Final Depth (ft):56.18

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) no remarks


Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB-78 Driller's Name: Brian McCord and Brandon Saturation of Borehole
Gomez
Panel Number(s): S3837292 & Borehole Logger's Name: Kristina McCoy Start Date, Time, Water Depth: 11/5/2021, 12:57, 0'
P3837369
Panel Completion Date: 10/12/2021 USACE/AECOM Representative(s):
Andrew Aceves/Austin Sagul/Luis End Date, Time, Water Depth: 11/8/2021, 9:08, 1.57'
Melo
Center of Panel, Overlap, or Joint: Joint Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft): 1.54
Northing: 903890.18 Actual Depth of VB Hole (ft)*: 55.5 Depth to Paywall from top of PVC (ft): 13.7
Easting: 641645.89 CT #: 2673
HHD Station: 3837+33.92 AT #: 103 Falling Head Test
Ground Elevation (ft): 37.16 Decommission Date Start Date & Time: 11/8/2021, 9:08
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time: 11/9/2021, 9:08
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft): 1.57
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 12.16 Top 1/3 12.2 27.2 N - 73.9F End (ft): 5.48

Depth to Bottom of Pay Wall (ft): 57.16 Middle 2/3 27.2 42.2 Manual Cutoff Wall Reading: 4.88x10^-8
Minimum Depth of VB Hole (ft): 55.16 Bottom 3/3 42.2 57.2 Automatic Cutoff Wall Reading**: 4.85x10^-8

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)
12.2-14.4 8:42 4m21s 100 100 12.8 several small vugs (org) throughout

14.4-19.4 100 100 16.4-16.8 - clay trace small vugs (organic and clay) throughout
20.5-21.3 21.3-22.1
19.4-24.4 4m9s 98 100 20.5, 23.7 trace small vugs (organic and clay) throughout

24.4-29.4 4m19s 100 100 trace small vugs (organic and clay) throughout

29.4-34.6 4m13s 96 100 trace small vugs (organic and clay) throughout

34.6-39.6 4m19s 102 100 29.4-30.2 30.2-31.0 36.1-36.5 - limestone trace small vugs (organic and clay) throughout
43.1 - vug, trace small vugs (organic and clay)
11/5/2021 39.6-44.6 98 100 throughout
remainder of core presumed to be ground up, trace
44.6-49.3 4m18s 49 100 45.8, 46.1, 46.7 vugs
49.6, 50.1, 50.5, 51.0,
49.3-54.3 56 100 51.2 remainder of core presumed to be ground up
43.2-43.9 42.4-43.2
entirety of core fished, remainder of core presumed to
54.3-55.5 11:40 58 100 54.5, 55.0 be ground up

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date:11/9/2021 VB Boring Number:TO3-VB-78 VB Boring Depth (ft):55.5

OPTV OBSERVATIONS:

Total Vector Deviation (ft): 0.11 Northing:0.11 Easting0.00

OPTV Start Time:10:15 OPTV End Time:10:45 OPTV Final Depth (ft):55.31

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain) No remarks

Was there Cracking? (Depths) No

Date: 11/9/21 CCTV OBSERVATIONS:

CCTV Start Time: 11:28 CCTV End Time:12:25 CCTV Final Depth (ft):53.86

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs 51.75, 47.47, 46.48, 41.04, 18.99, 16.67

Leaks 52.81, 52.84

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Herbert Hoover Dike Task Order 3 Cutoff Wall Verification Drilling and Field
Permeability Testing QA Form
Verification Boring Number: TO3-VB- Driller's Name: Saturation of Borehole

Panel Number(s): Borehole Logger's Name: Start Date, Time, Water Depth:

Panel Completion Date: USACE/AECOM Representative(s): End Date, Time, Water Depth:
Center of Panel, Overlap, or Joint: Hole Diameter (in): 4.8 (3.25 core) PVC Casing Stick-up (ft):
Northing: Actual Depth of VB Hole (ft)*: Depth to Paywall from top of PVC (ft): 10
Easting: CT #:
HHD Station: AT #: Falling Head Test
Ground Elevation (ft): 35 Decommission Date Start Date & Time:
Top of Pay Wall (EL): 25 Core Samples Locations Ranges (ft) End Date & Time:
Drill Water
Heated Up? Manual Water Depth (from top of casing) at
Bottom of Pay Wall (EL): -20 Min. (ft) Max. (ft) Start (ft):
Manual Water Depth (from top of casing) at
Depth to Top of Pay Wall (ft): 10 Top 1/3 10.0 25.0 End (ft):
Depth to Bottom of Pay Wall (ft): 55 Middle 2/3 25.0 40.0 Manual Cutoff Wall Reading:
Minimum Depth of VB Hole (ft): 53 Bottom 3/3 40.0 55.0 Automatic Cutoff Wall Reading**:

Start or End Descriptions


Drill Recovery (%) RQD (%) QA Sample QC Sample
Date Run (ft) Mechanical Break Inclusions Pits, Vugs, Rod drops, water loss, change in
Time Time (spec=90%) (spec=85%) Depths (ft) Depths (ft)
Depths (ft)*** (>3")**** drill water color, etc.)

*All boreholes shall be drilled vertically to within 2 feet of the finished depth of the cutoff wall taking care to not
penetrate to the bottom of the cutoff wall. Descriptions:
**02 35 29, para 1.4 "Continuitous and homogenous, width 24", Permeability <1x10 -6 cm/sec, UCS 100-500 at 28
days, verticality <1%, Temp <96F) Pitted Vugs Cavity
***02 32 00, para. 3.1.2 "Excessive mechanical breaks/fractures (defined as 3 or more per foot of core run are (0.25" to diameter
observed or low core recover <85%", correct drilling procedures. (< 0.25") of core) (Larger than the core diameter)
****02 35 29, para 1.3.9 "Homogeneous is material mixed uniformly throughout,exhibits consistent quality, and
minimizes voids and inclusions in excess of 3 inches in any dimension."
Herbert Hoover Dike Task Order 3 Cutoff Wall OPTV and CCTV Camera
Information
Date: VB Boring Number:TO3-VB- VB Boring Depth (ft):

OPTV OBSERVATIONS:

Total Vector Deviation (ft): Northing: Easting

OPTV Start Time: OPTV End Time: OPTV Final Depth (ft):

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)

Was there Cracking? (Depths)

Date: CCTV OBSERVATIONS:

CCTV Start Time: CCTV End Time: CCTV Final Depth (ft):

Feature (Leaks, Vugs, Pitting, Etc) Approximate Depths

Pitting

Vugs

Leaks

Aggregate

Soil Inclusions

Fractures

Other (Explain)
Task Order 3
Verification Boring VB78
Date 11/5/2021
Geotechs Andrew Aceves/Austin Sagul/Luis Melo
Depth Drilled 55.5
CT 2673
AT 103
Panels S3837292 & P3837369
Center, Overlap, or Joint: Joint
Station 3837+33.92
QA#1 20.5-21.3
QA#2 29.4-30.2
QA#3 43.2-43.9
Saturation Start 11/5/2021, 12:57, 0'
Saturation End 11/8/2021, 9:08, 1.57'
Falling Head Start 11/8/2021, 9:08
Manual Depth Start 1.57
Falling Head End 11/9/2021, 9:08
Manual Depth End 5.48
Manual K 4.88x10^-8
Automatic K 4.85x10^-8
OPTV Date 11/9/2021
OPTV Depth 55.31
CCTV Date 11/9/2021
CCTV Depth 53.86
Additional Comments
VB# SAMPLES 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-45

UCS QA X X
1
USC QC X X
UCS QA X X
2
USC QC X X
UCS QA X X
3
USC QC X X
UCS QA X X
4
USC QC X X
UCS QA X X
5
USC QC X X
UCS QA X X
6
USC QC X X
UCS QA X
7
USC QC
UCS QA X X
8
USC QC X X
UCS QA X X
9
USC QC X X
UCS QA X X
10
USC QC X X
UCS QA X X
11
USC QC X X
UCS QA X X
12
USC QC X X
UCS QA X X X
13
USC QC X X X
UCS QA X X
14
USC QC X X
UCS QA X X
15
USC QC X X
UCS QA X X
16
USC QC X X
UCS QA X X
17
USC QC X X
UCS QA X X
18
USC QC X X
UCS QA X X
18E
USC QC X X
UCS QA X X
18W
USC QC X X
UCS QA X X X
19
USC QC X X X
UCS QA X X
20
20
USC QC X X
UCS QA X X
21
USC QC X X
UCS QA X X
21E
USC QC X X
UCS QA X X
21W
USC QC X X
UCS QA X X
22
USC QC X X
UCS QA X X
23
USC QC X X
UCS QA X X
24
USC QC X X
UCS QA X X
25
USC QC X X
UCS QA X X
26
USC QC X X
UCS QA X X
27
USC QC X X
UCS QA X X
28
USC QC X X
UCS QA X X
29
USC QC X X
UCS QA X X
30
USC QC X X
UCS QA X X
31
USC QC X X
UCS QA X X X
32
USC QC X X X
UCS QA X X
33
USC QC X X
UCS QA X X
34
USC QC X X
UCS QA X X
35
USC QC X X
UCS QA X X
36
USC QC X X
UCS QA X X
37
USC QC X X
UCS QA X X
38
USC QC X X
UCS QA X X
39
USC QC X X
UCS QA X X
40
USC QC X X
UCS QA X X
41
41
USC QC X X
UCS QA X X
42
USC QC X X
UCS QA X X
JGVB01
USC QC X X
UCS QA X X
JGVB02
USC QC X X
UCS QA X X
JGVB03
USC QC X X
UCS QA X X
43
USC QC X X
UCS QA X X
44
USC QC X X
UCS QA X X
45
USC QC X X
UCS QA X X X
46
USC QC X X X
UCS QA X X
47
USC QC X X
UCS QA X X
48
USC QC X X
UCS QA X X
49
USC QC X X
UCS QA X X
50
USC QC X X
UCS QA X X
51
USC QC X X
UCS QA X X
52
USC QC X X
UCS QA X X
53
USC QC X X
UCS QA X X
54
USC QC X X
UCS QA X X X
JGVB04
USC QC X X X
UCS QA X X
JGVB05
USC QC X X
UCS QA X X
55
USC QC X X
UCS QA X X
56
USC QC X X
UCS QA X X X
57
USC QC X X X
UCS QA X X
58
USC QC X X
UCS QA X X
59
59
USC QC X X
UCS QA X X
60
USC QC X X X
UCS QA X X
61
USC QC X X
UCS QA X X
62
USC QC X X
UCS QA X X
63
USC QC X X
UCS QA X X
64
USC QC X X
UCS QA X X X
65
USC QC X X X
UCS QA X X
66
USC QC X X
UCS QA X X
67
USC QC X X
UCS QA X X
68
USC QC X X
UCS QA X X
69
USC QC X X
UCS QA X X
70
USC QC X X
UCS QA ? ?
71
USC QC ? ?
UCS QA X X
72
USC QC X X
UCS QA X X
73
USC QC X X
UCS QA
74
USC QC
UCS QA X X
75
USC QC X X
UCS QA X X
17W
USC QC X X
UCS QA X X
76
USC QC X X
UCS QA
77
USC QC
UCS QA X X X
78
USC QC X X X
UCS QA
79
USC QC
UCS QA X X
80
USC QC X X
UCS QA
81
81
USC QC
UCS QA
82
USC QC
UCS QA
83
USC QC
UCS QA
84
USC QC
UCS QA
85
USC QC
UCS QA
86
USC QC
UCS QA
87
USC QC
UCS QA
88
USC QC
UCS QA
89
USC QC
UCS QA
90
USC QC
UCS QA
91
USC QC
UCS QA
92
USC QC
UCS QA
93
USC QC
UCS QA
94
USC QC
UCS QA
95
USC QC
UCS QA
96
USC QC
UCS QA
97
USC QC
UCS QA
98
USC QC
UCS QA
99
USC QC
UCS QA
100
USC QC
UCS QA
101
USC QC
UCS QA
102
USC QC
UCS QA
103
USC QC
UCS QA
104
104
USC QC
UCS QA
105
USC QC
UCS QA
106
USC QC
UCS QA
107
USC QC
UCS QA
108
USC QC
UCS QA
45-50 50-55 55-60 60-65

X
X
X
X
X
X
X
X
X
X
X
X

X
X
X
X
X
X
X
X
X
X

X
X
X
X
X
X
X
X
X
X
X
X
X
X

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

X
X
X
X
X
X

X
X
X
X
X

X
X
X
X
X
X
X
X

X
X
X
X
X
X
X
X
X
X
?
?
X
X
X
X

X
X
X
X
X
X

X
X
Panel Days to Location in TO3 VB Summary Sheet
VB Date Drilled
Completion Date Drill Panel(s) CT AT
VB1 3/27/2020 4/22/2020 26 Joint 00043 0010
VB1R 0 No samples
Joint taken. Using VB-1 UCS
0 results
VB2 3/24/2020 4/17/2020 24 Overlap 00042 009
VB3 3/20/2020 4/15/2020 26 Center (non-hyd 00041 008
VB4 3/17/2020 4/10/2020 24 Joint 00040 0007
VB5 3/28/2020 4/23/2020 26 Overlap 0045 012
VB6 7/14/2020 8/26/2020 43 Joint 00226 0015
VB7 7/11/2020 8/27/2020 47 Center 00229 0016
VB8 8/12/2020 9/18/2020 37 Joint 00273 00018
VB9 8/8/2020 9/17/2020 40 Center 00270 00017
VB10 9/2/2020 9/29/2020 27 Joint 00297 020
VB11 8/27/2020 9/28/2020 32 Joint 00294 019
VB12 9/17/2020 10/20/2020 33 Center 00373 0022
VB13 9/21/2020 10/21/2020 30 Joint 00380 0023
VB14 10/28/2020 11/21/2020 24 Joint 00537 0027
VB15 10/2/2020 10/28/2020 26 Joint 00407 0024
VB16 10/19/2020 11/16/2020 28 Overlap 00493 0026
VB17 10/14/2020 11/13/2020 30 Joint 00477 0025
VB18 11/3/2020 12/8/2020 35 Overlap 00567 0028
VB18E 11/3/2020 2/3/2021 92 Center 00960 0045
VB18W 11/3/2020 1/25/2021 83 Center 00909 0041
VB19 11/14/2020 12/9/2020 25 Center 00661 0029
VB20 11/19/2020 12/16/2020 27 Joint 00713 0030
VB21 11/23/2020 12/18/2020 25 Center 00751 0031
VB21E 11/23/2020 2/4/2021 73 Center 00966 0046
VB21W 11/23/2020 1/26/2021 64 Center 00919 0042
VB22 12/3/2020 1/6/2021 34 Joint 00808 0032
VB23 12/7/2020 1/7/2021 31 Center 00820 0033
VB24 12/11/2020 1/8/2021 28 Overlap 00824 0034
VB25 12/15/2020 1/11/2021 27 Joint 00851 0035
VB26 12/18/2020 1/14/2021 27 Center 00873 0036
VB27 12/20/2020 1/18/2021 29 Overlap 00878 0039
VB28 1/4/2021 2/1/2021 28 Joint 00937 0043
VB29 1/6/2021 2/2/2021 27 Center 00940 00044
VB30 1/12/2021 2/19/2021 38 Center 01031 0047
VB31 1/21/2021 2/23/2021 33 Overlap 01044 0048
VB32 1/28/2021 2/24/2021 27 Joint 1045 049
VB33 2/18/2021 3/15/2021 25 Center 01207 0053
VB34 2/3/2021 3/9/2021 34 Overlap 01152 0050
VB35 2/8/2021 3/10/2021 30 Joint 01178 0051
VB36 2/10/2021 3/11/2021 29 Center 1191 052
VB37 2/23/2021 3/25/2021 30 Overlap 01267 0055
VB38 2/25/2021 3/29/2021 32 Joint 01268 0056
VB39 3/4/2021 3/30/2021 26 Center 01269 0057
VB40 3/10/2021 4/6/2021 27 Overlap 01270 0058
VB41 3/17/2021 4/14/2021 28 Joint 1402 N/A
VB42 3/22/2021 4/16/2021 25 Center 01403 N/A
JGVB01 3/24/2021 4/19/2021 26 Overlap 1443 060
JGVB02 3/25/2021 4/20/2021 26 Overlap 1449 062
JGVB03 3/29/2021 4/21/2021 23 Center 1447 061
JGWVB07 3/29/2021 4/22/2021 24 Edge 1454 N/A
JGWVB02 3/24/2021 4/23/2021 30 Edge of Overcut 1455 N/A
JGWVB08 3/29/2021 4/27/2021 29 Edge 1489 N/A
JGWVB10 3/29/2021 4/27/2021 29 Edge 1492 N/A
JGWVB11 3/29/2021 4/27/2021 29 Edge 1493 N/A
VB43 3/31/2021 4/28/2021 28 Overlap 01487 063
VB44 4/2/2021 4/29/2021 27 Joint 01487 N/A
VB45 4/9/2021 5/7/2021 28 Center 01550 NA
VB46 4/14/2021 5/10 - 5/11/21 ### Overlap 01555 064
VB47 4/26/2021 5/21/2021 25 Joint 01663 N/A
VB48 4/29/2021 5/25/2021 26 Center 01678 065
VB49 5/4/2021 6/2/2021 29 Overlap 01741 N/A
VB50 5/11/2021 6/3/2021 23 Joint 01747 066
VB51 5/13/2021 6/7/2021 25 Center 01775 N/A
VB52 5/18/2021 6/15/2021 28 Overlap 01857 067
VB53 5/26/2021 6/22/2021 27 Joint 01862 N/A
JGWVB18 5/27/2021 6/23/2021 27 Edge N/A N/A
JGWVB19 5/27/20216/23/2021 - 6/24/2021
### Edge N/A N/A
JGWVB21 5/28/20217/1/2021 + 7/2/2021### Edge Not provided N/A
JGVB04 6/1/2021
6/29/2021, 6/30/2021, 7/1/2021
### Overlap 01886 070
JGVB05 6/3/20216/24/2021 + 6/25/2021
### Overlap 01887 068
VB54 6/3/20216/28/2021 - 6/29/21### Center 01888 069
VB55 6/5/2021 & 6/7/20217/9/2021 ### Overlap 1926 072
VB56 6/11/2021 7/12/2021 31 Joint 01933 073
JGWVB22 5/27/2021 7/15/2021 49 Edge not given 074
JGWVB16 6/1/2021 7/16/2021 45 Overlap undecided n/a
VB57 6/25/2021 7/19/2021 24 Center 01966 075
VB58 6/30/2021 7/26/2021 26 Overlap 02038 077
VB59 7/12/21 & 7/13/218/10/2021 ### Joint 02093 080
VB60 7/19/2021 8/17/2021 29 Center 2133 081
VB61 7/27/2021 8/23/2021 27 Overlap 02189 082
VB62 7/30/2021 8/26/2021 27 Joint 2218 00083
VB63 8/4/2021 9/1/2021 28 Center 02251 084
VB64 8/10/2021 9/9/2021 30 Center 2280 085
VB65 8/19/2021 9/14/2021 26 Overlap 2309 086
VB66 8/26/20219/22/2021 + 9/23/2021
### Joint 2339 087
VB67 8/28/2021 9/28/2021 31 Overlap 2390 088
VB68 8/31/2021 9/30/2021 30 Center 2426 089
VB69 9/9/2021 10/5/2021 26 Overlap 2459 090
VB70 9/14/2021
10/12/2021+ 10/13/2021
### Joint 2505 092
VB71 9/17/2021 9/30/2021 13 Center 2518 093
VB72 9/11/2021 10/5/2021 24 Overlap 2462 091
VB73 9/22/2021 10/20/2021 28 Overlap 2557 096
VB74 9/30/2021 10/27/2021 27 Overlap 2606 098
VB75 9/15/2021 10/21/2021 36 Overlap 2559 097
VB76 8/21/2021 11/1/2021 72 Center 2631 100
VB77 #REF! #REF! #REF! #REF! #REF! #REF!
VB78 10/12/2021 11/5/2021 24 Joint 2673 103
VB79 #REF! #REF! #REF! #REF! #REF! #REF!
VB80 10/6/2021 11/3/2021 28 Joint 02655 101
VB81 #REF! #REF! #REF! #REF! #REF! #REF!
VB82 #REF! #REF! #REF! #REF! #REF! #REF!
VB83 #REF! #REF! #REF! #REF! #REF! #REF!
VB84 #REF! #REF! #REF! #REF! #REF! #REF!
VB85 #REF! #REF! #REF! #REF! #REF! #REF!
VB86 #REF! #REF! #REF! #REF! #REF! #REF!
VB87 #REF! #REF! #REF! #REF! #REF! #REF!
VB88 #REF! #REF! #REF! #REF! #REF! #REF!
VB89 #REF! #REF! #REF! #REF! #REF! #REF!
VB90 #REF! #REF! #REF! #REF! #REF! #REF!
VB91 #REF! #REF! #REF! #REF! #REF! #REF!
VB92 #REF! #REF! #REF! #REF! #REF! #REF!
VB93 #REF! #REF! #REF! #REF! #REF! #REF!
VB94 #REF! #REF! #REF! #REF! #REF! #REF!
VB95 #REF! #REF! #REF! #REF! #REF! #REF!
VB96 #REF! #REF! #REF! #REF! #REF! #REF!
VB97 #REF! #REF! #REF! #REF! #REF! #REF!
VB98 #REF! #REF! #REF! #REF! #REF! #REF!
VB99 #REF! #REF! #REF! #REF! #REF! #REF!
VB100 #REF! #REF! #REF! #REF! #REF! #REF!
VB101 #REF! #REF! #REF! #REF! #REF! #REF!
VB102 #REF! #REF! #REF! #REF! #REF! #REF!
VB103 #REF! #REF! #REF! #REF! #REF! #REF!
VB104 #REF! #REF! #REF! #REF! #REF! #REF!
VB105 #REF! #REF! #REF! #REF! #REF! #REF!
VB106 #REF! #REF! #REF! #REF! #REF! #REF!
VB107 #REF! #REF! #REF! #REF! #REF! #REF!
VB108 #REF! #REF! #REF! #REF! #REF! #REF!
VB109 #REF! #REF! #REF! #REF! #REF! #REF!
VB110 #REF! #REF! #REF! #REF! #REF! #REF!
VB111 #REF! #REF! #REF! #REF! #REF! #REF!
VB112 #REF! #REF! #REF! #REF! #REF! #REF!
VB113 #REF! #REF! #REF! #REF! #REF! #REF!
VB114 #REF! #REF! #REF! #REF! #REF! #REF!
VB115 #REF! #REF! #REF! #REF! #REF! #REF!
VB116 #REF! #REF! #REF! #REF! #REF! #REF!
VB117 #REF! #REF! #REF! #REF! #REF! #REF!
VB118 #REF! #REF! #REF! #REF! #REF! #REF!
VB119 #REF! #REF! #REF! #REF! #REF! #REF!
VB120 #REF! #REF! #REF! #REF! #REF! #REF!
VB121 #REF! #REF! #REF! #REF! #REF! #REF!
VB122 #REF! #REF! #REF! #REF! #REF! #REF!
VB123 #REF! #REF! #REF! #REF! #REF! #REF!
VB124 #REF! #REF! #REF! #REF! #REF! #REF!
VB125 #REF! #REF! #REF! #REF! #REF! #REF!
VB126 #REF! #REF! #REF! #REF! #REF! #REF!
VB127 #REF! #REF! #REF! #REF! #REF! #REF!
VB128 #REF! #REF! #REF! #REF! #REF! #REF!
VB129 #REF! #REF! #REF! #REF! #REF! #REF!
VB130 #REF! #REF! #REF! #REF! #REF! #REF!
VB131 #REF! #REF! #REF! #REF! #REF! #REF!
VB132 #REF! #REF! #REF! #REF! #REF! #REF!
VB133 #REF! #REF! #REF! #REF! #REF! #REF!
VB134 #REF! #REF! #REF! #REF! #REF! #REF!
VB135 #REF! #REF! #REF! #REF! #REF! #REF!
VB136 #REF! #REF! #REF! #REF! #REF! #REF!
VB137 #REF! #REF! #REF! #REF! #REF! #REF!
VB138 #REF! #REF! #REF! #REF! #REF! #REF!
VB139 #REF! #REF! #REF! #REF! #REF! #REF!
VB140 #REF! #REF! #REF! #REF! #REF! #REF!
VB141 #REF! #REF! #REF! #REF! #REF! #REF!
VB142 #REF! #REF! #REF! #REF! #REF! #REF!
TO3 VB Summary Sheet Depth of Depth
Panels Northing Easting Station Wall Drilled
S3986584 & P3986507 910539.37 628996.72 59.4 #REF!
S3986584 & P3986507 59.4 57.8
S3987812 & P3987736 910584.80 628882.55 398776.64 59.57 58.3
P3988504 910612.06 628814.05 398850.36 59.67 58.1
S3989656 & P3989579 910652.95 628711.29 3989+60.96 59.4 58
P3990500 & S3990424 (P3990462R) 910684.47 628632.09 399046.2 59.54 57.8
S3970381 & P3970304 909965.21 630511.75 3970+33.53 60.135 58.8
3970612 909974.94 630485.83 3970+61.18 59.8 35.3
S3963944 & P3964009 909738.27 631105.00 3963+98.35 59.28 57.7
P3966491 909829.08 630871.29 3966+49.09 59.65 58
S3969303 & P3969365 909930.27 630604.71 3969+34.22 60.07 58.2
S3961202 & P3961267 909638.95 631360.65 3961+24.0 59.36 57.7
P3955000 909413.78 631942.70 3955+00.01 59.4 57.9
S3952453 & P3952519 909323.96 632176.79 3952+49.28 59.05 57.4
S3944440 &P3944362 908960.73 632897.89 3944+39.41 58.96 57.3
S3947374 & P3947439 909129.70 632646.69 3947+41.34 59.4 57.5
S3972838 & P3972761 910051.95 630281.00 3972+79.97 59.57 58.1
S3974681 & P3974759 910119.75 630100.63 3974+72.67 59.15 57.7
S3941482 & P3941560 908758.00 633101.19 3941+52.77 58.91 57
S3941482 908755.65 633103.07 3941+49.77 59.24 57.3
P3941560 908760.35 633099.32 3941+55.77 59.26 58
P3939052 908563.85 633255.61 3939+05.20 59 57.1
S3936055 & P3935978 908319.98 633437.75 3936+00.99 59.6 57.8
S3933594 908128.59 633584.99 3933+59.40 59.4 57.8
S3933594 908126.23 633586.84 3933+56.4 59.48 57.6
S3933594 908130.97 633583.15 3933+62.40 59.38 58.2
S3931134 & P3931057 907930.09 633737.93 3931+08.80 59.49 57.8
P3928598 907732.55 633889.63 3928+59.77 59.66 58.2
S3925906 & P3925830 907514.60 634054.01 3925+86.78 59.7 58.1
S3923138 & P3923061 907293.05 634221.12 3923+09.24 60.21 58.6
S3920525 907086.87 634374.26 3920+52.5 61.27 59.6
S3918064 & P3917988 906886.06 634523.01 3918+02.6 61.95 60.5
S3916682 & P3916759 906780.96 634599.23 3916+72.69 60.93 59.5
P3914530 906605.03 634730.97 3914+52.96 60.9 59.5
P3910461 906279.37 634974.90 3910+46.08 61.31 60.1
S3715109 & P3715035 901886.82 653524.33 3715+07.21 56.64 55.5
S3718006 & P3717929 901968.13 653246.51 3717+96.02 55.92 54.4
S3720711 902062.36 652988.09 3720+71.07 60.98 59.4
S3723476 & P3723399 902153.31 652731.07 3723+43.72 61.31 59.4
S3726192 & P3726115 902265.11 652483.64 3726+14.6 61.31 59.9
P3728730 902354.74 652241.32 3728+73.00 61.61 60.3
S3731419 & P3731342 902447.32 651992.89 3731+38.09 62.1 60.3
S3734025 & P3734101 902536.98 651738.64 3734+06.97 61.31 60.1
S3736916 902606.85 651460.46 3736+91.60 60.69 59.3
S3739655 & P3739579 902630.26 651189.11 3739+61.70 61.48 60.6
S3742395 & P3742319 902616.21 650914.81 3742+35.04 62.22 60.3
P3745070 902587.79 650643.81 3745+07.03 61.7 60.5
JG1.1/JG1.2 909988.86 630502.58 3970+50.59 59.7 58.1
JG 2.1/JG 2.2 909985.08 630512.60 3970+39.88 59.5 57.8
JG 5.1 909973.91 630540.72 3970+09.63 59.45 57.8
JG 4.1 909980.71 630529.03 3970+22.98 59.5 10.5
JG 1.1 & JG 1.2 909987.72 630502.14 3970+50.59 59.7 58.1
JG 4.1 909975.38 630530.43 3970+19.76 59.5 13
JG 5.1 909971.52 630539.18 3970+10.2 59.5 15.7
JG 5.1 Not yet provided
Not yet provided
Not yet provided 59.5 20.7
S3747915 & P3747992 902556.20 650357.18 3747+95.38 61.79 60.3
S3750530 & P3750607 902527.50 650096.54 3750+57.48 56.55 55
P3753298 902497.70 649825.93 3753+29.80 56.7 55.2
S3757140 & P3757063 902452.95 649448.10 3757+10.15 57.5 55.7
S3759906 & P3759830 902422.68 649173.89 3759+86.14 57.2 55.4
P3762598 902392.76 648901.81 3762+59.80 57.23 55.6
S3765444 & P3765367 902362.05 648622.79 3765+40.53 57 55.4
S3768212 & P3768135 902331.88 648348.35 3768 + 16.72 56.19 54.5
S3770981 902302.28 648068.66 3770 + 98.09 56.81 55.2
S3773773 & P3773851 902299.45 647788.87 3773+81.2 57.14 55.4
S3776722 & P3776644 902334.00 647508.03 3776 + 67.53 57.34 55.5
JG 9.1 909973.01 630550.40 3970+00.27 60.03 12.6
JG 9.1 909968.57 630548.21 3970+00.72 60.03 17.1
JG 10.1 909958.77 630575.93 3969+71.33 59.8 35.6
JG6.1 & JG6.2 909992.41 630492.78 3970+60.99 59.7 58.2
JG8.1 & JG8.2 909999.32 630473.30 3970+81.66 60.1 58.3
P3779571 902406.22 647728.33 3779+57.56 57.8 56.4
P3781418 & S3781495 902455.09 647046.40 3781+45.96 58.4 56.7
S3785650 & P3785727 902564.97 646637.22 3785+69.66 57.9 56.4
JG 9.1 909972.30 630549.80 3970+00.57 60.3 58.5
JG 8.1 & JG8.2 909998.60 630473.10 3970+81.64 60.6 5
S3788417 902635.08 646374.32 3788 + 41.71 57.69 56.4
S3791185 & P3791262 902707.24 646103.08 3791 + 22.39 57.65 56.1
S3793954 & P3794031 902778.62 645834.82 3793 + 99.95 57.28 55.7
P3796568 902844.66 645586.61 3796+56.82 57.52 55.6
S3799337 & P3799260 902914.85 645322.79 3799+29.81 57.46 55.8
S3801951 & P3802028 902984.25 645061.96 3801+99.71 57.1 55.4
P3977775 910227.02 629815.25 3977 + 77.53 58.45 56.9
P3804948 903061.06 644777.01 3804+94.83 57.13 55.8
S3807794 & P3807871 903136.21 644498.60 3807+83.20 57.59 55.9
P3810639 &S3810716 903210.20 644224.67 3810+67.04 56.98 55.6
P3980467 & S3980403 910322.82 629567.20 3980+43.58 59.11 57.6
P3813638 903287.56 643938.10 3813+63.85 58 56.4
S3816561 & P3816638 903364.76 643652.76 3816 + 59.92 57.29 55.8
S3819610 & P3819533 903429.17 543362.54 3819+56.41 57.56 55.9
P3822455 903504.54 643083.42 3822+45.53 57.37 55.8
S3983223 & P3983287 910425.25 629304.50 3983+25.53 53.8 57.2
S3825454 & P3825378 903581.72 642797.59 3825+41.16 57.4 55.6
S3838377 & P3838300 903657.71 642516.20 3828+33.16 57.37 55.8
S3993383 & P3993446 910770.67 628350.19 3993+41.45 59.3 57.6
S3831299 903735.05 642229.66 3831+29.88 57.5 55.9
#REF! #REF! #REF! #REF! #REF! #REF!
S3837292 & P3837369 903890.18 641645.89 3837+33.92 57.16 55.5
#REF! #REF! #REF! #REF! #REF! #REF!
P3986046 & P3985978 910520.16 629045.02 3986+01.76 59.4 58
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Saturation Start FHT Start
Saturation End
4/22/2020; 16:53; 12' 4/23/2020; 16:53; not taken abandoned due to deviation out of wall

04/17/2020; 15:56, 11.95 04/20/20; 14:49; 9.85 04/21/2020; 15:21 (redo, 1st test rose)
4/15/2020; 16:47; 11.05' 4/16/2020; 15:57; 9.95' 4/17/2020; 16:25 (redo, 1st test rose)
4/10/2020, 16:56, 12.3' 4/13/2020, 11:58, 12.1' 4/13/2020, 12:12
04/23/2020; 15:42; 11.5 04/24/2020; 14:42; 9.5 04/24/2020; 14:59
8/27/20 10:18 0' from ToC 8/28/20 10:05 .27' from ToC 8/28/20; 10:20
N/A N/A N/A
9/18/20 16:08 0' 9/21/20 8:40 1.59' 9/21/20 8:40
9/17/20 15:47 0' 9/18/20 15:56 0' 9/18/20 15:56
9/29/20 1610 0' 9/30/20 1625 0' 9/30/20 16:29
9/29/20 10:28 .92' 9/30/20 14:42 1.09' 9/30/20 14:50
10/21/20 9:47 0' 10/22/20 11:08:00 1.16' 10/22/20 11:09
10/21/20 15:53 0' 10/26/20 08:44 1.39' 10/26/20 8:45
11/21/20 17:20 0' 11/23/20 8:02 .19' 11/23/20 8:14
10/28/20 16:07 0' 10/29/2020 15:07 2.72' 10/29/20 15:12
11/16/20 14:56 0' 11/17/2020 13:56 .33' 11/17/20 13:58
11/13/20 18:05 0' 11/16/20 8:06 2.63' 11/16/20 8:10
12/8/20 16:22 0' 12/9/20 15:25 3.31' 12/9/20 15:33
2/3/21 13:33 0' 2/4/21 13:16 1.26' 2/4/21 13:16
1/25/2021 14:20 0' 1/26/21 12:50 .87' 1/26/21 12:59
12/9/20 15:55 0' 12/10/20 17:07 0' 12/10/20 17:08
12/16/20 16:02 0' 12/17/20 15:35 .87' 12/17/20 15:43
12/18/20 16:45 0', (Retry-12/21/20
12/21/208:47
8:400')22' (Retry-12/22/20 8:14 10.40') 12/22/20 8:18
2/4/21 14:45 0' 2/5/21 13:45 0' 2/5/21 13:51
1/26/21 13:26 0' 1/27/21 12:26 1.76' 1/27/21 12:34
1/6/21 13:41 0' 1/7/21 12:41 0' 1/7/21 12:42
1/7/21 14:38 0' 1/8/21 13:38 0' 1/8/21 13:40
1/8/21 12:01 0' 1/11/21 8:49 1.83' 1/11/21 8:57
1/11/21 12:05 0' 1/12/2021 11:24 0' 1/12/21 11:40
1/14/21 15:00 0' 1/15/21 14:56 1.33' 1/15/21 15:04
1/18/21 13:10 0' 1/19/21 12:21 2.15' 1/19/21 12:30
2/1/21 13:30 0' 2/2/21 12:55 1.11' 2/2/21 12:55
2/2/2021 13:05 0' 2/3/2021 12:25 0' 2/3/21 12:38
2/19/21 14:21 0' 2/22/21 8:37 .51' 2/22/21 8:47
2/23/21 13:04 0' 2/24/21 12:46 .42' 2/24/21 12:56
2/24/21, 12:57, 0' 2/25/21 12:29 1.75' 2/25/21 12:31
3/15/21 12:47 0' 3/16/21 12:02 1.61 3/16/21 12:08
3/9/21 15:22 0' 3/10/21 14:22 .73' 3/10/21 14:23
3/10/21 14:22 0' 3/11/21 13:42 .71' 3/11/21 13:45
3/11/2021, 13:22, 0' 3/12/2021 12:22 .70' 3/12/21 12:23
3/25/21 13:30 0' 3/26/21 12:30 .75' 3/26/21 12:31
3/29/21 12:50 0' 3/30/21 12:28 1.59' 3/30/21 12:30
3/30/21 13:05 0' 3/31/21 12:42 .33' 3/31/21 12:51
4/6/21 13:53 0' 4/7/21 12:53 1.20' 4/7/21 12:55
4/14/21 15:40 0' 4/15/21 14:40 .72' 4/15/21 14:42
4/16/21, 13:57, 0' 4/19/21, 10:11, 1.54' 4/19/21, 10:12
4/20/2021, 16:56, 0' 4/21/21 15:59 1.54' 4/21/21 16:02
04/22/21 15:55 0' N/A N/A
4/21/21 16:05 0' 4/22/21 15:20 1.05' 4/22/21 15:21
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
4/28/21 14:00 0' 4/29/21 13:00 1.10' 4/29/21 13:03
4/29/21 12:28 0' 4/30/21 11:49 .71' 4/30/21 11:51
5/7/2021, 13:34, 0' 5/10/2021 8:35 2.07' 5/10/21 8:35
5/11/21 12:55 0' 5/12/2021 12:35 10.79' 5/12/21 12:36
5/21/2021, 16:44, 0' 5/24/2021, 8:39, 2.68' 5/24/2021, 8:49
5/25/21 13:22 0' 5/26/21 12:35 1.37' 5/26/21 12:42
6/2/2021, 13:05, 0' 6/3/21 12:05 2.55' 6/3/21 12:11
6/3/21 13:00 0' 6/4/21 12:00 1.04' 6/4/21 12:03
6/7/21 12:50 0' 6/8/21 12:02 1.29' 6/8/21 12:03
6/15/21 13:40 0' 6/16/21 12:40 3.20' 6/16/21 12:41
6/22/21 12:08 0' 6/23/21 11:08 2.39' 6/23/21 11:10
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
7/1/21, 14:04, 0' 7/2/21, 13:10, 2.06' 7/2/21, 13:10
6/28/21, 11:40, 2' 6/29/21, 11:04, 4.91' 6/29/21, 11:04
6/29/21 10:45 0' 6/30/21 9:45 1.56' 6/30/21 9:55
7/9/2021, 12:50, 0' 7/10/21 9:41 .42' 7/12/21 10:01
7/12/21 14:00 0' 7/14/21 09:15 2.48' 7/14/21 9:16
7/16/21 11:37 0' N/A N/A
N/A N/A N/A
7/20/21 9:00 0' 7/21/21 8:39 1.94' 7/21/21 8:40
7/26/21 12:30 0' 7/27/21 12:12 0' 7/27/21 12:13
8/10/21, 12:44, 0' 8/11/21, 11:49, 2.81 8/11/21, 11:49
8/17/21 15:38 0' 8/19/21 8:51 1.5' 8/19/21 8:52
8/23/21 13:34 0' 8/24/21 12:34 2.12' 8/24/21 12:35
8/26/21, 13:36, 0' 8/27/21, 12:36, 1.15 8/27/21, 12:36
9/1/21 12:30 0' 9/2/21 11:40 3.15' 9/2/21 11:41
9/9/21, 16:58, 1.88' 9/10/21, 15:59, 0.85' 9/10/21, 15:59
9/14/2021, 15:31, 0' 9/15/2021, 14:31, 2.40' 9/15/2021, 14:31
9/23/2021, 14:11, 0' 9/24/2021, 13:19, 2.19' 9/24/21 13:21
9/28/21, 16:58, 0' 9/29/21, 16:32, 1.82' 9/29/21, 16:32
9/29/21, 15:56, 0' 9/30/21, 15:50, 2.96' 9/30/21, 15:44
10/05/2021, 15:44, 0' 10/06/2021, 16:14, 2.55' 10/06/2021, 16:14
10/13/2021, 13:15, 0' 10/14/2021, 15:49, 1.16' 10/14/2021, 15:49
10/13/21, 16:48:56, 0' 10/14/21, 15:50, 0.72' 10/14/21, 16:00
10/06/2021, 15:44, 0' 10/07/2021, 15:36, 1.84' 10/07/2021, 1536
10/20/2021, 15:25, 0' 10/21/2021, 15:04, 2.42' 10/21/2021, 15:04
10/27/2021,1517,0 10/28/2021,1500,2.46 10/28/2021,1500
10/21/2021, 14:23, 0' 10/22/2021, 14:10, 0.104' 10/22/2021, 14:10
0 0 12/30/99 0:00
#REF! #REF! #REF!
11/5/2021, 12:57, 0' 11/8/2021, 9:08, 1.57' 11/8/2021, 9:08
#REF! #REF! #REF!
11/3/2021, 16:39, 0' 11/4/2021, 16:08, 2.56' 11/4/2021, 16:08
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Drill Water
FHT End Auto Perm (K) Manual Perm (K) Decommissioned Cracking
Heated Up
0 0 0 N N
0 0 0 N N
4/22/2020: 15:21 3.72 x 10-10 5.82 x 10-10 12/30/1899 N N
4/18/2020; 16:25 2.18 x 10-10 6.76 x 10-10 12/30/1899 N N
4/14/2020, 12:12 2.48 x 10-9 1.82 x 10-9 12/30/1899 N N
04/25/2020; 14:59 3.21 x 10-7 3.21 x 10-7 12/30/1899 N N
8/29/2020; 10:20 3.46x10^-8 3.48x10^-8 10/1/2020 N N
N/A N/A N/A N/A N N
9/22/20 8:40 4.14x10^-10 5.75x10^-10 10/31/2020 N N
9/19/20 15:56 1.65x10^-8 1.63X10^-8 10/31/2020 N N
10/1/20 16:29 2.39x10^-8 2.56x10^-8 10/31/2020 N N
10/1/20 14:50 1.72x10^-8 1.73x10^-8 10/31/2020 N N
10/23/20 11:09 5.35x10^-9 5.50x10^-9 11/17/2020 N N
10/27/20 8:45 5.29x10^-9 5.09x10^-9 11/17/2020 N N
11/24/20 8:14 2.47x10^-8 2.47x10^-8 12/21/2020 N N
10/30/20 15:12 1.01x10^-8 9.90x10^-9 11/17/2020 N N
11/18/20 13:58 4.39x10^-9 4.33x10^-9 12/21/2020 N N
11/17/20 8:10 1.33x10^-9 1.14'x10^-9 12/21/2020 N N
12/10/20 16:47 9.41x10^-6 N/A 1/6/2021 N 37-depth
2/5/21 13:!6 1.31x10^-8 1.30x10^-8 2/26/2021 Y N
1/27/21 13:00 4.64x10^-9 3.41x10^-9 2/26/2021 Y N
12/11/20 17:08 1.23x10^-8 1.28x10^-8 2/10/2021 N N
12/18/20 15:43 4.18x10^-9 4.17x10^-9 2/10/2021 N N
12/23/20 8:18 1.58x10^-6N/A - Below Lake Level 1/20/2021 N Y
2/6/21 13:51 1.99x10^-8 1.98x10^-8 2/26/2021 Y N
1/28/21 12:34 1.31x10^-8 1.31x10^-8 2/26/2021 Y N
1/8/21 12:42 N/A
1.09x10^-6
(reached 10% threshold around5/12/2021
12 hours) N 38-depth
1/9/21 13:40 2.91x10^-8 2.97x10^-8 2/10/2021 N N
1/12/21 8:57 9.13x10^-9 5.89x10^-10 2/10/2021 N N
1/13/21 11:40 7.78x10^-7 N/A 2/10/2021 Y 47.5-Depth
1/16/21 15:54 1.09x10^-6 Not Observed 5/12/2021 Y 49.5-depth
1/20/21 12:30 6.68x10^-9 7.45x10^-9 2/26/2021 Y N
2/3/21 12:55 1.91x10^-8 1.95x10^-8 2/26/2021 Y N
2/4/21 12:38 2.29x10^-8 2.30x10^-8 2/26/2021 Y N
2/23/21 8:47 3.78x10^-8 3.84x10^-8 4/14/2021 N-78F N
2/25/21 12:56 4.26x10^-9 4.45x10^-9 3/18/2021 N-71F N
2/26/21 12:31 5.27x10^-9 5.21x10^-9 4/13/2021 N-75F N
3/17/21 12:08 1.58x10^-8 1.58x10^-8 4/13/2021 N-72F N
3/11/21 14:23 7.43x10^-9 7.58x10^-9 4/13/2021 N-73F N
3/12/21 13:45 7.29x10^-9 7.27x10^-9 4/13/2021 Y N
3/13/21 12:23 1.17x10^-9 1.16x10^-9 4/13/2021 Y N
3/27/21 12:31 1.63x10^-8 1.63x10^-8 5/12/2021 N N
3/31/21 12:30 9.57x10^-9 9.67x10^-9 5/12/2021 N-75F N
4/1/21 12:51 7.71x10^-9 8.0x10^-9 5/12/2021 N-?F N
4/8/21 12:55 6.75x10^-9 6.84x10^-9 5/12/2021 Y-72F N
4/16/21 14:42 9.86x10^-9 9.59x10^-9 5/26/2021 N-74F N
4/20/21, 10:12 6.68*10^-9 6.28*10^-9 5/26/2021 N - 72.7F N
4/22/21 16:02 3.31x10^-6 N/A 6/7/2021 4/19-N-71 F N
N/A N/A N/A 6/7/2021 N-?f/N-?F N
4/23/21 15:21 6.14x10^-8 6.21x10^-8 6/7/2021 N-?F/N-?F N
N/A N/A N/A 6/7/2021 N-?F N/A
N/A N/A N/A 7/1/2021 Y-74F N
N/A N/A N/A 6/7/2021 not heated - 77.7F N/A
N/A N/A N/A 6/7/2021 Not heated - 81.1F N/A
N/A N/A N/A 6/7/2021 Not heated - 81.1F N/A
4/30/21 13:03 9.10x10^-9 9.17x10^-9 5/26/2021 N-75F N
5/1/21 11:51 7.94x10^-9 7.78x10^-9 5/26/2021 N-79F N
5/11/21 8:35 2.66x10^-9 2.45x10^-9 6/7/2021 N-80.7F N
5/13/21 12:36 6.70x10^-9 6.31x10^-9 6/7/2021N-79F (5/10) N-78F (5/11)N
5/25/2021, 8:49 1.30*10-8 1.31*10-8 6/16/2021 N-74F N/A
5/27/21 12:42 9.28x10^-9 9.38x10^-9 6/16/2021 N-75F N
6/4/21 12:11 1.14x10^-8 1.16x10^-8 7/1/2021 N-75.2 N
6/5/21 12:03 5.73x10^-8 5.67x10^-8 7/1/2021 N-79F N
6/9/21 12:03 1.42x10^-8 1.43x10^-8 7/1/2021 N-78F N
6/17/21 12:41 1.49x10^-8 1.51x10^-8 7/22/2021 N-75F N
6/24/21 11:10 3.23x10^-8 3.28x10^-8 7/22/2021 N-79F N
N/A N/A N/A 8/12/2021 N N
N/A N/A N/A 8/12/2021 N/N N
N/A N/A N/A 11/11/2021 N-85.8F ###
7/3/21, 13:10 1.97x10^-7 1.99x10^-7 8/12/2021
N - 79.1F (6/30), N-76.4F (7/1)
No
6/30/21 11:04 2.57x10^-7 2.61x10^-7 9/3/2021N - 80.5F -6/24, N - 6/25 N
7/1/21 9:55 1.17x10^-8 1.20x10^-8 7/22/2021 N-89F/N-84F N
7/13/21 10:01 4.54x10^-8 4.60x10^-8 8/17/2021 N-77.9F N
7/15/21 9:16 1.39x10^-8 1.43x10^-8 8/17/2021 N-77F N
N/A N/A N/A 8/12/2021 N-77F N
N/A N/A N/A 11/11/2021 N-? N/A
7/22/21 8:40 4.89x10^-8 4.89x10^-8 8/17/2021 N-79F N
7/28/21 12:13 3.39x10^-8 3.46x10^-8 9/3/2021 N-? N
8/12/21, 11:49 2.72x10^-8 2.76x10^-8 9/3/2021 N - 79.3 F No
8/20/21 8:52 2.35x10^-8 2.34x10^-8 9/17/2021 N N
8/25/21 12:35 1.71x10^-8 1.72x10^-8 9/17/2021 N-81F N
8/28/21, 12:36 1.56x10^-8 1.53x10^-8 9/17/2021 N - 77.2F No
9/3/21 11:41 8.19x10^-8 8.25x10^-8 9/27/2021 N-74F No Cracking
9/11/21, 15:59 1.29x10^-8 1.37x10^-8 10/5/2021 No - 82.1 F No
9/16/2021, 14:31 1.19x10^-8 1.27x10^-8 10/5/2021 84.5 F - No No
9/25/21, 13:21 5.27x10^-8 5.3x10^-8 12/30/1899 NM No
9/30/21, 16:32 8.08*10^-7
not calculated (water below lake
11/11/2021
level) N - No
77Fclear cracking observed.
10/01/21, 15:44 6.27 E -8 6.31 E -8 10/21/2021 No - 82.1 F No
10/7/21 16:14 3.68x10^-8 3.70x10^-8 11/3/2021 No - 91.3F No
10/15/2021, 15:49 4.30x10^-8 4.34x10^-8 11/3/2021
10/12:N - 83.1F, 10/13: N - 77.1F
No
10/15/21, 16:00 3.83 E -8 3.86 E -8 11/3/2021 No - 82.1 F No
10/08/2021 15:36 PM 1.27 E - 8 1.24 E - 8 11/11/2021 No - 91.3F No
10/22/2021, 15:04 4.89x10^-8 4.94x10^-8 11/11/2021 N - 73.9 F No
10/29/2021,1500 0.0000000159 0.0000000165 12/30/1899 12/30/1899 ###
10/23/2021, 14:10 6.55x10^-9 7.22x10^-9 12/30/1899 N - 75.1 F No
12/30/99 0:00 0 0 12/30/1899 12/30/1899 ###
#REF! #REF! #REF! #REF! #REF! #REF!
11/9/2021, 9:08 4.85x10^-8 4.88x10^-8 12/30/1899 N - 73.9F No
#REF! #REF! #REF! #REF! #REF! #REF!
11/5/2021, 16:08 1.20x10^-6 No reading 12/30/1899 N - 77.3F No
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Comments

1st top off at ~20', 2nd at ~13.5'

Joint Visible in core


Joint Visible in core

No Cracking

cracking observed.
Date Depth
VB Date Drilled Northing Easting Station Stick-up
Backfilled Drilled

VB1 4/22/20 12/30/99 910539.37 628996.72 3986+53.76 1.2 57.8


VB2 4/17/20 12/30/99 910584.80 628882.55 398776.64 1.25 58.3
VB3 4/15/20 12/30/99 910612.06 628814.05 398850.36 1.75 58.1
VB4 4/10/20 12/30/99 910652.95 628711.29 3989+60.96 1.5 58
VB5 4/23/20 12/30/99 910684.47 628632.09 399046.2 1.25 57.8
VB6 8/26/20 10/1/20 909965.21 630511.75 3970+33.53 14.5" 58.8
VB7 8/27/20 12/30/99 909974.94 630485.83 3970+61.18 N/A 35.3
VB8 9/18/20 10/31/20 909738.27 631105.00 3963+98.35 1.13 57.7
VB9 9/17/20 10/31/20 909829.08 630871.29 3966+49.09 0.98 58
VB10 9/29/20 10/31/20 909930.27 630604.71 3969+34.22 1.04 58.2
VB11 9/28/20 10/31/20 909638.95 631360.65 3961+24.0 0.96 57.7
VB12 10/20/20 11/17/20 909413.78 631942.70 3955+00.01 1.08 57.9
VB13 10/21/20 11/17/20 909323.96 632176.79 3952+49.28 1.125 57.4
VB14 11/21/20 12/21/20 908960.73 632897.89 3944+39.41 1.625 57.3
VB15 10/28/20 11/17/20 909129.70 632646.69 3947+41.34 1.42 57.5
VB16 11/16/20 12/21/20 910051.95 630281.00 3972+79.97 1.1875 58.1
VB17 11/13/20 12/21/20 910119.75 630100.63 3974+72.67 1.5 57.7
VB18 12/8/20 1/6/21 908758.00 633101.19 3941+52.77 1.17 57
VB18E 2/3/21 2/26/21 908755.65 633103.07 3941+49.77 1.33 57.3
VB18W 1/25/21 2/26/21 908760.35 633099.32 3941+55.77 0.4 58
VB19 12/9/20 2/10/21 908563.85 633255.61 3939+05.20 1.29 57.1
VB20 12/16/20 2/10/21 908319.98 633437.75 3936+00.99 1 57.8
VB21 12/18/20 1/20/21 908128.59 633584.99 3933+59.40 1.46 57.8
VB21E 2/4/21 2/26/21 908126.23 633586.84 3933+56.4 1 57.6
VB21W 1/26/21 2/26/21 908130.97 633583.15 3933+62.40 0.71 58.2
VB22 1/6/21 5/12/21 907930.09 633737.93 3931+08.80 1 57.8
VB23 1/7/21 2/10/21 907732.55 633889.63 3928+59.77 1.21 58.2
VB24 1/8/21 2/10/21 907514.60 634054.01 3925+86.78 0.96 58.1
VB25 1/11/21 2/10/21 907293.05 634221.12 3923+09.24 1 58.6
VB26 1/14/21 5/12/21 907086.87 634374.26 3920+52.5 1.29 59.6
VB27 1/18/21 2/26/21 906886.06 634523.01 3918+02.6 1.15 60.5
VB28 2/1/21 2/26/21 906780.96 634599.23 3916+72.69 0.77 59.5
VB29 2/2/21 2/26/21 906605.03 634730.97 3914+52.96 1.35 59.5
VB30 2/19/21 4/14/21 906279.37 634974.90 3910+46.08 0.58 60.1
VB31 2/23/21 3/18/21 901886.82 653524.33 3715+07.21 1.58 55.5
VB32 2/24/21 4/13/21 901968.13 653246.51 3717+96.02 1.13 54.4
VB33 3/15/21 4/13/21 902062.36 652988.09 3720+71.07 1.17 59.4
VB34 3/9/21 4/13/21 902153.31 652731.07 3723+43.72 1.58 59.4
VB35 3/10/21 4/13/21 902265.11 652483.64 3726+14.6 1.625 59.9
VB36 3/11/21 4/13/21 902354.74 652241.32 3728+73.00 1.5 60.3
VB37 3/25/21 5/12/21 902447.32 651992.89 3731+38.09 1.29 60.3
VB38 3/29/21 5/12/21 902536.98 651738.64 3734+06.97 1.06 60.1
VB39 3/30/21 5/12/21 902606.85 651460.46 3736+91.60 0.85 59.3
VB40 4/6/21 5/12/21 902630.26 651189.11 3739+61.70 1.23 60.6
VB41 4/14/21 5/26/21 902616.21 650914.81 3742+35.04 1.27 60.3
VB42 4/16/21 5/26/21 902587.79 650643.81 3745+07.03 1.25 60.5
JGVB01 4/19/2021 + 4/20/2021 6/7/21 909988.86 630502.58 3970+50.59 1.42 58.1
JGVB02 4/21/21 - 4/22/21 6/7/21 909985.08 630512.60 3970+39.88 0.94 57.8
JGVB03 4/20/2021-4/21/21 6/7/21 909973.91 630540.72 3970+09.63 1.02 57.8
JGWVB02 4/23/21 7/1/21 909987.72 630502.14 3970+50.59 0 58.1
JGWVB07 4/22/21 6/7/21 909980.71 630529.03 3970+22.98 0 10.5
JGWVB08 4/27/21 6/7/21 909975.38 630530.43 3970+19.76 N/A 13
JGWVB10 4/27/21 6/7/21 909971.52 630539.18 3970+10.2 N/A 15.7
JGWVB11 4/27/21 6/7/21 Not yet provided
Not yet provided
Not yet provided N/A 20.7
VB43 4/28/21 5/26/21 902556.20 650357.18 3747+95.38 1.08 60.3
VB44 4/29/21 5/26/21 902527.50 650096.54 3750+57.48 1.17 55
VB45 5/7/21 6/7/21 902497.70 649825.93 3753+29.80 1.67 55.2
VB46 5/10 - 5/11/21 6/7/21 902452.95 649448.10 3757+10.15 1.33 55.7
VB47 5/21/21 6/16/21 902422.68 649173.89 3759+86.14 1.21 55.4
VB48 5/25/21 6/16/21 902392.76 648901.81 3762+59.80 1.29 55.6
VB49 6/2/21 7/1/21 902362.05 648622.79 3765+40.53 1.42 55.4
VB50 6/3/21 7/1/21 902331.88 648348.35 3768 + 16.72 1.5 54.5
VB51 6/7/21 7/1/21 902302.28 648068.66 3770 + 98.09 1.5 55.2
VB52 6/15/21 7/22/21 902299.45 647788.87 3773+81.2 1.46 55.4
VB53 6/22/21 7/22/21 902334.00 647508.03 3776 + 67.53 1.15 55.5
JGWVB18 6/23/21 8/12/21 909973.01 630550.40 3970+00.27 N/A 12.6
JGWVB19 6/23/2021 - 6/24/2021 8/12/21 909968.57 630548.21 3970+00.72 N/A 17.1
JGWVB21 7/1/2021 + 7/2/2021 11/11/21 909958.77 630575.93 3969+71.33 N/A 35.6
JGVB04 6/29/2021, 6/30/2021, 7/1/20218/12/21 909992.41 630492.78 3970+60.99 1.5 58.2
JGVB05 6/24/2021 + 6/25/2021 9/3/21 909999.32 630473.30 3970+81.66 1.5' 58.3
VB54 6/28/2021 - 6/29/21 7/22/21 902406.22 647728.33 3779+57.56 0.83 56.4
VB55 7/9/21 8/17/21 902455.09 647046.40 3781+45.96 1.36 56.7
VB56 7/12/21 8/17/21 902564.97 646637.22 3785+69.66 1.4 56.4
JGWVB12 7/16/21 8/12/21 909991.44 630491.85 3970+61.53 1.5 58.1
JGWVB16 7/16/21 11/11/21 909998.60 630473.10 3970+81.64 N/A 5
JGWVB22 7/15/21 8/12/21 909972.30 630549.80 3970+00.57 0.46 58.5
JGWVB23 7/22/2021 & 7/28/21 8/12/21 909970.54 630549.46 3970+00.10 1.46 58.6
VB57 7/19/21 8/17/21 902635.08 646374.32 3788 + 41.71 1.6 56.4
VB58 7/26/21 9/3/21 902707.24 646103.08 3791 + 22.39 1.4 56.1
JGWVB25 8/4/21 8/12/21 909970.09 630547.39 3970 + 02.04 0 20.5
VB59 8/10/21 9/3/21 902778.62 645834.82 3793 + 99.95 1.08 55.7
VB60 8/17/21 9/17/21 902844.66 645586.61 3796+56.82 2 55.6
VB61 8/23/21 9/17/21 902914.85 645322.79 3799+29.81 1.42 55.8
VB62 8/26/21 9/17/21 902984.25 645061.96 3801+99.71 1.04 55.4
VB63 9/1/21 9/27/21 910227.02 629815.25 3977 + 77.53 0.92 56.9
VB64 9/9/21 10/5/21 903061.06 644777.01 3804+94.83 1.71 55.8
VB65 9/14/21 10/5/21 903136.21 644498.60 3807+83.20 1.4 55.9
VB66 9/22/2021 + 9/23/2021 12/30/99 903210.20 644224.67 3810+67.04 1.25 55.6
VB67 9/28/21 11/11/21 910322.82 629567.20 3980+43.58 1.25 57.6
VB68 9/30/21 10/21/21 903287.56 643938.10 3813+63.85 1.125 56.4
VB69 10/5/21 11/3/21 903364.76 643652.76 3816 + 59.92 0.66 55.8
VB70 10/12/2021+ 10/13/2021 11/3/21 903429.17 543362.54 3819+56.41 1.21 55.9
VB71 9/30/21 11/3/21 903504.54 643083.42 3822+45.53 1.08 55.8
VB72 10/5/21 11/11/21 910425.25 629304.50 3983+25.53 0.88 57.2
VB73 10/20/21 11/11/21 903581.72 642797.59 3825+41.16 0.98 55.6
VB74 10/27/21 12/30/99 903657.71 642516.20 3828+33.16 0.9 55.8
VB75 10/21/21 12/30/99 910770.67 628350.19 3993+41.45 0.69 57.6
VB76 11/1/21 12/30/99 903735.05 642229.66 3831+29.88 0 55.9
VB77 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB78 11/5/21 12/30/99 903890.18 641645.89 3837+33.92 1.54 55.5
VB79 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB80 11/3/21 12/30/99 910520.16 629045.02 3986+01.76 0.92 58
VB81 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB82 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB83 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB84 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB85 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB86 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB87 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB88 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB89 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB90 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB91 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB92 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB93 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB94 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB95 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB96 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB97 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB98 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB99 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB100 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB101 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB102 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB103 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB104 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB105 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB106 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB107 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB108 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB109 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB110 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB111 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB112 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB113 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB114 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB115 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB116 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB117 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB118 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB119 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB120 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB121 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB122 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB123 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB124 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB125 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB126 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB127 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB128 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB129 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB130 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB131 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB132 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB133 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB134 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB135 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB136 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB137 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB138 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB139 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB140 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB141 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB142 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB143 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB144 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB145 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB146 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB147 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB148 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB149 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB150 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB151 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB152 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB153 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB154 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB155 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB156 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB157 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB158 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VB159 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Depth to Pre-Flush Post-Flush Grout Gallons
Water Tag Depth Tag Depth Mix Used
For Grout Mix BP = Batch Plant
Mix NO = Not Observed
Mix Mix = 2 bags portland cement, 10 gal water, bentonite
Mix
Mix
Mix
NO 58.8 58.8 BP NO
N/A N/A N/A BP N/A
1.5 57.3 57.6 BP 65
2 57.9 58 BP 60
4.5 58.2 58.2 BP 66
4.3 57.7 57.7 BP 80
2 57.7 57.8 BP 58
2.5 56.3 57.3 BP 55
5.5 57.3 57.3 BP 60
6.3 57.5 57.5 BP 59
1.5 58.1 58.1 BP 60
2 57.7 57.7 BP 60
21.2 NO NO BP 60
4.1 57.2 57.3 BP 55
4.9 58 58 BP 55
2.9 56.8 56.8 BP 59
2.3 57.8 57.8 BP 57
23.2 57.8 57.8 BP 72
5.3 57.6 57.6 BP 59
5.6 58.1 58.2 BP 59
NO NO NO BP NO
5.5 58 58 BP 62
8.5 58 58.1 BP 60
23.9 58.6 58.6 BP 60
NO NO NO BP NO
8.6 60.5 60.5 BP 60
11.8 59.5 59.5 BP 52
9.1 59.3 59.3 BP 58
N/A N/A N/A BP N/A USACE observed
6.6 55.5 55.5 BP 55
2.8 54.6 54.6 BP 53
5.3 59 59.4 BP 58
4.4 59.4 59.4 BP 58
5.6 59.7 59.8 BP 58
1.85 60.3 60.3 BP 59
NO NO NO BP NO
NO NO NO BP NO
NO NO NO BP NO
NO NO NO BP NO
N/A N/A N/A BP 59 USACE observed
N/A N/A N/A BP 58 USACE observed
24.95 58 58.1 BP 55
22.1 51.8 57.25 BP 55 previous stickup was 0.94 no reference point due to ground level alte
24.3 58.4 NO BP 55 previous stickup was 1.02
15.6 58.1 58.1 BP 65
NO 11.7 NO BP 12.5
N/A 16.1 NO BP 20
N/A NO NO BP 15
N/A 23.2 NO BP 15 11+10 combined = 50
N/A N/A N/A BP 58 USACE observed
N/A N/A N/A BP 55 USACE observed
5.1 55.2 NO BP 55 casing was previously run over
34 55.6 55.6 BP 65
6.8 55.7 55.7 BP 59
6.8 55.8 55.8 BP N/A
8.3 55.5 55.5 BP 53
21.5 54.6 54.6 BP 53
9 55.4 55.4 BP 54
13.8 55.5 55.5 BP 57
21.1 55.5 55.5 BP 54
N/A 6.5 7.8 BP 15 excavated prior to decommissioning, GFA had correct elevations
N/A 1.5 5 BP 11 excavated prior to decommissioning, GFA had correct elevations
24.8 33.7 33.8 BP 40+10 measurements to top of casing
N/A 52.6 54.6 BP 65 excavated prior to decommissioning, GFA had correct elevations
25.7 58.3 NM BP 65
6.3 56.6 56.6 BP 56
47.54 58.2 N/A BP 60 readings from TOC
13.72 57.85 57.85 BP 58 readings from TOC (casing bent)
N/A 52.9 52.9 BP 65 excavated prior to decommissioning, GFA had correct elevations
NM 3.3 4.1 BP 5 stickup 3"
N/A 47 47.8 BP 55 excavated prior to decommissioning, GFA had correct elevations
N/A 53.9 54.4 BP 65 excavated prior to decommissioning, GFA had correct elevations
BP 54 observed by USACE
52.4 54.3 54.3 BP 64 stickup is 0.9', csing appears to be damaged, tremmied reach to 56.0 depth
N/A 12 13.7 BP 10 excavated prior to decommissioning, GFA had correct elevations
15.7 55.7 NM BP 52 casing length still same
18.32 55.6 NM BP 61
12.5 55.7 55.7 BP 57
13.8 55.4 NM BP 55
24.5 56.9 NM BP 62
11.7 55.7 55.8 BP 60 (55+5)
9.3 55.4 55.6 BP 60 (55+5) GFA believes they are on hard bottom
- - - not observed, AECOM not notified
23.25 57.8 57.8 BP 65 (60+5)
25.2 56.4 56.4 TO1 BP 65
13.5 54.7 55.8 BP 60 observed by USACE
26.4 56.9 56.9 BP 55 observed by USACE
17 56.1 56.1 BP 55 observed by USACE
5.1 57.3 57.3 BP 65 (56+5+4)
16.9 55.7 55.7 BP 60 (55+5)
10 gal water, bentonite
nce point due to ground level alteratio

had correct elevations


had correct elevations

had correct elevations

had correct elevations

had correct elevations


had correct elevations

ed, tremmied reach to 56.0 depth


had correct elevations
Panel
VB Drilled Depths of
VB Completion Location in Panel(s) Panel(s)
Date Cracking (ft)
Date

VB1 3/27/2020 4/22/2020 Joint S3986584 & P3986507 No Cracking


VB2 3/24/2020 4/17/2020 Overlap S3987812 & P3987736 No Cracking
Center (Non-
VB3 3/20/2020 4/15/2020 P3988504 No Cracking
hydrated) Panel
VB4 3/17/2020 4/10/2020 Joint S3989656 & P3989579 No Cracking
VB5 3/28/2020 4/23/2020 Overlap P3990500 & S3990424 (P3990462) No Cracking
VB6 7/14/2020 8/26/2020 Joint S3970381 & P3970304 No Cracking
VB7 7/11/2020 8/27/2020 Center 3970612 No Cracking
VB8 8/12/2020 9/18/2020 Joint S3963944 & P3964009 No Cracking
VB9 8/8/2020 9/17/2020 Center P3966491 No Cracking
VB10 9/2/2020 9/29/2020 Joint S3969303 & P3969365 No Cracking
VB11 8/27/2020 9/28/2020 Joint S3961202 & P3961267 No Cracking
VB12 9/17/2020 10/20/2020 Center P3955000 No Cracking
VB13 9/21/2020 10/21/2020 Joint S3952453 & P3952519 No Cracking
VB14 10/28/2020 11/21/2020 Joint S3944440 &P3944362 No Cracking
VB15 10/2/2020 10/28/2020 Joint S3947374 & P3947439 No Cracking
VB16 10/19/2020 11/16/2020 Overlap S3972838 & P3972761 No Cracking
VB17 10/14/2020 11/13/2020 Joint S3974681 & P3974759 No Cracking
VB18 11/3/2020 12/8/2020 Overlap S3941482 & P3941560 37-depth
VB19 11/14/2020 12/9/2020 Center P3939052 No Cracking
VB20 11/19/2020 12/16/2020 Joint S3936055 & P3935978 No Cracking
VB21 11/23/2020 12/18/2020 Center S3933594 0-30, 50-depth
VB22 12/3/2020 1/6/2021 Joint S3931134 & P3931057 38-depth
VB23 12/7/2020 1/7/2021 Center P3928598 No Cracking
VB24 12/11/2020 1/8/2021 Overlap S3925906 & P3925830 No Cracking
VB25 12/15/2020 1/11/2021 Joint S3923138 & P3923061 47.5-depth
VB26 12/18/2020 1/14/2021 Center S3920525 49.5-depth
VB27 12/20/2020 1/18/2021 Overlap S3918064 & P3917988 No Cracking
VB28 1/4/2021 2/1/2021 Joint S3916682 & P3916759 No Cracking
VB29 1/6/2021 2/2/2021 Center P3914530 No Cracking
VB30 1/12/2021 2/19/2021 Center P3910461 No Cracking
VB31 1/21/2021 2/23/2021 Overlap S3715109 & P3715035 No Cracking
VB32 1/28/2021 2/24/2021 Joint S3718006 & P3717929 No Cracking
VB33 2/18/2021 3/15/2021 Center S3720711 No Cracking
VB34 2/3/2021 3/9/2021 Overlap S3723476 & P3723399 No Cracking
VB35 2/8/2021 3/10/2021 Joint S3726192 & P3726115 No Cracking
VB36 2/10/2021 3/11/2021 Center P3728730 No Cracking
VB37 2/23/2021 3/25/2021 Overlap S3731419 & P3731342 No Cracking
VB38 2/25/2021 3/29/2021 Joint S3734025 & P3734101 No Cracking
VB39 3/4/2021 3/30/2021 Center S3736916 No Cracking
VB40 3/10/2021 4/6/2021 Overlap S3739655 & P3739579 No Cracking
VB41 3/17/2021 4/14/2021 Joint S3742395 & P3742319 No Cracking
VB42 3/22/2021 4/16/2021 Center P3745070 No Cracking
VB43 3/31/2021 4/28/2021 Overlap S3747915 & P3747992 No Cracking
VB44 4/2/2021 4/29/2021 Joint S3750530 & P3750607 No Cracking
VB45 4/9/2021 5/7/2021 Center P3753298 No Cracking
5/10 -
VB46 4/14/2021 Overlap S3757140 & P3757063 No Cracking
5/11/21
VB47 4/26/2021 5/21/2021 Joint S3759906 & P3759830 No Cracking
VB48 4/29/2021 5/25/2021 Center P3762598 No Cracking
VB49 5/4/2021 6/2/2021 Overlap S3765444 & P3765367 No Cracking
VB50 5/11/2021 6/3/2021 Joint S3768212 & P3768135 No Cracking
VB51 5/13/2021 6/7/2021 Center S3770981 No Cracking
VB52 5/18/2021 6/15/2021 Overlap S3773773 & P3773851 No Cracking
VB53 5/26/2021 6/22/2021 Joint S3776722 & P3776644 No Cracking
6/28/2021 -
VB54 6/3/2021 Center P3779571 No Cracking
6/29/21
6/5/2021 &
VB55 7/9/2021 Overlap P3781418 & S3781495 No Cracking
6/7/2021
VB56 6/11/2021 7/12/2021 Joint S3785650 & P3785727 No Cracking
VB57 6/25/2021 7/19/2021 Center S3788417 No Cracking
VB58 6/30/2021 7/26/2021 Overlap S3791185 & P3791262 No Cracking
7/12/21 &
VB59 8/10/2021 Joint S3793954 & P3794031 No Cracking
7/13/21
VB60 7/19/2021 8/17/2021 Center P3796568 No Cracking
VB61 7/27/2021 8/23/2021 Overlap S3799337 & P3799260 No Cracking
VB62 7/30/2021 8/26/2021 Joint S3801951 & P3802028 No Cracking
VB63 8/4/2021 9/1/2021 Center P3977775 No Cracking
VB64 8/10/2021 9/9/2021 Center P3804948 No
VB65 8/19/2021 9/14/2021 Overlap S3807794 & P3807871 No
9/22/2021 +
VB66 8/26/2021 Joint P3810639 &S3810716 No
9/23/2021
No clear
VB67 8/28/2021 9/28/2021 Overlap P3980467 & S3980403 cracking
observed.
VB68 8/31/2021 9/30/2021 Center P3813638 No
VB69 9/9/2021 10/5/2021 Overlap S3816561 & P3816638 No

10/12/2021+
VB70 9/14/2021 Joint S3819610 & P3819533 No
10/13/2021

VB71 9/17/2021 9/30/2021 Center P3822455 No


VB72 9/11/2021 10/5/2021 Overlap S3983223 & P3983287 No
VB73 9/22/2021 10/20/2021 Overlap S3825454 & P3825378 No
VB74 9/30/2021 10/27/2021 Overlap S3838377 & P3838300 0
VB75 9/15/2021 10/21/2021 Overlap S3993383 & P3993446 No
VB76 8/21/2021 11/1/2021 Center S3831299 0
VB77 #REF! #REF! #REF! #REF! #REF!
VB78 10/12/2021 11/5/2021 Joint S3837292 & P3837369 No
VB79 #REF! #REF! #REF! #REF! #REF!
VB80 10/6/2021 11/3/2021 Joint P3986046 & P3985978 No
VB81 #REF! #REF! #REF! #REF! #REF!
VB82 #REF! #REF! #REF! #REF! #REF!
VB83 #REF! #REF! #REF! #REF! #REF!
VB84 #REF! #REF! #REF! #REF! #REF!
VB85 #REF! #REF! #REF! #REF! #REF!
VB86 #REF! #REF! #REF! #REF! #REF!
VB87 #REF! #REF! #REF! #REF! #REF!
VB88 #REF! #REF! #REF! #REF! #REF!
VB89 #REF! #REF! #REF! #REF! #REF!
VB90 #REF! #REF! #REF! #REF! #REF!
VB91 #REF! #REF! #REF! #REF! #REF!
VB92 #REF! #REF! #REF! #REF! #REF!
VB93 #REF! #REF! #REF! #REF! #REF!
VB94 #REF! #REF! #REF! #REF! #REF!
VB95 #REF! #REF! #REF! #REF! #REF!
VB96 #REF! #REF! #REF! #REF! #REF!
VB97 #REF! #REF! #REF! #REF! #REF!
VB98 #REF! #REF! #REF! #REF! #REF!
VB99 #REF! #REF! #REF! #REF! #REF!
VB100 #REF! #REF! #REF! #REF! #REF!
VB101 #REF! #REF! #REF! #REF! #REF!
VB102 #REF! #REF! #REF! #REF! #REF!
VB103 #REF! #REF! #REF! #REF! #REF!
VB104 #REF! #REF! #REF! #REF! #REF!
VB105 #REF! #REF! #REF! #REF! #REF!
VB106 #REF! #REF! #REF! #REF! #REF!
VB107 #REF! #REF! #REF! #REF! #REF!
VB108 #REF! #REF! #REF! #REF! #REF!
VB109 #REF! #REF! #REF! #REF! #REF!
VB110 #REF! #REF! #REF! #REF! #REF!
VB111 #REF! #REF! #REF! #REF! #REF!
VB112 #REF! #REF! #REF! #REF! #REF!
VB113 #REF! #REF! #REF! #REF! #REF!
VB114 #REF! #REF! #REF! #REF! #REF!
VB115 #REF! #REF! #REF! #REF! #REF!
VB116 #REF! #REF! #REF! #REF! #REF!
VB117 #REF! #REF! #REF! #REF! #REF!
VB118 #REF! #REF! #REF! #REF! #REF!
VB119 #REF! #REF! #REF! #REF! #REF!
VB120 #REF! #REF! #REF! #REF! #REF!
VB121 #REF! #REF! #REF! #REF! #REF!
VB122 #REF! #REF! #REF! #REF! #REF!
VB123 #REF! #REF! #REF! #REF! #REF!
VB124 #REF! #REF! #REF! #REF! #REF!
VB125 #REF! #REF! #REF! #REF! #REF!
VB126 #REF! #REF! #REF! #REF! #REF!
VB127 #REF! #REF! #REF! #REF! #REF!
VB128 #REF! #REF! #REF! #REF! #REF!
VB129 #REF! #REF! #REF! #REF! #REF!
VB130 #REF! #REF! #REF! #REF! #REF!
VB131 #REF! #REF! #REF! #REF! #REF!
VB132 #REF! #REF! #REF! #REF! #REF!
VB133 #REF! #REF! #REF! #REF! #REF!
VB134 #REF! #REF! #REF! #REF! #REF!
VB135 #REF! #REF! #REF! #REF! #REF!
VB136 #REF! #REF! #REF! #REF! #REF!
VB137 #REF! #REF! #REF! #REF! #REF!
VB138 #REF! #REF! #REF! #REF! #REF!
VB139 #REF! #REF! #REF! #REF! #REF!
VB140 #REF! #REF! #REF! #REF! #REF!
VB141 #REF! #REF! #REF! #REF! #REF!
VB142 #REF! #REF! #REF! #REF! #REF!
VB143 #REF! #REF! #REF! #REF! #REF!
VB144 #REF! #REF! #REF! #REF! #REF!
VB145 #REF! #REF! #REF! #REF! #REF!
VB146 #REF! #REF! #REF! #REF! #REF!
VB147 #REF! #REF! #REF! #REF! #REF!
VB148 #REF! #REF! #REF! #REF! #REF!
VB149 #REF! #REF! #REF! #REF! #REF!
VB150 #REF! #REF! #REF! #REF! #REF!
VB151 #REF! #REF! #REF! #REF! #REF!
VB152 #REF! #REF! #REF! #REF! #REF!
VB153 #REF! #REF! #REF! #REF! #REF!
VB154 #REF! #REF! #REF! #REF! #REF!
VB155 #REF! #REF! #REF! #REF! #REF!
VB156 #REF! #REF! #REF! #REF! #REF!
VB157 #REF! #REF! #REF! #REF! #REF!
VB158 #REF! #REF! #REF! #REF! #REF!
VB159 #REF! #REF! #REF! #REF! #REF!
VB160 #REF! #REF! #REF! #REF! #REF!
VB161 #REF! #REF! #REF! #REF! #REF!
VB162 #REF! #REF! #REF! #REF! #REF!
VB163 #REF! #REF! #REF! #REF! #REF!
VB164 #REF! #REF! #REF! #REF! #REF!
VB165 #REF! #REF! #REF! #REF! #REF!
VB166 #REF! #REF! #REF! #REF! #REF!
VB167 #REF! #REF! #REF! #REF! #REF!
VB168 #REF! #REF! #REF! #REF! #REF!
VB169 #REF! #REF! #REF! #REF! #REF!
VB170 #REF! #REF! #REF! #REF! #REF!
VB171 #REF! #REF! #REF! #REF! #REF!
VB172 #REF! #REF! #REF! #REF! #REF!
VB173 #REF! #REF! #REF! #REF! #REF!
VB174 #REF! #REF! #REF! #REF! #REF!
VB175 #REF! #REF! #REF! #REF! #REF!
VB176 #REF! #REF! #REF! #REF! #REF!
VB177 #REF! #REF! #REF! #REF! #REF!
VB178 #REF! #REF! #REF! #REF! #REF!
VB179 #REF! #REF! #REF! #REF! #REF!
VB180 #REF! #REF! #REF! #REF! #REF!
VB181 #REF! #REF! #REF! #REF! #REF!
VB182 #REF! #REF! #REF! #REF! #REF!
VB183 #REF! #REF! #REF! #REF! #REF!
VB184 #REF! #REF! #REF! #REF! #REF!
VB185 #REF! #REF! #REF! #REF! #REF!
VB186 #REF! #REF! #REF! #REF! #REF!
VB187 #REF! #REF! #REF! #REF! #REF!
VB188 #REF! #REF! #REF! #REF! #REF!
VB189 #REF! #REF! #REF! #REF! #REF!
VB190 #REF! #REF! #REF! #REF! #REF!
VB191 #REF! #REF! #REF! #REF! #REF!
VB192 #REF! #REF! #REF! #REF! #REF!
VB193 #REF! #REF! #REF! #REF! #REF!
VB194 #REF! #REF! #REF! #REF! #REF!
VB195 #REF! #REF! #REF! #REF! #REF!
VB196 #REF! #REF! #REF! #REF! #REF!
VB197 #REF! #REF! #REF! #REF! #REF!
VB198 #REF! #REF! #REF! #REF! #REF!
VB199 #REF! #REF! #REF! #REF! #REF!
VB200 #REF! #REF! #REF! #REF! #REF!
VB201 #REF! #REF! #REF! #REF! #REF!
VB202 #REF! #REF! #REF! #REF! #REF!
VB203 #REF! #REF! #REF! #REF! #REF!
VB204 #REF! #REF! #REF! #REF! #REF!
VB205 #REF! #REF! #REF! #REF! #REF!
VB206 #REF! #REF! #REF! #REF! #REF!
VB207 #REF! #REF! #REF! #REF! #REF!
VB208 #REF! #REF! #REF! #REF! #REF!
VB209 #REF! #REF! #REF! #REF! #REF!
VB210 #REF! #REF! #REF! #REF! #REF!
VB211 #REF! #REF! #REF! #REF! #REF!
VB212 #REF! #REF! #REF! #REF! #REF!
VB213 #REF! #REF! #REF! #REF! #REF!
VB214 #REF! #REF! #REF! #REF! #REF!
VB215 #REF! #REF! #REF! #REF! #REF!
VB216 #REF! #REF! #REF! #REF! #REF!
VB217 #REF! #REF! #REF! #REF! #REF!
VB218 #REF! #REF! #REF! #REF! #REF!
VB219 #REF! #REF! #REF! #REF! #REF!
VB220 #REF! #REF! #REF! #REF! #REF!
VB221 #REF! #REF! #REF! #REF! #REF!
VB222 #REF! #REF! #REF! #REF! #REF!
VB223 #REF! #REF! #REF! #REF! #REF!
VB224 #REF! #REF! #REF! #REF! #REF!
VB225 #REF! #REF! #REF! #REF! #REF!
VB226 #REF! #REF! #REF! #REF! #REF!
VB227 #REF! #REF! #REF! #REF! #REF!
VB228 #REF! #REF! #REF! #REF! #REF!
VB229 #REF! #REF! #REF! #REF! #REF!
Lake Air
Volume of Air Drill Water Slurry
Mix Predrilling Temperature Temperature
Panel Temperature Temperture Temperture
Design Method Day Panel Day Panel
(Liter/Ft) Day of VB (F) (F) At Rig (F)
Placed (F) Placed (F)
TO3-420 CFA 78.4 88 86 Unknown
TO3-420 CFA 77.2 86 82 Unknown
TO3-420 CFA 75.9 86 95 Unknown
TO3-420 CFA 74.1 86 90 Unknown
TO3-420 CFA 78.8 88 88 Unknown
TO3-420 CFA 230.96 85.8 91 90 Unknown
TO3-420 CFA 286.43 86.5 91 91 Unknown
TO3-420 CFA 168.59 87.8 90 90 Unknown 85.3
TO3-420 CFA 210.68 85.8 91 90 Unknown 86.0
TO3-420 CFA 168.26 88.7 91 90 Unknown 80.7
TO3-420 CFA 178.90 85.8 91 90 Unknown 84.5
TO3-420 CFA 215.79 85.1 90 82 Unknown 82.5
TO3-420 CFA 168.84 84.6 82 82 Unknown 83.0
TO3-420 CFA 273.14 82 88 75 Unknown 78.5
TO3-420 CFA 172.51 83.3 81 88 Unknown 72.8
TO3-420 CFA 219.12 82.4 79 82 Unknown 77.7
TO3-420 CFA 213.93 83.8 88 82 Unknown 76.2
TO3-420 CFA 289.15 77.9 77 59 Unknown 83.0
TO3-420 CFA 294.81 79.5 86 63 Unknown 79.0
TO3-420 CFA 250.44 76.5 77 79 Unknown 71.3
TO3-420 CFA 226.54 74.8 77 61 Unknown 78.7
TO3-420 CFA 251.82 69.6 73 70 Unknown 69.4
TO3-420 CFA 338.05 69.1 70 73 Unknown 76.3
TO3-420 CFA 280.48 68 72 72 Unknown 69.8
TO3-420 CFA 264.11 67.5 77 86 Unknown 79.4
TO3-420 CFA 231.03 67.1 61 72 70F 68.5
TO3-420 CFA 231.95 66.9 77 68 Y-70F 76.5
TO3-420 CFA 238.80 64.9 70 70 Y-72F 74.3
TO3-420 CFA 294.49 64.9 72 59 Y-72F 72.5
TO3-420 Kelly 308.38 64.8 70 88 N-78F 74.5
TO3-325 Kelly 168.91 64.4 75 81 N-Unknown 69.3
TO3-325 Kelly 210.94 72.1 70 81 N-75F 69.3
TO3-325 Kelly 142.55 74.3 86 82 N-72F 71.0
TO3-325 Kelly 186.06 67.3 63 73 N-73F 72.0
TO3-325 Kelly 185.20 64.4 81 77 Y-73F 79.5
TO3-325 Kelly 207.98 66.6 82 79 Y-76F 70.0
TO3-325 Kelly 200.67 72.3 81 88 N-75F Unknown
TO3-325 Kelly 166.67 72.9 81 86 N-75F 70.0
TO3-325 Kelly 147.19 77.2 70 88 N-Unknown 78.0
TO3-325 Kelly 163.24 75.2 77 79 Y-72F 72.5
TO3-325 Kelly 180.67 75.7 84 84 N-74F 76.7
TO3-325 Kelly 201.58 75 72 82 N - 72.7F 75.3
TO3-325 Kelly 166.67 74.8 86 84 N-75F 64.5
TO3-325 Kelly 157.97 77.9 70 90 N-79F 70.0
TO3-325 Kelly 134.92 76.6 84 86 N-80.7F 75.0
N-79F (5/10)
TO3-325 Kelly 159.28 76.5 84 90 66.0
N-78F (5/11)
TO3-325 Kelly 164.13 79 82 82 N-74F 67.0
TO3-325 Kelly 201.35 79.9 90 88 N-75F 61.5
TO3-325 Kelly 164.49 84.4 90 84 N-75.2 87.8
TO3-325 Kelly 162.97 82.4 90 86 N-79F 84.5
TO3-325 Kelly 139.81 82.9 82 90 N-78F 59.5
TO3-325 Kelly 162.31 80.4 84 88 N-75F 77.5
TO3-325 Kelly 170.28 77.9 90 91 N-79F 87.0
TO3-325 Kelly 196.96 79.9 86 88 N-89F/N-84F Unknown

TO3-325 Kelly 178.36 80.2 90 90 N-77.9F 80.0


TO3-325 Kelly 178.35 83.5 91 86 N-77F 85.5
TO3-325 Kelly 132.70 85.1 86 90 N-79F 79.0
TO3-325 Kelly 164.96 82.9 86 92 N-? 93.0
TO3-325 Kelly 178.25 82.9 88 87 N - 79.3 F 79.5
TO3-325 Kelly 205.91 84.4 90 92 N 78.0
TO3-325 Kelly 166.61 86.2 91 92 N-81F 76.5
TO3-325 Kelly 163.31 86.5 92 88 N - 77.2F 85.5
TO3-420 Kelly 210.99 85.6 80 90 N-74F 73.0
Kelly No - 82.1 F
84.5 F - No
NM

N - 77F

No - 82.1 F
No - 91.3F
10/12:N -
83.1F, 10/13:
N - 77.1F
No - 82.1 F
No - 91.3F
N - 73.9 F
0.0
N - 75.1 F
0.0
#REF!
N - 73.9F
#REF!
N - 77.3F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Precipitation Precipitation
Day of Panel Day of VB Notes
Placed (in.) (in.)

0.00 0.00 CFA = Controlled flight auger (no casing)


0.00 0.33 Yellow highlights cracked vbs
0.00 0.00 Kelly = Casing used to remove material
0.00 0.00 For Drill Water Temp - N means not heated, Y means heated
0.00 0.00 F = Farenheit (high for day from weather report)
0.05 0.00 Volume of panel is calculated as
0.00 0.00 slurry (L)/ft drilled and is combined
0.00 0.00 into an average for 2 panels
0.00 0.19 VB19 through VB29 done for comparison
0.00 0.00 to holes without cracking
0.00 0.43
0.19 0.06 air temperatures from accuweather.com
0.04 0.12 lake water temp. from seatemperature.info
0.00 0.00 drill water started being heated at vb26
0.01 0.00 https://my.sfwmd.gov/dbhydroplsql/show_dbkey_info_detail.show_station_charac
0.97 0.00 station - S77_R
0.00 0.11
0.05 0.04
0.00 0.04
0.00 0.01
0.00 0.01
0.00 0.00
0.17 0.01
0.04 0.00
0.02 0.00 0.04
0.01 0.01 0.02
0.01 0.00 0.04
0.00 0.12 0.01
0.00 0.00
0.03 0.01
0.00 0.01
0.00 0.00
0.01 0.00
0.04 0.01
0.01 0.00
0.00 0.00
0.01 0.00
0.01 0.00
0.00 0.00
0.00 0.00
0.00 0.01
0.00 0.03
0.00 0.00
0.00 0.40
0.00 0.00
0.01 0.00
0.00 0.00
0.40 0.00
0.00 0.00
0.00 0.01
0.01 0.00
0.00 0.00
0.00 0.00
0.01 0.02

0.00 0.05
0.00 0.19
0.01 0.00
0.01 0.04
0.39 0.00
0.00 1.30
0.72 0.21
0.00 0.21
0.02 0.00
Not Cracked Average Temperatures
86
84.12
means heated 84 83.02

82

Temperature (F)
80
78.07
78
Not Cracked 76.23
Temperature Average 76
Day Panel Placed 83.02
74
Day of VB 84.12
Lake 78.07 72
Day Panel Placed Day of VB Lake Slurry at Rig
Slurry at Rig 76.23
Precip. Panel 0.0547
Precip. VB 0.0676
Cracked Average Temperatures
Cracked 78
Temperature Average
Day Panel Placed 73.00 75.79
76
Day of VB 69.60
Lake 71.38 74
Temperature (F)

73.00
Slurry at Rig 75.79
72 71.38
Precip. Panel 0.0160
Precip. VB 0.0120 69.60
70

68

66
Day Panel Placed Day of VB Lake Slurry at Rig

Not Cracked Air Temp. vs Lake Temp.


100

90
Air Temp Day Panel Placed

80

70

60

50

40
40 50 60 70 80 90 100
Lake Temperature Day Panel Placed
60

Air Tem
50

40
40 50 60 70 80 90 100
Lake Temperature Day Panel Placed

Not Cracked Air Temp. Panel vs Air Temp. VB


100

90

Air Temp Day of VB


80

70

60

50

40
40 50 60 70 80 90 100
Air Temp Day Panel Placed

Not Cracked Lake Temp Day Panel Placed vs


Slurry Temp at Rig
100.0

90.0

80.0
Slurry Temp at Rig

70.0

60.0

50.0

40.0
40 50 60 70 80 90 100

LakeTemp Day Panel Placed

Not Cracked Air Temp Day Panel Placed vs Slurry


Temp at Rig
100.0

90.0
Slurry Temp at Rig

80.0

70.0

60.0
100.0

90.0

Slurry Temp at Rig


80.0

70.0

60.0

50.0

40.0
40 50 60 70 80 90 100
Air Temp Day Panel Placed
ratures Not Cracked Precipitation Averages
0.0500

0.0400
Precipitation (inches)

0.0300
07

76.23 0.0200

0.0100

e Slurry at Rig 0.0000


Precip. Panel Precip. VB

atures Cracked Precipitation Averages


0.0500

75.79
0.0400
Precipitation (inches)

0.0300

.38
0.0200

0.0100

0.0000
Precip. Panel Precip. VB
ake Slurry at Rig

ke Temp. Cracked Air Temp. vs Lake Temp. A


100 100

90 90
Air Temp Day Panel Placed

Air Temp Day Panel Placed

80 80

70 70

60 60

50 50

40 40
80 90 100 40 50 60 70 80 90 100 40 50

Placed Lake Temperature Day Panel Placed Lake


Air Tem

Air Tem
50 50

40 40
80 90 100 40 50 60 70 80 90 100 40 50

Placed Lake Temperature Day Panel Placed Lake

Air Temp. VB Cracked Air Temp. Panel vs Air Temp. VB


100

Air Temp Day of VB 90

80

70

60

50

40
80 90 100 40 50 60 70 80 90 100
ed Air Temp Day Panel Placed

nel Placed vs Cracked Lake Temp Day Panel Placed vs Slurry


Temp at Rig
100.0

90.0

80.0
Slurry Temp at Rig

70.0

60.0

50.0

40.0
80 90 100 40 50 60 70 80 90 100

ced LakeTemp Day Panel Placed

laced vs Slurry Cracked Air Temp Day Panel Placed vs Slurry


Temp at Rig
100.0

90.0
Slurry Temp at Rig

80.0

70.0

60.0
100.0

90.0

Slurry Temp at Rig


80.0

70.0

60.0

50.0

40.0
80 90 100 40 50 60 70 80 90 100
ed Air Temp Day Panel Placed
Yellow Dots are Cracked
Blue Dots are Not Cracked

Air Temp. vs Lake Temp. Combined


100

90
Air Temp Day Panel Placed

80

70 Air Temperature Day Panel


Placed (F)
60

50

40
40 50 60 70 80 90 100
Lake Temperature Day Panel Placed
Air Tem
50

40
40 50 60 70 80 90 100
Lake Temperature Day Panel Placed

Air Temp. Panel vs Air Temp. VB


100

90
Air Temp Day of VB

80

70

60

50

40
40 50 60 70 80 90 100
Air Temp Day Panel Placed

Lake Temp Day Panel Placed vs Slurry Temp at


Rig
100.0

90.0

80.0
Slurry Temp at Rig

70.0

60.0

50.0

40.0
40 50 60 70 80 90 100

LakeTemp Day Panel Placed

Air Temp Day Panel Placed vs Slurry Temp at Rig


100.0

90.0