You are on page 1of 59

DEPARTAMENTO DE INGENIERÍA

DE TRÁNSITO

DATA CONTROLADOR SIEMENS


MODELO ST-950

INTERSECCIÓN : Providencia - Seminario


Seminario - Rodolfo Vergara
COMUNA : Providencia
FECHA : 28 DE MARZO DE 2023

Semáforos Jorge Lavezzolo Valenzuela EIRL


Rivadavia 6556 – San Ramon – Santiago – Chile
Tel.: (56 -2) 2 525 0495
contacto@semaforoslavezzolo.cl
http://www.semaforoslavezzolo.cl/
Esquema del cruce
Nodo A

Nodo B

Diagrama de fases
Nodo a Nodo B
Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Administration

General Specifications

Customer Name UOCT - Providencia


Customer Order No.
Intersection/ PROVIDENCIA - SEMINARIO
General Description Controller/ J001161-J001162
SEMINARIO - Rodolfo Vergara Serial Number
S.T.S. /EM Number 001160 Issue 0

New Modification Equipment


Controller
Installation by
Area Specifications/
Customer Drawings Slot Cutting by

Specification Section Semaforos Lavezzolo EIRL


Civil Works by
Contract/Tender Ref:
Customer's Engineer
Quotation No.
Telephone Number
Works Order No. BS-ITS-044-1

Signal Company Use Only


(IF PROM Label as >) PROM Number 16260 PROM Variant 0
Signal Engineer
Configuration Check Value A 2A 65 B3
Controller Options

Hardware ST950 Firmware Type and Issue 46059 ISS 16 Other Options

ST950/ST900/ST750 Series Cabinet Options

Cabinet/Rack Rack Kit Type Options UK-Std Non-UK Small Non-UK

Cabinet/Rack Variant Automatic Cuckoo Options None Gemini Unit Fitted

Mains Supply 230 Volts 50 Hz Dimming None Answer Issue 29


Peak Lamp Current 5 Amps Low Inrush Edit Issue 26
Transformer
Average Lamp Power 50 Watts
Date Created 01/07/2021
Total Average Power 2000 Watts

Power feed fuse rating: requires 30 Amp minimum for controller, 15 Amp minimum for pelican/lightly loaded controller

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 1.1


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Phases, Stages and Streams

Phases, Stages and Streams

Add/Delete/Insert Streams:
Streams Phases

Current Total Number of Phases 10


Current Number of Streams 2
Number of Real Phases 10

Number of Dummy Phases 0

Stages Switched Signs

Current Number of stages


6 Number of Switched Signs 0
(inc. ALL-RED stages)

Action

Add At Delete At

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 1.2


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Facilities/Modes Enabled and Mode Priority Levels

Facilities
UTC Master TimeClock Lamp Monitoring ExtendAll Red Non-UK
Serial/Internal UTMC OTU Holiday Clock RED Lamp Monitoring Speed Measurement Fail to Part Time
Free-standing OTU FT To Current MAX Pelican/Puffin/Toucan Ripple Change Fail To Hardware Flashing
Linked Fixed Tim e Standalone Manual Last Lamp Failed Monitoring
Serial MOVA Download To Level 3

4 Starting Intergreen

Mode Priority Configuration Complexity


1 2 3 4 5 6 7 8 9 10 11 12 13
Low Medium High Maximum
Part Time
Emergency Vehicles
Hurry Call standard46059.8df
LRT
Default PROM data file
Priority Vehicle
Manual Control Correspondence Monitoring to inc.
Manual Step On
Reds Ambers
Selected FT or VA or CLF
UTC Switched Signs
MOVA Mode
CLF (Non-Base Time) Flash Rate (ms)
CLF (Base Tim e)
VehicleActuated 500 Off 500 On
Fixed Time

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 1.3


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Phases in Stages

Phases
A B C D E F G H I J

1
In Stages

4
5

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 1.4


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Stages in Streams

Stages in Streams
0 1 2 3 4 5 6 7
Phase or Stage to revert to in absence of 1 3 Note: For a Stand-Alone Stream, the
demands/extensions reversion must be to All Red stage or
Traffic stage/phasetomeet the relevant
Startup Stage 1 3 standard or specification.

Switch Off Stage 1 3

Standalone Pedestrian

Stages
0 1 2 3 4 5
In Stream

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 1.5


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Lamp Sequence(s)

Lamp Sequence(s)
Power Up From Part-Time to Normal
Colour Time Colour Time
To ROW To ROW
0 Lamp Sequence Id. Copy From
Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Lamp Sequence Title:
Peatonal 18 Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
Steady States Normal Sequence To Not at ROW To Not at ROW
Colour Colour Time
To ROW Step 1 Red 4 Step 1 Blank: Blackout or Not Used
ROW Green Step 1 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used

Not At ROW Red Step 2 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used

Part-Time Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Signals OFF to ON From Normal to Part-Time
To Not at ROW Colour Time Colour Time
To ROW From ROW
Sequence Type Step 1 FG: Flashing Green16
Pelican Vehicle Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Traffic Step 2 Blank: Blackout or Not Used
Pedestrian Pelican Ped Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used
Green Arrow Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
To Not at ROW From Not at ROW
Amber Control
Amber controlled by lamp seq - IS conflict monitored Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Flexible Lamp Sequencing
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
R,G Lamp Monitoring States

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.1 (1)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Lamp Sequence(s)

Lamp Sequence(s)
Power Up From Part-Time to Normal
Colour Time Colour Time
To ROW To ROW
1 Lamp Sequence Id. Copy From
Step 1 Blank: Blackout or Not Used Step 1 Blank: Blackout or Not Used
Lamp Sequence Title:
Flecha Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
Steady States Normal Sequence To Not at ROW To Not at ROW
Colour Colour Time
To ROW Step 1 Blank: Blackout or Not Used Step 1 Blank: Blackout or Not Used
ROW Green Step 1 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used

Not At ROW Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used

Part-Time Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Signals OFF to ON From Normal to Part-Time
To Not at ROW Colour Time Colour Time
To ROW From ROW
Sequence Type Step 1 FG: Flashing Green3
Pelican Vehicle Step 1 Blank: Blackout or Not Used Step 1 Blank: Blackout or Not Used
Traffic Step 2 Blank: Blackout or Not Used
Pedestrian Pelican Ped Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used
Green Arrow Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
To Not at ROW From Not at ROW
Amber Control
Amber controlled by lamp seq - NOT conflict monitored Step 1 Blank: Blackout or Not Used Step 1 Blank: Blackout or Not Used
Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Flexible Lamp Sequencing
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
G Lamp Monitoring States

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.1 (2)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Lamp Sequence(s)

Lamp Sequence(s)
Power Up From Part-Time to Normal
Colour Time Colour Time
To ROW To ROW
2 Lamp Sequence Id. Copy From
Step 1 Amber 3 Step 1 Blank: Blackout or Not Used
Lamp Sequence Title:
Vehicular Ppal Step 2 Red 1 Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
Steady States Normal Sequence To Not at ROW To Not at ROW
Colour Colour Time
To ROW Step 1 Amber 3 Step 1 Blank: Blackout or Not Used
ROW Green Step 1 Blank: Blackout or Not Used Step 2 Red 1 Step 2 Blank: Blackout or Not Used

Not At ROW Red Step 2 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used

Part-Time Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Signals OFF to ON From Normal to Part-Time
To Not at ROW Colour Time Colour Time
To ROW From ROW
Sequence Type Step 1 Amber 3
Pelican Vehicle Step 1 Amber 3 Step 1 Blank: Blackout or Not Used
Traffic Step 2 Red 2
Pedestrian Pelican Ped Step 2 Red 1 Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used
Green Arrow Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
To Not at ROW From Not at ROW
Amber Control
Amber controlled by lamp seq - IS conflict monitored Step 1 Amber 3 Step 1 Blank: Blackout or Not Used
Step 2 Red 1 Step 2 Blank: Blackout or Not Used
Flexible Lamp Sequencing
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
R,G,A Lamp Monitoring States

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.1 (3)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Lamp Sequence(s)

Lamp Sequence(s)
Power Up From Part-Time to Normal
Colour Time Colour Time
To ROW To ROW
3 Lamp Sequence Id. Copy From
Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Lamp Sequence Title:
Vehicular Secundario Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
Steady States Normal Sequence To Not at ROW To Not at ROW
Colour Colour Time
To ROW Step 1 Red 4 Step 1 Blank: Blackout or Not Used
ROW Green Step 1 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used

Not At ROW Red Step 2 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used

Part-Time Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Signals OFF to ON From Normal to Part-Time
To Not at ROW Colour Time Colour Time
To ROW From ROW
Sequence Type Step 1 Amber 3
Pelican Vehicle Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Traffic Step 2 Red 2
Pedestrian Pelican Ped Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used
Green Arrow Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
To Not at ROW From Not at ROW
Amber Control
Amber controlled by lamp seq - IS conflict monitored Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Flexible Lamp Sequencing
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
R,G,A Lamp Monitoring States

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.1 (4)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Lamp Sequence(s)

Lamp Sequence(s)
Power Up From Part-Time to Normal
Colour Time Colour Time
To ROW To ROW
4 Lamp Sequence Id. Copy From
Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Lamp Sequence Title:
Peatonal 17 Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
Steady States Normal Sequence To Not at ROW To Not at ROW
Colour Colour Time
To ROW Step 1 Red 4 Step 1 Blank: Blackout or Not Used
ROW Green Step 1 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used

Not At ROW Red Step 2 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used

Part-Time Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Signals OFF to ON From Normal to Part-Time
To Not at ROW Colour Time Colour Time
To ROW From ROW
Sequence Type Step 1 FG: Flashing Green15
Pelican Vehicle Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Traffic Step 2 Blank: Blackout or Not Used
Pedestrian Pelican Ped Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used
Green Arrow Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
To Not at ROW From Not at ROW
Amber Control
Amber controlled by lamp seq - NOT conflict monitored Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Flexible Lamp Sequencing
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
R,G Lamp Monitoring States

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.1 (5)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Lamp Sequence(s)

Lamp Sequence(s)
Power Up From Part-Time to Normal
Colour Time Colour Time
To ROW To ROW
5 Lamp Sequence Id. Copy From
Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Lamp Sequence Title:
Peatonal 22 Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
Steady States Normal Sequence To Not at ROW To Not at ROW
Colour Colour Time
To ROW Step 1 Red 4 Step 1 Blank: Blackout or Not Used
ROW Green Step 1 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used

Not At ROW Red Step 2 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used

Part-Time Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Signals OFF to ON From Normal to Part-Time
To Not at ROW Colour Time Colour Time
To ROW From ROW
Sequence Type Step 1 FG: Flashing Green20
Pelican Vehicle Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Traffic Step 2 Blank: Blackout or Not Used
Pedestrian Pelican Ped Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used
Green Arrow Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
To Not at ROW From Not at ROW
Amber Control
Amber as Wait Indicator - NOT conflict monitored Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Flexible Lamp Sequencing
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
R,G Lamp Monitoring States

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.1 (6)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Lamp Sequence(s)

Lamp Sequence(s)
Power Up From Part-Time to Normal
Colour Time Colour Time
To ROW To ROW
6 Lamp Sequence Id. Copy From
Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Lamp Sequence Title:
peatonal 11 Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
Steady States Normal Sequence To Not at ROW To Not at ROW
Colour Colour Time
To ROW Step 1 Red 4 Step 1 Blank: Blackout or Not Used
ROW Green Step 1 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used

Not At ROW Red Step 2 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used

Part-Time Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Signals OFF to ON From Normal to Part-Time
To Not at ROW Colour Time Colour Time
To ROW From ROW
Sequence Type Step 1 FG: Flashing Green10
Pelican Vehicle Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Traffic Step 2 Blank: Blackout or Not Used
Pedestrian Pelican Ped Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used
Green Arrow Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
To Not at ROW From Not at ROW
Amber Control
Amber as Wait Indicator - NOT conflict monitored Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Flexible Lamp Sequencing
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
R,G Lamp Monitoring States

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.1 (7)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Lamp Sequence(s)

Lamp Sequence(s)
Power Up From Part-Time to Normal
Colour Time Colour Time
To ROW To ROW
7 Lamp Sequence Id. Copy From
Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Lamp Sequence Title:
Vehicular Secundario 2 Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
Steady States Normal Sequence To Not at ROW To Not at ROW
Colour Colour Time
To ROW Step 1 Red 4 Step 1 Blank: Blackout or Not Used
ROW Green Step 1 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used

Not At ROW Red Step 2 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used

Part-Time Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used Signals OFF to ON From Normal to Part-Time
To Not at ROW Colour Time Colour Time
To ROW From ROW
Sequence Type Step 1 Amber 3
Pelican Vehicle Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Traffic Step 2 Red 1
Pedestrian Pelican Ped Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Step 3 Blank: Blackout or Not Used
Green Arrow Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
To Not at ROW From Not at ROW
Amber Control
Amber controlled by lamp seq - IS conflict monitored Step 1 Red 4 Step 1 Blank: Blackout or Not Used
Step 2 Blank: Blackout or Not Used Step 2 Blank: Blackout or Not Used
Flexible Lamp Sequencing
Step 3 Blank: Blackout or Not Used Step 3 Blank: Blackout or Not Used
R,G,A Lamp Monitoring States

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.1 (8)


Works Order :
EM Number : 00002
Engineer :
Intersection : Oñederra - Portales

Phase Type and Conditions

Phase Type and Conditions


Phases A to P Improved GA Appearance

App. Term. Assoc.


Phase Title Type Type Type Phase
A Vehicular providencia O-P 2 - Vehic ular principal 0 0 - End of stage
B Vehicular providencia P -O 2 - Vehic ular principal 0 0 - End of stage
C Vehicular seminario S-N nodo 1 3 - vehicular Secundario 0 0 - End of stage
D Giro Vehicular S-P 1 - flecha 0 0 - End of stage
E Peat. Que cruza Seminario Sur Nodo 1 5 - peatonal 22 0 0 - End of stage
F Peat. Que cruza providencia Oriente 4 - peatonal 17 0 0 - End of stage
G Vehicular Seminario S-N nodo 2 2 - Vehic ular principal 0 0 - End of stage
H Vevicular Rodolfo Vergara O-P 7 - peatonal secundario 2 0 0 - End of stage
I Peat. Que cruza Seminario Sur Nodo 2 0 - Peatonal 18 0 0 - End of stage
J Peat. Que cruza Rodolfo VergaraOriente 6 - peatonal 11 0 0 - End of stage

1) App Types: 0 = Always Appears, 1 = Appears if dem'd prior to interstage, 2 = If dem'd, 3 = If dem'd before end of window time
2) Term Types: 0 = Term's at end of stage, 1 = Term's when Assoc phase gains R.O.W,2 = Term's when Assoc phase loses R.O.W.
3) The H/W Fail Flash fields are for information only on all but ST900 ELV and ST950 ELV Controllers. For other controllers, physical switches or links (etc.), select which aspects flash; these need to be set up manually.

Last Modified 31/03/2023, Issue 0.15.7 Form Ref: 2.2


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Opposing and Conflicting Phases

Select Stream(s) To Configure


Initialise
All 0 1

Amber Conflict Monitoring

To Phase
A B C D E F G H I J

A Co Co Co
B Co Co Co
C Co Co Co
D
From Phase

Co Co Co
E Co Co
F Co Co
G Co Co
H Co Co
I Co
J Co

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.3


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Phase Minimums, Maximums, Extensions, Ped Leaving Periods

Phase Minimums, Maximums, Extensions, Ped Leaving Periods

Phases Ato P

Phase Min Green Min Ped Clr Extensions Maximums


A B C D E F G H Pre-timed
A 5 0 0.0 0 0 0 0 0 0 0 0
B 5 0 0.0 0 0 0 0 0 0 0 0
C 5 0 0.0 0 0 0 0 0 0 0 0
D 5 0 0.0 0 0 0 0 0 0 0 0
E 5 0 0.0 0 0 0 0 0 0 0 0
F 5 0 0.0 0 0 0 0 0 0 0 0
G 5 0 0.0 0 0 0 0 0 0 0 0
H 5 0 0.0 0 0 0 0 0 0 0 0
I 5 0 0.0 0 0 0 0 0 0 0 0
J 5 0 0.0 0 0 0 0 0 0 0 0

Note: For Standalone Streams see Help for use of Max Sets.

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.4.1


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Phase Starting and Leaving Periods

Phase Starting and Leaving Periods


Phases A to P
Phase Starting period Leaving periods
A B C D E F G H
A 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

B 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

C 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

D 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

E 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

F 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

G 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

H 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

I 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

J 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.4.2


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Phase Intergreen Times

Select Stream(s) To Configure


All 0 1

Note: On a Stand Alone Pelican/Toucan/Puffin Stream the Intergreens between Pedestrian and Traffic Phases are controlled by the timings (PBT, PIT, CMX, CDY, CRD and PAR), therefore 0
should be entered for the appropriate intergreen times in grid below.

To Phase
A B C D E F G H I J
A 5 5 5
B 5 5 5
C 5 5 5
From Phase

D 5 5 5
E 22 22
F 17 17
G 5 5
H 4 4
I 18
J 11

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.4.3


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Intergreen Handset Limits

HIGH 0 Copy Intergreen Values

To Phase
A B C D E F G H I J
A 5 5 5
B 5 5 5
C 5 5 5
From Phase

D 5 5 5
E 22 22
F 17 17
G 5 5
H 4 4
I 18
J 11

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.4.4


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Phase Timing Handset Ranges

Phase Timing Handset Ranges

Initialise Min Green Limits

Phase Min. Green Phase Min. Green Max. Green


Min. Max. Min. Max. Min. Max.
0 255
A 3 255 Q
B 3 255 R Vehicle Extension
C 3 255 S Min. 0.0 Max. 10.0
D 3 255 T
Phase Delay
E 3 255 U
Min. 2 Max. 10
F 3 255 V
Starting I/G
G 3 255 W
Min. 4 Max. 12
H 3 255 X
I 3 255 Y Min Pedestrian Clearance (PBT)
J 3 255 Z Min. 0 Max. 12
K A2
Traffic Phase Leaving
L B2
Min. 3.0 Max. 3.0
M C2
N D2 Traffic Phase Red/Amber
O E2
Min. 2 Max. 2
P F2

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.4.5


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

VA Demand and Extend Definitions

VA Demand and Extend Definitions


Demands Phases A to P

Phase For Unlatched demands precede the name with a #. Extensions


Conditioning MUST be used to specify unlatched demands.
A
B
C
D
E
F
G
H DV
I
J DP

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.5


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Phase Internal/Revertive Demands

Phase Internal/Revertive Demands


Start-up Vehicle Responsive Demands

A B C D E F G H I J

Demands Inserted When Leaving Manual and Fixed Time Modes

A B C D E F G H I J

Unlatched Demands that Start Max Tim ers

A B C D E F G H I J

Revertive Phase Demands

A B C D E F G H I J K L M N O P

Q R S T U V W X Y Z A2 B2 C2 D2 E2 F2

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 2.6


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Stage Internal Demands/Pedestrian Window Times

Stage Internal Demands/Pedestrian Window Times


Start-up Vehicle Responsive Demands

0 1 2 3 4 5

Demands Inserted When Leaving Manual and Fixed Time Modes

0 1 2 3 4 5

Unlatched Demands that Start Maximum Timers

0 1 2 3 4 5

Window Times

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0 0 0 0 0 0

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Exceptional Stages
0 1 2 3 4 5

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 3.2


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Phase Delays

Phase Delays

Phase Delays 0-29 Phase Delays 30-59 Phase Delays 60-89 Phase Delays 90-119

No. Delay On Change To By (X) No. Delay On Change To By (X)


Phase from Stage Stage Seconds Phase from Stage Stage Seconds
0 A 1 2 17 15 0
1 A 1 0 17 16 0
2 B 1 2 17 17 0
3 B 1 0 17 18 0
4 C 2 1 12 19 0
5 C 2 0 12 20 0
6 G 3 5 13 21 0
7 G 3 4 13 22 0
8 H 4 5 7 23 0
9 H 4 3 7 24 0
10 0 25 0
11 0 26 0
12 0 27 0
13 0 28 0
14 0 29 0

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 3.3 (1)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Fixed Time

Fixed Time
Stage Moves & Times (Not FixedTime to Current Max)
Note:
Current Stage 0 1 2 3 4 5 6 7 Fixed Time mode may be usedby the Reserve State, therefore,
Next Stage 1 2 0 4 5 3 the Stage Moves and Times section should always be configured
(unless Linked Fixed Time si selected ni stead).
Time 1 75 19 68 19 1

Current Stage 8 9 10 11 12 13 14 15
Next Stage

Time

Current Stage 16 17 18 19 20 21 22 23
Next Stage

Time

Current Stage 24 25 26 27 28 29 30 31
Next Stage

Time

Phases Demanded and Extended under Fixed TimetoCurrent Max.

A B C D E F G H I J K L M N O P
Demand
Extend
Q R S T U V W X Y Z A2 B2 C2 D2 E2 F2
Demand
Extend

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.1


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

CLF - Plan(s)

CLF - Plan(s)
Group/Influence CLF Influences
1 Plan No.
Group Group Group Related Group Group Group Related
No. Offset Influence Stage No. Offset Influence Stage 0 - Go To VA
Copy From
0 111 1 1 16 1 - Immediate
Plan Specifics
1 17 Move
73 1 2
0 Influence Set 2 18 2 - Demand
Dependent Move
Copy From 3 78 1 3 19
3 - Hold
4 40 3 3 20
Entry Point 255 4 - Prevent Except
5 41 2 4 21
(secs) To
Exit Point 255 6 22
(secs) 5 - Add Immediate
7 23 Move
Cycle Time 120
(secs) 8 24 6 - Add Demand
9 25 Dependent Move
Slow 10 26 7 - Ignore
Fast 11 27 8 - Stand Alone
Inhibited
12 28
Group Offset 9 - Stand Alone
Handset Range 13 29
Ped Allowed
Min. 0 14 30

Max. 255 15 31

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.2.1 (1)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

CLF - Plan(s)

CLF - Plan(s)
Group/Influence CLF Influences
2 Plan No.
Group Group Group Related Group Group Group Related
No. Offset Influence Stage No. Offset Influence Stage 0 - Go To VA
Copy From
0 31 1 1 16 1 - Immediate
Plan Specifics
1 17 Move
104 1 2
0 Influence Set 2 18 2 - Demand
Dependent Move
Copy From 3 109 1 3 19
3 - Hold
4 62 3 3 20
Entry Point 255 4 - Prevent Except
5 63 2 4 21
(secs) To
Exit Point 255 6 22
(secs) 5 - Add Immediate
7 23 Move
Cycle Time 120
(secs) 8 24 6 - Add Demand
9 25 Dependent Move
Slow 10 26 7 - Ignore
Fast 11 27 8 - Stand Alone
Inhibited
12 28
Group Offset 9 - Stand Alone
Handset Range 13 29
Ped Allowed
Min. 0 14 30

Max. 255 15 31

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.2.1 (2)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

CLF - Plan(s)

CLF - Plan(s)
Group/Influence CLF Influences
3 Plan No.
Group Group Group Related Group Group Group Related
No. Offset Influence Stage No. Offset Influence Stage 0 - Go To VA
Copy From
0 76 1 1 16 1 - Immediate
Plan Specifics
1 17 Move
43 1 2
0 Influence Set 2 18 2 - Demand
Dependent Move
Copy From 3 48 1 3 19
3 - Hold
4 13 3 3 20
Entry Point 255 4 - Prevent Except
5 14 2 4 21
(secs) To
Exit Point 255 6 22
(secs) 5 - Add Immediate
7 23 Move
Cycle Time 110
(secs) 8 24 6 - Add Demand
9 25 Dependent Move
Slow 10 26 7 - Ignore
Fast 11 27 8 - Stand Alone
Inhibited
12 28
Group Offset 9 - Stand Alone
Handset Range 13 29
Ped Allowed
Min. 0 14 30

Max. 255 15 31

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.2.1 (3)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

CLF - Plan(s)

CLF - Plan(s)
Group/Influence CLF Influences
4 Plan No.
Group Group Group Related Group Group Group Related
No. Offset Influence Stage No. Offset Influence Stage 0 - Go To VA
Copy From
0 36 1 1 16 1 - Immediate
Plan Specifics
1 17 Move
96 1 2
0 Influence Set 2 18 2 - Demand
Dependent Move
Copy From 3 1 1 3 19
3 - Hold
4 61 3 3 20
Entry Point 255 4 - Prevent Except
5 62 2 4 21
(secs) To
Exit Point 255 6 22
(secs) 5 - Add Immediate
7 23 Move
Cycle Time 100
(secs) 8 24 6 - Add Demand
9 25 Dependent Move
Slow 10 26 7 - Ignore
Fast 11 27 8 - Stand Alone
Inhibited
12 28
Group Offset 9 - Stand Alone
Handset Range 13 29
Ped Allowed
Min. 0 14 30

Max. 255 15 31

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.2.1 (4)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

CLF - Plan(s)

CLF - Plan(s)
Group/Influence CLF Influences
5 Plan No.
Group Group Group Related Group Group Group Related
No. Offset Influence Stage No. Offset Influence Stage 0 - Go To VA
Copy From
0 46 1 1 16 1 - Immediate
Plan Specifics
1 17 Move
14 1 2
0 Influence Set 2 18 2 - Demand
Dependent Move
Copy From 3 19 1 3 19
3 - Hold
4 74 3 3 20
Entry Point 255 4 - Prevent Except
5 75 2 4 21
(secs) To
Exit Point 255 6 22
(secs) 5 - Add Immediate
7 23 Move
Cycle Time 90
(secs) 8 24 6 - Add Demand
9 25 Dependent Move
Slow 10 26 7 - Ignore
Fast 11 27 8 - Stand Alone
Inhibited
12 28
Group Offset 9 - Stand Alone
Handset Range 13 29
Ped Allowed
Min. 0 14 30

Max. 255 15 31

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.2.1 (5)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

CLF - Plan(s)

CLF - Plan(s)
Group/Influence CLF Influences
6 Plan No.
Group Group Group Related Group Group Group Related
No. Offset Influence Stage No. Offset Influence Stage 0 - Go To VA
Copy From
0 91 1 1 16 1 - Immediate
Plan Specifics
1 17 Move
53 1 2
0 Influence Set 2 18 2 - Demand
Dependent Move
Copy From 3 58 1 3 19
3 - Hold
4 20 3 3 20
Entry Point 255 4 - Prevent Except
5 21 2 4 21
(secs) To
Exit Point 255 6 22
(secs) 5 - Add Immediate
7 23 Move
Cycle Time 120
(secs) 8 24 6 - Add Demand
9 25 Dependent Move
Slow 10 26 7 - Ignore
Fast 11 27 8 - Stand Alone
Inhibited
12 28
Group Offset 9 - Stand Alone
Handset Range 13 29
Ped Allowed
Min. 0 14 30

Max. 255 15 31

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.2.1 (6)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

CLF - Plan(s)

CLF - Plan(s)
Group/Influence CLF Influences
7 Plan No.
Group Group Group Related Group Group Group Related
No. Offset Influence Stage No. Offset Influence Stage 0 - Go To VA
Copy From
0 116 1 1 16 1 - Immediate
Plan Specifics
1 17 Move
78 1 2
0 Influence Set 2 18 2 - Demand
Dependent Move
Copy From 3 83 1 3 19
3 - Hold
4 45 3 3 20
Entry Point 255 4 - Prevent Except
5 46 2 4 21
(secs) To
Exit Point 255 6 22
(secs) 5 - Add Immediate
7 23 Move
Cycle Time 120
(secs) 8 24 6 - Add Demand
9 25 Dependent Move
Slow 10 26 7 - Ignore
Fast 11 27 8 - Stand Alone
Inhibited
12 28
Group Offset 9 - Stand Alone
Handset Range 13 29
Ped Allowed
Min. 0 14 30

Max. 255 15 31

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.2.1 (7)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

CLF - Demand Dependent Moves

Clear Grid Data Notes:


If no data is entered for a stage then a demand for any phases in that stage wil be considered. The data specified on this screen wil also change the
screen CLF - Demands to Consider with Demand Dependent Stage Moves.

Phases
A B C D E F G H I J
0

1
Stages

3
4
5

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.2.2


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

UTC General Data

UTC General Data


Type of UTC

106 316

Integral OTU Address

2 Number of Control Words

2 Number of Reply Words

Controller to respond to TC bit.

Introduction of UTC to be disabled by Priority and LRT Modes

Non UTC RTC synchronisation input name

RTC Synchronisation Times

Clock Synchronise Time ( UTC TS input )


Day Time
Time Only 12:00:00

Clock Confirm Time ( UTC RT output )


Day Time

Time Only 12:00:01

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.3.1


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

UTC Control and Reply Data Format

UTC Control and Reply Data Format


Bit 1 Bit 2 Bit 3 Bit 4 Bit 5 Bit 6 Bit 7 Bit 8
Control Words
Word 1 F1 F2 F3 #F4 D4
Word 2 TS
Word 3
Word 4
Reply Words
Word 1 G1 G2 G3 G4 SD4
Word 2 RR DF CF RT
Word 3
Word 4
Word 5
Word 6
Word 7
Word 8
Word 9
Word 10
Word 11
Word 12
Word 13
Word 14

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.3.2


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

UTC Phase Demand and Extend Definitions

UTC Demand and Extend Definitions


Phases A to P
Demands
Phase For Unlatched demands, preceed the name with a #. Extensions
Conditioning MUST be used to specify unlatched demands.
A
B
C
D
E
F
G
H D4
I
J D4

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.3.3.1


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

UTC Stage and Mode Data Definitions

UTC Stage and Mode Data Definitions

Mode Data Definitions


Green Demand Green Demand
Stage Force Bit Confirm Bit Confirm Bit Stage Force Bit Confirm Bit Confirm Bit Manual Mode Operative:
G1/G2 RR
0 16
1 F1 G1 17
Manual Mode Selected:
2 F2 G2 18 G1/G2 RR
3 F3 G3 19 No Lamp Power, or Lamps Off due to RLM or Part
4 20 Time:
#F4 G4 SD4
G1/G2
5 21
6 22 Detector Fault:
7 23 DF
8 24 Normal NOT selected on the
Manual Panel:
9 25
G1/G2 RR
10 26
11 27 RR Button Selected:
12 28 G1/G2 RR

13 29
If UTC Reply Confirms are required for a Controller
14 30 Fault (CF) OR for separate MC and RR replies,
Conditioning must be used.
15 31

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.3.3.2


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

UTC Demand Dependent Forces

Clear Grid Data Notes:


If no data is entered for a stage then a demand for any phases in that stage wil be considered. The data specified on this screen wil also change the
screen CLF - Demands to Consider with Demand Dependent Stage Moves.

Phases
A B C D E F G H I J
0

1
Stages

3
4
5

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.3.3.3


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

UTC and MOVA Detectors

UTC and MOVA Detectors


Detector Mapping Set Selection

1 N001172J1 2 N001172B1 3 N001161F1 4 N001161B1 5 N001161C1 6 N001161F2 7 N001161G1 8 EC1

9 EC2 10 EC3 11 12 13 14 15 16

17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32

33 34 35 36 37 38 39 40

41 42 43 44 45 46 47 48

49 50 51 52 53 54 55 56

57 58 59 60 61 62 63 64

Note - only 32 detectors available on MOVA 4.0

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.3.4 (1)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

MTC - Time Switch Parameters

MTC - Time Switch Parameters

Type Event Type Event


0 No Action 16 No Action

1 No Action 17 No Action

2 No Action 18 No Action

3 No Action 19 No Action

4 No Action 20 No Action

5 No Action 21 No Action

6 No Action 22 No Action

7 No Action 23 No Action

8 No Action 24 No Action

9 No Action 25 No Action

10 No Action 26 No Action

11 No Action 27 No Action

12 No Action 28 No Action

13 No Action 29 No Action

14 No Action 30 No Action

15 No Action 31 No Action

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.4.1


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

MTC - Day Type

MTC - Day Type

No. Mon Tue Wed Thu Fri Sat Sun

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.4.3


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

MTC - Timetable

MTC - Timetable
View Timetable Settings
0 - 15 16 - 31 32 - 47 48 - 63

No. Day Time Description Function Plan/


Type Code Parameter
0 0 00:01:00 Plan 5 1 5 Function Codes:

1 1 07:00:00 Plan 1 1 1 0 = Isolate From CLF

2 1 07:30:00 Plan 6 (28 de Sistema) 1 6 1 = Introduce a CLF Plan


3 1 09:15:00 Plan 7 (29 de Sistema) 1 7 2 = Introduce a Parameter
4 1 09:45:00 Plan 6 (28 de Sistema) 1 6 (Combination of event switches)

5 1 10:00:00 Plan 3 1 3 3 = Selects an Individual event


switch to be set
6 1 17:00:00 Plan 2 1 2
4 = Selects an Individual event
7 1 21:00:00 Plan 4 1 4 switch to be cleared.
8 1 22:00:00 Plan 5 1 5
9 4 09:00:00 Plan 4 1 4
10 4 11:00:00 Plan 3 1 3
11 4 14:00:00 Plan 4 1 4
12 4 22:00:00 Plan 5 1 5
13 5 10:00:00 Plan 4 1 4
14 5 21:00:00 Plan 5 1 5
15 0 0 0

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.4.4 (1)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Holiday Clock - Special Days

Holiday Clock - Special Days


0 - 15 16 - 31 32 - 47 48 - 63
Day Day Day Day
No. Date No. Date No. Date No. Date
Type Type Type Type
0 01/01/xxxx 5 16 15/04/2022 5 32 18/04/2025 5 48 26/06/2028 5
1 02/04/2021 5 17 16/04/2022 5 33 19/04/2025 5 49 09/10/2028 5
2 03/04/2021 5 18 27/06/2022 5 34 29/06/2025 5 50 27/10/2028 5
3 01/05/xxxx 5 19 10/10/2022 5 35 12/10/2025 5 51 30/03/2029 5
4 21/05/xxxx 5 20 31/10/2022 5 36 31/10/2025 5 52 31/03/2029 5
5 21/06/xxxx 5 21 07/04/2023 5 37 03/04/2026 5 53 02/07/2029 5
6 28/06/2021 5 22 08/04/2023 5 38 04/04/2026 5 54 17/09/2029 5
7 16/07/xxxx 5 23 26/06/2023 5 39 29/06/2026 5 55 15/10/2029 5
8 15/08/xxxx 5 24 09/10/2023 5 40 12/10/2026 5 56 02/11/2029 5
9 18/09/xxxx 5 25 27/10/2023 5 41 31/10/2026 5 57 19/04/2030 5
10 19/09/xxxx 5 26 29/04/2024 5 42 26/03/2027 5 58 20/04/2030 5
11 11/10/2021 5 27 30/04/2024 5 43 27/03/2027 5 59 29/06/2030 5
12 31/10/2021 5 28 29/06/2024 5 44 28/06/2027 5 60 20/09/2030 5
13 01/11/xxxx 5 29 20/09/2024 5 45 11/10/2027 5 61 12/10/2030 5

14 08/12/xxxx 5 30 12/10/2024 5 46 31/10/2027 5 62 31/10/2030 5

15 25/12/xxxx 5 31 31/10/2024 5 47 14/04/2028 5 63 255

Note 1 - Date format = dd/mm/yyyy Note 2 - As 0 is a valid day type, 255 has been used as the day type default.

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.4.5


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Holiday Clock - Special Holiday Periods

Holiday Clock - Special Holiday Periods


0 - 15 16 - 31
No. Start Date End Date No. Start Date End Date
0 16

1 17

2 18

3 19

4 20

5 21

6 22

7 23

8 24

9 25

10 26

11 27

12 28

13 29

14 30

15 31

Note - Date format = dd/mm/yyyy

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.4.6


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Manual Panel

Manual Panel
Stage Buttons and LEDs
Button Title Called Stage for Stream
No. 0 1 2 3 4 5 6 7
0 Todo Rojo 0 5
1 Fase 1 1 3
2 Fase 2 2 4
3

General LEDs Manual Mode Enable


AUX 1 AUX 2 AUX 3 AUX 4 AUX 5 Always NOTE:
(Hurry Call) (Higher Priority) For this to operate Special
Conditioned When Handset Plugged in (Note 1) Conditioning is required.
General Buttons Manual Signals On When 'MND' Command Entered
None SW1 SW2 SW3
Momentary Immediate Signals On
Mode Select Switches Disabled
Dim Override As Start-Up
VA Fixed Time CLF
RR

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.5.1


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Reserve State

Reserve State

Stream 0 1 2 3 4 5 6 7
Entry
Go to Switch
Off Stage
Timeout Part Time on App Global Settings
(seconds) Failure or Timeout
Use Defaults
Limited Time

Timeout Fixed Time


(seconds) Part Time
Hold Stage Timeouts

After Timeout 0 = Use Firmware default


Fixed Time
Part Time
Hold Stage

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 4.6


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Special Conditioning

NOT (MANSEL)=RR ;Invertir estado logico del indicador Panel Policial activado mediante BIT MC
NOT(FLAFLF)=CF ; Inhibe fallos en CF como UTC y GPS
UTCFOP=MIL22 ; Habilita AUX 3 en panel como indicador UTC
OMURUN=TRUE ; Fuerza comunnicacion UTC con sistemas inalambricos

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 5.1


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Fault Log Flags

Fault Log Flags

Note:
Fault Cond Act Fault Cond Act Fault Cond Act Fault Cond Act Cond Flag -
No Flag Flag No Flag Flag No Flag Flag No Flag Flag If a fault occurs which sets a fault
0 16 32 48 log flag that has been checked
for this Cond flag option then a
1 17 33 49 flag wil be set that can be read in
Conditioning.
2 18 34 50
3 19 35 51
4 20 36 52 Act Flag -
If a fault occurs which sets a fault
5 21 37 53 log flag that has been checked for
this Act flag option then firstly the
6 22 38 54
lamps
7 23 39 55
wil be switched OFF and secondly
8 24 40 56 a flag wil be set that can be read in
conditioning, to allow any further
9 25 41 57 actions required to be performed by
10 26 42 58 conditioning.

11 27 43 59
12 28 44 60
13 29 45 61
14 30 46 62
Clearance of Special Conditioning Faults
15 31 47 63

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 5.3


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Special Instructions

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 6


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Inputs and Outputs

Inputs and Outputs


Port Number & Type Card Type & Address
Enable Signal Required Inputs Outputs
Check boxes Serial IO 24/4
Port: 0 CardAddress: 1
ManualAllocation Inputs & Outputs

DET Bit Type Name Req'd BP Count Inv U/D Misc DFM DFM Ext Used By Term Line
No No I or O Group time Phs UTC SDE Pri HC CC IG UD LRT Block No

0 0 I N001172J1 N 0.0 1I/O1 I-0

1 1 I N001172B1 N 0.0 1I/O1 I-1

2 2 I N001161F1 N 0.0 1I/O1 I-2

3 3 I N001161B1 N 0.0 1I/O1 I-3

4 4 I N001161C1 N 0.0 1I/O1 I-4

5 5 I N001161F2 N 0.0 1I/O1 I-5

6 6 I N001161G1 N 0.0 1I/O1 I-6

7 7 I EC1 N 0.0 1I/O1 I-7

Add Delete Move Clear Used By Move to/from backplane

Manual Map Optimisation

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 7.2 (1)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Inputs and Outputs

Inputs and Outputs


Port Number & Type Card Type & Address
Enable Signal Required Inputs Outputs
Check boxes Serial IO 24/4
Port: 1 CardAddress: 1
ManualAllocation Inputs & Outputs

DET Bit Type Name Req'd BP Count Inv U/D Misc DFM DFM Ext Used By Term Line
No No I or O Group time Phs UTC SDE Pri HC CC IG UD LRT Block No

8 0 I EC2 N 0.0 1I/O1 I-8

9 1 I EC3 N 0.0 1I/O1 I-9

10 2 I DV Y 0 0.0 1I/O1 I-10

11 3 I DP Y 0 0.0 1I/O1 I-11

12 4 I 1I/O1 I-12

13 5 I 1I/O1 I-13

14 6 I 1I/O1 I-14

15 7 I 1I/O1 I-15

Add Delete Move Clear Used By Move to/from backplane

Manual Map Optimisation

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 7.2 (2)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

Aspect Drives

Aspect Drives

A-L M-X Y-F2

Phase Driver Card 1 Phase Driver Card 1 Phase Driver Card 2

Used For Term Term Used For Term Term Used For Term Term
Block No Block No Block No

A - Red Phase 1TBA 1 E - Red Phase 1TBB 1 I - Red Phase 1TBC 1

A - Amber Phase 1TBA 2 E - Amber Phase 1TBB 2 I - Amber Phase 1TBC 2

A - Green Phase 1TBA 3 E - Green Phase 1TBB 3 I - Green Phase 1TBC 3

B - Red Phase 1TBA 4 F - Red Phase 1TBB 4 J - Red Phase 1TBC 4

B - Amber Phase 1TBA 5 F - Amber Phase 1TBB 5 J - Amber Phase 1TBC 5

B - Green Phase 1TBA 6 F - Green Phase 1TBB 6 J - Green Phase 1TBC 6

C - Red Phase 1TBA 7 G - Red Phase 1TBB 7 K - Red

C - Amber Phase 1TBA 8 G - Amber Phase 1TBB 8 K - Amber

C - Green Phase 1TBA 9 G - Green Phase 1TBB 9 K - Green

D - Red Phase 1TBA 10 H - Red Phase 1TBB 10 L - Red

D - Amber Phase 1TBA 11 H - Amber Phase 1TBB 11 L - Amber

D - Green Phase 1TBA 12 H - Green Phase 1TBB 12 L - Green

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 7.3 (1)


Works Order : BS-ITS-044-1
EM Number : 001160
Engineer :
Intersection : PROVIDENCIA - SEMINARIO SEMINARIO - Rodolfo Vergara

I/O - DFM Group Timings

I/O - DFM Group Timings


Handset Limiting Values
Input Group State SET A SET B SET C SET D
State Min Max
Group 0 Active (Mins) 30 30 30 30
Active (Mins) 0 254
InActive (Hrs) 18 18 18 18
InActive (Hrs) 0 254
Group 1 Active (Mins) 30 30 30 30

InActive (Hrs) 18 18 18 18

Group 2 Active (Mins) 30 30 30 30

InActive (Hrs) 18 18 18 18

Group 3 Active (Mins) 30 30 30 30

InActive (Hrs) 18 18 18 18

Group 4 Active (Mins) 30 30 30 30

InActive (Hrs) 18 18 18 18

Group 5 Active (Mins) 30 30 30 30

InActive (Hrs) 18 18 18 18

Group 6 Active (Mins) 30 30 30 30

InActive (Hrs) 18 18 18 18

Group 7 Active (Mins) 30 30 30 30

InActive (Hrs) 18 18 18 18

Note - 255 or blank disables DFM monitoring of that state (active or inactive) during that timeset (A to D)

Last Modified 30/03/2023, Issue 0.29.26 Form Ref: 7.4


Index
1 General Junction Data
1.1 Administration
1.2 Phases, Stages and Streams
1.3 Facilities/Modes Enabled and Mode Priority Levels
1.4 Phases in Stages
1.5 Stages in Streams
2 Phases
2.1 Lamp Sequence(s)
2.2 Phase Type and Conditions
2.3 Opposing and Conflicting Phases
2.4 Timings
2.4.1 Phase Minimums, Maximums, Extensions, Ped Leaving Periods
2.4.2 Phase Starting and Leaving Periods
2.4.3 Phase Intergreen Times
2.4.4 Intergreen Handset Limits
2.4.5 Phase Timing Handset Ranges
2.5 VA Demand and Extend Definitions
2.6 Phase Internal/Revertive Demands
3 Stage Movements
3.1 Stages - Prohibited, Alternative, Ignored Moves (No configuration data to print)
3.2 Stage Internal Demands/Pedestrian Window Times
3.3 Phase Delays
3.4 Intergreen Delays (No configuration data to print)
4 Modes and Facilities - Detailed
4.1 Fixed Time
4.2 Cableless Linking
4.2.1 CLF - Plan(s)
4.2.2 CLF - Demand Dependent Moves
4.3 UTC and MOVA
4.3.1 UTC General Data
4.3.2 UTC Control and Reply Data Format
4.3.3 UTC Data Definitions
4.3.3.1 UTC Phase Demand and Extend Definitions
4.3.3.2 UTC Stage and Mode Data Definitions
4.3.3.3 UTC Demand Dependent Forces
4.3.4 UTC and MOVA Detectors
4.4 Master Time Clock
4.4.1 MTC - Time Switch Parameters
4.4.2 MTC - Time Switch Parameters Array (No configuration data to print)
4.4.3 MTC - Day Type
4.4.4 MTC - Timetable
4.4.5 Holiday Clock - Special Days
4.4.6 Holiday Clock - Special Holiday Periods
4.5 Manual
4.5.1 Manual Panel
4.5.2 Manual Mode - Optional Phases Appearance (No configuration data to print)
4.6 Reserve State
5 Conditioning Data
5.1 Special Conditioning
5.2 Special Conditioning Timers (No configuration data to print)
5.3 Fault Log Flags
6 Special Instructions
7 I/O
7.1 Call Cancel (No configuration data to print)
7.2 Inputs and Outputs
7.3 Aspect Drives
7.4 I/O - DFM Group Timings
FORMULARIO DE PROGRAMACIONES DE TIEMPOS DE SEMAFOROS
CRUCE : Av. Providencia con Seminario / Seminario con Rodolfo Vergara
CONTROLADOR : Siemens ST-950
RED :1 VIGENCIA : 1 AÑO (UCT-23-0101)
CÓDIGO SISTEMA : J 001 161 - J 001 162 VERSIÓN : Puesta en Marcha (I. Municipalidad de Providencia)

ESQUEMA DEL CRUCE


FASES
NODO Nº ETAPAS
1 A, B, E
A
2 C, D, F
3 G, I
B
4 H, J Dda. H o J

SECUENCIAS
NODO Nº FASES SISTEMA
A 1 1-2 A-B
B 1 3-4 A - B,AB

ENTREVERDES
NODO DE A SEG
A C,D,F 5
B C,D,F 5
C A,B,E 5
A
D A,B,E 5
E D,C 22
F A,B 17
G H, J 5
H G, I 4
B
I H 18
J G 11

PERIODIZACION : ( L:LUNES - VIERNES; S:SABADO; D:DOMINGOS Y FESTIVOS) ROJO-ROJO


DIA HORA PLAN DIA HORA PLAN DIA HORA PLAN NODO DE A SEG
L 0:01 S S 0:01 S D 0:01 S F1 F2 2
A
L 0:01 5 S 0:01 5 D 0:01 5 F2 F1 2
L 7:00 1 S 9:00 4 D 10:00 4 F3 F4 2
B
L 7:30 XS S 11:00 3 D 21:00 5 F4 F3 1
L 7:30 28 S 14:00 4
L 9:15 29 S 22:00 5 DIAGRAMA DE FASES
L 9:45 28 NODO A NODO B
L 10:00 S
L 10:00 3
L 17:00 XS
L 17:00 2
L 20:00 S
L 21:00 4
L 22:00 5

PROGRAMACIÓN (Actual): Av. Providencia con Seminario (J001161)


PLAN CICLO I. FASE ENT. VEH I. VERDE TPO. VERDE ENT. PEAT I. SISTEMA
F1 F2 F2aF1 F1aF2 F1 F2 F1 F2 F2aF1 F1aF2 F1 F2
1 120 3 90 5 5 8 95 82 28 17 22 111 73 ok
2 120 43 1 5 5 48 6 73 37 17 22 31 104 ok
3 110 88 60 5 5 93 65 77 23 17 22 76 43 ok
4 100 48 13 5 5 53 18 60 30 17 22 36 96 ok
5 90 58 31 5 5 63 36 58 22 17 22 46 14 ok
28 120 103 70 5 5 108 75 82 28 17 22 91 53 ok
29 120 8 95 5 5 13 100 82 28 17 22 116 78 ok

PROGRAMACIÓN (Puesta en marcha): Seminario con Rodolfo Vergara (J001162)


PLAN CICLO I. FASE ENT. VEH I. VERDE TPO. VERDE ENT. PEAT I. SISTEMA
F3 F4 F4aF3 F3aF4 F3 F4 F3 F4 F4aF3 F3aF4 F3 F4
1 120 85 54 4 5 89 59 85 26 11 18 78 41 ok
2 120 116 76 4 5 0 81 76 35 11 18 109 63 ok
3 110 55 27 4 5 59 32 78 23 11 18 48 14 ok
4 100 8 75 4 5 12 80 63 28 11 18 101 62 ok
5 90 26 88 4 5 30 3 58 23 11 18 19 75 ok
28 120 65 34 4 5 69 39 85 26 11 18 58 21 ok
29 120 90 59 4 5 94 64 85 26 11 18 83 46 ok

Notas: 1) Todas las etapas y saltos de fase deben se estar configurados en MAN, CLF y UTC
2) Tiempo mínimo de verde presentado por etapa, 5 segundos
3) Inmediatamente encendido el cruce, se deberá ejecutar la tarea de sintonía fina, en la totalidad de planes operativos

PALABRAS DE CONTROL Y RESPUESTA X001160 (ACTUAL)


BIT 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
CONTROL TS DD FD FC FB FA
RESPUESTA CS CF DF MC DRD GD GC GB GA
RED N° 0011

Nombre PROVIDENCIA SEMINARIO


Intersección J001161 - J001162
OTU / Dirección X001160 Palabras de Control 2
PC / Modem Palabras de Respuesta 2
Arco
Par UOCT Revisión: Nodo Nuevo

Bit 15 14 13 12 11 10 9 8 Bit 7 6 5 4 3 2 1 0
Palabra Control 1 TS Palabra Control 0 D4 F4 F3 F2 F1
Bit 15 14 13 12 11 10 9 8 Bit 7 6 5 4 3 2 1 0
Palabra Respuesta 1 CS CF DF MC Palabra Respuesta 0 SD4 G4 G3 G2 G1
Bit 31 30 29 28 27 26 25 24 Bit 23 22 21 20 19 18 17 16
Palabra Respuesta 3 N001172J1 N001172B1 Palabra Respuesta 2 N001161C1 N001161B1
Bit 47 46 45 44 43 42 41 40 Bit 39 38 37 36 35 34 33 32
Palabra Respuesta 5 N001161G1 Palabra Respuesta 4 N001161F2 N001161F1

Observaciones

SD1= N001161B1 SD6= N001161F2


SD2= N001161C2 SD7= N001161G1
SD3= N001172B2
SD4= N001172J1
SD5= N001161F1
Nota:
PANEL AUTOMATICOS Y CONEXIONES

R
E
D G
A A A
I L
U U U S
SAL UPS EMPALME G F G E SVC E E E
T T T E
E E E N N N T
O O O R
N R N C C C A
M M M V
F N T F N T E E E H H H
A A A I F N
R N R U U U T
T T T C
A C A F F F I
I I I I
L I L E E E E
C C C O
A R
O O O
L R
A
S

PANEL DE SALIDA DE LUCES

R
E
G
L
E
ETAPA A ETAPA B ETAPA C ETAPA D ETAPA E ETAPA F ETAPA G ETAPA H ETAPA I ETAPA J T
A

R A V R A V R A V R A V R A V R A V R A V R A V R A V R A V N
E
U
T
R
O
Botonera1 Espiralocal scoot scoot scoot scoot scoot
Luz BOT E1 sd1 sd2 sd3 sd4 sd5 sd6 sd7 ec1 ec2 ec3