You are on page 1of 2

EOQ Model with Planned Shortage (Analytical Version)

Data
D= 6000 (Demand /year)
K= $ 115.00 (Setup cost)
h= $ 4.20 (unit holding cost)
p= $ 7.50 (unit shortage cost)

Decision
Q (S.P)= 715.9409393 (optimal order quantity) SQRT((h+p)/(p)) * SQRT((2KD)/(h))
S= 257.00443975 (optimal maximun shortage) ( (h)/(h+p) )* Q

Q (Nor)=
Result
Maximum Inventory Level 458.93649955

Annual Setup Cost $ 963.77 KD/Q


Annual Holding Cost $ 617.80 h* (Q-S)/2 * (Q-S)/Q
Annual Shortage Cost $ 345.97 p* S/2 * S/Q
Total Variable Cost $ 1,927.53

You might also like