SCOPE OF WORKS GENERAL CONSTRUCTION WORKS SUBSTRUCTURE AND SUPERSTRUCTURE

LARSEN TOWER

ITEM SCOPE OF WORKS Details


A. STRUCTURAL WORKS
1 Concrete Forming
2 Concrete Accessories
3 Concrete Reinforcing
4 Cast-in-place Concrete Complete Structural works (Fix only on Rebars and Cement)
5 Structural Metal Framing (please verify if required)
6 Joint Sealants
7 Vapor Retarders for confirmation
8 Earth Moving Structural Excavation-separate
B. ARCHITECTURAL WORKS
1 Concrete Finishing > On walls and ceilings; Rubbed finish on BOH and Fire Exit
> Skim coating on exposed concrete surfaces (Common Areas and Residential Units) - by others.
> Trowelling (verify if required)
> Power floating finish applying floor treatment (Ashford Formula)
> Fine broom finish (floor to receive painting)
> Scratched finish (bare slab/floor to receive waterproofing/topping)
1. Ready to receive paint, skim coating under Interior painting works Package
2. Ready to receive floor treatment (Ashford) - Floor Treatment separate contract
2 PreCast Architectural Concrete > Wheelstops (Full)
> Precast Canopies (if applicable)
> Ledges (if applicable)
> Zocalos (if applicable)
3 Cast Decks and Underlayment > Toppings to receive required floor finishes (except ID areas (lobbies, gym, function room)
> Light weight topping at roof decks with Thermoshield
Roofdeck Topping not included - under Waterproofing Works Package
4 Unit Masonry > Concrete Hollow Blocks (pipe chase including wet works, all areas identfied on plan)
> Design joints for horizontal and vertical connections
> Lintels and stiffeners

5 Finish Carpentry > Carpentry works on the Common Areas (i.e Fire Hose Cabinet Cladding, etc.)
6 Damproofing > Capillary/cementitious type
> Elastomeric cementitious type
> Elastomeric cold-applied waterproofing
> Polyurethane damp coarse
> Sheet membrane or torched-applied
> Epoxy tank-lining
> Reinforced PVC waterproofing
> Nordrain system
* except Amenity areas and Roof deck
7 Joint Sealants > Rx Volclay Waterstop (Perimeter and Toilets - Wet/Dry areas only) for confirmation
8 Metal Doors and Frames Install the following type of metal doors and jambs:
> Hollow core metal doors; 2 hrs fire rated
> Glazed metal door with vision panel
> Hollow metal louvered door
> Grille doors
> Other steel doors not mentioned above (but shown on drawings)

9 Hardware > Fix only of hardware to metal doors

10 Louvers and Vents > Stormproof/Demountable metal louvers


> Mechanical Louvers - By Mechanical Contractor
> Residential Louvers - By Others
> Acoustic louvers to Genset room - By Others

11 Plaster and Render > On CHB walls to receive finishes


Skimcoat on Residential Floors (by Painting Contractor)
12 Wall Assemblies and Cladding > Aluminum cladding to external columns - excluded in original bid, framing only
> Spraycrete walls (Basement and Residential Floors)
> Drywall Partitions and Installation (BOH - by gencon; residential - Dryworks Package)

13 Tiles and Slab Finishes Fix only of the ff tiles at Basement, BOH/Common Areas, and Residential Units: Tiles (OSM)
> Homogeneous tiles
> Rectified and vertified tiles
Supply and installation of non-skid tiles
14 Ceiling Systems Supply and fix of the following at BOH/Common Areas and Basement only:
> Suspended gypsum ceiling and required bulkheads (BOH and Units)
> Suspended ficem ceiling (BOH and Units)
> Suspended metal ceiling (BOH and Units)
> Acess panels / handholes
> Removable manholes

15 Painting and Coating Painting on BOH/Common Areas except Typical Hallways, Residential Units, Amenity, and Fixed Decor
Areas
> Floor, wall and ceiling
> Metal doors and frames, metal balustrades, railings, fences and gates
> Concrete floors - epoxy
> Concrete floors - parking area
> Structural steel - if required
> External walls - exposed only
> Door jambs Final Paint
Note: Skimcoat items - on Common Areas shall be placed under this Work section
16 Fences and Gates for confirmation
17 Rough Carpentry > Wood plate and door stopper to Wood Doors, Wood Doors and Hardware BOH not included
18 Thermal Insulation > Acoustic insulation to Genset Room's wall and ceiling (by others)
19 Other Architectural Works Supply and fix of the ff:
> Wood Doors at BOH offices at Basement Levels (to verify if applicable)
> Drip moulds (If applicable) Supply and Install
> Metal trellis
> Genset pads w/ KIP isolation pads (by others)
> Acoustic treatment to Genset door (by others)
C. EXTERNAL WORKS
1 Fences not applicable
2 PreCast Architectural Concrete > Bollards
> Curbs
3 Window washer > Davit System pedestal

4 structural frame canopy incl accent ledge glass( by exga contractor)


D. FOR PRELIMINARIES Kindly consider the following
1 Safety Nets
2 Manhoist
3 MobileCrane
4 Site Survey
5 Safety and Security
6 Bluesack
7 Temfacil
8 Warehouse
9 Disposal of Debris
10 Wash Area
11 Construction Toilets
12 Power for Constructions
13 Material Testing