You are on page 1of 77

1 2 3 4 5

APPR
Building 3069 Repairs to Packout Operations

DATE
-

-
D FINAL DESIGN SUBMISSION D
NSWC INDIAN HEAD DIVISION

DESCRIPTION
DRAWING INDEX

-
NAVAL SUPPORT ACTIVITY, SOUTH POTOMAC DRAWING SHEET
SHEET NAME

SYM
NUMBER NUMBER

-
13,145,405 G-001 COVER SHEET

INDIAN HEAD, MARYLAND 20640 13,145,406


13,145,407
13,145,408
LS-001
LS-101
LS-102
LIFE SAFETY CODE CRITERIA
LIFE SAFETY PLAN -FIRST FLOOR
LIFE SAFETY PLAN - SECOND FLOOR
13,145,409 C-001 SURVEY POINT LOCATIONS AND EXISTING CONDITIONS...
BASE MAP PROJECT DESCRIPTION 13,145,410 C-002 DEMOLITION & REMOVAL, SITE IMPROVEMENT PLANS
13,145,411 C-003 GRADING PLAN AND SITE DETAILS
The work for this project includes demolishing existing hvac system, replacing entire HVAC 13,145,412 C-004 LIMITS OF DISTRUBANCE AND E&S CONTROLS
system for building, providing new lighting , electrical conduit and outlets, conductive flooring, 13,145,413 S-001 STRUCTURAL GENERAL NOTES
ultra-high speed fire suppression system, replacing asphalt loading area with concrete, 13,145,414 S-101 DEMO AND PROPOSED FLOOR PLANS
constructing loading docks and metal canopy. and incidental related work. 13,145,415 S-201 LOADING DOCK ELEVATIONS AND FRAMING PLAN
13,145,416 S-501 STRUCTURAL DETAILS
13,145,417 AD-101 DEMOLITION FLOOR PLANS - GROUND AND 3090
NSF INDIAN HEAD
THIS PROJECT WAS DESIGNED BY NAVFAC WASHINGTON PWD INDIAN HEAD OF THE NAVAL FACILITIES 13,145,418 AD-102 DEMOLITION FLOOR PLAN - MEZZANINE
ENGINEERING COMMAND. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF 13,145,419 A-101 PROPOSED FLOOR PLAN - GROUND
INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS 13,145,420 A-102 EXISTING EXTERIOR ELEVATIONS, DUCT PENETRATION...
C REQUIRED BY NAVFAC INSTRUCTION 3540.1D. 13,145,421
13,145,422
M-001
MD-101
MECHANICAL NOTES, ABBREVIATIONS, AND LEGENDS
MECHANICAL DEMOLITION FLOOR PLAN
SEAL
C
GENERAL NOTES 13,145,423 MD-102 MECHANICAL DEMOLITION FLOOR PLAN
13,145,424 MD-103 MECHANICAL DEMOLITION MEZZANINE FLOOR PLAN
MD-104 MECHANICAL DEMOLITION UTILITY BUILDING FLOOR PLAN
SITE MAP 1. FIELD VERIFY ALL EXISTING DIMENSIONS, FINISHES, CONSTRUCTION AND CONDITIONS IN THE 13,145,425
13,145,426 M-101 MECHANICAL FLOOR PLAN
CONTRACT AREAS PRIOR TO COMMENCING WORK. THE CONSTRUCTION OFFICER SHALL BE
NOTIFIED IMMEDIATELY OF ALL DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE 13,145,427 M-301 MECHANICAL SECTION VIEW
POTOMAC RIVER CONTRACT DOCUMENTS. 13,145,428 M-501 MECHANICAL DETAILS
2. EXISTING ITEMS ARE TO REMAIN IN PLACE UNDISTURBED UNLESS SPECIFICALLY NOTED OR 13,145,429 M-601 MECHANICAL SCHEDULES
INDICATED TO BE REMOVED. REPAIRS TO EXISTING SURFACES SHALL ALIGN FLUSH WITH AND 13,145,430 M-701 CONTROLS
MATCH THE APPEARANCE OF EXISTING ADJACENT SURFACES. 13,145,431 M-702 CONTROLS
APPROVED

3. ALL EXISTING MATERIALS TO REMAIN WHICH ARE DAMAGED OR OTHERWISE DISTURBED BY THE 13,145,432 M-703 CONTROLS
CONTROLLED
CONTRACTOR'S OPERATIONS SHALL BE PATCHED AND REPAIRED TO MATCH EXISTING 13,145,433 P-001 PLUMBING NOTES, ABBREVIATIONS, AND LEGENDS FOR COMMANDER NAVFAC
AREA 13,145,434 P-101 PLUMBING PLANS
ADJACENT MATERIALS AT THE CONTRACTOR'S EXPENSE. ACTIVITY

4. DIMENSIONS SHOWN THUS (±) INDICATE DIMENSIONS WHICH MAY VARY IN THE FIELD. WHERE 13,145,435 P-501 PLUMBING SCHEDULES AND DETAILS
SUCH VARIANCE EXCEEDS 3 INCHES, NOTIFY THE CONSTRUCTION OFFICER PRIOR TO 13,145,436 P-601 PLUMBING ISOMETRIC
CONTINUING WORK. 13,145,437 E-001 ELECTRICAL LEGEND AND GENERAL NOTES
5. ALL ITEMS ARE NEW UNLESS SPECIFICALLY NOTED AS EXISTING. 13,145,438 ES-101 DISTRIBUTION POWER & TELECOM SITE DEMO PLAN
6. PRIOR TO PERFORMING DEMOLITION WORK, THE CONTRACTOR SHALL VERIFY THAT THE ITEM(S) 13,145,439 ES-102 GROUNDING SITE PLAN - NEW
SATISFACTORY TO DATE
TO BE REMOVED DO NOT SUPPORT ADJACENT EXISTING STRUCTURE(S) TO REMAIN. IF THE 13,145,440 ES-501 B3069 UTILITY POLE DETAILS
DES DRW CHK

ITEM(S) TO BE REMOVED DO SUPPORT ADJACENT EXISTING STRUCTURE(S) THE CONTRACTOR 13,145,441 E-101 LIGHTING DEMO PLAN - BUILDINGS 3069 AND 3090
BUILDING 3069 SHALL PROVIDE TEMPORARY SUPPORTS AND BRACING AS NECESSARY TO SAFELY SUPPORT 13,145,442 E-102 LIGHTING DEMO PLAN - MEZZANINE
GENERAL VICINITY
THE STRUCTURE(S) TO REMAIN IN PLACE, AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY 13,145,443 E-103 LIGHTING DEMO PLAN - BUILDING 3069 AND 3090
PRIOR TO CONTINUING WORK IN THE VICINITY. 13,145,444 E-104 LIGHTING DEMO PLAN - MEZZANINE
7. THE CONTRACTOR SHALL PROVIDE DUST PROTECTION AND AIR QUALITY CONTROL MEASURES. 13,145,445 E-105 NEW LIGHTING PLAN - BUILDINGS 3069 AND 3090
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


13,145,446 E-201 POWER DEMO PLANS - BUILDINGS 3069 AND 3090

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


8. THE CONTRACTOR SHALL PROVIDE A TEMPORARY PORTABLE TOILET DURING CONSTRUCTION
FOR USE BY THE CONTRACTOR PERSONNEL OF THE BUILDING. BUILDING TOILETS DO NOT 13,145,447 E-202 POWER DEMO PLAN - MEZZANINE
13,145,448 E-203 NEW POWER PLAN - BUILDINGS 3069 AND 3090

REPAIRS TO PACKOUT OPERATIONS


EXIST.
13,145,449 E-204 NEW POWER PLAN - MEZZANINE
13,145,450 E-301 GROUNDING DEMO PLAN
13,145,451 E-302 NEW GROUNDING PLAN
ASBESTOS DISCLOSURE STATEMENT 13,145,452 E-303 BUILDING 3069 METAL STUD GROUNDING DETAILS
13,145,453 E-304 LIGHTNING PROTECTION PLAN AND DETAILS
NOTE: THE GOVERNMENT HAS NOT PERFORMED TESTING FOR ASBESTOS
13,145,454 E-305 NEW LIGHTNING PROTECTION SYSTEM REVIEW
CONTAINING MATERIALS IN BUILDING 3069. DUE TO THE AGE OF INITIAL

BUILDING 3069
13,145,455 E-306 SITE HAZARDOUS AREA CLASSIFICATIONS
CONSTRUCTION (2002), NO ACMs ARE EXPECTED TO BE ENCOUNTERED DURING
13,145,456 E-401 ENLARGED POWER DEMO PLAN - B3069
THE EXECUTION OF THIS PROJECT.
13,145,457 E-402 ENLARGED NEW POWER PLAN - B3069
ASBESTOS IS NOT SUSPECTED TO BE ENCOUNTERED ON THIS PROJECT; THEREFORE THERE SHALL BE 13,145,458 E-403 ENLARGED POWER PLAN - B3069 M.O. DOORS
NO FEES INCLUDED IN THE PROPOSAL FOR THIS PROJECT FOR THE COST OF SAMPLING AND 13,145,459 E-501 LIGHTING DETAILS
ANALYSIS. 13,145,460 E-502 GROUNDING AND BONDING DETAILS
13,145,461 E-601 POWER CONDUIT AND WIRE SCHEDULE - DEMO
13,145,462 E-602 POWER CONDUIT AND WIRE SCHEDULE - NEW
LEAD BASED PAINT STATEMENT 13,145,463 E-603 PANEL SCHEDULES - DEMO
13,145,464 E-604 PANEL SCHEDULES - NEW
NOTE: THE GOVERNMENT HAS NOT PERFORMED TESTING FOR LEAD BASED PAINT IN SIGNATURE BELOW INDICATES THAT THE ENTIRE DRAWING 13,145,465 E-701 SINGLE LINE DIAGRAM - DEMO
BUILDING 3069. DUE TO THE AGE OF INITIAL CONSTRUCTION (2002), NO LBP IS PACKAGE HAS BEEN REVIEWED AND APPROVED BY SIGNEE 13,145,466 E-702 SINGLE LINE DIAGRAM - NEW

DEPARTMENT OF THE NAVY


EXPECTED TO BE ENCOUNTERED DURING THE EXECUTION OF THIS PROJECT. 13,145,467 CI-101 CONTROL AND INSTRUMENTATION DEMO PLAN
CODE SIGNATURE DATE 13,145,468 CI-102 CONTROL AND INSTRUMENTATION DEMO DETAILS
13,145,469 CI-601 CONTROL & INSTRUMENT CONDUIT & WIRE DEMO 1
A LEAD BASED PAINT IS NOT SUSPECTED TO BE ENCOUNTERED ON THIS PROJECT; THEREFORE THERE
SHALL BE NO FEES INCLUDED IN THE PROPOSAL FOR THIS PROJECT FOR THE COST OF SAMPLING AND
REVIEW BY 457TL TONY LIVERMAN, P.E. PMEB 13,145,470 CI-602
T-101
CONTROL & INSTRUMENT CONDUIT & WIRE DEMO 2
CCTV SYSTEM PLAN
A
REVIEW BY 457AB XXXX Design Tem Lead IH 13,145,471
ANALYSIS. 13,145,472 T-701 CCTV SYSTEM DIAGRAM
REVIEW BY 457PG Patrick Gannon, P.E. Construction Team Lead IH
13,145,473 T-702 TELEPHONE SYSTEM DIAGRAM
REVIEW BY ENVIRON XXXX
13,145,474 FX-001 FIRE SUPPRESSION GENERAL NOTES & SYMBOLS SCALE:
REVIEW BY CUST XXX , NSWC Facilities Infrastructure Manager
FX-101 FIRE SUPPRESSION PLAN - FIRST FLOOR
13,145,475 EPROJECT NO.:
REVIEW BY CUST XXXX 13,145,476 FX-102 FIRE SUPPRESSION PLAN - SECOND FLOOR CONSTR. CONTR. NO.

REVIEW BY SECURITY Tiffany Blayliss 13,145,477 FX-201 FIRE SUPPRESSION DETAILS


REVIEW BY SAFETY XXXX 13,145,478 FA-001 FIRE ALARM GENERAL NOTES NAVFAC DRAWING NO.

13,145,479 FA-101 FIRE ALARM PLAN - FIRST FLOOR


REVIEW BY FIRE / LS XXXX SHEET OF
13,145,480 FA-102 FIRE ALARM PLAN - SECOND FLOOR
13,145,481 FA-201 FIRE ALARM DETAILS
G-001
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5
GENERAL STRUCTURAL NOTES DESIGN CRITERIA NOTES CAST-IN-PLACE CONCRETE NOTES STRUCTURAL STEEL NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
SLAB ON GRADE NOTES
C SEAL
C

COLD-FORMED STEEL FRAMING NOTES


APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS FOR PACKOUT OPERATIONS


BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

S-001
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

-
DEMOLITION KEYNOTES

SYM
-

-
6'
SGG

SGG
C 19'-8" SEAL
C

NEW KEYNOTES APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

10'
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS FOR PACKOUT OPERATIONS


BUILDING 3069
13'-3"

17'-11"

4'-8"

DEPARTMENT OF THE NAVY


A A

SCALE:

GRAPHIC SCALE EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

S-101
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
17'-11"

MIN. 1-1/2" CONC. COVER


#4 BAR BOTH WAYS
@ 12" O.C.
D 17'-4"
8"
D
1'-31 4"
5'-9" 5'-10" 5'-9"

DESCRIPTION
3'-111 4" 8"

-
C8X11.5

SYM
-

-
2'
MIN. 1-1/2" CONC. COVER
NEW KEYNOTES
1'-4" 1'-4"

1'-8" 10'

MIN. 1-1/2" CONC. COVER #4 BAR BOTH WAYS


@ 12" O.C.
C 8"
SEAL
C
C8X11.5

C8X11.5

C8X11.5

C8X11.5
1'-31 4"
6"
C8X11.5
8"
3'-111 4"

2'
MIN. 1-1/2" CONC. COVER

1'-4" 1'-4"
APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS FOR PACKOUT OPERATIONS


1
12

BUILDING 3069
7' 7'

10'

DEPARTMENT OF THE NAVY


1'-111 4"

4'-79 16" ROADWAY 16'


A A
GRAPHIC SCALE
SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

S-201
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

-
3/8"

DATE
-

-
D D

DESCRIPTION
-

-
3" 4" 3"

SYM
-

-
C SEAL
C

1'-11"
2
1

3/8

APPROVED

HOT DIPPED GALVANIZED


STEEL C6x8.2 FOR COMMANDER NAVFAC

ACTIVITY

HOT DIPPED GALVANIZED

8'-0"
SATISFACTORY TO DATE
STEEL HSS 3"x3"x1/4"
DES DRW CHK

SLOPE CONCRETE TO
GRADE.
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


1-1/2" MIN.
GRADE

REPAIRS FOR PACKOUT OPERATIONS


GALVANIZED STEEL IN
CONTACT WITH CONCRETE
SHALL BE DIPPED IN
BITUMINOUS COATING

BUILDING 3069
4'-0"
CONCRETE F'c=3,000 PSI
POURED AGAINST
UNDISTURBED SOIL.

12" MAX

DEPARTMENT OF THE NAVY


A 1'-6"
A
1'-8" O.C.
SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

S-501
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
C SEAL
C

KEYNOTES

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACK-OUT OPERATIONS


BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.

SHEET OF

AD101
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
C SEAL
C

KEYNOTES

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACK-OUT OPERATIONS


BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.

SHEET OF

AD102
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
2'-13 4"

C 5" SEAL
C

1'-10" 1'

5"
194A
STREET ADDRESS APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

NEW KEYNOTES
DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACK-OUT OPERATIONS


BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.

SHEET OF

A101
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
MATCH EXISTING

-
PANEL(S) WIDTH

9"

D D

DESCRIPTION
-

-
9"

SYM
-

-
C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

1 " MAX. (TYP.)


2

SATISFACTORY TO DATE

DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACK-OUT OPERATIONS


BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.

SHEET OF

A102
DRAWFORM REVISION: JUN 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
DETAIL CALLOUT INDICATOR

INTERIOR ELEVATION INDICATOR

EXTERIOR ELEVATIONS INDICATOR

WALL SECTION INDICATOR


C SEAL
C

BUILDING SECTION INDICATOR

APPROVED

ENLARGED DETAIL/AREA INDICATOR FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

MECHANICAL NOTES, ABBREVIATIONS, AND LEGENDS


DRAWING TITLE INDICATOR

REPAIRS TO PACKOUT OPERATIONS


REVISION CLOUD AND NUMBER INDICATOR

BUILDING 3069
DEPARTMENT OF THE NAVY
T

A H A
H

SCALE: AS NOTED

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.


13,145,421
SHEET 17 OF

M-001
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

-
DEMOLITION KEYNOTES

SYM
-

-
C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


MECHANICAL DEMOLITION FLOOR PLAN
BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE: AS NOTED

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.


13,145,422
SHEET 18 OF

MD-101
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

-
DEMOLITION KEYNOTES

SYM
-

-
C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


MECHANICAL DEMOLITION FLOOR PLAN
BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE: AS NOTED

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.


13,145,423
SHEET 19 OF

MD-102
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

-
DEMOLITION KEYNOTES

SYM
-

-
C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

MECHANICAL DEMOLITION MEZZANINE FLOOR PLAN


REPAIRS TO PACKOUT OPERATIONS
BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE: AS NOTED

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.


13,145,424
SHEET 20 OF

MD-103
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

-
DEMOLITION KEYNOTES

SYM
-

-
C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

MECHANICAL DEMOLITION UTILITY BUILDING FLOOR PLAN


NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


BUILDING 3069
KEYPLAN

DEPARTMENT OF THE NAVY


A A

SCALE: AS NOTED

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.


13,145,425
SHEET 21 OF

MD-104
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
NEW WORK KEYNOTES
C SEAL
C

26"Ø
26"Ø
APPROVED

26"Ø
FOR COMMANDER NAVFAC

ACTIVITY

26"Ø

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT



26

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


26"Ø

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


MECHANICAL FLOOR PLAN
BUILDING 3069
'

DEPARTMENT OF THE NAVY


A A

SCALE: AS NOTED

GRAPHIC SCALE
EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.


13,145,426
SHEET 22 OF

M-101
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

-
NEW WORK KEYNOTES

SYM
-

-
MAX SPACING 5'

RD-2 (BEHIND)

RD-1
C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


MECHANICAL SECTION VIEW
BUILDING 3069
9' 7"
MIN 3'

DEPARTMENT OF THE NAVY


A A

SCALE: AS NOTED

EPROJECT NO.:

CONSTR. CONTR. NO.

GRAPHIC SCALE NAVFAC DRAWING NO.


13,145,427
SHEET 23 OF

M-301
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
NOTE: SINGLE HORIZONTAL RUNS WITH
NOTE: NON-INSULATED HORIZONTAL RUNS VAPOR BARRIER INSULATION

1 2 3 4

C SEAL
C
18" MOTORIZED ISOLATION DAMPER
1
4 x 41 S.S BIRD SCREEN

36"
APPROVED

PRE FILTER
FOR COMMANDER NAVFAC

60" INTAKE DUCT WIDTH AHU PLENUM


ACTIVITY

MIN 36"
FLEX CONNECTION

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

MECHANICAL NOTES, ABBREVIATIONS, AND LEGENDS


5 6

REPAIRS TO PACKOUT OPERATIONS


DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE
DRAIN PAN

BUILDING 3069
PITCH DOWN TOWARD DRAIN

CLEAN OUT
A DRAIN PAN

B
2"

CONDENSATE DRAIN

DEPARTMENT OF THE NAVY


A PRESSURE A B A
NEGATIVE 2" X
PLUS X
POSITIVE 1" 2X SCALE: AS NOTED
MINIMUM
EPROJECT NO.:

WHERE X = STATIC PRESSURE IN AHU PAN LOCATION CONSTR. CONTR. NO.

NAVFAC DRAWING NO.


13,145,428
7 8 9 10 SHEET 24 OF

M-501
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


DESIGN CRITERIA
OUTDOOR DESIGN CONDITIONS (MAIN BAY):

MECHANICAL SCHEDULES
SUMMER: 97.0ºF DB/ 85.4ºF WB,

BUILDING 3069
170 GR/LB
WINTER:
0 ºF DB/ 0 ºF WB

OUTDOOR DESIGN CONDITIONS (ELEC/MECH ROOM):


SUMMER: 90ºF DB/ 78ºF WB,
126 GR/LB
WINTER:
15 ºF DB/ 5 ºF WB

DEPARTMENT OF THE NAVY


INDOOR DESIGN CONDITIONS (MAIN BAY)
SUMMER:
A 70 °F DB/ 52 °F WB, 30GR/LB A
WINTER:
68 °F DB/ 50 °F WB

INDOOR DESIGN CONDITIONS (ELEC/MECH ROOM) SCALE: AS NOTED

SUMMER: EPROJECT NO.:

78 °F DB/ 57.9 °F WB, 50% RH CONSTR. CONTR. NO.

WINTER: NAVFAC DRAWING NO.


55 °F DB/ 40 °F WB 13,145,429
SHEET 25 OF

M-601
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
FAN, FILTER OR

APPR
-

-
OTHER DEVICE
EXISTING
INSULATION
UPSTREAM PITOT PROVIDE M CONTROL AIR MAIN CONNECTION

DATE
1. PROVIDE THE FOLLOWING AUTOMATIC ALARM AT OPERATOR WORK STATION

-
TUBE INSTALL IN AIR FLOW BRACKET
D-# EVERY MARCH 1ST AND SEPTEMBER 1ST: "IN CONFORMANCE WITH UFCs AND IN
ACCORDANCE PER OPPOSED BLADE DAMPER. ORDER TO SAVE ENERGY, BUILDING SENSORS MUST BE CALIBRATED AND CLEANED
WITH DETAIL DOWNSTREAM AT REGULAR INTERVALS. OUTSIDE AIR, DUCT, AND UNIT-MOUNTED TEMPERATURE
PITOT TUBE INSTALL D-# PARALLEL BLADE DAMPER.
M-701 AND HUMIDITY SENSORS SHOULD BE CALIBRATED ANNUALLY.
IN ACCORDANCE
M-701
WITH DETAIL A-#
PROVIDE DAMPER OR VALVE ACTUATOR.
D M-701 0.25" RIGID D
0.25" TYPE M RIGID COPPER
2 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).
COPPER TUBE SUPPORT V-#
DIFFERENTIAL PRESSURE SWITCH

DESCRIPTION
TUBE
OR TRANSMITTER. PROVIDE

-
WIRE AND 3 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).
BRACKET IN ACCORDANCE WITH SCREW TO
CONDUIT TO V-#
DETAIL DUCT/CASING
FIELD PANEL CONTROL COMMUNICATION

SYM
-

-
M-701 WITH SELF
DRILLING/ ARRANGE IN UNIFORM #12 BARE HYDRONIC PIPING
TAPPING MANNER THRU SPACE COPPER WIRE
TEST TEE WITH PLUG SCREWS AIR OR WATER FLOW PATH
AI ANALOG INPUT

M-701 NO SCALE FILTER OR COIL (AS LABELED) AO ANALOG OUTPUT


BAS BUILDING AUTOMATION SYSTEM

AIR OR WATER DIFFERENTIAL PRESSURE SWITCH, BY APPLICATION. BI BINARY INPUT


M-701 NO SCALE DP-# PROVIDE AIR SWITCH PER DETAIL 4/M-701.
BO BINARY OUTPUT

18 GAUGE GALVANIZED SHEET METAL G DIFFERENTIAL PRESSURE GAUGE, CONNECT TO STATIC CLG COOLING
BRACKET ATTACHED TO DUCT WITH PRESSURE TAPS IN ACCORDANCE WITH DETAIL 3/M-701.
JUNCTION BOX AND COVER COV CHANGE OF VALUE
FOUR #8 x 0.75" SHEET METAL SCREWS
DP-# AIR OR WATER DIFFERENTIAL PRESSURE TRANSMITTER, BY APPLICATION.
C PROVIDE RIGID FIBERGLASS INSULATION
CONDUIT TO
PROVIDE AIR TRANSMITTER PER DETAIL 4/M-701.
Cx COMMISSIONING SEAL
C
WITH VAPOR BARRIER, THICKNESS TO HTG HEATING
FIELD PANEL
MATCH ADJACENT INSULATION
I/O INPUT/OUTPUT
LOW TEMPERATURE DETECTION FREEZESTAT, MANUAL RESET, WITH
20 FOOT ELEMENT. PROVIDE PER DETAILS 1/M-701 AND 2/M-701. NVI NETWORK VARIABLE INPUT
SEAL VAPOR TIGHT WITH NVO NETWORK VARIABLE OUTPUT
VAPOR BARRIER MASTIC FLEXIBLE METAL
CONDUIT TO SP SETPOINT
ATTACH DEVICE TO BRACKET OTHER DEVICES,
WITH SHEET METAL SCREWS DUCT MOUNTED ELECTRONIC TEMPERATURE SENSOR WITH 20
IF NEEDED FOOT AVERAGING ELEMENT. PROVIDE PER DETAILS 1/M-701 AND H APPROVED

FLEXIBLE CONDUIT BETWEEN T-# 2/M-701. O HAND-OFF-AUTO SWITCH FOR COMMANDER NAVFAC

JUNCTION BOX AND DEVICE PROVIDE BRACKET IN A ACTIVITY

TO ALLOW REMOVAL, MINIMUM ACCORDANCE WITH M-701


LENGTH OF 3 FT. DUCT MOUNTED ELECTRONIC TEMPERATURE SENSOR WITH MOTOR

TS-# RIGID STEM ELEMENT. PROVIDE PER DETAIL 2/M-701.


NORMALLY OPEN CONTACTS
NOTE: DO NOT USE DEVICE AS A JUNCTION BOX. DO NOT
PROVIDE RIGID FIBERGLASS INSULATION WIRE THRU DEVICE TO OTHER DEVICES NORMALLY CLOSED CONTACTS SATISFACTORY TO DATE
WITH VAPOR BARRIER, THICKNESS TO PIPE MOUNTED INSERTION TYPE ELECTRONIC DES ATY DRW ATY CHK PWT
MATCH ADJACENT INSULATION R#
TEMPERATURE SENSOR WITH WELL. RELAY COIL
TS-#
M STARTER HOLDING COIL
RS-# WALL-MOUNTED ELECTRONIC TEMPERATURE SENSOR

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


WALL-MOUNTED HUMIDITY TRANSMITTER. MOUNT ADJACENT TO ROOM THERMAL MOTOR SWITCH

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


M-701 NO SCALE M-701 NO SCALE HT-#
TEMPERATURE SENSOR.
PNEUMATIC TUBING

REPAIRS TO PACKOUT OPERATIONS


WALL-MOUNTED CARBON DIOXIDE SENSOR. MOUNT
CD-# EXISTING PNEUMATIC TUBING
ADJACENT TO ROOM TEMPERATURE SENSOR.
MOTOR STARTER
PROVIDE RIGID DUCT MOUNTED CARBON DIOXIDE SENSOR. PROVIDE PER DETAIL
FIBERGLASS CD-# 2/M-701. ELECTRIC TO PNEUMATIC SOLENOID VALVE
INSULATION WITH SEAL VAPOR NC
C MOUNTED IN INSTRUMENTATION PANEL,
VAPOR BARRIER, TIGHT WITH EP# NO COIL VOLTAGES AS INDICATED ON WIRING

BUILDING 3069
THICKNESS TO MATCH VAPOR BARRIER
DUCT MOUNTED ELECTRONIC RELATIVE HUMIDITY TRANSMITTER DIAGRAMS.
ADJACENT INSULATION MASTIC
HT-# PROVIDE PER DETAIL 2/M-701.

CONTROLS
FLOW METER
(TURBINE-STYLE)

CS-# CURRENT SWITCH

0.25" TYPE M AHU CASING/DUCTWORK ES-# END SWITCH FAN OR PUMP, BY APPLICATION
RIGID COPPER INSULATION
TUBE BINARY INPUT OR OUTPUT POINT

DEPARTMENT OF THE NAVY


STATIC PITOT
TUBE SECURE PITOT TUBE ANALOG INPUT OR OUTPUT POINT DUCT MOUNTED ENTHALPY TRANSMITTER
MOUNTING FLANGE TO DUCT PROVIDE PER DETAIL 2/M-701.
EN-#
A WITH TWO #10 SHEET METAL
SCREWS AND DUCT SEALANT.
NETWORK CONNECTION
A
AIR FLOW
EHO EMERGENCY HVAC OFF (SYSTEM VARIABLE)
DIRECTION THERMOMETER.

TS-OA OUTSIDE AIR TEMPERATURE SENSOR (SYSTEM VARIABLE) SCALE: AS NOTED

EPROJECT NO.:
BUTTERFLY VALVE.
EN-OA OUTSIDE AIR ENTHALPY TRANSMITTER (SYSTEM VARIABLE) CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

M-701 NO SCALE VFD-# VARIABLE FREQUENCY DRIVE 13,145,430


SMOKE DETECTOR SHEET 26 OF

AMS-# AIRFLOW MEASURING STATION - THERMAL DISPERSION TYPE M-701


DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".

LPS G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND


COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
D G3. EQUIPMENT AND CONTROLS INSIDE HAZARDOUS AREA SHALL BE
D
INTRINSICALLY SAFE, RATED FOR CLASS I, DIVISION I, GROUP C & D
V-S-3
AND CLASS II, DIVISION I, GROUP E, F, & G.

DESCRIPTION
-

-
V-S-4

SYM
-

-
V-S-5

V-S-6
MAIN BAY ELEC ROOM T

CU-2
CU-1
IU-2
SD-1

AHU-1 IDS

IDS
CU-2 CONTROLLER MECH ROOM T

C CU-1 SEAL
C
THERMOSTAT AND RELATIVE HUMIDITY SENSOR IU-1
T RH BAS FRONT
SHALL HAVE A DIGITAL DISPLAY CAPABLE OF
END
DISPLAYING SPACE TEMP (°F), RELATIVE
CONTROL
HUMIDITY (%), AND HUMIDITY RATIO (GR/LB)
LPS PANEL
V-S-2

LPS
V-S-1 APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT


GENERAL

THE INTEGRATED DEHUMIDIFICATION SYSTEM (IDS) SHALL BE CONTROLLED BY THE BACNET BUILDING AUTOMATION SYSTEM LOCATED IN THE MECHANICAL ROOM.

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


UNIT STARTUP: UPON AT COMMAND TO START, THE OUTSIDE AIR DAMPER SHALL FULLY OPEN, WHEN THE OUTSIDE AIR DAMPER IS FULLY OPEN THE SUPPLY FAN SHALL START.

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


SPACE TEMPERATURE AND HUMIDITY SENSORS: INTRINSICALLY SAFE TEMPERATURE AND HUMIDITY SENSORS LOCATED IN THE SPACE ARE PART OF THE BUILDING BACNET SYSTEM.
TEMPERATURE AND HUMIDITY INPUT SIGNALS FROM THE BUILDING BACNET SYSTEM SHALL BE USED FOR BAY HEATING AND HUMIDITY CONTROL FROM THE OPERATOR'S WORK
STATION IN THE MECHANICAL ROOM. THE IDS UNIT WILL PROVIDE A SET TEMPERATURE FOR COOLING AND HEATING AS SCHEDULED. FROM THE OPERATOR'S WORK STATION THE
BUILDING OCCUPANTS SHALL SELECT SETPOINTS DEPENDENT ON THEIR NEEDS.

TEMPERATURE AND HUMIDITY CONTROL: THE PACKAGED UNIT CONTROLS SHALL OPERATE THE DESICCANT WHEEL, FACE AND BYPASS DAMPERS, REFRIGERATION SYSTEM AND
STEAM HEATING COILS TO MAINTAIN THE SPACE SET POINTS AND CONDITIONS. REFRIGERATION SYSTEM CONSISTS OF A PRE-COOLING COIL AND A POST-COOLING COIL WHICH

BUILDING 3069
ARE EACH SERVED BY ITS OWN CONDENSER. INITIAL SET POINT IS 70 °F DB AND HUMIDITY RATIO OF 35 GR/LB. THE UNIT SHALL OPERATE THE REACTIVATION STEAM COIL AND
REACTIVATION FAN TO MAINTAIN EFFECTIVENESS OF THE DESICCANT WHEEL.

CONTROLS
COOLING SET POINT: 70°
HEATING SET POINT: 68°
HUMIDITY SET POINT: 35 GR/LB. UPON A RISE IN SPACE HUMIDITY ABOVE 40 GR/LB, AN ALARM WILL BE INDICATED.
FILTERS: ON A RISE IN FILTER DIFFERENTIAL PRESSURE ABOVE SET POINT, AS SENSED BY DPT, AN ALARM WILL BE INDICATED. INITIAL DPT SET POINTS ARE SCHEDULED.

UNIT SAFETY:

DEPARTMENT OF THE NAVY


FREEZESTAT FZ-1, SET AT 38°F, SHALL STOP THE SUPPLY FAN THROUGH A HARDWIRE INTERLOCK.
SMOKE DETECTOR SD-1 SHALL STOP THE UNIT FANS AND RETURN ALL VALVES AND DAMPERS TO THEIR NORMAL POSITIONS. REMOTE ANNUNCIATION TO THE BUILDING FIRE
A ALARM SYSTEM SHALL OCCUR PER NFPA 90A.
A
RESET: ALL PROTECTION CONTROLS SHALL REQUIRE LOCAL MANUAL RESET BEFORE THE UNIT FANS CAN BE RESTARTED AFTER THE DEVICES TRIP.
LIMIT SWITCHES SHALL VERIFY DAMPER OPEN PRIOR TO FAN STARTING.
DPT-1, DPT-2, DPT-3, AND DPT-4 HIGH LIMIT SET AT 0.5 IN WG GREATER THAN BASELINE MEASURED AT INSTALLATION. SCALE: AS NOTED

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.


13,145,431
SHEET 27 OF

M-702
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

-
DESICCANT
WHEEL

DATE
-

-
AI G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".
ID-1
TT-7 FINAL PRE G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
D-2 FILTER FILTER COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.

G3. ALL POINTS INCLUDED ON POINTS LIST SHALL BE SHOWN ON THE


D BAS CONTROL PANEL IN THE MECHANICAL ROOM. D

DESCRIPTION
-

SYM
CS-2

-
CS-3
V-S-3 V-S-4 V-S-5 V-S-6 M DPT-4 DPT-3
M (N.C.) (N.C.) (N.C.) (N.C.)

HEATING

HEATING

HEATING

HEATING
ES-2

STEAM

STEAM

STEAM

STEAM
COIL

COIL

COIL

COIL
ES-3 EXTERIOR
SPACE

PRE FINAL TT-2 RH-2 M RH-3 TT-4 TT-5 RH-4


OUTDOOR D-1 FZ-1 SUPPLY FAN
FILTER FILTER

D-3
TT-1 RH-1

C CS-1
SEAL
C
M DPT-1 DPT-2 TT-3
D-4
VFD V-S-2
V-S-1 FAULT (N.C.) SD-1
ES-1 FREQ.
(N.C.) CONTACT
CU-1 CU-2

HEATING
PRE-HEAT

SPEED START/STOP

STEAM
STEAM

PRE-COOL

COIL
COOLING
(TYP)

COIL
DX
M
DX

ES-4
APPROVED
IDS-1 CONTROLS SCHEMATIC
FOR COMMANDER NAVFAC

ACTIVITY

ALARMS TRENDING ALARMS TRENDING


I/O LIMIT I/O LIMIT
POINT NAME DESCRIPTION Cx OPERATING POINT NAME DESCRIPTION Cx OPERATING
TYPE FAIL TYPE FAIL SATISFACTORY TO DATE

LOW HIGH FREQUENCY FREQUENCY LOW HIGH FREQUENCY FREQUENCY DES ATY DRW ATY CHK PWT

S/S START / STOP BO COV COV PRE-FILTER DIFFERENTIAL


DPT-3 AI X 15 MIN 15 MIN
PRESSURE SENSOR
ST STATUS BI X COV COV
ALARM ALARM BI X COV COV FINAL FILTER DIFFERENTIAL
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


DPT-4 AI X 15 MIN 15 MIN
PRESSURE SENSOR

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


TT-1 OUTDOOR TEMP SENSPOR AI 15 MIN 15 MIN
V-S-1 STEAM VALVE AI 15 MIN 15MIN

REPAIRS TO PACKOUT OPERATIONS


TT-2 PRE-HEAT TEMP SENSOR AI 15 MIN 15 MIN
V-S-2 STEAM VALVE AI 15 MIN 15MIN
TT-3 PRE-COOL TEMP SENSOR AI 15 MIN 15 MIN
V-S-3 STEAM VALVE AI 15 MIN 15MIN
TT-4 POST-COOL TEMP SENSOR AI 15 MIN 15 MIN
V-S-4 STEAM VALVE AI 15 MIN 15MIN
TT-5 POST-HEAT TEMP SENSOR AI 15 MIN 15 MIN
V-S-5 STEAM VALVE AI 15 MIN 15MIN
TT-6 SPACE TEMP SENSOR AI X X 15 MIN 15 MIN

BUILDING 3069
V-S-6 STEAM VALVE AI 15 MIN 15MIN
TT-7 REGEN. TEMP SENSOR AI 15 MIN 15 MIN
FZ-1 FREEZESTAT BI X 15 MIN 15MIN

CONTROLS
RH-1 OUTDOOR RH SENSOR AI 15 MIN 15 MIN
START/STOP BO COV COV
RH-2 PRE-WHEEL RH SENSOR AI 15 MIN 15 MIN
CU-1 STATUS BI X COV COV
RH-3 POST-WHEEL RH SENSOR AI 15 MIN 15 MIN
ALARM BI X COV COV
RH-4 POST-FAN RH SENSOR AI 15 MIN 15 MIN
START/STOP BO COV COV
RH-5 SPACE RH SENSOR AI X 15 MIN 15 MIN
CU-2 STATUS BI X COV COV
ES-1 DAMPER 1 STATE BI X COV COV

DEPARTMENT OF THE NAVY


ALARM BI X COV COV
ES-2 DAMPER 2 STATE BI X COV COV
ES-3 DAMPER 3 STATE BI X COV COV CS-1 SUPPLY FAN MOTOR STATE AI X 15 MIN 15 MIN
A ES-4 DAMPER 4 STATE BI X COV COV
CS-2
REGENERATION FAN MOTOR
AI X 15 MIN 15 MIN
A
STATE
PRE-FILTER DIFFERENTIAL
DPT-1 AI X 15 MIN 15 MIN DESICCANT WHEEL MOTOR
PRESSURE SENSOR CS-3 AI X 15 MIN 15 MIN
STATE
FINAL FILTER DIFFERENTIAL SCALE: AS NOTED
DPT-2 AI X 15 MIN 15 MIN EPROJECT NO.:
PRESSURE SENSOR
CONSTR. CONTR. NO.

NAVFAC DRAWING NO.


13,145,432
SHEET 28 OF

M-703
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
DETAIL CALLOUT INDICATOR

-
INTERIOR ELEVATION INDICATOR

EXTERIOR ELEVATIONS INDICATOR

WALL SECTION INDICATOR


C SEAL
C

BUILDING SECTION INDICATOR

APPROVED

ENLARGED DETAIL/AREA INDICATOR


FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


DRAWING TITLE INDICATOR

PLUMBING NOTES, ABBREVIATIONS, AND LEGENDS


REPAIRS TO PACKOUT OPERATIONS
REVISION CLOUD AND NUMBER INDICATOR

BUILDING 3069
DEPARTMENT OF THE NAVY
A A

SCALE: AS NOTED

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.


13,145,433
SHEET 29 OF

P-001
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES

APPR
-

DATE
-

-
D D

DESCRIPTION
-

SYM
-

-
NEW WORK KEYNOTES
C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES ATY DRW ATY CHK PWT

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


BUILDING 3069

PLUMBING PLANS
DEPARTMENT OF THE NAVY
A A

SCALE: AS NOTED

GRAPHIC SCALE
EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.


13,145,434
SHEET 30 OF

P-101
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

-
131° WATER
DHCP-1 50° WATER

DATE
-

-
1 1/2" DCW
1 1/2" HW

MV-2 1 1/2" HW
50° WATER
80°F
D MV-1 D

132°F
80° WATER 3/4"

DESCRIPTION
EXP.
TANK

-
T
CONNECT TO EFS-1 3/4" RECIRC

SYM
-

-
1 1/2" DCW BACKFLOW PREVENTER SCHEDULE
122°+ RECIRC WATER
ΔP
DESIG. GPM SIZE (IN) SERVICE LOCATION REMARKS
(PSI)
FROM DCW SERVICE
140° HOT WATER TANK
POTABLE MECH.
BFP-1 1 10 1.5" 1, 2, 3, 4
WATER ROOM
EWH-1 NOTES:
TANK FLUSH
SECONDARY CONTAINMENT 1. TYPE: LEAD FREE - REDUCED PRESSURE ASSEMBLY
2. PROVIDE AND INSTALL IN ACCORDANCE WITH MANUFACTURER'S
4" HOUSEKEEPING PAD RECOMMENDATIONS.
3. PROVIDE SHUT-OFF VALVES INTEGRAL TO ASSEMBLY.
4. PROVIDE DRAIN OUTLET WITH AIR GAP FITTING AND PIPE FULL SIZE DRAIN AS
INDICATED.

C 1
SEAL
C

PRESSURE GAGE
GLOBE VALVE
1 1/2" CW
REDUCED PRESSURE PRINCIPLE
B.F. PREVENTER APPROVED

TEMPERED WATER SUPPLY FOR COMMANDER NAVFAC


1 1/2" ACTIVITY

CW
AIR GAP 1 1/2" CW
STRAINER SATISFACTORY TO DATE

PRESSURE DES ATY DRW ATY CHK PWT

METER TO HAVE BOTH: DIRECT FUNNEL REDUCING VALVE


SET @ 80 PSIG
REGISTER READ (IN GALLONS) (ADJUSTABLE)
AND REMOTE READABLITY (VIA
PIPE TO FLOOR
PULSE INTIATOR) DRAIN
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


2

PLUMBING SCHEDULES AND DETAILS


50' HOSE REEL

BUILDING 3069
STAINLESS STEEL BOWL

QUICK DISCONNECT
COMBINATION
F

FILTER NOTE: CONTRACTOR SHALL PROVIDE 3/4" QUICK


REGULATOR DISCONNECT SIZE BASED ON FIELD ASSESSMENT.
WITH
60" AFF

PRESSURE
GAGE

DEPARTMENT OF THE NAVY


POWER OUTLET COORD. W/ ISOLATION VALVE
A ELECTRICAL A
*STATION TO MEET ALL REQUIREMENTS OF ANSI Z358.1 2014

3 SCALE:

EPROJECT NO.:
AS NOTED

CONSTR. CONTR. NO.

4
NAVFAC DRAWING NO.
13,145,435
SHEET 31 OF

P-501
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
A
B
C
D
1

1
2

2
13
2 °F
80
°F
3

3
4

4
5

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND - - - -


DES

SHEET
SCALE:

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON - - - -


ACTIVITY

ATY
APPROVED

- - - -
EPROJECT NO.:

32

- - - -
DRW

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

OF
SATISFACTORY TO DATE

BUILDING 3069 - - - -
ATY
FOR COMMANDER NAVFAC

- - - -
REPAIRS TO PACKOUT OPERATIONS
AS NOTED

13,145,436
CHK

P-601
DRAWFORM REVISION: SEP 2021

- - - -
PWT

PLUMBING ISOMETRIC SYM DESCRIPTION DATE APPR


SEAL

A
B
C
D
1 2 3 4 5
LEGEND ABBREVIATIONS GENERAL NOTES

APPR
-

-
ɸ PHASE
ONE LINE DIAGRAMS POWER & CONTROL LIGHTING 1/C ONE CONDUCTOR 1. ALL ELECTRICAL WORK AND MATERIAL IS NEW AND

DATE
RECTANGULAR SURFACE OR PENDANT MOUNTED A AMPERAGE OR AMPS SHALL BE PROVIDED BY THE CONTRACTOR UNLESS

-
DISCONNECT SWITCH, HEAVY DUTY TYPE 600V, 3 POLE FLUORESCENT/LED FIXTURE AFF ABOVE FINISHED FLOOR OTHERWISE NOTED. COORDINATE WITH MECHANICAL
F E E = INDICATES BATTERY BACKUP FOR EMERGENCY LIGHTING
UNLESS OTHERWISE NOTED AFG ABOVE FINISHED GRADE
ELECTRICAL OPERATED 60 WP
5a 5 = CIRCUIT NUMBER AND OTHER TRADES TO PROVIDE RACEWAYS/CONDUITS
1200AF F = FUSED a = INDICATES SWITCH CONTROLLING FIXTURE AHU AIR HANDLING UNIT
E
1200AT
MAIN CIRCUIT BREAKER FOR CONTROL WIRING IN ACCORDANCE WITH THE
60 = SWITCH SIZE IF UNFUSED BKR BREAKER NATIONAL ELECTRIC CODE (NEC OR NFPA 70).
L-S-I-GR 1200AF = FRAME SIZE
OR FUSE SIZE IF FUSED
1200AT = TRIP SETTING PENDANT MTD HIGH INTENSITY DISCHARGE FIXTURE C CONDUIT
WP = WEATHERPROOF NEMA 4X CB CIRCUIT BREAKER
L = LONG TIME OVERCURRENT
ENCLOSURE STAINLESS STEEL
2. AN EQUIPMENT GROUND WIRE SHALL BE RUN WITH
S = SHORT TIME OVERCURRENT CKT CIRCUIT FEEDERS AND BRANCH CIRCUITS.
D I = INSTANTANEOUS OVERCURRENT
GR = GROUND FAULT OVERCURRENT
PENDANT MTD HIGH INTENSITY DISCHARGE FIXTURE
HID FIXTURE COMES WITH 100W QUARTZ LAMP DWG DRAWING D
EA EACH 3. INSTALLATION SHALL BE AS PER NEC. CONDUCTORS
ONE ELEMENT PUSHBUTTON STATION, DPDT WALL MTD HIGH INTENSITY DISCHARGE FIXTURE
EPO HID FIXTURE COMES WITH 100W QUARTZ LAMP
ELEC ELECTRICAL SHALL BE COPPER, MIN. #12 THHN/THWN. CONDUIT
EPO = EMERGENCY POWER OFF BUTTON IS

DESCRIPTION
FUSE EMT ELECTRICAL METALLIC TUBING
125A MECHANICALLY HELD CLOSED SHALL BE EMT FOR INDOOR, DRY AREA, AND SHALL BE
125A = AMPERE RATING WALL MTD HIGH INTENSITY DISCHARGE FIXTURE ENCLOSURE
ENCL

-
HID FIXTURE COMES WITH 100W QUARTZ LAMP
RIGID GALV. STEEL FOR WET OR EXTERIOR
EQUIP EQUIPMENT APPLICATIONS.
POWER TRANSFORMER DUPLEX RECEPTACLE 20A, 125V, NEMA 5-20R EWC ELECTRIC WATER COOLER

SYM
WP, GFCI 5 5 = CIRCUIT NUMBER

-
DELTA CONNECTED PRIMARY LED ILLUMINATED EXIT LIGHT EWH ELECTRIC WATER HEATER 4. ELECTRICAL EQUIPMENT SHALL BE IDENTIFIED AND
WP = WEATHER PROOF WITH INTERNAL BATTERY AND CHARGER
WYE CONNECTED GROUNDED SECONDARY GFCI = GROUND-FAULT CIRCUIT INTERRUPTER EXIST EXISTING LABELED.
EXP EXPLOSION PROOF
SURFACE OR PENDANT MOUNTED HIGH BAY LED FIXTURE
GFE GOVERNMENT FURNISHED EQUIPMENT
CIRCUIT BREAKER MANUAL MOTOR STARTER
5. FEEDERS/CIRCUITS SHALL BE IDENTIFIED AT EACH END
GFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLED
30AT 3-POLE UNLESS NOTED BY 1P OR 2P OF THE WIRE AND AT EVERY SPLICE OR JUNCTION/PULL
Sa SINGLE POLE SWITCH, 20A, 120-277 VOLT GFI GROUND FAULT INTERRUPTER
30AT = TRIP RATING H BOX.
a = INDICATES FIXTURE CONTROL GND GROUND
SINGLE RECEPTACLE 20A, 125V, WITH S = 3-WAY, 20A, 120-277 VOLT
3 HGT HEIGHT
5 GROUND FAULT CIRCUIT INTERRUPTER LIGHT EMITTING DIODE 6. PROVIDE NAMEPLATES ON THE EXTERIOR OF
H =RATED FOR USE IN HAZARDOUS AREA LED
5 = CIRCUIT NUMBER CLASS I DIVISION 1 GROUPS C & D LIQUIDTIGHT FLEXIBLE METALLIC CONDUIT ELECTRICAL PANELS AND ENCLOSURES AS FOLLOWS:
NON FUSED DISCONNECT SWITCH LFMC
RATED FOR USE IN HAZARDOUS AREA CLASS II DIVISION 1 GROUPS E, F & G
30AS 30AS = SWITCH SIZE CLASS I DIVISION 1 GROUPS C & D LPS LIGHTNING PROTECTION SYSTEM
WP = WEATHERPROOF CLASS II DIVISION 1 GROUPS E, F, & G MAIN DISTRIBUTION PANEL
WALL MOUNTED HIGH PRESSURE SODIUM/LED FIXTURE
MDP DEVICE I.D.
MECHANICAL PANEL XXX
MECH DEVICE RATING
RACEWAY OR CABLE TURNING UP TOWARD OBSERVER 100A, 208Y/120V-3Ø, 4W
MLO MAIN LUGS ONLY
WALL MOUNTED LED FIXTURE FED FROM PANEL MDP POWER SOURCE
MOTOR MTD MOUNTED
10
10 = HORSEPOWER
RACEWAY OR CABLE TURNING DOWN AWAY FROM INSTALLED 2018 INSTALLATION YEAR
OBSERVER JUNCTION BOX MTG HT MOUNTING HEIGHT
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
C GROUND CONNECTION RACEWAY CONCEALED IN OR BELOW FLOOR
MISCELLANEOUS SYSTEM NTS NOT TO SCALE
SEAL
C
OC OCCUPANCY SENSOR 7. PROVIDE NEW TYPE DIRECTORIES FOR PANELS (NEW
MOTOR
5
5 = HORSEPOWER PGG PRIMARY GROUNDING GIRDLE OR EXISTING) INCLUDED IN THIS PROJECT.
DESKTOP MASTER STATION
PREWIRED PACKAGED MOTOR COMPLETE WITH DISCONNECT PNL PANEL
PREWIRED PACKAGED MOTOR COMPLETE WITH DISCONNECT PNLBD PANELBOARD 8. INTERIOR WIRING SYSTEMS SHALL BE CONCEALED WITH
5 SWITCH, MOTOR STARTER AND ALL NECESSARY CONTROLS
5 = HORSEPOWER SWITCH, MOTOR STARTER AND ALL NECESSARY CONTROLS REQ'D REQUIRED FLUSH MOUNTED BOXES/DEVICES, UON.
5 P HANDS-FREE REMOTE PAGING STATION
5 = HORSEPOWER 1 SUITABLE FOR HAZARDOUS AREA RGS/RMC RIGID GALVANIZED STEEL/RIGID METAL CONDUIT
SGG SECONDARY GROUNDING GIRDLE 9. DRAWINGS ARE BASED ON EXISTING BUILDING PLANS
PREWIRED PACKAGED UNIT COMPLETE WITH DISCONNECT TYP TYPICAL AND FIELD INVESTIGATIONS. CONTRACTOR SHALL VISIT
60 SWITCH AND ALL NECESSARY CONTROLS UON UNLESS OTHERWISE NOTED
COMBINATION FULL VOLTAGE NON-REVERSING P HANDS-FREE REMOTE PAGING STATION
THE EXISTING BUILDING AND ACQUAINT THEMSELVES
30AS KW 60 = KILOWATTS
STARTER WITH FUSED DISCONNECT SWITCH 2 VAC VOLTS, AC WITH THE EXISTING FIELD CONDITIONS. CONTRACTOR
20AF APPROVED
RED AND GREEN INDICATING LIGHTS AND VDC VOLTS, DC SHALL EXAMINE DRAWINGS TO AVOID CONFLICT.
HAND-OFF-AUTO SELECTOR SWITCH J JUNCTION BOX
WP WEATHERPROOF FOR COMMANDER NAVFAC
1 C CCTV CAMERA XFMR TRANSFORMER
R T THERMOSTAT 10. ALL NEW METAL SHALL BE GROUNDED, INCLUDING BUT ACTIVITY
30AS = SWITCH SIZE R = STOPPED NOT LIMITED TO GUTTERS, DOWNSPOUTS, REINFORCING
G
20AF = FUSE SIZE G = RUNNING
H H HUMIDISTAT TELEPHONE OUTLET
BARES, STEEL BEAMS, COLUMNS, DUCT WORK, DOORS,
O 1 = STARTER SIZE
A DOOR FRAMES, CONDUCTIVE FLOORS, PIPING, CONDUIT,
O OCCUPANCY SENSOR AND SUPPORTS TO THE SECONDARY GROUNDING
FOE FIBER OPTICS TO ELECTRICAL CONVERTER GIRDLE. SATISFACTORY TO DATE
RP1 RACEWAY OR CABLE HOMERUN DESIGNATION TO
FUSED DISCONNECT SWITCH PANELBOARD RP1 DES DRW CHK
30AS (2,4,6) 11. ALL EQUIPMENT WIRING AND CONDUIT INSTALLATIONS
(2,4,6) CIRCUIT NUMBERS
20AF 30AS = SWITCH SIZE
20AF = FUSE SIZE R CCTV CAMERA RECEIVER IN THE CLASSIFIED AREAS SHALL BE SUITABLE FOR
CLASS I, DIVISION 1, GROUPS C & D AND CLASS II,
CONDUIT CAPPED & TERMINATED WITH BUSHING DIVISION 1, GROUPS E, F, & G APPLICATIONS PER NEC
DISTRIBUTION POWER
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


ARTICLE 500, OR SHALL BE RATED INTRINSICALLY SAFE.

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


PREWIRED PACKAGED UNIT COMPLETE WITH DISCONNECT 4W RACEWAY WHERE NUMBER OR CROSS LINES
60 12. ALL CONDUITS TRANSITIONING FROM AN UNCLASSIFIED
SWITCH AND ALL NECESSARY CONTROLS INDICATES NUMBER OF #12 AWG WIRES.
KW

REPAIRS TO PACKOUT OPERATIONS


60 = KILOWATTS NO NUMBER OR NO CROSS LINES INDICATES AREA TO A CLASSIFIED AREA SHALL BE PROVIDED WITH
INDICATES ONE PHASE WIRE, ONE WHITE NEUTRAL WIRE, SINGLE PHASE POLE-MOUNTED TRANSFORMER
SEALING TYPE FITTINGS.
& ONE GREEN EQUIPMENT GROUND WIRE.
VFD VARIABLE FREQUENCY DRIVE RACEWAY SHALL BE 3/4" MINIMUM THREE PHASE POLE-MOUNTED TRANSFORMER BANK
GENERAL DEMOLITION NOTES
EPO EMERGENCY POWER OFF PANEL RACEWAY UTILITY POLE
2" = CONDUIT SIZE RIGID STEEL 1. COORDINATE WITH MECHANICAL AND OTHER TRADES
4 #1 = THREE #1 AWG PHASE WIRES AND 1 #1 NEUTRAL TO DISCONNECT THE POWER TO FACILITATE THE

BUILDING 3069
SPD SURGE PROTECTIVE DEVICE 2"C-4#1, 1#6 1 #6 = ONE #6 AWG GREEN EQUIPMENT GROUND
PAD-MOUNTED TRANSFORMER
DEMOLITION.

2. EXIST. WIRING AND CONDUIT IDENTIFIED FOR


P1 = CONDUIT IDENTIFICATION NUMBER (POWER) DEMOLITION SHALL BE REMOVED, UON.
C1 = CONDUIT IDENTIFICATION NUMBER (CONTROL)
GROUNDING & LIGHTNING PROTECTION P1 13.2KV ELECTRIC POWER LINES
3. CONDUIT CONCEALED IN WALLS AND SLABS SHALL BE
3/4" DIA. x 10'-0" LONG COPPER CLAD GROUND ROD BLANKED OFF AND ABANDONED IN PLACE. PATCH WALLS
PANELBOARD COMMUNICATION LINES IN CONDUIT
AND SLABS AFTER DEMOLITION IS COMPLETE.
RP1 INDICATES PANEL NUMBER 1
EXOTHERMIC CONNECTION
ABOVE GROUND LINES
RP - RECEPTACLE PANEL 4. BOXES WHICH ARE DISCONTINUED SHALL BE BLANKED
LP - LIGHTING PANEL
UNDERGROUND LINES
OFF OR REMOVED ALONG WITH DEVICES.
BOLTED OR PRESSURE CONNECTION PP - POWER PANEL

DEPARTMENT OF THE NAVY


S 5. EXISTING ELECTRICAL EQUIPMENT NOT INDICATED ON
24" HIGH AIR TERMINAL S START STOP PUSH-BUTTON STATION DEMOLITION PLAN SHALL REMAIN CONNECTED FOR
GENERAL
A R RED AND GREEN INDICATING LIGHTS
CONTINUED USE.
A
SECONDARY GROUNDING GIRDLE CABLE DETAIL OR SECTION
SGG
#4/0 AWG BARE STRANDED COPPER.
G R - STOPPED IDENTIFICATION SYMBOL 6. CONTRACTOR SHALL RECONNECT EXISTING CIRCUIT(S)
G - RUNNING DETAILS ARE NUMBERS, (INTERRUPTED BY REMOVAL OF EXISTING DEVICE) TO
PIGTAIL - COIL AND LEAVE 6'-0" LONG H SECTIONS ARE LETTERS THE REMAINING ELECTRICAL EQUIPMENT LOCATED
#6 AWG SOLID BARE COPPER WIRE O HAND-OFF-AUTO CONTROL STATION DOWNSTREAM FROM THE POINT OF INTERRUPTION. SCALE:

UNLESS OTHERWISE NOTED. A EPROJECT NO.:

#4/0 - INDICATES #4/0 AWG STRANDED BARE COPPER WIRE CONSTR. CONTR. NO.
DEMOLISH AND REMOVE
EXISTING LIGHTNING PROTECTION CABLE CONTROL LOCATION SELECTOR SWITCH
LP NAVFAC DRAWING NO.
#4/0 AWG STRANDED BARE COPPER WIRE
CLASS I DIVISION 1 GROUPS C & D AND
MOV SIGNAL SURGE SUPRESSION CLASS II DIVISION 1 GROUPS E, F, & G SHEET OF
HAZARDOUS ENVIRONMENT
E-001
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
23

-
3 4
1. FOR LEGEND AND GENERAL NOTES SEE DRAWING E-001.

DATE
END OF CONCRETE POLE #14

-
ENCASEMENT 2. THE CONTRACTOR SHALL SCAN THE AREA USING
C ELECTROMAGNETIC METHODOLOGY TO DETERMINE THE
POLE #13 LOCATION OF THE EXISTING UNDERGROUND
DUCTBANKS PRIOR TO COMMENCEMENT OF
EXISTING 2-2" RIGID POLE #11 EXCAVATION. THE EXISTING DUCTBANKS SHALL NOT BE
METAL CONDUITS C DAMAGED DURING EARTHWORK AND CONSTRUCTION.
FOR POWER FEED ANY DAMAGE WHICH MAY OCCUR DURING
D TO TRANSFORMER PRIMARY CONSTRUCTION SHALL BE REPAIRED AND APPROVED BY D
EXISTING 6-5" AND NSWC REPRESENTATIVE AND/OR NAVFAC
1-1" RSC CONDUITS
1 POLE #11A
E CONSTRUCTION MANAGER.

DESCRIPTION
EXISTING 6-2" RIGID

-
C METAL CONDUITS
A FOR CONTROL AND TELECOMMUNICATION

SYM
-

-
LINES (PHONE, FIRE ALARM, AUDIO,
ELECTRICAL
G-4 MCC1 CONTROL AND INSTRUMENTATION, AND FIBER OPTIC)
TO BUILDING - ONE 2" CONDUIT TO BE
USED AS SPARE FOR FUTURE FIBER LINE

2
NEW 12" RCP FLARED
DEMOLITION KEYNOTES
END SECTION
B
1. EQUIPMENT TO BE DEMOLISHED IN ELECTRICAL ROOM.
NEW 12" RCP SEE DRAWINGS E-201 AND E-401 FOR DETAILS.

ENLARGED DEMO PLAN - ELECTRICAL ROOM


1/8" = 1'-0" A EXISTING
OVERHEAD LINE
#336 ACRS WIRE
2. TELECOMMUNICATIONS DUCTBANK. COPPER CONTROL
CABLE TO BE REMOVED FROM ONE OF THE 2" CONDUITS
IN THE DUCTBANK AND SHALL REMAIN AS A SPARE FOR
A FUTURE FIBER OPTIC LINE. SEE DRAWING ES-501 FOR
DETAILS.
D
SB
C 3. MECHANICAL EQUIPMENT TO BE DEMOLISHED. SEE SEAL
C
DRAWING MD-101 FOR DETAILS.

G
25' BUFFER

RA
SW ALE

VE
AC ROSS

L
1000 KVA SSF

RO
PAD MOUNTED

AD
TRANSFORMER SF

APPROVED

AY
SF VEW
. DRI
FOR COMMANDER NAVFAC

BIT
NEW
ACTIVITY

GFC
3
POLE #13
NEW CB
POLE #14
SATISFACTORY TO DATE

R C DES DRW CHK

A GFC
A L D
O
N SB
I
AT 25 SF
B R B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


E C

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


P
O AR
A L

REPAIRS TO PACKOUT OPERATIONS


I ON
R AT
24 E
3 OP

BUILDING 3069
3
23

SF
3

SEE ENLARGED PLAN - ELECTRICAL ROOM


A

DEPARTMENT OF THE NAVY


SF
22
A A

22
GRAPHIC SCALE
SF

21
HVAC YARD AREA
0' 4' 8' 16'

20
SCALE:

1/8"=1'-0" EPROJECT NO.:

19
CONSTR. CONTR. NO.

17
0' 1' 2'

SF
NAVFAC DRAWING NO.

OVERHEAD DISTRIBUTION DEMO PLAN


1"=1' SHEET OF
1" = 1'-0"
ES-101
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. PLAN ONLY DESCRIBES MAJOR ITEMS TO BE

DATE
DEMOLISHED. REFER TO DRAWING E-301 FOR

-
DEMOLITION OF GROUNDING GIRDLES.

24 2. ALL CONDUCTORS SHALL BE THHN BARE STRANDED


COPPER TO BE DIRECT BURIAL FOR LIGHTNING
23 PROTECTION SYSTEMS.

3. ENSURE ALL METALS SUPPORTING EQUIPMENT AT


D 24 BUILDING EXTERIOR WILL BE BONDED TO THE SGG D
USING #4/0 AWG BARE SOLID COPPER WIRE. REFER TO
DRAWINGS E-301 AND E-302 FOR DETAILS.

DESCRIPTION
-

-
4. THE CONTRACTOR SHALL SCAN THE AREA USING
ELECTROMAGNETIC METHODOLOGY TO DETERMINE THE
LOCATION OF THE EXISTING UNDERGROUND

SYM
-

-
GROUNDING GIRDLE PRIOR TO COMMENCEMENT OF
EXCAVATION. THE EXISTING GROUNDING GIRDLE SHALL
1 NOT BE DAMAGED DURING EARTHWORK AND
CONSTRUCTION. ANY DAMAGE WHICH MAY OCCUR
DURING CONSTRUCTION SHALL BE REPAIRED AND
APPROVED BY NSWC REPRESENTATIVE AND/OR NAVFAC
CONSTRUCTION MANAGER.
21
22

TP

SGG
#4/0
SGG
ASPH. SGG DEMOLITION KEYNOTES
1. DEMOLISH AND REMOVE EXISTING SECONDARY
GROUNDING GIRDLE AS NOTED ON THE PLAN, OR AT
LEAST ONE FOOT OUTSIDE THE EDGE OF EACH
C ELEC. CONCRETE PAD SHOWN.
SEAL
C

SGG
BLDG 3069 FF ELEV=24.67

MECH NEW WORK KEYNOTES


SGG

SGG
GROUNDING DEMOLITION PLAN 1. EXISTING SECONDARY GROUNDING GIRDLE (SGG) IS APPROVED

SCALE: 1" = 1 FT ASSUMED TO BE APPROXIMATELY 3 FEET FROM THE


BUILDING EXTERIOR AND 3 FEET IN DEPTH. SCAN AND FOR COMMANDER NAVFAC

MARK SGG PRIOR TO CUTTING AND TERMINATING AT ACTIVITY

NEW GROUND RODS WITHIN NEW GROUND TEST WELLS.

2. NEW 3/4" X 12 FOOT GROUND ROD IN TEST POCKET. SEE


DRAWINGS E-301 AND E-302 FOR DETAILS.
SATISFACTORY TO DATE
3. NEW #4/0 BARE COPPER CABLE AT 3 FOOT DEPTH TO BE
24 CONNECTED TO EXISTING DOWN CONDUCTORS (NOT
DES DRW CHK

23 SHOWN) FROM THE ROOF INTEGRAL LIGHTNING


PROTECTION SYSTEM (SEE DRAWING E-304 FOR
DETAILS) AND NEW GROUND RODS IN TEST WELLS.
B 24 B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


4. NEW PORTION OF SECONDARY GROUNDING GIRDLE
3 SHALL BE BONDED TO REBAR OF NEW CONCRETE

REPAIRS TO PACKOUT OPERATIONS


LOADING DOCK. SEE DRAWINGS C-003 FOR CIVIL
ES
ES

ES ES
ES

ES
DETAILS, S-101 FOR STRUCTURAL DETAILS, AND E-302
ES

ES
ES

ES
ES

ES
ES

ES
ES

ES
ES

ES

ES
ES
ES
ES
ES
ES

FOR GROUNDING DETAILS.

2 2

BUILDING 3069
ES ES
ES ES
ES ES
ES

ES
ES

ES
ES

ES
ES

ES
ES

ES
ES

ES

ES ES
ES ES
ES ES

ES
ES
ES
ES

ES
ES

ES
ES

ES

ES
ES
ES

ES

ES

1
ES
ES

ES
ES

ES
ES

ES

ES
ES

ES

4
21
22

TP
SGG

#4/0
SGG
ASPH. SGG

DEPARTMENT OF THE NAVY


A ELEC. A
SGG

BLDG 3069 FF ELEV=24.67


GRAPHIC SCALE SCALE:

EPROJECT NO.:

MECH CONSTR. CONTR. NO.


SGG

SGG

0' 1' 2' NAVFAC DRAWING NO.

GROUNDING PLAN
SCALE: 1" = 1 FT
1"=1' SHEET OF

ES-102
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
COMPACTED STRUCTURAL

-
BACKFILL IN 6" LIFTS
TO 95% ASTM D 1557 GRADE
1. FOR LEGEND AND GENERAL NOTES SEE DRAWING E-001.

DATE
-

-
TRENCH SHORING 2. ALL EXISTING DUCTBANKS, UTILITY POLES, AND

9"
~ ASSOCIATED EQUIPMENT ARE FOR CONTRACTOR

24" MIN.
GRADE REFERENCE ONLY. OTHER THAN REMOVAL OF EXISTING
EARLY WARNING
AND IDENTIFICATION TAPE 1 COPPER CONTROL CABLES, NO NEW WORK IS REQUIRED
FOR ITEMS DEPICTED.
TRENCH SHORING

9"
TELEPHONE CABLE

24" MIN.
3. THE CONTRACTOR SHALL SCAN THE AREA USING
D EXISTING 2" RSC
(TYPICAL FOR 6) COPPER CONTROL CABLE
POLE
#13 ELECTROMAGNETIC METHODOLOGY TO DETERMINE THE D
EARLY WARNING LOCATION OF THE EXISTING UNDERGROUND
AND IDENTIFICATION TAPE CONDUIT TO BE USED AS
COMPACTED STRUCTURAL SPARE FOR FUTURE DUCTBANKS PRIOR TO COMMENCEMENT OF

DESCRIPTION
BACKFILL IN 6" LIFTS EXCAVATION. THE EXISTING DUCTBANKS SHALL NOT BE
FIRE ALARM

-
TO 95% ASTM D 1557 3" TYP. DAMAGED DURING EARTHWORK AND CONSTRUCTION.
ANNUNCIATOR
SP ANY DAMAGE WHICH MAY OCCUR DURING
3 #1/0 15KV CABLE CONSTRUCTION SHALL BE REPAIRED AND APPROVED BY

SYM
EXISTING 4" RSC

-
& 4/0 BARE COPPER WIRE NSWC REPRESENTATIVE AND/OR NAVFAC
SPARE IN EXISTING 4" RSC 3" TYP. CONSTRUCTION MANAGER.
P.A./AUDIO CABLE FIRE ALARM LOOP
3" TYP. P.A. / AUDIO EXISTING FIRE
FIBER OPTICS/VIDEO CABLE CABLE ALARM LOOP
TO POLE #8

POWER DUCTBANK SECTION TELECOM DUCTBANK SECTION DEMOLITION KEYNOTES


NO SCALE NO SCALE FIBER OPTICS/ FIRE ALARM 1. REMOVE EXISTING COPPER CONTROL CABLES FROM
VIDEO CABLE ANNUNCIATOR CABLE CONDUIT. CONDUIT TO REMAIN AS SPARE FOR FUTURE
TELEPHONE CABLE COPPER CONTROL FIBER OPTIC LINE.
CABLE

1
EXISTING 65E FUSE
AND FUSE HOLDER.
LIGHTNING ARRESTORS
C TO REMAIN AS IS.
SEAL
C
4

#1/0 AWG 15KV CABLE


24

26 24
APPROVED
TRIMOUNT #4/0 BARE COPPER
BRACKET 25 GROUND WIRE FOR COMMANDER NAVFAC
EXISTING FIRE ACTIVITY
ALARM LOOP
FROM POLE #8
CLASS 1 POLE EXISTING P.A./
AUDIO CABLE
EXISTING 4" RSC
3#1/0 15KV CABLE
~ EXISTING FIRE ALARM SATISFACTORY TO DATE

ANNUNCIATOR CABLE DES DRW CHK

12"
& 4/0 BARE COPPER WIRE SIDE VIEW
1
EXISTING FIBER OPTICS/
VIDEO CABLE

12"
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


EXISTING COPPER CONTROL

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


CABLE
TELEPHONE CABLE

REPAIRS TO PACKOUT OPERATIONS


POLE MATERIAL LIST: SEE NOTE 2
CLASS 1 POLE
~ INSULATING BUSHING
4 MACHINE BOLT 5/8" x LENGTH AS NEEDED WITH PRESENT ON ALL
WITH WASHER, NUT AND LOCKWASHER CONDUITS. AFTER
CABLES ARE
24 PORCELAIN HOUSED TERMINATOR INSTALLED

BUILDING 3069
SEAL ALL EXISTING
25 CABLE GRIP HANGER CONDUITS MASTER BOX
~
ON POLE #13
26 HOSE CLAMP
#4/0 BARE COPPER
GROUND WIRE 1" RSC 2#6,
EXISTING 4" RSC 1#10 GND.
CAPPED 12" CONNECTED TO THE 1"x2" RSC REDUCER
ABOVE GRADE EXISTING GROUND ROD

DEPARTMENT OF THE NAVY


A A

SCALE:

EPROJECT NO.:
FRONT VIEW
POLE #14 DETAIL POLE #13 DETAIL
CONSTR. CONTR. NO.

NO SCALE
NO SCALE NAVFAC DRAWING NO.

SHEET OF

ES-501
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1 2 3 4 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
2. FOR LIGHTING FIXTURE AND EXIT SIGN DEMO
SCHEDULE, SEE DRAWING E-501.
AGV AIR LOCK
0-2
3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY
ALL NEW LIGHTING CIRCUITS WHERE APPLICABLE.
Sd
H M5 M6 2
REFER TO DRAWINGS E-103 AND E-104 FOR NEW
D X1
2
1d 1d PHOTO-CELL 120V LIGHTING PLAN. D
B FOR CONTROL OF
E OUTDOOR H2 FIXTURES
RED STROBE MOUNTED ON OUTSIDE

DESCRIPTION
WARNING LIGHT WALL OF ELECTRIC ROOM
WALL MOUNTED

-
CROUSE-HINDS
CAT # EVBS230R/120V PE DEMOLITION KEYNOTES

SYM
X2

-
E B X1 HSa A
2 HSb STAIRS 2 1. DEMOLISH AND REMOVE EXISTING LIGHTS AND EXIT
HSc
F1 MTD. 10'-0" AFF
ACC SIGNS, INCLUDING BUT NOT LIMITED TO ALL WIRING
F1 F1 F1 (TYPICAL)
J E E E WITHIN CONDUIT FROM LIGHTS/SIGNS BACK TO
LP1 E 2b 2a 2b
"MATCON IBC" ELECTRICAL PANEL/SOURCE.
(1,3,5)
BIN CAPPING 3/4" 5#12 2a 0-4
STATION UP TO LIGHTS 2. DEMOLISH AND REMOVE EXISTING PHOTOCELL.
J RP1 X2
M6 3/4"C-3#12
LIGHT FIXTURE WITH M5 (2) 2
CEILING MOUNTED 5c 5c
JUNCTION BOX F1 LP1(2)
MOUNTED ON BEAM Sa
X1 UNDER MEZZ. E F1 F1 F1
PROCESS E E E Sb
2 (TYPICAL) 2b 2a 2b
B 0-1 1 2a
E 1
M5 M5 B
PELLETIZER
ROTARY INDEXING 5c 5c
TURNTABLE HIGH BAY DOME
(TYPICAL)
EXTRUDER ACC
F1
LP1(4)
C E MECHANICAL
0-3 F1
SEAL
C
E
4b 4b
MTD. 10'-0" AFF 1
X2
(TYP. FOR 6)
4

F1 F1 F1 F1
E E E
4b 4b 4b
M6 M5 E Sb

5c 5c 4b

C APPROVED
E B X1
2
FOR COMMANDER NAVFAC

ACTIVITY
CHILLER

CHILLER
SATISFACTORY TO DATE

DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


LP1(6) 1

Sa
X2 6 F1
E
6a
F1

BUILDING 3069
E

6a F1
E
UTILITY BLDG.6a
2-1

F1
E

6a
F1 F1
E E
6a 6a

DEPARTMENT OF THE NAVY


MCC2

A A

GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

0' 4' 8' 12' NAVFAC DRAWING NO.

LIGHTING DEMO PLAN B3069 & B3090 3/16"=1'-0" SHEET OF

3/16" = 1'-0" E-101


DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.

DATE
-

-
2. FOR LIGHTING FIXTURE AND EXIT SIGN DEMO SCHEDULE, SEE DRAWING E-501.

1 3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY ALL NEW LIGHTING CIRCUITS WHERE
APPLICABLE. REFER TO DRAWINGS E-103 AND E-104 FOR NEW LIGHTING PLAN.
1

D D
X1

DESCRIPTION
E B

-
2
DEMOLITION KEYNOTES

SYM
-

-
HIGH BAY DOME 1. DEMOLISH AND REMOVE EXISTING LIGHTS AND EXIT SIGNS, INCLUDING BUT NOT LIMITED TO
1
LIGHT FIXTURE WITH ALL WIRING WITHIN CONDUIT FROM LIGHTS/SIGNS BACK TO PANEL/SOURCE.
WALL MOUNTING
BRACKET M1 M2 M3
M4
(TYPICAL)
1a 1a 3b 3b

STAIRS

C PROCESS SEAL
C
1-1
M1 M3
1a
3b
M1 M3
1a 3b
APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

MOUNTED ABOVE DES DRW CHK

CRANE (TYPICAL)
M2 M1 M4 M3
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


1a 1a 3b 3b

REPAIRS TO PACKOUT OPERATIONS


1

X1

BUILDING 3069
E B 2

LIGHTING DEMO PLAN MEZZANINE

DEPARTMENT OF THE NAVY


3/8" = 1'-0"

A A

GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

1' 0 1' 5' 10' NAVFAC DRAWING NO.

3/8"=1'-0" SHEET OF

E-102
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
23.6 26.5 27.3 26.5 23.5 18.8

-
12 12
30.8 34.6 35.7 34.6 30.6 24.2
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E
E-001.

-
35.4 40.0 41.3 39.9 35.3 27.9

A2
37.5 42.1 43.5 A2
42.2 37.5 29.8 2. FOR NEW LIGHTING FIXTURE AND EXIT SIGN SCHEDULE,
SEE DRAWING E-501.
38.1 CANOPY
42.7 44.1 42.9 38.2 30.6

38.5
12
43.1 44.5 43.4
12
38.9 31.3
3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY
ALL NEW LIGHTING CIRCUITS WHERE APPLICABLE.
REFER TO DRAWINGS E-103 AND E-104 FOR NEW
D 36.8 41.2 43.0 E
42.0 37.8 30.7
LIGHTING PLAN. D
1 32.2 36.1 37.4 36.7 33.8 27.6 2 3 4
A2 A2 10
H3 4. ALL NEW WIRING FOR LIGHTING CIRCUITS SHALL

DESCRIPTION
24.6 27.7 28.8 28.4 26.1 22.3
CONSIST OF INSULATED #12 AWG THHN STRANDED

-
4.4 6.1 8.2 10.6 11.4 23.2 19.7 14.3 11.0 8.5 6.6 5.2 4.1 3.5 3.0 2.6 2.3 2.1 2.0 1.9 1.9 1.8 1.7 1.7 1.7 1.7 1.7 1.7 1.6 1.6 1.5 1.4 1.3 1.2 1.1 1.1 1.0 0.9 0.9 1.0 COPPER CONDUCTORS.

4.1 5.6 6.7 8.1 4.1 AGV AIR


53.4LOCK 5. EXIT SIGNS SHALL BE MOUNTED ABOVE DOORWAYS IN

SYM
43.0 53.0 56.0 56.4 52.6 41.8 2.0 6.8 5.6 5.1 4.1 3.4 3.0 2.8 2.7 2.6 2.6 2.5 2.5 2.4 2.4 2.3 2.3 2.3 2.3 2.3 2.3 2.2 2.1 2.0 1.8 1.7 1.5 1.4 1.3 1.2 1.1 1.1 1.2

-
0-2
ACCORDANCE WITH NFPA 101.
3.6 4.8 6.1 4.6 3.9 59.2 72.6 77.1 82.3 77.0 71.8 57.9 2.1 2.2 4.1 3.8 3.4 3.2 3.1 3.2 3.2 3.3 3.4 3.4 3.4 3.3 3.2 3.1 3.1 3.1 3.2 3.2 3.1 3.0 2.8 2.6 2.3 2.1 1.9 1.8 1.6 1.5 1.4 1.3 1.6
HSd
3.4 4.6 4.3 4.8 4.2
6. LIGHTS WITH "E" DESIGNATION SHALL INCLUDE A
67.1 H2
81.1 87.5 92.1 87.2 H280.1 65.3 1.9 2.4 3.9 3.7 3.6 3.5 3.5 3.7 4.0 4.2 4.4 4.4 4.4 4.4 4.3 4.2 4.1 4.1 4.2 4.2 4.1 3.9 3.6 3.2 2.8 2.5 2.3 2.1 2.0 1.8 1.7 1.5 2.0
H3 EXISTING BATTERY PACK FOR EMERGENCY LIGHTING PURPOSES.
10 8d 8d
3.3 3.6 4.3
10
4.7 4.2 X1 RED STROBE
61.6 75.0 80.4 85.2 80.4 74.3 60.4 2.0 2.6 2.8 3.7 3.8 3.8 3.9 4.2 4.6 5.0 5.3 5.4 5.4 5.3 5.3 5.2 5.1 5.1 5.2 5.3 5.1 4.8 4.2 3.7 3.3 2.9 2.7 2.5 2.3 2.1 1.9 1.6 2.3
WARNING LIGHT
2.8 3.5 4.3 4.5 4.3 46.9 57.0 60.9 62.3 60.8 56.6 46.0 1.9 2.3 2.6 2.9 3.6 3.8 4.0 4.3 4.8 5.2
H3
5.6 5.8
WALL MOUNTED
5.7 5.6
CROUSE-HINDS
5.5 5.5 5.4 5.5 5.7 5.9 5.5
H3
5.1 4.4 3.9 3.4 3.0 2.7 2.4 2.3 2.1 1.8 1.4 2.3 NEW WORK KEYNOTES
2.6 3.3 4.0 4.3 4.1 10 CAT # EVBS230R/120V 11e 7
26.3 33.9 36.6 36.6 36.4 33.8 26.3 1.0 1.3 1.8 2.1 2.7 3.1 3.5 3.9 4.4 4.5 4.6 4.9 4.9 4.7 4.6 4.7 4.7 4.9 5.1 5.1 4.7 4.5 4.0 3.5 3.0 2.6 2.2 1.9 1.6 1.4 1.1 0.8 2.3
1. LIGHTS SHALL BE WIRED IN PARALLEL WITH LIGHTS ON
2.5 3.2 3.8 4.0 3.7
X1
1 X2
E
3.3 4.1 4.2 3.6
A
2.9 THE SAME CIRCUIT ONLY. REFER TO DRAWING E-604
45.2 47.7 49.3 50.2 50.4 50.2 49.5 48.4 46.8 44.6 41.9 38.9 28.3 30.8 32.9 34.8 10
36.3 HSa HSb
37.3 HSc37.2HSe
37.8 35.8 34.0 31.7 29.0 Se 15.4 2
21.1 25.6 28.1 28.8 27.9 27.0 27.0 26.3 24.8 23.5 21.1 16.6 11.4 FOR PANEL LP1 SCHEDULE. CONDUIT SHALL BE RMC
E J E J E 3.7 4.6 4.6 3.9 3.0
2.5 3.1 3.6 3.8 3.3
9b H3 9b H3 TO MEZZANINE LIGHTS 5a 9b H3 A1 A1 ACC AND SHALL INCLUDE EQUIPMENT SEALS WITHIN 18" OF
47.9 50.4 51.8 52.6 52.8 52.5 51.7 50.6 PALLET
49.0 46.9 44.2 41.1 31.5 34.5 37.0 39.2 41.1 42.5 43.4 42.7 41.4 39.4 36.8 33.6 19.8 27.8 33.8 36.8 37.2 35.4 34.1 34.3 33.4 31.3 29.9 27.2 21.0 14.0
(DRAWING E-104) J LP1(3,5,8,9) A1
2a E 2b 2a E ALL FIXTURES AND BOUNDARY SEALS WHEN
2.4 3.1 3.6 3.6 3.0 4.3 5.3 5.1 4.2 3.3
8c,d 8c,d 8c,d 8c,d A1 TRANSITION FROM A CLASSIFIED TO AN UNCLASSIFIED
49.4 51.9 53.2 53.9 54.1 53.7 53.0 51.9 50.4 48.3 45.8 42.9 34.7 38.1 40.9 43.4 45.7 47.4 48.6 48.2 47.0 44.9 42.1 38.5 22.1 30.9 37.4 40.2
ELECTRICAL
40.3 38.3 36.8 36.9 35.9 33.7 32.1 29.0 22.5 O 15.1
H2 H2 H2 H2
8c,d
H2
8c,d STAIRS 0-4 MTD. 10'-0" AFF AREA. REFER TO DRAWING E-306 FOR ARE
WRAPPING H2 H2
2.4 3.1 3.5 3.4 2.7 5.0 5.9 5.6 4.6 3.5
A2 8c,d 2b
LP1(11) (TYPICAL) CLASSIFICATION DETAILS.
49.9 52.2 53.6 54.3 54.4 54.2 53.5 52.5 51.0 49.2 46.9 44.2 MACHINE
37.8 41.6 44.6 47.3 49.8 51.9 53.5 53.4 52.4 50.4 47.5 43.4 22.3 30.6 36.7 39.4 39.4 37.8 36.5 36.1 35.0 33.1 31.2 27.8 21.9 15.2
2 H3
C J LP1(10, 12)
C
O
5a E 5.3 6.2 5.9 4.8 3.6
2.4 3.0 3.3 3.1 2.4 PALLET 5a 5a SEAL
X2 7
49.7 52.0 53.4 54.1 54.3 54.1 53.5 52.7 51.5 49.8 47.7 45.3 40.6 44.8 47.9 50.7 53.4 55.8 57.7 57.9 57.1 55.4 52.5 48.0 22.3 30.6 36.7 39.4 39.4 37.9 36.5 36.1 35.0 33.0 31.2 27.8 21.9 15.2 2. LIGHTS SHALL BE WIRED IN PARALLEL. CONDUIT SHALL
H3
2.4 2.8 3.1 2.9 2.1 E 9b 4 H2 8c,d LP1(2)
5.6 6.4 6.1 4.9 3.6 BE RMC AND SHALL INCLUDE EQUIPMENT SEALS WITHIN

DRYING CARTS
8c,d E
49.5 51.6 53.0 53.8
H2
54.0 53.9 53.5 52.8
EXPLOSION
51.8 50.4 48.6 46.4 42.9 47.3 50.7 53.7 56.5 58.9 60.9 61.5 61.1 59.5 56.5 51.9 22.1 30.9
A1 E
37.4 40.2 40.4 38.4 36.9 37.0 35.8 33.6 32.0 29.0 22.5 15.1
Sa
18" OF ALL FIXTURES AND BOUNDARY SEALS WHEN
2.3 2.7 2.9 2.7
10
1.7
X1
49.5 51.5 52.8 53.6 53.9 53.8 53.6
PROOF
53.0 52.2 51.1 49.6 47.6 45.0 49.6 53.0
PROCESS
0-1 61.5
56.0 58.8 63.9 64.5 64.3 62.9 A260.1 55.1
2 19.8 27.8 33.8
2b
36.8 A1
37.2 35.5
2a
34.2
E
A1
34.4 33.3 31.1
2b
29.8 A127.1 21.0
Sb
14.0
5.7 6.4 6.0 4.8 3.6
TRANSITION FROM A CLASSIFIED TO AN UNCLASSIFIED
HIGH BAY LED A2 A2 AREA. REFER TO DRAWING E-306 FOR AREA
2.2 2.5 2.6 H3
2.3 1.4 10 2a 5.6 6.3 5.8 4.7 3.5
(TYPICAL) H2 8c,d CLASSIFICATION DETAILS.
49.6 51.7 52.9 53.6 53.9 53.9 53.8 53.4 52.8 52.0 50.7 48.9 46.3 51.2 54.6 57.7 60.6 63.4 65.9 66.7 66.6 65.2 62.4 57.2 15.4 21.0 25.5 28.1 28.8 27.9 27.1 27.0 26.2 24.7 23.4 21.1 16.6 11.4
H2 8c,d 5a 5a 5a B4.5
2.0 2.2 2.3 1.9 1.2 H2 8c,d H2 8c,d 5.6 6.1 5.7 3.4
H2 8c,d 8c,d H2
50.0 51.9 53.1 53.7 54.0 54.1 54.0 53.9 53.5 52.8 51.8 50.2 47.1 52.1 55.6 58.8 61.8 64.5 67.1 68.0 67.9 66.6 63.7 58.4 11.2 15.0 16.9 15.8 13.2 11.0 9.8 9.5 10.1 11.5 13.3 14.4 13.4 10.7 3. LIGHTS SHALL BE WIRED IN PARALLEL WITH LIGHTS ON
8c,d 4c
1.9 2.0 1.9 1.6 1.1
DRYING CART H2 DRYING CART DRYING CART E EXPLOSION PROOF
LED FIXTURE WITH
E 3 LP1(4)
5.6 6.1 5.6ACC4.5 3.4 THE SAME CIRCUIT ONLY. REFER TO DRAWING E-604
50.2 52.2 53.3 53.9 54.1 54.2 54.2 54.2 54.0 53.6 52.8 51.2 47.3 52.4 56.0 59.3
CEILING MOUNTED
62.3 65.0 67.5 68.4 68.3 67.0 64.0 58.7 14.8 20.7 23.8
A1
22.1 18.3 15.2 13.6
MECHANICAL
13.3 14.3 16.5 19.7 21.9 20.4 15.6 FOR PANEL LP1 SCHEDULE. CONDUIT SHALL BE 3/4" EMT
APPROVED
1.7 1.7 1.6 1.4 1.0
A2 A1 5.7 6.2 5.7 4.5 3.4
WHEN INSIDE THE FACILITY, AND SHALL TRANSITION TO
A252.2 JUNCTION BOX 0-3
50.2 52.2 53.3 53.9 54.2 54.2 54.3 54.4 54.4 54.1 53.3 51.8 47.0 55.8 59.1 62.1 64.8 A2
67.2 68.1 67.9 66.4 63.4 58.0 17.0 23.9 28.0 26.9 23.5 20.5 18.8 18.5 19.7 22.3 4c
26.3 29.3 26.9 19.9
H2 8c,d MOUNTED UNDER MTD. 10'-0" AFF 3/4" RMC WHEN OUTSIDE OF THE FACILITY. FOR COMMANDER NAVFAC
1.5 1.5 1.4 1.2 0.9 O 5.5 6.2 5.7 4.6 3.4
MEZZ. (TYPICAL) (TYPICAL)
49.5 51.6 52.9 53.6 53.9 54.1 54.3 54.4 54.3 54.0 53.1 51.5
5a
46.0 51.1 54.8 58.0 61.0 63.6 5a
65.9 66.6 66.3 64.7 5a61.6 56.3 17.7 24.7 29.4 30.3 28.8 26.7 25.0 25.0 26.2 28.2 31.3 33.5 30.3 22.3 H3 ACTIVITY
MOUNTED ABOVE CRANE E X2 4. NEW WALL MOUNTED INTERIOR LIGHTS IN PROCESS
1.5 1.3 1.2 1.1 0.8 4 5.37 6.0 5.6 4.5 3.4
H3 (TYPICAL)
48.2 50.6 52.0 52.9 53.3 53.6 53.8 53.9 53.7 53.2 52.2 50.5 44.1 49.0 52.7 56.0 58.9 61.3 63.3 63.9 63.4 61.7 58.5 53.5 18.0 25.5 4c31.0 33.3 A1 32.3
33.7 30.3 30.3 31.6 32.1 33.4 34.3 30.5 22.3 ROOM SHALL NOT HAVE PHOTOCELL AND MOTION
E A2
1.4 1.4 1.1 0.9 0.7 9b H2
8c,d H2 H2 H2 H2 3 E 4c 4c E 4c 5.0 5.9 5.4 4.3 3.3 SENSOR INTERNAL TO UNIT (TYPICAL).
46.6 49.1 50.7 51.7 52.2 52.5 52.8 52.8 52.4 51.6 50.5 48.6 41.5 46.2 49.8 52.9 55.6 57.9 59.6 59.9 59.2 57.5 54.5 49.6 17.5 25.4
A1 31.3 33.6 34.0 32.9 30.9 30.8 31.8
A1 31.4 31.2 31.1
A1 27.3 Sc
19.9
8c,d SCREENING 8c,d A2 8c,d 8c,d A2
1.5 1.5 1.4 0.8 0.7 TABLES SCREENING DRYING CARTS 4.4 5.3 5.1 4.1 3.2
44.4 47.0 48.7 49.7 50.39b50.7H350.8 50.8 50.2 TABLES
49.2 47.7 45.7 38.1 9b
42.3H345.7 48.7 51.1 53.2 54.6 54.7 53.9 52.1 49.2 44.9 15.2 21.7 26.6 28.3 28.2 27.2 25.8 25.6 25.9 25.3 24.7 23.9 20.8 15.5 SATISFACTORY TO DATE
LP1(7)
1.5 1.6 1.6 1.5 0.6 E 3.7 4.7 4.6 3.8 3.0 DES DRW CHK

41.6 44.2 45.9 46.9 47.6 47.9 48.1 47.9 47.2 45.9 44.3 42.2 J 34.1 37.8 40.9 43.6 45.8 47.4 48.5 48.5 47.7 45.9 43.3 39.5 11.4 15.6 18.8 20.0 19.9 19.3 18.5 18.2 18.1 17.7 17.0 16.1 13.9 10.8 C
10 X1
2.0 2.1 2.2 2.2 2.1 4.5 4.9 4.7 3.9 3.1

10 10 H3
2.3 1.9 2.0 2.1 2.2 2.3 2.3 2.4 2.5 2.5 2.7 2.9 3.0 3.2 3.5 3.8 H3
7 H3
4.3 4.6 10 4.7 4.8 4.9 5.0 5.3 5.9 6.6 7.0 7.0 7.2 7.1 6.9 6.8 6.9 6.8 6.6 6.2 5.9 5.1 4.4 3.9 3.4 4.7
H3 H3 7

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


2.4 2.0 2.1 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.1 3.3 3.5 3.8 4.3 4.8

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


5.3 5.6 5.7 5.7 5.8 5.8 6.2 6.8 7.4 7.7 7.8 7.8 7.6 7.4 7.4 7.5 7.5 7.4 7.1 6.7 6.0 5.2 4.7 4.2 5.2

2.4 2.1 2.2 2.4 2.5 2.6 2.7 2.8 3.0 3.1 3.3 3.6 3.9 4.3 4.8 5.3
5.5 5.9 6.1 6.2 6.1 6.0 6.3 6.7 7.1 7.3 7.3 7.3 7.1 7.0 7.0 7.1 7.1 7.0 6.8 6.4 5.8 5.3 4.8 4.4 5.2

REPAIRS TO PACKOUT OPERATIONS


2.4 2.2 2.3 2.4 2.5 2.6 2.8 2.9 3.1 3.3 3.5 3.8 4.2 4.5 4.9 5.3
5.5 5.9 6.2 6.4 6.1 5.8 5.8 6.1 6.3 6.4 6.5 6.4 6.3 6.1 6.1 6.1 6.1 6.0 5.9 5.6 5.2 4.8 4.4 4.1 4.6

2.4 2.1 2.2 2.3 2.4 2.6 2.7 2.9 3.1 3.4 3.6 3.9 4.2 4.5 4.9 5.3
5.5 5.9 6.2 6.4 6.1 5.6 5.4 5.6 5.7 5.7 5.7 5.6 5.5 5.3 5.3 5.2 5.2 5.1 5.0 4.8 4.5 4.2 3.9 3.8 4.0

2.2 2.0 2.1 2.2 2.3 2.4 2.6 2.8 3.0 3.3 3.6 3.9 4.2 4.5 4.8 5.2
5.5 5.9 6.2 6.3 6.0 5.5 5.1 5.2 5.3 5.3 5.2 5.1 5.0 4.8 4.7 4.6 4.6 4.5 4.4 4.2 4.0 3.7 3.5 3.3 3.4

2.0 1.8 1.9 2.0 2.2 2.3 2.4 2.6 2.8 3.1 3.4 3.7 4.0 4.4 4.8 5.2

BUILDING 3069
5.5 5.9 6.3 6.3 6.1 4.8 4.9 5.1 5.1 5.1 5.1 4.9 4.7 4.6 4.4 4.3 4.2 4.1 4.0 3.8 3.6 3.3 3.1 2.9 2.8

1.8 1.7 1.7 1.8 1.9 2.1 2.2 2.3 2.5 2.8 3.0 3.4 3.8 4.2 4.6 5.1
5.4 5.8 6.3 6.4 6.1 4.8 4.9 5.1 5.2 5.2 5.0 4.8 4.6 4.4 4.2 4.1 3.9 3.8 3.7 3.5 3.3 3.0 2.7 2.4 2.4

5.0 5.5 6.0 6.3 6.1 4.6 4.9 5.1 5.1 5.1 5.0 4.7 4.5 4.2 4.0 3.8 3.6 3.5 3.4 3.2 2.9 2.5 2.2 2.0 1.9

4.3 4.9 5.4 5.9 5.9 4.2 4.5 4.8


6
4.7
H3
4.7 4.7
RP2(1)
4.4 4.1 3.8 3.5
3 3.2 3.0 2.8 2.7 2.5 2.2 1.9 1.7 1.6 1.6

6 E Sd
3.5 3.2 3.5 3.7 3.5 8.8 12.6 16.5 20.0 23.3 26.7 27.7 23.6 16.8
X2 6d
6d
2.7 3.1 3.5 3.6 3.2 11.6 17.4 23.3 27.5 30.3 33.4A1 33.9 28.6 20.2
O

2.6 3.1 3.4 3.7 3.4 13.9 21.2 E


28.8 33.2 35.2 37.3 37.2 31.3 22.2
A1

DEPARTMENT OF THE NAVY


A1
2.5 3.0 3.5 3.7 3.6 15.0 22.7 30.4 35.0 37.1 39.0 38.5 32.4 23.2
UTILITY BLDG. 6d

2.4 3.0 3.5 3.7 3.6 15.4 23.0 30.5 35.1 2-1
37.3 38.6 37.7 31.9 23.4

A 2.3 2.9 3.4 3.7


6
H3
3.5 15.3 23.3 31.4 36.4 38.1 38.6 37.0 31.9 24.1
A
E
2.2 2.8 3.2 3.5 3.5 14.4 22.2 A1
30.6 36.2 39.0 40.3 39.0 34.1 26.0

2.1 2.5 3.0 3.3 3.2 12.2 18.6 6d


25.7 32.0
6d
37.1
E
40.6 40.5 35.8 27.1
6d
GRAPHIC SCALE SCALE:

EPROJECT NO.:
A1 A1
9.5 13.9 19.2 24.8 30.7 35.1 35.7 31.9 24.4 CONSTR. CONTR. NO.
2.0 2.4 2.8 3.0 2.9

MCC2
1.8 2.2 2.6 2.8 2.5 6.9 9.8 13.3 17.5 21.9 25.2 25.9 23.3 18.3 0' 4' 8' 12' NAVFAC DRAWING NO.

NEW LIGHTING PLAN B3069 & B3090


3/16"=1'-0" SHEET OF

3/16" = 1'-0" E-103


DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.

DATE
-

-
2. FOR NEW LIGHTING FIXTURE AND EXIT SIGN SCHEDULE, SEE DRAWING E-501.

3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY ALL NEW LIGHTING CIRCUITS WHERE
APPLICABLE. REFER TO DRAWINGS E-103 AND E-104 FOR NEW LIGHTING PLAN.

4. ALL NEW WIRING FOR LIGHTING CIRCUITS SHALL CONSIST OF INSULATED #12 AWG THHN
D STRANDED COPPER CONDUCTORS. D
5. EXIT SIGNS SHALL BE MOUNTED ABOVE DOORWAYS IN ACCORDANCE WITH NFPA 101.

DESCRIPTION
-

-
H3 10 NEW WORK KEYNOTES

SYM
-

-
1. LIGHTS SHALL BE WIRED IN PARALLEL WITH LIGHTS ON THE SAME CIRCUIT ONLY. REFER TO
H1 3a X1 DRAWING E-604 FOR PANEL LP1 SCHEDULE. CONDUIT SHALL BE RMC AND SHALL INCLUDE
EQUIPMENT SEALS WITHIN 18" OF ALL FIXTURES AND BOUNDARY SEALS WHEN TRANSITION
45.2 47.7 49.3 50.2 50.4 50.2 49.5 48.4 46.8 44.6 41.9 38.9 28.3 30.8 32.9 34.8 36.3 10 37.8
37.3 37.2 35.8 34.0 31.7 29.0 FROM A CLASSIFIED TO AN UNCLASSIFIED AREA. REFER TO DRAWING E-306 FOR ARE
H1 3a H1 3a H1 3a TO WALL LIGHTS CLASSIFICATION DETAILS.
PALLET 1
EXPLOSION PROOF (DRAWING E-103)
47.9 50.4 51.8 52.6 52.8 52.5 51.7 50.6 49.0 46.9 44.2 41.1 31.5 34.5 37.0 39.2 41.1 42.5 43.4 42.7 41.4 39.4 36.8 33.6
HIGH BAY LED WRAPPING
FIXTURE (TYPICAL) 8c,d MACHINE 8c,d
49.4 51.9 53.2 53.9 54.1 53.7 53.0 51.9 50.4 48.3 45.8 42.9 34.7 38.1 40.9 43.4 45.7 47.4 48.6 48.2 47.0 44.9 42.1 38.5
H2 H2 H2 H2 H2 H2 H2
H1

8c,d 8c,d 8c,d 8c,d 8c,d


C 49.9 52.2 53.6 54.3 54.4 54.2 53.5 52.5 51.0 49.2 46.9 44.2 37.8 41.6 44.6 47.3 49.8 51.9 53.5 53.4 52.4 50.4 47.5 43.4 SEAL
C
3a

3a
PALLET
49.7 52.0 53.4 54.1 54.3 54.1 53.5 52.7 51.5 49.8 47.7 45.3 40.6 44.8 47.9 50.7 53.4 55.8 57.7 57.9 57.1 55.4 52.5 48.0

H1
H2 8c,d STAIRS

DRYING CARTS
49.5 51.6 53.0 53.8 54.0 53.9 53.5 52.8 51.8 50.4 48.6 46.4 42.9 47.3 50.7 53.7 56.5 58.9 60.9 61.5 61.1 59.5 56.5 51.9
H2 8c,d PROCESS
49.5 51.5 52.8 53.6 53.9 53.8 53.6 53.0 52.2 51.1 49.6 47.6 45.0 49.6 53.0 56.01-158.8 61.5 63.9 64.5 64.3 62.9 60.1 55.1 APPROVED

3a
FOR COMMANDER NAVFAC

H2 8c,d 8c,d57.7
ACTIVITY

49.6 51.7 52.9 53.6 53.9 53.9 53.8 53.4 52.8 52.0 50.7 48.9 46.3 51.2H254.6 60.6 63.4 65.9 66.7 66.6 65.2 62.4 57.2

H1
H2 8c,d H2 8c,d
H2 8c,d 8c,d H2
50.0 51.9 53.1 53.7 54.0 54.1 54.0 53.9 53.5 52.8 51.8 50.2 47.1 52.1 55.6 58.8 61.8 64.5 67.1 68.0 67.9 66.6 63.7 58.4
SATISFACTORY TO DATE

DRYING CART H2 8c,d DRYING CART DRYING CART


DES DRW CHK

3a
50.2 52.2 53.3 53.9 54.1 54.2 54.2 54.2 54.0 53.6 52.8 51.2 47.3 52.4 56.0 59.3 62.3 65.0 67.5 68.4 68.3 67.0 64.0 58.7
H1
H1

H1
3a
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


50.2 52.2 53.3 53.9 54.2 54.2 54.3 54.4 54.4 54.1 53.3 51.8 47.0 52.2 55.8 59.1 62.1 64.8 67.2 68.1 67.9 66.4 63.4 58.0

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


H2 8c,d MOUNTED ABOVE CRANE
3a

REPAIRS TO PACKOUT OPERATIONS


49.5 51.6 52.9 53.6 53.9 54.1 54.3 54.4 54.3 54.0 53.1 51.5 46.0 51.1 54.8
(TYPICAL)
58.0 61.0 63.6 65.9 66.6 66.3 64.7 61.6 56.3

3a
48.2 50.6 52.0 52.9 53.3 53.6 53.8 53.9 53.7 53.2 52.2 50.5 44.1 49.0 52.7 56.0 58.9 61.3 63.3 63.9 63.4 61.7 58.5 53.5

H1
8c,d H2 H2 H2 H2 H2
H2

BUILDING 3069
8c,d 8c,d8c,d H1 MOUNTED BELOW
46.6 49.1 50.7 51.7 52.2 52.5 52.8 52.8 52.4 51.6 50.5 48.6 41.5 46.2 49.8 52.9 55.6 57.9 59.6 59.9 59.2 57.5 54.5 49.6
8c,d 8c,d
SCREENING 3a MEZZANINE (TYPICAL)
TABLES SCREENING DRYING CARTS
44.4 47.0 48.7 49.7 50.3 50.7 50.8 50.8 50.2 TABLES
49.2 47.7 45.7 38.1 42.3 45.7 48.7 51.1 53.2 54.6 54.7 53.9 52.1 49.2 44.9
H1 3a H1 3a H1 3a 1 H1 3a H1 3a H1 3a
X1
41.6 44.2 45.9 46.9 47.6 47.9 48.1 47.9 47.2 45.9 44.3 42.2 34.1 37.8 40.9 43.6 45.8 47.4 48.5 48.5 47.7 45.9 43.3 39.5

1 10

DEPARTMENT OF THE NAVY


10 10 H3

A H3 H3 10 A

NEW LIGHTING PLAN MEZZANINE GRAPHIC SCALE SCALE:

EPROJECT NO.:

3/8" = 1'-0" CONSTR. CONTR. NO.

1' 0 1' 5' 10' NAVFAC DRAWING NO.

3/8"=1'-0" SHEET OF

E-104
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
GENERAL NOTES

-
C B A
15'-2" 15'-2"

DATE
1. FOR LEGEND AND GENERAL NOTES, SEE

-
DRAWING E-001.

2. FOR NEW LIGHTING PLAN, SEE DRAWINGS


E-103 AND E-104.

3. FOR NEW LIGHTING FIXTURE AND EXIT SIGN


H2
H2 SCHEDULE, SEE DRAWING E-501.
D H2
D
4. EXIT SIGNS SHALL BE MOUNTED ABOVE
DOORWAYS IN ACCORDANCE WITH NFPA

DESCRIPTION
101.

SYM
-

-
H3

H3 H3
PROCESS AREA - MEZZANINE LEVEL

A1 A1 A1 A1

X2 X2
A2 A2

C MECHANICAL ROOM ELECTRICAL ROOM SEAL


C

NEW LIGHTING PLAN - EAST ELEVATION


NONE APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

A B C
SATISFACTORY TO DATE

DES DRW CHK

TOP OF STEEL (L.P.)


EL. 38'-3"

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


H2 H2 H2 H2 H2 H2 H2
H2 H2

REPAIRS TO PACKOUT OPERATIONS


BUILDING 3069
H3 H3

PROCESS AREA - MEZZANINE LEVEL

H3 H3 H3
MEZZANINE
EL. 14'-6"(T.O.GRATING)

TOP OF STEEL (L.P.)


EL. 11'-4"

H1 H1 H1 H1
A2

DEPARTMENT OF THE NAVY


H1 A2 A2 H1 H1 H1 H1 H1
A1 A1 A1 A1
H3
A A
X1
PROCESS AREA - GROUND LEVEL X1
MECHANICAL ROOM

SCALE:

GRADE EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

NEW LIGHTING PLAN - SOUTH ELEVATION NEW LIGHTING PLAN - WEST ELEVATION SHEET OF

NONE NONE E-105


DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
2. FOR DETAILS OF DEMO WORK IN ELECTRICAL AND
1 2 EXISTING 3 4
DISCONNECT ACU-1
MECHANICAL ROOMS, SEE DRAWING E-401.
RP1(5) SWITCH
TOULENE 3 WP 22
DOOR 05 VAPOR KW 3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY
9
EXHAUST FAN ALL NEW POWER CIRCUITS WHERE APPLICABLE. REFER
1/6 TO DRAWINGS E-203, E-204, AND E-402 FOR NEW POWER
D EF-4
PLAN. D
AGV AIR LOCK 4. ALL EXISTING WIRING TO BE DEMOLISHED AND

DESCRIPTION
0-2 P33 REMOVED BACK TO PANEL/SOURCE.

-
~
5. REFER TO DRAWING E-601 FOR POWER CIRCUIT
DESIGNATIONS AND CONDUIT SIZES.

SYM
-

-
P54
P54
~

~
DOOR 03 BIN CAPPING STATION
CONTROL CABINET
11 9
P51 MCC1MCC1 A
RP1
DEMOLITION KEYNOTES

~
WALL-MOUNTED MCC1
(9,11) TELEPHONE (TYPICAL) P46 EF-1
RP1(13) 12 ELECTRICAL 0-4
EPO 1

~
~
~ RECIEVER MOUNTING LOCATION 20
CONTROL RELAY 120V COIL
FOR TRIPOD MOUNTED CAMERA #7 12
2 N.O. & 2 N.C. RP1(1)
CONTACTS MTD IN A MCC1 1. CONDUIT TO BE LEFT IN PLACE FOR CONNECTION TO
P2 P108 4"x4"x4" NEMA 1 ENCLOSURE
NEW MECHANICAL EQUIPMENT.
STAIRS P8
P4
P31
MOUNTED ON STEEL GRIT C
22'-4" AFF SEE NOTE 2 P3 C265 P45
PROCESS
P29 ZVD PP1
C 0-1 30 KVA TRANS. RP1(15)
MOUNTED ON P51 DRIVES 15 KVA TRANS.
UPS BATT. WALL MTD. MCC1
COL. B/1 6"x6"x4" NEMA 4X P14 EPO MCC1 P9
HOFFMAN A606CHNF CAMERA #7 MCC1
PP1 IP1 UPS1 LP1 RP1
P16 P5 P7 J
FOR MINI CAMERAS TRIPOD 12 10
P28
C RECEIVER MOUNTING LOCATION
MOUNTED 8'-0" AFF
(TYPICAL) MOUNTED
14
P13 P15 P10
RP1(3)
B
SEAL
C
RP1 7 WP 7
5 P108 P4
CAMERA #3
C P26 (14,16) 1
20
P31 RP2(7) EF-2
TRIPOD EXP FLEX METAL COUPLING 250 1
MOUNTED WITH 1 INTERCOM 1 CABLE C266 16 721
P3
C267
XXX

14"x12"x6" & COAX (TYPICAL)


P25
NEMA 4X PS TB1302
C268 TB1318
X XX

3/4"#14 FLEX CABLE


PROVIDE SEALING FITTING P19
ON EACH END C269
P22
C270 MECHANICAL
13/C CCTV 0-3
APPROVED
P16
CABLE WITH C271
2 COAX CABLES RP1(4)
~~

FOR COMMANDER NAVFAC


~
C P50 P21
MCC1 ACTIVITY

14 16 C
WP 7 7
PELLETIZER P52 FIRE ALARM
PATCH PANEL: CAMERA #5 P53 POWER SUPPLY PANEL
CONTROL TRIPOD
POWER MOUNTED P32
60
KW SATISFACTORY TO DATE

P30 DES DRW CHK

22 ACU-2
1 KW
PULLBOX
6"x6"x36" LONG

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


P1

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


P1
P40

REPAIRS TO PACKOUT OPERATIONS


P37
1
1
1

VACP-1
CONTROL PANEL

BUILDING 3069
215 P11 5
KW GFP-1
P34
CH-1 30 TCCH-2 TCCH-1
VACP-1
KW P41
RP2(1) EUH-1 3
AHU-1 P47
7.5 RUN
KW P36 BESIDE
WP 3 UTILITY BLDG.
3 PIPING

~
2-1 P35
P43

30
P40 AR-1 AC-1 KW
CHP-1
P39

DEPARTMENT OF THE NAVY


15 5 EUH-2 5
7.5
P38
KW LN-1
EF-3
A 1/6
AD-1 P11 P42
A
3 MCC2
RP2(4)
IOPUT
RP2

GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

B3069 & B3090 POWER DEMO PLAN 0' 4' 8' 12' NAVFAC DRAWING NO.

3/16" = 1'-0"
3/16"=1'-0" SHEET OF

E-201
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.

DATE
-

-
2. FOR DETAILS OF DEMO WORK IN ELECTRICAL AND MECHANICAL ROOMS, SEE DRAWING E-401.

3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY ALL NEW POWER CIRCUITS WHERE
APPLICABLE. REFER TO DRAWINGS E-203, E-204, AND E-402 FOR NEW POWER PLAN.

4. ALL EXISTING WIRING TO BE DEMOLISHED AND REMOVED BACK TO PANEL/SOURCE.

D 5. REFER TO DRAWING E-601 FOR POWER CIRCUIT DESIGNATIONS AND CONDUIT SIZES. D
6'-0"

DESCRIPTION
CRANE FESTOON CONTROL JUNCTION BOX

-
CAMERA #1
CRANE FESTOON POWER JB-1 DEMOLITION KEYNOTES

SYM
C

-
11
1. FOR CCTV DEMOLITION DETAILS, SEE DRAWINGS T-101 AND T-701.

MOUNTED ON P17
RECIEVER MOUNTING LOCATION
STEEL GIRT MOUNTED 6'-0" AFF
FOR TRIPOD MOUNTED CAMERA #6

1 CAMERA #6 C CROUSE-HINDS
C TRIPOD BHR DEAD FRONT INTERLOCKED SEAL
C
MOUNTED RECEPTACLE WITH FACTORY
LOSS-IN-WEIGHT P29 SEALED SWITCH & BHP PLUG
PATCH PANELS: AG-3
3 480V, 4P, 3W, 30A
TYPICAL FOR AG-1, AG-2 & AG-3
1
PROCESS
4/C#12
1-1 LFP-3 WITH PLUG INSTALLED
1 P28
16 ON RECEPTACLE END APPROVED

LFP-4 FOR COMMANDER NAVFAC

3 P21 ACTIVITY

AG-1 P44 SINGLE GANG


C
3 FS BOX WITH BLANK COVER
MINI-CAM
C281 SATISFACTORY TO DATE

TO AG-1 AC-DRIVE DES DRW CHK

2 P19 IN ELECTRIC ROOM


1
LFP-1
3/C#14 FOR
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


1 P25 AG-1 MOTOR

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


LFP-2 THERMOSTAT

REPAIRS TO PACKOUT OPERATIONS


PROVIDE 30' OF CORD
MOUNTED ON 1
P26
STEEL GIRT 6'-0" 3
22'-4" AFF AG-2

BUILDING 3069
CAMERA #2
C P53
14 P52

LOSS-IN-WEIGHT IOP-PB1
PATCH PANELS:
CONTROL

DEPARTMENT OF THE NAVY


POWER

A A
POWER DEMO PLAN MEZZANINE
3/8" = 1'-0"

GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

1' 0 1' 5' 10' NAVFAC DRAWING NO.

3/8"=1'-0" SHEET OF

E-202
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
CANOPY
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
2. FOR DETAILS OF NEW WORK IN ELECTRICAL AND
1 2 3 4
MECHANICAL ROOMS, SEE DRAWING E-402.

RP1(5) 3. REFER TO DRAWING E-601 FOR POWER CIRCUIT


9 DOOR 05 DESIGNATIONS AND CONDUIT SIZES.
D 1/6
EF-4 4. ALL OUTDOOR RECEPTACLES SHALL BE HEAVY DUTY, D
WEATHERPROOF, GFCI DEVICES. ALL RECEPTACLES IN
THE PROCESS AREA SHALL BE EXPLOSION PROOF

DESCRIPTION
AGV AIR LOCK 1 RATED UNITS TO MATCH THE HAZARDOUS RATING OF

-
0-2 THE SPACE (SEE DRAWING E-306 FOR DETAIL). ALL
OTHER RECEPTACLES SHALL BE 120V, 20A RATED
4 DUPLEX DEVICES.

SYM
-

-
16W
WP, GFCI 10
DOOR 03
11 P51
9 RP1 (9,11) 10 10
EF-1 A NEW WORK KEYNOTES

~
1
9W 20
6W 10 P46 12
6W PALLET MCC1 RP1(1)
EPO RP1 (10)
8W
12W 12 WP, GFCI 1. CONDUIT SHALL BE 3/4" RMC. RECEPTACLES ON CIRCUIT
WRAPPING 15W
10 MCC1
9 SHALL SHARE A GROUND, AND RECEPTACLES ON
MACHINE
RP1 (12)
CIRCUIT 11 SHALL SHARE A GROUND. SEAL FITTINGS
ELECTRICAL P8
STAIRS SHALL BE INSTALLED WITHIN 18" OF NEW RECEPTACLES
11 0-4 12W
PALLET
9
2 6W
AND FILLED. SEAL FITTINGS SHALL BE REPLACED,
INSTALLED WITHIN 18" OF EXISTING RECEPTACLES, AND
PROCESS IP1(13,15) FILLED.
0-1 11 30 KVA TRANS. RP1(15)
15 KVA TRANS. NEW IU-1
WALL MTD. MCC1
WALL MTD. 0.1
MCC1 P9
2. CONDUIT SHALL BE 1" RMC. CONDUIT SHALL BE
MCC1 KW
PP1 P5 IP1 LP1 RP1 PERMITTED TO BE REDUCED TO 3/4" EMT WHEN FEWER
C 14
12
P7 J
12 THAN 16 WIRES WILL BE IN THE CONDUIT. RECEPTACLES SEAL
C

DRYING CARTS
RP1 (14,16) P13 P10 B ON CIRCUIT 14 SHALL SHARE A GROUND, AND
RP1(3)
18W
7 0.1 6W RP1 (7)
7 RECEPTACLES ON CIRCUIT 16 SHALL SHARE A GROUND.
14W NEW IU-2 KW
1
SEAL FITTINGS SHALL BE INSTALLED WITHIN 18" OF NEW
DRYING CART DRYING CART RP1(19,21) 15W EF-2
DRYING CART 20 RECEPTACLES AND FILLED. SEAL FITTINGS SHALL BE
14 NEW
EWH-1 IP1(17,19) REPLACED, INSTALLED WITHIN 18" OF EXISTING
RECEPTACLES, AND FILLED.
6W
12W
FIRE ALARM
SCREENING TABLE SCREENING TABLE SCREENING TABLE POWER SUPPLY PANEL 3. CONDUIT SHALL BE 1" EMT WHEN INSIDE THE FACILITY,
AND SHALL TRANSITION TO 1" RMC WHEN OUTSIDE OF
DRYING CARTS MECHANICAL 5 THE FACILITY. CONDUIT SHALL BE PERMITTED TO BE APPROVED
0-3
REDUCED TO 3/4" EMT WHEN FEWER THAN 16 WIRES
RP1(4)
WILL BE IN THE CONDUIT. EACH RECEPTACLE SHALL FOR COMMANDER NAVFAC

HAVE ITS OWN GROUND WIRE. ACTIVITY

5W 10W WP, GFCI 7 WP, GFCI 7


16 C
14 14 16 7 4. CONDUIT SHALL BE 3/4" EMT WHEN INSIDE THE FACILITY,
~~ ~~~~~~~~~~ WP, GFCI AND SHALL TRANSITION TO 3/4" RMC WHEN OUTSIDE OF
TO IP1(13,15) IP1(17,19) THE FACILITY. EACH RECEPTACLE SHALL HAVE ITS OWN
ELECTRICAL
ROOM GROUND WIRE. SATISFACTORY TO DATE

DES DRW CHK

4.2 4.2 5. CONDUIT SHALL BE 3/4" EMT WHEN INSIDE THE FACILITY,
KW KW
AND SHALL TRANSITION TO 3/4" RMC WHEN OUTSIDE OF
NEW OU-1 NEW OU-2
THE FACILITY. EACH RECEPTACLE SHALL HAVE ITS OWN
PULLBOX GROUND WIRE.
B 6"x6"x36" LONG
B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


P1 6. SEE DRAWINGS E-401 AND E-402 FOR ROUTING AND
P40
6 IDENTIFICATION OF CIRCUITS/CONDUITS.

REPAIRS TO PACKOUT OPERATIONS


P1

P37

BUILDING 3069
WP, GFCI 3

52.5 P11 5
RP2 (3,5) GFP-1
KW P34
21.5 24W VACP-1
NEW CU-1 KW
21W RP2(1) 3
NEW IDS EUH-1
7.5
WP 3 UTILITY BLDG. KW
3
2-1 6W
~

18W P43
30
AC-1 KW WP, GFCI
~
P40 AR-1 ~
12W 5

DEPARTMENT OF THE NAVY


P39
31.5
5 EUH-2 5
KW
7.5
P38
NEW CU-2 KW LN-1
A EF-3
1/6 A
AD-1 P11 P42
3 MCC2
RP2(4)

RP2
GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

0' 4' 8' 12' NAVFAC DRAWING NO.

B3069 & B3090 NEW POWER PLAN 3/16"=1'-0" SHEET OF

3/16" = 1'-0"
E-203
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

DATE
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.

-
2. FOR DETAILS OF NEW WORK IN ELECTRICAL AND MECHANICAL ROOMS, SEE DRAWING E-402.

3. REFER TO DRAWING E-604 FOR POWER CIRCUIT DESIGNATIONS.

4. ALL RECEPTACLES IN THE PROCESS AREA SHALL BE EXPLOSION PROOF RATED UNITS TO
MATCH THE HAZARDOUS RATING OF THE SPACE (SEE DRAWING E-306 FOR DETAIL).
D D
CRANE FESTOON CONTROL JUNCTION BOX

DESCRIPTION
CRANE FESTOON POWER JB-1

-
11 NEW WORK KEYNOTES

SYM
-

-
1. REFER TO DRAWING E-203 FOR EXPLOSION PROOF RECEPTACLE CONDUIT AND WIRING
REQUIREMENTS.

1 P17

C SEAL
C

1
PROCESS
1-1
16
APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


1

BUILDING 3069
14

DEPARTMENT OF THE NAVY


A A

GRAPHIC SCALE SCALE:

EPROJECT NO.:
B3069 NEW MEZZANINE POWER PLAN CONSTR. CONTR. NO.

3/8" = 1'-0"
1' 0 1' 5' 10' NAVFAC DRAWING NO.

3/8"=1'-0" SHEET OF

E-204
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GROUNDING & BONDING DETAILS GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
2. FOR ADDITIONAL GROUNDING AND BONDING DETAILS,
POLYMER (HDPE) BOLTED
SEE DRAWING E-502.
NOMINAL 17"x12" BOX COVER-ENGRAVED
"GROUND ROD"

D D

12"
DEMOLITION KEYNOTES

24"

27" TO 30"
#4/0 COPPER GROUND

DESCRIPTION
GIRDLE (CONTINUOUS)

-
1. REMOVE HATCHED PORTION OF EXISTING SECONDARY
~
#4/O COPPER GROUNDING GIRDLE (SGG) TO MAKE ROOM FOR NEW
1 GROUND GIRDLE

SYM
GRAVEL
CONCRETE PAD. SEE DRAWING E-302 FOR NEW

-
(CONTINUOUS)
REMOVABLE
SGG SGG GROUND
12' x 3/4" Ø COPPER-CLAD GROUND ROD ADDITION TO SGG.
EXISTING #4/0 FOR ROD CLAMP
CONNECTION TO 2. REMOVE COPPER BUS BARS FROM DEMOLISHED
NOTE:
TRANS. GND. SYSTEM EQUIPMENT.

~
CONNECTIONS TO GROUND GIRDLE OTHER THAN AT
EXISTING 1/4"x1" COPPER EXISTING COUNTERPOISE TEST POCKET SHALL BE WITH HIGH STRENGTH
BUS BAR MOUNTED 6" AFF AGV AIR LOCK SGG CONNECTED TO GROUNDING (TYPICAL) COMPRESSION CONNECTION.
(TYPICAL) TP 3. LOCATION OF EXISTING SGG IS APPROXIMATE.
SEE DETAIL 2
SGG

0-2 MCC2 GND BUS CONTRACTOR TO VERIFY SGG ROUTING IN FIELD USING
SEE DETAIL 3 ACCESSIBLE GROUND ROD-TEST POCKET DETAIL
#4/0 ELECTRONIC METHODOLOGY.
DETAIL
SGG SGG
#4/0 NOT TO SCALE 1
#4/0 #4/0

~
"MATCON IBC"
3 BIN CAPPING STAIRS MCC1 CAP CONDUITS

SGG
STATION 2" ABOVE SLAB
C PROCESS ELECTRICAL
(TYPICAL) SEAL
C
EXISTING STRUCTURAL

~
COLUMN GROUNDING 0-1 0-4 TO GROUND GIRDLE
PELLETIZER #4/0 BARE COPPER
GROUND WIRE
CONNECTION (TYPICAL)

~
SEE DETAIL 1, DWG E-303 EXTRUDER EXOTHERMIC
CONNECTION
MECHANICAL
ROTARY INDEXING 2
COPPER GROUND ROD
TURNTABLE 0-3 3/4"DIA. x 10'-0" LG.
SGG

SGG
TO GROUND GIRDLE
#4/0 BARE COPPER

10'-0"
GROUND WIRE
EXISTING GROUNDING
PIGTAIL (TYPICAL) EXOTHERMIC CONNECTION
~

APPROVED

~~~
#4/0 BARE COPPER GROUND WIRE. FOR COMMANDER NAVFAC

ACTIVITY

~
~

COUNTERPOISE GROUNDING
CHILLER #4/0 EXISTING #4/0 BARE COPPER
#4/0 GROUND CABLE BURIED 30" BELOW DETAIL
~ ~
SGG
~ ~ ~ ~ ~ ~ ~
TP
~ ~ ~ ~ ~ ~ ~ ~
SGG
~ GRADE AT A MINIMUM OF 3'-0" FROM NOT TO SCALE 2
#4/0 THE OUTSIDE WALL OF BUILDING
~

SATISFACTORY TO DATE
#4/0 CONNECTED DES DRW CHK
TO PIPE BRIDGE
SGG

SGG

~ ~
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


~

REPAIRS TO PACKOUT OPERATIONS


~

CHILLER PROVIDE 1/2" ID x 1" SCHEDULE 80


~

PVC SPACER PROVIDE 1/4" x 1"


~ SGG

COPPER BUS BAR


ST1 UTILITY BLDG.
7" PROVIDE 1/4" x 3" BOLT
2-1 SPACE AT 24" O.C.
SGG

CH1 AHU1
~

C7 x 9.8
#4/0 MCC2

BUILDING 3069
WALL GIRT
TP MCC2 PREFABRICATED
PROVIDE WASHER
INSULATED 3/8" 1"
SANDWICH WALL
PANEL
CHP1
#4/0 COPPER BUS BAR
SGG
DETAIL
CONNECTED TO
NOT TO SCALE 3
MCC2 GND BUS

GROUNDING DEMOLITION PLAN


1/8" = 1'-0"

DEPARTMENT OF THE NAVY


A A

GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

0' 4' 8' 16' NAVFAC DRAWING NO.

1/8"=1'-0" SHEET OF

E-301
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
2. GROUND ALL NEW INTERIOR METALS, INCLUDING BUT
NOT LIMITED TO PLATFORMS, AIR HANDLING UNITS
(AHU), DOORS, FANS, PIPING, TANKS, STEEL DUCTS,
JACKETING, GRATING, AND CONDUIT TO SECONDARY
SGG 1 GROUNDING GIRDLE (SGG) PIGTAILS WITH #6 AWG THHN
BARE SOLID COPPER WIRE UNLESS INDICATED
D REBAR OF NEW CONCRETE
OTHERWISE. D
LOADING DOCK SHALL TP TP
BE BONDED TO SGG. ROADWAY 3. GROUND ALL EXTERIOR METALLIC PIPING, METAL

DESCRIPTION
SEE CIVIL PLAN DWG C-003 JACKETING, SUPPORTS/STANDS, AND CONDUIT TO SGG

-
CANOPY
WITH #4/0 AWG THHN BARE STRANDED COPPER WIRE
UNLESS INDICATED OTHERWISE. ALSO BOND ALL METAL
OBJECTS WITHIN 6'-0" OF PIPING OR CONDUIT.

SYM
-

-
TP TP SGG
4. FOR ADDITIONAL GROUNDING AND BONDING DETAILS,
EXISTING TEST POCKET (TYPICAL) EXISTING #4/0 FOR SEE DRAWING E-502.
SEE DETAIL 1, DWG E-301 CONNECTION TO
TRANS. GND. SYSTEM 5. BOND ALL DOORS TO DOOR FRAMES IN TWO PLACES
EXISTING 1/4"x1" COPPER SGG
AGV AIR LOCK USING FLEXIBLE BONDING STRAPS CONSISTING OF #30
BUS BAR MOUNTED 6" AFF TP

SGG
0-2 AWG TINNED STRANDED COPPER WIRES.
(TYPICAL)
SEE DETAIL 3, DWG E-301 #4/0
6. NSWC GROUNDING TEAM TO TEST GROUNDING SYSTEM
SGG SGG
#4/0 PRIOR TO AND AFTER COMPLETION OF CONSTRUCTION
#4/0 #4/0 TO ENSURE CONDUCTIVITY READINGS ARE IN
ACCORDANCE WITH ALL NAVSEA OP-5 REQUIREMENTS.
CONTRACTOR AND NAVFAC CONSTRUCTION MANAGER
PALLET

WRAPPING
SHALL WITNESS ALL TESTS AND DOCUMENT THE
MACHINE RESULTS.
STAIRS MCC1

SGG
PALLET

C PROCESS ELECTRICAL
SEAL
C
EXISTING STRUCTURAL COLUMN
NEW IU-2 NEW WORK KEYNOTES

~
GROUNDING CONNECTION GROUNDING PIGTAIL TO BE 0-1 0-4
BONDED TO CONDUCTIVE FLOORING

DRYING CARTS
(TYPICAL)

~
SEE DETAIL 1, DWG E-303 NEW IU-1 1. EXTEND SGG AROUND NEW CONCRETE LOADING DOCK
DRYING CART
DRYING CART DRYING CART
MECHANICAL AND BOND THE REBAR IN THE LOADING DOCK RAMP AND
0-3 NEARBY PAVEMENT TO THE SGG WITH #4/0 AWG THHN
SGG

SGG
BARE STRANDED COPPER WIRE. THE CANOPY
SCREENING TABLE SCREENING TABLE SCREENING TABLE
STRUCTURE, GATE, AND REBAR FOR THE STRUCTURE'S
DRYING CARTS
EXISTING GROUNDING BASE SHALL BE BONDED TO THE SGG AS WELL. GROUND
PIGTAIL (TYPICAL)
RODS TO BE INSTALLED IN TEST POCKETS AND PLACED APPROVED

EVERY TEN FEET AND TIED TO NEW PORTION OF SGG.


FOR COMMANDER NAVFAC

ACTIVITY
2. RECONNECT GROUNDING CONNECTIONS/PIGTAILS TO
NEW OU-1 #4/0 EXISTING #4/0 BARE COPPER NEW MECHANICAL EQUIPMENT AND BOND
#4/0 NEW OU-2 GROUND CABLE BURIED 30" BELOW APPROPRIATELY.
SGG TP SGG GRADE AT A MINIMUM OF 3'-0" FROM
THE OUTSIDE WALL OF BUILDING
EXISTING COUNTERPOISE #4/0
GROUNDING (TYPICAL) #4/0 CONNECTED
SATISFACTORY TO DATE

SEE DETAIL 2, DWG E-301 TO PIPE BRIDGE


DES DRW CHK

SGG

SGG
2

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


~

REPAIRS TO PACKOUT OPERATIONS


SGG
UTILITY BLDG.
2-1
SGG

NEW CU-2 NEW CU-1 NEW IDS

BUILDING 3069
TP MCC2

#4/0
SGG

GROUNDING PLAN

DEPARTMENT OF THE NAVY


1/8" = 1'-0"

A A

GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

0' 4' 8' 16' NAVFAC DRAWING NO.

1/8"=1'-0" SHEET OF

E-302
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
2. GROUND ALL NEW INTERIOR METALS, INCLUDING BUT
FOR GROUNDING NOT LIMITED TO PLATFORMS, AIR HANDLING UNITS
METAL STUD WALL (AHU), DOORS, FANS, PIPING, TANKS, STEEL DUCTS,
JACKETING, GRATING, AND CONDUIT TO SECONDARY
SEE DETAIL 1 GROUNDING GIRDLE (SGG) PIGTAILS WITH #6 AWG THHN
BARE STRANDED COPPER WIRE UNLESS INDICATED
D OTHERWISE. D
3. GROUND ALL EXTERIOR METALLIC PIPING, METAL

DESCRIPTION
JACKETING, AND CONDUIT TO SGG WITH #4/0 AWG THHN

-
BARE STRANDED COPPER WIRE UNLESS INDICATED
OTHERWISE. ALSO BOND ALL METAL OBJECTS WITHIN
6'-0" OF PIPING OR CONDUIT.

SYM
-

-
4. FOR ADDITIONAL GROUNDING AND BONDING DETAILS,
SEE DRAWING E-502.
FOR GROUNDING
METAL STUD WALL
SEE DETAIL 1

C GROUND BUS PLAN


SEAL
C
3/16" = 1'-0"

~
APPROVED

FOR COMMANDER NAVFAC

COPPER GROUNDING LUG ACTIVITY

(TYPICAL)

SATISFACTORY TO DATE

DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


METAL STUD
16" O.C.

BUILDING 3069
#6 GROUND WIRE
TO GROUND BUS
INSTALL COPPER GROUNDING LUG
ON EACH METAL STUD (TYPICAL)

DEPARTMENT OF THE NAVY


#6 GROUND WIRE
RUN CONTINUOUSLY
A #6 GROUND WIRE
UPPER AND LOWER TRACK A
~
~

COPPER TEE GRAPHIC SCALE SCALE:

CONNECTOR EPROJECT NO.:

DETAIL
1
CONSTR. CONTR. NO.

NOT TO SCALE 0' 4' 8' 12' NAVFAC DRAWING NO.

3/16"=1'-0" SHEET OF

E-303
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
AIR TERMINAL

-
1 2 3 4
SEE DETAIL 1 COL. 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.

DATE
-

-
LP 2. THE EXISTING LIGHTNING PROTECTION SYSTEM SHALL BE TESTED
AND REPAIRED BY THE CONTRACTOR AS NECESSARY (INCLUDING

LP
1 THE NEW ADDITION ON TOP OF THE NEW CANOPY) TO MEET ALL
LP NAVSEA OP-5 AND NFPA 780 REQUIREMENTS.

CANOPY
3. FOR ADDITIONAL GROUNDING AND BONDING DETAILS, SEE DRAWING
E-502.
D D
LP LP
A AIR TERMINALS TO BE ADHESIVE

DESCRIPTION
TESTED AND REPAIRED
BASE

-
LP LP LP
A NEW WORK KEYNOTES

SYM
-

-
GUTTER W/
DOWNSPOUTS 1. EXTEND INTEGRAL LIGHTNING PROTECTION SYSTEM TO COVER NEW
MAIN ROOF

LP LP LP CANOPY. SYSTEM CONDUCTOR SHALL BE #4/0 AWG THHN BARE


STRANDED COPPER WIRE AND SHALL INCLUDE DOWN CONDUCTORS
LOW ROOF WHICH SHALL BE BONDED TO THE SGG.

2. NEW TEST WELLS TO BE INSTALLED EVERY TEN FEET ALONG


B EXTENSION OF GROUNDING GIRDLE. SEE DRAWING E-301 FOR TEST
WELL DETAILS.

3. DOWN CONDUCTORS FROM AIR TERMINALS SHALL BE #4/0 AWG BARE


STRANDED COPPER CONDUCTORS AND SHALL TIE TO GROUNDING
LP LP LP INSUL. EXTERIOR GIRDLE.
METAL PANEL
4. BONDING CONDUCTORS FROM GATE, CANOPY, AND REBAR WITHIN
CONCRETE STRUCTURES SHALL BE #6 AWG BARE SOLID COPPER
C CONDUCTORS AND SHALL TIE TO GROUNDING GIRDLE.
C LP LP LP
DOWN TO EXISTING
SEAL
C
#4/0 GROUND CABLE
GUTTER W/ CONNECT WITH MECHANICAL
DOWNSPOUTS CONNECTION (TYPICAL)
SUPPORT CABLE VERTICALLY
EVERY 36" (TYPICAL)

LIGHTNING PROTECTION PLAN


1/8" = 1'-0"
SECTION
NOT TO SCALE A APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

GROUNDING AND BONDING DETAILS


SATISFACTORY TO DATE

DES DRW CHK

5/8" x 24" HIGH


LIGHTNING PROTECTION
AIR TERMINAL
SOLID COPPER

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


COPPER CABLE CONNECTOR
HEARY BROTHERS

REPAIRS TO PACKOUT OPERATIONS


CAT. NO. HB-57C OR APPROVED EQUAL.
UL-APPROVED FOR LIGHTNING PROTECTION
3 SWING GATE
BRONZE ADHESIVE LIGHTNING PROTECTION ROOF CONDUCTOR
BASE 37 STRAND 4/0 GAUGE COPPER WIRE
UL-APPROVED FOR LIGHTNING PROTECTION

BUILDING 3069
LIGHTNING PROTECTION ROOF CONDUCTOR
37 STRAND 4/0 GAUGE COPPER WIRE
UL-APPROVED FOR LIGHTNING PROTECTION

4 COPPER ADHESIVE
CABLE FASTENER

GRADE GRADE
DETAIL
NOT TO SCALE 1

DEPARTMENT OF THE NAVY


A SGG
A
SGG

GRAPHIC SCALE SCALE:

LIGHTNING PROTECTION NEW CANOPY ELEVATION 1 LIGHTNING PROTECTION NEW CANOPY ELEVATION 2 EPROJECT NO.:

CONSTR. CONTR. NO.


NONE NONE
0' 4' 8' 16' NAVFAC DRAWING NO.

1/8"=1'-0" SHEET OF

E-304
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.

DATE
-

-
2. THE EXISTING LIGHTNING PROTECTION SYSTEM SHALL
BE TESTED AND REPAIRED BY THE CONTRACTOR AS
NECESSARY (INCLUDING THE NEW ADDITION ON TOP OF
THE NEW CANOPY) TO MEET ALL NAVSEA OP-5 AND NFPA
780 REQUIREMENTS.

3. FOR ADDITIONAL GROUNDING AND BONDING DETAILS,


D SEE DRAWING E-502. D
4. FOR ADDITIONAL LIGHTNING PROTECTION DETAILS, SEE

DESCRIPTION
DRAWING E-304.

-
1 2 3 4

LP

LP LP

CANOPY

SYM
-

-
LP LP

LP LP LP
A

GUTTER W/
DOWNSPOUTS

MAIN ROOF
LP LP LP

LOW ROOF

100'-0" B

LP LP LP

C
LP LP LP

GUTTER W/
DOWNSPOUTS

UTILITY BLDG.

NEW CU-2 NEW CU-1 NEW IDS

PROCESS AREA - MEZZANINE LEVEL

C MECHANICAL ROOM ELECTRICAL ROOM


SEAL
C

LIGHTNING PROTECTION SPHERE 1 LIGHTNING PROTECTION SPHERE PLAN


1/32" = 1'-0"
1/32" = 1'-0"

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


100'-0" 100'-0"

BUILDING 3069
TOP OF STEEL (L.P.)
EL. 38'-3"

PROCESS AREA - MEZZANINE LEVEL

MEZZANINE
EL. 14'-6"(T.O.GRATING)

TOP OF STEEL (L.P.)


EL. 11'-4"

PROCESS AREA - GROUND LEVEL


MECHANICAL ROOM

DEPARTMENT OF THE NAVY


GRADE

A LIGHTNING PROTECTION SPHERE 2 LIGHTNING PROTECTION SPHERE 3 A


1/32" = 1'-0" 1/32" = 1'-0"

GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

0' 20' 40' 60' 80' 100' 120' NAVFAC DRAWING NO.

1/32"=1'-0"
SHEET OF

E-305
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
ROLL-UP DOOR WIDTH
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
10'-0" RADIUS (TYP.)
2. EVERYTHING WITHIN THE HATCHED AREA IS
ENCOMPASSED BY A HAZARDOUS ATMOSPHERE RATED
AS A CLASS I, DIVISION 1, GROUPS C & D AND CLASS II,
DIVISION 1, GROUPS E, F, & G ENVIRONMENT.

3. ALL ELECTRICAL EQUIPMENT WITHIN HATCHED AREA ON


D THIS DRAWING SHALL BE RATED FOR USAGE IN A CLASS D
I, DIVISION 1, GROUPS C & D AND CLASS II, DIVISION 1,
GROUPS E, F, & G ENVIRONMENT IN ACCORDANCE WITH

DESCRIPTION
ARTICLE 500 OF NFPA 70.

-
CANOPY

SYM
-

-
1 2 3 4

EMERGENCY
SLIDE

AGV AIR LOCK


O-2

C STAIRS SEAL
C
PROCESS ELECTRICAL
O-1 O-4

MECHANICAL
O-3

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

10'-0" RADIUS (TYP.)

DOOR WIDTH

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


B3069 GROUND FLOOR HAZARDOUS AREA CLASSIFICATION
1/8" = 1'-0"

REPAIRS TO PACKOUT OPERATIONS


BUILDING 3069
PROCESS
I-1

DEPARTMENT OF THE NAVY


A A
GRAPHIC SCALE
0' 4' 8' 16' SCALE:

1/8"=1'-0" EPROJECT NO.:

CONSTR. CONTR. NO.

0' 4' 8' 12' NAVFAC DRAWING NO.

MEZZANINE HAZARDOUS AREA CLASSIFICATION 3/16"=1'-0" SHEET OF

3/16" = 1'-0"
E-306
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
FOR DETAILS SEE

-
DRAWING T-701
B MCC1
TELEPHONE
TERMINAL BOX 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
4"x4"x4" WIREWAY 1" TELEPHONE 2. FOR DETAILS OF DEMO WORK OF THE REST OF THE
WITH REMOVABLE COVER CCTV 2 6 PAIR #22 ELECTRICAL SYSTEM, SEE DRAWINGS E-201 AND E-202.
EQUIPMENT
P29
P17 P26 P73 3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY
P75 ALL NEW POWER CIRCUITS WHERE APPLICABLE. REFER
P2 1" FIBER OPTICS/
TO DRAWINGS E-203, E-204, AND E-402 FOR NEW POWER
D P2
P22 VIDEO CABLE
PLAN. D
P100 P30
P6 4. ALL EXISTING WIRING TO BE DEMOLISHED AND
~

DESCRIPTION
C222 P99 P97 REMOVED BACK TO PANEL/SOURCE.

-
P98
~ ~

C220 5. REFER TO DRAWINGS E-601, CI-601, AND CI-602 FOR


J EXTRUDER KSC CRANE POWER, CONTROL, AND INSTRUMENTATION CIRCUIT

SYM
CRANE 1"C-17#12

-
C221 DISPLAY DISPLAY CONSOLE
C219 C218 MOTOR DESIGNATIONS AND CONDUIT SIZES.
IOPER STARTERS
ANALOG CONVERTER WITH HMIER
BARRIER (TYP. FOR 2) PELLETIZER
K-TRON (PLC)
EXTRUDER P34 FEEDER (PLC) 1" P.A. CABLE 1
CONTROL
PANEL P1
P24
8/C GAI-TRONICS
MODEL NO. 60038-101 DEMOLITION KEYNOTES
P5 P12 ELECTRICAL P16
P18 P27 P20 P53 0-4 1"-11/C#12
P97 P7 P9
P52 CONTROL 1. EXISTING P.A. SYSTEM TO BE LEFT IN PLACE. DO NOT
P23
IOPER
DEMOLISH AND REMOVE.
P11
3/4"C-6#12 2. CCTV SYSTEM TO BE REPLACED IN KIND. SEE DRAWINGS
P14 UPS
UP TO WEIGH TRANSMITTER
P28 BATT. SUMMING BOX MEZZANINE LEVEL E-402 AND T-701 FOR DETAILS.
A P44 P22 P50
P51 3/4"C-6#12
FOR CONTINUATION SEE DWG CI-102
P21 C225 C226
J C224
PP1
IP1 UPS1 EPO LP1 RP1
1 SEAL FITTING (TYPICAL) 1"
BLH I.S.
P10 BARRIER BOX
C P56
PP1(1)
P19 P25 P13 P15 EXTRUDER
CONTROL P103 C227 (TYP. FOR 3) SEAL
C
PANEL
J ZVD'S 15 KVA TRANS. T-2 30 KVA TRANS. T-1 C230 C228
C233 C229
C231
3/C#4 W/GND 3/4" TELEPHONE IOPER J
P.A. SYSTEM SWITCH P104
3/4" FIRE ALARM MATRIX CONTROLLER C232
3/4" INSTRUMENTATION IP1 J
TCU-1 3/4" CONTROL P106 P105 WEIGH TRANSMITTER
BLH-LCP-100
INDICATOR
(TYP. FOR 3)
P34

P23
P1

MECHANICAL
P11
P30

0-3
P1

APPROVED

P57
PP1(3) FOR COMMANDER NAVFAC

B
J
3/C#4 W/GND
SECTION ACTIVITY

TO UTILITY BUILDING 3090


NOT TO SCALE
TCU-2

3/4"C-8#12
SATISFACTORY TO DATE
3/4"C, 11#12 DES DRW CHK

1"C-2#6 & 1#10


FIRE ALARM LOOP CABLE

P58
PP1(2)
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


J

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


3/C#4 W/GND
B3069 ELECTRICAL AND MECHANICAL ROOMS DEMO PLAN
FIRE ALARM

REPAIRS TO PACKOUT OPERATIONS


TCU-3 1/8" = 1'-0"
CONTROL PANEL
VSD DRIVE
P.A. SYSTEM SWITCH 30 KVA TRANS. FOR AG-1
MATRIX CONTROLLER WALL MTD. T-1
P18
P22 P24 P5

BUILDING 3069
P7 P12 P27 P28
P9 P44
TO
P21 PUMPS
X

X
X

X
P10 15 KVA TRANS. P25
P20

X
P19

X
WALL MTD. T-2 X
X

VSD DRIVE
X

X
X P13 X
X FOR LFP-2
RP1 LP1 EPO UPS1 IP1 PP1

DEPARTMENT OF THE NAVY


P14
A P15 A
UPS
VSD DRIVE
1 BATT.
FOR LFP-1
GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

VSD DRIVE FOR LFP-3


0' 4' 8' 16' NAVFAC DRAWING NO.

SECTION
NOT TO SCALE A VSD DRIVE FOR LFP-4 1/8"=1'-0" SHEET

E-401
OF

DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
FOR DETAILS SEE
DRAWING T-701
TELEPHONE
CCTV 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
MCC1 TERMINAL BOX

DATE
EQUIPMENT

~
E-001.

-
4"x4"x4" WIREWAY 1" TELEPHONE 2. FOR DETAILS OF NEW WORK OF THE REST OF THE
WITH REMOVABLE COVER 6 PAIR #22 ELECTRICAL SYSTEM, SEE DRAWING E-203 AND E-204.

B P17 P73 1" FIBER OPTICS


PROVIDE SIGNAL SURGE
3. REFER TO DRAWINGS E-601, CI-601, AND CI-602 FOR
SPARE POWER, CONTROL, AND INSTRUMENTATION CIRCUIT
P75 SUPRESSION (MOV) FOR
D ALL CONDUCTORS
ENTERING BUILDING
DESIGNATIONS AND CONDUIT SIZES.
D

DESCRIPTION
FOR CONTINUATION OF

-
CCTV SYSTEM DIAGRAM
SEE DWG T-701

SYM
CRANE

-
CONSOLE CRANE 1"C-17#12 9-COAX RG-59/U
MOTOR BELDEN #9259
STARTERS
4"x4"x4" WIREWAY 7-2PR SHLD #18
WITH REMOVABLE COVER BELDEN # 9368 BUILDING
P34 1" P.A. CABLE STEEL
P1 P12
8/C GAI-TRONICS
MODEL NO. 60038-101
NEW WORK KEYNOTES
P5 ELECTRICAL
TO TELEPHONE TERMINAL BOX
0-4 1" CONDUIT
P7 P9 WITH FIBER
TO FIRE ALARM PANEL DOOR 1. EXISTING CCTV SYSTEM TO BE REPLACED IN KIND WITH
OPTICS CABLE NEW SYSTEM. SEE DRAWING T-701 FOR DETAILS.
TO BLDG. 1424

FTU

~
FIBER OPTOCS
A CABINET MCC
SUPPLIED BY
TO REVIEW FOE

~
PP1 EMX
IP1 LP1 RP1 STATION

C P13
P10
3/4" CONDUIT
19" RACK
SEAL
C
WITH ETHERNET
15 KVA TRANS. T-2 30 KVA TRANS. T-1
CABLE
P.A. SYSTEM SWITCH 1" CONDUIT
MATRIX CONTROLLER WITH FIBER
3/4" TELEPHONE
3/4" FIRE ALARM OPTICS CABLE
P34
P1

MECHANICAL
P11

APPROVED
0-3
P1

SECTION
NOT TO SCALE B FOR COMMANDER NAVFAC

ACTIVITY

TO UTILITY BUILDING 3090

3/4"C-8#12 SATISFACTORY TO DATE

DES DRW CHK

1"C-2#6 & 1#10


FIRE ALARM LOOP CABLE

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


FIRE ALARM
CONTROL PANEL

P.A. SYSTEM SWITCH 30 KVA TRANS.


MATRIX CONTROLLER WALL MTD. T-1

BUILDING 3069
B3069 ELECTRICAL AND MECHANICAL ROOMS NEW PLAN P5
1/8" = 1'-0" P7 P12
P9
X

X
X

X
P10 15 KVA TRANS.

X
X
WALL MTD. T-2 X
X
X

X
X P13 X
X

DEPARTMENT OF THE NAVY


SPD RP1 LP1 IP1 PP1
SPD SPD
A SPD A

GRAPHIC SCALE SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

0' 4' 8' 16' NAVFAC DRAWING NO.

SECTION
NOT TO SCALE A 1/8"=1'-0" SHEET

E-402
OF

DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
3 POSITION PUSH BUTTON
OPEN, CLOSE & STOP 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
NEMA 4, LOCKABLE ENCLOSURE 3 POSITION PUSH BUTTON E-001.

-
OPEN, CLOSE & STOP
2 NEMA 7, LOCKABLE ENCLOSURE 2. FOR DETAILS OF NEW WORK OF THE REST OF THE
ELECTRICAL SYSTEM, SEE DRAWING E-203 AND E-204.
SAFETY EDGE 2 1
TO REVERSE 3. REFER TO DRAWINGS E-601, CI-601, AND CI-602 FOR
SAFETY EDGE POWER, CONTROL, AND INSTRUMENTATION CIRCUIT
DOOR 05 TO REVERSE
D 3/4"C-3#14
3 POSITION
PUSH BUTTON DOOR 05
DESIGNATIONS AND CONDUIT SIZES.
D
OPEN, CLOSE 3 POSITION
& STOP 3/4"C-3#14 PUSH BUTTON

DESCRIPTION
3/4"C-5#14 NEMA 4 OPEN, CLOSE
LIMIT SWITCH

-
ENCLOSURE ENCLOSURE & STOP
3/4"C-5#14 NEMA 7
LIMIT SWITCH
ENCLOSURE

SYM
1/2 ENCLOSURE

-
MOTOR
3/4"C-6#14
1/2 2
MOTOR
EP ENCLOSURE
P74 3/4"C-6#14
3/4"C-4#12 EP ENCLOSURE DEMOLITION KEYNOTES
SEAL FITTING P74
AGV AIR LOCK (TYPICAL) 3/4"C-4#12
G-2 SEAL FITTING 1. EXISTING FLEX CONNECTIONS TO BE DEMOLISHED AND
P73 AGV AIR LOCK (TYPICAL)
3/4"C-4#12 REMOVED.
G-2 P73
TO MCC 3/4"C-4#12 2 2. EXISTING PUSH BUTTON STATIONS TO BE DEMOLISHED
AND REMOVED.
TO MCC

C 3/4"C-3#14
SEAL
C
(INTERLOCK)
FLEX (TYPICAL) 3/4"C-3#14
(INTERLOCK)
1 EXPLOSION PROOF FLEX (TYPICAL) NEW WORK KEYNOTES
DOOR 03
1. NEW EXPLOSION PROOF FLEX CONNECTIONS TO
DOOR 03 REPLACE DEMOLISHED FLEX CONNECTIONS AND NEW
TRACK MOUNTED
LIMIT SWITCH EXPLOSION PROOF PUSHBUTTON STATIONS TO
1 TRACK MOUNTED REPLACE DEMOLISHED PUSHBUTTON STATIONS. NEW APPROVED

LIMIT SWITCH FLEX CONNECTIONS AND PUSHBUTTON STATIONS


FOR COMMANDER NAVFAC
SHALL COMPLY WITH THE AREA ELECTRICAL HAZARD
ACTIVITY
CLASSIFICATION DEPICTED ON DRAWING E-306.
POWER DEMO PLAN FOR M.O. DOOR 05
NEW POWER PLAN FOR M.O. DOOR 05
1/2" = 1'-0" 2. ALL SEAL FITTINGS TO BE REPLACED AND POURED AS
1/2" = 1'-0" NECESSARY.

SATISFACTORY TO DATE
DOOR 05 DOOR 05
DES DRW CHK

TRACK MOUNTED TRACK MOUNTED


LIMIT SWITCH LIMIT SWITCH
FLEX (TYPICAL) EXPLOSION PROOF FLEX (TYPICAL)
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON

REPAIRS TO PACKOUT OPERATIONS


3/4"C-3#14 3/4"C-3#14
INTERLOCK 1 1 INTERLOCK

AGV AIR LOCK

BUILDING 3069
AGV AIR LOCK
G-2 G-2

3/4"C-6#14 3/4"C-6#14
SEAL FITTING SEAL FITTING
(TYPICAL) MOTOR (TYPICAL) MOTOR
P76 P76
3/4"C-4#12 3/4"C-4#12
EP ENCLOSURE 3 POSITION PUSH BUTTON EP ENCLOSURE
1/2 OPEN, CLOSE & STOP 1/2 3 POSITION PUSH BUTTON
3 POSITION NEMA 4, ENCLOSURE 3 POSITION OPEN, CLOSE & STOP

DEPARTMENT OF THE NAVY


3/4"C-5#14 3/4"C-5#14
PUSH BUTTON LIMIT SWITCH PUSH BUTTON LIMIT SWITCH NEMA 7, ENCLOSURE
OPEN, CLOSE ENCLOSURE OPEN, CLOSE 2 ENCLOSURE
& STOP
~
~

& STOP
~
~

A NEMA 4 NEMA 7 A
ENCLOSURE 3/4"C-3#14 ENCLOSURE 3/4"C-3#14
DOOR 03 DOOR 03
3/4"C-5#14 SAFETY EDGE 3/4"C-5#14 SAFETY EDGE 2
2
TO REVERSE
1
TO REVERSE GRAPHIC SCALE SCALE:

EPROJECT NO.:
TO MCC TO MCC
P75 2 P75 1 CONSTR. CONTR. NO.

3/4"C-4#12 3/4"C-4#12
0' 1' 2' 4' NAVFAC DRAWING NO.

POWER DEMO PLAN FOR M.O. DOOR 03 NEW POWER PLAN FOR M.O. DOOR 03 1/2"=1'-0" SHEET OF

1/2" = 1'-0" 1/2" = 1'-0"


E-403
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
LUMINAIRE REQUIREMENTS:
D LUMINAIRE REQUIREMENTS: D
1. HOUSING - DIE-FORMED, COLD ROLLED STEEL, WITH ONE-PIECE LOWER
REFLECTOR HAVING TEXTURED, HIGH REFLECTANCE, WHITE POLYESTER 1. HOUSING - HIGH IMPACT AND SCRATCH RESISTANT DIE CAST ALUMINUM
POWDER-COATED FINISH. HOUSING AND POLYCARBONATE COVER. OPTIONAL SIZES OF 2FT LONG AND 4FT

DESCRIPTION
LONG VERSIONS AVAILABLE.

-
2. LIGHT SOURCE - UPWARD-FACING LEDS WITH DIFFUSE LENS TO ELIMINATE
DIRECT VIEW OF LIGHT SOURCE. 4000K COLOR TEMPERATURE UON, MAXIMUM 2. LIGHT SOURCE - LED AREA LIGHT WITH CRI OF AT LEAST 80.
BINNING TOLERANCE OF A 4-STEP MCADAM ELLIPSE, MINIMUM EFFICACY OF 120

SYM
-

-
LUMENS/WATT, WITH A MINIMUM CRI OF 80. INITIAL LUMEN OUTPUT AS 3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9
LUMINAIRE REQUIREMENTS:
INDICATED IN LUMINAIRE SCHEDULE. PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL
HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN
LUMINAIRE REQUIREMENTS: 1. HOUSING/TRIM - IMPACT AND SCRATCH RESISTANT DIE CAST ALUMINUM
3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9 LUMINAIRE SCHEDULE.
HOUSING FOR BACK MOUNTING WITH RED UNIVERSAL, DIRECTIONAL CHEVRON
PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL
1. HOUSING/TRIM - IMPACT AND SCRATCH RESISTANT DIE CAST ALUMINUM INSERTS. DOUBLE-FACED MODEL.
HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN 4. CONTROL - AUTOMATIC ON/OFF CONTROL WITH MOTION DETECTION BY
HOUSING FOR BACK MOUNTING WITH RED UNIVERSAL, DIRECTIONAL CHEVRON
LUMINAIRE SCHEDULE. OCCUPANCY SENSOR AND MANUAL ON/OFF CONTROL.
INSERTS. DOUBLE-FACED MODEL. 2. LETTERS/CHEVRONS - MINIMUM 6" HIGH WITH 3/4" STROKE AND RED LETTERS.
PROVIDE CHEVRONS AS EITHER LEFT, RIGHT, OR BOTH DIRECTIONS AS
4. CONTROL - AUTOMATIC ON/OFF CONTROL WITH MOTION DETECTION BY 5. EMERGENCY BATTERY PACK - SOLID-STATE, CONSTANT-CURRENT TYPE
2. LETTERS/CHEVRONS - MINIMUM 6" HIGH WITH 3/4" STROKE AND RED LETTERS. INDICATED ON PLAN.
OCCUPANCY SENSOR AND MANUAL ON/OFF CONTROL. BATTERY CHARGER WITH MAINTENANCE-FREE, NICKEL-CADMIUM BATTERY,
PROVIDE CHEVRONS AS EITHER LEFT, RIGHT, OR BOTH DIRECTIONS AS
AC-ON INDICATOR LAMP AND TEST SWITCH.
INDICATED ON PLAN. 3. EMERGENCY PACK - SOLID-STATE, CONSTANT-CURRENT TYPE BATTERY
5. EMERGENCY BATTERY PACK - SOLID-STATE, CONSTANT-CURRENT TYPE
CHARGER WITH MAINTENANCE-FREE NICKEL-CADMIUM BATTERY, AC-ON
BATTERY CHARGER WITH MAINTENANCE-FREE, NICKEL-CADMIUM BATTERY, 6. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II,
3. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II, INDICATOR LAMP, AND TEST SWITCH. INCLUDES TWO LED LIGHTS SUPPORTED
AC-ON INDICATOR LAMP AND TEST SWITCH. DIVISION 1, GROUPS E, F, & G ENVIRONMENTS.
DIVISION 1, GROUPS E, F, & G ENVIRONMENTS. BY BATTERY PACK.
6. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS 7. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS
4. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS 4. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS
COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL
COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL
924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN 924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN
924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN 924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN
INDICATED. INDICATED. INCLUDES NEC TEMPERATURE CLASSIFICATION OF T4.
INDICATED. INCLUDES NEC TEMPERATURE CLASSIFICATION OF T4. INDICATED.

C 7. MOUNTING - PENDANT MOUNTED ON SUSPENDED ACOUSTICAL TILE OR HARD


CEILING.
8. MOUNTING - ABLE TO BE MOUNTED TO FLOOR GRATING OR HARD
SURFACE/CEILING.
5. MOUNTING - BACK MOUNTING FOR WALL MOUNT. 5. MOUNTING - HARD SURFACE/CEILING MOUNT. SEAL
C
6. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF A 6. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF A
8. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF A 9. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF A
LUMINAIRE THAT MAY MEET THE SPECIFICATION REQUIREMENTS. IT IS NOT LUMINAIRE THAT MAY MEET THE SPECIFICATION REQUIREMENTS. IT IS NOT
LUMINAIRE THAT MAY MEET THE SPECIFICATION REQUIREMENTS. IT IS NOT LUMINAIRE THAT MAY MEET THE SPECIFICATION REQUIREMENTS. IT IS NOT
INTENDED TO INDICATE A CERTAIN MANUFACTURER OR PREFERENCE. INTENDED TO INDICATE A CERTAIN MANUFACTURER OR PREFERENCE.
INTENDED TO INDICATE A CERTAIN MANUFACTURER OR PREFERENCE. INTENDED TO INDICATE A CERTAIN MANUFACTURER OR PREFERENCE.

LINEAR LED LIGHT HAZARDOUS LINEAR LED LIGHT HAZARDOUS EXIT LIGHT EXIT AND EMERGENCY LIGHT
TYPE: A1 TYPE: A2 REVISED: TYPE: X1 REVISED: TYPE: X2
APPROVED

FOR COMMANDER NAVFAC

ACTIVITY

SATISFACTORY TO DATE

DES DRW CHK

B LIGHTING FIXTURE SCHEDULE B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


LUMINAIRE REQUIREMENTS: LAMP LAMP LUMENS/
TYPE VOLTAGE MOUNTING NOTE

REPAIRS TO PACKOUT OPERATIONS


TYPE COLOR WATT
LUMINAIRE REQUIREMENTS: 1. HOUSING - HIGH IMPACT AND SCRATCH RESISTANT WEATHERPROOF HOUSING.
A1 LED 4000 120VAC 82 CEILING 2'x4'
1. HOUSING - HIGH IMPACT AND SCRATCH RESISTANT DIE CAST ALUMINUM LUMINAIRE REQUIREMENTS: 2. LIGHT SOURCE - OUTDOOR RATED WALL MOUNT LIGHT WITH LOW PROFILE
HOUSING AND POLYCARBONATE COVER. OPTIONAL SIZES OF 2FT LONG AND 4FT SOURCE AND CRI OF AT LEAST 70.
LONG VERSIONS AVAILABLE. 1. HOUSING - HIGH IMPACT AND SCRATCH RESISTANT DIE CAST ALUMINUM A2 LED 4000 277VAC 96 CEILING 2'x4', HAZARDOUS RATED
HOUSING AND POLYCARBONATE COVER. 3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9
2. LIGHT SOURCE - LED TASK LIGHT WITH CRI OF AT LEAST 80. PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL
2. LIGHT SOURCE - HIGH BAY LIGHT WITH CRI OF AT LEAST 80. HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN X1 LED - 120VAC - WALL EXIT SIGN, HAZARDOUS RATED

BUILDING 3069
3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9 LUMINAIRE SCHEDULE.
PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL 3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9
X2 LED - 120VAC - CEILING EXIT SIGN
HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL 4. CONTROL - AUTOMATIC ON/OFF CONTROL OPERATED BY PHOTOCELL FOR
LUMINAIRE SCHEDULE. HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN DAYLIGHT SENSING.
LUMINAIRE SCHEDULE. H1 LED 4000 277VAC WALL 2'x4', HAZARDOUS RATED
104
4. CONTROL - AUTOMATIC ON/OFF CONTROL WITH FOR MOTION DETECTION BY 5. EMERGENCY BATTERY PACK - SOLID-STATE, CONSTANT-CURRENT TYPE
OCCUPANCY SENSOR AND MANUAL ON/OFF CONTROL. 4. CONTROL - AUTOMATIC ON/OFF CONTROL WITH MOTION DETECTION BY BATTERY CHARGER WITH MAINTENANCE-FREE, NICKEL-CADMIUM BATTERY,
OCCUPANCY SENSOR AND MANUAL ON/OFF CONTROL. AC-ON INDICATOR LAMP AND TEST SWITCH. H2 LED 4000 277VAC 92 CEILING HAZARDOUS RATED
5. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II,
DIVISION 1, GROUPS E, F, & G ENVIRONMENTS. 5. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II, 6. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II, 120VAC
DIVISION 1, GROUPS E, F, & G ENVIRONMENTS. DIVISION 1, GROUPS E, F, & G ENVIRONMENTS. H3 LED 4000 120 WALL HAZARDOUS RATED
277VAC
6. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS
COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL 6. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS 7. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS
924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL

DEPARTMENT OF THE NAVY


INDICATED. INCLUDES NEC TEMPERATURE CLASSIFICATION OF T4. 924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN 924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN
INDICATED. INCLUDES NEC TEMPERATURE CLASSIFICATION OF T4. INDICATED. INCLUDES NEC TEMPERATURE CLASSIFICATION OF T4.
7. MOUNTING - ABLE TO BE MOUNTED TO FLOOR GRATING, I-BEAM, WALL, OR HARD
A SURFACE/CEILING. 7. MOUNTING - HIGH BAY HARD SURFACE/CEILING. 8. MOUNTING - WALL MOUNT.
A
8. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF A 8. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF A 9. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF A
LUMINAIRE THAT MAY MEET THE SPECIFICATION REQUIREMENTS. IT IS NOT LUMINAIRE THAT MAY MEET THE SPECIFICATION REQUIREMENTS. IT IS NOT LUMINAIRE THAT MAY MEET THE SPECIFICATION REQUIREMENTS. IT IS NOT
INTENDED TO INDICATE A CERTAIN MANUFACTURER OR PREFERENCE. INTENDED TO INDICATE A CERTAIN MANUFACTURER OR PREFERENCE. INTENDED TO INDICATE A CERTAIN MANUFACTURER OR PREFERENCE.
SCALE:

HAZARDOUS LED TASK LIGHT HAZARDOUS HIGH BAY LED LIGHT HAZARDOUS LED WALL LIGHT EPROJECT NO.:

CONSTR. CONTR. NO.

REVISED: TYPE: H1 REVISED: TYPE: H2 REVISED: TYPE: H3 NAVFAC DRAWING NO.

SHEET OF

E-501
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
A
B
C
D
1

1
2

2
3

3
4

4
5

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND - - - -


DES

SHEET
SCALE:

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON - - - -


ACTIVITY
APPROVED

- - - -
EPROJECT NO.:

- - - -
DRW

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

OF
SATISFACTORY TO DATE

BUILDING 3069 - - - -
FOR COMMANDER NAVFAC

- - - -
E-502

REPAIRS TO PACKOUT OPERATIONS


CHK

DRAWFORM REVISION: SEP 2021

- - - -

SYM DESCRIPTION DATE APPR


SEAL

A
B
C
D
1 2 3 4 5

APPR
-

DATE
-

-
EXISTING CONDUIT AND WIRE SCHEDULE EXISTING CONDUIT AND WIRE SCHEDULE EXISTING CONDUIT AND WIRE SCHEDULE
CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION
FROM TO FROM TO FROM TO
NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING

P1 3" 3-250Kcmil #1 600V MCC1 CH-1 P50 1" 10#14 #14 600V PELLETIZER CONTROL PANEL PELLETIZER POWER PATCH PANEL P97 3/4" 2#12 #12 600V JB IP1

P2 3" 3-350Kcmil #1 600V MCC1 EXTRUDER CONTROL PANEL P51 3/4" 2#12 #12 600V RP1 EF4 P98 3/4" 2#12 #12 600V CONVERTER #2 JB
D P3 3" 3-500Kcmil #1 600V EXTRUDER CONTROL PANEL EXTRUDER P52 1 1/4" 30#12 #12 600V K-TRON CONTROL PANEL PATCH PANEL MEZZ. LEVEL P99 3/4" 2#12 #12 600V CONVERTER #1 JB
D
P4 3/4" 3#12 #12 600V EXTRUDER CONTROL PANEL CIRCULATING PUMP P53 1 1/4" 30#12 #12 600V K-TRON CONTROL PANEL PATCH PANEL MEZZ. LEVEL P100 3/4" 2#12 #12 600V JB JB

DESCRIPTION
-

-
P5 2" 3#4/0 #6 600V MCC1 PANEL PP1 P54 3/4" 3#12 #12 600V MCC1 TOULENE VAPOR EXHAUST FAN P101 3/4" 2#12 #12 600V DC POWER SUPPLY #2 JB

P6 1" 3#4 #8 600V MCC1 K-TRON CONTROL PANEL P55 P102 3/4" 2#12 #12 600V DC POWER SUPPLY #1 JB

SYM
-

-
P7 1 1/4" 4#2 #8 600V MCC1 PANEL LP1 P56 1" 3#4 #8 600V PP1 (1) JB P103 3/4" 2#12 #12 600V BLH-LCP-100 JB
INDICATOR

P8 3/4" 3#10 #10 600V MCC1 CRANE MOTOR STARTERS P57 1" 3#4 #8 600V PP1 (3) JB P104 3/4" 2#12 #12 600V BLH-LCP-100 JB
INDICATOR

P9 3/4" 3#8 #10 600V MCC1 TRANSFORMER T-1 P58 1" 3#4 #8 600V PP1 (2) JB P105 3/4" 2#12 #12 600V BLH-LCP-100 JB
INDICATOR
IP1
P10 1 1/4" 4#2 #8 600V TRANSFORMER T-1 PANEL RP1 P59 P106 3/4" 6#12 #12 600V JB
(CKT'S 4, 6 & 8)

P11 1" 4#6 #10 600V PANEL RP1 PANEL RP2 P60 P107 3/4" 8#14 #14 600V POWER PATCH PANEL NO. 2 IOPER

P12 3/4" 3#10 #10 600V MCC1 TRANSFORMER T-2 P61 P108 3/4" 3#12 #12 600V EXTRUDER CONTROL PANEL COOLING FAN

P13 1" 4#6 #10 600V TRANSFORMER T-2 PANEL IP1 P62

P14 3/4" 2#6 #10 600V PANEL IP1 UPS P63 3/4" 2#12 #12 600V JB IOPPBO

P15 3/4" 2#6 #10 600V UPS PANEL UPS1 P64 3/4" 2/C#16 SHLD 600V JB IOPPBO PSL1050

P16 3/4" 3#12 #12 600V PELLETIZER CONTROL PANEL PELLETIZER POWER PATCH PANEL P65 3/4" 4#12 #12 600V IP1 (3, 4) JB FOR WT0506, FT0501

C P17 1 1/2"
24#12
10#10
#10 600V CRANE MOTOR STARTERS PANEL CRANE FESTON POWER JB-1 P66 3/4" 2#12 #12 600V JB FT0501 SEAL
C
P18 3/4" 3#12 #12 600V MCC1 VFD P67

P19 3/4" 3#12 #12 600V VFD LIQUID TANK #1 PUMP #1 P68 3/4" 2#12 #12 600V JB FT0521

P20 3/4" 3#12 #12 600V MCC1 VFD P69 3/4" 6#12 #12 600V IP1 (7, 8 & 9) JB FOR WT0526, FT0523, FT0524

P21 3/4" 3#12 #12 600V VFD LIQUID TANK #1 PUMP #4 P70 3/4" 2#12 #12 600V IP1 FT0523

P22 3/4" 3#12 #12 600V MCC1 VFD P71

P23 3/4" 2#12 #12 600V UPS1(4) IOPUT P72 APPROVED

P24 3/4" 3#12 #12 600V MCC1 VFD P73 3/4" 3#12 #12 600V MCC1 M.O. DOOR CONTROL PANEL FOR COMMANDER NAVFAC

ACTIVITY
P25 3/4" 3#12 #12 600V VFD LIQUID FEED TANK #2 PUMP #2 P74 3/4" 3#12 #12 600V M.O. DOOR CONTROL PANEL M.O. DOOR MOTOR

P26 3/4" 3#12 #12 600V MCC1 LIQUID FEED TANK #2 AGITATOR P75 3/4" 3#12 #12 600V MCC1 M.O. DOOR CONTROL PANEL

P27 3/4" 3#12 #12 600V MCC1 VFD P76 3/4" 3#12 #12 600V M.O. DOOR CONTROL PANEL M.O. DOOR MOTOR

SATISFACTORY TO DATE
P28 3/4" 3#12 #12 600V VFD LIQUID FEED TANK #3 PUMP #3 P77
DES DRW CHK

P29 3/4" 3#12 #12 600V MCC1 LIQUID FEED TANK #3 AGITATOR P78 3/4" 4#12 #12 600V IOPER (POWER) JB

P30 1 1/4" 3#1 #6 600V EXTRUDER CONTROL PANEL EXTRUDER CHILLER P79 3/4" 2#12 #12 600V JB IOPPB1

P31 3/4" 3#12 #12 600V EXTRUDER CONTROL PANEL LUBE OIL PUMP P80 3/4" 2-2/C#16 600V IOPER JB FOR

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


SHLD PSL1050 & PSL1051

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


P32 3/4" 3#8 #10 600V MCC1 ACU-2 P81 3/4" 2/C#16 SHLD 600V JB IOPPB1 PSL1051

REPAIRS TO PACKOUT OPERATIONS


P33 3/4" 3#8 #10 600V MCC1 ACU-1 P82

P34 2" 3-250Kcmil #4 600V MCC1 MCC2 P83

P35 3/4" 3#6 #10 600V MCC2 TCU CHILLER P84

P36 3/4" 3#12 #12 600V MCC2 VACUUM PUMP CONTROL PANEL P85

BUILDING 3069
P37 1" 3#4 #8 600V MCC2 AHU-1 CONTROL PANEL P86

P38 3/4" 2#12 #12 600V RP2(7) AD-1 P87

P39 1 1/4" 3#2 #8 600V MCC2 OIL-FREE AIR COMPRESSOR P88

P40 3/4" 3#8 #10 600V AHU-1 CONTROL PANEL CHP-1 P89

P41 3/4" 3#12 #12 600V VACUUM PUMP CONTROL PANEL VACUUM PUMP VACP-1 P90

P42 3/4" 3#12 #12 600V MCC2 EUH-2 P91

P43 3/4" 3#12 #12 600V MCC2 EUH-1 P92

DEPARTMENT OF THE NAVY


P44 3/4" 3#12 #12 600V VFD LIQUID FEED TANK #1 AGITATOR P93

P45 3/4" 3#10 #10 600V PELLETIZER CONTROL PANEL PP1

A P46 1" 17#14 #14 600V MCC1 EMERGENCY POWER


OFF PANEL (EPO) A
P47 1" 5#6 #10 600V TCCH-2 CONTROL PANEL TCCH-1

P48
SCALE:
P49 EPROJECT NO.:

CONSTR. CONTR. NO.

NEW CIRCUIT TO REPLACE EXISTING, REFER TO DRAWING E-602


NAVFAC DRAWING NO.

SHEET OF

E-601
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
NEW CONDUIT AND WIRE SCHEDULE NEW CONDUIT AND WIRE SCHEDULE
CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION
FROM TO FROM TO
NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING

P1 3" 3#1 #8 600V MCC1 NEW CU1 P50

P2 P51 3/4" 2#12 #12 600V RP1 EF4


D P3 P52
D
P4 P53

DESCRIPTION
-

-
P5 P54

P6 P55

SYM
-

-
P7 1 1/4" 4#2 #8 600V MCC1 PANEL LP1 P56

P8 3/4" 3#10 #10 600V MCC1 CRANE MOTOR STARTERS P57

P9 3/4" 3#8 #10 600V MCC1 TRANSFORMER T-1 P58

P10 1 1/4" 4#2 #8 600V TRANSFORMER T-1 PANEL RP1 P59

P11 1" 4#6 #10 600V PANEL RP1 PANEL RP2 P60

P12 3/4" 3#10 #10 600V MCC1 TRANSFORMER T-2 P61

P13 1" 4#6 #10 600V TRANSFORMER T-2 PANEL IP1 P62

P14 P63

P15 P64

P16 P65

C P17 1 1/2"
24#12
10#10
#10 600V CRANE MOTOR STARTERS PANEL CRANE FESTOON POWER JB-1 P66 SEAL
C
P18 P67

P19 P68

P20 P69

P21 P70

P22 P71

P23 P72 APPROVED

P24 P73 3/4" 3#12 #12 600V MCC1 M.O. DOOR CONTROL PANEL FOR COMMANDER NAVFAC

ACTIVITY
P25 P74 3/4" 3#12 #12 600V M.O. DOOR CONTROL PANEL M.O. DOOR MOTOR

P26 P75 3/4" 3#12 #12 600V MCC1 M.O. DOOR CONTROL PANEL

P27 P76 3/4" 3#12 #12 600V M.O. DOOR CONTROL PANEL M.O. DOOR MOTOR

SATISFACTORY TO DATE
P28 P77
DES DRW CHK

P29 P78

P30 P79

P31 P80
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


P32 P81

REPAIRS TO PACKOUT OPERATIONS


P33 P82

P34 2" 3-250Kcmil #4 600V MCC1 MCC2 P83

P35 P84

P36 P85

BUILDING 3069
P37 1" 3#4 #8 600V MCC2 NEW CU2 P86

P38 3/4" 2#12 #12 600V RP2(7) AD-1 P87

P39 1 1/4" 3#2 #8 600V MCC2 OIL-FREE AIR COMPRESSOR P88

P40 3/4" 3#6 #8 600V MCC2 NEW IDS P89

P41 P90

P42 3/4" 3#12 #12 600V MCC2 EUH-2 P91

P43 3/4" 3#12 #12 600V MCC2 EUH-1 P92

DEPARTMENT OF THE NAVY


P44 P93

P45

A P46 A
P47

P48
SCALE:
P49 EPROJECT NO.:

CONSTR. CONTR. NO.

NEW CIRCUIT
NAVFAC DRAWING NO.

SHEET OF

E-602
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
D PANEL SCHEDULE LP1 PANEL SCHEDULE RP1 PANEL SCHEDULE PP1 D
NO. RP1 LOCATION: ELECTRICAL ROOM (G-4) NO. PP1 LOCATION: ELECTRICAL ROOM (G-4)
NO. LP1 LOCATION: ELECTRICAL ROOM (G-4)

DESCRIPTION
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 100 A MCB 480 V, 3 PH., 3 W 225 A MAINS, 200 A MCB
480/277 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 100 A MCB

-
10,000 AIC AT 120 V GND. BUS SURFACE MTG. 14,000 AIC AT 277 V GND. BUS SURFACE MTG.
14,000 AIC AT 277 V GND. BUS SURFACE MTG.
LOAD CKT. BKR PHASE CKT. BKR LOAD LOAD CKT. BKR PHASE CKT. BKR LOAD
LOAD CKT. BKR PHASE CKT. BKR LOAD SERVES EQUIPMENT SERVES EQUIPMENT

SYM
SERVES EQUIPMENT SERVES EQUIPMENT WATTS WATTS SERVES EQUIPMENT SERVES EQUIPMENT
POLES TRIP NO. A B C NO. TRIP POLES WATTS NO. TRIP POLES WATTS

-
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS POLES TRIP NO. A B C
EXHAUST FAN EF-1, ELEC ROOM 100 1 20 1 300 2 20 1 200 EXIT SIGNS 30433
PROCESS 1-1 AIR LOCK 0-2 2700 1 20 1 2800 2 20 1 100 LIGHTING ELECTRIC ROOM 0-4
EXHAUST FAN EF-2, MECH ROOM 100 1 20 3 600 4 20 1 500 FIRE ALARM CONTROL PANEL TEMPERATURE CONTROL TCU-1 45,650 3 80 1 30433 2 80 3 45,650 TEMPERATURE CONTROL TCU-3
LIGHTING MEZZANNE 1-1 1600 1 20 3 2350 4 20 1 750 LIGHTING MECH ROOM 0-3
EXHAUST FAN EF-4, AIR LOCK 528 1 20 5 708 6 20 1 180 RECEPTACLES ELECTRIC ROOM 30433
LIGHTING UNDER MEZZANNE 0-1 2050 1 20 5 2900 6 20 1 850 LIGHTING UTILITY BUILDING 2-1
RECEPTACLES MECH ROOM 720 1 20 7 2529 8 20 1 1809 RECEPTACLES ELECTRIC ROOM 15217
SPARE 1 20 7 8 20 1 SPARE
RECEPTACLES PROCESS ROOM 360 1 20 9 900 10 20 1 540 RECEPTACLES ELECTRIC ROOM TEMPERATURE CONTROL TCU-2 45,650 3 80 3 15217 4 30 3 PELLETIZER CONTROL PANEL
SPARE 1 20 9 10 20 1 SPARE
RECEPTACLES PROCESS ROOM 360 1 20 11 720 12 20 1 360 RECEPTACLES ELECTRIC ROOM 15217
SPARE 1 20 11 12 20 1 SPARE
BIN CAPPING STATION 100 1 20 13 640 14 20 1 540 RECEPTACLES PROCESS ROOM
SPACE 13 14 SPACE
P.A. SYSTEM 100 1 20 15 460 16 20 1 360 RECEPTACLES PROCESS ROOM SPARE 3 20 5 6 20 3 SPARE
SPACE 15 16 SPACE
MINI-CAMERAS 200 1 20 17 200 18 20 1 SPARE
SPACE 17 18 SPACE
SPARE 1 20 19 20 20 1 SPARE
SPACE 19 20 SPACE
SPARE 1 20 21 22 20 1 SPARE SPARE 3 20 7 8 SPACE
SPACE 21 22 SPACE
SPARE 1 20 23 24 20 1 SPARE
SPACE 23 24 SPACE
SPACE 25 26 20 1 SPARE
TOTALS 6350 2800 2350 2900 1700 TOTAL
SPACE 27 28 SPACE SPACE 9 10 SPACE
TOTAL CONNECTED LOAD 8050 WATTS
SPACE 29 30 SPACE
SPACE 31 32 SPACE
SPACE 33 34 SPACE SPACE 11 12 SPACE

C PANEL SCHEDULE RP2


SPACE
SPACE
35
37
36
38
SPACE SEAL
C
SPACE 39 40 60 3 PANEL RP2, UTILITY BUILDING SPACE 13 14 SPACE
NO. RP2 LOCATION:UTILITY BUILDING
SPACE 41 42
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 60 A MCB TOTALS 2568 3669 1960 1428 4489 TOTAL TOTALS 91,300 45,65045,65045,650 45,650 TOTAL
10,000 AIC AT 120 V GND. BUS SURFACE MTG. TOTAL CONNECTED LOAD 7057 WATTS TOTAL CONNECTED LOAD 136,950 WATTS
BREAKER SHALL BE PROVIDED WITH LOCKABLE ON HANDLE
LOAD CKT. BKR PHASE CKT. BKR LOAD
SERVES EQUIPMENT SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
GLYCOL FEEDER PUMP GFP-1 500 1 20 1 1500 2 20 1 1000 I/O RACK IOP-UT
RECEPTACLES UTILITY BUILDING 540 1 20 3 1068 4 20 1 528 EXHAUST FAN EF-3 PANEL SCHEDULE UPS1
RECEPTACLES UTILITY BUILDING 540 1 20 5 640 6 20 1 100 M.O. DAMPER MD-1 APPROVED
AD-1 CONTROL POWER 75 1 20 7 375 8 20 300 M.O. DAMPER MD-2A, 2B, AND 2C NO. UPS1 LOCATION: ELECTRICAL ROOM (G-4)
TEMPERATURE CONTROLLER 100 1 20 9 10 20 SPARE FOR COMMANDER NAVFAC
SPARE 1 20 11 12 20 SPARE 208/120 V, 1 PH., 3 W 100 A MAINS, 100 A SOLID NEUTRAL 60 A MCB ACTIVITY
SPACE 13 14 - SPACE 10,000 AIC AT 120 V GND. BUS SURFACE MTG.
SPACE 15 16 - SPACE
- LOAD CKT. BKR CKT. BKR LOAD
SPACE 17 18 SPACE SERVES EQUIPMENT SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
SPACE 19 20 - SPACE
- CRANE PLC 500 1 20 1 1500 2 20 1 1000 SYSTEM PLC IOPER
SPACE 21 22 SPACE
HMIER 500 1 20 3 1500 4 20 1 1000 I/O RACK - IOP-UT
SPACE 23 24 - SPACE SATISFACTORY TO DATE
K-TRON PLC 800 1 20 5 1800 6 20 1 1000 EPO PANEL
DES DRW CHK
TOTALS 1655 1875 1068 640 1928 TOTAL EXTRUDER 500 1 20 7 500 8 20 1 SPARE
TOTAL CONNECTED LOAD 3583 WATTS EXTRUDER CONSOLE RACK (PLC) 500 1 20 9 1000 10 20 1 500 SURGE PROTECTOR
KSC DISPLAY (PLC) 500 1 20 11 1500 12 20 1 1000 CCTV
PELLETIZER (PLC) 500 1 20 13 500 14 - SPACE
SPACE - 15 16 - SPACE
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


SPACE - 17 18 - SPACE
PANEL SCHEDULE IP1

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


SPACE - 19 20 - SPACE
SPACE - 21 22 - SPACE

REPAIRS TO PACKOUT OPERATIONS


NO. IP1 LOCATION: ELECTRICAL ROOM (G-4) - -
SPACE 23 24 SPACE
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 60 A MCB TOTALS 3800 2500 2500 3300 4500 TOTAL
10,000 AIC AT 120 V GND. BUS SURFACE MTG. TOTAL CONNECTED LOAD 8300 WATTS

LOAD CKT. BKR PHASE CKT. BKR LOAD


SERVES EQUIPMENT SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
AT-0400 100 1 20 1 1100 2 20 1 1000 SYSTEM PLC
FT-0501 100 1 20 3 200 4 20 1 100 WT-0506

BUILDING 3069
FT-0521 100 1 20 5 200 6 20 1 100 WT-0516
FT-0523 100 1 20 7 200 8 20 1 100 WT-0526
FT-0524 100 1 20 9 600 10 20 1 500 FIRE ALARM DELUGE SYSTEM
SPARE 1 20 11 500 12 20 1 500 SURGE PROTECTOR
SPARE 1 20 13 200 14 20 1 200 PORTABLE SCALES
SPARE 1 20 15 16 20 1 SPARE
SPARE 20 17 18 SPACE
SPARE 20 19 20 SPACE
SPACE 20 21
22 50 2 UPS
SPACE 20 23
TOTALS 500 1500 800 700 2500 TOTAL
TOTAL CONNECTED LOAD 3000 WATTS

DEPARTMENT OF THE NAVY


A A

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

E-603
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

-
PANEL SCHEDULE LP1 PANEL SCHEDULE RP1

DATE
-

-
NO. RP1 LOCATION: ELECTRICAL ROOM (G-4)
NO. LP1 LOCATION: ELECTRICAL ROOM (G-4)
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 100 A MCB
480/277 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 100 A MCB
10,000 AIC AT 120 V GND. BUS SURFACE MTG.
14,000 AIC AT 277 V GND. BUS SURFACE MTG.
LOAD CKT. BKR PHASE CKT. BKR LOAD
LOAD CKT. BKR PHASE CKT. BKR LOAD SERVES EQUIPMENT SERVES EQUIPMENT
D SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
SERVES EQUIPMENT WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
D
EXHAUST FAN EF-1, ELEC ROOM 100 1 20 1 300 2 20 1 200 EXIT SIGNS
PROCESS 1-1 AIR LOCK 0-2 2700 1 20 1 3700 2 20 1 1000 LIGHTING ELECTRIC ROOM 0-4
EXHAUST FAN EF-2, MECH ROOM 100 1 20 3 600 4 20 1 500 FIRE ALARM CONTROL PANEL
MEZZANINE TASK LIGHTING 0-1 1100 1 20 3 1800 4 20 1 700 LIGHTING MECH ROOM 0-3

DESCRIPTION
EXHAUST FAN EF-4, AIR LOCK 528 1 20 5 528 6 20 1 SPARE
LIGHTING UNDER MEZZANINE 0-1 1600 1 20 5 1600 6 20 1 SPARE

-
6300 5200 RECEPTACLES MECH ROOM 900 1 20 7 900 8 20 1 SPARE
LIGHTS OUTSIDE ROOMS 0-3, 0-4 1100 1 20 7 8 20 1 HIGH BAY LIGHTING 0-1
RECEPTACLES PROCESS ROOM 540 1 20 9 1440 10 20 1 900 RECEPTACLES ELECTRIC ROOM
WALL LIGHTS PROCESS AREA 0-1 1540 1 20 9 3640 10 20 1 2100 LIGHTS OUTSIDE ROOMS 0-1, 1-1

SYM
720 1 20 11 1440 12 20 1 720

-
60 1 20 11 860 12 20 1 RECEPTACLES PROCESS ROOM RECEPTACLES ELECTRIC ROOM
RED STROBE WARNING LIGHT 800 CANOPY LIGHTS
1 20 SPARE 1 20 13 900 14 20 1 900 RECEPTACLES PROCESS ROOM
SURGE PROTECTOR 500 13 500 14 SPACE
P.A. SYSTEM 100 1 20 15 640 16 20 1 540 RECEPTACLES PROCESS ROOM
SPACE 15 16 SPACE
MINI-CAMERAS 200 1 20 17 200 18 20 1 SPARE
SPACE 17 18 SPACE
19 3016 20 20 1 SPARE
SPACE 19 20 SPACE NEW EWH-1 6032 2 40
21 3016 22 20 1 SPARE
SPACE 21 22 SPACE
SURGE PROTECTOR 500 1 20 23 500 24 20 1 SPARE
SPACE 23 24 SPACE
SPACE 25 26 20 1 SPARE
TOTALS 8600 10500 5440 2460 9800 TOTAL
SPACE 27 28 SPACE
TOTAL CONNECTED LOAD 18400 WATTS
NEW CIRCUIT TO BE RUN FROM PANEL SPACE 29 30 SPACE
SPACE 31 32 SPACE
SPACE 33 34 SPACE
SPACE 35 36 SPACE
PANEL SCHEDULE RP2 SPACE 37 38
C NO. RP2 LOCATION:UTILITY BUILDING
SPACE 39 40 60 3 PANEL RP2, UTILITY BUILDING SEAL
C
SPACE 41 42
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 60 A MCB TOTALS 9720 5616 5696 2168 3760 TOTAL
10,000 AIC AT 120 V GND. BUS SURFACE MTG. TOTAL CONNECTED LOAD 13480 WATTS
BREAKER SHALL BE PROVIDED WITH LOCKABLE ON HANDLE
LOAD CKT. BKR PHASE CKT. BKR LOAD NEW CIRCUIT TO BE RUN FROM PANEL
SERVES EQUIPMENT SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
LIGHTING UTILITY BUILDING 2-1 1130 1 20 1 1130 2 20 1 SPARE
RECEPTACLES UTILITY BUILDING 720 1 20 3 1248 4 20 1 528 EXHAUST FAN EF-3
APPROVED
RECEPTACLES UTILITY BUILDING 720 1 20 5 820 6 20 1 100 M.O. DAMPER MD-1
AD-1 CONTROL POWER 75 1 20 7 375 8 20 1 300 M.O. DAMPER MD-2A, 2B, AND 2C FOR COMMANDER NAVFAC

TEMPERATURE CONTROLLER 100 1 20 9 100 10 20 SPARE ACTIVITY

SURGE PROTECTOR 500 1 20 11 500 12 20 SPARE PANEL SCHEDULE PP1


SPACE 13 14 SPACE
SPACE 15 16 SPACE
NO. PP1 LOCATION: ELECTRICAL ROOM (G-4)
SPACE 17 18 SPACE SATISFACTORY TO DATE

SPACE 19 20 SPACE 480 V, 3 PH., 3 W 225 A MAINS, 200 A MCB DES DRW CHK

SPACE 21 22 SPACE 14,000 AIC AT 277 V GND. BUS SURFACE MTG.


SPACE 23 24 SPACE
LOAD CKT. BKR PHASE CKT. BKR LOAD
TOTALS 3245 2005 1348 820 928 TOTAL SERVES EQUIPMENT SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


TOTAL CONNECTED LOAD 4173 WATTS
NEW CIRCUIT TO BE RUN FROM PANEL

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


SPARE 3 80 1 2 80 3 SPARE

REPAIRS TO PACKOUT OPERATIONS


SPARE 3 80 3 4 30 3 SPARE
PANEL SCHEDULE IP1
167
NO. IP1 LOCATION: ELECTRICAL ROOM (G-4)
SURGE PROTECTOR 500 3 20 5 167 6 20 3 SPARE

BUILDING 3069
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 60 A MCB 167

10,000 AIC AT 120 V GND. BUS SURFACE MTG.


SPARE 3 20 7 8 SPACE
LOAD CKT. BKR PHASE CKT. BKR LOAD
SERVES EQUIPMENT SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
CCTV SYSTEM 1000 1 20 1 1000 2 20 1 SPARE
SPACE 9 10 SPACE
SPARE 1 20 3 4 20 1 SPARE
SPARE 1 20 5 6 20 1 SPARE
SPARE 1 20 7 8 20 1 SPARE
SPARE 1 20 9 500 10 20 1 500 FIRE ALARM DELUGE SYSTEM SPACE 11 12 SPACE

DEPARTMENT OF THE NAVY


SPARE 1 20 11 500 12 20 1 500 SURGE PROTECTOR
13 2080 14 20 1 SPARE
NEW OU-1 AND IU-1 4160 2 25
15 2080 16 20 1 SPARE SPACE 13 14 SPACE
A 25
17 2080 18 SPACE A
NEW OU-2 AND IU-2 4160 2
19 2080 20 SPACE TOTALS 500 167 167 167 - TOTAL
SPACE 20 21
22 50 2 UPS TOTAL CONNECTED LOAD 500 WATTS
SPACE 20 23 NEW CIRCUIT TO BE RUN FROM PANEL SCALE:

TOTALS 9320 5160 2580 2580 1000 TOTAL EPROJECT NO.:

CONSTR. CONTR. NO.


TOTAL CONNECTED LOAD 10320 WATTS
NEW CIRCUIT TO BE RUN FROM PANEL
NAVFAC DRAWING NO.

SHEET OF

E-604
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

-
EXISTING 4" RSC, 3#1/0, 15KV CABLE

DATE
-

-
1000kVA 13.2kV - 480/277V
3Ø., 4W., 60Hz
EXISTING PAD MOUNTED TRANSFORMER

EXISTING (4) 5" RSC, 4-750Kcmil, 1-250Kcmil

D EPO
P46
E 1200AF
D
1200AT
L-S-I-GR

DESCRIPTION
3
1200/5

-
POWER MOTOR CONTROL CENTER MCC1
METER

SYM
-

-
480/277V., 3Ø 4W., 1200A. BUS 42,000 AIC

600AS 600AS 30AS 30AS 200AS 100AS 100AS 30AS 60AS 30AS 100AS 30AS 30AS 30AS 30AS 30AS 60AS 30AS 30AS 100AS 30AS
500AF 500AF 20AF 30AF 200AF 80AF 100AF 30AF 45AF 25AF 70AF 6AF 10AF 10AF 6AF 10AF 60AF 6AF 10AF 70AF 15AF

1 1 1 1

PROTECTOR
R R R R
G G G G

SURGE
H H H H
O O O O
A A A A

(2) P1 (2)P2 P5 P6 P7 P8 P9 P12 P18 P20 P22 P26 P P27 P29 P P54
30kVA 15kVA P24 L L
C C
T-1 480-208/120V T-2 480-208/120V
3Ø., 4W. 3Ø., 4W.
P14
UPS 7.5 KVA
C CONT. CONT. CRANE
P10 P13
208V IN
208/120V OUT
P
L
P
L
P
L
P
L
P
L
SEAL
C
PANEL PANEL MOTOR C C C C C
STARTERS P11 P15
30A
VFD P VFD P VFD P VFD P P VFD P P
P52, P53, L L L L L L L WP
P3 P31 P4 P30 P17 C C C C C C C
P19 P21 P44 P25 P28

CRANE FESTON S S S S S S S

(TEMP CONTROLS)
215 60 15 S S

UTILITY BUILDING
250 5 7 1/2 2 S 3 S 3 S 1 S 3 S 1 3 3

208/120V, 3Ø, 4W

208/120V, 1Ø, 3W
LIGHTING PANEL
480/277V, 3Ø, 4W

208/120V, 3Ø, 4W
KW KW KW POWER JB
DISTRIBUTION

MISC. POWER

INST. POWER
FLUID FILTER

LIQUID FEED

LIQUID FEED
480V, 3Ø, 3W

LIQUID FEED

LIQUID FEED

LIQUID FEED

LIQUID FEED

LIQUID FEED
UPS POWER
HVAC EXTRUDER
HYDRAULIC

PANEL PP1
EXTRUDER

AGITATOR
AGITATOR

AGITATOR
CHILLER

FEEDERS

TOULENE

EXHAUST
LUBE OIL

PUMP #3
PUMP #1

PUMP #4

PUMP #2
TSECH-1
CHILLER

TANK #3

TANK #3
TANK #1

TANK #1

TANK #1

TANK #2

TANK #2
K-TRON
POWER

VAPOR
CRANE
SPARE

SPARE

SPARE

SPARE
SOLID
PUMP

PUMP

UPS1
APPROVED

FAN
RP1

RP2
LP1

IP1
FOR COMMANDER NAVFAC

ACTIVITY
MOTOR CONTROL CENTER MCC2

480v, 3Ø 3W., 600A. BUS 42,000 AIC

30AS 30AS 30AS 100AS 30AS 60AS 30AS 60AS 100AS 30AS 60AS 400AS 60AS 60AS 30AS 30AS 30AS 30AS 60AS 30AS 60AS SATISFACTORY TO DATE
15AF 15AF 20AF 100AF 30AF 60AF 30AF 60AF 70AF 6AF 50AF 250AF 40AF 40AF 3AF 3AF 20AF 20AF 60AF 30AF 60AF
DES DRW CHK

P34
1 2 1 1 2
R R R R R

B G G
B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


G G G

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


H H H H H
O O O O O
A A A A A

REPAIRS TO PACKOUT OPERATIONS


P43 P42 P39 P37 P36 P35 P33 P32 P73 P75
P77
VACP-1 INTERLOCK
CONT.
PANEL
AHU-1
CONT.
P40 P41 P74 P76
PANEL EUH-1
INCOMING

BUILDING 3069
LIQUID FEEDLIQUID FEED
LIQUID FEED LINE
LP1 SPARE CRANE 7.5 7.5 30 25 30AS 22 22
TANK #1 TANK #2 TANK #2 15 10 15 5 2 1/2 1/2
KW KW KW KW 15AF KW KW
ROTOR WHEEL

REACTIVATION
PUMP #1 PUMP #2 AGITATOR
AIR COMPRESSOR

100AS 100AS 30AS


GLYCOL CHILLED

100AF 70AF 30AF TCU


DESICCANT

30AS 6AF 30AS 6AF


PP1 AHU-1
PROCESS
CHILLER

AGV AIRLOCK

AGV AIRLOCK
WATER PUMP
UNIT HEATER

UNIT HEATER

MECH. ROOM
TCU CHILLER
BLOWER

BLOWER
POWER TOULENE TRANS. T-1

ELEC. ROOM
LIQUID FEED
LIQUID FEED
METER ACU-2

M.O. DOOR

M.O. DOOR
TANK #3 TANK #3 VAPOR RP1 60AS 100AS
OIL-FREE

VACUUM
200AS PUMP #3 AGITATOR 60ASEXHAUST FAN 60AS 50AF 70AF

TCCH-2
VACP-1
SPARE

SPARE

SPARE
SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE
EUH-1

EUH-2

ACU-1

ACU-2
CHP-1

PUMP
200AF 30AS 6AF 40AF 45AF OIL-FREE
AC-1

COMP. AC-1 SPARE


LIQUID FEED AHU-1
SPARE SPARE
TANK #1 SPARE 100AS 30AS
INCOMING PUMP #4 100AF 30AF
LINE 30AS 10AF 100AS 70AF VACUUM
1200A LIQUID FEED PUMP SPARE
CHILLER M.O. DOOR SPARE
MAIN TANK #1 SPARE 30AS
BREAKER

DEPARTMENT OF THE NAVY


AGITATOR 30AS 30AS 6AF 1
EXTRUDER MCC2 30AS 10AF 3AF 30AF
SURGE TRANS. T-2 EUH-2 SPARE
SPARE ACU-1
PROTECTOR IP1
A 30AS
30AF
30AS
25AF
60AS
60AF
60AS
40AF
30AS
15AF 2 A
SPARE SPARE
M.O. DOOR SPARE SPARE K-TRON
600AS 600AS 400AS 30AS 60AS 100AS 30AS 60AS
500AF 500AF 250AF 3AF 60AF 80AF 30AF 60AF
SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.


15'-5" 3'-4"

NAVFAC DRAWING NO.


FRONT VIEW-SWITCHGEAR/MOTOR CONTROL CENTER MCC1 FRONT VIEW-MOTOR CONTROL CENTER MCC2
SHEET OF

E-701
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

-
4" RSC, 3#1/0, 15KV CABLE

DATE
-

-
1000kVA 13.2kV - 480/277V
3Ø., 4W., 60Hz
PAD MOUNTED TRANSFORMER

(4) 5" RSC, 4-750Kcmil, 1-250Kcmil

D P46
D
EPO E 1200AF
1200AT

DESCRIPTION
L-S-I-GR
3

-
1200/5

POWER EXISTING MOTOR CONTROL CENTER MCC1


METER

SYM
-

-
480/277V, 3Ø, 4W, 1200A BUS 42,000 AIC

600AS 600AS 30AS 30AS 200AS 100AS 100AS 30AS 60AS 30AS 100AS 30AS 30AS 30AS 30AS 30AS 60AS 30AS 30AS 100AS 30AS
*150AF 500AF 20AF 30AF 200AF 80AF 100AF 30AF 45AF 25AF 70AF 6AF 10AF 10AF 6AF 10AF 60AF 6AF 10AF 70AF 15AF

1 1 1 1

PROTECTOR
R R R R
G G G G

SURGE
H H H H
O O O O
A A A A

P1 P5 P7 P8 P9 P12
30kVA 15kVA
T-1 480-208/120V T-2 480-208/120V
3Ø., 4W. 3Ø., 4W.

C CRANE
SEAL
C
P10 P13
MOTOR
STARTERS P11

52.5 P17
*SPD *SPD *SPD *SPD *SPD
KW

15 CRANE FESTON

(TEMP CONTROLS)

UTILITY BUILDING
POWER JB

208/120V, 3Ø, 4W
LIGHTING PANEL
480/277V, 3Ø, 4W

208/120V, 3Ø, 4W
KW
HVAC CHILLER

DISTRIBUTION

MISC. POWER

INST. POWER
480V, 3Ø, 3W

PANEL PP1
NEW CU-1

POWER

SPARE

CRANE
SPARE

SPARE
SPARE

SPARE

SPARE
SPARE
SPARE

SPARE

SPARE
SPARE

SPARE

SPARE

SPARE
APPROVED

RP1

RP2
LP1

IP1
FOR COMMANDER NAVFAC

ACTIVITY
EXISTING MOTOR CONTROL CENTER MCC2

480V, 3Ø, 3W, 600A BUS 42,000 AIC

30AS 30AS 30AS 100AS 30AS 60AS 30AS 60AS 100AS 30AS 60AS 400AS 60AS 60AS 30AS 30AS 30AS 30AS 60AS 30AS 60AS SATISFACTORY TO DATE
15AF 15AF 20AF *6AF 30AF 60AF 30AF 60AF *50AF 6AF 50AF 250AF 40AF 40AF 3AF 3AF 20AF 20AF 60AF 30AF 60AF
DES DRW CHK

P34
1 2 1 1 2
R R R R R
G G G G G
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


H H

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


H H H
O O O O O
A A A A A

REPAIRS TO PACKOUT OPERATIONS


P43 P42 P39 P40 P37 P73 P75
P77
INTERLOCK

CONT.
PANEL
21.5 P74 P76
KW

BUILDING 3069
7.5 7.5 5
11.5 3 1/2 1/2
SPARE SPARE SPARE LP1 SPARE CRANE KW KW KW INCOMING EUH-1
31.5
30AS 100AS 100AS 30AS KW LINE 30AS
AIR COMPRESSOR

30AS
6AF 6AF 100AF 70AF 30AF 15AF
PP1
ROTOR WHEEL

REACTIVATION
HVAC CHILLER

POWER

AGV AIRLOCK

AGV AIRLOCK
TRANS. T-1
UNIT HEATER

UNIT HEATER

METER SPARE SPARE SPARE SPARE SPARE NEW IDS


DESICCANT

RP1

M.O. DOOR

M.O. DOOR
PROCESS
OIL-FREE

NEW CU-2

BLOWER

BLOWER
200AS 30AS 60AS 60AS 60AS 100AS
SPARE

SPARE

SPARE

SPARE

SPARE
SPARE

SPARE

SPARE

SPARE

SPARE
SPARE

SPARE

SPARE
EUH-1

EUH-2

200AF 6AF 40AF 45AF 50AF *50AF


AC-1

OIL-FREE
SPARE SPARE SPARE COMP. AC-1 SPARE
SPARE
INCOMING 30AS 100AS NEW IDS 100AS 30AS
LINE 10AF 70AF *6AF 30AF
1200A NEW CU-2
MAIN SPARE M.O. DOOR SPARE SPARE SPARE NOTES:
SPARE

DEPARTMENT OF THE NAVY


BREAKER SPARE 30AS 30AS 30AS 30AS
MCC2 10AF 3AF 30AF 6AF 1. * INDICATES NEW FUSE OR SPD.

TRANS. T-2
SPD SPARE EUH-2 SPARE
A 30AS
IP1
30AS
SPARE
60AS 60AS 30AS
A
30AF 25AF 60AF 40AF 15AF

M.O. DOOR SPARE SPARE SPARE SPARE NEW CU-2


600AS 600AS 400AS 30AS 60AS 100AS 30AS 60AS
SCALE:
500AF *150AF 250AF 3AF 60AF 80AF 30AF 60AF
EPROJECT NO.:

CONSTR. CONTR. NO.

15'-5" 3'-4"
NAVFAC DRAWING NO.

FRONT VIEW-SWITCHGEAR/MOTOR CONTROL CENTER MCC1 FRONT VIEW-MOTOR CONTROL CENTER MCC2
SHEET OF

E-702
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
ACU-1

2. REFER TO DRAWINGS CI-601 AND CI-602 FOR


CONTROL
PANEL
SCHEDULES OF CIRCUITS TO BE DEMOLISHED.

3. ALL CONDUIT, FITTINGS, AND WIRING ASSOCIATED WITH


CIRCUITS MARKED FOR DEMOLITION SHALL BE
DEMOLISHED AND REMOVED FROM SITE.
D AGV AIR LOCK
0-2
PSL1046 D

DESCRIPTION
EMERGENCY

-
SHUTDOWN
BIN CAPPING STATION PUSHBUTTON
CONTROL CABINET HS-0010 TELEPHONE

SYM
TERMINAL BOX

-
A

~
C206
C272 MCC1
J
C205 EPO C189 C190
CRANE FESTOON
C204 C191
CONTROL JUNCTION BOX
EXTRUDER (PLC) C274 CRANE
PROCESS MOTOR
J AT0400
0-1 C273 STARTERS
C175 IOPER CRANE ASH0400
C174 PORTABLE P78 P80
CONSOLE

15'-2"
ASHH0400
C173 SCALE HMIER FSLL0415
K-TRON CONTROL
C176 EQUIPMENT PANEL
C177

~~

~ ~ ~~~~
PELLETIZER (PLC)

~ ~~~

~~~
FV1106 FV1104 FV1108 PSL1045

~ ~ ~~
IOPPBI

~~
~
C178
C181 J
ELECTRICAL

IOPPBO
P79 P63 UPS1(4)
C180 P81 J 0-4
C179 P64 FOR ADDITIONAL ELECTRICAL
P23 C243 WORK IN ELECTRICAL ROOM
EPO
J SEE ENLARGED PLAN DWG E-401 AND E-402
3/4" CONTROLNET
B
DPT-0404 CABLE
C244
C80 C79 C78 C88 C250
C C66
~
J

C245
SEAL
C
VV1040 J
FV1126
C68 C69 C71 TO UTILITY BLDG

15'-2"
C246
TT0630 J C152 SPARE CONDUIT
VT0401 J
PT1201 PT0500 C70 ~
J MECHANICAL
C81 VT0416 ~
C56 C55
PY1201A J PT0511 J 0-3
C82 C151C150 C72
C257 TT0803 IOPER IOPER
PY1201B C83 PT0522 C247 C202
TT0806 J
CV1202 IOPPBO C75 C73 C58
TT0818 PT-0030
C186 C201 ZSO0541 C74 C248
UP TO IOPPB1 J ~ C57
C184 C182 C249
ZSO0542 J
C185 C183
ZSO0543 C APPROVED

PELLETIZER C76 C77 FIRE ALARM PANEL


FOR COMMANDER NAVFAC
PATCH PANELS:
CONTROL ACTIVITY

POWER TSECH-1
CONTROL
PANEL
ACU-2
FOR CONDUIT PENETRATING EXTERIOR WALL
SEE DRAWING E-701. SATISFACTORY TO DATE
CONTROL DES DRW CHK
PANEL

P23 A B
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


2.8 3.13/4" CONTROLNET CABLE

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


CONDUITS RUN
C85 C86 ON CONCRETE C85
C86 TO EPO

REPAIRS TO PACKOUT OPERATIONS


SLEEPERS
IN ELECTRIC ROOM
THRU MECHANICAL ROOM
TO TELEPHONE OUTLET VIA PIPE BRIDGE
CONTROL PANEL
C250 (HS-0805A)
CONTROL FIRE ALARM JB
PANEL E IOPUT TC15502 IOPUT C188
J TCCH-2 TCCH-1
VACP-1

BUILDING 3069
CONTROL 3/4"C, 3#12 C98 P100
PANEL TT0810 C223
UTILITY BLDG. C95 RUN
2-1 J J C222
C203 C187 BESIDE
C96 PIPING
C97 P101
AR-1 TE15502 CONTROL PANEL C221
C253 (HS-1200A)
CONTROL PANEL P102
C91 (HS-1000A) C251
CHP-1 CH-1 AHU-1 PT1002
C90 AC-1 J C252

X
FS-15301 J DC
C254 POWER

X
CONTROL SUPPLY
PANEL C92 STAIRS X X
AD-1 C94 LT1101

X
PT1100 LN-1 IOPPBO
#1

X
PT1007 MCC2 C99 C100

DEPARTMENT OF THE NAVY


X

X
3/4"C, 3#12 X
F RP2 RP2(2) IOPUT X
X X
#2

A A

X X X X X X

X X X X X
SCALE
INDICATOR

GRAPHIC SCALE SCALE:

EPROJECT NO.:
SCALE #1 SCALE #2
CONSTR. CONTR. NO.

0' 4' 8' 12' NAVFAC DRAWING NO.

B3069 & B3090 CONTROL AND INSTRUMENTATION PLAN - DEMO


3/16" = 1'-0"
SECTION
NOT TO SCALE A 3/16"=1'-0" SHEET

CI-101
OF

DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.

DATE
-

-
FIBER OPTICS CABINET 2. REFER TO DRAWINGS CI-601 AND CI-602 FOR SCHEDULES OF CIRCUITS TO BE DEMOLISHED.

3. ALL CONDUIT, FITTINGS, AND WIRING ASSOCIATED WITH CIRCUITS MARKED FOR DEMOLITION
CCTV
EQUIPMENT SHALL BE DEMOLISHED AND REMOVED FROM SITE.
UPS1(8)
MCC1 C168 C167 C166 1"C WITH (2) FIBER OPTICS CABLE

D 3/4"
ETHERNET
3/4"
2 ETHERNET
D
CABLE CABLES

DESCRIPTION
HMIER
EXTRUDER C258 MOUNTED ON SUPPORT

-
CONTROL FOR MONITORS
PANEL 3/4" ETHERNET
UPS1(7) EXTRUDER KSC
CABLE
CONSOLE DISPLAY

SYM
CRANE MOTOR

-
IOPER RACK CONSOLE
SYSTEM 9 11 STARTERS
J HMIER
(PLC) PELLETIZER
K-TRON FEEDER (PLC) UPS1(1) 13 (PLC)
C172 C236
3/4"
C237
C260 UPS1(2) ETHERNET
HMIER CABLE C238
UPS1(5) ELECTRICAL UPS1(3)
IP1(2)
C242 C241 C240 G-4
J J
C239
C171 C170 C169 C235 30 KVA
TRANS.
C261 C255 UPS1(6) WALL MTD.
C255 BATT.
C262 UPS
UPS1
C259 C263 (9,11,13)
C264 15 KVA
~

TRANS.
PP1 IP1 WALL MTD. UPS1 EPO LP1 RP1
IOPER
C3
IOPER
TT0609 IOPER
ZVD
C19 DRIVES
C C
C2 J C1
SEAL
TT0623
C20
~
~

J
C62
C22 C4
TT0607
C21
~

J
~

J
TT0622 C63
C61
C6
TT0605

C5 J
TT0621

IOPER
IOPER C9
TT0603 IOPER
C31 J C7
C8
TT0620 C32 B3069 MECH. AND ELEC. ROOM CONTROL AND INST. PLAN - DEMO
~
~

J APPROVED
C34 C65
TT0601
C10
C33
3/8" = 1'-0"
~

J
~

J
CRANE FESTON POWER JUNCTION BOX FOR COMMANDER NAVFAC
TT0619 C115
C64 ACTIVITY
C12
TT0617 EMERGENCY SHUTDOWN
J PUSHBUTTON HS-0010 C206
C11
TT0618
IOPER DOWN TO CRANE
MECHANICAL C190 C189
DOWN TO CRANE
FESTOON CONTROL MOTOR STARTERS
IOPER C14
TT0700 IOPER JUNCTION BOX 0-3 C191
C43 J C13
C15 SATISFACTORY TO DATE
TT0701 C44
J
~
~

KTRON DES DRW CHK


C131 C275
C46 C16
TT0702 CONTROL
C45
PANEL
~

J
~

J
TT0703 C173
C140 C123
C174
C17 SFDR-2
TT0704 C175
PROCESS (CONTROL) KTRON
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


C18 J C176
G-1 SFDR-3 CONTROL

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


TT0705 C177 LFT-3
(CONTROL) PANEL C109
C178 C113 HS0509A
PSL1046 C276 PTO508

REPAIRS TO PACKOUT OPERATIONS


C179
C279 J TTO505
C180
IOPPB1 IOPPB1 C112 C114
C181 P65
SFDR-4 C102 P66 C224, C225, AND C226
KTRON ~
(CONTROL) FT0501 IP1 SEE DRAWING E-401

~
C277 PSH0504 ~
CONTROL C110 HS0503A SECTION B

~~~
PANEL FE0501 C104
J J J
IOPPB1 C101 C103 C106
LFT-1 C105 PSH0534
C146 HS0536A
C138 HS0529A

BUILDING 3069
SFDR-5 C139 PTO528
C137 C145
J TTO525
IOPPB1 J
C136
P70 ~ C141
FT0523 PSH0531 IOPPB1

~
C148 IP1
C59 ~
C132 FE0523 C134 HS0532A
J J
IOPPB1 C133 C135
SFDR-1
PSH0514
C116 C118 C119 HS0513A
IOPPB1 J J
C117 LFT-2 C121
C155 C126 FT0521 C125
AT0400 C156 C129 HS0519A
KTRON FE0521 PTO518
CONTROL ASH0400 J ~
C128 J TTO515
PANEL ASHH0400 C153 ~

DEPARTMENT OF THE NAVY


IOPPB1 C130
FSLL0415
C160 C278 C158 P68
C154
C280 IP1
IOPPBI

A FV1106
C165
J FV1104
C162
J FV1108 J PSL1045
C159
C157 IOPPB1
IOPER
IOPPBI C257
A
C184
C183
P107
GRAPHIC SCALE
C182 P79
P81 3/4" ETHERNET
LOSS-IN-WEIGHT
PATCH PANELS: POWER PATCH
CABLE
0' 2' 4' 8' SCALE:

SFDR-1 & 5 (CONTROL)


PANEL NO. 2
1/4"=1'-0" EPROJECT NO.:

CONSTR. CONTR. NO.

1' 0 1' 5' 10' NAVFAC DRAWING NO.

B3069 MEZZANINE CONTROL AND INST. PLAN - DEMO 3/8"=1'-0" SHEET OF


1/4" = 1'-0"
CI-102
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
CONDUIT AND WIRE SCHEDULE CONDUIT AND WIRE SCHEDULE CONDUIT AND WIRE SCHEDULE
CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION
FROM TO FROM TO FROM TO
NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING

C1 1 1/4" 6-2/C#16 SHLD 600V IOPER TCU-1 SECTION 1 JB C55 1" 3-2/C#16 SHLD 600V IOPER JB C109 3/4" 3/C#16 SHLD 600V JB HS0509A

D C2 3/4" 2/C#16 SHLD 600V JB TT0623 C56 1/2" 2/C#16 SHLD 600V JB TT0803 C110 3/4" 2/C#16 SHLD 600V FT0501 FE0501
D
C3 3/4" 2/C#16 SHLD 600V JB TT0609 C57 1/2" 2/C#16 SHLD 600V JB TT0806 C111

DESCRIPTION
C4 1" 4-2/C#16 SHLD 600V JB JB C58 3/4" 2/C#16 SHLD 600V JB TT0818 C112 3/4" 2-2/C#16 SHLD 600V IOPPB1 JB

-
C5 3/4" 2/C#16 SHLD 600V JB TT0621 C59 3/4" 2/C#16 SHLD 600V FT0523 FE0523 C113 3/4" 2/C#16 SHLD 600V JB PT0508

SYM
C6 3/4" 2/C#16 SHLD 600V JB TT0605 C60 3/4" 2/C#16 600V JB TT0803 C114 3/4" 2/C#16 SHLD 600V JB TT0505

-
C7 1 1/4" 6-2/C#16 SHLD 600V IOPER JB C61 3/4" 2/C#16 SHLD 600V JB TT0622 C115 3/4" 2-2/C#16 SHLD 600V JB JB

2-2/C#16 SHLD
C8 3/4" 2/C#16 SHLD 600V JB TT0620 C62 3/4" 2/C#16 SHLD 600V JB TT0607 C116 1 1/4" 600V IOPPB1 JB
2-3/C#16 SHLD

C9 3/4" 2/C#16 SHLD 600V JB TT0603 C63 3/4" 2-2/C#16 SHLD 600V JB JB C117 3/4" 2/C#16 SHLD 600V JB FT0521

2/C#16 SHLD
C10 1" 4-2/C#16 SHLD 600V JB JB C64 3/4" 2/C#16 SHLD 600V JB TT0619 C118 1" 600V JB JB
2-3/C#16 SHLD

C11 3/4" 2/C#16 SHLD 600V JB TT0618 C65 3/4" 2/C#16 SHLD 600V JB TT0601 C119 3/4" 2/C#16 SHLD 600V JB PSH0514

C12 3/4" 2/C#16 SHLD 600V JB TT0617 C66 1" 3-2/C#16 SHLD 600V IOPPBO JB C120 1" 2-3/C#16 SHLD 600V JB JB

C13 1 1/4" 6-2/C#16 SHLD 600V IOPER JB C67 C121 3/4" 3/C#16 SHLD 600V JB HS0513A

C14 3/4" 2/C#16 SHLD 600V JB TT0700 C68 3/4" 2/C#16 SHLD 600V JB VV1040 C122

C15 3/4" 2/C#16 SHLD 600V JB TT0701 C69 3/4" 2/C#16 SHLD 600V JB FV1126 C123 3/4" 2-2/C#16 SHLD 600V JB JB

C16 1" 4-2/C#16 SHLD 600V JB JB C70 1" 3-2/C#16 SHLD 600V IOPPBO JB C124

C17 3/4" 2/C#16 SHLD 600V JB TT0704 C71 3/4" 2/C#16 SHLD 600V JB PT0500 C125 3/4" 3/C#16 SHLD 600V JB HS0519A

C C18 3/4" 2/C#16 SHLD 600V JB TT0705 C72 3/4" 2/C#16 SHLD 600V JB PT0511 C126 3/4" 2/C#16 SHLD 600V FT0521 FE0521 SEAL
C
C19 1" 3-2/C#16 SHLD 600V IOPER JB @ TCU-1 C73 3/4" 2/C#16 SHLD 600V JB PT0522 C127

C20 1" FLEX 3-2/C#16 SHLD 600V JB @ TCU-1 TCU-1 C74 1" 3-2/C#16 SHLD 600V IOPPBO JB C128 3/4" 2-2/C#16 SHLD 600V IOPPB1 JB

C21 1" FLEX 20#14 600V JB @ TCU-1 TCU-1 C75 3/4" 2/C#16 SHLD 600V JB ZSO0541 C129 3/4" 2/C#16 SHLD 600V JB PT0518

C22 1" 20#14 600V IOPER JB @ TCU-1 C76 3/4" 2/C#16 SHLD 600V JB ZSO0542 C130 3/4" 2/C#16 SHLD 600V JB TT0515

C23 C77 3/4" 2/C#16 SHLD 600V JB ZSO0543 C131 3/4" 2/C#16 SHLD 600V JB TT0702

2-2/C#16 SHLD
C24 C78 1" 4-2/C#16 SHLD 600V IOPPBO JB C132 1" 600V IOPPB1 JB
2-3/C#16 SHLD
2/C#16 SHLD APPROVED
C25 C79 3/4" 2/C#16 SHLD 600V JB PT1201 C133 1" 600V JB JB
2-3/C#16 SHLD

C26 C80 3/4" 2/C#16 SHLD 600V JB TT0630 C134 3/4" 2/C#16 SHLD 600V JB PSH0531 FOR COMMANDER NAVFAC

ACTIVITY
C27 C81 3/4" 3-2/C#16 SHLD 600V JB JB C135 3/4" 3/C#16 SHLD 600V JB HS0532A

C28 C82 3/4" 2/C#16 SHLD 600V JB PY1201A C136 3/4" 3/C#16 SHLD 600V JB HS0529A

C29 C83 3/4" 2/C#16 SHLD 600V JB PY1201B C137 3/4" 2-2/C#16 SHLD 600V IOPPB1 JB

C30 C84 C138 3/4" 2/C#16 SHLD 600V JB PT0528


SATISFACTORY TO DATE

C31 1" 3-2/C#16 SHLD 600V IOPER JB @ TCU-2 C85 3/4" 2/C#16 SHLD 600V IOPUT CONTROL PANEL (CHP-1) C139 3/4" 2/C#16 SHLD 600V JB TT0525 DES DRW CHK

C32 1" FLEX 3-2/C#16 SHLD 600V JB @ TCU-2 TCU-2 C86 3/4" 2-2/C#16 SHLD 600V IOPUT CONTROL PANEL (AHU-1) C140 3/4" 2/C#16 SHLD 600V JB TT0703

2/C#16 SHLD
C33 1" FLEX 20#14 600V JB @ TCU-2 TCU-2 C87 C141 1" 600V IOPPB1 JB
3/C#16 SHLD

C34 1" 20#14 600V IOPER JB @ TCU-2 C88 3/4" 2/C#16 SHLD 600V JB DPT-0404 C142
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


C35 C89 C143

REPAIRS TO PACKOUT OPERATIONS


C36 C90 3/4" 2-2/C#16 SHLD 600V IOPUT JB C144

C37 C91 3/4" 2/C#16 SHLD 600V JB PT1002 C145 3/4" 3/C#16 SHLD 600V JB HS0536A

C38 C92 3/4" 2/C#16 SHLD 600V JB PT1007 C146 3/4" 2/C#16 SHLD 600V JB PSH0534

C39 C93 C147

C40 C94 3/4" 14#14 600V IOPUT CONTROL PANEL (HS-1000A) C148 3/4" 2/C#16 SHLD 600V JB FT0523

BUILDING 3069
2/C#16 SHLD
C41 C95 3/4" 600V IOPUT CONTROL PANEL (HS1200A) C149
3/C#16 SHLD

C42 C96 3/4" 7#14 600V IOPUT CONTROL PANEL (HS-0805A) C150 3/4" 2-2/C#16 SHLD 600V IOPPBO JB

C43 1" 3-2/C#16 SHLD 600V IOPER JB @ TCU-3 C97 1 1/4" 1-3/C#16 SHLD 600V IOPUT JB (TCCH-2) C151 3/4" JB VT0416
5-2/C#16 SHLD 2/C#16 SHLD 600V

C44 1" FLEX 3-2/C#16 SHLD 600V JB @ TCU-3 TCU-3 C98 3/4" 2/C#16 SHLD 600V JB (TCCH-2) TT0810 C152 3/4" 2/C#16 SHLD 600V JB VT0401

2-3/C#16 SHLD
C45 1" FLEX 20#14 600V JB @ TCU-3 TCU-3 C99 3/4" 2/C#16 SHLD 600V IOPUT PT1100 C153 1" 600V IOPER JB
4/C#16 SHLD

C46 1" 20#14 600V IOPER JB @ TCU-3 C100 3/4" 2/C#16 SHLD 600V IOPUT LT1101 C154 3/4" 3/C#16 SHLD 600V JB FSLL0415

2-2/C#16 SHLD ASH0400


C47 C101 1 1/4" 600V IOPPB1 JB C155 3/4" 4/C#16 SHLD 600V JB
2-3/C#16 SHLD ASHH0400

C48 C102 3/4" 2/C#16 SHLD 600V JB FT0501 C156 3/4" 3/C#16 SHLD 600V JB AT0400

DEPARTMENT OF THE NAVY


2/C#16 SHLD
C49 C103 1" 600V JB JB C157 1" 4-2/C#16 SHLD 600V IOPPB1 JB
2-3/C#16 SHLD

C50 C104 3/4" 2/C#16 SHLD 600V JB PSH0504 C158 3/4" 2-2/C#16 SHLD 600V JB JB

A C51 C105 1" 2-3/C#16 SHLD 600V JB JB C159 3/4" 2/C#16 SHLD 600V JB FV1108 A
C52 C106 3/4" 3/C#16 SHLD 600V JB HS0503A C160 3/4" 2-2/C#16 SHLD 600V JB JB

C53 C107 C161

SCALE:
C54 C108 C162 3/4" 2/C#16 SHLD 600V JB FV1104
EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

CI-601
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5

APPR
-

DATE
-

-
CONDUIT AND WIRE SCHEDULE CONDUIT AND WIRE SCHEDULE CONDUIT AND WIRE SCHEDULE
CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION
FROM TO FROM TO FROM TO
NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING

C163 C217 C271 3/4" 4#14 #14 600V EXTRUDER CONTROL PANEL CHILLER CONTROL PANEL

C164 CONTROL LOCATION


C218 3/4" 2-2/C#16 SHLD 600V JB IOPER C272 3/4" 6#14 #14 600V JB
SELECTOR SWITCH

D C165 3/4" 2/C#16 SHLD 600V JB FV1106 C219 3/4" 2/C#16 SHLD 600V CONVERTER #2 JB C273 3/4" 3#14 #14 600V EXTRUDER CONTROL PANEL JB
D
C166 3/4" 2/C#16 SHLD 600V IOPER MCC1 C220 3/4" 2/C#16 SHLD 600V CONVERTER #1 JB C274 3/4" 3#14 #14 600V PELLETIZER (PLC) JB

DESCRIPTION
C167 3/4" 2/C#16 SHLD 600V IOPER MCC1 C275 3/4" 6/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-2
C221 3/4"
** 600V SCALE INDICATOR #2 CONVERTER #2

-
C168 3/4" 2/C#16 SHLD 600V IOPER MCC1 C222 3/4"
** 600V SCALE INDICATOR #1 CONVERTER #1 C276 3/4" 6/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-3

C169 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR LFP-4 TCCH-1 1PS, 2PS, &
C223 3/4" 7#14 600V TCCH-2 CONTROL PANEL C277 3/4" 6/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-4

SYM
SOLENOID VALVE

-
C170 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR AG-1 BLH-LCP-100 SUMMING BOX
C224 1" 6/C#16 SHLD 600V C278 3/4" 6/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-1 & 5
INDICATOR WY0516

C171 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR LFP-1 BLH-LCP-100 SUMMING BOX
C225 1" 6/C#16 SHLD 600V C279 3/4" 2/C#16 SHLD 600V IOPPB1 PSL1046
INDICATOR WY0526

C172 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR LFP-2 BLH-LCP-100 SUMMING BOX
C226 1" 6/C#16 SHLD 600V C280 3/4" 2/C#16 SHLD 600V IOPPB1 PSL1045
INDICATOR WY0506

C173 1 1/4" 7-2/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-2 BLH I.S. BLH-LCP-100
C227 1" 6/C#16 SHLD 600V C281 3/4" 2#14 #14 600V AG-1 VSD (SP500) JB ON MEZZANINE
BARRIER BOX INDICATOR

C174 3/4" 15#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-2 BLH I.S. BLH-LCP-100
C228 1" 6/C#16 SHLD 600V
BARRIER BOX INDICATOR

C175 3/4" 12#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-2 BLH I.S. BLH-LCP-100
C229 1" 6/C#16 SHLD 600V
BARRIER BOX INDICATOR

C176 1 1/4" 7-2/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-3 BLH-LCP-100
C230 3/4" 2/C#16 SHLD 600V JB
INDICATOR

C177 3/4" 15#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-3 BLH-LCP-100
C231 3/4" 2/C#16 SHLD 600V JB
INDICATOR

C178 3/4" 12#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-3 BLH-LCP-100
C232 3/4" 2/C#16 SHLD 600V JB
INDICATOR

C179 1 1/4" 7-2/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-4 C233 3/4" 3-2/C#16 SHLD 600V JB IOPER

C180 3/4" 15#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-4 C234
C C181 3/4" 12#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-4 C235 3/4" 8#14 #14 600V EPO JB
SEAL
C
C182 1 1/4" 7-2/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-1 & 5 C236 3/4" 2#14 #14 600V JB CRANE MOTOR STARTER

C183 3/4" 15#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-1 & 5 C237 3/4" 2#14 #14 600V JB PELLETIZER INDEXER

C184 3/4" 12#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-1 & 5 C238 3/4" 4#14 #14 600V JB HMIER
3-CAT 5 CABLE PELLETIZER CONTROL
C185 1" 1-BELDEN 9463 600V PELLETIZER CONTROL PANEL PATCH PANEL C239 3/4" 14#14 #14 600V EPO JB
PELLETIZER CONTROL
C186 1" 11#14 #14 600V PELLETIZER CONTROL PANEL PATCH PANEL C240 3/4" 14#14 #14 600V JB K-TRON SOLID FEEDER

C187 3/4" 4#14 600V IOPUT CONTROL PANEL (HS-1200A) C241 3/4" 6#14 #14 600V JB IOPER APPROVED

1-3/C#16 SHLD
C188 1 1/4" 4-2/C#16 SHLD 600V JB (TCCH-2) CONTROL PANEL (HS-0805A) C242 3/4" 4#14 #14 600V JB EXTRUDER FOR COMMANDER NAVFAC

48#14 CRANE FESTOON CONTROL ACTIVITY


C189 1 1/2" 10#12 600V CRANE CONTROL PANEL JUNCTION BOX #4 C243 3/4" 8#14 #14 600V EPO JB
CRANE FESTOON CONTROL
C190 1 1/2" 9-2/C#16 SHLD 600V CRANE CONTROL PANEL JUNCTION BOX #4 C244 3/4" 2#14 #14 600V JB TCU-1
CRANE FESTOON CONTROL
C191 1 1/2" 9-2/C#16 SHLD 600V CRANE CONTROL PANEL JUNCTION BOX #4 C245 3/4" 6#14 #14 600V JB JB

C192 1" 4/C#16 SHLD 600V EXTRUDER CONTROL PANEL #2 ST1304 C246 3/4" 2#14 #14 600V JB TCU-2 SATISFACTORY TO DATE

DES DRW CHK


C193 1 1/4" 16#14 600V EXTRUDER CONTROL PANEL #2 LOCAL CONTROL PANEL C247 3/4" 4#14 #14 600V JB JB
C194 1 1/4" 48#14 600V EXTRUDER CONTROL PANEL #2 EXTRUDER TERMINAL BOX #1
C248 3/4" 2#14 #14 600V JB TCU-3
EXTRUDER TERMINAL BOX #2
C195 1 1/4" 44#14 600V EXTRUDER CONTROL PANEL #2 WIRES TERMINATED IN TB#1 FIRE ALARM
VIA NIPPLE C249 3/4" 2#14 #14 600V JB CONTROL PANEL

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


3-2/C#16 SHLD
C196 1 1/2" 600V EXTRUDER CONTROL PANEL #1 EXTRUDER TERMINAL BOX #1 C250 3/4" 10#14 #14 600V EPO JB

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


6-4/C#16 SHLD
5/C#16 SHLD
C197 1 1/4" 6-4/C#16 SHLD 600V EXTRUDER CONTROL PANEL #1 EXTRUDER TERMINAL BOX #1 C251 3/4" 2#14 #14 600V JB VACUUM PUMP

REPAIRS TO PACKOUT OPERATIONS


9-2/C#16 SHLD
C198 1 1/4" 600V EXTRUDER CONTROL PANEL #1 EXTRUDER TERMINAL BOX #2 C252 3/4" 8#14 #14 600V JB JB
TCJ
9-2/C#16 SHLD
C199 1 1/4" 600V EXTRUDER CONTROL PANEL #1 EXTRUDER TERMINAL BOX #2 C253 3/4" 6#14 #14 600V JB AIR COMPRESSOR
TCJ

C200 1 1/4" 40#14 600V EXTRUDER CONTROL PANEL #1 LOCAL CONTROL PANEL C254 3/4" 2#14 #14 600V JB TCU CHILLER IOPUT

C201 3/4" 2/C#16 SHLD 600V IOPPBO CV-1202 C255 3/4" 4#14 #14 600V EPO JB

BUILDING 3069
C202 3/4" 2/C#16 SHLD 600V IOPER PT-0030 C256 3/4" 2#14 #14 600V JB IOPPBO

C203 3/4" 2#14 #14 600V CHILLER CONTROL PANEL FS-15301 C257 3/4" 2#14 #14 600V JB IOPPB1

C204 3/4" 4#14 #14 600V EPO JB C258 3/4" 8#14 #14 600V IOPER HMIER

C205 3/4" 2#14 #14 600V JB HS-0010 C259 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR LFP-3

C206 3/4" 2#14 #14 600V JB HS-0011 C260 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR LFP-2

C207 C261 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR LFP-3

C208 C262 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR LFP-1

C209 C263 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR LFP-4

DEPARTMENT OF THE NAVY


C210 C264 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR AG-1

C211
A C212
C265 3/4" 15#14

2/C#16 SHLD
#14 600V EXTRUDER CONTROL PANEL EXTRUDER CONSOLE
A
C266 3/4" (TCJ) 600V EXTRUDER CONTROL PANEL TB1302

C213 C267 3/4" 10#14 SHLD #14 600V EXTRUDER CONTROL PANEL TB1302

4/C#16 SHLD
C214 C268 1" 3/C#16 SHLD #14 600V EXTRUDER CONTROL PANEL TB1318 SCALE:
2/C#16 SHLD
EPROJECT NO.:
C215 C269 1 1/2" 76#14 #14 600V EXTRUDER CONTROL PANEL TB1318 CONSTR. CONTR. NO.

2/C#16 SHLD
C216 C270 3/4" (TCJ) 600V EXTRUDER CONTROL PANEL CHILLER CONTROL PANEL
NAVFAC DRAWING NO.

SHEET OF

CI-602
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
COLUMN A/2
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
R

DATE
E-001.

-
RECIEVER MOUNTING LOCATION
FOR TRIPOD MOUNTED CAMERA #7 3/4" RIGID METAL CONDUIT, 1 COAX CABLE TO ELECTRIC ROOM RECIEVER MOUNTING LOCATION
2. FOR CCTV SYSTEM DETAILS, SEE DRAWING T-701.
FOR TRIPOD MOUNTED CAMERA #7
3/4" RIGID METAL CONDUIT, 3 - #12 AWG TO IP1(1)

D D
DEMOLITION KEYNOTES

DESCRIPTION
C
C

COLUMN B/1

-
1. NOTE EXISTING LOCATIONS OF CAMERAS FOR
CAMERA #7 PROCESS
PROCESS REPLACEMENT IN KIND.
3/4" RIGID METAL CONDUIT, 3 - #12 AWG CAMERA #6

SYM
TRIPOD 0-1

-
MOUNTED IP1(1) TRIPOD 0-1
MOUNTED

R
6"x6"x4" NEMA 4X PELLETIZER 3/4" RIGID METAL CONDUIT
HOFFMAN A606CHNF 1 COAX CABLE
FOR MINI CAMERAS 1 TO ELECTRIC ROOM
EXP FLEX METAL COUPLING
(TYPICAL)
WITH 1 INTERCOM 1 CABLE
XXX

14"x12"x6" & COAX (TYPICAL)


NEMA 4X PS CAMERA #3
X XX

3/4"#14 FLEX CABLE C


PROVIDE SEALING FITTING
ON EACH END
MOUNTED ON
WALL
21'-0" AFF
13/C CCTV
CABLE WITH
2 COAX CABLES CAMERA #5
C C TRIPOD
MOUNTED
ACCESS PLATFORM
C
CAMERA #4
TRIPOD
SEAL
C
TO MEZZANINE
R MOUNTED MINI-CAM #2
MINI-CAM #1 C
R
COLUMN C/2
3/4" 2 COAX CABLES 3/4"C-5#14 TO RELAY BOX
TO ELECTRIC ROOM ELECTRIC ROOM 3/4" RIGID METAL CONDUIT, 2 COAX CABLES 3/4" RIGID METAL CONDUIT, 1 COAX CABLE
1 2 TO ELECTRIC ROOM TO ELECTRIC ROOM
1 3/4" RIGID METAL CONDUIT, 6 - #12 AWG 2 3/4" RIGID METAL CONDUIT, 3 - #12 AWG
RP1(17) TO ELECTRIC ROOM

APPROVED
B3069 GROUND FLOOR CCTV DEMO PLAN B3069 GROUND FLOOR CCTV NEW PLAN
1/4" = 1'-0" 1/4" = 1'-0" FOR COMMANDER NAVFAC

ACTIVITY

6'-0"
6'-0"
CAMERA #1
CAMERA #1
SATISFACTORY TO DATE
C
C DES DRW CHK
MOUNTED ON COLUMN A/2
STEEL GIRT R R

MOUNTED ON RECIEVER MOUNTING LOCATION 3/4" RIGID METAL CONDUIT, 1 COAX CABLE
STEEL GIRT IP1(1) RECIEVER MOUNTING LOCATION
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


MOUNTED 6'-0" AFF

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


FOR TRIPOD MOUNTED CAMERA #6 3/4" RIGID METAL CONDUIT, 3 - #12 AWG MOUNTED 6'-0" AFF
IP1(1) FOR TRIPOD MOUNTED CAMERA #6

REPAIRS TO PACKOUT OPERATIONS


C
C CAMERA #5
CAMERA #6 TRIPOD
TRIPOD MOUNTED
MOUNTED

BUILDING 3069
PROCESS
PROCESS
1-1
1-1

1
C
MINI-CAM

DEPARTMENT OF THE NAVY


3/4" RIGID METAL CONDUIT
1 COAX CABLE
A MOUNTED ON
TO ELECTRIC ROOM
A
MOUNTED ON 6'-0" 3/4" RIGID METAL CONDUIT
6'-0" STEEL GIRT
STEEL GIRT 3 - #12 AWG
22'-4" AFF FROM RECEIVER BOX
22'-4" AFF IP1(1)
ON GROUND FLOOR
CAMERA #2
CAMERA #2 MINI-CAM #2 GRAPHIC SCALE SCALE:

EPROJECT NO.:
C R C CONSTR. CONTR. NO.
C
COLUMN C/2
0' 2' 4' 8' NAVFAC DRAWING NO.

MEZZANINE CCTV DEMO PLAN MEZZANINE CCTV NEW PLAN 1/4"=1'-0" SHEET OF

1/4" = 1'-0" 1/4" = 1'-0"


T-101
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
CCTV CAMERA DETAILS GENERAL NOTES

APPR
-

-
SEAL FITTING TO BE 1. FOR LEGEND AND GENERAL

DATE
PROVIDED BY THIS NOTES, SEE DRAWING E-001.

-
CONTRACTOR (TYPICAL) EXPLOSION PROOF
13/C CCTV CABLE BELDEN JUNCTION BOX FOR
RECEIVERS FOR 2. CCTV SYSTEM TO BE REPLACED
PANEL IP1(1) #9254 CONNECTED TO THE
TYPICAL WIRING FOR CAMERA #5, IN KIND WITH NEW SYSTEM. THE
3 - #12 AWG EXPLOSION PROOF HOUSING CAMERA #6,
CAMERAS 1, 2, & 3 CAMAREA #7, EXISTING FIBER OPTIC CABLE
120V AC (TYPICAL RUN TO THE SYSTEM FROM
ALL RECEIVERS) BUILDING 1424 MAY BE REUSED
PROVIDED IT IS TESTED AND
D RECEIVER
#1
CAMERA #1
MEZZ. COLUMN A/2
SEALING FITTING
(TYPICAL) VERIFIED TO BE ABLE TO MEET D
ALL CONTINUITY AND
SEALING FITTING PROVIDED
WITH HOUSING ATTENUATION REQUIREMENTS.

DESCRIPTION
P/T DRIVE (TYPICAL) EXPLOSION OTHERWISE, THE EXISTING
PROOF

-
HOUSING
CABLE SHALL BE REPLACED IN
CCTV KIND WITH A NEW ONE.
11/C SIGNAL CABLE
TYPICAL WIRING FOR CABLE PAN/TILT

4'-0"

SYM
BELDEN #27602AS

-
DRIVE
CAMERAS 1, 2, & 3 3. ALL PORTIONS OF THE NEW CCTV
CONNECTED TO P/T DRIVE
SEALING FITTING SYSTEM SHALL BE RATED FOR
PROVIDED WITH
P/T DRIVE THE ELECTRIC HAZARDOUS
SIGNAL MOUNTING PLATE
CLASSIFICATION OF THE AREA IN
RECEIVER WHICH THEY WILL BE INSTALLED
CAMERA #2 CABLE
#2 MEZZ. LEVEL 0, COLUMN C/2 AS IDENTIFIED ON DRAWING
FLOOR
COLUMN C/2 E-306.
RECEIVER
CAMERA #4
#4
TRIPOD MOUNT CAMERA DETAIL
NO SCALE

PROVIDE 30'-0" OF EACH CABLE LEVEL 0 EL. 28'-2 1/2"


WITH SEALING FITTING ON EACH END

1"
120V, AC
C LIGHT SOURCE
RP1(17) SEAL
C
MEZZ. COLUMN A/2
C
L COLUMN
MINI RECEIVER
#1 CAMERA #5
CAM #5 EXPLOSION PROOF

2'-0"
JUNCTION BOX
24"L x 8" DP
FOR RECEIVER
PROVIDE 30'-0" OF EACH CABLE MEZZANINE
120V, AC WITH SEALING FITTING ON EACH END LEVEL 1 SEALING FITTING
RECEIVER RP1(17) (TYPICAL)
CAMERA #3 APPROVED
#3 LEVEL 0 LIGHT SOURCE
COLUMN B/1 SEALING FITTING PROVIDED FOR COMMANDER NAVFAC
@21'-0" AFF MINI WITH HOUSING ACTIVITY
#2 EXPLOSION
CAM
PROOF
HOUSING
CCTV

2'-9"
3/4"C WITH PAN/TILT
3/4"C WITH CABLE
1-COAX RG-59/U DRIVE
1-COAX RG-59/U 13/C CCTV CABLE BELDEN #9254 CONNECTED
BELDEN #9259 3/4"C WITH SATISFACTORY TO DATE
BELDEN #9259 TO THE EXPLOSION PROOF HOUSING (TYPICAL) DES DRW CHK
1-2PR SHLD #18 1-COAX RG-59/U SEALING FITTING
SIGNAL CABLE
BELDEN # 9368 BELDEN #9259 11/C SIGNAL CABLE BELDEN #27602AS PROVIDED WITH
1-2PR SHLD #18 CONNECTED TO PT DRIVE P/T DRIVE
BELDEN # 9368
EL. 22'-4 1/2"
B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


LEVEL 0, COLUMN A/2

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


C8x11.5 SUPPORT
2'-7" CHANNEL
RECEIVER

REPAIRS TO PACKOUT OPERATIONS


CAMERA #6
#6
EXTERIOR
SKIN

PROVIDE 30'-0" OF EACH CABLE LEVEL 0 WALL MOUNT CAMERA DETAIL 1


SEALING WITH SEALING FITTING NO SCALE
FITTING (TYP.) ON EACH END
~

BUILDING 3069
PLAN OF WIREWAY
FROM DWG E-402
19" RACK
4"x4"x4" WIREWAY TO CONTROL SYSTEM CAMERA
WITH REMOVABLE COVER PAN/TILT
ETHERNET NETWORK
9-COAX RG-59/U DRIVE C8x11.5
FIBER OPTIC OVERHEAD SUPPORT CHANNEL
BELDEN #9259 TRANSMITTERS FTU DISTRIBUTION
7-2PR SHLD #18 FIBER OPTICS TO BUILDING
BELDEN # 9368 CABINET 1424

POWER FIBER OPTICS


120V AC SEALING FITTING
SUPPLY CABLE - EXISTING
IP1(1) PROVIDED WITH CAMERA

DEPARTMENT OF THE NAVY


C10 GIRT

PC BASED
A FOE REVIEW
STATION
EXPLOSION PROOF A
JUNCTION BOX
ETHERNET FOR RECEIVER
CAT. #5
SCALE:
MONITOR EPROJECT NO.:

EXTERIOR CONSTR. CONTR. NO.

VIDEO SYSTEM RISER DIAGRAM SKIN


NAVFAC DRAWING NO.

WALL MOUNT CAMERA DETAIL 2 SHEET OF

NO SCALE
T-701
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
GENERAL NOTES

APPR
-

-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING

DATE
E-001.

-
2. TELEPHONE SYSTEM TO BE TESTED AND VERIFY
PROPER OPERATION. ALL TELEPHONES IN BUILDING
3069 AND BUILDING 3090 TO BE REPLACED IN KIND.

D 25 PAIR PUNCH BLOCK ASSEMBLY WITH (6) D


TELEPHONE PROTECTION MODULE AND
ELECTRIC ROOM
GROUND RAIL
WALL

DESCRIPTION
-

-
EXISTING OVERHEAD
PROCESS 1"C-6PR#22 2"C-6PR#22 TELEPHONE DISTRIBUTION

SYM
BAY UTILITY MECHANICAL ELECTRICAL

-
SYSTEM
0-1 BUILDING ROOM ROOM MODEM MOV

TELEPHONE
3/4"C-4PR#22 SPLICE BOX
CAT. 3 CABLE AT POLE #13
TELEPHONE
CONTROL
BOX

SEALING
FITTING

TELEPHONE SYSTEM RISER DIAGRAM

C SEAL
C

APPROVED

FOR COMMANDER NAVFAC

ACTIVITY
MECHANICAL/ELECTRICAL ROOM
FRP SURFACE
PROCESS AREA
FRP SURFACE
GYPSUM WALLBOARD
INSULATED METAL PANEL
SATISFACTORY TO DATE

DES DRW CHK


CAULK ANNULAR SPACE TO BE SEALANT ALL AROUND
1/8"MIN TO 1/4" MAX
FILL VOIDS WITH
AROUND PIPE EPDM FLASHING SLEEVE INSULATION

B B

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND


SEALANT (TYP.)

NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON


CONDUIT CONDUIT

REPAIRS TO PACKOUT OPERATIONS


STAINLESS STEEL
FLASHING CLAMP 1/4" MAXIMUM
SHEET METAL SCREWS ANNULAR SPACE
MIN. 1" THICKNESS
OF MINERAL WOOL BATT
INSULATION PACKED PACKED

BUILDING 3069
INTO OPENING. RECESS FROM
BOTH SURFACES OF WALL. EXTERIOR INTERIOR

EXTERIOR INTERIOR
MINERAL WOOL SHALL BE 4 pcf MINERAL WOOL BATT INSULATION
CAULK SHALL BEAR THE UL CLASSIFICATION MARKING

DEPARTMENT OF THE NAVY


CONDUIT PENETRATION THRU INTERIOR RATED WALLS CONDUIT PENETRATION THRU EXTERIOR METAL SIDING
A A

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

T-702
DRAWFORM REVISION: SEP 2021

1 2 3 4 5
1 2 3 4 5
' ' ' ' ' ' ' t

GENERAL NOTES FIRE SUPPRESSION NOTES FIRE SUPPRESSION NOTES (CONT'D) FIRE SUPPRESSION LEGEND
D 1. DRAWING ACCURACY: LOCATIONS AND SIZES OF EXISTING EQUIPMENT, PIPING, 1. PROVIDE WET-PIPE SPRINKLER SYSTEM, OVERHEAD DELUGE SYSTEM, AND AN NEW SPRINKLER PIPE D
DUCTWORK, OUTLETS, DIMENSIONS, FIXTURES, WALLS/PARTITIONS, AND DEVICES ULTRA HIGH SPEED DELUGE SYSTEM TO PROTECT THE BUILDINGS. SYSTEM A. THE FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED AND INSTALLED BY
SHOWN ON DRAWINGS ARE APPROXIMATE. VERIFY AT THE PROJECT SITE. DRAWINGS COMPONENTS SHALL INCLUDE, BUT NOT BE LIMITED TO PIPES, FITTINGS, DESIGNERS, ENGINEERS, AND INSTALLERS WHO HAVE AT LEAST TWO
SPRINKLER, SPRAY NOZZLES, HANGERS, DRAINS, TEST ASSEMBLY, AND ALL
0 PIPE TURNED DOWN (AWAY FROM VIEWER)
ARE DIAGRAMMATIC AND NOT INTENDED TO BE SCALED. YEARS' RECENT EXPERIENCE WITH ULTRA HIGH SPEED DELUGE SYSTEMS.
NECESSARY COMPONENTS FOR A COMPLETE AND USEABLE SYSTEM.
2. COORDINATION: COORDINATE AND SEQUENCE THE WORK PRIOR TO FABRICATION B. ALL COMPONENTS AND ASSEMBLIES USED IN THIS FIRE PROTECTION 0 PIPE TURNED UP (TOWARD VIEWER)
AND INSTALLATION OF EQUIPMENT. MAKE NECESSARY ACCOMMODATIONS TO MEET 2. FEED THE FIRE SUPPRESSION SYSTEM FROM THE BASE FIRE PROTECTION SYSTEM MUST BE SPECIFICALLY UL LISTED OR FM APPROVED FOR THEIR
THE INTENT OF THE DRAWINGS AND ENSURE A COORDINATED INSTALLATION. WATER SYSTEM.

3. SUBMITTALS: PROVIDE PRODUCT INFORMATION, SHOP DRAWINGS, DOCUMENTS AND 3. COORDINATE ALL REQUIRED SYSTEMS TO THE SATISFACTION OF THE
INTENDED USE.
[g STRAINER

C. FRICTION LOSSES: CALCULATE LOSSES IN PIPING IN ACCORDANCE WITH

---
WARRANTIES FOR MATERIALS AND SERVICES PROVIDED ON THIS PROJECT. CONTRACTING OFFICER AND AUTHORITY HAVING JURISDICTION. ANY DEFICIENCIES, NOT USED
THE HAZEN-WILLIAMS FORMULA WITH 'C' VALUE OF 120 FOR STEEL �
INCONSISTENCIES, OR POORLY COORDINATED INSTALLATIONS SHALL BE PIPING, AND 140 FOR NEW CEMENT-LINED DUCTILE-IRON PIPING. USE
4. INSTALLATION OF NEW WORK: PERFORM INSTALLATION IN A NEAT AND CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST. N CHECK VALVE
PROFESSIONAL MANNER IN ACCORDANCE WITH INDUSTRY STANDARD MATERIALS, 100 FOR EXISTING UNDERGROUND PIPING. VELOCITY IN THE SPRINKLER
TOOLS, AND METHODS. PIPING SHALL BE LIMITED TO A MAXIMUM OF 25 FT/SEC.
4. FINAL DESIGN REQUIREMENTS (DEVICE QUANTITY, SIZE, AND LOCATIONS) ARE
THE SOLE RESPONSIBILITY OF THE FIRE SUPPRESSION CONTRACTOR. DRAWINGS D- FLOW SWITCH
5. MOUNTING HEIGHTS: COORDINATE MOUNTING HEIGHTS OF DEVICES ON FINISHED D. FLOW TEST DATA (FOR REFERENCE ONLY)
INDICATE MINIMUM REQUIREMENTS; THE FIRE SUPPRESSION CONTRACTOR WILL PRESSURE GAUGE
WALLS TO PROVIDE A NEAT AND SYMMETRICAL APPEARANCE.

"
BE RESPONSIBLE FOR VERIFYING AND COORDINATING FINAL DESIGN �
REQUIREMENTS WITH THESE CONSTRUCTION DOCUMENTS, SPECIFICATIONS, DATE-8/30/22
6. CLEANING & MATERIAL DISPOSITION: CLEAR ALL DEBRIS FROM THE AREA OF WORK REFERENCE DOCUMENTS, APPLICABLE CODES, MANUFACTURER REQUIREMENTS, STATIC-160 PSI NOT USED
AND LEAVE SITE IN CLEAN CONDITION. CLEAN ALL EQUIPMENT ENCLOSURES, INSIDE AND FACILITY USER REQUIREMENTS. RESIDUAL-98 PSI
AND OUTSIDE. FLOW-2,700 GPM �
RISER ASSEMBLY
7. CONTRACT DRAWINGS MUST BE USED WITH THE SPECIFICATIONS TO OBTAIN 5. ALL DRAIN PENETRATIONS THROUGH EXTERIOR WALL SHALL BE NO GREATER
C COMPLETE CONSTRUCTION INFORMATION. CONTRACTOR SHALL COORDINATE ALL THAN 2'-0" ABOVE FINISHED GRADE.
ABBREVIATIONS
DRAWINGS AND SPECIFICATIONS PRIOR TO COMMENCING WORK. QUESTIONS
REGARDING DESIGN INTENT OR SYSTEM OPERATION SHALL BE PROMPTLY BROUGHT 6. SPRINKLER PIPES 3" AND LARGER SHALL BE SUPPORTED FROM THE EXISTING
TO THE OWNER'S REPRESENTATIVES ATTENTION. TRUSSES AT EVERY 1O' MAXIMUM. PIPES 2 1/2" AND SMALLER SHALL BE AFF ABOVE FINISHED FLOOR
SUPPORTED PER NFPA 13 REQUIREMENTS.
8. ANY CONFLICTS BETWEEN SPECIFICATIONS AND DRAWINGS SHALL BE BROUGHT TO AHJ AUTHORITY HAVING JURISDICTION
THE GOVERNMENT'S ATTENTION IMMEDIATELY. THE CONTRACTOR SHALL NOT 7. WHERE POSSIBLE, PITCH ALL PIPES BACK TO THE RISER TO AVOID INSTALLING DN DOWN
PROCEED WITH ANY WORK EXCEPT AT THEIR OWN RISK, UNTIL CLARIFICATIONS OF LOW POINT DRAINS. EX EXISTING
CONFLICTS ARE ISSUED TO THE CONTRACTOR BY THE COTR OR HIS/HER FDC FIRE DEPARTMENT CONNECTION
AUTHORIZED REPRESENTATIVE. 8. ALL VALVES INCLUDING CONTROL AND TRIM VALVES SHALL BE WITHIN 6'-0" FM FM GLOBAL
AFF. JJ-38 FP FIRE PROTECTION
9. CONTRACTOR SHALL BE RESPONSIBLE FOR AVOIDING ALL CONFLICTS WITH LIGHT
FIXTURES, HVAC DIFFUSERS, GRILLS, DUCTS, CONDUIT AND OTHER PIPING OR GPM GALLONS PER MINUTE
9. SPRINKLER SYSTEM SHALL BE GROUNDED PER NFPA 70.
OTHER OBSTRUCTIONS ENCOUNTERED. COORDINATE ALL WORK WITH FIELD NC NORMALLY CLOSED
CONDITIONS. CONTRACTOR SHALL PROMPTLY NOTIFY COTR PRIOR TO INITIATING 10. ALL SPRINKLER SYSTEM PIPING SHALL BE SCHEDULE 40.
., 1 NEC NATIONAL ELECTRICAL CODE
WORK, IF ANY MOUNTING LOCATIONS ARE OBSTRUCTED AND/OR IF ANY MOUNTING NO NORMALLY OPEN
CONFLICTS OR PROBLEMS ARE DISCOVERED. 11. WHERE PROVIDED, SPRINKLER PIPE SIZES SHOWN ON THESE DRAWINGS SHALL • Flow Hydrant -3 8 RN RISER NIPPLE

'\
NOT BE REDUCED (NO EXCEPTIONS). 3 0
FT SQUARE FOOT
Indian Head
SQ -
10. INSTALL SPRINKLERS IN CENTER OF CEILING TILES. SPRINKLERS SHALL BE SATISFACTORY TO DATE

SYMMETRICAL OR OTHERWISE ALIGNED ON CENTERLINES OTHER SPRINKLERS AND UL UNDERWRITERS LABORATORIES JDK JDK CHK JIJK
12. FIRE SUPPRESSION DESIGN CRITERIA: DES DRW

WITH CONSIDERATION TO ARCHITECTURAL FEATURES (SOFFITS, ETC.) WITHOUT PM/DM W. O'BRIEN, E.I.T.
VIOLATING REFERENCED STANDARDS OR THIS SPECIFICATION. BRANCH MANAGER T. LNER�. P.E.
CHIEF ENG/ARCH T. COX. P.E.
A. CONNECT THE FIRE SUPPRESSION SYSTEM TO EXISTING SPRINKLER
11. DESIGN LAYOUT AND DRAWING BACKGROUNDS ARE FOR BIDDING PURPOSES ONLY INFRASTRUCTURE. PERFORM A HYDRANT FLOW TEST. AND INCORPORATE STANDARDS AND CODE REFERENCES FIRE PROTECTION

"'
J. KILPAlRICK, P.E.

B B
□ C Cl
AND ARE NOT TO BE USED FOR CONSTRUCTION. DRAWING BACKGROUNDS MAY THE MOST CURRENT TEST RESULTS INTO THE HYDRAULIC CALCULATIONS. "' z -
z
en
NOT MATCH FIELD CONDITIONS. CONTRACTOR SHALL VERIFY ALL FIELD UNLESS THE EXISTING TEST RESULTS PROVIDED ON THIS DRAWING IS 1. APPLICABLE CODES AND STANDARDS: THE PROJECT INSTALLATION MUST �o� �
_J
DIMENSIONS PRIOR TO FABRICATION/INSTALLATION OF ANY EQUIPMENT. LOWER. HYDRANT FLOW TESTING SHALL BE IN ACCORDANCE WITH NFPA SATISFY THE MOST CURRENT EDITIONS OF THE FOLLOWING CODES AND CJ I
800 I- Cf)
0
m
z a!!:
z ::::!!:>-

291, AND THE RESULTS OF THE TESTING SHALL BE SUBMITTED AS STANDARDS USING THE MOST STRINGENT REQUIREMENT WHEN THERE IS ai>--
12. PENETRATIONS IN MASONRY WALLS AND FLOOR/CEILING SLABS SHALL BE A CONFLICT BETWEEN THEM. �I c:i I

PROPERLY CORE DRILLED. ALL WALLS AND FLOORS SHALL BE EXAMINED FOR
INDICATED IN NFPA 291 FIGURE 4.11.2. HYDRAULIC CALCULATIONS SHALL 00 Cl) � i:5
:::c 0 en
BE BASED ON A WATERFLOW TEST THAT WAS PERFORMED NO MORE THAN 6
HIDDEN OBSTRUCTIONS PRIOR TO CORE DRILLING. SCAN FLOORS WITH GROUND MONTHS PRIOR TO SUBMISSION OF THE CALCULATIONS. DOD UNIFORM FACILITIES CRITERIA DOCUMENTS w <( � z
"
��
< �
a:

PENETRATING RADAR FOR OBSTRUCTION.
B. BUILDING SHALL BE DESIGNED TO MEET THE ORDINARY AND EXTRA HAZARD
A.
B.
UFC 1-200-01, GENERAL BUILDING REQUIREMENTS
FC 1-300-09N, NAVY AND MARINE CORPS DESIGN PROCEDURES �oi
�z z
w 5
Cl
w en
w
ma.
o
13. REFERENCE ARCHITECTURAL DRAWINGS FOR CEILING TYPES AND HEIGHTS. IB <(
:::i!: f-
co
REQUIREMENTS OF UFC 3-600-01, NFPA 13, NFPA 15, AS WELL AS THE C. UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES
ULTRA HIGH SPEED DELUGE AREA REQUIREMENTS OF NAVSEA OP-5 AND UFC j �r:ilI;; 0
z
14. ALL PENETRATIONS THROUGH THE FLOOR/CEILING ASSEMBLY SHALL BE PROPERLY
PROTECTED IN ACCORDANCE WITH PROJECT SPECIFICATION SECTION 07 84 00,
3-600-01. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES
A. NFPA 1, FIRE CODE
13
:le O �
0
;;!> CJ !s
gl- _J

"'z z VJ
UC)::) <(

w �zO z
FIRE STOPPING. B. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS O'.'.
�-�
C. ORDINARY HAZARD OCCUPANCY AREAS (OH) SHALL BE HYDRAULICALLY - ;;a!
,. w
DESIGNED BASED ON A MINIMUM 0.20 GPM/SF OVER THE HYDRAULICALLY SPRINKLER SCHEDULE C. NFPA 15, INSTALLATION OF WATER SPRAY SYSTEMS a: ;:Ii
w
z �00
15. ONLY DESIGNERS, ENGINEERS, AND INSTALLERS WHO HAVE AT LEAST TWO MOST REMOTE 2,500 SF. MAXIMUM SPRINKLER HEAD SPACING SHALL BE 130 D. NFPA 24, INSTALLATION OF PRIVATE FIRE SERVICE MAINS w
YEARS' RECENT EXPERIENCE WITH ULTRA HIGH SPEED DELUGE SYSTEMS CAN SF. HOSE STREAM ALLOWANCE SHALL BE 250 GPM. E. NFPA 25, STANDARD FOR THE INSPECTION, TESTING AND CJ :::c_j<( C)
AREA OF APPLICATION TYPE FINISH ORIFICE TEMP. ::, :::>
1--a_ z
DESIGN AND INSTALL ULTRA HIGH SPEED DELUGE SYSTEMS AND THEIR
RELEASING SYSTEMS. D. EXTRA HAZARD OCCUPANCY AREAS (EH) SHALL BE HYDRAULICALLY DESIGNED
MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS
F. NFPA 70, NATIONAL ELECTRIC CODE
z
w� si rco 0
en
ORDINARY HAZARD UPRIGHT BRASS K 8.0 INTERMEDIATE G. NFPA 72, NATIONAL FIRE ALARM CODE w
Cl) :c
i I-
BASED ON A MINIMUM 0.30 GPM/SF OVER THE ENTIRE AREA OF THE -c �
>
en
H. NFPA 101, LIFE SAFETY CODE Cf) w
DELUGE ZONE. MAXIMUM SPRINKLER SPACING SHALL BE 1OOSF. HOSE
STREAM ALLOWANCE SHALL BE MINIMUM 500 GPM.
HIGH HAZARD UPRIGHT BRASS K 11.2 HIGH
I. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION,
ALTERNATION, AND DEMOLITION OPERATIONS

�offi
I- ii,I
::::! G
< -
a: O'.'.
<(
ie, b:: a.
w
J. NFPA 291, RECOMMENDATIONS FOR FIRE FLOW TESTING AND F IL
w
<( 0 :::)
E. ULTRA HIGH SPEED DELUGE (UHSD) AREAS SHALL BE HYDRAULICALLY a. en
A DESIGNED TO 0.50 GPM/SF OVER THEIR LOCALIZED APPLICATION AREAS, ULTRA HIGH SPEED LOCAL APPLICATION BRASS K 5.6 N/A
MARKING OF HYDRANTS 0 ...J
u.

....[TI <(> ,le


<( C
VJ
a.
::, a: w
A
WITH MINIMUM END HEAD PRESSURE OF 50 PSI. HOSE STREAM ALLOWANCE
(./)

DELUGE NOZZLE �zi ....J O'.'.


SHALL BE MINIMUM 500 GPM. 0:
cf.W :::,
c..,
:;i: LL
ID ..:
□ it z
SCALE, NONE
EPROJECT NO., 1701966
CONSTR. CONTR. NO.

IH##I-H-1-##H
NAVFAC DRAWING NO.

13145474
SHEET 70 OF 77

FX-001
1 2 3 4 5
DRAWFORM REVISION: 5EP2021
1 2 3 4 5

n : ··· ·• . ·. •n
. . .. 4;_. -· .
t=l �-- 4-,.. -.•-·


·--Ld-

... . ..
_ ..,
i-
·7r:�
�- �- � __- ...�
-
�- .·. "4' ... !I. -· . .·
· .4 -
�-----:-::..,-, -,t-- _-_. � -
..
. . . •
. .
. . .4

FIRE SUPPRESSION HAZARD IDENTIFICATION NOTES


D 2 3 4 D
24 -0" 2 9 -6
1 1 11

ORDINARY ORDINARY HAZARD DESIGN AREA - WET PIPE SPRINKLER SYSTEM WITH 0.20
HAZARD GPM/SQ.FT DESIGN DENSITY OVER MAXIMUM 2500 SQUARE FEET. OUTSIDE
HOSE STREAM ALLOWANCE OF 250 GPM. MAXIMUM SPRINKLER SPACING OF
130 SQ.FT PER SPRINKLER. MINIMUM K-FACTOR 8.0 SPRINKLER HEADS.
I I HIGH HIGH HAZARD DESIGN AREA - DELUGE SPRINKLER SYSTEM WITH 0.30
HAZARD GPM/SQ.FT DESIGN DENSITY OVER THE ENTIRE AREA. OUTSIDE HOSE STREAM
---------
I ALLOWANCE OF 500 GPM. MAXIMUM SPRINKLER SPACING OF 100 SQ.FT PER
SPRINKLER. MINIMUM K-FACTOR 11.2, HIGH TEMPERATURE SPRINKLER HEADS.
---------
BOUNDARY OF MEZZANINE
---AVG AI R LOCK
I=,-' -- 7 UHSD HIGH HAZARD DESIGN AREA - ULTRA HIGH SPEED DELUGE SYSTEM WITH 0.50
( I 0 -2 I ' GPM/SQ.FT DESIGN DENSITY OVER THE HAZARD AREAS INDICATED. MINIMUM
K-FACTOR 5.6 SPRINKLER HEADS.
-====I'!::,..
--- ---

\ \
"�--------

I I WET PIPE 0.2 GPM/SQFT OVERHEAD DELUGE 0.3 GPM/SQFT


. ---.-.A
�----------- PALLET ___ IL.r-----, ___ / '-.._- \
1
--
/ �------=,q=�------1"-j

f----� +------=-=----=-- --=----=----_.....�--=---=_--J_-_---=-=------i _


r-++-----------+--+--------, - W RAPPI NG
ACHI NE --- �\
_JA
SHOWE
_
, &
EM E R G ENCY--J-
EYEWASH
,f � + ULTRA HIGH SPEED DELUGE
C rlt-- - - - - - - - - - PALLET1------,ft-�==��------____j � + 0.5 GPM/SQFT
--- - --------- --

----- -------------- --- I


io
�-----------
ORDINARY ELEQTRI CAL
HAZARD 0-4 I
HIGH HIGH
P ROCESS- ------

�f-���
/ :- - - - - HAZARD --- -
1�----�---=--�---=--���!��_::�------1-�_=_==_�_u_�
- HAZARD -- - --

1
______________
10_11
__ FIRE SUPPRESSION KEYED NOTES
r - - -
T1 REMOVE ALL EXISTING SPRINKLER COMPONENTS BACK TO THE STUB-OUT FLANGE;
I RETURN ALL DELUGE VALVES AND COMPONENTS TO THE GOVERNMENT. PROVIDE NEW APPROVED
r---------------- ------------- -- - -
6" STRAINER, 6" MANIFOLD, 6" FDC FEED. PROVIDE NEW WET PIPE ZONE CONTROL
r � -- - - VALVE ASSEMBLY; PROVIDE TWO DELUGE ZONE CONTROL VALVE ASSEMBLIES; PROVIDE
---,.....=--=,
CART
_
- - - ......-=---,
CART
_
- - - ---,.....=--=,
CART --------- DRY
- I NG
DRYING , _
_ ____,
DRYI NG , __
_ _,DRYI NG II---------- CARTS---+-1---1--1-----< ONE WET FEED TO THE ULTRA HIGH SPEED DELUGE ZONE.
-

ORDINARY
f-----++--_,

I
f---- - ---'=-- -
r = =.I_--=-- = = = -='---- -- - = =
-=-�--'= -- - - - -DiA���\ - - - - - ���- �
-- -- HAZARD io PROVIDE NEW WET PIPE RISER TO MECHANICAL AND ELECTRICAL ROOM. EXISTING PIPE
----- \- ---- - --
--'

c=
:;; �� - -
l---1- -=-'--j

r = = �-
,-----,_;=SC RE =i G - = �
+----,:s=CR =EEN =,- -+-�s
EN G ENI : G PENETRATIONS TO BE REUSED TO THE MAXIMUM EXTENT PRACTICAL; ALL PENETRATIONS
- --

TABLE
l
t- TABLE
1
TA E ,_-_J=:__ -_=_:__=_-;_:;__=_-;_:;__=_...::._ ;;;;_;;;;;_ ;;;;_;;;;_ ;;;;;;;;;_�j--U-::��� �
��-� �
r
�-tf+-;;;;;_ M ECHANI CAL
Indian Head

=I-+�+- ;;;;;_ TO BE RE-SEALED WITH 2-HOUR FIRE RESISTANCE RATED FIRE CAULK.
�-+�+- �-+�+-
_ _ _
..,...- SATISFACTORY TO DATE -

-- +
+ � - - =-=-=-=- \ ' �-- � -- t - �--
-
- -
��
0 -3 I
PROVIDE NEW DELUGE VALVE RISER FOR OVERHEAD AND UNDER-MEZZANINE DELUGE
DES JOK DRW ..OK CHK

w. O'BRIEN, £.1.T.
SP\\'

: ��
PM/DM

---.,....._.... + L--....J, t-- --t'-1 SYSTEM. EXISTING PIPE PENETRATIONS TO BE REUSED TO THE MAXIMUM EXTENT
----c
IL...l!l--t------1 -----tt-------t- _____,_, BRANCH MANAGER T. LNERMAN, P.E.
�' PRACTICAL; ALL PENETRATIONS TO BE RE-SEALED WITH 2-HOUR FIRE RESISTANCE
CHIEF ENG/ARCH T. cox.
P.E.
I I I \ FIRE PROTECTION J. KIIPAlRICK, P.E.
RATED FIRE CAULK.
B B
Cl Cl Cl
z
� zg � "' z
::. 0 >-
0 I- :c e:::
PROVIDE NEW AIRLOCK DELUGE VALVE RISER TO EXTEND OVER THE LOADING DOCK. (.) <:
EXISTING PIPE PENETRATIONS TO BE REUSED TO THE MAXIMUM EXTENT PRACTICAL; "' C, iii: Cl) 0::
1 ifi z ii,
t,-1ci'
0 :::;;

Z
ALL PENETRATIONS TO BE RE-SEALED WITH 2-HOUR FIRE RESISTANCE RATED FIRE �a5��
0
CAULK. � <( la! :::r:
0
-
g
LL
o::?;� <:z I-�
f-
UJ

PROVIDE NEW HIGH SPEED DELUGE FIRE SUPPRESSION RISER. PROVIDE NEW �05O Cl
mz
(/)
EXPLOSION PROOF ISOLATION VALVES TO EACH ZONE. EXISTING PIPE PENETRATIONS TO
(0

c:e � -
Z
w o::
LL
BE REUSED TO THE MAXIMUM EXTENT PRACTICAL; ALL PENETRATIONS TO BE fil::i!:- 0,0..
RE-SEALED WITH 2-HOUR FIRE RESISTANCE RATED FIRE CAULK. THE UHSD SYSTEM §�= c.oo
SPRAY NOZZLES SHALL BE PROPERLY POSITIONED AND INSTALLED IN ACCORDANCE �Oi
� C,
J
:::,
u
gl-
CJ _, z
WITH NFPA 15, HAZARD TYPE, HAZARD LOCATION(S), AND MANUFACTURER'S
.....,.

��1 � z�
II)

INSTALLATION REQUIREMENTS. COORDINATE WITH BUILDING OPERATOR FOR THE HAZARD (l_

TYPE AND EXACT LOCATION OF THE HAZARD. INSTALL CUSTOM PIPE/NOZZLE SUPPORT ltlz � 00 z
:::r: ...J <(
SYSTEMS. CUSTOM SUPPORT SHALL NOT OBSTRUCT OPERATIONS. -
C,
z I- ::::, ::::) a.. (/)

-----+II- AREA UNDER THE MEZZANINE ALSO TO BE PROTECTED BY OVERHEAD DELUGE SYSTEM. w��coo w
CJ) :c
(/)

1- 0::
W f �
I-�> Cl)
(l_
CONCEPTUAL LAYOUT/LOCATION OF THE WET-PIPE FEED TO THE ULTRA HIGH SPEED !;..J10 a: (l_

DELUGE SYSTEMS. ��ffi <: <(


(/)

�LLi � W
15 � !!i 8::
a_ w
0::
A ��i � a: LL A
UTILITY BUILDING �zi _J

ill �
� u �

[BJ Cl
SCALE,
o.
<
Z
l>S NOTED
EPROJECTNO., 1701966

0�1.�� SUPPRESSION HAZARD IDENTIFICATION PLAN - FIRST FLOOR


CONSTR. CONTR. NO.

HHIHH-IIH
NAVFAC DRAWING NO.

13145475
SHEET 71 OF n
FX-101
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5

D D
□� .• �□
·•·
: _.,

.... -� '• .... •.


• •
4.' .
•· .;
. 4
;,· '

• •. .. •
.. •
.
•.. . .
fl-4 • ,4"
• • ., ,d :
. .. .., . . .if 4
. ..

•• .. . •. •
-

•· ..• ....
• •
- •• . . .

FIRE SUPPRESSION HAZARD IDENTIFICATION NOTES


·-: :.,·.

(1__, • •. •: •• .
2 3 4

• • 2 -0" 24'-Q" 29'-6"


•• '◄ . . . ·•
•. �
• • ·• ORDINARY ORDINARY HAZARD DESIGN AREA - WET PIPE SPRINKLER SYSTEM WITH 0.20
., ,t. •• . • . . . .' • • • ..
.
HAZARD GPM/SQ.FT DESIGN DENSITY OVER MAXIMUM 2500 SQUARE FEET. OUTSIDE
HOSE STREAM ALLOWANCE OF 250 GPM. MAXIMUM SPRINKLER SPACING OF
I ..• . • .,
· ' .. . 4 ..
• -- 4,
�-.
• I I I 130 SQ.FT PER SPRINKLER. MINIMUM K-FACTOR 8.0 SPRINKLER HEADS.
[] '
., : .

□ .---H-IG-H ---, HIGH HAZARD DESIGN AREA - DELUGE SPRINKLER SYSTEM WITH 0.30
GPM/SQ.FT DESIGN DENSITY OVER THE ENTIRE AREA. OUTSIDE HOSE STREAM
HAZARD
ALLOWANCE OF 500 GPM. MAXIMUM SPRINKLER SPACING OF 100 SQ.FT PER
BOUNDARY OF MEZZANINE SPRINKLER. MINIMUM K-FACTOR 11.2, HIGH TEMPERATURE SPRINKLER HEADS.
UHSD HIGH HAZARD DESIGN AREA - ULTRA HIGH SPEED DELUGE SYSTEM WITH 0.50
AIR LOCK ROOF
GPM/SQ.FT DESIGN DENSITY OVER THE HAZARD AREAS INDICATED. MINIMUM
C �---� K-FACTOR 5.6 SPRINKLER HEADS.
I I I I
I\
I
I
I
I

,�
-
�c
- - - WET PIPE 0.2 GPM/SQFT OVERHEAD DELUGE 0.3 GPM/SQFT

----------

EXISTING BRIDGE �
CRANE TO REMAIN

+
-- ---------

I s AIRS}
I ULTRA HIGH SPEED DELUGE
�-
HIGH �---
+ 0.5 GPM/SQFT
APPROVED

OPEN
TO BELOW

- HAZARD �--- -----

-I
io

�----- _PROCESS __ -----

1-1 I
---------- -----

-
LOW ROOF
'
FIRE SUPPRESSION KEYED NOTES

1� -
-- - 7 � - - Indian Head
SATISFACTORY TO DATE -

I �---------- -----
I AREA UNDER THE MEZZANINE ALSO TO BE PROTECTED BY OVERHEAD DELUGE SYSTEM. DES JDK DRW JD K CHK SPW

PM/DM w. O'BRIEN, E.I.T.
I / --...__ r \ - - - - --------

-
BRANCH MANAGER T. l.JVERIWI, P.E.
T. cox, P.E.
=r
CHIEF ENG/ARCH

I ( -I \ I I
' - ----- FlRE PROTECTION J. KILPATRICK, P.E.

--- -
��
J
OPEN I

B B
C,
z
0
,. z
"'

\ "'t/L
TO BELOW -- ----- �
- -
:.o�
:liZ " :'.5
..i.__
- --
>-
'--.. / �
---------- -----
o I- :c 0:::
C) ;j:<C
,,,.
LL.

iiiti; z Cl) 0
z g
Cl) � Q :::.
iE
-------- ::CI O
7
I I �C/)lll i:5 0
- LL

-
�<(f,! :r:
ffi :S: � �
----Ye
I I
0
'- ,/
� z
I I

'a\' □� z
'
- -
rl � z!i!
i5
a: o
w<(1:: W U
ffl::::1:5 a,O.. W
s::::1:� coo Cf)
l)� �81 gl-
1 � � � u rl"i ::::) z
�zi�.....,z
a:�o O �
w 0....
1:,-0
w a.. 0
z :r:...J <( z

z I- =. a.. 0
::, __,
w�SllllQ Cf)
C/) :c 1- w
Cf)

w� �
I- iE >
a:::
Cl) 0....
�....1,t,
�(.) <C
a:- 0....
=>
w<C
ffi 1- <( Cf)
�LL�
j!
g§ a_

A ��!!l & w w A
��i vl a: a:::
� z i -' LL

� g �
0. ID <(
� ic z
SCALE, /IS NOTED
EPROJECT NO., 1701966

0�1. �� SUPPRESSION HAZARD IDENTIFICATION PLAN - SECOND FLOOR


CONSTR. CONTR. NO.

Hlff#-H-#-1#11
NAVFAC DRAWING NO.

13145476
SHEET 72 OF 77

FX-102
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5

NOTE: BASKET STRAINER EQUIPPED WITH FLUSH LINE AND ISOLATION VALVE FOR THE
BASKET STRAINER. PIPE FLUSH LINE DISCHARGE TO THE EXTERIOR.

RETAINING STRA EAM CLAMP


\_ -�- /

D BEA ALL THREAD ROD


M1D Cl.WP TO STEEL PU.TE
(1'11'. BOIB SIDES)
D
DELUGE ZONE TO AIR LOCK FMJRICATED PIPE CLAMP FROM
I -1/2" X i" S1EEL STRAP
SUPPLY PIPING (lYP. BOTH SIOCS)
WELD CLMIP TO PIP£
,- - -
ULTRA HIGH SPEED DELUGE SUPPLY PIPING (lYP. B0Tli SIDES)
DELUGE ZONE TO PROCESS BAY
SUPPLY PIPING
,----WET PIPE SUPPLY PIPING EAM CLAMP / \ BEAM CLAM
/ �

1 11<===:::f=:::;;1
SEAL WITH SILICONE RUBBER SEAlANT
HANGER RINJJ (lYP. BOTH SIDES)

_.r-----LOCAL INSPECTORS TEST ASSEMBLY WITH MAIN ALL THREAD ROD ALL THREAD ROD
P,\CK l'ITTli OAKUM
(TIP. BOTl1 SIDES)
DRAIN AND PRESSURE RELIEF VALVE RETAINING STRAJ· •• ,.. ·�ETAINING STRAP GROUT s:JLID
(m'. som SIDES)
3 / 8' STEEL PLl,TI
SIZE: (O.S. PIPE DIA. + 4: MIN.) SD
PIPE THROUGH CONCRm WALL (lYP. BOIB SIDES)

GENERAL NOTES
....,-- - -
- VANE TYPE FLOW SWITCH HANGER RING
\ 1. IF THE HOLES CAN BE DRILLED CLOSE TO PIPE DIA., NO
SLEEVE IS REQUIRED. IF HOLE IS MADE WITH AIR HAMMER
OR CHISEL SLEEVE MUST BE USED AS SHOWN AND ANY
�---- TAMPER SWITCH REBARS CUT OR REMOVED SHALL BE WELDED BACK IN
LJ PIPE, SIZED PER NFPA 13 HANGER RIN PLACE.
AS BASED ON SUPPORTED PIPE SIZE
AND SPAN DISTANCE 2. LOCATE HOLES 8 FEET MINIMUM ABOVE FLOOR.
CHECK VALVE
3. PROVIDE MINIMUM I" DEEP CAULK WITH A MINIMUM SLEEVE

----s�::::-?t;;::-----.....
DELUGE VALVE AND TRIM GAP OF 1" ON ALL SIDES.
PIPE SLEEVE THROUGH CONCRETE WALL
NOT TO SCALE
BUTTERFLY VALVE

C BASKET STRAINER C


8" FIRE SERVICE STUB-OUT
/

I�
"
8" FIRE SERVICE LATERAL I>.
� FIRE STOPPIN I
I
I
I
I
I " Indian Head
I � SATISFACTORY TO DATE
I DES JDK DRW JDK CHK SPW
I PM/DM W, O'BRIEN, E.I.T.
BRANCH �ANAGER T. UI/ERIMN, P.E.
FIRE STOPPIN/ CHIEF ENG/ARCH T. COX, P.E.


Q6 GUAGE GALV. SNAP SHEET SLEEVE J. KILPAlRICK, P.E.
ALV SCH40 PIPE SLEEVE FIRE PROTECTION

B Cl
B
0 0
z z
z
::E
<
" ACKUP MATERIAL ::;
::; 0 ::c

:'.:S

en

8en C:, o
i
�z� i
I> I-

t- -
�I ci I z
en Cl) � c5
::c 0
<(
� �
"' � z
5
w
<( (/)
PIPE RESTRAINER � Cl Cl
�z � z
w

PIPE C
w
A B IB <( -
� !§
coo
0)0..
SIZE �
B - U-BOLT DIAMETER §��
ALL-THREAD
ROD
ALL-THREAD ROD ½ ¾ 3Ys 2% 0 0 Ii
;oi
"> Cl
gl-
�=>
z
0
¾ ¾ u
en
3Ys < z ;I_
=>
SADDLE (GUSSETS USED FOR 8" AND LARGER) 2½
1 ¾ 3¾ 2%
a: lE
z -
""

UJ
�z�
I- -
(/)
(/)
w
A B SWIVEL NUT UJ
z �00 O::'.
PIPE PIPE BOLT SADDLE PLATFORM BOLT 1¼ ¾ 3¾ 2½ Cl
::ca..
<(...J
-
Q_
Q_
SIZE DIAMETER DIAMETER SIZE SIZE SIZE z
I-
:::> =>
ADJUSTABLE BAND
1 ¾ ¼ ¼ X 1½ ¼ X 6 X 6 % HANGER 1½ ¾ 3½ 2½ UJ � �CDO (/)

¼ X2 ¼ X 6
Cl)::c
UJ i I- w
1¼ ¾ ¾ X 6 % 2 ¾ 4½ 3 -o
en O::'.
PRINKLER PIPING
I 1½
2
¾
¾
¾
¾
¼ X2
¼ X2
¼
¼
X 6
X 6
X 6
X 6
%
% AT LEAST ONE FULL 2½ ¾ 5% 4½ <
z 0 !z
I- ,!;
?;; _J I �
<(
a:
L_J <(
iIll
""

2½ ½ ¼ X 3 18 X 8 ¾ THREAD OF ROD MUST


a..
I-
1½ X 8
3 4
<( 0:::
BE EXPOSED ¾ 5½ � LL 0
w
A 3 1½ ½ ¼ X 3 18 X 8 X 8 ¾
¾
u. _J
0
<(
o
CL
CL
:::> a: A
4 2½ ½ 18 X 3½ 18 X 12 X 12 ¾ 4 7¾ 5 � � 12
w

�zi
"'

18 X 3½
-'
5 2½ ½ 18 X 12 X 12 ¾ 5 ½ 9½ 6¼
"' u
ti. ii! �
i---A (SCH. 40) 6 2½ % ½ X 3½ 18 X 12 X 12 ¾ w
0
:::,
"- z
8 2½ % ½ X 3½ 18 X 12 X 12 ¾ 6 ½ 1 QYs 6¾ SCALE: />S NOTED
10 2½ ¾ ½ X 3½ 18 X 12 12 ¾ 1701966
EPROJECT NO.
¼"WELD X
8 ½ 13½ 8¾ CONSTR. CONTR. NO.
12 2½ ½ ½ X 3½ 18 X 12 X 12 ¾ IHHf-H-1-1111
ALL SIZES ARE IN INCHES ALL SIZES ARE IN INCHES NAVFAC DRAWING NO
SPRINKLER PIPING 13145477
NOTE: PIPE RESTRAINERS MUST BE PROVIDED ON ALL FIRE SUPPRESSION PIPING 2" AND
SMALLER. RESTRAINERS MUST BE PLACED IN ACCORDANCE WITH NFPA 13. SHEET 73 OF n
PLATFOR BOLT TYPICAL
FX-201
1
DRAWFORM REVISION: 5EP2021

2 3 4 5
1 2 3 4 5

GENERAL NOTES FIRE ALARM NOTES FIRE ALARM NOTES (CONT'D) FIRE ALARM LEGEND
1. DRAWING ACCURACY: LOCATIONS AND SIZES OF EXISTING EQUIPMENT, PIPING, DUCTWORK, 1. PROVIDE SYSTEM DESIGN AND INSTALLATION OF A NEW FULLY CODE COMPLIANT, SUPERVISED, C. PROVIDE A MINIMUM SOUND POWER OF 70 DBA AND 15 DB OVER THE AVERAGE
OUTLETS, DIMENSIONS, FIXTURES, WALLS/PARTITIONS, AND DEVICES SHOWN ON DRAWINGS ADDRESSABLE FIRE ALARM SYSTEM. THE NEW SYSTEM SHALL INCLUDE, BUT NOT BE LIMITED TO AMBIENT SOUND LEVEL AT THE MOST REMOTE LOCATION WITHIN THE ROOM/AREA
ARE APPROXIMATE. VERIFY AT THE PROJECT SITE. DRAWINGS ARE DIAGRAMMATIC AND THE FOLLOWING COMPONENTS: NEW FIRE ALARM CONTROL PANEL, SNUB WIRELESS ALARM MEASURED AT 5 FT AFF. THE FOLLOWING CRITERIA WILL BE USED FOR REVIEW FIRE ALARM/MASS NOTIFICATION CONTROL PANEL
NOT INTENDED TO BE SCALED. TRANSMITTER/ANTENNA, TERMINAL CABINETS, MANUAL PULL STATIONS, SMOKE DETECTORS, AND APPROVAL OF SHOP DRAWINGS.
ADDRESSABLE INTERFACE DEVICES, OTHER INITIATING DEVICES, RELAYS, NOTIFICATION APPLIANCES, NOT USED
2. COORDINATION: COORDINATE AND SEQUENCE THE WORK PRIOR TO FABRICATION AND CONDUIT, SOFTWARE, CUSTOM PROGRAMMING, SYSTEM CHECK OUT AND TESTING, AND ALL 1.) REDUCE THE SOUND POWER BY 6 DB EACH TIME THE DISTANCE BETWEEN THE
INSTALLATION OF EQUIPMENT. MAKE NECESSARY ACCOMMODATIONS TO MEET THE INTENT ACCESSORIES NECESSARY FOR A COMPLETE AND USEABLE SYSTEM. HEAT DETECTION SHALL BE
D OF THE DRAWINGS AND ENSURE A COORDINATED INSTALLATION. PROVIDED AT THE CEILING FOR RELEASE OF THE OVERHEAD DELUGE SYSTEM; ALSO LOCATED
APPLIANCE AND THE LISTENER IS DOUBLED. STARTING DISTANCE IS PER
MANUFACTURER'S DATASHEET, TYPICALLY 10 FT.
FIRE ALARM COMMUNICATOR (WIRELESS RF TRANSMITTER)
D
UNDER MEZZANINE FOR RELEASE OF THE OVERHEAD DELUGE SYSTEM. COMBINATION ULTRAVIOLET
3. SUBMITTALS: PROVIDE PRODUCT INFORMATION, SHOP DRAWINGS, DOCUMENTS AND INFRARED {UV/IR) FLAME DETECTORS SHALL BE PROVIDED FOR RELEASING OF ULTRA HIGH I TXT I NOT USED
WARRANTIES FOR MATERIALS AND SERVICES PROVIDED ON THIS PROJECT. SPEED DELUGE FIRE SUPPRESSION SYSTEMS. UV/IR FLAME DETECTORS SHALL ALSO HAVE A 2.) REDUCE THE SOUND POWER IN ACCORDANCE WITH THE MANUFACTURER'S
DEDICATED ZONE TO RELEASE OVERHEAD DELUGE SUPPRESSION SYSTEM. DATASHEET FOR SOUND POWER DISTRIBUTION NOT PERPENDICULAR TO THE NOT USED
4. INSTALLATION OF NEW WORK: PERFORM INSTALLATION IN A NEAT AND PROFESSIONAL FACE OF THE APPLIANCE. REFER TO MANUFACTURER'S TYPICAL SOUND OUTPUT
MANNER IN ACCORDANCE WITH INDUSTRY STANDARD MATERIALS, TOOLS, AND METHODS. 2. ALL DEVICES, JUNCTION BOXES, BACK BOXES, AND CONDUITS IN ELECTRICAL HAZARDOUS AREAS DISTRIBUTION DIAGRAM. SURGE SUPPRESSOR {TRANSIENT VOLTAGE SURGE SUPPRESSOR)
SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70, ARTICLE 501. ELECTRICAL HAZARDOUS
5. MOUNTING HEIGHTS: COORDINATE MOUNTING HEIGHTS OF DEVICES ON FINISHED WALLS AREAS ARE IDENTIFIED ON SHEET E-308 FOR REFERENCE. 3.) IN LIEU OF THE MANUFACTURER'S PUBLISHED DB LOSS, ASSUME A MINIMUM 15 MANUAL PULL STATION
TO PROVIDE A NEAT AND SYMMETRICAL APPEARANCE. DB LOSS THROUGH A STANDARD CLOSED DOOR. IT]
3. COORDINATE ALL REQUIRED SYSTEMS TO THE SATISFACTION OF THE CONTRACTING OFFICER AND NOT USED
6. CLEANING & MATERIAL DISPOSITION: CLEAR ALL DEBRIS FROM THE AREA OF WORK AND AUTHORITY HAVING JURISDICTION. ANY DEFICIENCIES, INCONSISTENCIES, OR POORLY COORDINATED OAIM
LEAVE SITE IN CLEAN CONDITION. CLEAN ALL EQUIPMENT ENCLOSURES, INSIDE AND INSTALLATIONS SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST. 13. VISUAL NOTIFICATION DESIGN CRITERIA: HEAT DETECTOR
OUTSIDE. CD
4. THE FIRE ALARM DRAWINGS ARE SCHEMATIC IN NATURE AND SHOW A MINIMAL QUANTITY OF A. PROVIDE VISIBLE NOTIFICATION APPLIANCES AS REQUIRED TO ACHIEVE THE
7. CONTRACT DRAWINGS MUST BE USED WITH THE SPECIFICATIONS TO OBTAIN COMPLETE
CONSTRUCTION INFORMATION. CONTRACTOR SHALL COORDINATE ALL DRAWINGS AND
DEVICES. DETERMINE THE FINAL QUANTITY AND LOCATION OF ALL DEVICES IN ACCORDANCE WITH COVERAGE INDICATED. CD SMOKE DETECTOR
THE SPECIFICATIONS, CONTRACT DRAWINGS, AND MANUFACTURER'S WRITTEN RECOMMENDATIONS TO B. SPACE STROBES IN ACCORDANCE WITH THE CRITERIA OUTLINED IN NFPA 72,
SPECIFICATIONS PRIOR TO COMMENCING WORK. QUESTIONS REGARDING DESIGN INTENT
OR SYSTEM OPERATION SHALL BE PROMPTLY BROUGHT TO THE OWNER'S
BE COMPLIANT WITH ALL APPLICABLE CODES AND STANDARDS. PROVIDE ADDITIONAL DEVICES
WHEN REQUIRED FOR A FULLY FUNCTIONING FIRE ALARM SYSTEM AS REQUIRED BY NFPA 72,
UNLESS OTHERWISE NOTED. ®F NOT USED
REPRESENTATIVES ATTENTION. AND UFC 3-600-01.
CD NOT USED
8. ANY CONFLICTS BETWEEN SPECIFICATIONS AND DRAWINGS SHALL BE BROUGHT TO THE 'cf
, '
5. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN METALLIC CONDUIT. ONLY SYSTEM WIRING OF
GOVERNMENT'S ATTENTION IMMEDIATELY. THE CONTRACTOR SHALL NOT PROCEED WITH THE SAME VOLTAGE MAY BE RUN IN THE SAME CONDUIT. MINIMUM CONDUIT SIZE SHALL BE ¾ @J<]CD NOT USED
ANY WORK EXCEPT AT THEIR OWN RISK, UNTIL CLARIFICATIONS OF CONFLICTS ARE INCH. RUN ALL CONDUIT IN THE VERTICAL OR HORIZONTAL PLANE, AND MAKE TURNS AT 90
C
WP
ISSUED TO THE CONTRACTOR BY THE COTR OR HIS/HER AUTHORIZED REPRESENTATIVE. DEGREE ANGLES.
9. "PROVIDE" SHALL MEAN CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE AND 6. WHERE AVAILABLE, ALL EXPOSED FIRE ALARM JUNCTION BOXES, COVERS AND CONDUITS IN D<J FIRE ALARM HORN (WP=WEATHERPROOF)
READY FOR INTENDED USE. UNFINISHED AREAS ARE TO BE PROVIDED PRE-FINISHED RED FROM THE FACTORY. PAINT
EXPOSED CONDUIT AND JUNCTION BOXES IN FINISHED AREAS TO MATCH ADJACENT SURFACES. U1 WALL MOUNTED STROBE
10. "REMOVE" SHALL MEAN CONTRACTOR SHALL DISCONNECT AND CLEAR FROM SITE, UNLESS JUNCTION BOXES INSIDE COVER LABELED, "FIRE ALARM". WHERE CONDUIT PENETRATES A WALL,
SPECIFICALLY NOTED OR SPECIFIED OTHERWISE. RED 3/4 INCH WIDE BANDS SHALL BE PAINTED EVERY 20FT AND BOTH SIDES OF PENETRATIONS. NOT USED

11. CONTRACTOR SHALL BE RESPONSIBLE FOR AVOIDING ALL CONFLICTS WITH LIGHT 7. PROVIDE CONDUIT IN ACCORDANCE WITH THE REQUIREMENTS OF THE ELECTRICAL SPECIFICATIONS, SPRINKLER VALVE TAMPER {MODULE ONLY)
FIXTURES, HVAC DIFFUSERS, GRILLS, DUCTS, CONDUIT AND OTHER PIPING OR OTHER UNLESS OTHERWISE NOTED. SUPPORT CONDUIT IN ACCORDANCE WITH THE NEC SUCH AS
OBSTRUCTIONS ENCOUNTERED. COORDINATE ALL WORK WITH FIELD CONDITIONS. MAXIMUM 10 FT SUPPORT INTERVALS AND 3 FT FROM A TERMINATION. TENSION ONLY HANGERS APPROVED

CONTRACTOR SHALL PROMPTLY NOTIFY COTR PRIOR TO INITIATING WORK, IF ANY SPRINKLER FLOW SWITCH (MODULE ONLY)
ARE NOT PERMITTED SUCH AS BATWINGS. FLEXIBLE CONDUIT IS ONLY PERMITTED WHEN
MOUNTING LOCATIONS ARE OBSTRUCTED AND/OR IF ANY MOUNTING CONFLICTS OR CONNECTING TO THE FOLLOWING DEVICES AND APPLIANCES: DEVICES LOCATED ON FIRE
PROBLEMS ARE DISCOVERED. SUPPRESSION EQUIPMENT SUCH AS FLOW/PRESSURE SWITCHES, SOLENOIDS, AND TAMPER *EX* SUBNOTATION DENOTES EXPLOSION-PROOF DEVICE.
SWITCHES. DEVICES AND APPLIANCES LOCATED IN REMOVABLE CEILING TILES, OR WHERE
12. LAYOUT AND INSTALLATION OF CEILING-MOUNTED DEVICES IN "PUBLIC OR COMMON SPECIFICALLY NOTED. ULTRAVIOLET/IFRARED FLAME DETECTOR
AREAS" FINISHED CEILINGS SHALL BE SYMMETRICAL (ALIGNED WITH OTHER FIRE ALARM
CEILING-MOUNTED DEVICES) WITHOUT VIOLATING REFERENCED STANDARDS OR THIS 8. SEE PROJECT SPECS FOR FIRE ALARM WIRING/CONDUCTOR REQUIREMENTS. PROVIDE ALL FIRE SUPPRESSION RELEASING PANEL Indian Head

SPECIFICATION. CIRCUITS WITH LABELING AT THE POINT OF TERMINATION SUCH AS SLC 1, NAC 8, IDC 4. SATISFACTORY TO DATE

JDK JDK SPW


[Bl FIRE SUPPRESSION MANUAL RELEASING STATION DES DRW CHK

13. DESIGN LAYOUT AND DRAWING BACKGROUNDS ARE FOR BIDDING PURPOSES ONLY AND 9. RUN CONDUCTORS FROM DEVICE TO DEVICE WITHOUT SPLICES. WIRE NUTS ARE PROHIBITED. PM/DM w. O'BRIEN, E.I.T.
ARE NOT TO BE USED FOR CONSTRUCTION. DRAWING BACKGROUNDS MAY NOT MATCH UTILIZE TERMINAL STRIPS WHERE CONDUCTORS CANNOT BE DIRECTLY TERMINATED AT THE DEVICE BRANCH MANAGER T, �, p,[
FIELD CONDITIONS. CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS PRIOR TO SUCH AS PIGTAILS OFF A HEAT DETECTOR.
CHIEF ENG/ARCH T. cox. P.E.
FIRE PROTECTION J. KILPATRICK, P.E.
FABRICATION/INSTALLATION OF ANY EQUIPMENT.
B 10. DO NOT USE FIRE ALARM EQUIPMENT PANELS AS RACEWAY FOR ROUTING POWER WIRING OR LOW B
14. ALL PENETRATIONS THROUGH THE FLOOR/CEILING ASSEMBLY SHALL BE PROPERLY VOLTAGE WIRING. ONLY ROUTE WIRING TERMINATING WITHIN THE PANEL INTO THE PANEL. PROVIDE
PROTECTED IN ACCORDANCE WITH PROJECT SPECIFICATION SECTION 07 84 00, FIRE
STOPPING.
1/4 INCH SEPARATION BETWEEN POWER-LIMITED FIRE ALARM CIRCUITS AND POWER CIRCUITS.
STANDARDS AND CODE REFERENCES ABBREVIATIONS
11. SURGE SUPPRESSION:
15. ONLY DESIGNERS, ENGINEERS, AND INSTALLERS WHO HAVE AT LEAST TWO YEARS' 1. APPLICABLE CODES AND STANDARDS: THE PROJECT INSTALLATION MUST SATISFY THE MOST AFF ABOVE FINISHED FLOOR
RECENT EXPERIENCE WITH ULTRA HIGH SPEED DELUGE SYSTEMS CAN DESIGN AND A. PROVIDE SURGE SUPPRESSION (SPD) FOR ALL SIGNALING LINE CIRCUITS, INDICATING DEVICE
CIRCUITS, OR NOTIFICATION APPLIANCE CIRCUITS THAT LEAVE OR ENTER A FACILITY'S EXTERIOR CURRENT EDITIONS OF THE FOLLOWING CODES AND STANDARDS USING THE MOST STRINGENT AHJ AUTHORITY HAVING JURISDICTION
INSTALL ULTRA HIGH SPEED DELUGE SYSTEMS AND THEIR RELEASING SYSTEMS. REQUIREMENT WHEN THERE IS A CONFLICT BETWEEN THEM.
ENCLOSURE. SPD IS NOT REQUIRED FOR DEVICES CONNECTED DIRECTLY TO THE FACILITY AWG AMERICAN WIRE GAGE
EXTERIOR WHEN THE FACILITY ITSELF IS PROVIDED WITH LIGHTNING PROTECTION. DOD UNIFORM FACILITIES CRITERIA DOCUMENTS CD CANDELA
A. UFC 1-200-01, GENERAL BUILDING REQUIREMENTS CFM CUBIC FEET PER MINUTE
B. SPD MUST BE PROVIDED AT THE FIRST LOCATION WHERE CONNECTIONS ARE MADE THAT IS CLOSE
TO WHERE THE CIRCUIT ENTERS OR LEAVES THE FACILITY, PRIOR TO CONNECTION TO ANY OTHER
B. FC 1-300-09N, NAVY AND MARINE CORPS DESIGN PROCEDURES co CARBON MONOXIDE
DEVICES WHEN FEASIBLE. C. UFC 3-410-01, HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS DB DECIBEL
D. UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES DBA DECIBEL A-WEIGHTED
C. PROVIDE SURGE SUPPRESSORS TO PROTECT ALL POWER SUPPLY CIRCUITS TO ALL FIRE E. UFC 3-601-02, OPERATIONS AND MAINTENANCE: INSPECTION, TESTING, AND
MAINTENANCE OFFIRE PROTECTION SYSTEMS FAMN FIRE ALARM MASS NOTIFICATION
ALARM SYSTEM EQUIPMENT (FACP, ACU, & NACP). SURGE SUPPRESSOR MUST HAVE BOTH A FA FIRE ALARM
UL 1449 AND 1283 LISTING. IT MUST BE LOCATED IN AN ADJACENT HINGED TERMINAL BOX. FDC FIRE DEPARTMENT CONNECTION
12. AUDIBLE NOTIFICATION DESIGN CRITERIA: NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES FM FM GLOBAL
A. NFPA 1, FIRE CODE IDC INITIATING DEVICE CIRCUIT
A. PROVIDE AUDIBLE NOTIFICATION APPLIANCES AS INDICATED TO ACCOMPLISH THE FOLLOWING B. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS LED LIGHT EMITTING DIODE
DESIGN CRITERIA WITH ALL DOORS AND WINDOWS CLOSED. WHERE THIS DESIGN CRITERIA C. NFPA 70, NATIONAL ELECTRIC CODE
D. NFPA 72, NATIONAL FIRE ALARM CODE NAC NOTIFICATION APPLIANCE CIRCUIT
IS NOT ACCOMPLISHED DURING COMMISSIONING, PROVIDE ADDITIONAL DEVICES TO MEET E. NFPA 90A, AIR CONDITIONING AND VENTILATION SYSTEMS NEC NATIONAL ELECTRICAL CODE
A THE MINIMUM DESIGN CRITERIA WITHOUT EXCEEDING THE LIMITATIONS OF THE FACP AND
NACP. (INCLUSIVE OF PRESCRIBED SAFETY FACTORS).
F. NFPA 101, LIFE SAFETY CODE NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION A
RF RADIO FREQUENCY
B. PROVIDE AUDIO NOTIFICATION THROUGHOUT THE ENTIRE BUILDING THAT MEET THE SLC SIGNALING LINE CIRCUIT
REQUIRED SOUND LEVELS OUTLINED IN THESE CONTRACT DOCUMENTS. TYP TYPICAL SCALE AS NOTED
UL UNDERWRITERS LABORATORY EPROJECTNO., 1701966
WP WEATHER PROOF (NEMA 250, TYPE 3R) CONSTR. CONTR. NO.

HHH-H+II##
NAVFAC DRAWING NO.

1.3145478
SHEET 74 OF 77

FA-001
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5

FIRE ALARM KEYED NOTES


D 24'-o" 29'-6"
COMBINATION UV/IR FLAME DETECTOR FOR RELEASE OF SCREENING TABLE ULTRA HIGH
D
SPEED DELUGE (UHSD) ZONE (DIAGRAMMATIC ONLY, CONTRACTOR TO VERIFY ACTUAL
LAYOUT REQUIRED PER MANUFACTURER RECOMMENDATIONS AND CONTRACT
REQUIREMENTS). TO BE INTERLOCKED WITH RELEASE OF OVERHEAD DELUGE SYSTEM.
FLAME DETECTORS SHALL BE PROPERLY POSITIONED AND INSTALLED IN ACCORDANCE
*EX WITH NFPA 15, NFPA 72, HAZARD TYPE, HAZARD LOCATION(S), AND MANUFACTURER'S
(J) INSTALLATION REQUIREMENTS. COORDINATE WITH BUILDING OPERATOR FOR THE HAZARD
TYPE AND EXACT LOCATION OF THE HAZARD. INSTALL CUSTOM STRUCTURE TO
AVG AIR LOCK
SUPPORT DETECTORS, WHERE NECESSARY. CUSTOM SUPPORT SHALL NOT OBSTRUCT
I o-2 1
OPERATIONS.
COMBINATION UV/IR FLAME DETECTOR FOR RELEASE OF OVERHEAD DELUGE ZONE. NOT
TO ACTIVATE ANY UHSD ZONE. TO BE INSTALLED UNDERNEATH MEZZANINE LEVEL.
FLAME DETECTORS SHALL BE PROPERLY POSITIONED AND INSTALLED IN ACCORDANCE
WITH NFPA 15, NFPA 72, HAZARD TYPE, HAZARD LOCATION(S), AND MANUFACTURER'S NWFAC

I """ I
INSTALLATION REQUIREMENTS. COORDINATE WITH BUILDING OPERATOR FOR THE HAZARD
TYPE AND EXACT LOCATION OF THE HAZARD. INSTALL CUSTOM STRUCTURE TO
WRAPPING SUPPORT DETECTORS, WHERE NECESSARY. CUSTOM SUPPORT SHALL NOT OBSTRUCT

w
MACHINftx,
OPERATIONS.

C EMERGENCY
SHOWER & EYEWASH
ELECTRICAL NEW CONDUIT SHALL BE RUN BETWEEN MAIN BUILDING AND UTILITY BUILDING. PROVIDE
*EX*
I o-4 I SURGE PROTECTION ON BOTH ENDS OF THE CIRCUITS BOTH INSIDE THE MAIN
BUILDING AND THE UTILITY BUILDING.
PROCESS
I o-1 I
• x•
CD
*EX'
2 FIRE ALARM RADIO TRANSMITTER SHALL BE AN AES BRAND TRANSMITTER. PROVIDE
-@....---- --+----+-I® TRANSMITTER WITH BUILT-IN STUB ANTENNA TO "MESH" WITH THE EXISTING AES MESH
NETWORK IN THE AREA.
MECHANICAL
I o-3 I HEAT DETECTORS LOCATED UNDER THE MEZZANINE FOR ACTIVATION OF THE OVERHEAD
DRYING DRYING DRYING
4 DELUGE SYSTEM. HEAT DETECTORS SHALL BE PROPERLY POSITIONED AND INSTALLED IN
CART CART CART DRYING ACCORDANCE WITH NFPA 72, HAZARD TYPE, HAZARD LOCATION(S), AND
®®®®
CARTS
MANUFACTURER'S INSTALLATION REQUIREMENTS.
w
*EX' \
SCREENI G

□□
TABLE

'EX* *EX- *EX*



®®®® SATISFACTORY TO DATE

JDK
Indian Head

JDK
-

SPW
<ZS> ..__..... <ZS> <ZS>
DR W CHK

FACP FAC
DES

PM/OM w. O'BRIEN, E.I.T.


'EX*
BRANCH MANAGER T. LIVERMAN, P.E.
CHIEF ENG/ARCH T. COX, P.E.
FIRE PROTECTION J. KlPAlRICK, P.E.

B B
C Q Cl
z ,. z
:i:zg :5
"0:c >-
8 I- � e:::
"' CJ i5 ::Ii en
ill z;:;
g
1
t��
t;;I,

ffiS:� �
:r:
Z
Q g§
� 0
3 �Cl� Cl CI: �
�ziii z
W
w<(s
(/)
a.. f­
coo
[fj ::i: - 0)
-o
§�� -
0:::

�(.) � i.:
g f-
;;: CJ ill (..) (!J ::::)
LL

��l�z� z
tl1z � 0 (.) ::i
:r:....J<(
a_ 0..
CJ 1- -
F SS z :::::, ::::) �
w��lllO 0:::
(/) :c I- 4'.
W[i � _J

s 1-i� en <(
t, a: w
�5ii::g§
...J -;-

c.) icLL�
<(
a_
0:::
LL

A UTILITY BUILDING �<i!!!!& w A


ffi � !:! i7l a:
[I] � z;
!1i0.

gID ;;:
<(
....J

� :z
SCALE /IS NOTED
EPROJECTNO., 1701966

0��-�� ALARM PLAN - FIRST FLOOR


CONSTR. CONTR. NO .

##IH#-##-1-#IH
NAVFAC DRAWINGNO.

13145479
SHEET 75 OF 77

FA-101
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5

D D

2
24 ' - Q
"
29'-
6"
FIRE ALARM KEYED NOTES
COMBINATION UV/IR FLAME DETECTOR FOR RELEASE OF OVERHEAD DELUGE ZONE. NOT
TO ACTIVATE ANY UHSD ZONE. INSTALL CUSTOM STRUCTURE TO SUPPORT DETECTORS,
C WHERE NECESSARY. CUSTOM SUPPORT SHALL NOT OBSTRUCT OPERATIONS.

1
AIR LOCK ROOF

APPROVED

ff?
EXl9'11NG BRIDGE *EX* *EX*

Cl)
Indian Head
TO REMAIN
SATISFACTORY TO DATE

DES JIJI( DRW Jill( CHK SPW


'N PM/DM w. O'BRIEN, E.I.T.
OPEN I BRANCH MANAGER T. LNERl4AN, P.E.
T. cox, P.E.
TO BELOW lll
CHIEF ENG/ARCH
FIRE PROTECTION J. KILPAlRICK, P.E.

B
PROCESS
B I1-1 I
*EX* *EX* *EX' *EX* LOW ROOF
1
*EX*
1

OPEN
TO BELOW 'N
I
*EX* *EX* .LC)

Cl) Cl)
+---+--

1
A A

SCALE, AS NOTED
EPROJECT NO., 1701966

0E�.�� ALARM PLAN - SECOND FLOOR


IHIH-H-1-IHI
CONSTR. CONTR. NO.

NAVFAC DRAWING NO

1.3145480
SHEET 76 OF n
FA-102
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5

FIRE ALARM RISER GENERAL NOTES FIRE ALARM RISER KEYED NOTES CIRCUIT LEGEND
1. ALL WIRING AND CONDUIT SIZES AND QUANTITIES SHALL BE DEDICATED POWER CIRCUIT(S) FOR THE FIRE ALARM SIGNALING LINE CIRCUIT (CLASS B)
IN ACCORDANCE WITH THE FIRE ALARM SYSTEM EQUIPMENT PANELS, AND AES RADIO TRANSMITTER. SEE
MANUFACTURE'S RECOMMENDATIONS, UFC 3-600-01, NFPA ELECTRICAL PLANS FOR ADDITIONAL INFORMATION. NOTIFICATION APPLIANCE CIRCUIT (CLASS B)
70 AND NFPA 72. COORDINATE ALL WORK WITH THE ONE DEDICATED CIRCUIT PER FLOOR
ELECTRICAL AND SPRINKLER CONTRACTORS. INSTALL SURGE SUPPRESSOR ON ALL CIRCUITS LEAVING THE
D BUILDING. SPEAKER CIRCUIT (CLASS B) D
2. FIRE ALARM RISER DIAGRAM IS DIAGRAMMATIC. RUNS OF
CONDUIT AND MANNER OF CONNECTION SHALL BE MOUNT RADIO TRANSMITTER ANTENNA PER MANUFACTURER'S
DETERMINED BY THE CONTRACTOR AND IN ACCORDANCE RECOMMENDATION FOR OPTIMUM SIGNAL STRENGTH.
WITH THE FIRE ALARM SYSTEM MANUFACTURER'S
RECOMMENDATIONS, UFC 3-600-1, NFPA 70, NFPA 72
AND THE CONTRACT SPECIFICATIONS.

3. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN 3/4"


RIGID CONDUIT (MINIMUM).

(i)
SYSTEM OUTPUTS
............
,------------u--V-�--@}- WP
C •-•-•-•�•_rN D<J
CONTROL UNIT CONTROL
ANNUNCIATION NOTIFICATION FUNCTION
FAC FACP

120 VAC

G)
1ST FLOOR

0,__F _ IR _ E _ A_LA_R_ M__S_ Y_S_T_EM_ _R _I S_ E_R__D_IA _GR


APPROVED

_ _A_M_S-CA- -: -0-
LE N NE

Indian Head

------¥
SATISFACTORY TO DATE

AIR SUPPLY DIFFUSER JL__ Ml N DES JDK DRWJDK CHK SPtl


w. O'BRIEN, E.I.T.
OR RETURN AIR OPENING------- 'I 'I
PM/DM

3' -o" BRANCH MANAGER T. LNERMAN, p.E.


T. cox. P.£.
CEILING
CHIEF ENG/ARCH

12" TO CEILING
FIRE PROTECTION J. KILPAlRICK, P.E.

B WALL MOUNT MAXIMUM COMBINATION B


SMOKE DETECTOR SPEAKER/STROBE--
SMOKE OR HEAT EMPTY SQUARE INDICATES ACTION WILL NOT CAUSE A SPECIFIC RESULT
of-------''k-SPEAKER----------. DETECTOR--�
e INDICATES ACTION WILL CAUSE A SPECIFIC RESULT
STROBE --

SYSTEM INPUT J K L M
•• •• •• •• •
A B C D E F G H I N O P Q R
1 MANUAL PULL STATION ACTIVATION
2 SMOKE DETECTOR ACTIVATION
DUCT DETECTOR
COMBINATION
3
4
SPRINKLER WATERFLOW SWITCH ACTIVATION
SPRINKLER CONTROL VALVE TAMPER SWITCH ACTIVATION
•• •• ••• • 2
3
MANUAL PULL REMOTE INDICATING
STATION----..
TO TO 0
LAMP/TEST SWITCH 5
6
FIRE ALARM SYSTEM TROUBLE
FIRE ALARM SYSTEM PRIMARY POWER LOSS
•• •• •
••
4
5
BOTTOM BOTTOM
80" 80" 6
7
(i)

OF LENS OF LENS 7
8 8
SIDEWALL
9 9
5'-0" 44" TO 66" TO 10
CENTER
10
OPERATING 11 11
MAX HANDLE 12 12
13 13
A FLOOR 14 14 A
15 15
16 16
17 17
A B C D E F G H I J K L M N O P Q R
SCALE />S NOTED

0 TY P. NON-EXPLO SION-PROOF MOUNTING H EI GHTS FOR


EPROJECT NO.c 1701966
**FOR ADDITIONAL SYSTEM OPERATION REQUIREMENTS, SEE SPEC SECTION 28 31 70.
CONSTR. CONTR. NO.

IHHHl-1-HH
WALL M OUNTED D EVICES
SCALE: ON NE
NAVFAC DRAWING NO.

13145481
SHEET 77 OF 77

FA-201