OWNER :

R R

Q Q

MAIN CONSULTANT : WEBSITE: WWW.Archplan-eg.com

1160/04 AL-AKADEMYA ST. SHERATON BUILDING,CAIRO, EGYPT.


EMAIL: Archplan@Archplan-eg.com
(TEL)+202 22630065/6

P P

MEP CONSULTANT :

N N

STRUCTURAL CONSULTANT :

AMR ABDELRAHMAN
CONSULTANT ENGINEERS
M M

MAIN CONTRACTOR :

L L

General Notes

- All dimensions and levels shown in the plates measured in meters unless otherwise stated.
- The contractor shall provide samples of the different materials used in the finishes for approval.
- When any work coordination is done, the consultant must be addressed before starting implementation.
- The contractor should review the dimensions shown with the dimensions in the site before starting the implementation.

K
LOCATION K

ZJD53
ay-103 °18′39 .6″
R-40 4
Ls-120
T-572 .569
L-84 8.45 9
X-8 106 82.6 15
Y-6 858 23.9 39

ZJD53

YJD5 3

YJD5 3
ay-103 °18′39 .6″
R-40 0
Ls-120
T-567 .530
L-84 1.24 7
X-8 106 82.1 50
Y-6 858 17.5 08

kl ,̀[ gg r'h UHg uvq Df' vd R

kl ,̀[ gg r'h UHg uvq Df' vd R


u vQ 40 jl v

u vQ 40 jl v

9
8

9
8
7
7
6
6
81
1.0
54
9+
P6
BK
AK
HY

63
4.9
54
9+
P6
BK
AK
5 HY
5

J J
1
08
4 21.
P 69+
BK
AK
ZH

9 63
4 24.
9+4
P6
BK
AK
4 ZH

3 0m
56 4.0
3 53.
P 69+
BK
AK
HZ

4 63
57.
9+3
P6
BK
AK
HZ

.3″
3

R-8 1°00′52
ay-1 52
63

93.2 21
ZJD
3.5

L-24 22.555
Ls-9 04

66
Y-6 111 11.41
+26

T-1 0
X-8 4.56
P69
AK
YH

851
3
.46
267
69+

52
AKP

ZJD
YH

.3″
52

R-8 1°00′52
YJD

ay-1 52
2

91.3 96
YJD
9.00
se 3

L-24 22.1 70
Ls-9 00

36
+19

Y-6 111 07.82


pha 2

T-1 0
X-8 3.79
t of pha se k AK P69 2
t poin t of trac HY
Star poinB down 60.00 0

851
End ion 69+1
3 .6712
of sect BKP of p hase 2
203
69+
Start point of pha se erec
ting AKP
End pointB do wn track t for HY
0.000 poin
ing of section
BKP 69+16 End
for ere ct
End p oint
40 07.0 3
E-6 851 of p hase 2 B up track
5 2.653 0 Start point of pha secting of section
N-8111 +145.00 End point for e re
BKP69
End point 5.404 06.1 61
BKP 69+16 E-6 851
4 8.751 4
N-8111 +150.40
BKP69
002
109.
69+
ZH AKP
1 71
13.6
1 69+1
ZH AKP

m
4.00

124
044.
69+
HZ AKP
90
48.7
69+0
HZ AKP

69
4 AKP 1200

1200
3750

2400
3750
.12

3750
1200

1500
1200
984

6150
68+ 9900
69
AKP AKP
YH
0
1200
.79

37501200
988

2400
3750
3750
68+

1500
1200

1200
AKP

6150
9900
YH

00
12

00

2400
12
50
37

50
50

37
37

00
00
12

1500
12

50
00
99

61
0
20

0
1

1 20
0

2400
75
3

0
3 75
0
75
3

0
1 20
0

1500
9 0
20
1

90

0
9

6 15
9

00
12
00
12

50
2400

37
50
37

50
00

37
12

00
0
150

12
00
99
50
61

New Capital (2)

2 00
00

1
12

7 50
2400
Z9839.206 Z5501.130
50
37

3
00

New Capital (1) New Capital (3)

7 50
12

3
1500

2 00
Y9843.399 Y5497.813

1
9 00
9
50
61


51 7.2

0
ZJD 66°48′
0

120
20

BKP68+414.695
1
0

0
75

2400

375
3
0
120

0
az- 5 0

375
0
20
1500

9900

1
8
R-3 60 6 6
15
0

Ls- 61 .06 0 89

1200
1200

X-811710.514 3750

T-2 .07 88. 0

2400

3750
1200

L- 468 112 81. 0 29

8
3750
Y-684781.029

1200
1 500

9900
X-8 847

4
6150

0
120
HY AKP68+636.05
1200
3750

Y-6

0
0
240

375
1200

0
375
0
500

50
990
1

0
120
1
N = 81 1 643. 364
E = 6 84 792 . 4 79

1200
1200 6150
3750
1200

00

3750
24

3750
7

9900
00
15

1200
1200
1200

AKP68
3750
1200 6150

00
126

145

146

205

220

221
120

119

116

110

109

107

3750
51

176

178

180

179

24
166

167

169

168

182

183

188

189
121

118

117

111

108

106
127

144

147

206

219

222
177

181

1200

3750
ZJD
3750 1200

9900
1200
1500

00

3750
131

128

141

142

148

151

153

152

184

185

190

193

202

203

223

226

1200
164

165

170

171

246

244

112

242

243

207

209

217

218

7
24
1200 3750 1200

3750 1200
122

123

233

234
1200 3750 1200 1200 3750 1200 1200 3750 1200 1200 3750 1200 1200 3750 1200

113
130

129

140

143

149

150

154

155

163

172
3750 1200

3750 1200

3750 1200

187

186

191

192

201

204

208

216

224

225
3750 1200

3750 1200

245

241
6150

9900
400

3750
2
00 00 00

2 400

2 400
00
24 24 24 15

9900

1200
9900

9900

9900

9900

9900

1200 3750
1500 6150

1200 3750

1200 3750

1200 3750

1200 3750

1200 3750
1500 1500 1500 1500 1500
6150

252

247

239

237

6
132

135

137

138

157

156

162

173

194

196

199

210

214

227

230
6150 6150 6150 6150 6150

115
4.00m
AKP68

P1
8

4
124

125

N-811792.914 EE-684777.029

231

232
250

251

160

161

174

175

248

249

240

238

235

236

198

200

211

212

213

215

HY AKP68+636.05
114
133

134

136

139

158

159

195

197

228

229
51

101

103

105
1

11

13

15

17

19

21

23

25

27

29

31

33

35

37

39

41

43

45

47

49

51

53

55

57

59

61

63

65

67

69

71

73

75

77

79

81

83

85

87

89

91

93

95

97

99
3

100

102

104
10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

44

46

48

50

52

54

56

58

60

62

64

66

68

70

72

74

76

78

80

82

84

86

88

90

92

94

96

98
YJD

8
BKP68+332.295

E = 6 84 765 . 5 79
N = 81 1 643. 364
UP

= 6 84 765 . 5 79
N = 81 1 795. 664

51 7.2
YJD 66°48′
X-811710.514 az- 5 4
R-3 60 1
Y-684777.029 Ls- 63 .70 4 52
T-2 .73 85. 4 29
FOUNDATION ARRANGEMENT PLAN PILES COORDINATION AND DISTRIBUTION L- 472 112 77. 0
X-8 847
Y-6

H H

G G

KEY PLAN

+33 8. 11
F. F. L

+33 8. 11
F. F. L

+33 8. 11
F. F. L

+33 8. 11
F. F. L

F F
+33 8. 11
F. F. L

BR-12

+33 8. 11
F. F. L

UP
UP

UP

+3 3 8 . 1 1 m
F .F.L

+3 2 9 . 8 5 m +3 2 9 . 8 5 m +3 2 9 . 8 5 m
F .F.L F .F.L
+3 2 9 . 8 5 m +3 2 9 . 8 5 m +3 2 9 . 8 5 m F .F.L
+3 2 9 . 8 5 m F .F.L
F .F.L F .F.L
F .F.L

BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN DN

DN UP

UP

UP

N
E E

REV Date Issued For


Sheet size ‐ ISO A0 (841* 1189 mm)

D D

C C
100 mm

PROJECT DATA:

‫ﺍﻟﻌﺎﺻﻣﺔ ﺍﻻﺩﺍﺭﻳﺔ ﺍﻟﺟﺩﻳﺩﺓ‬-‫ﺍﻟﻣﺣﻁﺔ ﺍﻟﺗﺑﺎﺩﻟﻳﺔ ﻟﻠﻘﻁﺎﺭ ﻭﺍﻟﻣﻧﻭﺭﻳﻝ‬

SHEET NUM SHEET TITLE


AR-000 TH21-WD-DWG-BR-AR-000-GN-REV00
B B
50 mm

TEAM MEMBER REVIEW


Eng.Mohamed Helmy
Nour El-Din Abdelwahab Menna Mostafa Ahmed Dr. Shady El Zeiny
Scanning scale

Esraa M. Abou-El-Naga Amany Ashraf Ahmed


Merna Kamal Eldesoukey Israa Mohamed Ali
Amr Hamed Mahmoud Fareeda Ayman Ahmed
PROJECT MANGER
Mostafa Mohamed Abdelhamied Ahmed Mohamed Hamdy
SCALE PAPER SIZE PROJECT NO. SITE CODE BLDG NO. SHEET NO. PHASE REV.
10 mm

A A0 TH-21 AR-000 IFC 0 A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39' B-J

B-I

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38 B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

UP
DN DN
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41
63450

225 8400 8400 8400 8400 8400 8400 8400 4200 225
NOTES:-
25825 7600 30025

1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
B-F B-F opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
B-E' B-E' 5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .

HOLD UNTIL MEP INSTALLATION 8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
NCTH-HAC-DWG-AR-WWGN-IW-008 9-Door opening Jambs min 200 MM if less it should be made as concrete post.
10- All Partitions extend to the underside of slab above unless otherwise is noted .
NCTH-HAC-DWG-AR-WWGN-IW00-9

W02-250
B 60 min
W02-250
B 60 min
W02-250
B 60 min B
W02-250
60 min B
W02-250
60 min B
W02-250
60 min B
W02-250
60 min B
W02-250
60 min B
W02-250
60 min
W02-250
B 60 min
W02-250
B 60 min B
W02-250
60 min
W02-250
B 60 min
W02-250
B 60 min
LEGEND AND ABBREVIATIONS:
WALL TYPE DESIGNATOR
165 850 115 LE = LEVEL WALL TYPE WALL SIZE

375 250
GL-01 GL-01 GL-01 GL-01 GL-01 GL-01

400
T.O.C = TOP PF CONCRETE
B-E B-E

150

150

150

150

150
550

550

550

550

550

550

550

550

550

550

550
1125 250 4850 250 1125
F.F.L = FINISH FLOOR LEVEL FIRE RATING
WALL HEIGHT REQUIRED
T.O.PR = TOP OF PARAPET
550 1190 4800 1435 275 275 1400 4800 1400 275 275 1400 4800 1400 275 275 7600 275 275 1400 4800 1400 275 275 1400 4800 1400 275 275 1400 4800 1400 800 420 2385 420 550
F.P.L = FINISH PAVEMENT LEVEL DOOR DESIGNATOR KEY
8375 8275 8275 8275 8275 8275 8275 4175 LINTEL
T.O.W = TOP OF WALL
H.+2225
F.C.L = FINISH CEILING LEVEL
8250 8150 8130 8150 8150 8150 12450 DOOR TYPE SD-07
W.F.L = WALKWAY LEVEL F-45 FIRE RATED
Shop
Shop lobby Shop Shop T.O.S.S = TOP OF STAINLESS STEEL

8425
Shop BR-GF- 52

8550

8550

8275
7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600
8400

8400

8400

8400

8400

8400
Shop BR-GF- 47 BR-GF- 99 BR-GF- 51 BR-GF- 54 WINDOW DESIGNATOR KEY
F.G.L = FINISH GRAVEL LEVEL
BR-GF- 43 BR-GF- 45
+322.65 m LINTEL
W02-250
+322.65 m +322.65 m F.D = FLOOR DRAIN
W02-250 +322.65 m +322.65 m +322.65 m F.F.L
+322.65 m B 60 min W02-250
W02-250

R.D = ROOF DRAIN


B 60 min
F.F.L F.F.L B 60 min F.F.L B 60 min F.F.L W02-250

F.F.L F.F.L W02-250


W02-250
B 60 min

W02
B 60 min

12625

12625

12625

12625
W02-250 B 60 min
E.J = EXPANSION JOINT WINDOW TYPE
B 60 min
W02-250
B 60 min
CU = CONDENSER UNIT
550 7425 275 275 7600 275 275 7600 275 275 7600 275 275 3425 500 3675 275 275 7600 275 7600 800 3225 550
SLAB TH. = SLAB THICKNESS
275 SILL
CR.J = CONTROL JOINT
ROOM DESIGNATOR KEY

275
B-D B-D
800

800

800

800

800

800

800

800

800

800

800

800

800
ROOM NAME

275
W02-250

425
W02-250 W02-250 275 3425 500 2825 B 60 min

PRAYER HALL
B 60 min B 60 min
H.+2225 H.+2205 H.+2205

1745

1745

1750

1750

1750

1750
H.+2225 SD-07 H.+2205 SD-07 H.+2205 H.+2205 SD-07
SD-07 F-45 SD-07 F-45 SD-07 SD-07 F-45
F-45 F-45 +324.45 F-45 F-45
00 G03
mF.F.L
4075

4075

4075

4075

4075
3950
3675

3675

3675

3675

3675

3675
300

300

300

300

300

300
Detail-A Detail-A Detail-A
W02-250 W02-250
3925 2850
ROOM No.

200

200

200

200

200

200
B 60 min B 60 min

FLOOR

410 350 610

410 350 610

410 350 610

410 410 350 610

410 350 610

410 350 610


33 10 W02-250
W02-250 W02-250
W02-250 W01-125 B 60 min
W03-125 B 60 min W03-125 W03-125 B 60 min
B 60 min B 60 min
B 60 min B 60 min B 60 min

60

60
26000

26000
60

60

60
INTERIOR ELEVATION CALLOUT

7600
8400

8400

8400
8275
25750
300 610 100

610 100

300 610 100

610 100

610 100
6925
2830 1145

7200
H.+2205 H.+2205 H.+2205 H.+2205 H.+2205 H.+2205
DOOR MATERIAL ELEVATION NOT A

9400
610
SD-11 SD-11 SD-11 SD-11 SD-11 SD-11
W02-250
ELEVATION
170

170

170

170

170

170
F-45 F-45 F-45 F-45 B 60 min F-45 F-45
M = METAL SHOWN

300

300

300

300
SHOWN
W02-250 W02-250 W02-250 W = WOOD B
UP

3925
3675

3675

3675

3675

3675

3675
B 60 min B 60 min B 60 min
Services
4075

4075

4075

4075

4075
Stair FIRE RATING
H.+2205 H.+2205 W02-250
H.+2205 SHEET SHOWN

2495

2495
2500

2500

2500

2500
H.+2205 SD-07 H.+2205 SD-07 B 2 Hr
BR-GF- 59 BR-GF- 61 H.+2205 SD-07
W02-250
SD-07 F-45 SD-07 F-45 SD-07 F-45 F1 = 60 min
F-45 F-45 F-45
W02-250
B 60 min

Detail-A
W02-250
B 60 min Detail-A
B
W02-250
60 min
H.+2205
SD-01
25 3675 275
Detail-A B
W02-250
60 min
B 60 min F2 = 2 Hr HATCH LEGEND:
F-90 H.+3005
SD-09 CONCRETE

275 275
WALL HEIGHT
B-C B-C
F-45
800

800

800

800

800

800

800

800

800

800

800

800

800

800
125
P= PARTIAL WALL HOLLOW CMU

1125
W02-250 725 2550 725

725
1425
B 2 Hr
B = TO BOTTOM OF STRUCTURE SOLID CMU
275 7600 7600 800 3225 550
550 7425 7600 275 275 7600 7600 275 275 275
275
120 1110 2200 200 745 2510 745
275 275 275 275 R.F.I. :-
12350

12350

12350

12350

12350
Shop 3900 4000 Shop
Shop lobby
W02-250 Shop DOCUMENT NO. SUB. REV. DOC. TITLE
BR-GF- 46 Shop Distribution Hall B 60 min
BR-GF- 55

2550
BR-GF- 44 BR-GF- 99 BR-GF- 53 W02-250
1
NCTH-HAC-AP-WW-RFI-ARCH-33 00 Conflict in Door Opening ( SD 07 )
BR-GF- 48 BR-GF- 77 Refer to NCTH-HAC-AR-WWE-SR-01-00 B 60 min --
H.+2225 W02-250 H.+2205
SD-06 +322.65 m Missing Structure Slab under Shaft
+322.65 m B 60 min
F-45 +322.65 m 2 NCTH-HAC-AP-WW-RFI-ARCH-32 -- 00 Wall
+322.65 m F.F.L
8275

8275

8275
+322.65 m

8275

8275
7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600
8400

8400

8150

8400
F.F.L +322.65 m 2620 1210 170
F.F.L Conflict in design DWG's .for Door
F.F.L F.F.L F.F.L 3 NCTH-HAC-AP-WW-RFI-ARCH-32 -- 00 Opening ( SD 07 )

8375 8275 8275 8275 4025 4125 8275 8275 4175


W02-250
ELEC.
W02-250 W02-250
W02-250
W02-250
B 60 min
B 60 min
W02-250 W02-250
B
ROOM60 min B 60 min

B 60 min B 60 min
BR-GF- 63
REVISIONS :
B 60 min

4300
8250 8150 8150 8150 3900 4000 8150 12450

550 225 6975 275 225 7150 275 225 7150 225 275 7600 275 225 3400 3725 275 225 7150 275 225 7150 225 800 250 2750 225 550
REV.NO. DATE REMARKS CODE
225 275 225 275 275 275 275 225 275
275

275

275

275

275

275

275

275

275

275

275

275
B-B B-B
125

125

125

125
00

800

800
GL-01 GL-01 GL-01 GL-01 GL-01 2/01/2022
400

400

400
Post 250*225 up to Beam Post 250*225 up to Beam Post 250*225 up to Beam Post 250*225 up to Beam Post 250*225 up to Beam Post 250*225 up to Beam Post 250*225 up to Beam Post 250*225 up to Beam Post 250*225 up to Beam 01 14/02/2022
W02-250
B 60 min

02 6/06/2022

03 14/08/2022 Updated Steel Doors

04 29/10/2022 Updated Fire Hose Cabinet

OWNER :

B-A B-A

PROJECT :
25825 7600 30025
+338.11
F.F.L

225 8400 8400 8400 8400 8400 8400 8400 4200 225
+338.11
F.F.L

63450 +338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

BR-12

1
+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L
F.F.L +329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L
F.F.L

2
BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN DN

DN
UP

UP

UP

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39' CONSULTANT :

A R CH P L A N
ARCH C PLANN R
-- GROUND FLOOR - BLOCKWORK PLAN - ZONE ( E )
-- -- 1:100
DESIGNER :

Concrete Lintel 300*250

329.85+ WALL TYPE


Wall
300
370

WALL NO. C.M.U. Type Fire Rating


Thickness CONTRACTOR :
OPENING SCHEDULE
W01 125 mm Solid 60 min
3245

OPENING IDENTFICATION

Concrete Lintel 300*250 ARCHITECTURAL STRUCTURAL W02 250 mm Solid 60 min


OPENING OPENING
W05 250 mm Solid 2 Hr
NUMBER

Head Height
FROM F.F.L

SHOP DRAWING
Solid-H 650 60 min
7100

W06 250 mm
HEIGHT

HEIGHT
WIDTH

WIDTH

DRAWING TITLE :
Solid Block Work 250mm
W07 250 mm Solid 2 hr BLOCK WORK - GROUND FLOOR LEVEL FOR WALKWAY
ZONE E
W08 125 mm Solid-H 650 60 min
2205 2205 2205
3255

SD 01 1110 1110 W09 60 min


250 mm Solid-H 900 COORDINATION

SD 07 2205 2205 610 2205


CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE

610 W10 250 mm Solid-H 1000 60 min


ARCH. ENG. Mahmoud Samy ARCH. ENG.

CIVIL ENG. CIVIL ENG.

322.65+
SD 11 410 2205 2205 410 2205 MECH. ENG.

ELEC. ENG.
MECH. ENG.

ELEC. ENG.

SD 06 1210 2205 2205 1210 2205 W11 250 mm Solid-H 1500 60 min SURVEYOR
PROJ. MGR.
SURVEYOR
ZONE. MGR.

-- SD 09 2510 3005 3005 2510 3005 W12 125 mm Solid-H 1500 29/10/2022

60 min
DATE:
Detail A-A DRAWN BY: Mohamed Labib
SCALE: 1:100

TRANS. NO.:
APPROVED

W13 250 mm
PARTIAL (0)

Solid-H 850
CHECKED BY: HANY.ADEL APPROVED AS NOTED
-- -- 1:50
60 min ARCH.
C O O R D I N A T I O N
CIVIL ELEC. MECH. SURVEY
TENDER DWG. AR-105 NOT APPROVED
(CORRECT & RESUBMIT)

SHEET NO:- 1/1 NCTH-WW-E-SD-ARCH-BW-GL-001-04 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39' B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-I

B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

64000 DN
UP
DN
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

8400 500 8400 8400 8400 8400 8400 8400 8400 4200 500
NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.

4200
2- All levels are in meters unless otherwise indicated .
329.85
3- Refer to structural drawings for concrete, location, setting out, profile, type and
W02-250 W02-250 W02-250 F.
T.O.P +330.10
200 200
T.O.P +330.10
200 opening.
W10-250 4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
1200 --
details .
B-F B-F

7600
5-Door & Windows opening should be solid blocks. 250* wall thickness

550

550

550

550

550
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will

1500
1500
400 7600 800 7600 800 7600 400
be 250*300 mm.
B-E' T.O.P +330.10 T.O.P +330.10
B-E' 7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
W02-250 W02-250 9-Door opening Jambs min 200 MM if less it should be made as concrete post.
200 200

10- All Partitions extend to the underside of slab above unless otherwise is noted .

7600

7600

7600

7600

800
ELEC . ROOM

6900
7000
BR-CF- 36 329.85+m
F.F.L LEGEND AND ABBREVIATIONS:
W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250
B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min WALL TYPE
Wall WALL TYPE DESIGNATOR

3400
WALL NO. C.M.U. Type Fire Rating
Thickness WALL SIZE
Refeer to NCTH-HAC-DWG-AR-WWGN-IW-003-00
Refeer to NCTH-HAC-DWG-AR-WWGN-IW-003-00 Refeer to NCTH-HAC-DWG-AR-WWGN-IW-003-00 WALL TYPE
W01 125 mm Hollow 60 min
W02 250 mm Hollow --
1400 4800 1400 1400 4800 1400 1400 4800 1400
3600 595 300 925 890 300 595 3600 595 300 1145 1100 300 600 3600 600 300 1100 1100 300 600 3600 600 300 1100 1100 300 600
W03 125 mm Hollow -- FIRE RATING
W04 250 mm Hollow 60 min WALL HEIGHT REQUIRED

500

500

500

500

500

500
B-E B-E

250

250

250
W05 250 mm Hollow 2 Hr

550

550

550
420 2385 420
Solid-H 650 -- DOOR DESIGNATOR KEY

680 250
W06 250 mm

400
W07 250 mm Hollow 2 hr LINTEL

610
H.+2205
5040 1065 550 SD-07 W08 125 mm Solid-H 650 --
550 1065 5040 1320 275 275 1275 5050 1275 275 275 1275 5050 1275 275 275 1150 250 4800 250 1150 275 275 1150 250 2225 2305
F-45
250 1170 275 275 1150 250 4800 250 1150 275 275 1275 5050 1275 800 3225 575 W09 250 mm Solid-H 900 -- H.+2220
8375
W10 250 mm Solid-H 1000 -- DOOR TYPE SD-07

1725
3875
8375 8275 8275 8275 4025 4125 8275 8275 4200
8250
W02-250
W11 250 mm Solid-H 1500 -- F-90 FIRE RATED
B 60 min
W12 125 mm Solid-H 1500 --

3535
8250 8150 8150 8150 4000 8150 12475
W02-250 3900 W13 250 mm Solid-H 850 --

1210
B 60 min
LE = LEVEL
H.+2205
SD-06
T.O.C = TOP PF CONCRETE
WINDOW DESIGNATOR KEY

8400
7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

7600

6800
8400

8400
F-45

610 260 140


H.+2205
SD-07 LINTEL

8300
F-45 W02-250
STORE F.F.L = FINISH FLOOR LEVEL
STORE STORE W02-250 B 60 min STORE BR-CF- 30

610
BR-CF- 24 BR-CF- 25
W02-250
STORE
STORE B 60 min
W02-250 BR-CF- 29 W02-250
T.O.PR = TOP OF PARAPET
329.85+m
W02
B 60 min

BR-CF- 26
W02-250 BR-CF- 27 B 60 min B 60 min WINDOW TYPE
329.85+m W02-250
W02-250 COORIDOR 329.85+m F.P.L = FINISH PAVEMENT LEVEL
B 60 min 329.85+m B 60 min
IT Room F.F.L
F.F.L 329.85+m 329.85+m B 60 min F.F.L
BR-CF- 48

3475
F.F.L

1725
F.F.L F.F.L BR-CF- 38 T.O.W = TOP OF WALL

2755
7025 550 50 550 7025 275 400 7200 275 275 7200 275 400 7200 275 275 610 2725 200 50 2825 845 275 275 7200 275 400 7200 800 3225 50 F.C.L = FINISH CEILING LEVEL SILL
400 275 400 275 90 H.+2205 400 275
SD-04
W.F.L = WALKWAY LEVEL ROOM DESIGNATOR KEY

145 1010
F-45
H.+2205 W02-250
SD-07
B 60 min
T.O.S.S = TOP OF STAINLESS STEEL ROOM NAME

275
F-45

17300

400
16550
H.+1150
B-D B-D

675

675

675

675

675

675
800

800

800

800

800

575 500

800

800

800
SD-7*
F-45 F.G.L = FINISH GRAVEL LEVEL
W02-250
STORE

400
W01-125 W01-125 W01-125
W01-125
60 min B
W01-125
60 min
B 60 min
W01-125
B 60 min
W01-125
B 60 min B 60 min B 60 min
B 60 min
F.D = FLOOR DRAIN
BR-CF- 06

1870

1870

1870

1870

1870

1870
W05-250
R.D = ROOF DRAIN
W01-125 W01-125 W01-125 W01-125 W01-125
B 2 Hr
E.J = EXPANSION JOINT

4075
W02-250 B 60 min B 60 min B 60 min
W02-250
B 60 min 3865
W02-250
B 60 min
ROOM No.

300

300

300

300

300

300
B 60 min
332.03+m

240

240

240

240

240
CU = CONDENSER UNIT

240
B 60 min
H.+2205
B 60 min
H.+2205 H.+2205 H.+2205 H.+2205 F.F.L W05-250 H.+2205 H.+2205 FLOOR
SD-07 SD-07 SD-07 W02-250 SD-07 SD-07 SD-07 SD-07

300 610 370 410 325 610

300 610 370 410 325 610

610 355 410 320 610

300 610 355 410 320 610

610 355 410 320 610

300 610 355 410 320 610


W05-250 B 2 Hr
F-45 F-45
W01-125
F-45 B 60 min F-45
W01-125
F-45
B 2 Hr
W01-125
F-45 F-45 SLAB TH. = SLAB THICKNESS
W01-125 W01-125
B 60 min B 60 min B 60 min
60 min B 60 min
CR.J = CONTROL JOINT INTERIOR ELEVATION CALLOUT
42000

H.+2205 H.+2205 H.+2205 H.+2205 H.+2205 H.+2205 H.+2205

8400
8275

8275
7600

7600

7600

7600

7600

7600

6800
SD-11 SD-11 SD-11 SD-11 SD-11 SD-11 SD-11

8500

8500

7850
F-45 F-45 F-45 F-45 F-45 F-45 F-45
DOOR MATERIAL ELEVATION NOT A

7325
8400

W01-125

6925
H.+2205 H.+2205
B 60 min
H.+2205 H.+2205 H.+2205 2875 1120 H.+2205 H.+2205 ELEVATION
SD-07 SD-07 SD-07 SD-07 SD-07 SD-07 SD-07 M = METAL SHOWN

210

210

210
SHOWN

190

190

210
F-45 F-45 F-45 F-45 F-45 F-45 F-45
B

300

300
W = WOOD
W01-125
UP

3925
W01-125
W01-125 B 60 min W01-125
W01-125
W01-125 B 60 min FIRE RATING
60 min B 60 min
B 60 min
B 60 min W01-125 SHEET SHOWN
7575 B 60 min
F1 = 60 min

3000

3000

3000

3000

3000

3000
W01-125
550 400 6625 400 400 6800 400 275 6800 400 400 6800 400 275 275 545 1150 1730 200 50 3675 275 275400 6800 400 400 6800 400 800 400 2425 400 550 F2 = 2 Hr
60 min
6625 400 550
275 400 HATCH LEGEND:
W01-125 W01-125
F3 = 2 Hr

250400
GL-01 GL-01 GL-01 B 60 min GL-01 B 60 min
GL-01 GL-01

275
250

250

250

250

250

250

250
CONCRETE
B-C B-C

500
WALL HEIGHT

800
H.+2205
SD-01
P= PARTIAL WALL HOLLOW CMU
F-90

W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W05-250 W05-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 B = TO BOTTOM OF STRUCTURE SOLID CMU
B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min B 2 Hr B 2 Hr B 60 min B 60 min B 60 min B 60 min B 60 min B 60 min

R.F.I. :-
Stair
BR-CF- 34 DOCUMENT NO. SUB. REV. DOC. TITLE
Pedestrian cooridor 1
Refer to NCTH-HAC-AR-WWE-SR-01-00 NCTH-HAC-AP-WW-RFI-ARCH-10 -- 00 Conflict in Door Opening ( SD 07 )

BR-CF- 45 Missing Structure Slab under Shaft


2 NCTH-HAC-AP-WW-RFI-ARCH-32 00
8400

8400
-- Wall

Conflict in design DWG's .for Door


3 NCTH-HAC-AP-WW-RFI-ARCH-33 -- 00 Opening ( SD 07 )

4 NCTH-HAC-AP-WW-RFI-STR-28 -- 00 Lintel and posts/Stiffeners details

REV.NO. DATE REMARKS CODE


00 19/01/2022

01 15/02/2022
B-B B-B
02 6/04/2022

03 22/05/2022

04 27/08/2022 Steel Doors Update

329.85+m
329.85+m
OWNER :
F.F.L

8400
8400

F.F.L

7425 A 1650 7425 A 800 7600 A 800 7600 A 800 7600 A 800 7400 A 1200 7200 A 1200 A 7400 800 3225 12300

B-A B-A
W13-250
850 --
A 850
W13-250
--
A
W13-250
850 --
A
W13-250
850 --
A 850
W13-250
--
A 850
W13-250
--
A
W13-250
850 --
A A
W13-250
850 -- 850
W13-250
-- PROJECT :

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

500 500 BR-12

1
8400 8400 8400 8400 8400 8400 8400 8400 4200
+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L
F.F.L +329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L
F.F.L

BR-12

64000
UP

DN DN

UP

UP

DN
DN

UP
DN
DN

DN UP

UP

UP

CONSULTANT :

A R CH P L A N
ARCH C PLANN R

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39'

DESIGNER :

Conc. CONCOURSE FLOOR - BLOCKWORK PLAN - ZONE ( E )


500 E 1:100
850 200

CONTRACTOR :
OPENING SCHEDULE WALL TYPE
Wall C.M.U. Type Fire Rating
OPENING IDENTFICATION

ARCHITECTURAL
WALL NO.
STRUCTURAL DESCRIPTION Thickness
OPENING OPENING
W01 125 mm Solid 60 min
NUMBER

Fire Rate

W02 250 mm Solid 60 min


HEIGHT

HEIGHT

SHOP DRAWING
WIDTH

WIDTH

W05 250 mm Solid 2 Hr DRAWING TITLE :

W06 250 mm Solid-H 650 60 min BLOCK WORK - CONCOURSE FLOOR LEVEL FOR WALKWAY
ZONE E
SD 01 1110 2205 1110 2205 F-90 W07 125 mm Solid 2 hr
SD 07 610 2205 610 2205 F-45 W08 125 mm Solid-H 650 60 min COORDINATION

SD 11 410 2205 410 2205 F-45 W09 250 mm Solid-H 900 60 min ARCH. ENG.
CONTRACTOR
Mahmoud Samy
SIGN. DATE

ARCH. ENG.
CONSULTANT SIGN. DATE

SD 04 1010 1010 F-45


250 mm
CIVIL ENG. CIVIL ENG.

2205 2205 W10 Solid-H 1200 60 min MECH. ENG.

ELEC. ENG.
MECH. ENG.

ELEC. ENG.
F-45
SD 06 1210 2205 1210 2205
250 mm
SURVEYOR SURVEYOR

1150 1150 F-45 W11 Solid-H 1500 60 min PROJ. MGR. ZONE. MGR.

SD 07* 575 575


A Section A-A for Parapet SD 16 1010 2205 1010 2205 F-00 W12 125 mm Solid-H 1500 60 min
DATE:
DRAWN BY:
27/08/2022
Eng\ Mohamed Labib
SCALE: 1:100

TRANS. NO.:
APPROVED

A 1:10 SD 17 1010 2205 1010 2205 F-00 W13 250 mm Solid-H 850 60 min CHECKED BY:
ARCH.
C O O R D I N A T I O N
CIVIL ELEC. MECH. SURVEY
PARTIAL (0)

AR-116
APPROVED AS NOTED
NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 5/5 NCTH-HAC-DWG-AR-WWE-IW-001-04 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39' B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-I

B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

64000 DN
UP
DN
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

8400 500 8400 8400 8400 8400 8400 8400 8400 4200 500
250 3780
NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
Shaft Detail 02 Shaft Detail 02 Shaft Detail 02 Shaft Detail 02 3- Refer to structural drawings for concrete, location, setting out, profile, type and
Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW004-0- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW004-0- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW004-0- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW004-0- opening.
Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW005-00- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW005-00- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW005-00- 4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services

6900
7000
GRC Detail 01 GRC Detail 01 GRC Detail 01 details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
4000 250 3400 250250 4000 250 4000 250 4000 250 4000 250 4000 250 3775 3925 250 4000 250 4000 250 6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
W09-250 W09-250
950 -- W09-250
be 250*300 mm.
950 --

W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250 W02-250


950 --
7- All drawings should be read in conjunction with other relevant Architectural ,
B 1 hr 450 1 hr B 1 hr B 1 hr 450 1 hr B 1 hr B 1 hr 450 1 hr B 1 hr Structural, Mechanical & Electrical drawings .

250
1400 4800 1400 1400 4800 1400
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).

300 460

300 460

250 510

250 510
650

650
125
B-E B-E

150
9-Door opening Jambs min 200 MM if less it should be made as concrete post.

550

550

550

550
W02-250 AC room
10- All Partitions extend to the underside of slab above unless otherwise is noted .

1825
B 1 hr
BR-SF- 03

4000
1400

1400
W02-250

2250

2250

2250

2250
B 1 hr

4500
334.55+m
W09-250
900 --
F.F.L LEGEND AND ABBREVIATIONS:

300

300

300

300
6750 250 2750 250 13550 250 2750 250 4800 1400 800 1400 4800 1400 800 1400 4800 250 2750 250 10950
6750
LE = LEVEL WALL TYPE DESIGNATOR

250
175 175
T.O.C = TOP PF CONCRETE
8375 8400 8275 16675 8275 8275 4175 WALL TYPE WALL SIZE
F.F.L = FINISH FLOOR LEVEL

250

8400
4800

4800

4800
8400

8400

7600

7600

7600

7600

8400
8375 25050 24950 12450
T.O.PR = TOP OF PARAPET

8300

3940

3940
W09-250
FIRE RATING
900 --
GRC Detail 01 W02-250 W02-250 F.P.L = FINISH PAVEMENT LEVEL WALL HEIGHT REQUIRED

4000
Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW005-00-
200 1 hr 200 1 hr
GRC Detail 01

5890

5890
T.O.W = TOP OF WALL
Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW005-00- DOOR DESIGNATOR KEY

4000
W09-250
900 -- F.C.L = FINISH CEILING LEVEL LINTEL
W02-250 H.+3205 W02-250
W06-250 W02-250 W06-250
B 1 hr SD-13 B 1 hr W.F.L = WALKWAY LEVEL H.+2220
900 -- B 1 hr 900 -- F-45 W02-250

1400

1400

1400

1400
T.O.S.S = TOP OF STAINLESS STEEL DOOR TYPE SD-07

250
B 1 hr
7625 7625 1500 15300 350 275 600 7000 800 3625 655 2010 1310 800 7000 600 275 350 11825
F-90 FIRE RATED

17300

17300

17300
275 275
F.G.L = FINISH GRAVEL LEVEL

275

275

275
16825

400
250

550

550
B-D B-D

800

800
Steel Ladder
F.D = FLOOR DRAIN

250

250

250
W02-250
B 1 hr
R.D = ROOF DRAIN WINDOW DESIGNATOR KEY

1925

1925
W02-250

4000
B 1 hr
334.55+m

1750
W06-250
AHU 332.73+m W08-125 Fresh Air E.J = EXPANSION JOINT LINTEL
W05-250 F.F.L 900 --
900 -- F.F.L
BR-SF-11 B 2 hr
CU = CONDENSER UNIT

4000
BR-SF- 09

4075
3675

3675

3675
250
3900 334.55+m

4080
SLAB TH. = SLAB THICKNESS
W02
--
334.55+m 334.55+m WINDOW TYPE
W06-250
W06-250
F.F.L
334.55+m F.F.L 900 -- F.F.L W06-250
900 --
W02-250 900 -- CR.J = CONTROL JOINT

250
F.F.L W06-250

6850
1000 B 1 hr

6415
W06-250
900 --
900 -- DOOR MATERIAL
SILL
42000

H.+3205 GRC Detail 02

8400
250

8250

8250
8275
4800

4800
8100

8100

8100

8100
W05-250

250

250

250
SD-14
M = METAL

280
B 2 hr F-45 W06-250 Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW06-00-
8400

W06-250
900 -- ROOM DESIGNATOR KEY
W06-250 W05-250
W = WOOD ROOM NAME
900 -- GRC Detail 02 B 2 hr 900 --
11825

250

250
7525 7525
Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW06-00- 4000 FIRE RATING

4800
H.+2205 125 8275 7650 4175
STORE

3010

3010
SD-05 H.+2205

3675

3675

3675
4050
7650 F-90 4025 SD-01 4125 7650 F1 = 1 hr
7650 16050 F-90
F2 = 2 hr BR-CF- 06

2495

2495
4125
UP W02-250

1400 B 1 hr
1050 4800 3900 2325 1400 1400 4800 1050 11825

1100

1675
1680
334.55+m ROOM No.

1110
W02-250
F.F.L WALL HEIGHT

150510

275 510
W02-250
F.F.L B 1 hr
B 1 hr
FLOOR

85
275
250

250

250
65
P= PARTIAL WALL
B-C B-C

250
1400
3675 250 4000 250 4000 250
B = TO BOTTOM OF STRUCTURE
4000 250 4000 250250 4000 250 4000 250 4000 250 4000 250 4000 250 3525 W01-125
W06-250 W06-250 W06-250 W02-250 W02-250 W02-250 W02-250
B 1 hr W02-250 W02-250 W02-250 W02-250 W02-250 W06-250 INTERIOR ELEVATION CALLOUT
700 -- 700 -- 700 -- B 1 hr 450 1 hr B 1 hr B 1 hr 450 1 hr B 1 hr B 1 hr 450 1 hr B 1 hr 700 --

HATCH LEGEND: ELEVATION NOT A


Stair ELEVATION
SHOWN SHOWN
BR-SF- 07 CONCRETE
B
HOLLOW CMU
GRC Detail 01 GRC Detail 01 GRC Detail 01
Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW005-00- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW005-00- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW005-00-
SOLID CMU SHEET SHOWN
8400

8400
Refer to NCTH-HAC-AR-WWE-SR-01-00
R.F.I. :-
DOCUMENT NO. SUB. REV. DOC. TITLE
Shaft Detail 01 Shaft Detail 01 Shaft Detail 01 Shaft Detail 01
Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW004-0- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW004-0- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW004-0- Refere to sheet NCTH-HAC-DWG-AR-WWGN-IW004-0-

B-B B-B

REVISIONS :

REV.NO. DATE REMARKS CODE


8400

8400
00 15/02/2022
01 02/04/2022
02 10/04/2022
03 19/06/2022
04 14/08/2022
05 2/11/2022 Changes as per Clouded

B-A B-A
OWNER :

8400 500 8400 8400 8400 8400 8400 8400 8400 4200 500
64000

PROJECT :

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39'
+338.11
F.F.L

BR-12

+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L F.F.L
+329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L F.F.L

BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN DN

DN
UP

UP

UP

CONSULTANT :
Parapet Height has changed due to Finishing level increase P(A) SECOND FLOOR - BLOCKWORK PLAN - ZONE ( E )
A R CH P L A N
-- -- 1:100
ARCH C PLANN R

250
200
200

DESIGNER :

OPENING SCHEDULE WALL TYPE


900

700
1150

Wall
950

WALL NO. C.M.U. Type Fire Rating


OPENING IDENTFICATION

ARCHITECTURAL STRUCTURAL DESCRIPTION


Thickness
OPENING OPENING W01 125 mm Solid 60 min CONTRACTOR :
NUMBER

W02 250 mm Solid 60 min


Head Height
FROM F.F.L

Fire Rate
HEIGHT

HEIGHT

W05 250 mm 2 Hr
WIDTH

WIDTH

Solid
FLOOR

W06 250 mm Solid 60 min


SHOP DRAWING
W07 125 mm Solid 2 hr DRAWING TITLE :

SD 01 1110 2205 2205 1110 2205 S.F 90 min W08 125 mm Solid-H 650 60 min
BLOCK WORK - SECOND FLOOR LEVEL FOR WALKWAY
W09 250 mm Solid-H 900 60 min ZONE E
SD 04 1010 2205 2205 1010 2205 S.F 45 min
W10 250 mm Solid-H 1200 60 min
SD 05 1110 2205 2205 1110 2205 S.F 90 min COORDINATION

W11 250 mm
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE

SD 13 2010 3205 3205 2010 3205 S.F 45 min Solid-H 1500 60 min ARCH. ENG. Mahmoud Samy ARCH. ENG.

P(A) SECTION B-B P(A) SECTION A-A CIVIL ENG. CIVIL ENG.

W12 125 mm Solid-H 1500


MECH. ENG. MECH. ENG.

-- -- 1:20 -- -- 1:20 SD 14 3010 3205 3205 3010 3205 S.F 45 min 60 min ELEC. ENG.

SURVEYOR
ELEC. ENG.

SURVEYOR

1210 2205 2205 1020 2205 45 min W13 250 mm Solid-H 850 60 min PROJ. MGR. ZONE. MGR.

SD 06 S.F DATE: 2/11/2022


Mohamed Labib
SCALE: 1:100
APPROVED
DRAWN BY:
TRANS. NO.:
CHECKED BY: PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-123 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 5/6 NCTH-HAC-DWG-AR-WWE-IW-002-05 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B-I

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38 B-H
UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39'
D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1
D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

DN DN
UP
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

64000
NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
8400 500 8400 8400 8400 8400 8400 8400 8400 4200 500
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*450 mm & In 250 mm wall stiffening will

6900
7000
be 250*450 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
10- All Partitions extend to the underside of slab above unless otherwise is noted .

150
B-E B-E
GRC W15-250
GRC W15-250
450 --
GRC GRC LEGEND AND ABBREVIATIONS:
450 --

650 7100 1300 7100 1300 7100 650


LE = LEVEL WALL TYPE DESIGNATOR
T.O.C = TOP PF CONCRETE
W15-250
450 --
WALL TYPE WALL SIZE
F.F.L = FINISH FLOOR LEVEL
+334.55 m +334.55 m +334.55 m +334.55 m
T.O.PR = TOP OF PARAPET
F.F.L F.F.L F.F.L F.F.L FIRE RATING
--
W15-250
450
F.P.L = FINISH PAVEMENT LEVEL WALL HEIGHT REQUIRED

8400
7600
7550
8300 W15-250 T.O.W = TOP OF WALL DOOR DESIGNATOR KEY
450 --
W15-250 F.C.L = FINISH CEILING LEVEL LINTEL
450 --

W.F.L = WALKWAY LEVEL H.+2220


T.O.S.S = TOP OF STAINLESS STEEL DOOR TYPE SD-07
W14-250 W14-250
1325 -- 1325 --
F.G.L = FINISH GRAVEL LEVEL F-90 FIRE RATED

F.D = FLOOR DRAIN


800 800
400 R.D = ROOF DRAIN WINDOW DESIGNATOR KEY

275

275
E.J = EXPANSION JOINT LINTEL
B-D B-D

800

800

800
800

400

400
+334.55 m CU = CONDENSER UNIT
800 800
SLAB TH. = SLAB THICKNESS
W14-250
334.55+m
400 7600 400 F.F.L
334.55+m
W14-250 W02 WINDOW TYPE
1325 -- 1325 --
CR.J = CONTROL JOINT
W15-250

F.F.L 450 -- F.F.L DOOR MATERIAL


--
W15-250
450
SILL
M = METAL
ROOM DESIGNATOR KEY
341.90+m W = WOOD ROOM NAME
450
42000

8375

8375

8400
7475
FIRE RATING

7600
F.F.L
F.F.L STORE
8400

F1 = 1 hr
W15-250
W15-250
F2 = 2 hr BR-CF- 06
450 --
450 --

WALL HEIGHT ROOM No.


450
W15-250 FLOOR
450 -- 7050 400 650 7350 400 150 7600 P= PARTIAL WALL
B = TO BOTTOM OF STRUCTURE
INTERIOR ELEVATION CALLOUT
HATCH LEGEND: A

150
B-C B-C ELEVATION NOT ELEVATION
SHOWN SHOWN
CONCRETE
W15-250 W15-250 B
GRC 450 --
GRC 450 -- W15-250 HOLLOW CMU
W14-250 -- 450
-- 1325
SOLID CMU SHEET SHOWN

3 R.F.I. :-
DOCUMENT NO. SUB. REV. DOC. TITLE
8400

8400
1 NCTH-HAC-AP-RFI-AR-00077 00 Missing parapet martial and fixation
2 NCTH-HAC-AP-RFI-AR-00079 00 Missing drainage system in upper roof

AR-
B-B B-B

REVISIONS :

REV.NO. DATE REMARKS CODE

00 26/02/2022

01 28/08/2022
8400

8400
OWNER :

B-A B-A

8400 500 8400 8400 8400 8400 8400 8400 8400 4200 500
64000
PROJECT :

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

BR-12

+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L F.F.L
+329.85 m +329.85 m +329.85 m F.F.L
F.F.L
+329.85 m F.F.L
F.F.L
F.F.L

BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN
DN

DN
UP

UP

UP

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39'
CONSULTANT :

Roof ROOF FLOOR - BLOCKWORK PLAN - ZONE ( E ) A R CH P L A N


ARCH C PLANN R
E 1:100

DESIGNER :

CONTRACTOR :

WALL TYPE SHOP DRAWING


Wall C.M.U. Type Fire Rating DRAWING TITLE :
WALL NO.
Thickness
BLOCK WORK - ROOF FLOOR LEVEL FOR WALKWAY
ZONE E
W14 250 mm Solid-H 1325 --
W15 250 mm Solid-H 450 -- COORDINATION
W16 500 mm Solid-H 200 -- CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE

ARCH. ENG. Mahmoud Samy ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 28/08/2022 SCALE: 1:100


DRAWN BY: Mohamed Labib APPROVED
TRANS. NO.:
CHECKED BY: PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-130 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 3/4 NCTH-HAC-DWG-AR-WWE-IW-004-01 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B-I

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38 B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

UP
DN DN
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

NOTES:-

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
10- All Partitions extend to the underside of slab above unless otherwise is noted .

B-E +4.45 m

S S S S S S S
Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001
S S
+4.60 m

12625.00
B-D S S S
S
+4.45 m

S S S
R.F.I. :-
DOCUMENT NO. SUB. REV. DOC. TITLE
1
+4.60 m S
2

Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001

S
REVISIONS :

REV.NO. DATE REMARKS CODE

00 2/01/2022

S
S

B-C
S S S +4.45 m S S S

OWNER :

12478.00
Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001

S
+4.60 m

S
S S S S S S

M PROJECT :

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001 Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001 Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001 Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001 Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001 Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001 +338.11
F.F.L

+338.11
F.F.L

B-B
BR-12

+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L
F.F.L +329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L
F.F.L

BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN DN

DN
UP

UP

UP

CONSULTANT :

1597.00
+4.45 m +4.45 m +4.45 m +4.45 m

A R CH P L A N
ARCH C PLANN R
+4.60 m

+4.60 m +4.60 m +4.60 m

5200.00
DESIGNER :
Refeer to NCTH-HAC-DWG-AR-WWGN-IC-001

+4.45 m +4.45 m

1200.00
B-A CONTRACTOR :

SHOP DRAWING
DRAWING TITLE :

REFLECTED CEILING - GROUND FLOOR -ZONE E

5 GROUND FLOOR - Reflected Ceiling - ZONE ( E ) COORDINATION


6 1:75 ARCH. ENG.
CONTRACTOR
Mahmoud Samy
SIGN. DATE
ARCH. ENG.
CONSULTANT SIGN. DATE

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 17/07/2022 SCALE: 1:100


DRAWN BY: ENG\ Mohamed Labib APPROVED
TRANS. NO.:
CHECKED BY: HANY.ADEL PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-501,502 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 5/6 NCTH-HAC-DWG-AR-WWE-IC-01-00 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B-I

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38 B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

B31' B32 B33 B34 B35 B36 B37 B38 B39 B39'
UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

DN DN
UP
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

64000 NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
500 8400 8400 8400 8400 8400 8400 8400 4200 500 2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .

6900
7000
5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
B-E 1950 1950
B-E 10- All Partitions extend to the underside of slab above unless otherwise is noted .

245
1405

1405

1405

1405

1405

1405
1045
ELEC . ROOM
1655 2470 2470 1655 1605 2470 2470 1605 1605 2470 2470 1605 1605 2470 2470 1605 1605 2470 2470 1605 1555 3115 1555 1560 3115 1555

900
BR-CF- 36

LEGEND

400 400 400


1045
STORE
BR-CF- 30

1045
3270

3270

3270

3270

3270

3275
800
329.85+m
F.F.L

1045

800

8400
S

500
8300
S S S S S S

600 100
500 500

500 500

500 500

500 500

500 500

500
500 300 400
STORE
BR-CF- 25 STORE
STORE 1100
BR-CF- 27

600
BR-CF- 26
329.85+m
329.85+m 329.85+m 450 600 600 600 600 600 400 STORE

600
F.F.L

700
F.F.L F.F.L
BR-CF- 29

600
329.85+m

900

4225
3345

3345

3345

3345

3345
F.F.L

600

600
IT Room

600
BR-CF- 38

B-D B-D

600
600
700
1925 1925

875

600
3385

3385

3385

3385

3385
500
COORIDOR
BR-CF- 48

700

3500
600 300 500 500
S
42000

S S S S S

8400
500 500

500 500

500 500

500 500

500 500
S
8400

500
600
700
UP
2500

2500

2500

2500

2500

2500
400 400 600
400 400
S
S

400
1975 705 1270
890

890

890

890

890

890
775
GL-01 GL-01 GL-01 GL-01 1925 1925

85
GL-01 GL-01
B-C B-C
O

Stair

4825
BR-CF- 34

5005
Pedestrian cooridor
BR-CF- 45
8400

8400
1975 3950 1975 1975 3950 1975

L10 L10
L10 L10

R.F.I. :-
DOCUMENT NO. SUB. REV. DOC. TITLE
LED STRIP LED STRIP LED STRIP LED STRIP 1

B-B 7200
B-B

7195
2

1975 3950 1975 1975 3950 1975


REV.NO. DATE REMARKS CODE
329.85+m
L10 L10 329.85+m
F.F.L L10 L10
00
8400

8400
F.F.L 12/11/2022

B-A B-A OWNER :

500 8400 8400 8400 8400 8400 8400 8400 4200 500
64000

PROJECT :

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

BR-12

+338.11
F.F.L

B31' B32 B33 B34 B35 B36 B37 B38 B39


UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L F.F.L
+329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L F.F.L

BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN DN

DN
UP

UP

UP

CONSULTANT :

P(A) CONCOURSE Celing - R.C.P PLAN - ZONE ( E )


-- -- 1:100
A R CH P L A N
ARCH C PLANN R

DESIGNER :

B-E B-D B-C

CONTRACTOR :
MLRT-Secound FLOOR
+344.55
435

610

610

1115
675

505

505

SHOP DRAWING
4130

DRAWING TITLE :
Gypsum Board 600*600*12 mm Gypsum Board 600*600*12 mm
3000

3000

REFLECTED CEILING - CONCOURSE FLOOR ZONE E

COORDINATION
MLRT-CONCOURSE FLOOR
329.85
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE
ARCH. ENG. Mahmoud Samy ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

A S E C T I O N A-A DATE:
DRAWN BY:
12/11/2022
Eng\ Mohamed Labib
SCALE: 1:100

TRANS. NO.:
APPROVED

01 1:50 CHECKED BY:


C O O R D I N A T I O N
PARTIAL (0) APPROVED AS NOTED
ARCH. CIVIL ELEC. MECH. SURVEY
AR-113 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 4/6 NCTH-HAC-DWG-AR-WWE-IC-002-00 REJECTED


-KEYPLAN:
B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B31B31' B32 B33 B34 B35 B36 B37 B38 B39B39' B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
UP
B-I

B-H

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1D02-1D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

DN DN
UP
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

B-E
B-E B-E S.P. 2 S.P. NOTES:-
S.P. S.P. 1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,
2 1 2 Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
2 10- All Partitions extend to the underside of slab above unless otherwise is noted .

Granite
B-D
B-D

S.P.
S.P.
2

S.P.
1 Shabah
Service
BR-GF-61 Granite Brown
33 10
1
+322.65 m
F.F.L
2 Qusir
Ceramic AS
2 3 PER BOQ
3

Passage UP
2 BR-GF-99
+322.65 m
F.F.L
2
4 Eboxy

2
B-C
B-C
S.P. S.P.
S.P. S.P.

1 3

2 2
Lobby
REVISIONS :
BR-GF-77
1 +322.65 m 2
F.F.L REV.NO. DATE REMARKS CODE

0 09-05-2022

Elec.-Room
BR-GF-63
S.P. +322.65 m
F.F.L
B-B
B-B
OWNER :
S.P. S.P.
2 2 2 2 2 2 2 2

S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.


S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.

PROJECT :
1 1 1 2 2 1 2 2 1 1 1 1
+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

BR-12

+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L
F.F.L +329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L
F.F.L

BR-12

UP

DN DN

UP

UP

DN
DN

S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.


UP
DN
DN

DN
UP

UP

UP

CONSULTANT :

2 2 2 2 2 2 2 2
B-A
B-A
A R CH P L A N
ARCH C PLANN R
2 2 2 2 2 2 2 2

S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.


S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.
DESIGNER :

1 1 1 1 1 1 1 1

GT 2 2 GT 2 2
CONTRACTOR :

IC IC IC IC
S.P.
S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.

2 2 2 2 2 2 2 2

SHOP DRAWING
DRAWING TITLE :

FLOORING - GROUND FLOOR LEVEL FOR WALKWAY


ZONE E

B31B31' B32 B33 B34 B35 B36 B37 B38 B39B39'


COORDINATION
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE
ARCH. ENG. Mahmoud Samy ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

P(A) GROUND FLOOR - FLOORING PLAN - ZONE ( E )


SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

-- -- 1:100 DATE: 09-05-2022 SCALE: 1:75


DRAWN BY: ENG\ Mohamed Labib APPROVED
TRANS. NO.:
CHECKED BY: HANY.ADEL PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 1/1 NCTH-HAC-DWG-AR-WWE-EF-001-00 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B-I

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38 B-H
UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

UP
DN DN
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39' 6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
64000
9-Door opening Jambs min 200 MM if less it should be made as concrete post.

1 2 3 4 5 6 7
265 1200 180
10- All Partitions extend to the underside of slab above unless otherwise is noted .

For Sloop Reefer to NCTH-HAC-DWG-AR-WWX-CW-00X-03


B-G CUT TO SIZE B-G

265
Marble Shabah 600*600

4200
Polished 2 CM THIK AS
approved sample
265

B-F B-F

600 380
S.P.

1500

1500
Brown Qusir 600*600
2

600
B-E' B-E'
Polished 2 CM THIK AS

600
265

Approved sample

600
C.J = 10 MM
C.J = 10 MM

600
6410
265

600
425 600 600 600 600 600 600 600 600 600 600 600 600 58010 600 600 600 600 600 600 600 600 600 600 600 600 57010 600 600 600 600 600 600 600 600 600 600 600 600 600 410
Marble Shabah 600*600

600

6900
7000

329.85+m

600
F.F.L
Matte 2 CM THIK AS

600
220

1.5
approved sample

600
S.P. S.P. S.P. Block work Around opening
100mm from Concrete
S.P. S.P. S.P.

600
Detail-F01

1485
1650 7200 8400 7645

600
Refeer to Detail 03
50
NCTH-HAC-DWG-AR-WWGN-EF-01-01 Refeer to Detail 03 Refeer to Detail 03
NCTH-HAC-DWG-AR-WWGN-EF-01-01BROWN QUSIR NCTH-HAC-DWG-AR-WWGN-EF-01-01
THRESHOLD 20 MM

250 535
elevated 5MM

B-E S.P.
B-E

300

300
BROWN QUSIR
THRESHOLD 20 MM
elevated 5MM BROWN QUSIR
THRESHOLD 20 MM
250
BROWN QUSIR
THRESHOLD 20 MM
elevated 5MM
S.P. S.P.
4 Mosaico 250*250*50 mm

4425
520 5*600=3000MM 430
ELEC . ROOM 340 600

BR-CF- 36 5
3900 250
BROWN QUSIR

5
THRESHOLD 20 MM

8400
BROWN QUSIR

Epoxy As per BOQ


THRESHOLD 20 MM

S.P.
8300

STORE

600
STORE 250 STORE
BROWN QUSIR BR-CF- 30
STORE THRESHOLD 20 MM
BR-CF- 25 STORE BR-CF- 29
329.85+m 2

600
BR-CF- 26 BR-CF- 27
329.85+m COORIDOR 329.85+m F.F.L
329.85+m IT Room
6 F.F.L

600
F.F.L 329.85+m BR-CF- 48
F.F.L 800 340 600
F.F.L BR-CF- 38

600
250 600 600 600 600 600 600

2 Porcelain 600*600

600
6
BROWN QUSIR 250
THRESHOLD 20 MM

28*600=16,800MM
100 600
B-D S.P. S.P.
B-D per BOQ
BROWN QUSIR
THRESHOLD 20 MM 250 CUT TO SIZE
R.F.I. :-
Reefer to Stair Flooring
NCTH-HAC-DWG-AR-WWE-IF-01
332.03+m DOCUMENT NO. SUB. REV. DOC. TITLE
520 600 600 600 510
F.F.L
42000

8400
255
REVISIONS :
8400

BROWN QUSIR
THRESHOLD 20 MM

REV.NO. DATE REMARKS CODE

6*600=3600MM
UP
800 340 600
Stair 00 10/10/2022
BR-CF- 34
Refeer to Detail 03 Refeer to Detail 03 Refeer to Detail 03 Refeer to Detail 03 520 5*600=3000MM 430 Refeer to Detail 03 Refeer to Detail 03 Refeer to Detail 03
NCTH-HAC-DWG-AR-WWGN-EF-01-01 NCTH-HAC-DWG-AR-WWGN-EF-01-01 NCTH-HAC-DWG-AR-WWGN-EF-01-01 NCTH-HAC-DWG-AR-WWGN-EF-01-01 NCTH-HAC-DWG-AR-WWGN-EF-01-01 NCTH-HAC-DWG-AR-WWGN-EF-01-01 NCTH-HAC-DWG-AR-WWGN-EF-01-01 NCTH-HAC-DWG-AR-WWGN-EF-01-01
450
01 20/05/2023
BROWN QUSIR BROWN QUSIR BROWN QUSIR BROWN QUSIR BROWN QUSIR BROWN QUSIR
THRESHOLD 20 MM THRESHOLD 20 MM THRESHOLD 20 MM THRESHOLD 20 MM THRESHOLD 20 MM BROWN QUSIR BROWN QUSIR
THRESHOLD 20 MM THRESHOLD 20 MM THRESHOLD 20 MM
elevated 5MM elevated 5MM elevated 5MM elevated 5MM BROWN QUSIR elevated 5MM
elevated 5MM elevated 5MM
THRESHOLD 20 MM
S.P.
550

550

550

550

550

550

550
B-C B-C

600 250
S.P. S.P.

10
795 795
600

600

600

600

600

600

600

600
795 795 955 795 795 795 2
1250

1250

1250

1250

1250

1250

1250
2 50
2 2 2 2 2 2 2

1250
200 230 13*600=7800MM 570 13*600=7800MM 575 13*600=7800MM 575 13*600=7800MM 575
600

600

600

600

600

600

600

600

600
13*600=7800MM 575 13*600=7800MM 575 7*600=4200MM 210340 600
S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.
C.J = 10 MM
CUT TO SIZE CUT TO SIZE CUT TO SIZE CUT TO SIZE CUT TO SIZE CUT TO SIZE
710

710

710

710

710

710

710

710

710
OWNER :
10
3115

3115

3115

3115

3115

3115

3115

3115
10 10 10 10
50 10 10 50
12*600=7200MM 200230 13*600=7800MM 570 13*600=7800MM 575 13*600=7800MM 575 12*600=7200MM 600 575 600 600 10*600=6000MM 600 570 600 600 11*600=6600MM 575 13*600=7800MM 575 7*600=4200MM 210
CUT TO SIZE
7*600=4200MM

7*600=4200MM

7*600=4200MM

1.5 7*600=4200MM

7*600=4200MM

7*600=4200MM

7*600=4200MM

7*600=4200MM

7*600=4200MM
8400

8400
S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.
S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.

3 3 3 3 3 2 3 3 3
1.5

1.5

1.5 C.J = 10 MM 10 1.5 1.5 2 340


2515

2515

2515

2515

2515

2515

2515

2515
C.J = 10 MM C.J = 10 MM C.J = 10 MM C.J = 10 MM C.J = 10 MM
C.J = 10 MM
Expansion joint = 50 MM

CUT TO SIZE CUT TO SIZE CUT TO SIZE CUT TO SIZE CUT TO SIZE CUT TO SIZE
710

710

710

710

710

710

710

710

710
S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.
600

600

600

600

600

600

600

600
600
2 2 2 2 2 2 2 2 2
1210

1210

1210

1210

1210

1210

1210

1210
PROJECT :
600

600 10 600

600 10 600

600 10 600

600 10 600

600 10 600

600

600
600
S.P.
CUT TO SIZE
10

10

10

10
B-B S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P. S.P.
B-B
600

600

600

600
1205

1205

1205

1205

1205

1205

1205

1205
C.J = 10 MM C.J = 10 MM
10
600

600

600

600

600

600

600

600

600
340
+338.11
F.F.L

C.J = 10 MM S.P. S.P. S.P. C.J = 10 MM S.P. C.J = 10 MM S.P. S.P. S.P. S.P. S.P. S.P. S.P.
C.J = 10 MM C.J = 10 MM C.J = 10 MM +338.11
F.F.L

50 +338.11
F.F.L

+338.11
F.F.L

200230 13*600=7800MM 570 13*600=7800MM 575 13*600=7800MM 575 13*600=7800MM 575 13*600=7800MM 570 13*600=7800MM 575 13*600=7800MM 575 7*600=4200MM 210 340 +338.11
F.F.L

BR-12

+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L F.F.L
+329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L F.F.L

BR-12

UP

DN DN

UP

UP
9*600=5400MM

9*600=5400MM

9*600=5400MM

9*600=5400MM

9*600=5400MM

9*600=5400MM

9*600=5400MM

9*600=5400MM

9*600=5400MM
DN
DN

UP
DN
DN

DN
UP

UP

UP
8400

8400
CONSULTANT :
6400

6400

6400

6400

6400

6400

6400

6400
3 3 3 3 3 2 3 2 3 3 3

A R CH P L A N
50
200230 13*600=7800MM 570 13*600=7800MM 575 13*600=7800MM 575 13*600=7800MM 575 13*600=7800MM 570 13*600=7800MM 575 13*600=7800MM 575 7*600=4200MM 210340

ARCH C PLANN R
600 385

600 385

600 385

600 385

600 385

600 385

600 385

600 385

600 385
S.P.

2 S.P. 2 S.P. 2 S.P. 2 S.P. 2 S.P. 2 S.P. 2 2 2


600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600

600
100 100

422

422
100 100 100
S.P. S.P.
145

145

145

B-A B-A
DESIGNER :

500 8400 8400 8400 8400 8400 8400 8400 4200 500
64000

CONTRACTOR :

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39'

SHOP DRAWING
DRAWING TITLE :

FLOORING - CONCOURSE FLOOR LEVEL FOR WALKWAY

E CONCOURSE FLOOR - FLOORING PLAN - ZONE ( E ) ZONE E

5 1:100 COORDINATION
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE

ARCH. ENG. Mohamed Abdallah ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 20/05/2023 SCALE: 1:100


DRAWN BY: Eng/ Mohamed Labib APPROVED
TRANS. NO.:
CHECKED BY: PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-1009 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 5/7 NCTH-HAC-DWG-AR-WWE-EF-01-01 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39' B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-I

B-H
UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1D02-1 D02-1D02-1 D02-1 D02-1D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

64000 DN
UP
DN
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

8400 500 8400 8400 8400 8400 8400 8400 8400 4200 500
NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services

6900
7000
details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
B-E B-E 9-Door opening Jambs min 200 MM if less it should be made as concrete post.

100

100

100

100

100

100
10- All Partitions extend to the underside of slab above unless otherwise is noted .

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM
14*300=4200MM

14*300=4200MM

14*300=4200MM

14*300=4200MM

14*300=4200MM

14*300=4200MM
5050

5050

5050

5050

5050

5050

5050

5050
1 1 1 1 1 1 1 1 1 1 1 1 LEGEND AND ABBREVIATIONS:

4550

4550

4550

4550
250
10 10 10 10 10 10 10 10 10 10 10 10 LE = LEVEL WALL TYPE DESIGNATOR
16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 16*300=4800MM 15*300=4500MM 230 T.O.C = TOP PF CONCRETE
WALL TYPE WALL SIZE
F.F.L = FINISH FLOOR LEVEL

8400
10

10

10

10

10

10
10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10
T.O.PR = TOP OF PARAPET
8300 C.J = 10 MM
FIRE RATING
4370 250 4810 4810 4810 4810 4810 4810 4810 4810 4810 4810 4810 4810 4980 F.P.L = FINISH PAVEMENT LEVEL WALL HEIGHT REQUIRED
T.O.W = TOP OF WALL
DOOR DESIGNATOR KEY

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM
1 1 1 1 1 1 1 1 1 1 F.C.L = FINISH CEILING LEVEL LINTEL

3865
3990
10
16*300=4800MM 13*300=3900MM 220
W.F.L = WALKWAY LEVEL H.+2220
T.O.S.S = TOP OF STAINLESS STEEL DOOR TYPE SD-07
1 1 F-90 FIRE RATED
F.G.L = FINISH GRAVEL LEVEL
B-D B-D F.D = FLOOR DRAIN

9610
R.D = ROOF DRAIN

9610

9610

9610

9610

9610

9610

9610

9610

9610
WINDOW DESIGNATOR KEY
10

10

10

10

10

10

10

10

10

10

10

10

10
1750
50 9*300=2700MM
C.J = 10 MM +332.73 m E.J = EXPANSION JOINT LINTEL
F.F.L
CU = CONDENSER UNIT

16*300=4800MM
10 10 10 10 10 10 10 10 10
185
300 15*300=4500MM 7*300=2100MM 215 300 16*300=4800MM 16*300=4800MM 15*300=4500MM 185 225 9*300=2700MM 13*300=3900MM 190 280 900 16*300=4800MM 900 125 5*300=1775MM 16*300=4800MM 15*300=4500MM 230
SLAB TH. = SLAB THICKNESS
W02

4800
WINDOW TYPE
16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM

16*300=4800MM
1 1
CR.J = CONTROL JOINT
10 DOOR MATERIAL
SILL
42000

8400
9*300=2700MM 13*300=3900MM 220
1 1 1 1 1 1430 10
14800 10 1275 2025 10
1 4810
1 4980 M = METAL
8400

ROOM DESIGNATOR KEY


250 4810 2565 735 10 4810 4810 4935 3175 10 4340 W = WOOD ROOM NAME

10
50 13*300=3900MM
FIRE RATING
10

10

10

10

10

10
10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10

10
10*300=3000MM
STORE
7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM

7*300=2100MM
F1 = 1 hr
3245 10 4370

3215
F2 = 2 hr BR-CF- 06

2495
UP
2620

2620

2620

2620

2620

2620

2620

2620
2645

2645
1 1 1 1 1 1 1 1 1 1
+334.55 m
WALL HEIGHT ROOM No.
F.F.L
270

270

270

270

270

270

270

270

270
295

295

295

295
FLOOR
P= PARTIAL WALL
B-C B-C
B = TO BOTTOM OF STRUCTURE
INTERIOR ELEVATION CALLOUT
Reefer to Stair Flooring
NCTH-HAC-DWG-AR-WWE-IF-01 HATCH LEGEND: ELEVATION NOT A
ELEVATION
SHOWN
CONCRETE SHOWN
B
HOLLOW CMU
SOLID CMU SHEET SHOWN
8400

8400
R.F.I. :-
DOCUMENT NO. SUB. REV. DOC. TITLE

B-B B-B

REVISIONS :

REV.NO. DATE REMARKS CODE


8400

8400
00 15/02/2022

01 02/04/2022

02 10/04/2022

03 19/06/2022
04 14/08/2022
B-A B-A
OWNER :

8400 500 8400 8400 8400 8400 8400 8400 8400 4200 500

64000

PROJECT :

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11

B31 B31' B32 B33 B34 B35 B36 B37 B38 B39 B39'
F.F.L

BR-12

+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L F.F.L +329.85 m +329.85 m
+329.85 m +329.85 m F.F.L
F.F.L
F.F.L F.F.L
F.F.L

BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN DN

DN UP

UP

UP

CONSULTANT :
P(A) SECOND FLOOR - BLOCKWORK PLAN - ZONE ( E )
A R CH P L A N
-- -- 1:100
ARCH C PLANN R

DESIGNER :
405

250
650
150

80
900

CONTRACTOR :

SHOP DRAWING
DRAWING TITLE :

BLOCK WORK - SECOND FLOOR LEVEL FOR WALKWAY


ZONE E

COORDINATION
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE
ARCH. ENG. Mahmoud Samy ARCH. ENG.

P(A) SECTION B-B P(A) SECTION A-A CIVIL ENG.

MECH. ENG.

ELEC. ENG.
CIVIL ENG.

MECH. ENG.

ELEC. ENG.
-- -- 1:20 -- -- 1:20 SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 14/08/2022 SCALE: 1:100


DRAWN BY: Mohamed Labib APPROVED
TRANS. NO.:
CHECKED BY: PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-123 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 5/6 NCTH-HAC-DWG-AR-WWE-IW-002-04 REJECTED


-KEYPLAN: B39- B'39- B40- B41-

B-N

B-M

B-L

B-K

B-J

B-I

B1- B2- B3- B4- B5- B6- B7- B8- B9- B'9- B10- B11- B12- B13- B14- B15- B16- B17- B18- B'18- B19- B20- B21- B22- B23-B'23- B24- B25- B26- B27- B28- B29- B30- B31- B'31- B32- B33- B34- B35- B36- B37- B38- B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

UP
DN DN
UP

B1- B2- B3- B4- B5- B6- B7- B8- B9- B'9- B10- B11- B12- B13- B14- B15- B16- B17- B18- B'18- B19- B20- B21- B22- B23- B'23- B24- B25- B26- B27- B28- B29- B30- B31- B'31- B32- B33- B34- B35- B36- B37- B38-
B39- B'39- B40- B41-

NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.

31 B31' B32 B33 B34 B35 B36 B37 B38 B39 7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
10- All Partitions extend to the underside of slab above unless otherwise is noted .

HATCH LEGEND:

1 CEMENT BOARD PAINTED AS PER APPROVED MATRERIAL

2 SECURITE GLASS 12MM AS PER APPROVED MATERIAL

3 JO-TA SHIELD PAINTED AS PER APPROVED MATRIAL AND COLOR

4 GRC PAINTED WITH APPROVED MATERIAL AND COLOR

5 CRYTAL AS PER APPROVED MATERIAL

6 ALUMINUM LOVERS AS PER APPROVED MATERIAL AND COLOR

L5 Tubo Kinkiet

1750
L6 GENEX LIGHTING \ ROMA

ADS SCREEN
4

2000
L8 HYDROFLOOR MAXI COMPACT

8400
L9 LED STRIP FOR CEMENT BOARD (U) SHAPE

5 5

1150
B-ROOF SECOND FLOOR
341.90

1810

1810
LOUVERS LOUVERS

3 3
REVISIONS :

1200

1200
REV.NO. DATE REMARKS
GRC FRAME
1 1 CODE

14520
00 10/10/2022

1200

1200
7350

L6 L6 L6
6 6 L6
L6
GRC CORRNISH GRC CORRNISH GRC CORRNISH L5 L5 GRC CORRNISH GRC CORRNISH

3325

3325
OWNER :
1100

1100

1905
1800
430

5 5

1130
450 450
900

900

900

B-SECOND FLOOR

334.55

1305

1305
3 3 3 3 3 3 3
980

980

980
1200

2 2 2 2 2 2 2
4700

2420

2420

2420

2420

2420
2200

PROJECT :

3290

3290
2000
4 4 4 4 4 4 4 4 4 4 338.11
F F L
+

.
.
730 200
930

930

930

930

930
3 3 3 3 3 3 3 338.11+
. L

F
F
.
338.11+
. L

F
F
.
338.11
F F L
+

.
.
MLRT-CONCOURSE FLOOR 338.11+
F F

.L
.
BR 12

-
1

338.11+
F F L

.
.
329.85
UP
UP

UP

338.11 +m
FFL

.
.
329.85+m 329.85 +m 329.85+m
FFL
329.85+m 329.85+m

.
.
FFL . .
329.85 +m 329.85 +m

F
F
L
.
.
. .

F
F
L
FFL FFL

.
.

.
.
. .

F
F
L
1550

1550

1550

1550

1550

1550

1550
2

BR 12

-
UP

DN DN

UP

4 4 4 4 4 4 4 4
UP

DN
DN

UP
DN
DN

DN UP

UP

UP

CONSULTANT :
3550

L5 L5 L5 L5 L5
1195

1195

1195

1195

1195

1195

1195
1 1 1 1 1 1 1 1

A R CH P L A N
650

650

650

650

650

650

650
3 3 3 3 3 3
B-MEZZANINE FLOOR ARCH C PLANN R
326.30
1575

1575

1575

1575

1775
2 2 2 2 2 2
3
DESIGNER :

3975

3975
3650

2400

2400

2400

2400

2200

MLRT-GROUND FLOOR

322.65

L8 L8 L8 L8 L8 L8 L8 L8 L8

CONTRACTOR :

SHOP DRAWING
DRAWING TITLE :
ELEV ELEVATION OF ZONE E ELEVATION SHOP DRAWING
ZONE E
E 1:75
COORDINATION
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE

ARCH. ENG. MAHMOUD SAMY ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 10/10/2022 SCALE: 1:75


DRAWN BY: Mohamed labib APPROVED
TRANS. NO.:
CHECKED BY: PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-119 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 1/1 NCTH-HAC-DWG-AR-WWE-FC-001 REJECTED


-KEYPLAN: B39- B'39- B40- B41-

B-N

B-M

B-L

B-K

B-J

B-I

B1- B2- B3- B4- B5- B6- B7- B8- B9- B'9- B10- B11- B12- B13- B14- B15- B16- B17- B18- B'18- B19- B20- B21- B22- B23-B'23- B24- B25- B26- B27- B28- B29- B30- B31- B'31- B32- B33- B34- B35- B36- B37- B38- B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

UP
DN DN
UP

B1- B2- B3- B4- B5- B6- B7- B8- B9- B'9- B10- B11- B12- B13- B14- B15- B16- B17- B18- B'18- B19- B20- B21- B22- B23- B'23- B24- B25- B26- B27- B28- B29- B30- B31- B'31- B32- B33- B34- B35- B36- B37- B38-
B39- B'39- B40- B41-

NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
10- All Partitions extend to the underside of slab above unless otherwise is noted .

HATCH LEGEND:

39 B38 B37 B36 B35 B34 B33 B32 B31' B31 1


2
CEMENT BOARD PAINTED AS PER APPROVED MATRERIAL

SECURITE GLASS 12MM AS PER APPROVED MATERIAL

3 JO-TA SHIELD PAINTED AS PER APPROVED MATRIAL AND COLOR

4 GRC PAINTED WITH APPROVED MATERIAL AND COLOR

5 CRYTAL AS PER APPROVED MATERIAL

4 4 4
6 ALUMINUM LOVERS AS PER APPROVED MATERIAL AND COLOR
6750

6750
6750

L5 Tubo Kinkiet

5 5 5 L6 GENEX LIGHTING \ ROMA

640
L8 HYDROFLOOR MAXI COMPACT

760
15750

2300
B-ROOF SECOND FLOOR
341.90
LOUVERS LOUVERS LOUVERS
L9 LED STRIP FOR CEMENT BOARD (U) SHAPE

1750
4890

L9 L9 L9

810
B39- B'39- B40- B41-

B-N
6870

B-M

GRC FRAME GRC FRAME GRC FRAME B-L

1350
L5 4 L5 4 L5 4 L5

1780
B-K

B-J

B-I

B1- B2- B3- B4- B5- B6- B7- B8- B9- B'9- B10- B11- B12- B13- B14- B15- B16- B17- B18- B'18- B19- B20- B21- B22- B23-B'23- B24- B25- B26- B27- B28- B29- B30- B31- B'31- B32- B33- B34- B35- B36- B37- B38- B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

UP
DN DN

L9 L9 L9

3465
UP

B1- B2- B3- B4- B5- B6- B7- B8- B9- B'9- B10- B11- B12- B13- B14- B15- B16- B17- B18- B'18- B19- B20- B21- B22- B23- B'23- B24- B25- B26- B27- B28- B29- B30- B31- B'31- B32- B33- B34- B35- B36- B37- B38-
B39- B'39- B40- B41-

4 6 6 6 4
27650

1155

1155

1180
5650

5 5 5 REVISIONS :

760
7160
REV.NO. DATE REMARKS CODE
1500

1500

1450
B-SECOND FLOOR
4 4 4
334.55
L5 00 15/11/2022

1425
3 3 L5 3 3 3L5 3 3 3L5 3 3 3 3 3 3
L9 L9 L9 L9

150 1000
875

1125

7370
1350

100 1100
1200
4700

4 4 4 4 4
3300

1190
2 2 2 OWNER :
640
1200

1200
760

760
5500

L5 L5 L5 L5 L5
100 850 100 650

100 850 100 650


MLRT-CONCOURSE FLOOR 5 5 5

100 875 100


14030

329.85
1400

1400
1050

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
L5 L5 L5 L5 L9 L9 L9
1190
3550

1800
L9
610

PROJECT :

3950
B-MEZZANINE FLOOR
338.11+
F .F .L

6660
326.30
6150

6150

2 2 3 2 3 3 2 3 3 3 2 2 2 338.11+
338.11+
F .F.L
3050

F .F.L

4 4 4 4
338.11+
F .F.L
4745

338.11+
F.F .L

BR 12-

338.11+
F .F.L
4250

UP
UP

UP

338.11+m
F.F.L

329.85+m 329.85+m 329.85+m


F.F.L F.F.L 329.85+m 329.85+m 329.85+m
329.85+m F.F.L
F.F.L
F.F.L F.F.L F.F.L
3650

BR12 -

UP

DN DN

UP

UP

DN
DN

UP
DN
DN

DN
UP

UP

UP

2200
CONSULTANT :
1200

MLRT-GROUND FLOOR

322.65
A R CH P L A N
ARCH C PLANN R
L8 L8 L8 L8

DESIGNER :

CONTRACTOR :

SHOP DRAWING
DRAWING TITLE :
FC ELEVATION OF ZONE E BACK ELEVATION SHOP DRAWING
ZONE E
E02 1:75
COORDINATION
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE
ARCH. ENG. MAHMOUD SAMY ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 15/11/2022 SCALE: 1:75


DRAWN BY: Mohamed labib APPROVED
TRANS. NO.:
CHECKED BY: PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-119 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 5/6 NCTH-HAC-DWG-AR-WWE-FC-02 REJECTED


B-C B-D

B-C B-D

B35

B35
B-C B-D

SD05 B-ROOF SECOND FLOOR


SD01

B35

B35
341.90+

1
2
3
4

71
70
69
68
67
66
65
64

61
60
72

63
62
59
58

44
45
46
47
48
49
50
51
52
53
54
55
56
57
SD01

B-C B-D
B35

B35
SD05

SD01 +334.55 72 B-SECOND FLOOR


F.F.L
71 334.55
70
69
68
15
14
13
12

67
66
65
10
11
9
2
3
4
5
6
7
8
1

64
63
62 REVISIONS :
61
60 REV.NO. DATE REMARKS CODE
59 +332.37
F.F.L
58 00 30\5\2022
57 +332.03
F.F.L
56
55
54
53
52
51
50
49
48 -KEYPLAN:
47
46
B-39 B-39' B-40 B-41

B-N

B-C B-D 45 B-M

+329.85 44 MLRT-CONCOURSE FLOOR


B-L

F.F.L B-K

43 329.85 B-J

42
B-I

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38 B-H

41
UP

B-G B-G

B-F B-F

40
B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

39
B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

38 B-B
SD03

SD02
SD03

B-B

37
B-A B-A

UP
DN DN

36
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

35
B35

B35

34
33 +328.05
32
F.F.L
PROJECT :
31
30 +338.11
F.F.L

29 +338.11
F.F.L

28 +338.11
F.F.L
+338.11
F.F.L

27 BR-12
+338.11
F.F.L

1
26
+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L
F.F.L +329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L
F.F.L

25
2

BR-12

UP

DN DN

UP
44
43
42
41
40
39

37
36
35
38

34

UP

DN
DN

24
UP
DN
DN

DN
UP

UP

UP

23
+326.25 22 B-MEZZANINE FLOOR
F.F.L
326.30 OWNER :
21
23
24

33
22

25
26
27
28
29
30
31
32

20
19
18
17
16
15
14
13
12
11 +324.45
F.F.L
10 CONSULTANT :
9
8
6
7
A R CH P L A N
5 ARCH C PLANN R
4
3
2
+322.65
1
F.F.L MLRT-GROUND FLOOR
322.65

DESIGNER :
B-C B-D
STAIR STARTER

TIE BEAM (TB.1)

CONTRACTOR :
B35

B35

SD01
SHOP DRAWING
70
69
68
67
66
65
64
63
62
61
60

59
58 DRAWING TITLE :
44
45
46
47
48
49
50
51
52
53
54
55
56
57

ARCHITECTURE STAIR FLOORING IN

WALKWAY - ZONE E From +322.65 To 334.55

COORDINATION
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE

CIVIL ENG. ARCH. ENG.

ARCH. ENG. MAHMOUD SAMY CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 30/5/2022 SCALE: 1:100


DRAWN BY: MOHAMED LABIB APPROVED
TRANS. NO.:
CHECKED BY: HANY.ADEL PARTIAL (0) APPROVED AS NOTED
NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

NCTH-HAC-DWG-AR-WWE-IF-01-00 REJECTED
SHEET NO:-1 /1
-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

B-K

B-J

B-I

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38 B-H
UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

UP
DN DN
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

NOTES:-
1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
20 mm Marble Flooring as Spec. 3- Refer to structural drawings for concrete, location, setting out, profile, type and
30 mm Mortar 20 mm Marble Flooring as Spec. opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
10-30mm Sand 30 mm Mortar details .
5-Door & Windows opening should be solid blocks. 250* wall thickness
50-70 MM Light weight foam Concrete 10-30mm Sand 6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.

400 Micro Polythene Sheet 50-70 MM Light weight foam Concrete 7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
400 Micro Polythene Sheet
50 MM Thermal Insulation 8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
Protection Layer of Cement Screed 20mm 50 MM Thermal Insulation 10- All Partitions extend to the underside of slab above unless otherwise is noted .
Protection Layer of Cement Screed 20mm For Sloop Reefer to NCTH-HAC-DWG-AR-WWX-CW-00X-03
4MM Waterproofing membrane
4MM Waterproofing membrane
RC SLAB
RC SLAB
Marble Shabah 600*600

1 Polished 2 CM THIK AS
approved sample

Brown Qusir 600*600


2 Polished 2 CM THIK AS
Approved sample

Marble Shabah 600*600


3 Matte 2 CM THIK AS
approved sample

4 Mosaico 250*250*50 mm

5 Epoxy As per BOQ

Porcelain 600*600
6 per BOQ
R.F.I. :-
DOCUMENT NO. SUB. REV. DOC. TITLE

REVISIONS :

REV.NO. DATE REMARKS CODE

00 10/10/2022

01 20/05/2023

OWNER :

20 mm Marble Flooring as Spec.


30 mm Mortar
10-30mm Sand
50-70 MM Light weight foam Concrete
400 Micro Polythene Sheet
PROJECT :
50 MM Thermal Insulation +338.11
F.F.L

Protection Layer of Cement Screed 20mm +338.11


F.F.L
+338.11
F.F.L

+338.11
F.F.L

4MM Waterproofing membrane


+338.11
F.F.L

BR-12

+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

20 mm Marble Flooring as Spec.


+329.85 m +329.85 m +329.85 m
F.F.L F.F.L
+329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L F.F.L

BR-12

RC SLAB
UP

DN DN

UP

UP

DN
DN

UP
DN
DN

DN
UP

UP

UP

30 mm Mortar
CONSULTANT :
10-30mm Sand
50-70 MM Light weight foam Concrete
400 Micro Polythene Sheet
A R CH P L A N
ARCH C PLANN R

50 MM Thermal Insulation
Protection Layer of Cement Screed 20mm
DESIGNER :
4MM Waterproofing membrane
RC SLAB

CONTRACTOR :

SHOP DRAWING
DRAWING TITLE :

FLOORING - GENERAL DETAILS

COORDINATION
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE

ARCH. ENG. Mohamed Abdallah ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 20/05/2023 SCALE: 1:5


DRAWN BY: Eng/ Mohamed Labib APPROVED
TRANS. NO.:
CHECKED BY: PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-1009 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 7/7 NCTH-HAC-DWG-AR-WWGN-EF-01-01 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

B-N

B-M

B-L

METAL LATH
B-K

B-J

B-I

CORNER BEAD AS APPROVED SAMPLE AS APPROVED SAMPLE PLASTER STOP AS APPROVED SAMPLE CORNER BEAD AS APPROVED SAMPLE B-G

B-F

B-E'
B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
UP
B-H

B-G

B-F

B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

DN DN
UP
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

CONCRETE BEAM NOTES:-

1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
LINTEL 3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
MASONRY 5-Door & Windows opening should be solid blocks. 250* wall thickness
MASONRY MASONRY MASONRY MASONRY 6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
LINTEL 7- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
10- All Partitions extend to the underside of slab above unless otherwise is noted .

METAL LATH METAL LATH


AS APPROVED SAMPLE

OPENING STEEL DOOR OPENING


PLASTER PLASTER PLASTER
PLASTER PLASTER PLASTER

ELEVATION ELEVATION ELEVATION

EXPANSION JOINT

R.F.I. :-
DOCUMENT NO. SUB. REV. DOC. TITLE

METAL LATH CONTROL JOINT


200 AS APPROVED SAMPLE
CONTROL JOINT REVISIONS :

REFLECTED CEILING HEIGHT


200

AS APPROVED SAMPLE REV.NO. DATE REMARKS CODE

ANGLE CORNER 01 22/08/2022

METAL LATH
CONCRETE BEAM As approved Sample
200

AS APPROVED SAMPLE 3066.1028

ANGLE BEAD CORNER


AS APPRVOED SAMPLE
PLASTER
OWNER :

ELEVATION ELEVATION PROJECT :

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

BR-12

1
+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L
F.F.L +329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L
F.F.L

2
BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN
DN

DN
UP

UP

UP

CONSULTANT :

A R CH P L A N
ARCH C PLANN R

DESIGNER :
METAL LATH MEP WORKS
AS APPROVED SAMPLE

PLASTER STOP AS APPROVED SAMPLE

STEEL DOOR FRAME CONTRACTOR :


PLASTER

20
MASONRY
SHOP DRAWING
DRAWING TITLE :

GENERAL DETAILS
PLASTER DETAILS AND ACCESSORIES

Angle bead corner 50x50 mm COORDINATION


CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE
ARCH. ENG. Mahmoud Samy ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.


ELEVATION SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 22/08/2022 SCALE: 1:100


DRAWN BY: Mohamed Labib APPROVED
TRANS. NO.:
CHECKED BY: HANY.ADEL PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
AR-106,107 NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 1/1 CTH-HAC-DWG-AR-WWGN-GN-005-01 REJECTED


-KEYPLAN: B-39 B-39' B-40 B-41

400
B-N

B-M

B-L

B-K

B-J

B-I

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38 B-H

UP

B-G B-G

B-F B-F

B-E' B-E'

B-E
K D01 D01 B-E
D02 D02

D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1 D02-1


D02-2 D02-2

B-D SD07 SD07 B-D

UP UP
SD01 SD01
UP
SD07 SD07

B-C SD01 SD01


B-C
SD09

SD03 SD03

B-B SD02
B-B

B-A B-A

UP
DN DN
UP

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-9' B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-18' B-19 B-20 B-21 B-22 B-23 B-23' B-24 B-25 B-26 B-27 B-28 B-29 B-30 B-31 B-31' B-32 B-33 B-34 B-35 B-36 B-37 B-38
B-39 B-39' B-40 B-41

GLASS LINTEL 300 MM THK NOTES:-

BLOCK WORK UP TO BEAM 1- All dimensions are metric (in mm.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
Fire pipe

200
opening.

300
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
lintel 300 thk 5-Door & Windows opening should be solid blocks. 250* wall thickness
6-In the 125 mm wall stiffener will be 125*300 mm & In 250 mm wall stiffening will
be 250*300 mm.
7- All drawings should be read in conjunction with other relevant Architectural ,

300
Structural, Mechanical & Electrical drawings .
Glass above lintel 8- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
9-Door opening Jambs min 200 MM if less it should be made as concrete post.
10- All Partitions extend to the underside of slab above unless otherwise is noted .
GLASS

POST (125 * 250 MM )


1650

UP TO LINTEL

2175
1650
lintel 300 thk

FOR BLOCK WORK DIMENSION REEFER TO BLOCK WORK PLANS


upstand 250mm

upstand 250mm
225

Fire pipe

225
R.F.I. :-
DOCUMENT NO. SUB. REV. DOC. TITLE

REVISIONS :

REV.NO. DATE REMARKS CODE

00 30/10/2022

LINTEL 250*300 MM
BLOCK WORK UP TO BEAM
Fire pipe
BLOCK WORK UP TO BEAM BLOCK WORK UP TO BEAM OWNER :

300
300

Fire pipe

PROJECT :

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

+338.11
F.F.L

BR-12

1
+338.11
F.F.L

UP
UP

UP

+338.11 m
F.F.L

+329.85 m +329.85 m +329.85 m


F.F.L
F.F.L +329.85 m +329.85 m +329.85 m F.F.L
+329.85 m F.F.L
F.F.L F.F.L
F.F.L

POST (125 * 250 MM )

2
BR-12

UP

DN DN

UP

UP

DN
DN

UP
DN DN

DN
UP

UP

UP

UP TO LINTEL CONSULTANT :

A R CH P L A N

1650
1650

ARCH C PLANN R

DESIGNER :
LINTEL 250*300 MM

FOR BLOCK WORK DIMENSION REEFER TO BLOCK WORK PLANS

upstand 250mm upstand 250mm CONTRACTOR :


225
225

SHOP DRAWING
DRAWING TITLE :

FIRE HOSE CABINET GENERAL DETAIL

COORDINATION
CONTRACTOR SIGN. DATE CONSULTANT SIGN. DATE
ARCH. ENG. Mahmoud Samy ARCH. ENG.

CIVIL ENG. CIVIL ENG.

MECH. ENG. MECH. ENG.

ELEC. ENG. ELEC. ENG.

SURVEYOR SURVEYOR
PROJ. MGR. ZONE. MGR.

DATE: 30/10/2022 SCALE: 1:100


DRAWN BY: Mohamed Labib APPROVED
TRANS. NO.:
CHECKED BY: HANY.ADEL PARTIAL (0) APPROVED AS NOTED
C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY NOT APPROVED
TENDER DWG. (CORRECT & RESUBMIT)

SHEET NO:- 1/1 NCTH-HAC-DWG-AR-WWGN-IW-009 REJECTED


DETERGENT PLANT LIST OF DRAWING Statues

ITEM NO. Drawing No. Title


GENERAL DRAWINGS
01 DEPL GN AR GN 01 00 DRAWING LIST Delivered
02 DEPL GN AR GN 02 01 LAYOUT Delivered
03 DEPL GN AR GN 03 00 FINISHING SCHEDULE Delivered
04 DEPL GN AR GN 04 00 FINISHING SCHEDULE Delivered
05 DEPL GN AR GN 05 00 GENERAL DETAILS-01 Delivered
06 DEPL GN AR GN 06 00 GENERAL DETAILS-02 Delivered
07 DEPL GN AR GN 07 00 GENERAL DETAILS-03 FOR STEEL BUILDING Delivered
BUILDING NO. A01 Include(A02-A03-A04)- MAIN BUILDING
08 DEPL A01 AR GR 08 01 GROUND FLOOR PLAN Delivered
09 DEPL A01 AR GR 09 01 Ground floor partial plan part 1 of 2 Delivered
10 DEPL A01 AR GR 10 01 Ground floor partial plan part 2 of 2 Delivered
11 DEPL A01 AR FR 11 01 FIRST FLOOR PLAN Delivered
12 DEPL A01 AR RF 12 01 ROOF FLOOR PLAN Delivered
13 DEPL A01 AR RF 13 01 ROOF partial plan part 1 of 2 Delivered
14 DEPL A01 AR RF 14 01 ROOF partial plan part 2 of 2 Delivered
15 DEPL A01 AR ELE 15 01 ELEVATION-01 Delivered
16 DEPL A01 AR ELE 16 01 ELEVATION-02 Delivered
17 DEPL A01 AR ELE 17 01 ELEVATION-03 Delivered
18 DEPL A01 AR ELE 18 01 ELEVATION-04 Delivered
19 DEPL A01 AR SEC 19 01 SECTION A-A Delivered
20 DEPL A01 AR SEC 20 01 SECTION B-B Delivered
21 DEPL A01 AR GN 21 01 DOORS & WINDOWS SCHEDULE Delivered
22 DEPL A01 AR CL 22 01 GROUND FLOOR CELING PLAN Delivered
23 DEPL A01 AR CL 23 01 Ground floor partial ceiling plan part 1 of 2 Delivered
24 DEPL A01 AR CL 24 01 Ground floor partial ceiling plan part 2 of2 Delivered
25 DEPL A01 AR CL 25 01 FIRST FLOOR CEILING PLAN Delivered
26 DEPL A01 AR GN 26 01 STAIR CASE DETAIL-01 Delivered
BUILDING NO. A05 - UTILITY BUILDING
27 DEPL A05 AR BS 27 00 BASEMENT FLOOR PLAN Delivered
28 DEPL A05 AR GR 28 00 GROUND FLOOR PLAN Delivered
29 DEPL A05 AR RF 29 00 ROOF FLOOR PLAN Delivered
30 DEPL A05 AR ELE 30 00 ELEVATION-01 Delivered
31 DEPL A05 AR SEC 31 00 SECTION A-A Delivered
32 DEPL A05 AR GN 32 00 DOORS & WINDOWS SCHEDULE Delivered
33 DEPL A05 AR CL 33 00 GROUND FLOOR CELING PLAN Delivered
34 DEPL A01 AR GN 34 00 STAIR CASE DETAIL-01 Delivered
BUILDING NO. A06 - RESTURANT BUILDING
35 DEPL A06 AR GR 35 00 GROUND FLOOR PLAN Delivered
36 DEPL A06 AR FR 36 00 FIRST FLOOR PLAN Delivered
37 DEPL A06 AR RF 37 00 ROOF FLOOR PLAN Delivered
38 DEPL A06 AR ELE 38 00 ELEVATION-01 Delivered
39 DEPL A06 AR SEC 39 00 SECTION A-A Delivered
40 DEPL A06 AR GN 40 00 DOORS & WINDOWS SCHEDULE Delivered
41 DEPL A06 AR CL 41 00 GROUND FLOOR CELING PLAN Delivered
42 DEPL A06 AR CL 42 00 FIRST FLOOR CEILING PLAN Delivered
43 DEPL A01 AR GN 43 00 STAIR CASE DETAIL-01 Delivered
BUILDING NO. A07 - LOCKERS BUILDING
44 DEPL A07 AR GR 44 01 GROUND FLOOR PLAN Delivered
45 DEPL A07 AR FR 45 01 FIRST FLOOR PLAN Delivered
46 DEPL A07 AR RF 46 01 ROOF FLOOR PLAN Delivered
47 DEPL A07 AR ELE 47 01 ELEVATION-01 Delivered
48 DEPL A07 AR SEC 48 01 SECTION A-A Delivered
49 DEPL A07 AR GN 49 01 DOORS & WINDOWS SCHEDULE Delivered
50 DEPL A07 AR CL 50 01 GROUND FLOOR CELING PLAN Delivered
51 DEPL A07 AR CL 51 01 FIRST FLOOR CEILING PLAN Delivered
52 DEPL A07 AR GN 52 00 STAIR CASE DETAIL-01 Delivered
BUILDING NO. A08 - MOSQUE BUILDING
53 DEPL A08 AR GR 53 01 GROUND FLOOR PLAN Delivered
54 DEPL A08 AR RF 54 01 ROOF FLOOR PLAN Delivered
55 DEPL A08 AR ELE 55 01 ELEVATION-01 Delivered
56 DEPL A08 AR SEC 56 01 SECTION A-A Delivered
57 DEPL A08 AR GN 57 01 DOORS & WINDOWS SCHEDULE Delivered
58 DEPL A08 AR CL 58 01 GROUND FLOOR CELING PLAN Delivered
BUILDING NO. A09 - MANAGEMENT BUILDING
59 DEPL A09 AR GR 59 01 GROUND FLOOR PLAN Delivered
60 DEPL A09 AR FR 60 01 FIRST FLOOR PLAN Delivered
61 DEPL A09 AR RF 61 01 ROOF FLOOR PLAN Delivered
62 DEPL A09 AR ELE 62 01 ELEVATION-01 Delivered
63 DEPL A09 AR ELE 63 01 ELEVATION-02 Delivered
64 DEPL A09 AR SEC 64 01 SECTION A-A Delivered
65 DEPL A09 AR GN 65 01 DOORS & WINDOWS SCHEDULE Delivered
66 DEPL A09 AR CL 66 01 GROUND FLOOR CELING PLAN Delivered
67 DEPL A09 AR CL 67 01 FIRST FLOOR CEILING PLAN Delivered
68 DEPL A09 AR GN 68 01 STAIR CASE DETAIL-01 Delivered
BUILDING NO. A11 SECUERTIY BUILDING
69 DEPL A11 AR GR 69 01 GROUND FLOOR PLAN Delivered
70 DEPL A11 AR RF 70 01 ROOF FLOOR PLAN Delivered
71 DEPL A11 AR ELE 71 01 ELEVATION-01 Delivered
72 DEPL A11 AR ELE 72 01 ELEVATION-02 Delivered
73 DEPL A11 AR ELE 73 01 ELEVATION-03 Delivered
74 DEPL A11 AR ELE 74 01 ELEVATION-04 Delivered
75 DEPL A11 AR SEC 75 01 SECTION A-A Delivered
76 DEPL A11 AR GN 76 01 DOORS & WINDOWS SCHEDULE Delivered
77 DEPL A11 AR CL 77 01 GROUND FLOOR CELING PLAN Delivered
FENCE
78 DEPL GN AR GN 87 00 PLAN Delivered
79 DEPL GN AR GN 88 02 GENERAL DETAILS Delivered
-KEYPLAN:
83.61

1.11

1.10
1.10
R5.
00
00
R5. A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20

83.61 PAVMENT

+0.00
+9.30 +9.30

STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 Void


+10.30

5.69
6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30

+6.90 +7.90 +6.90

A06-RESTAURANT

24.82

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

1.11

52.07
1.10
1.10

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
R5

1.
R

50
+5.05 +4.51

00

R1.
.0
50
REINFORCED SKYLIGHT R1.

32.34
5.
2.00 9.55 11.63 0.92

0
A05-TRANSFORMER ROOM

12.60
VIP PARKING

R +0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05

12.90
+4.51

R1
.50

33.81

+0.00
+0.20 STREET LEVEL
+0.20
PAVMENT PAVMENT

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

9.20

12.67
+5.65

27.12
.00
R1

1.10
A12-WEIGHT SCALE

.00
R1
0.30 F.F.L

0
.0
15.00

R1
1.10 23.09 36.62 9.65 2.00 PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

E 0.2%
9.75

SLOP
MAIN ENTRANCE
A11-SECURITY GATE (TWO WAY)

83.61

A01-MAIN BUILDING
10.35
NOTES:-
+0.20
PAVMENT 1- All dimensions are metric (in m.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
+9.30 +9.30 3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
+0.00 5- All drawings should be read in conjunction with other relevant Architectural ,
STREET LEVEL Structural, Mechanical & Electrical drawings .
6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
A05-UTILITY BUILDING

14.85
7- All Partitions extend to the underside of slab above unless otherwise is noted .
32.71
+5.65
F.F.L

21.48
REVISIONS :
+0.00
STREET LEVEL A08-MOSQUE REV.NO. DATE REMARKS

00 20/12/2023
+0.20
PAVMENT +5.65
F.F.L 01 20/01/2024

5.00
10.35

+10.30

Void
PROJECT
+6.90 +7.90 +6.90 +10.30

5.69
6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

DETERGENT PLANT

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT
95.95

Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71

+11.70 +12.93 +11.70

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
1.
R

0
+5.05 +4.51

.5
50

R1
.
REINFORCED SKYLIGHT R1
32.34

2.00 9.55 11.63 0.92

12.60
VIP PARKING

+0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05 +4.51

12.90 R1
.50

33.81

+0.00
+0.20 STREET LEVEL
+0.20
PAVMENT PAVMENT
7.10

1.10 31.75 13.79 24.74

TRAILERS WAITING AREA


12.67

27.12
.0
R1
1.10

A12-WEIGHT SCALE
.00
R1

DESIGN DRAWINGS
DRAWING TITLE :
0
.0

15.00
R1

PARKING FOR 12 CAR


6.02

6.02

MASTER PLAN
+3.40
F.F.L
%
0.2

9.75
E
OP
SL

MAIN ENTRANCE
A11-SECURITY GATE (TWO WAY)
DATE: 20/01/2024 SCALE:
DRAWN BY: ENG.Mohamed Labib APPROVED

83.61 SHEET NO :
C O O R D I N A T I O N
1/1 APPROVED AS NOTED
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-GN-AR-GN-02-01 REJECTED
LEVEL NUMBER NAME FLOOR FINISH SKIRTING WALL FINISH CEILING FINISH

BASEMENT A05-01 PUMP ROOM SMOOTH CONCRETE + EPOXY PAINT ------- WATER PROOFING EPOXY COATING ON R.C WATER PROOFING EPOXY COATING ON R.C

BASEMENT A05-02 WATER TANK-01 FAIR FACE CONCRETE ------- WATER PROOFING EPOXY COATING ON R.C WATER PROOFING EPOXY COATING ON R.C

BASEMENT A05-03 WATER TANK-02 SMOOTH CONCRETE + EPOXY PAINT ------- WATER PROOFING EPOXY COATING ON R.C WATER PROOFING EPOXY COATING ON R.C

GROUND A01-01 PRODUCTION AREA CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A01-02 CONTROL ROOM CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A01-03 PRODUCTION SHIFT SUPERVISOR CERAMIC TILES 600X600 151 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A01-04 SUB STORE FOR PRODUCTION CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A01-05 RAW MATRIAL HEATING ROOM CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A01-06 MAINTENANCE WORKSHOP CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A01-07 COMPRESSOR ROOM CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A01-08 BOILER ROOM CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT + SANDWICH PANEL EXPOSED STRUCURE

GROUND A02-01 PACKING LINES CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A02-02 PACKING SHIFT SUPERVISOR CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A02-03 RAW WATER TANKS CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A02-04 PACKING MATERIAL SUB-STORE CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A02-05 TOILEST CERAMIC TILES 600X600 ------- CERAMIC TILES 600X600 GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A03-01 RAW MIXING MATREAL STORAGE CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A03-02 PACKING MATERIAL MAIN STORAGE CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A04-01 FINISHING PRODUCT STORAGE CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A05-04 UTILITY BUILDING CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A05-05 TRANSFORMER CONCRETE SLAB WITH HARDENING SURFACE 150 MM HIGH CEMENT PLASTIC EMULSION PAINT EXPOSED STRUCURE

GROUND A06-01 RESTURANT ENTERENCE CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A06-02 KITCHEN CERAMIC TILES 600X600 ------- CERAMIC TILES 600X600 GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A07-01 MALE LOCKER BUIDING CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A07-02 MALE TOILEST CERAMIC TILES 600X600 ---------- CERAMIC TILES 600X600 GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A07-03 SERVICE CERAMIC TILES 600X600 ---------- CERAMIC TILES 600X600 GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A08-01 MOSEQUE MOZZAICO TILES 300X300 + GREEN CARPET PVC PLASTIC PAINT PAINT ON R.C

GROUND A09-01 MANAGEMENT ENTERENCE PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT+ GLASS PARTIONS GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A09-02 TECHNICAL MANGER PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT+ GLASS PARTIONS GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A09-03 HR OFFICE PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT+ GLASS PARTIONS GYPSUM TILES 600X600AND GYPSUM BOARD
GROUND A09-04 ACCOUNTING OFFICE PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT+ GLASS PARTIONS GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A09-05 MEETING ROOM PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT+ GLASS PARTIONS GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A09-06 MALE TOILET PORCILENE TILES 600X600. --------------- PORCILINE TILES 1200X600. GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A09-07 FEMLAE TOILETS PORCILENE TILES 600X600. --------------- PORCILINE TILES 1200X600. GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A09-08 KITCHEN CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT PAINT ON R.C

GROUND A09-09 LOBBY PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A11-01 SECURTY GATE CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

GROUND A11-02 MAIN GATE ASPHALT --------------- --------------- ---------------

GROUND A11-03 PERSONAL GATE GRANITE TILES GRANITE ALUMINUM CLADDING PAINT ON R.C

GROUND A12-01 WEIGHT SCALE ROOM CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

MEZZANIE A01-11 SHIFT MANGER HDF HDF PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

MEZZANIE A01-12 TOILETS CERAMIC TILES 600X600 ------- CERAMIC TILES 600X600 GYPSUM TILES 600X600AND GYPSUM BOARD

MEZZANIE A01-13 SERVICE CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

MEZZANIE A01-14 MANGER HDF HDF PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A06-03 DINNIG HALL CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A07-04 FEMALE LOCKER ROOM CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A07-05 FEMALE TOILEST CERAMIC TILES 600X600 ---------- CERAMIC TILES 600X600 GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A09-10 GM OFFICE HDF HDF PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A09-11 TOILET CERAMIC TILES 600X600 ------- CERAMIC TILES 600X600 GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A09-12 KITCHEN CERAMIC TILES 600X600 150 MM HIGH CERMIC PLASTIC PAINT GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A09-13 LOBBY PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT+ GLASS PARTIONS GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A09-14 MEETING ROOM PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT+ GLASS PARTIONS GYPSUM TILES 600X600AND GYPSUM BOARD

FIRST FLOOR A09-15 WATING AREA PORCILENE TILES 600X600. PORCILIENE PLASTIC PAINT+ GLASS PARTIONS GYPSUM TILES 600X600AND GYPSUM BOARD

ROOF FLOOR A05-06 TRANSFORMER MOZZAICO TILES 300X300. MOZZAICO PLASTIC PIANT --------------

ROOF FLOOR A05-07 UTILITY BUILDING MOZZAICO TILES 300X300. MOZZAICO PLASTIC PIANT --------------

ROOF FLOOR A06-04 RESTURANT ENTERENCE MOZZAICO TILES 300X300. MOZZAICO PLASTIC PIANT --------------

ROOF FLOOR A07-06 LOCKER BUILDING MOZZAICO TILES 300X300. MOZZAICO PLASTIC PIANT --------------

ROOF FLOOR A08-02 MOSQUE MOZZAICO TILES 300X300. MOZZAICO PLASTIC PIANT --------------

ROOF FLOOR A09-16 TRANSFORMER MOZZAICO TILES 300X300. MOZZAICO PLASTIC PIANT --------------

ROOF FLOOR A11-02 SECURTY GATE MOZZAICO TILES 300X300. MOZZAICO PLASTIC PIANT --------------

ROOF FLOOR A12-02 WEIGHT SCALE ROOM MOZZAICO TILES 300X300. MOZZAICO PLASTIC PIANT --------------
-KEYPLAN:
WALL 83.61

1.11

1.10
1.10
R5.
00
00
R5. A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
50 700 39 PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

50

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69

6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
- MOSAIC SKIRTING 10 CM +11.70 +12.93 +11.70

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

- 300X300X30mm MOSAIC TILES


2.00

50
1.
R

50
+5.05 +4.51

R1.
50
REINFORCED SKYLIGHT

700
R1.

32.34
- 2 CM CEMENT MORTAR
2.00 9.55 11.63 0.92

12.60
VIP PARKING

+0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05 +4.51

12.90 R1
.50

- 6 CM SAND
33.81

+0.00
+0.20 STREET LEVEL
+0.20
PAVMENT PAVMENT

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

-Light weight concrete foam average thickness 7 cm

12.67
60mm THICK INTERLOCKING CONCRETE HAUNCH

27.12
.00
R1

1.10
A12-WEIGHT SCALE

.00
R1
CONCRETE PAVERS HEAT INSULATION 5 CM
150mm THICK PRECAST CONCRETE

00
15.00

R1.
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

600

E 0.2%
50mm THICK SAND
9.75

SLOP
/ *30M
25 O KERB A11-SECURITY GATE
MAIN ENTRANCE
(TWO WAY)

MANUAL FIRE LAYING COURSE 80mm THICK INTERLOCKING MOISTURE UNSULATION 2 CM


83.61

HOSE REEL 250 mm SOLID


150mm THICK CONCRETE PAVERS

1450
50
BLOCK WALL - RC SLAB
STEEL STUD COMPACTED 50mm THICK SAND LAYING COURSE
GRANULAR BASE LAYER

1800
50x6mm DYNABOLT NOTES:-
PRV SIDEWALK LEVEL 200mm THICK COMPACTED ROAD

600
INSULATION RUBBER BASE LAYER 1- All dimensions are metric (in m.) and real unless otherwise indicated.

80
LV WITH PRV AUTOMATIC DOOR CLOSER 2- All levels are in meters unless otherwise indicated .

50
ROAD LEVEL 3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.

80
150
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services

700
Roof 1 Floor Plan - T.O.S

67mm
details .

50
5- All drawings should be read in conjunction with other relevant Architectural ,
FLUSH BOLT LOCK Structural, Mechanical & Electrical drawings .

200
PLASTER HINGE 600
6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
INSULATION

300
7- All Partitions extend to the underside of slab above unless otherwise is noted .
CO2 WATER
0.7 mm STAINLESS STEEL
10 LBS 9Ltr.

F.F.L
50

SETTING MORTAR
FRONT SIDE CONCRETE FOUNDATION
250

PLAN ELEVATION NATURAL SOIL


FIN. FLOOR REVISIONS :
LVL.
REV.NO. DATE REMARKS

00 17/1/2024
NOTE: STAINLESS STEEL BRUSH FINISH FOR
FIRE HOSE REEL CABINET & FIRE
EXTINGUISHER CABINETS

Fire Cabinete Detail Duct Maintainance Opening Detail KERB Detail Roof Detail PROJECT

CEMENT PLASTER DETERGENT PLANT


AND PAINT FIXING FOAM FOR
AS PER ROOM FINISH DOOR

GRANITE SKIRTING
20MM THICKNESS
GRANITE TILES CONCRETE SLAB

15
CEMENT / SAND PLASTER TO
SPECIFICATION
ADHESIVE (MINIMUM
GROUT THICKNESS 3mm)
NOMINAL 8mm THICK
COLD APPLIED
NON-SLIP FLOOR
WATERPROOFING
CERAMIC TILES
MEMBRANE UP TO 200mm
ADHESIVE
ABOVE FFL AND ALL S/S SHOWER DOOR
SCREED LAID AROUND THE BATH TUB
TO FALL NOMINAL 6mm THICK HINGE MIRROR
1/100
FFL S/S SHOWER DOOR
POLISHED

100
WALL CERAMIC TILES
FIXED WITH ADHESIVE HINGE MIRROR
(OR 25X25mm GLASS
MOSAIC
RC OR TILES) POLISHED 10MM THICK FULLY
MASONRY TEMPERED CLEAR
SSL WALL 10MM THICK FULLY GLASS
TEMPERED CLEAR
GLASS
PERIMETER
WEATHERSTRIP
LIMIT OF GLASS DOOR CASING
TOP LEVEL
LIMIT OF THRESHOLD
RC SLAB TO
STRUCTURAL CEMENT/SAND FILLET
DRAWINGS & DETAILS

BLOCK 20 MM GRANITE
CEMENTWALL
PLASTER THRESHOLD
15MM
DOOR FRAME
CERAMIC TILES

DOOR ARCHITRAVE

wet area wall detail Glass Door Detail Door with ceramic tiles detail Connection between false ceiling and wall detail
Plan

DOOR LEAF
DOOR LEAF MARBLE THRESHOLD
MARBLE THRESHOLD
DOOR UNDER CUT
CEMENT MORTAR SEALANT
CEMENT MORTAR BAKED ENAMEL FINISH
CERAMIC WALL AS SPEC. GALVANIZED STEEL
FACE PLATE

SLIDE SSTL LATCH

BAKED ENAMEL FINISH


WALL FIN GALVANIZED STEEL
FACE PLATE
STAINLESS STEEL WALL BRACKET STAINLESS STEEL
PILASTER BRACKET
150

25
32

32
CERAMIC TILES AS SPEC.
HONEYCOMB CORE
HONEYCOMB CORE
CONCEALED HINGE

SKIRTING AS SPEC. MORTAR BED HONEYCOMB


CORE RUBBER STOP
BAKED ENAMEL FINISH GALVANIZED
STEEL FACE PLATE

+171.55
F.F.L
CERAMIC FLOORING CEMENT SCREED TO SLOPE
SKIRTING AS SPEC. SKIRTING AS SPEC.
AS SPEC. DESIGN DRAWINGS
100 MICRONS, POLYETHYLENE SHEET
MARBLE FLOORING CERAMIC FLOORING 4cm TH. SCREED LOOSELY LAID. DRAWING TITLE :
AS SPEC. AS SPEC. WITH SELF-LEVELING
WATER PROOFING MEMBRANE 4mm
SCREED+MORTER THICK WITH PRIMER
R.C.C SLAB

GENERAL DETAILS-01

wall and ceramic floor tiling theshold between spaces theshold between wet area and other rooms Partition detail DATE: 17/1/2024 SCALE:
DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 1/1 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-GN-AR-GN-05-00 REJECTED
-KEYPLAN:
83.61

1.11

1.10
1.10
R5.
00
00
R5. A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20

WATER PROOFING
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69

6.03
+5.05 +4.51
A07-LOCKER BUILDING

MEMBRANE
1.10 33.81 12.90
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30

CONTINUOUS EXTRUDED CONTINUOUS EXTRUDED


+6.90 +7.90 +6.90

REINFORCING

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

GASKET .COLOR TO ALUM FRAME


10.25

STRIPS IN CORNER STAINLESS CONTINUOUS VINYL VAPOR


+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

52.07
MATCH FIN.

19.35
A09- MANAGEMENT BUILDING

STEEL SPRING BARRIER & MOISTURE SEAL +11.70 +12.93 +11.70

2.00
+6.95
F.F.L

50
1.
40*40 FILLET

R
PROPRIETARY CLIP

50
+5.05 +4.51

R1.
FFL
50
REINFORCED SKYLIGHT R1.

32.34
2.00 9.55 11.63 0.92

GALVANISED ALUM COVER CONTINUOUS MOISTURE SEAL

12.60
VIP PARKING

+0.00
STREET LEVEL

STEEL RENDER STOP


+11.70 +12.93 +11.70
+5.05 +4.51

PLATE
12.90 R1
.50

33.81

+0.00
+0.20 STREET LEVEL
+0.20
PAVMENT PAVMENT

PROPRIETARY INTERNAL

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

12.67

27.12
.00
R1

1.10
A12-WEIGHT SCALE

ALUM ROOFING COVER

.00
R1
PLASTER TO

00
15.00

SPECIFICATION

R1.
140 MIN
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

E 0.2%
9.75

SLOP
MAIN ENTRANCE

M20 FINISHED WITH


A11-SECURITY GATE (TWO WAY)

75
83.61

PAINT SLOPE
TO SPECIFICATIN M60
PROPRIETARY EXPANSION JOINT SYSTEM NOTES:-
WITH ALUMINIUM COVER PROFILE WITH
STAINLESS STEEL SPRING CLIPS - KF 1- All dimensions are metric (in m.) and real unless otherwise indicated.
250/30 IN KF KLEMM-FIX SERIES BY 'MIGUA' T.O.S.S 2- All levels are in meters unless otherwise indicated .
OR APPROVED EQUIVALENT 3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
COMPRESSIBLE FILLER BOARD details .
5- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
RC / BLOCKWORK WALL WATERPROOFING
MEMBRANE 6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
EXP
2 HR JOINT FIRE BARRIER CAULK 7- All Partitions extend to the underside of slab above unless otherwise is noted .
FIRE BARRIER
2 HR FIRE BARRIER CAULK
ENCAPSULATED
FIRE BARRIER EXP INSULATION
JOINT
(REF TO STU DWGS)
ENCAPSULATED
REVISIONS :
COMPRESSIBLE FILLER BOARD INSULATION
(REF TO SE DWGS)
REV.NO. DATE REMARKS

00 17/1/2024

Wall To Wall Expantion Joints Detail Roof Expantion Joint Detail Expantion Joint Floor-Floor Detail Expantion Joint Roof-Roof Cover Detail PROJECT

DETERGENT PLANT
WALL FINISH LINE
EXP
CONTINUOUS JOINT
EXTRUDED ALUM FRAME VARIES
WALL FINISH LINE (REF TO STU DWGS)
CONTINUOUS WALL LINE CONTINUOUS
MOISTURE SEAL EXTRUDED GASKET .
SEALANT
CONTINUOUS FIRE BARRIER
COLOR TO MATCH FIN
ALUM COVER EXTRUDED ALUM FRAME
PLATE WHERE REQUIRED
ALUM ROOFING CONTINUOUS
COVER EXTRUDED GASKET .
WATERPROOFIN COLOR TO MATCH FIN
G MEMBRANE F.F.L
LINE OF WALL
OR SLAB

VARIES
CONTINUOUS VINYL
VAPOR BARRIER AND
MOISTURE SEAL
75

T.O.S.S
WALL FIN OR
2 HR FIRE BARRIER CAULK CEILING LINE
FIRE BARRIER

ENCAPSULATED
INSULATION CONTINUOUS CONTINUOUS
2 HR EXTRUDED GASKET . EXTRUDED ALUM
(REF TO STU DWGS)
FIRE BARRIER COLOR TO MATCH FIN FRAME
ENCAPSULATED EXP FIRE BARRIER CAULK
JOINT
INSULATION
(REF TO STU DWGS)

Expantion Joint Roof-Wall Cover Detail Expantion Joint Floor-Wall Detail Expantion Joint Wall-Wall Detail

DESIGN DRAWINGS
DRAWING TITLE :

GENERAL DETAILS-01

DATE: 17/1/2024 SCALE:


DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 1/1 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-GN-AR-GN-06-00 REJECTED
-KEYPLAN:

1.11

1.10
1.10
R5.
00
00
R5. A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69
6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
1.
R

0
+5.05 +4.51

.5
R1
50
REINFORCED SKYLIGHT

1.
R
32.34
2.00 9.55 11.63 0.92

VIP PARKING

12.60
+0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05 +4.51

12.90 R1
.50

33.81

+0.00
+0.20 +0.20 STREET LEVEL
PAVMENT PAVMENT

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

12.67
.00

27.12
R1

1.10
A12-WEIGHT SCALE

0
.0
R1

00
15.00

R1.
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

0.2%
9.75

E
SLOP
MAIN ENTRANCE
A11-SECURITY GATE (TWO WAY)

83.61

NOTES:-
BEADMASTIC SKYLIGHT BEADMASTIC 1- All dimensions are metric (in m.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
ROOF PANEL opening.
INSIDE CORNER TRIM 4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
(03-0303) W/ details .
END FRAME PLATE END FRAME PLATE 5- All drawings should be read in conjunction with other relevant Architectural ,
STITCH SCREW (WS) (06-0213)
CS-4.8x16 (06-0213) Structural, Mechanical & Electrical drawings .
SS-4.8x20 PURLIN 6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
FIXING SCREW (WS) @ 600 O.C BOTH SIDES SECTION-B
CS-5.5x25 7- All Partitions extend to the underside of slab above unless otherwise is noted .
SS-5.5x28
@ PANEL MODULE SPACER TRIM
ALONG GIRTS FIXING SIDE FRAME ANGLES
(03-0251) SCREW (RS) (06-0211/06-0221)
CS-5.5x25
SS-5.5x28 A END FRAME PANEL WIDTH
PLATES
ENDWALL GIRT LINE (06-0213) REVISIONS :

LINER PANEL ROOF SKYLIGHT


PANEL PANEL REV.NO. DATE REMARKS

PANEL WIDTH
SIDEWALL GIRT LINE
00 17/1/2024

PURLIN ROOF SIDE FRAME ANGLE


NOTE : CORNER COLUMN DEPTH IS NOT MORE THAN 200mm. INSULATION

SECTION-A (SIDELAP DETAIL)

LINER DETAIL @ CORNER (P & B END) (LIE-603) PROJECT


SKYLIGHT FRAME SECTION (INE-005)

RO STITCH
O FP SCREW (RS)
AN CS-4.8x16
SS-4.8x20 FIXING
EL SCREW (RS)
@ 300 O.C
CS-5.5x25/45
SS-5.5x28/50
(REFER TO ROOF PANEL SHEETING DETAILS @ ENDLAP) DETERGENT PLANT
EXTERIOR RIDGE PANEL
C
L OF RIDGE
ST RIDGE PU
CSITCH RLIN D ISTANCE RLIN DIS
SS -4.8 SC RIDGE PU TANCE
@ -4.8 x16 REW
PA x20 (W 10
NE S) 10 INSIDE FOAM
LM CLOSURE
OD
UL
E
M STITCH
TRI PO SCREW (WS)
BL
E (5- P R CS-4.8x16
G A RE IVE SS-4.8x20
OUTSIDE
QD TS
SIS
FOAM CLOSURE
.) ROOF PANEL @ 250 O.C
OA (01-0606)

245 245
EAVE STRUT

BEAD MASTIC EAVE DETAIL


(01-0091)

OASIS GABLE TRIM (TRE-002)


EXTERIOR RIDGE PANEL (SHE-038)

EXTERIOR RIDGE PANEL

ROOF PANEL
CL OF RIDGE

INTERIOR RIDGE CAP (03-0390)


FIXING W/ STITCH SCREW (WS)
SCREW (WS)
CS-4.8x16
CS-5.5x25
SS-4.8x20
SS-5.5x28 @ PANEL MODULE
@ PANEL MODULE
ALONG PANEL WIDTH

ROOF LINER PANEL

ROOF LINER @ RIDGE LIE-034

SYE-015 SYE-017
ROOF PANEL
SELF DRILLING FASTENERS SCHEDULE @ ROOF SELF DRILLING FASTENERS SCHEDULE @ WALL

FASTENER PART NUMBER DOUBLE FACED TAPE


FASTENER FASTENER PART NUMBER
USAGE
TYPE FASTENER
STAINLESS STEEL "SS" TYPE
USAGE

STAINLESS STEEL "SS" INSULATION


SS-5.5x28
(01-0451)
ROOF PURLIN
SS-5.5x28
FIXING ROOF SS-5.5x50 (01-0451) INSULATION END LAP
SCREW (01-0460) WALL
SCREWS FIXING
(RS) SCREWS
SCREW
(WS) SS-5.5x50 C L OF RIDGE
SS-5.5x65 (01-0460)
(01-0459)

WALL SS-4.8x20
ROOF SS-4.8x20 STITCH SCREW
STITCH SCREWS (01-0454)
SCREWS SCREW (01-0454) (WS)
(RS)

SS-5.5x28 SS-5.5x28 ROOF INSULATION PURLIN


(01-0451) (01-0451)
GENERAL
FIXING GENERAL FIXING SCREW
SCREWS SCREW SCREWS
(GS)
(GS) SS-5.5x40 SS-5.5x40
(01-0453)
(01-0453) ROOF INSULATION DETAIL AT PURLIN
(INE-009)

DESIGN DRAWINGS
DRAWING TITLE :

GENERAL DETAILS-02
FOR STEEL BUILDING

DATE: 17/1/2024 SCALE:


DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 1/1 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-GN-AR-GN-07-00 REJECTED
-KEYPLAN:

1.11

1.10
1.10
R5.
0

00
.0
R5 A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69

6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
1.
R

50
+5.05 +4.51

R1.
50
REINFORCED SKYLIGHT

46.71
R1.

32.34
2.00 9.55 11.63 0.92

VIP PARKING

12.60
+0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05 +4.51

12.90 R1
.50

33.81

+0.00
+0.20 +0.20 STREET LEVEL
PAVMENT PAVMENT

0.52 6.89 7.01 6.74 6.07 0.66 5.37 6.74 6.30 0.42

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

12.67
.00

27.12
R1

1.10
A12-WEIGHT SCALE

.00
R1

00
15.00

R1.
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

E 0.2%
9.75

SLOP
14.00 32.71 83.61
A11-SECURITY GATE
MAIN ENTRANCE
(TWO WAY)

NOTES:-

0.51
0.63
1- All dimensions are metric (in m.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and

E.EXIT
D301
1.10 opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
32.21
5- All drawings should be read in conjunction with other relevant Architectural ,

7.07
6.96
Structural, Mechanical & Electrical drawings .
6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
D102
3.00 7- All Partitions extend to the underside of slab above unless otherwise is noted .

REVISIONS :
20.70

20.65
7.00

7.00
REV.NO. DATE REMARKS
D102
3.00

00 10/1/2024

01 20/01/2024
6.49

6.49
D102
3.00 PROJECT
+0.20
F.F.L

E.EXIT
D301
W202 1.10
D101
0.60 3.00

0.50
DETERGENT PLANT
3.65

3.65
D301 D301 D301
0.80 0.80 0.80
5.28

+0.20
4.78

F.F.L
9.82 3.63 18.41 13.31

+0.20
F.F.L

D106
0.90
D108
1.50
6.05

6.05
D101
3.00

D103
2.00
6.10

32.65
E.EXIT

D302
1.10

24.24

24.16
6.05

6.05
4.17
W102
1.50 +0.20
F.F.L
3.97

E.EXIT
+0.20 D303
18.90

1.10
F.F.L D106
0.90

73.55
3.14

3.14
D103
77.85

77.85
2.00

Total Weight Total Weight


30 Ton 30 Ton
8.44

+0.50
F.F.L
5.55

5.55
+0.20
Total Weight Total Weight F.F.L
30 Ton 30 Ton

25.54

D108
28.41 1.50 3.85 13.16
6.05

6.05
57.15

6.86

+0.20
F.F.L +0.20
F.F.L

+0.20
F.F.L

2.22 4.60 4.51 11.60 5.75 3.73


E.EXIT

D301
1.10
3.42

3.42
D103
2.00
D108
1.50
18.83

FINISH PRODUCT
6.31

TANKS
+0.20
6.05

6.05
L 401 Total Weight F.F.L
1.05 30 Ton
Total Weight Total Weight Total Weight
27.37

30 Ton 30 Ton 30 Ton


27.37

27.66

D108
1.50
5.13

Total Weight
30 Ton +0.20
F.F.L
Total Weight Total Weight Total Weight
30 Ton
6.05

6.05
30 Ton 30 Ton
L 401
1.05

21 20 19 18 17 16 15 14 13 12
2.44

Total Weight
30 Ton
FINISH PRODUCT 1 2 3 4 5 6 7 8 9 10 11

TANKS (FUTURE EXT.)


STAIR AND STEEL
DERAIL REEFER TO
2.22 4.60 3.35
STURCURE DRAWING
10.75 4.45 7.12 13.47
6.05

6.05

Total Weight
D101
30 Ton 3.00
D106
0.90
3.95
Total Weight
3 Ton

MIXING UNIT
2.55

+0.20
F.F.L
E.EXIT
Total Weight 3.95
Total Weight Total Weight D106 D303
10 Ton 10 Ton 10 Ton 0.90 1.10

+0.20
DESIGN DRAWINGS
4.30

4.30

F.F.L
D103
4.30
4.27

2.00
+0.20 +0.20 W101
F.F.L 1.50
7.90
DRAWING TITLE :
Total Weight Total Weight Total Weight Total Weight Total Weight
3 Ton 3 Ton 3 Ton 3 Ton 3 Ton

E.EXIT
0.42

0.42

D105 D301
1.00 1.10
L 401 L 401
1.05 1.05

GROUND FLOOR OVER ALL PLAN-BUILDING A01

33.77 12.94

0.52 6.89 7.01 6.74 6.07 0.66 5.37 6.74 6.30 0.42
46.71
DATE: 20/01/2024 SCALE:
DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 1/3 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-A01-AR-GR-08-01 REJECTED
-KEYPLAN:

1.11

1.10
1.10
R5.
0

00
.0
R5 A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69

6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
1.
R

50
+5.05 +4.51

R1.
50
REINFORCED SKYLIGHT R1.

32.34
2.00 9.55 11.63 0.92

VIP PARKING

12.60
+0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05 +4.51

12.90 R1
.50

33.81

+0.00
+0.20 +0.20 STREET LEVEL
PAVMENT PAVMENT

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

12.67
.00

27.12
R1

1.10
A12-WEIGHT SCALE

.00
R1
46.71

00
15.00

R1.
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

E 0.2%
9.75

SLOP
MAIN ENTRANCE
A11-SECURITY GATE (TWO WAY)

83.61

0.52 6.89 7.01 6.74 6.07 0.66 5.37 6.74 6.30 0.42 NOTES:-
1- All dimensions are metric (in m.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
14.00 32.71 3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
5- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
7- All Partitions extend to the underside of slab above unless otherwise is noted .

0.51
0.63

E.EXIT
D301
1.10
REVISIONS :

REV.NO. DATE REMARKS


32.21

7.07
6.96

00 10/1/2024

01 20/01/2024

D102
3.00

PROJECT
20.70

DETERGENT PLANT

20.65
7.00

7.00
D102
3.00
6.49

6.49
D102
3.00

+0.20
F.F.L

E.EXIT
D301
W202 1.10
D101
0.60 3.00
0.50
3.65

3.65
D301 D301 D301
0.80 0.80 0.80
5.28

+0.20
4.78

F.F.L
9.82 3.63 18.41 13.31

+0.20
F.F.L

D106
0.90
D108
1.50
6.05

6.05
D101
3.00

D103
2.00
6.10

32.65
E.EXIT

D302
1.10

24.24

24.16
6.05

6.05
4.17
W102
1.50 +0.20
F.F.L
3.97

E.EXIT
+0.20 D303
18.90

1.10
F.F.L D106
0.90

73.55
3.14

3.14
D103
77.85

77.85
2.00

Total Weight Total Weight


30 Ton 30 Ton
8.44

+0.50
F.F.L
5.55

5.55
+0.20
Total Weight Total Weight F.F.L
30 Ton 30 Ton

25.54

DESIGN DRAWINGS
D108
DRAWING TITLE :
28.41 1.50 3.85 13.16

GROUND FLOOR PLAN-BUILDING A01


PART-1

DATE: 20/01/2024 SCALE:


DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 2/3 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-A01-AR-GR-09-01 REJECTED
-KEYPLAN:

1.11

1.10
1.10
R5.
0

00
.0
R5 A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69

6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
1.
R

50
+5.05 +4.51

R1.
50
REINFORCED SKYLIGHT R1.

32.34
2.00 9.55 11.63 0.92

VIP PARKING

12.60
+0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05 +4.51

12.90 R1
.50

33.81

+0.00
+0.20 +0.20 STREET LEVEL
PAVMENT PAVMENT

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

12.67
.00

27.12
R1

1.10
A12-WEIGHT SCALE

.00
R1

00
15.00

R1.
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

E 0.2%
9.75

SLOP
MAIN ENTRANCE
A11-SECURITY GATE (TWO WAY)

83.61

NOTES:-
25.54 1- All dimensions are metric (in m.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
D108
28.41 1.50 3.85 13.16 5- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
7- All Partitions extend to the underside of slab above unless otherwise is noted .

6.05

6.05
57.15

6.86
+0.20
F.F.L +0.20
F.F.L

+0.20
F.F.L REVISIONS :

2.22 4.60 4.51 11.60 5.75 3.73 REV.NO. DATE REMARKS

E.EXIT
D301 00 10/1/2024
1.10
3.42

3.42
D103
D108
2.00
01 20/01/2024
1.50

18.83
FINISH PRODUCT

6.31
TANKS PROJECT

+0.20
6.05

6.05
L 401 Total Weight F.F.L
1.05 30 Ton
Total Weight Total Weight Total Weight
27.37

30 Ton 30 Ton 30 Ton

DETERGENT PLANT

27.37

27.66
D108
1.50

5.13
Total Weight
30 Ton +0.20
F.F.L
Total Weight Total Weight Total Weight
30 Ton
6.05

6.05
30 Ton 30 Ton
L 401
1.05

21 20 19 18 17 16 15 14 13 12

2.44
Total Weight
30 Ton
FINISH PRODUCT 1 2 3 4 5 6 7 8 9 10 11

TANKS (FUTURE EXT.)


STAIR AND STEEL
DERAIL REEFER TO
2.22 4.60 3.35
STURCURE DRAWING
10.75 4.45 7.12 13.47
6.05

6.05
Total Weight
D101
30 Ton 3.00
D106
0.90
3.95
Total Weight
3 Ton

MIXING UNIT

2.55
+0.20
F.F.L
E.EXIT
Total Weight 3.95
Total Weight Total Weight D106 D303
10 Ton 10 Ton 10 Ton 0.90 1.10

+0.20
4.30

4.30
F.F.L
D103

4.30
4.27
2.00
+0.20 +0.20 W101
F.F.L 1.50
7.90
Total Weight Total Weight Total Weight Total Weight Total Weight
3 Ton 3 Ton 3 Ton 3 Ton 3 Ton

E.EXIT
0.42

0.42
D105 D301
1.00 1.10
L 401 L 401
1.05 1.05

33.77 12.94

0.52 6.89 7.01 6.74 6.07 0.66 5.37 6.74 6.30 0.42
46.71

DESIGN DRAWINGS
DRAWING TITLE :

GROUND FLOOR PLAN-BUILDING A01


PART-2

DATE: 20/01/2024 SCALE:


DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 3/3 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-A01-AR-GR-10-01 REJECTED
-KEYPLAN:

1.11

1.10
1.10
R5.
00
00
R5. A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE

5.55
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+0.20
+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69
6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30

F.F.L
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
1.
R

0
+5.05 +4.51

.5
R1
50
REINFORCED SKYLIGHT

1.
R
32.34
2.00 9.55 11.63 0.92

VIP PARKING

12.60
+0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05 +4.51

12.90 R1
.50

33.81

+0.00
+0.20 +0.20 STREET LEVEL
PAVMENT PAVMENT

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

12.67
.00

27.12
R1

1.10
A12-WEIGHT SCALE

0
.0
R1

00
15.00

R1.
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

0.2%
9.75

E
SLOP
MAIN ENTRANCE
A11-SECURITY GATE (TWO WAY)

83.61

NOTES:-

52.32
1- All dimensions are metric (in m.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and

4.04
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .

6.05
5- All drawings should be read in conjunction with other relevant Architectural ,

5.95
Structural, Mechanical & Electrical drawings .
6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
7- All Partitions extend to the underside of slab above unless otherwise is noted .

2.80 3.00

1.82
W202
0.60 REVISIONS :
D602
0.80
D202
0.90 REV.NO. DATE REMARKS

4.02 00 10/1/2024

+3.45
01 20/01/2024
F.F.L +5.05
F.F.L

3.42
3.32
PROJECT
D106
0.90

D106 D301
0.80
DETERGENT PLANT
0.90

W202

2.93
0.60
D301
0.80

6.05
D202
0.90

15.45
+5.05
F.F.L

6.26
1.42 4.40

6.05
21 20 19 18 17 16 15 14 13 12
+3.45
F.F.L 1 2 3 4 5 6 7 8 9 10 11

4.45 7.29

6.05
+5.05

12.94

0.66 5.37 6.74 6.30 0.42

DESIGN DRAWINGS
DRAWING TITLE :

FIRST FLOOR PLAN-BUILDING A01

DATE: 20/01/2024 SCALE:


DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 1/1 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-A01-AR-FR-11-01 REJECTED
-KEYPLAN:

1.11

1.10
1.10
R5.
00
00
R5. A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69
6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

46.71

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
1.
R

0
+5.05 +4.51

.5
R1
50
REINFORCED SKYLIGHT

1.
R
32.34
2.00 9.55 11.63 0.92

VIP PARKING

12.60
0.52 6.89 7.01 6.74 6.07 0.66 5.37 6.74 6.30 0.42 +0.00
STREET LEVEL
+11.70 +12.93

33.81
+11.70
+5.05

12.90
+4.51

R1
.50

+0.00
+0.20 +0.20 STREET LEVEL
PAVMENT PAVMENT

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

12.67
14.00 32.71
.00

27.12
R1

1.10
A12-WEIGHT SCALE

0
.0
R1

00
15.00

R1.
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

0.2%
9.75

E
SLOP
MAIN ENTRANCE
A11-SECURITY GATE (TWO WAY)

83.61

0.63
+9.30 +9.30
NOTES:-
1- All dimensions are metric (in m.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services

7.07
6.96
details .
5- All drawings should be read in conjunction with other relevant Architectural ,
Structural, Mechanical & Electrical drawings .
32.71 6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
7- All Partitions extend to the underside of slab above unless otherwise is noted .
20.70

21.48
7.00

7.00
REVISIONS :

REV.NO. DATE REMARKS

00 10/1/2024

01 20/01/2024
6.49

6.49
PROJECT
+10.30

+6.90 +7.90 +6.90 +10.30

+5.05 +4.51
3.65

3.65
33.81 12.90

DETERGENT PLANT
6.05

6.05
+6.90 +7.90 +6.90
24.82
6.05

6.05
+5.05 +4.51

REINFORCED SKYLIGHT

73.55
3.14

3.14
77.85

77.85
+6.90 +7.90 +6.90
5.55

5.55
+11.70 +12.93 +11.70

52.07
6.05

6.05
57.15
3.42

3.42
+11.70 +12.93 +11.70
6.05

6.05
+5.05 +4.51

REINFORCED SKYLIGHT
32.34
6.05

6.05
6.05

6.05

+11.70 +12.93 +11.70


+5.05 +4.51

12.90

33.81
4.30

4.30
4.30

DESIGN DRAWINGS
DRAWING TITLE :
0.42

0.42

ROOF LEVEL OVER ALL PLAN-BUILDING A01


33.77 12.94

0.52 6.89 7.01 6.74 6.07 0.66 5.37 6.74 6.30 0.42
46.71

DATE: 20/01/2024 SCALE:


DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 1/3 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-A01-AR-RF-12-01 REJECTED
-KEYPLAN:

1.11

1.10
1.10
R5.
00
00
R5. A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69
6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50
111.71
+11.70 +12.93 +11.70

52.07

19.35
A09- MANAGEMENT BUILDING
+6.95
F.F.L

+11.70 +12.93 +11.70

2.00

50
1.
R
46.71

0
+5.05 +4.51

.5
R1
50
REINFORCED SKYLIGHT

1.
R
32.34
2.00 9.55 11.63 0.92

VIP PARKING

12.60
+0.00
STREET LEVEL
+11.70 +12.93 +11.70
+5.05 +4.51

12.90 R1
.50

33.81

+0.00
+0.20 +0.20 STREET LEVEL
PAVMENT PAVMENT

7.10
1.10 31.75 13.79 24.74

TRAILERS WAITING AREA

12.67
.00

27.12
R1

1.10
A12-WEIGHT SCALE

0
.0
R1
0.52 6.89 7.01 6.74 6.07 0.66 5.37 6.74 6.30 0.42

00
15.00

R1.
PARKING FOR 12 CAR

6.02

6.02
+3.40
F.F.L

0.2%
9.75

E
SLOP
MAIN ENTRANCE
A11-SECURITY GATE (TWO WAY)

83.61

14.00 32.71
NOTES:-
1- All dimensions are metric (in m.) and real unless otherwise indicated.
2- All levels are in meters unless otherwise indicated .
3- Refer to structural drawings for concrete, location, setting out, profile, type and
opening.
4- Refer to M.E.P drawings for all mechanical , electrical , and plumping services
details .
0.63

5- All drawings should be read in conjunction with other relevant Architectural ,


+9.30 +9.30
Structural, Mechanical & Electrical drawings .
6- All leveling are done based on the F.F.L. ( Doors lintels, MEP opining).
7- All Partitions extend to the underside of slab above unless otherwise is noted .

7.07
6.96

REVISIONS :

REV.NO. DATE REMARKS

32.71 00 10/1/2024

01 20/01/2024

PROJECT
20.70

21.48
7.00

7.00
DETERGENT PLANT
6.49

6.49
+10.30

+6.90 +7.90 +6.90 +10.30

+5.05 +4.51
3.65

3.65
33.81 12.90
6.05

6.05
+6.90 +7.90 +6.90
24.82
6.05

6.05
+5.05 +4.51

REINFORCED SKYLIGHT

73.55
3.14

3.14
77.85

77.85
+6.90 +7.90 +6.90
5.55

5.55
+11.70 +12.93 +11.70

52.07
DESIGN DRAWINGS
6.05

6.05
DRAWING TITLE :
57.15

ROOF LEVEL PLAN-BUILDING A01


PART-1

DATE: 20/01/2024 SCALE:


DRAWN BY: ENG.Mohamed Labib APPROVED

SHEET NO : 2/3 APPROVED AS NOTED


C O O R D I N A T I O N
ARCH. CIVIL ELEC. MECH. SURVEY
TENDER DWG. NOT APPROVED
(CORRECT & RESUBMIT)

DEPL-A01-AR-RF-13-01 REJECTED
-KEYPLAN:

1.11

1.10
1.10
R5.
00
00
R5. A05-TRANSFORMER ROOM

9.20
+5.65
0.30 F.F.L
1.10 23.09 36.62 9.65 2.00

A01-MAIN BUILDING
10.35

+0.20
PAVMENT
+9.30 +9.30

+0.00
STREET LEVEL

A05-UTILITY BUILDING

14.85
32.71
+5.65
F.F.L

21.48
+0.00
STREET LEVEL A08-MOSQUE
+0.20
PAVMENT +5.65
F.F.L

5.00
10.35

+10.30

+6.90 +7.90 +6.90 +10.30


Void

5.69
6.03
1.10 33.81
+5.05
12.90
+4.51
A07-LOCKER BUILDING
1.00

11.95
69.90
F.F.L
+6.95

6.01
10.30
+6.90 +7.90 +6.90

24.82
A06-RESTAURANT

8.20
+5.05 +4.51 +6.95
F.F.L

REINFORCED SKYLIGHT

95.95
Void

1.60
0.30

10.25

+6.90 +7.90 +6.90

111.50

You might also like