Professional Documents
Culture Documents
Confidential
This form has been drawn up to serve as a guide in the assessment of the property to be built and it must be noted by the owner and the builder
that the Bank accepts no responsibility whatsoever for the carrying out of work to be done in accordance with this Schedule of Finishes.
I/We am/are willing to contract to perform and complete the entire work required to be done in the erection and completion of:
a) The proposed buildings (including out-buildings and fencing).
b) Additions and renovations of existing buildings.
c) Swimming pool/Tennis court.
Delete whichever is not applicable.
On Township
3 Foundation footings
4 Foundation plinth
5 Super structure
Cement brick Blocks clay or Brick burnt clay Other (specify)
(SABS) cement (SABS) (SABS)
6 Door and window frames
Steel Wooden Steel window Wooden window Other (specify)
doorframes doorframes frames frames
7 Windowsills
8 Roofing
Roof covering:
Cement fibre sheeting Cement fibre tiles Concrete tiles Corrugated iron Harvey tiles Metal rib/trough
9 Wall finishes
Internal: Smooth plaster, one coat Smooth plaster, two coats Other (specify)
External: Face brick Fair brick Rough cast Smooth plaster Other (specify)
11 Bedroom cupboards
12 Skirtings
13 Doors
14 Pelmets
15 Kitchen units
16 Wall tiling
17 Glazing
19 Bathroom fittings
20 Gutters/Downpipes – Square/Round
21 Electrical
22 Painting
Sills Gutters/Downpipes
23 Floor finishes
Diamond mesh Brick walling Pre-cast walling Three strand wire Motor gate Pedestrian gate
Other (specify)
25 PC items allowed for
1 Built-in cupboards R
2 Bathroom suites R
3 Floor coverings R
4 Kitchen units R
5 Light fittings R
6 Wall tilings R
7 Other/Variations R
8 R
9 R
10 R
11 R
12 R
Total R
Signed
(Owner) (Contractor)
Witnesses
Date D D M M C C Y Y