Hydrological Survey Works for Engineering

Services for Jakarta Mass Rapid Transit


(MRT) East-West Line Project (Phase 1)

1.1. UNDERSTANDING OF WORK

1.1.1. Objectives

The objective of the Hydrological Survey is to obtain necessary data for the Project
hydrological survey and this document shall be applied to the flood inundation study
work for the Engineering Service for Jakarta Mass Rapid Transit (MRT) East-West
Line Project (Phase1). The data obtained will be incorporated into the planning and
design of the civil and architectural structures and the railway facilities in the Project.

1.1.2. Scope Of Work

The scope of work for this hydrological survey includes, among others, surveys on
floods and inundations that have occurred through questionnaires and interviews with
residents who have been affected, geometric surveys, surveys of river flow velocity,
and others.
a. Preparatory work
b. Survey of Historical Flood Record: 580 nos
c. Study of Probable Flood Water Level
d. Summarization of Drainage System
e. Study of Probable Water Level in MRT East-West Line Project : 3 location
In addition, the historical flood record at 3 rivers of Cideng River, BKB Flood Control,
and BKT Flood Control is shown in Figures 1.3. to Figure 1.5. respectively.

1.1.3. Location Work Area

As TOR in the Contract, the survey area covers 21 stations (13 elevated stations and
8 underground stations), 2 transition sections (Grogol station to Roxy station and
Galur station to Cempaka Baru station), 2 substations, and 1 depot area.
The location of Mass Rapid Transit (MRT) Jakarta, East-West Line is shown in the
figure below :

Chapter 1 - 1
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

Figure 1.1. Location Map Of Entire Section of Jakarta MRT East-west Line
Sources : JMCA, 2021

Chapter 1 - 2
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

Figure 1.2. Station Location of Stage 1 of Phase 1 of MRT E-W Line


Sorce : JMCA / WhatsApp Images 2022-07-19 at 10.59.08

Chapter 1 - 3
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

Figure 1.3. River Line Survey on Banjir Kanal Barat Figure 1.4. River Line Survey on Banjir Kanal Timur
(BKB) Floodway (BKT) Floodway

Figure 1.5. River Line Survey on Cideng River

Chapter 1 - 4
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

1.1.4. Standards and Design Criteria

Design Criteria that will be used in this survey include the regulations and NSPK
(Norms, Standards, Guidelines, and Criteria) by using SNI (Indonesia National
Standard) used in this hydrological study / survey such as :

No. SNI Description

Vertical Control Network with Flatness Method (for


1 SNI 19-6988-2004
Vertical Control Network).
Horizontal Control Network (for Horizontal Control
2 SNI 19-6724-2002
Network).
A hydrographic survey using a single-beam
3 RSNI3 echosounder (Hydrography survey by using single-
beam echosounder).
Procedure for Measuring Flow of Rivers and Open
4 SNI 8066 : 2015 Channels using Flow Measuring Instruments and
Buoys.
Procedure for Calculation of Flood Design
5 SNI 2415-2016
(Procedure for Calculation of Flood Design).
Procedures for measuring the flow of rivers and
6 Revisi SNI A3-2414-1991 open channels using current measuring devices
and buoys.
The method of measuring the peak discharge is in
7 SNI 03-3413-1994
an indirect way.
Methods of making discharge curves and open
8 SNI 03-2822-1992
river/channel tables with graphical analysis.
Hydrographic Survey using Single-beam
9 RSNI3
EchoSounder.
Depth Measurement Method Using Perum Echo
10 SNI 8283:2016
Tool To Generate Bathymetric Maps.

Analysis of Hydrology, Hydraulics, and River


11 SNI 1724 : 2015
Building Design Criteria.
Flood hazard mapping method 1:50,000 and
12 SNI-8197-2015
1:25,000 scale.
Permen. PUPR No. 12/
13 About urban drainage
PRT/M/2014
14 Perda DKI No. 7 Tahun 2010 About buildings

1.1.5. Work Days

The duration time period of the Hydrological Survey Works for Engineering Services
for Jakarta Mass Rapid Transit (MRT) East-West Line Project (Phase 1) is 6 (six)
months or 180 (one hundred eighty) calendar days.

Chapter 1 - 5
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

1.2. OVERVIEW OF THE OUTLINE OF THE REPORT

The systematics of the Job Interim Report Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit (MRT) East-West Line Project (Phase 1)
covers :
a. Chapter 1. Introduction
In Chapter 1, the background, aims, objectives, scope of work, consultant's
understanding of the work to be carried out, and the systematics of the
preliminary report are described.
b. Chapter 2. Hydrological Survey Works
In chapter 2, it is presented in detail all the procedures for carrying out primary
and secondary data surveys, data acquisition, processing and analysis. All data
are presented in a narrative manner equipped with figures and tables.
c. Chapter 3. An Overview of GIS System in the MRT Project
In chapter 2, it is presented GIS (Geographic Information System) or geographic
information system is a computer-based tool to map and analyze things that
exist and events that occur on earth. GIS technology integrates common
databases with operations such as queries and statistical analysis with unique
visualizations. GIS can also display geographical aspects as well as the
analytical benefits offered by maps.
d. Chapter 4. Study Of Probable Water Levels
In chapter 4, it is presented about the modeling process and Calibration Model
with various scenarios.
e. Chapter 5. Work Plan
In chapter 5, the implementation of the work to date and the next work plan is
presented.

At the end of this Interim Report, an appendix is presented that supports the
presentation of the Interim Report.

Chapter 1 - 6
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)

CHAPTER 1 ........................................................................................................................................... 1
INTRODUCTION .................................................................................................................................... 1
1.1. UNDERSTANDING OF WORK ................................................................................................. 1
1.1.1. Objectives .................................................................................................................................. 1
1.1.2. Scope Of Work .......................................................................................................................... 1
1.1.3. Location Work Area ................................................................................................................... 1
1.1.4. Standards and Design Criteria................................................................................................... 4
1.1.5. Work Days ................................................................................................................................. 5
1.2. OVERVIEW OF THE OUTLINE OF THE REPORT................................................................... 6

GAMBAR
Figure 1.1. Location Map Of Entire Section of Jakarta MRT East-west Line ...........................2
Figure 1.2. Station Location of Stage 1 of Phase 1 of MRT E-W Line .....................................3
Figure 1.3. River Line Survey on Banjir Kanal Barat (BKB) Floodway.....................................4
Figure 1.4. River Line Survey on Banjir Kanal Timur (BKT) Floodway ....................................4
Figure 1.5. River Line Survey on Cideng River .......................................................................4

Tabel
No table of figures entries found.