Professional Documents
Culture Documents
CHAPTER1
CHAPTER1
Result
The minimum cost for this operation is $152,535
Conclusion
In order to reach the optimal cost and less than pre
Bellingham will transport 20 truckloads to SLC and 5
Eugene will transport 80 truckloads to SAC and 45 t
Albert Lea will transport 70 truckloads to RC and 30
Saving $13,060 compared to previous plan
Constraints
cramento Supply from Bellingham X1A+ X1B + X1C +X1D = 75
t Lake City from Eugene X2A+ X2B + X2C +X2D = 125
from Albert Lea X3A+ X3B + X3C +X3D = 100
uquerqye
Demand for Sacramento X1A + X2A + X3A = 80
for Salt Lake City X1B + X2B+ X3B = 65
for Albuquerque X1C + X2C + X3C = 70
for Rapid City X1D + X2D + X3D = 85
Lake City
operation is $152,535
Total Cost
$ 152,535.00