u NAM MO 2 HYDROPOWER COMPANY LIMITED
88, Nongbeuk-Tay village, Sikhottabong district, Vientiane Capital, Lao PDR
NAM MO 2
HYDROPOWER PROJECT- LAO PDR
DETAILED DESIGN
HEADWORK AREA
UPTREAM AND DOWNSTREAM COFFERDAM _
TECHNICAL MANAGER : NGO VU AN a
DESIGN MANAGER HOANG THE VINH
SCI JOINT STOCK COMPANY ‘SCI CONSULTING JOINT
STOCK COMPANY
kT. TONG GIAM BOC
Pu TENG GLAM DOC
Pham Vin Nghia
S Cl GeICONGULTING JONT TOOK CONFI DATE DRAWING NO.
3RO FLOOR, TOWER C. GOLDEN PALACE BUILBING, MER! ROAD
[ME TRI WARD, NAM TU LIEM DISTRICT, HA NOI, VIET NAM 12/2023 NM2-SCI-RD-2BANG THONG KE BAN VE / LIST OF DRAWINGS
coruan
Tu vin
STTINO DRAWING NAME /TEN BAN VE SYMBOL KY HIEU
1 [GENERAL INSTRUCTIONS, VOLUME TABLE ‘Nw2-S¢HRO-2FL-DG-0001 1
2 _|PLANANO LONGMTUDINAL SECTION OF UPSTREAM COFFERDAM ‘Nw2-SC}RD-2FL-DG-0001 o
3 |secTOnt-1.22 NM2-SCERD-2FIL-DG-0001 3
4 |secTionss;44 Nw2-S¢HRD-2FL-DG-0001 o
5 |PLANAND LONGITUDINAL SECTION OF DOWNSTREAM COFFEROAM NM2-SCERD-2FIL-DG-0001 05
6 |secTionss.66 ‘Nw2-SC#RO-2FL-DG-0001 08
7 |secton77,68 Nw2-SC}RO-2FL-DG-0001 71. LEGAL BASIS/ CAN CU’ PHAP LY
Sasso none om 2 yon i eS comig rt Sk Conga
tnd tora So acpi a
canto ogg bc bn
2. APPLICABLE STANDARDS AND REGULATIONS
TIEU CHUAN VA QUY PHAM AP DUNG
“emai cig an pam oom
“Tomo 2072 hades - ngs heat n i common an npc
EW e202 Cn et yw in co shang pl ttn ae,
Oe iret ere sts
cles ul ee ie eh ee pan
3. MAIN CONSTRUCTION METHOD STATEMENT
BIEN PHAP THI CONG CHU DAO
Geant mitrcrencn misnta ete
an ct 8 rg rg nn er
Dagreerebystgraat wngenmess tenet reso ete st dan 2 0s
“ody sung pains eu an a ass ule won Sng tO
Door ty or corte gamete 23 i atari aden Heep rors nage an
Dien Shen te 23 my os P tn ca mb aes
anes curator
"ing ie ny end ng
"Toupee or natn tio nr eg dene
1 le aot igs nar nb Syocs eg
ikea tn meron sates
bisa tay meng
4. SAFETY/ AN TOAN
“ann aa ue ah yma cass aed
retro bn ee nit Sora bi
ang wn ON 4 ha va eon eon ey
‘aman Gem 0214004 oe a han rg
gmt apn st a ato ata es a OP
“avec alla wn saa hu osteo
“Borg bos et wane esha as ato cope ps
Teatcnat let trys baw de erga
5, NOTE/ GHI CHU
Caray emg cae ng aa ate te
‘esr etn ee cn etn a ete tn ig
Drawing submission status:
TABLE OF MAIN QUANTITY SUMMARY
No. ‘Work’s namel Tén cing vibe [Univ Bon vi|Massichdiiweng
lUPTREAM COFFERDAM ma laatar
aren =0.8 ms _—_5295
[Rock d= 0.3m : mara
DOWNSTREAM COFFEROAW m3 [32.24
[Eatin 20.9 mg [12861
Rock = 0.3m mg 110560
rosa NAM MO-2 HYDROPOWER PROJECT - LAO POR
Funan 3)
SCT socom secon HEADWORK AREA
sroehs he rh
}az2023 UPTREAM AND DOWNSTREAM COFFERDAM
Maro WA
72-29) GENERALINSTRUCTIONS, VOLUME TABLE
(eneck [Tran Minh RS
22025] Granta ro FRefaneat
Rev] Date Description Dawn
[approved [Design [Le Ann vao
frzztas| NN2SCHRDZFL-DG-0001 |PLAN OF UPTREAM COFFERDAM
COORDINATORS
it} Ft anal shea — | — ar
LONGITUDINAL SECTION OF UPSTREAM COFFERDAM ®
ba aaa z
a LEGEND Posse NAM MO 2 HYDROPOWER PROJECT - LAO PDR
mim accomoaeying eanings, @ Ewen eed
inctmnonmnteoronmaienncemmimstsreeraseeeasne erm SClamease ee some| ” HEADWORK AREA
TABLE OF MAIN QUANTITY SUMMARY nee - cs TREN NNO DOMSTREA COFFERONU
sa ae | |_| 2am | See Femere [cs AMMO STON OFPSEAFEDAL
ET Tee ere "202 Oo Fev ee
Ror] ate Desupon ram | creo [Aapoved [sign fr22093 NM2-SCHRD2-FL-DG-0001SECTION 1-4
ean)
et aot
TRINH TY THI CONG DE QUAY
= osha a) oe
8 a a g CONSTRUCTION SEQUENCES OF COFFERDAM
(ieee He co ea | st Gran barnett dn tn
SECTION 2-2 ade eanuaeee
S COM cero cee Thm ntti n oe 2700
in? pacha Oe op vi Sau 06 tin hn dip Rnb a ga ob mak win deter in an GO HGH a
han romp he se ck ac hoo wh ee te eg eh
usta ch ain esac a 03 = CAmib ene
“napeamiligepzarcbnnra getdate dang ip
mer
oot
|
|
g 8 3 g e
Pn eaten im) a i i i 2
wont | Leen
3 q Q een
i i 8 pect
—— i : a
notes
{een dn see ho Pomm NAM MO2 HYDROPOWER PROJECT - LAO POR
2 piininiwncecna nn eet SCT scons erect HEADWORK AREA
GEOLOGICAL BOUNDARY bamepslaaratiehrn Eres HPTREAM AMO DOWNSTREAM COFFERONA
Sentence 1 | 12008 | Change cotton mat [Fmanagee|tigo vu. fizz0z3|__ SECTION 1-1, 2-2
nen at + | ws rec [Tenn NCES — I 00 Dora FeeSECTION 3-3
a AEs
rzrao + pre
oo
ee | oa
:
LEGEND
‘Clovation fh
mee SRA fF et Banca
pp
ana oan) 3 i . £ i zg i
a es rs ee
oe it i
NoTEs
GEOLOGICAL BOUNDARY
sonet gon ae
NAM MO-2 HYDROPOWER PROJECT - LAO PDR
HEADWORK AREA
iz 2025 JPTREAM AND DOWNSTREAM COFFEROA
[a20| _ SECTION 3-3; 4-4
[22028] Dero a]
‘Drawing submission status:
Rev] Dave Deserpion ‘Brawn _| check |Rporoves {2.2025 NM2-SCERD-2-FL-DG-0001PLAN OF DOWNSTREAM COFFERDAM!
phEiay
COORDINATORS
[reve] vr /) a [
SECTION OF DOWNSTREAM COFFERDAM
ord
so. a rs 5]
a aon
SST
ran
NoTes
1 Dimensions on this drawing, levatons are in meters. ideessies NAM MO 2 HYDROPOWER PROJECT - LAO PDR_|
2 inne tor cu ah ii dg ny in at te SCI sc1cons coven]
: ‘rawng submission stots Fao a Patt!” HEADWORK AREA
TABLE OF MAIN QUANTITY SUMMARY [O.Menaged Hoangthe vit | #72 2020 UPTREAM AND DOWNSTREAM COFFERDAM
‘No, | Works name/Ten cing vite [Une/ on vifatnantnaivgng || * | 122023 | Aenea Cnt ec, [Fatanager| Ngo Fz 2023 PUMUANDLONSTUDNA. SECTION OF DONSTREM COFFIN
a aH 0 | vanes [check [Tran Minh [122023] Drawing. Rev|sheet|
de038 cy 10360 —Iinev] Dete Desorption ‘Drawn | Check [Approved [oesign [Le Anh Heo {2.2029 NM2-SCIRD-2-FIL-DG-0001 |— ae
5
SECTION 6-6
LEGEND
NOTES
+1. Dimensions on this drain eatin aren mates Prefect te NAM MO 2 HYDROPOWER PROJECT - LAO PDR
1 pene eaten conan edb ncn ose tal rane et ‘SCI se: consuysion ie
Drawing submission sats: Simo HEADWORK AREA
GEOL eICa HOUNDAnY: [oManagel cana va 2 REAM AND COMNSTREAI COFFEROAM
we 7 [ase [rae wonoae ln ety SECTION 5-5; 6-6
onanymeretvae = @ | we eck [Tran aR ees argon et
Bouridary He bit IB vA [Rev| Date Description ‘Drawn | Check [Approved [Design [Le Anh Hao =p }i2.2023 NM2-SCHRD-2-FIL-DG-0001 |Nores
2 See Pie ceaming wah accompany drmengs. lis
Ss SCR RAPE APEC” seo WoRK AREA
GEOLOGICAL BOUNDARY onnsoet oan ihe will Fs PREAMANO DONNSTREACOFFERONL
et ee ee oo Foes Wea SECTION 7-7; 8-8
Soman 8 «| mee ck [Tan Me RE 2.a029| amar Foon
exon a 80 ev] ose Desenen wn _| Gc ssn tenn |=) ra2022|NM2-SCLRD2-LDG 0001
Sean)
‘SECTION 7-7
SECTION 8-8
LEGEND
Speers
Pract
NAM MQ.2 HYDROPOWER PROJECT - LAO POR