12 Rampa de H°A° Peatonal m3 Solo rampa 36.00 3.00 0.20 21.60 1.00 21.60
Protector 74.00 0.15 0.80 8.88 1.00 8.88
Rampa de H°A° Peatonal 30.48
AREA
13 Rampa de H°A° Vehicular m3 Solo rampa 24.00 6.00 0.20 28.80 1.00 28.80
Protector 48.00 0.15 0.80 5.76 1.00 5.76
14 Vigas de encadenado (Entrepiso) m3 Eje BAÑOS-BASURA A(1-3) 6.00 0.30 0.60 1.08 1.00 1.08
BAÑOS-2 B(1-3) 6.00 0.30 0.60 1.08 1.00 1.08
B(4-9) 15.00 0.30 0.60 2.70 1.00 2.70
B(10-18) 24.00 0.30 0.60 4.32 1.00 4.32
E(1-9) 27.00 0.30 0.60 4.86 1.00 4.86
E(10-18) 24.00 0.30 0.60 4.32 1.00 4.32
H(1-9) 27.00 0.30 0.60 4.86 1.00 4.86
H(10-18) 24.00 0.30 0.60 4.32 1.00 4.32
K(1-9) 27.00 0.30 0.60 4.86 1.00 4.86
K(10-18) 24.00 0.30 0.60 4.32 1.00 4.32
N(1-9) 24.00 0.30 0.60 4.32 1.00 4.32
N(10-18) 24.00 0.30 0.60 4.32 1.00 4.32
Q(1-9) 27.00 0.30 0.60 4.86 1.00 4.86
Q(10-18) 24.00 0.30 0.60 4.32 1.00 4.32
T(1-9) 27.00 0.30 0.60 4.86 1.00 4.86
T(10-18) 24.00 0.30 0.60 4.32 1.00 4.32
W(1-9) 27.00 0.30 0.60 4.86 1.00 4.86
W(10-18) 24.00 0.30 0.60 4.32 1.00 4.32
Eje 1(A-C) 5.00 0.30 0.60 0.90 1.00 0.90
1(D-E) 2.50 0.30 0.60 0.45 1.00 0.45
2(A-C) 5.00 0.30 0.60 0.90 1.00 0.90
2(D-F) 5.00 0.30 0.60 0.90 1.00 0.90
2(G-I) 5.00 0.30 0.60 0.90 1.00 0.90
2(J-L) 5.00 0.30 0.60 0.90 1.00 0.90
2(M-O) 5.00 0.30 0.60 0.90 1.00 0.90
2(P-R) 5.00 0.30 0.60 0.90 1.00 0.90
2(S-U) 5.00 0.30 0.60 0.90 1.00 0.90
2(V-W) 5.00 0.30 0.60 0.90 1.00 0.90
Eje 3(A-U) 5.00 0.30 0.60 0.90 7.00 6.30
3(V-W) 2.50 0.30 0.60 0.45 1.00 0.45
4(A-U) 5.00 0.30 0.60 0.90 7.00 6.30
4(V-W) 2.50 0.30 0.60 0.45 1.00 0.45
5(A-U) 5.00 0.30 0.60 0.90 7.00 6.30
5(V-W) 2.50 0.30 0.60 0.45 1.00 0.45
6-9(A-U) 5.00 0.30 0.60 0.90 21.00 18.90
6-9(V-W) 2.50 0.30 0.60 0.45 4.00 1.80
Eje 11-17(A1-C) 7.50 0.30 0.60 1.35 7.00 9.45
11-17(D-U) 5.00 0.30 0.60 0.90 42.00 37.80
11-17(V-W) 2.50 0.30 0.60 0.45 7.00 3.15
AREA
20 Revestimiento de pisos Coloc. En baños BAÑO mujeres 16.64 16.64
hombres 16.67 16.67
Total Baños 33.31
0.8 Instalacion Hidrosanitarias
0.8.1 instalacion Hidrosanitaria en Baños
21 punto hidraulico p/inodoro Pto 16.00
22 punto hidraulico p/lavamano Pto 8.00
23 punto hidraulico llave de paso 3/4 Pto 4.00
24 camara sinfonada de pvc de 6" Pza 2.00
25 camara sinfonada de pvc de 4" Pza 2.00
Griferia
Griferia en Baños
26 grifo de 1/2" pico movil para lavamano Pza 8.00
27 llave de paso de 3/4" para lavamano Pza 2.00
28 llave de paso de 3/4" en baños Pza 2.00
Colocación de artefactos sanitarios
29 Colocacion de Inodoro tanque bajo Pza BAT. BAÑOS MUJERES 8.00 8.00
HOMBRES 8.00 8.00
30 Colocacion de Lavamanos 8.00 8.00
Accesorios de baño
31 Toallero ferrum blanco Pza 2.00
32 Papelero Pza 16.00
11 Areas Exteriores
Los 3 frentes
Areas
1 replanteo m2 973.204 973.20 1.00 973.20
2 Compactacion y nivelacion, incluye parqueo exterior m2 973.204 973.20 1.00 973.20
4 excavacion de cordon e=15cm*40cm m3 187.61 0.15 0.40 11.26 1.00 11.26
5 cordon de H° e= 15cm*40cm. m3 187.61 0.15 0.40 11.26 1.00 11.26