You are on page 1of 2

GCP-1001-01-CS-0138-0000-D-VE-03691

SUPPLIER REPRESENTATIVE DAILY REPORT


STSO No.: VDR-03691 COMPANY: Emerson
REFERENCE PO No. POA-JD01-00001 PROJECT: Los Pelambres
EMERSON ELECTRIC (US) HOLDING
SUPPLIER: REPORT DATE 5-ene-23
CORPORATION (CHILE) LIMITADA
SUPPLIER REP.: Eleonora Santeliz REPORT No. VDR-03691
SDN NO: 26148-323-YR305-JD01-03691
EPC: EPC3 CONTRACT NO: 26148-220-HC4-JD01-00305
START DATE SITE ARRIVAL
START TIME STOP TIME TOTAL HOURS
11-oct-20 DATE
07:00 19:00 12:00
(Travel to site begins) 3-ene-23
DESCRIPTION OF SUPPLIER REPRESENTATIVE WORK PERFORMED TODAY:
10:15MaximilianoMiguel Paredes 0586PP7542 ByPass en LALL LAL, Arranque-60%-40%-80%-100% -Detenida
10:30Maximiliano0586HIS43718 CMD Cerrada
Part A (Completed by RSE/RFE)

03:20Maximiliano0584HIS44154 Abierto-Cierre
04:00MaximilianoRevisar P&ID de SWRO TREN1 , revisar diferencias con las pantallas , export de pantallas para comenzar a
modificarlas
04:00MaximilianoRevisar P&ID de SWRO TREN2 , revisar diferencias con las pantallas , export de pantallas, Modificada
17:00MaximilianoMarcelo Oliva switch de presión PAH y PAHH45335 sin comunicación por estar el PLC desconectado
NON-MANUAL HOURS
ST OT
12:00 00:00
SPECIAL COMMENTS (Final Site
Revisado
departure date)
Billable Manual Support Hours: 12
Rework or Non-Billable Manual Support
0
Hours:
Reported by (Print Name): Miguel Zuñiga Date: 5-ene-23

BECHTEL RECORD OF SUPPLIER REPRESENTATIVE WORK PERFORMED TODAY


PART B (Completed by Supplier

SUPPLIER REPRESENTATIVE AND MANUAL CRAFT HOUR VERIFICATION


Representative)

MANUAL
ST OT
SPECIAL COMMENTS: (Delays, Hold
ups, Equipment issues, Non-Bechtel OK
work, etc.)
Billable TA Hours: 0
Rework or Non- Billable TA Hours: 0
Prepared by (Print Name): Omar Saint-Jean Carrasco Date: 5-ene-23

Originator: Maximiliano Vargas Date: 5-ene-23

SWPP 6301, Rev. 2 – Services of Supplier Representatives

Distribution:

Original – FCM

Bechtel Confidential
©Bechtel Corporation 2002, 2013. Contains information that is confidential and proprietary to Bechtel or its affiliates, clients or suppliers, and
may not be used, reproduced or disclosed without Bechtel's prior written permission. All rights reserved.
Copies – RFE or RSE, Construction or Startup, Field Project Controls

Bechtel Confidential
©Bechtel Corporation 2002, 2013. Contains information that is confidential and proprietary to Bechtel or its affiliates, clients or suppliers, and
may not be used, reproduced or disclosed without Bechtel's prior written permission. All rights reserved.

You might also like