Professional Documents
Culture Documents
APPR
Building 3069 Repairs to Packout Operations
DATE
-
-
D FINAL DESIGN SUBMISSION D
NSWC INDIAN HEAD DIVISION
DESCRIPTION
DRAWING INDEX
-
NAVAL SUPPORT ACTIVITY, SOUTH POTOMAC DRAWING SHEET
SHEET NAME
SYM
NUMBER NUMBER
-
13,145,405 G-001 COVER SHEET
3. ALL EXISTING MATERIALS TO REMAIN WHICH ARE DAMAGED OR OTHERWISE DISTURBED BY THE 13,145,432 M-703 CONTROLS
CONTROLLED
CONTRACTOR'S OPERATIONS SHALL BE PATCHED AND REPAIRED TO MATCH EXISTING 13,145,433 P-001 PLUMBING NOTES, ABBREVIATIONS, AND LEGENDS FOR COMMANDER NAVFAC
AREA 13,145,434 P-101 PLUMBING PLANS
ADJACENT MATERIALS AT THE CONTRACTOR'S EXPENSE. ACTIVITY
4. DIMENSIONS SHOWN THUS (±) INDICATE DIMENSIONS WHICH MAY VARY IN THE FIELD. WHERE 13,145,435 P-501 PLUMBING SCHEDULES AND DETAILS
SUCH VARIANCE EXCEEDS 3 INCHES, NOTIFY THE CONSTRUCTION OFFICER PRIOR TO 13,145,436 P-601 PLUMBING ISOMETRIC
CONTINUING WORK. 13,145,437 E-001 ELECTRICAL LEGEND AND GENERAL NOTES
5. ALL ITEMS ARE NEW UNLESS SPECIFICALLY NOTED AS EXISTING. 13,145,438 ES-101 DISTRIBUTION POWER & TELECOM SITE DEMO PLAN
6. PRIOR TO PERFORMING DEMOLITION WORK, THE CONTRACTOR SHALL VERIFY THAT THE ITEM(S) 13,145,439 ES-102 GROUNDING SITE PLAN - NEW
SATISFACTORY TO DATE
TO BE REMOVED DO NOT SUPPORT ADJACENT EXISTING STRUCTURE(S) TO REMAIN. IF THE 13,145,440 ES-501 B3069 UTILITY POLE DETAILS
DES DRW CHK
ITEM(S) TO BE REMOVED DO SUPPORT ADJACENT EXISTING STRUCTURE(S) THE CONTRACTOR 13,145,441 E-101 LIGHTING DEMO PLAN - BUILDINGS 3069 AND 3090
BUILDING 3069 SHALL PROVIDE TEMPORARY SUPPORTS AND BRACING AS NECESSARY TO SAFELY SUPPORT 13,145,442 E-102 LIGHTING DEMO PLAN - MEZZANINE
GENERAL VICINITY
THE STRUCTURE(S) TO REMAIN IN PLACE, AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY 13,145,443 E-103 LIGHTING DEMO PLAN - BUILDING 3069 AND 3090
PRIOR TO CONTINUING WORK IN THE VICINITY. 13,145,444 E-104 LIGHTING DEMO PLAN - MEZZANINE
7. THE CONTRACTOR SHALL PROVIDE DUST PROTECTION AND AIR QUALITY CONTROL MEASURES. 13,145,445 E-105 NEW LIGHTING PLAN - BUILDINGS 3069 AND 3090
B B
BUILDING 3069
13,145,455 E-306 SITE HAZARDOUS AREA CLASSIFICATIONS
CONSTRUCTION (2002), NO ACMs ARE EXPECTED TO BE ENCOUNTERED DURING
13,145,456 E-401 ENLARGED POWER DEMO PLAN - B3069
THE EXECUTION OF THIS PROJECT.
13,145,457 E-402 ENLARGED NEW POWER PLAN - B3069
ASBESTOS IS NOT SUSPECTED TO BE ENCOUNTERED ON THIS PROJECT; THEREFORE THERE SHALL BE 13,145,458 E-403 ENLARGED POWER PLAN - B3069 M.O. DOORS
NO FEES INCLUDED IN THE PROPOSAL FOR THIS PROJECT FOR THE COST OF SAMPLING AND 13,145,459 E-501 LIGHTING DETAILS
ANALYSIS. 13,145,460 E-502 GROUNDING AND BONDING DETAILS
13,145,461 E-601 POWER CONDUIT AND WIRE SCHEDULE - DEMO
13,145,462 E-602 POWER CONDUIT AND WIRE SCHEDULE - NEW
LEAD BASED PAINT STATEMENT 13,145,463 E-603 PANEL SCHEDULES - DEMO
13,145,464 E-604 PANEL SCHEDULES - NEW
NOTE: THE GOVERNMENT HAS NOT PERFORMED TESTING FOR LEAD BASED PAINT IN SIGNATURE BELOW INDICATES THAT THE ENTIRE DRAWING 13,145,465 E-701 SINGLE LINE DIAGRAM - DEMO
BUILDING 3069. DUE TO THE AGE OF INITIAL CONSTRUCTION (2002), NO LBP IS PACKAGE HAS BEEN REVIEWED AND APPROVED BY SIGNEE 13,145,466 E-702 SINGLE LINE DIAGRAM - NEW
1 2 3 4 5
1 2 3 4 5
GENERAL STRUCTURAL NOTES DESIGN CRITERIA NOTES CAST-IN-PLACE CONCRETE NOTES STRUCTURAL STEEL NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
SLAB ON GRADE NOTES
C SEAL
C
ACTIVITY
SATISFACTORY TO DATE
B B
SCALE:
EPROJECT NO.:
SHEET OF
S-001
DRAWFORM REVISION: JUN 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
-
DEMOLITION KEYNOTES
SYM
-
-
6'
SGG
SGG
C 19'-8" SEAL
C
ACTIVITY
SATISFACTORY TO DATE
10'
B B
17'-11"
4'-8"
SCALE:
SHEET OF
S-101
DRAWFORM REVISION: JUN 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
17'-11"
DESCRIPTION
3'-111 4" 8"
-
C8X11.5
SYM
-
-
2'
MIN. 1-1/2" CONC. COVER
NEW KEYNOTES
1'-4" 1'-4"
1'-8" 10'
C8X11.5
C8X11.5
C8X11.5
1'-31 4"
6"
C8X11.5
8"
3'-111 4"
2'
MIN. 1-1/2" CONC. COVER
1'-4" 1'-4"
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
BUILDING 3069
7' 7'
10'
EPROJECT NO.:
SHEET OF
S-201
DRAWFORM REVISION: JUN 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
-
3/8"
DATE
-
-
D D
DESCRIPTION
-
-
3" 4" 3"
SYM
-
-
C SEAL
C
1'-11"
2
1
3/8
APPROVED
ACTIVITY
8'-0"
SATISFACTORY TO DATE
STEEL HSS 3"x3"x1/4"
DES DRW CHK
SLOPE CONCRETE TO
GRADE.
B B
BUILDING 3069
4'-0"
CONCRETE F'c=3,000 PSI
POURED AGAINST
UNDISTURBED SOIL.
12" MAX
EPROJECT NO.:
SHEET OF
S-501
DRAWFORM REVISION: JUN 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
C SEAL
C
KEYNOTES
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
SCALE:
EPROJECT NO.:
SHEET OF
AD101
DRAWFORM REVISION: JUN 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
C SEAL
C
KEYNOTES
APPROVED
ACTIVITY
SATISFACTORY TO DATE
SCALE:
EPROJECT NO.:
SHEET OF
AD102
DRAWFORM REVISION: JUN 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
2'-13 4"
C 5" SEAL
C
1'-10" 1'
5"
194A
STREET ADDRESS APPROVED
ACTIVITY
SATISFACTORY TO DATE
NEW KEYNOTES
DES DRW CHK
B B
SCALE:
EPROJECT NO.:
SHEET OF
A101
DRAWFORM REVISION: JUN 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
MATCH EXISTING
-
PANEL(S) WIDTH
9"
D D
DESCRIPTION
-
-
9"
SYM
-
-
C SEAL
C
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
SCALE:
EPROJECT NO.:
SHEET OF
A102
DRAWFORM REVISION: JUN 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
DETAIL CALLOUT INDICATOR
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
BUILDING 3069
DEPARTMENT OF THE NAVY
T
A H A
H
SCALE: AS NOTED
EPROJECT NO.:
M-001
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
-
DEMOLITION KEYNOTES
SYM
-
-
C SEAL
C
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
SCALE: AS NOTED
EPROJECT NO.:
MD-101
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
-
DEMOLITION KEYNOTES
SYM
-
-
C SEAL
C
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
SCALE: AS NOTED
EPROJECT NO.:
MD-102
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
-
DEMOLITION KEYNOTES
SYM
-
-
C SEAL
C
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
SCALE: AS NOTED
EPROJECT NO.:
MD-103
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
-
DEMOLITION KEYNOTES
SYM
-
-
C SEAL
C
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
SCALE: AS NOTED
EPROJECT NO.:
MD-104
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
NEW WORK KEYNOTES
C SEAL
C
26"Ø
26"Ø
APPROVED
26"Ø
FOR COMMANDER NAVFAC
ACTIVITY
26"Ø
SATISFACTORY TO DATE
B B
SCALE: AS NOTED
GRAPHIC SCALE
EPROJECT NO.:
M-101
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
-
NEW WORK KEYNOTES
SYM
-
-
MAX SPACING 5'
RD-2 (BEHIND)
RD-1
C SEAL
C
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
SCALE: AS NOTED
EPROJECT NO.:
M-301
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
NOTE: SINGLE HORIZONTAL RUNS WITH
NOTE: NON-INSULATED HORIZONTAL RUNS VAPOR BARRIER INSULATION
1 2 3 4
C SEAL
C
18" MOTORIZED ISOLATION DAMPER
1
4 x 41 S.S BIRD SCREEN
36"
APPROVED
PRE FILTER
FOR COMMANDER NAVFAC
MIN 36"
FLEX CONNECTION
SATISFACTORY TO DATE
B B
BUILDING 3069
PITCH DOWN TOWARD DRAIN
CLEAN OUT
A DRAIN PAN
B
2"
CONDENSATE DRAIN
M-501
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
C SEAL
C
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
MECHANICAL SCHEDULES
SUMMER: 97.0ºF DB/ 85.4ºF WB,
BUILDING 3069
170 GR/LB
WINTER:
0 ºF DB/ 0 ºF WB
M-601
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
FAN, FILTER OR
APPR
-
-
OTHER DEVICE
EXISTING
INSULATION
UPSTREAM PITOT PROVIDE M CONTROL AIR MAIN CONNECTION
DATE
1. PROVIDE THE FOLLOWING AUTOMATIC ALARM AT OPERATOR WORK STATION
-
TUBE INSTALL IN AIR FLOW BRACKET
D-# EVERY MARCH 1ST AND SEPTEMBER 1ST: "IN CONFORMANCE WITH UFCs AND IN
ACCORDANCE PER OPPOSED BLADE DAMPER. ORDER TO SAVE ENERGY, BUILDING SENSORS MUST BE CALIBRATED AND CLEANED
WITH DETAIL DOWNSTREAM AT REGULAR INTERVALS. OUTSIDE AIR, DUCT, AND UNIT-MOUNTED TEMPERATURE
PITOT TUBE INSTALL D-# PARALLEL BLADE DAMPER.
M-701 AND HUMIDITY SENSORS SHOULD BE CALIBRATED ANNUALLY.
IN ACCORDANCE
M-701
WITH DETAIL A-#
PROVIDE DAMPER OR VALVE ACTUATOR.
D M-701 0.25" RIGID D
0.25" TYPE M RIGID COPPER
2 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).
COPPER TUBE SUPPORT V-#
DIFFERENTIAL PRESSURE SWITCH
DESCRIPTION
TUBE
OR TRANSMITTER. PROVIDE
-
WIRE AND 3 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).
BRACKET IN ACCORDANCE WITH SCREW TO
CONDUIT TO V-#
DETAIL DUCT/CASING
FIELD PANEL CONTROL COMMUNICATION
SYM
-
-
M-701 WITH SELF
DRILLING/ ARRANGE IN UNIFORM #12 BARE HYDRONIC PIPING
TAPPING MANNER THRU SPACE COPPER WIRE
TEST TEE WITH PLUG SCREWS AIR OR WATER FLOW PATH
AI ANALOG INPUT
18 GAUGE GALVANIZED SHEET METAL G DIFFERENTIAL PRESSURE GAUGE, CONNECT TO STATIC CLG COOLING
BRACKET ATTACHED TO DUCT WITH PRESSURE TAPS IN ACCORDANCE WITH DETAIL 3/M-701.
JUNCTION BOX AND COVER COV CHANGE OF VALUE
FOUR #8 x 0.75" SHEET METAL SCREWS
DP-# AIR OR WATER DIFFERENTIAL PRESSURE TRANSMITTER, BY APPLICATION.
C PROVIDE RIGID FIBERGLASS INSULATION
CONDUIT TO
PROVIDE AIR TRANSMITTER PER DETAIL 4/M-701.
Cx COMMISSIONING SEAL
C
WITH VAPOR BARRIER, THICKNESS TO HTG HEATING
FIELD PANEL
MATCH ADJACENT INSULATION
I/O INPUT/OUTPUT
LOW TEMPERATURE DETECTION FREEZESTAT, MANUAL RESET, WITH
20 FOOT ELEMENT. PROVIDE PER DETAILS 1/M-701 AND 2/M-701. NVI NETWORK VARIABLE INPUT
SEAL VAPOR TIGHT WITH NVO NETWORK VARIABLE OUTPUT
VAPOR BARRIER MASTIC FLEXIBLE METAL
CONDUIT TO SP SETPOINT
ATTACH DEVICE TO BRACKET OTHER DEVICES,
WITH SHEET METAL SCREWS DUCT MOUNTED ELECTRONIC TEMPERATURE SENSOR WITH 20
IF NEEDED FOOT AVERAGING ELEMENT. PROVIDE PER DETAILS 1/M-701 AND H APPROVED
FLEXIBLE CONDUIT BETWEEN T-# 2/M-701. O HAND-OFF-AUTO SWITCH FOR COMMANDER NAVFAC
B B
BUILDING 3069
THICKNESS TO MATCH VAPOR BARRIER
DUCT MOUNTED ELECTRONIC RELATIVE HUMIDITY TRANSMITTER DIAGRAMS.
ADJACENT INSULATION MASTIC
HT-# PROVIDE PER DETAIL 2/M-701.
CONTROLS
FLOW METER
(TURBINE-STYLE)
0.25" TYPE M AHU CASING/DUCTWORK ES-# END SWITCH FAN OR PUMP, BY APPLICATION
RIGID COPPER INSULATION
TUBE BINARY INPUT OR OUTPUT POINT
EPROJECT NO.:
BUTTERFLY VALVE.
EN-OA OUTSIDE AIR ENTHALPY TRANSMITTER (SYSTEM VARIABLE) CONSTR. CONTR. NO.
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".
DESCRIPTION
-
-
V-S-4
SYM
-
-
V-S-5
V-S-6
MAIN BAY ELEC ROOM T
CU-2
CU-1
IU-2
SD-1
AHU-1 IDS
IDS
CU-2 CONTROLLER MECH ROOM T
C CU-1 SEAL
C
THERMOSTAT AND RELATIVE HUMIDITY SENSOR IU-1
T RH BAS FRONT
SHALL HAVE A DIGITAL DISPLAY CAPABLE OF
END
DISPLAYING SPACE TEMP (°F), RELATIVE
CONTROL
HUMIDITY (%), AND HUMIDITY RATIO (GR/LB)
LPS PANEL
V-S-2
LPS
V-S-1 APPROVED
ACTIVITY
SATISFACTORY TO DATE
THE INTEGRATED DEHUMIDIFICATION SYSTEM (IDS) SHALL BE CONTROLLED BY THE BACNET BUILDING AUTOMATION SYSTEM LOCATED IN THE MECHANICAL ROOM.
B B
TEMPERATURE AND HUMIDITY CONTROL: THE PACKAGED UNIT CONTROLS SHALL OPERATE THE DESICCANT WHEEL, FACE AND BYPASS DAMPERS, REFRIGERATION SYSTEM AND
STEAM HEATING COILS TO MAINTAIN THE SPACE SET POINTS AND CONDITIONS. REFRIGERATION SYSTEM CONSISTS OF A PRE-COOLING COIL AND A POST-COOLING COIL WHICH
BUILDING 3069
ARE EACH SERVED BY ITS OWN CONDENSER. INITIAL SET POINT IS 70 °F DB AND HUMIDITY RATIO OF 35 GR/LB. THE UNIT SHALL OPERATE THE REACTIVATION STEAM COIL AND
REACTIVATION FAN TO MAINTAIN EFFECTIVENESS OF THE DESICCANT WHEEL.
CONTROLS
COOLING SET POINT: 70°
HEATING SET POINT: 68°
HUMIDITY SET POINT: 35 GR/LB. UPON A RISE IN SPACE HUMIDITY ABOVE 40 GR/LB, AN ALARM WILL BE INDICATED.
FILTERS: ON A RISE IN FILTER DIFFERENTIAL PRESSURE ABOVE SET POINT, AS SENSED BY DPT, AN ALARM WILL BE INDICATED. INITIAL DPT SET POINTS ARE SCHEDULED.
UNIT SAFETY:
EPROJECT NO.:
M-702
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
-
DESICCANT
WHEEL
DATE
-
-
AI G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".
ID-1
TT-7 FINAL PRE G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
D-2 FILTER FILTER COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
DESCRIPTION
-
SYM
CS-2
-
CS-3
V-S-3 V-S-4 V-S-5 V-S-6 M DPT-4 DPT-3
M (N.C.) (N.C.) (N.C.) (N.C.)
HEATING
HEATING
HEATING
HEATING
ES-2
STEAM
STEAM
STEAM
STEAM
COIL
COIL
COIL
COIL
ES-3 EXTERIOR
SPACE
D-3
TT-1 RH-1
C CS-1
SEAL
C
M DPT-1 DPT-2 TT-3
D-4
VFD V-S-2
V-S-1 FAULT (N.C.) SD-1
ES-1 FREQ.
(N.C.) CONTACT
CU-1 CU-2
HEATING
PRE-HEAT
SPEED START/STOP
STEAM
STEAM
PRE-COOL
COIL
COOLING
(TYP)
COIL
DX
M
DX
ES-4
APPROVED
IDS-1 CONTROLS SCHEMATIC
FOR COMMANDER NAVFAC
ACTIVITY
LOW HIGH FREQUENCY FREQUENCY LOW HIGH FREQUENCY FREQUENCY DES ATY DRW ATY CHK PWT
BUILDING 3069
V-S-6 STEAM VALVE AI 15 MIN 15MIN
TT-7 REGEN. TEMP SENSOR AI 15 MIN 15 MIN
FZ-1 FREEZESTAT BI X 15 MIN 15MIN
CONTROLS
RH-1 OUTDOOR RH SENSOR AI 15 MIN 15 MIN
START/STOP BO COV COV
RH-2 PRE-WHEEL RH SENSOR AI 15 MIN 15 MIN
CU-1 STATUS BI X COV COV
RH-3 POST-WHEEL RH SENSOR AI 15 MIN 15 MIN
ALARM BI X COV COV
RH-4 POST-FAN RH SENSOR AI 15 MIN 15 MIN
START/STOP BO COV COV
RH-5 SPACE RH SENSOR AI X 15 MIN 15 MIN
CU-2 STATUS BI X COV COV
ES-1 DAMPER 1 STATE BI X COV COV
M-703
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
DETAIL CALLOUT INDICATOR
-
INTERIOR ELEVATION INDICATOR
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
BUILDING 3069
DEPARTMENT OF THE NAVY
A A
SCALE: AS NOTED
EPROJECT NO.:
P-001
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL SHEET NOTES
APPR
-
DATE
-
-
D D
DESCRIPTION
-
SYM
-
-
NEW WORK KEYNOTES
C SEAL
C
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
PLUMBING PLANS
DEPARTMENT OF THE NAVY
A A
SCALE: AS NOTED
GRAPHIC SCALE
EPROJECT NO.:
P-101
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
-
131° WATER
DHCP-1 50° WATER
DATE
-
-
1 1/2" DCW
1 1/2" HW
MV-2 1 1/2" HW
50° WATER
80°F
D MV-1 D
132°F
80° WATER 3/4"
DESCRIPTION
EXP.
TANK
-
T
CONNECT TO EFS-1 3/4" RECIRC
SYM
-
-
1 1/2" DCW BACKFLOW PREVENTER SCHEDULE
122°+ RECIRC WATER
ΔP
DESIG. GPM SIZE (IN) SERVICE LOCATION REMARKS
(PSI)
FROM DCW SERVICE
140° HOT WATER TANK
POTABLE MECH.
BFP-1 1 10 1.5" 1, 2, 3, 4
WATER ROOM
EWH-1 NOTES:
TANK FLUSH
SECONDARY CONTAINMENT 1. TYPE: LEAD FREE - REDUCED PRESSURE ASSEMBLY
2. PROVIDE AND INSTALL IN ACCORDANCE WITH MANUFACTURER'S
4" HOUSEKEEPING PAD RECOMMENDATIONS.
3. PROVIDE SHUT-OFF VALVES INTEGRAL TO ASSEMBLY.
4. PROVIDE DRAIN OUTLET WITH AIR GAP FITTING AND PIPE FULL SIZE DRAIN AS
INDICATED.
C 1
SEAL
C
PRESSURE GAGE
GLOBE VALVE
1 1/2" CW
REDUCED PRESSURE PRINCIPLE
B.F. PREVENTER APPROVED
CW
AIR GAP 1 1/2" CW
STRAINER SATISFACTORY TO DATE
BUILDING 3069
STAINLESS STEEL BOWL
QUICK DISCONNECT
COMBINATION
F
PRESSURE
GAGE
3 SCALE:
EPROJECT NO.:
AS NOTED
4
NAVFAC DRAWING NO.
13,145,435
SHEET 31 OF
P-501
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
A
B
C
D
1
1
2
2
13
2 °F
80
°F
3
3
4
4
5
SHEET
SCALE:
ATY
APPROVED
- - - -
EPROJECT NO.:
32
- - - -
DRW
OF
SATISFACTORY TO DATE
BUILDING 3069 - - - -
ATY
FOR COMMANDER NAVFAC
- - - -
REPAIRS TO PACKOUT OPERATIONS
AS NOTED
13,145,436
CHK
P-601
DRAWFORM REVISION: SEP 2021
- - - -
PWT
A
B
C
D
1 2 3 4 5
LEGEND ABBREVIATIONS GENERAL NOTES
APPR
-
-
ɸ PHASE
ONE LINE DIAGRAMS POWER & CONTROL LIGHTING 1/C ONE CONDUCTOR 1. ALL ELECTRICAL WORK AND MATERIAL IS NEW AND
DATE
RECTANGULAR SURFACE OR PENDANT MOUNTED A AMPERAGE OR AMPS SHALL BE PROVIDED BY THE CONTRACTOR UNLESS
-
DISCONNECT SWITCH, HEAVY DUTY TYPE 600V, 3 POLE FLUORESCENT/LED FIXTURE AFF ABOVE FINISHED FLOOR OTHERWISE NOTED. COORDINATE WITH MECHANICAL
F E E = INDICATES BATTERY BACKUP FOR EMERGENCY LIGHTING
UNLESS OTHERWISE NOTED AFG ABOVE FINISHED GRADE
ELECTRICAL OPERATED 60 WP
5a 5 = CIRCUIT NUMBER AND OTHER TRADES TO PROVIDE RACEWAYS/CONDUITS
1200AF F = FUSED a = INDICATES SWITCH CONTROLLING FIXTURE AHU AIR HANDLING UNIT
E
1200AT
MAIN CIRCUIT BREAKER FOR CONTROL WIRING IN ACCORDANCE WITH THE
60 = SWITCH SIZE IF UNFUSED BKR BREAKER NATIONAL ELECTRIC CODE (NEC OR NFPA 70).
L-S-I-GR 1200AF = FRAME SIZE
OR FUSE SIZE IF FUSED
1200AT = TRIP SETTING PENDANT MTD HIGH INTENSITY DISCHARGE FIXTURE C CONDUIT
WP = WEATHERPROOF NEMA 4X CB CIRCUIT BREAKER
L = LONG TIME OVERCURRENT
ENCLOSURE STAINLESS STEEL
2. AN EQUIPMENT GROUND WIRE SHALL BE RUN WITH
S = SHORT TIME OVERCURRENT CKT CIRCUIT FEEDERS AND BRANCH CIRCUITS.
D I = INSTANTANEOUS OVERCURRENT
GR = GROUND FAULT OVERCURRENT
PENDANT MTD HIGH INTENSITY DISCHARGE FIXTURE
HID FIXTURE COMES WITH 100W QUARTZ LAMP DWG DRAWING D
EA EACH 3. INSTALLATION SHALL BE AS PER NEC. CONDUCTORS
ONE ELEMENT PUSHBUTTON STATION, DPDT WALL MTD HIGH INTENSITY DISCHARGE FIXTURE
EPO HID FIXTURE COMES WITH 100W QUARTZ LAMP
ELEC ELECTRICAL SHALL BE COPPER, MIN. #12 THHN/THWN. CONDUIT
EPO = EMERGENCY POWER OFF BUTTON IS
DESCRIPTION
FUSE EMT ELECTRICAL METALLIC TUBING
125A MECHANICALLY HELD CLOSED SHALL BE EMT FOR INDOOR, DRY AREA, AND SHALL BE
125A = AMPERE RATING WALL MTD HIGH INTENSITY DISCHARGE FIXTURE ENCLOSURE
ENCL
-
HID FIXTURE COMES WITH 100W QUARTZ LAMP
RIGID GALV. STEEL FOR WET OR EXTERIOR
EQUIP EQUIPMENT APPLICATIONS.
POWER TRANSFORMER DUPLEX RECEPTACLE 20A, 125V, NEMA 5-20R EWC ELECTRIC WATER COOLER
SYM
WP, GFCI 5 5 = CIRCUIT NUMBER
-
DELTA CONNECTED PRIMARY LED ILLUMINATED EXIT LIGHT EWH ELECTRIC WATER HEATER 4. ELECTRICAL EQUIPMENT SHALL BE IDENTIFIED AND
WP = WEATHER PROOF WITH INTERNAL BATTERY AND CHARGER
WYE CONNECTED GROUNDED SECONDARY GFCI = GROUND-FAULT CIRCUIT INTERRUPTER EXIST EXISTING LABELED.
EXP EXPLOSION PROOF
SURFACE OR PENDANT MOUNTED HIGH BAY LED FIXTURE
GFE GOVERNMENT FURNISHED EQUIPMENT
CIRCUIT BREAKER MANUAL MOTOR STARTER
5. FEEDERS/CIRCUITS SHALL BE IDENTIFIED AT EACH END
GFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLED
30AT 3-POLE UNLESS NOTED BY 1P OR 2P OF THE WIRE AND AT EVERY SPLICE OR JUNCTION/PULL
Sa SINGLE POLE SWITCH, 20A, 120-277 VOLT GFI GROUND FAULT INTERRUPTER
30AT = TRIP RATING H BOX.
a = INDICATES FIXTURE CONTROL GND GROUND
SINGLE RECEPTACLE 20A, 125V, WITH S = 3-WAY, 20A, 120-277 VOLT
3 HGT HEIGHT
5 GROUND FAULT CIRCUIT INTERRUPTER LIGHT EMITTING DIODE 6. PROVIDE NAMEPLATES ON THE EXTERIOR OF
H =RATED FOR USE IN HAZARDOUS AREA LED
5 = CIRCUIT NUMBER CLASS I DIVISION 1 GROUPS C & D LIQUIDTIGHT FLEXIBLE METALLIC CONDUIT ELECTRICAL PANELS AND ENCLOSURES AS FOLLOWS:
NON FUSED DISCONNECT SWITCH LFMC
RATED FOR USE IN HAZARDOUS AREA CLASS II DIVISION 1 GROUPS E, F & G
30AS 30AS = SWITCH SIZE CLASS I DIVISION 1 GROUPS C & D LPS LIGHTNING PROTECTION SYSTEM
WP = WEATHERPROOF CLASS II DIVISION 1 GROUPS E, F, & G MAIN DISTRIBUTION PANEL
WALL MOUNTED HIGH PRESSURE SODIUM/LED FIXTURE
MDP DEVICE I.D.
MECHANICAL PANEL XXX
MECH DEVICE RATING
RACEWAY OR CABLE TURNING UP TOWARD OBSERVER 100A, 208Y/120V-3Ø, 4W
MLO MAIN LUGS ONLY
WALL MOUNTED LED FIXTURE FED FROM PANEL MDP POWER SOURCE
MOTOR MTD MOUNTED
10
10 = HORSEPOWER
RACEWAY OR CABLE TURNING DOWN AWAY FROM INSTALLED 2018 INSTALLATION YEAR
OBSERVER JUNCTION BOX MTG HT MOUNTING HEIGHT
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
C GROUND CONNECTION RACEWAY CONCEALED IN OR BELOW FLOOR
MISCELLANEOUS SYSTEM NTS NOT TO SCALE
SEAL
C
OC OCCUPANCY SENSOR 7. PROVIDE NEW TYPE DIRECTORIES FOR PANELS (NEW
MOTOR
5
5 = HORSEPOWER PGG PRIMARY GROUNDING GIRDLE OR EXISTING) INCLUDED IN THIS PROJECT.
DESKTOP MASTER STATION
PREWIRED PACKAGED MOTOR COMPLETE WITH DISCONNECT PNL PANEL
PREWIRED PACKAGED MOTOR COMPLETE WITH DISCONNECT PNLBD PANELBOARD 8. INTERIOR WIRING SYSTEMS SHALL BE CONCEALED WITH
5 SWITCH, MOTOR STARTER AND ALL NECESSARY CONTROLS
5 = HORSEPOWER SWITCH, MOTOR STARTER AND ALL NECESSARY CONTROLS REQ'D REQUIRED FLUSH MOUNTED BOXES/DEVICES, UON.
5 P HANDS-FREE REMOTE PAGING STATION
5 = HORSEPOWER 1 SUITABLE FOR HAZARDOUS AREA RGS/RMC RIGID GALVANIZED STEEL/RIGID METAL CONDUIT
SGG SECONDARY GROUNDING GIRDLE 9. DRAWINGS ARE BASED ON EXISTING BUILDING PLANS
PREWIRED PACKAGED UNIT COMPLETE WITH DISCONNECT TYP TYPICAL AND FIELD INVESTIGATIONS. CONTRACTOR SHALL VISIT
60 SWITCH AND ALL NECESSARY CONTROLS UON UNLESS OTHERWISE NOTED
COMBINATION FULL VOLTAGE NON-REVERSING P HANDS-FREE REMOTE PAGING STATION
THE EXISTING BUILDING AND ACQUAINT THEMSELVES
30AS KW 60 = KILOWATTS
STARTER WITH FUSED DISCONNECT SWITCH 2 VAC VOLTS, AC WITH THE EXISTING FIELD CONDITIONS. CONTRACTOR
20AF APPROVED
RED AND GREEN INDICATING LIGHTS AND VDC VOLTS, DC SHALL EXAMINE DRAWINGS TO AVOID CONFLICT.
HAND-OFF-AUTO SELECTOR SWITCH J JUNCTION BOX
WP WEATHERPROOF FOR COMMANDER NAVFAC
1 C CCTV CAMERA XFMR TRANSFORMER
R T THERMOSTAT 10. ALL NEW METAL SHALL BE GROUNDED, INCLUDING BUT ACTIVITY
30AS = SWITCH SIZE R = STOPPED NOT LIMITED TO GUTTERS, DOWNSPOUTS, REINFORCING
G
20AF = FUSE SIZE G = RUNNING
H H HUMIDISTAT TELEPHONE OUTLET
BARES, STEEL BEAMS, COLUMNS, DUCT WORK, DOORS,
O 1 = STARTER SIZE
A DOOR FRAMES, CONDUCTIVE FLOORS, PIPING, CONDUIT,
O OCCUPANCY SENSOR AND SUPPORTS TO THE SECONDARY GROUNDING
FOE FIBER OPTICS TO ELECTRICAL CONVERTER GIRDLE. SATISFACTORY TO DATE
RP1 RACEWAY OR CABLE HOMERUN DESIGNATION TO
FUSED DISCONNECT SWITCH PANELBOARD RP1 DES DRW CHK
30AS (2,4,6) 11. ALL EQUIPMENT WIRING AND CONDUIT INSTALLATIONS
(2,4,6) CIRCUIT NUMBERS
20AF 30AS = SWITCH SIZE
20AF = FUSE SIZE R CCTV CAMERA RECEIVER IN THE CLASSIFIED AREAS SHALL BE SUITABLE FOR
CLASS I, DIVISION 1, GROUPS C & D AND CLASS II,
CONDUIT CAPPED & TERMINATED WITH BUSHING DIVISION 1, GROUPS E, F, & G APPLICATIONS PER NEC
DISTRIBUTION POWER
B B
BUILDING 3069
SPD SURGE PROTECTIVE DEVICE 2"C-4#1, 1#6 1 #6 = ONE #6 AWG GREEN EQUIPMENT GROUND
PAD-MOUNTED TRANSFORMER
DEMOLITION.
#4/0 - INDICATES #4/0 AWG STRANDED BARE COPPER WIRE CONSTR. CONTR. NO.
DEMOLISH AND REMOVE
EXISTING LIGHTNING PROTECTION CABLE CONTROL LOCATION SELECTOR SWITCH
LP NAVFAC DRAWING NO.
#4/0 AWG STRANDED BARE COPPER WIRE
CLASS I DIVISION 1 GROUPS C & D AND
MOV SIGNAL SURGE SUPRESSION CLASS II DIVISION 1 GROUPS E, F, & G SHEET OF
HAZARDOUS ENVIRONMENT
E-001
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
23
-
3 4
1. FOR LEGEND AND GENERAL NOTES SEE DRAWING E-001.
DATE
END OF CONCRETE POLE #14
-
ENCASEMENT 2. THE CONTRACTOR SHALL SCAN THE AREA USING
C ELECTROMAGNETIC METHODOLOGY TO DETERMINE THE
POLE #13 LOCATION OF THE EXISTING UNDERGROUND
DUCTBANKS PRIOR TO COMMENCEMENT OF
EXISTING 2-2" RIGID POLE #11 EXCAVATION. THE EXISTING DUCTBANKS SHALL NOT BE
METAL CONDUITS C DAMAGED DURING EARTHWORK AND CONSTRUCTION.
FOR POWER FEED ANY DAMAGE WHICH MAY OCCUR DURING
D TO TRANSFORMER PRIMARY CONSTRUCTION SHALL BE REPAIRED AND APPROVED BY D
EXISTING 6-5" AND NSWC REPRESENTATIVE AND/OR NAVFAC
1-1" RSC CONDUITS
1 POLE #11A
E CONSTRUCTION MANAGER.
DESCRIPTION
EXISTING 6-2" RIGID
-
C METAL CONDUITS
A FOR CONTROL AND TELECOMMUNICATION
SYM
-
-
LINES (PHONE, FIRE ALARM, AUDIO,
ELECTRICAL
G-4 MCC1 CONTROL AND INSTRUMENTATION, AND FIBER OPTIC)
TO BUILDING - ONE 2" CONDUIT TO BE
USED AS SPARE FOR FUTURE FIBER LINE
2
NEW 12" RCP FLARED
DEMOLITION KEYNOTES
END SECTION
B
1. EQUIPMENT TO BE DEMOLISHED IN ELECTRICAL ROOM.
NEW 12" RCP SEE DRAWINGS E-201 AND E-401 FOR DETAILS.
G
25' BUFFER
RA
SW ALE
VE
AC ROSS
L
1000 KVA SSF
RO
PAD MOUNTED
AD
TRANSFORMER SF
APPROVED
AY
SF VEW
. DRI
FOR COMMANDER NAVFAC
BIT
NEW
ACTIVITY
GFC
3
POLE #13
NEW CB
POLE #14
SATISFACTORY TO DATE
A GFC
A L D
O
N SB
I
AT 25 SF
B R B
BUILDING 3069
3
23
SF
3
22
GRAPHIC SCALE
SF
21
HVAC YARD AREA
0' 4' 8' 16'
20
SCALE:
19
CONSTR. CONTR. NO.
17
0' 1' 2'
SF
NAVFAC DRAWING NO.
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. PLAN ONLY DESCRIBES MAJOR ITEMS TO BE
DATE
DEMOLISHED. REFER TO DRAWING E-301 FOR
-
DEMOLITION OF GROUNDING GIRDLES.
DESCRIPTION
-
-
4. THE CONTRACTOR SHALL SCAN THE AREA USING
ELECTROMAGNETIC METHODOLOGY TO DETERMINE THE
LOCATION OF THE EXISTING UNDERGROUND
SYM
-
-
GROUNDING GIRDLE PRIOR TO COMMENCEMENT OF
EXCAVATION. THE EXISTING GROUNDING GIRDLE SHALL
1 NOT BE DAMAGED DURING EARTHWORK AND
CONSTRUCTION. ANY DAMAGE WHICH MAY OCCUR
DURING CONSTRUCTION SHALL BE REPAIRED AND
APPROVED BY NSWC REPRESENTATIVE AND/OR NAVFAC
CONSTRUCTION MANAGER.
21
22
TP
SGG
#4/0
SGG
ASPH. SGG DEMOLITION KEYNOTES
1. DEMOLISH AND REMOVE EXISTING SECONDARY
GROUNDING GIRDLE AS NOTED ON THE PLAN, OR AT
LEAST ONE FOOT OUTSIDE THE EDGE OF EACH
C ELEC. CONCRETE PAD SHOWN.
SEAL
C
SGG
BLDG 3069 FF ELEV=24.67
SGG
GROUNDING DEMOLITION PLAN 1. EXISTING SECONDARY GROUNDING GIRDLE (SGG) IS APPROVED
ES ES
ES
ES
DETAILS, S-101 FOR STRUCTURAL DETAILS, AND E-302
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
2 2
BUILDING 3069
ES ES
ES ES
ES ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES ES
ES ES
ES ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
1
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
4
21
22
TP
SGG
#4/0
SGG
ASPH. SGG
EPROJECT NO.:
SGG
GROUNDING PLAN
SCALE: 1" = 1 FT
1"=1' SHEET OF
ES-102
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
COMPACTED STRUCTURAL
-
BACKFILL IN 6" LIFTS
TO 95% ASTM D 1557 GRADE
1. FOR LEGEND AND GENERAL NOTES SEE DRAWING E-001.
DATE
-
-
TRENCH SHORING 2. ALL EXISTING DUCTBANKS, UTILITY POLES, AND
9"
~ ASSOCIATED EQUIPMENT ARE FOR CONTRACTOR
24" MIN.
GRADE REFERENCE ONLY. OTHER THAN REMOVAL OF EXISTING
EARLY WARNING
AND IDENTIFICATION TAPE 1 COPPER CONTROL CABLES, NO NEW WORK IS REQUIRED
FOR ITEMS DEPICTED.
TRENCH SHORING
9"
TELEPHONE CABLE
24" MIN.
3. THE CONTRACTOR SHALL SCAN THE AREA USING
D EXISTING 2" RSC
(TYPICAL FOR 6) COPPER CONTROL CABLE
POLE
#13 ELECTROMAGNETIC METHODOLOGY TO DETERMINE THE D
EARLY WARNING LOCATION OF THE EXISTING UNDERGROUND
AND IDENTIFICATION TAPE CONDUIT TO BE USED AS
COMPACTED STRUCTURAL SPARE FOR FUTURE DUCTBANKS PRIOR TO COMMENCEMENT OF
DESCRIPTION
BACKFILL IN 6" LIFTS EXCAVATION. THE EXISTING DUCTBANKS SHALL NOT BE
FIRE ALARM
-
TO 95% ASTM D 1557 3" TYP. DAMAGED DURING EARTHWORK AND CONSTRUCTION.
ANNUNCIATOR
SP ANY DAMAGE WHICH MAY OCCUR DURING
3 #1/0 15KV CABLE CONSTRUCTION SHALL BE REPAIRED AND APPROVED BY
SYM
EXISTING 4" RSC
-
& 4/0 BARE COPPER WIRE NSWC REPRESENTATIVE AND/OR NAVFAC
SPARE IN EXISTING 4" RSC 3" TYP. CONSTRUCTION MANAGER.
P.A./AUDIO CABLE FIRE ALARM LOOP
3" TYP. P.A. / AUDIO EXISTING FIRE
FIBER OPTICS/VIDEO CABLE CABLE ALARM LOOP
TO POLE #8
1
EXISTING 65E FUSE
AND FUSE HOLDER.
LIGHTNING ARRESTORS
C TO REMAIN AS IS.
SEAL
C
4
26 24
APPROVED
TRIMOUNT #4/0 BARE COPPER
BRACKET 25 GROUND WIRE FOR COMMANDER NAVFAC
EXISTING FIRE ACTIVITY
ALARM LOOP
FROM POLE #8
CLASS 1 POLE EXISTING P.A./
AUDIO CABLE
EXISTING 4" RSC
3#1/0 15KV CABLE
~ EXISTING FIRE ALARM SATISFACTORY TO DATE
12"
& 4/0 BARE COPPER WIRE SIDE VIEW
1
EXISTING FIBER OPTICS/
VIDEO CABLE
12"
B B
BUILDING 3069
SEAL ALL EXISTING
25 CABLE GRIP HANGER CONDUITS MASTER BOX
~
ON POLE #13
26 HOSE CLAMP
#4/0 BARE COPPER
GROUND WIRE 1" RSC 2#6,
EXISTING 4" RSC 1#10 GND.
CAPPED 12" CONNECTED TO THE 1"x2" RSC REDUCER
ABOVE GRADE EXISTING GROUND ROD
SCALE:
EPROJECT NO.:
FRONT VIEW
POLE #14 DETAIL POLE #13 DETAIL
CONSTR. CONTR. NO.
NO SCALE
NO SCALE NAVFAC DRAWING NO.
SHEET OF
ES-501
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1 2 3 4 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
2. FOR LIGHTING FIXTURE AND EXIT SIGN DEMO
SCHEDULE, SEE DRAWING E-501.
AGV AIR LOCK
0-2
3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY
ALL NEW LIGHTING CIRCUITS WHERE APPLICABLE.
Sd
H M5 M6 2
REFER TO DRAWINGS E-103 AND E-104 FOR NEW
D X1
2
1d 1d PHOTO-CELL 120V LIGHTING PLAN. D
B FOR CONTROL OF
E OUTDOOR H2 FIXTURES
RED STROBE MOUNTED ON OUTSIDE
DESCRIPTION
WARNING LIGHT WALL OF ELECTRIC ROOM
WALL MOUNTED
-
CROUSE-HINDS
CAT # EVBS230R/120V PE DEMOLITION KEYNOTES
SYM
X2
-
E B X1 HSa A
2 HSb STAIRS 2 1. DEMOLISH AND REMOVE EXISTING LIGHTS AND EXIT
HSc
F1 MTD. 10'-0" AFF
ACC SIGNS, INCLUDING BUT NOT LIMITED TO ALL WIRING
F1 F1 F1 (TYPICAL)
J E E E WITHIN CONDUIT FROM LIGHTS/SIGNS BACK TO
LP1 E 2b 2a 2b
"MATCON IBC" ELECTRICAL PANEL/SOURCE.
(1,3,5)
BIN CAPPING 3/4" 5#12 2a 0-4
STATION UP TO LIGHTS 2. DEMOLISH AND REMOVE EXISTING PHOTOCELL.
J RP1 X2
M6 3/4"C-3#12
LIGHT FIXTURE WITH M5 (2) 2
CEILING MOUNTED 5c 5c
JUNCTION BOX F1 LP1(2)
MOUNTED ON BEAM Sa
X1 UNDER MEZZ. E F1 F1 F1
PROCESS E E E Sb
2 (TYPICAL) 2b 2a 2b
B 0-1 1 2a
E 1
M5 M5 B
PELLETIZER
ROTARY INDEXING 5c 5c
TURNTABLE HIGH BAY DOME
(TYPICAL)
EXTRUDER ACC
F1
LP1(4)
C E MECHANICAL
0-3 F1
SEAL
C
E
4b 4b
MTD. 10'-0" AFF 1
X2
(TYP. FOR 6)
4
F1 F1 F1 F1
E E E
4b 4b 4b
M6 M5 E Sb
5c 5c 4b
C APPROVED
E B X1
2
FOR COMMANDER NAVFAC
ACTIVITY
CHILLER
CHILLER
SATISFACTORY TO DATE
B B
Sa
X2 6 F1
E
6a
F1
BUILDING 3069
E
6a F1
E
UTILITY BLDG.6a
2-1
F1
E
6a
F1 F1
E E
6a 6a
A A
EPROJECT NO.:
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.
DATE
-
-
2. FOR LIGHTING FIXTURE AND EXIT SIGN DEMO SCHEDULE, SEE DRAWING E-501.
1 3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY ALL NEW LIGHTING CIRCUITS WHERE
APPLICABLE. REFER TO DRAWINGS E-103 AND E-104 FOR NEW LIGHTING PLAN.
1
D D
X1
DESCRIPTION
E B
-
2
DEMOLITION KEYNOTES
SYM
-
-
HIGH BAY DOME 1. DEMOLISH AND REMOVE EXISTING LIGHTS AND EXIT SIGNS, INCLUDING BUT NOT LIMITED TO
1
LIGHT FIXTURE WITH ALL WIRING WITHIN CONDUIT FROM LIGHTS/SIGNS BACK TO PANEL/SOURCE.
WALL MOUNTING
BRACKET M1 M2 M3
M4
(TYPICAL)
1a 1a 3b 3b
STAIRS
C PROCESS SEAL
C
1-1
M1 M3
1a
3b
M1 M3
1a 3b
APPROVED
ACTIVITY
SATISFACTORY TO DATE
CRANE (TYPICAL)
M2 M1 M4 M3
B B
X1
BUILDING 3069
E B 2
A A
EPROJECT NO.:
3/8"=1'-0" SHEET OF
E-102
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
23.6 26.5 27.3 26.5 23.5 18.8
-
12 12
30.8 34.6 35.7 34.6 30.6 24.2
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E
E-001.
-
35.4 40.0 41.3 39.9 35.3 27.9
A2
37.5 42.1 43.5 A2
42.2 37.5 29.8 2. FOR NEW LIGHTING FIXTURE AND EXIT SIGN SCHEDULE,
SEE DRAWING E-501.
38.1 CANOPY
42.7 44.1 42.9 38.2 30.6
38.5
12
43.1 44.5 43.4
12
38.9 31.3
3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY
ALL NEW LIGHTING CIRCUITS WHERE APPLICABLE.
REFER TO DRAWINGS E-103 AND E-104 FOR NEW
D 36.8 41.2 43.0 E
42.0 37.8 30.7
LIGHTING PLAN. D
1 32.2 36.1 37.4 36.7 33.8 27.6 2 3 4
A2 A2 10
H3 4. ALL NEW WIRING FOR LIGHTING CIRCUITS SHALL
DESCRIPTION
24.6 27.7 28.8 28.4 26.1 22.3
CONSIST OF INSULATED #12 AWG THHN STRANDED
-
4.4 6.1 8.2 10.6 11.4 23.2 19.7 14.3 11.0 8.5 6.6 5.2 4.1 3.5 3.0 2.6 2.3 2.1 2.0 1.9 1.9 1.8 1.7 1.7 1.7 1.7 1.7 1.7 1.6 1.6 1.5 1.4 1.3 1.2 1.1 1.1 1.0 0.9 0.9 1.0 COPPER CONDUCTORS.
SYM
43.0 53.0 56.0 56.4 52.6 41.8 2.0 6.8 5.6 5.1 4.1 3.4 3.0 2.8 2.7 2.6 2.6 2.5 2.5 2.4 2.4 2.3 2.3 2.3 2.3 2.3 2.3 2.2 2.1 2.0 1.8 1.7 1.5 1.4 1.3 1.2 1.1 1.1 1.2
-
0-2
ACCORDANCE WITH NFPA 101.
3.6 4.8 6.1 4.6 3.9 59.2 72.6 77.1 82.3 77.0 71.8 57.9 2.1 2.2 4.1 3.8 3.4 3.2 3.1 3.2 3.2 3.3 3.4 3.4 3.4 3.3 3.2 3.1 3.1 3.1 3.2 3.2 3.1 3.0 2.8 2.6 2.3 2.1 1.9 1.8 1.6 1.5 1.4 1.3 1.6
HSd
3.4 4.6 4.3 4.8 4.2
6. LIGHTS WITH "E" DESIGNATION SHALL INCLUDE A
67.1 H2
81.1 87.5 92.1 87.2 H280.1 65.3 1.9 2.4 3.9 3.7 3.6 3.5 3.5 3.7 4.0 4.2 4.4 4.4 4.4 4.4 4.3 4.2 4.1 4.1 4.2 4.2 4.1 3.9 3.6 3.2 2.8 2.5 2.3 2.1 2.0 1.8 1.7 1.5 2.0
H3 EXISTING BATTERY PACK FOR EMERGENCY LIGHTING PURPOSES.
10 8d 8d
3.3 3.6 4.3
10
4.7 4.2 X1 RED STROBE
61.6 75.0 80.4 85.2 80.4 74.3 60.4 2.0 2.6 2.8 3.7 3.8 3.8 3.9 4.2 4.6 5.0 5.3 5.4 5.4 5.3 5.3 5.2 5.1 5.1 5.2 5.3 5.1 4.8 4.2 3.7 3.3 2.9 2.7 2.5 2.3 2.1 1.9 1.6 2.3
WARNING LIGHT
2.8 3.5 4.3 4.5 4.3 46.9 57.0 60.9 62.3 60.8 56.6 46.0 1.9 2.3 2.6 2.9 3.6 3.8 4.0 4.3 4.8 5.2
H3
5.6 5.8
WALL MOUNTED
5.7 5.6
CROUSE-HINDS
5.5 5.5 5.4 5.5 5.7 5.9 5.5
H3
5.1 4.4 3.9 3.4 3.0 2.7 2.4 2.3 2.1 1.8 1.4 2.3 NEW WORK KEYNOTES
2.6 3.3 4.0 4.3 4.1 10 CAT # EVBS230R/120V 11e 7
26.3 33.9 36.6 36.6 36.4 33.8 26.3 1.0 1.3 1.8 2.1 2.7 3.1 3.5 3.9 4.4 4.5 4.6 4.9 4.9 4.7 4.6 4.7 4.7 4.9 5.1 5.1 4.7 4.5 4.0 3.5 3.0 2.6 2.2 1.9 1.6 1.4 1.1 0.8 2.3
1. LIGHTS SHALL BE WIRED IN PARALLEL WITH LIGHTS ON
2.5 3.2 3.8 4.0 3.7
X1
1 X2
E
3.3 4.1 4.2 3.6
A
2.9 THE SAME CIRCUIT ONLY. REFER TO DRAWING E-604
45.2 47.7 49.3 50.2 50.4 50.2 49.5 48.4 46.8 44.6 41.9 38.9 28.3 30.8 32.9 34.8 10
36.3 HSa HSb
37.3 HSc37.2HSe
37.8 35.8 34.0 31.7 29.0 Se 15.4 2
21.1 25.6 28.1 28.8 27.9 27.0 27.0 26.3 24.8 23.5 21.1 16.6 11.4 FOR PANEL LP1 SCHEDULE. CONDUIT SHALL BE RMC
E J E J E 3.7 4.6 4.6 3.9 3.0
2.5 3.1 3.6 3.8 3.3
9b H3 9b H3 TO MEZZANINE LIGHTS 5a 9b H3 A1 A1 ACC AND SHALL INCLUDE EQUIPMENT SEALS WITHIN 18" OF
47.9 50.4 51.8 52.6 52.8 52.5 51.7 50.6 PALLET
49.0 46.9 44.2 41.1 31.5 34.5 37.0 39.2 41.1 42.5 43.4 42.7 41.4 39.4 36.8 33.6 19.8 27.8 33.8 36.8 37.2 35.4 34.1 34.3 33.4 31.3 29.9 27.2 21.0 14.0
(DRAWING E-104) J LP1(3,5,8,9) A1
2a E 2b 2a E ALL FIXTURES AND BOUNDARY SEALS WHEN
2.4 3.1 3.6 3.6 3.0 4.3 5.3 5.1 4.2 3.3
8c,d 8c,d 8c,d 8c,d A1 TRANSITION FROM A CLASSIFIED TO AN UNCLASSIFIED
49.4 51.9 53.2 53.9 54.1 53.7 53.0 51.9 50.4 48.3 45.8 42.9 34.7 38.1 40.9 43.4 45.7 47.4 48.6 48.2 47.0 44.9 42.1 38.5 22.1 30.9 37.4 40.2
ELECTRICAL
40.3 38.3 36.8 36.9 35.9 33.7 32.1 29.0 22.5 O 15.1
H2 H2 H2 H2
8c,d
H2
8c,d STAIRS 0-4 MTD. 10'-0" AFF AREA. REFER TO DRAWING E-306 FOR ARE
WRAPPING H2 H2
2.4 3.1 3.5 3.4 2.7 5.0 5.9 5.6 4.6 3.5
A2 8c,d 2b
LP1(11) (TYPICAL) CLASSIFICATION DETAILS.
49.9 52.2 53.6 54.3 54.4 54.2 53.5 52.5 51.0 49.2 46.9 44.2 MACHINE
37.8 41.6 44.6 47.3 49.8 51.9 53.5 53.4 52.4 50.4 47.5 43.4 22.3 30.6 36.7 39.4 39.4 37.8 36.5 36.1 35.0 33.1 31.2 27.8 21.9 15.2
2 H3
C J LP1(10, 12)
C
O
5a E 5.3 6.2 5.9 4.8 3.6
2.4 3.0 3.3 3.1 2.4 PALLET 5a 5a SEAL
X2 7
49.7 52.0 53.4 54.1 54.3 54.1 53.5 52.7 51.5 49.8 47.7 45.3 40.6 44.8 47.9 50.7 53.4 55.8 57.7 57.9 57.1 55.4 52.5 48.0 22.3 30.6 36.7 39.4 39.4 37.9 36.5 36.1 35.0 33.0 31.2 27.8 21.9 15.2 2. LIGHTS SHALL BE WIRED IN PARALLEL. CONDUIT SHALL
H3
2.4 2.8 3.1 2.9 2.1 E 9b 4 H2 8c,d LP1(2)
5.6 6.4 6.1 4.9 3.6 BE RMC AND SHALL INCLUDE EQUIPMENT SEALS WITHIN
DRYING CARTS
8c,d E
49.5 51.6 53.0 53.8
H2
54.0 53.9 53.5 52.8
EXPLOSION
51.8 50.4 48.6 46.4 42.9 47.3 50.7 53.7 56.5 58.9 60.9 61.5 61.1 59.5 56.5 51.9 22.1 30.9
A1 E
37.4 40.2 40.4 38.4 36.9 37.0 35.8 33.6 32.0 29.0 22.5 15.1
Sa
18" OF ALL FIXTURES AND BOUNDARY SEALS WHEN
2.3 2.7 2.9 2.7
10
1.7
X1
49.5 51.5 52.8 53.6 53.9 53.8 53.6
PROOF
53.0 52.2 51.1 49.6 47.6 45.0 49.6 53.0
PROCESS
0-1 61.5
56.0 58.8 63.9 64.5 64.3 62.9 A260.1 55.1
2 19.8 27.8 33.8
2b
36.8 A1
37.2 35.5
2a
34.2
E
A1
34.4 33.3 31.1
2b
29.8 A127.1 21.0
Sb
14.0
5.7 6.4 6.0 4.8 3.6
TRANSITION FROM A CLASSIFIED TO AN UNCLASSIFIED
HIGH BAY LED A2 A2 AREA. REFER TO DRAWING E-306 FOR AREA
2.2 2.5 2.6 H3
2.3 1.4 10 2a 5.6 6.3 5.8 4.7 3.5
(TYPICAL) H2 8c,d CLASSIFICATION DETAILS.
49.6 51.7 52.9 53.6 53.9 53.9 53.8 53.4 52.8 52.0 50.7 48.9 46.3 51.2 54.6 57.7 60.6 63.4 65.9 66.7 66.6 65.2 62.4 57.2 15.4 21.0 25.5 28.1 28.8 27.9 27.1 27.0 26.2 24.7 23.4 21.1 16.6 11.4
H2 8c,d 5a 5a 5a B4.5
2.0 2.2 2.3 1.9 1.2 H2 8c,d H2 8c,d 5.6 6.1 5.7 3.4
H2 8c,d 8c,d H2
50.0 51.9 53.1 53.7 54.0 54.1 54.0 53.9 53.5 52.8 51.8 50.2 47.1 52.1 55.6 58.8 61.8 64.5 67.1 68.0 67.9 66.6 63.7 58.4 11.2 15.0 16.9 15.8 13.2 11.0 9.8 9.5 10.1 11.5 13.3 14.4 13.4 10.7 3. LIGHTS SHALL BE WIRED IN PARALLEL WITH LIGHTS ON
8c,d 4c
1.9 2.0 1.9 1.6 1.1
DRYING CART H2 DRYING CART DRYING CART E EXPLOSION PROOF
LED FIXTURE WITH
E 3 LP1(4)
5.6 6.1 5.6ACC4.5 3.4 THE SAME CIRCUIT ONLY. REFER TO DRAWING E-604
50.2 52.2 53.3 53.9 54.1 54.2 54.2 54.2 54.0 53.6 52.8 51.2 47.3 52.4 56.0 59.3
CEILING MOUNTED
62.3 65.0 67.5 68.4 68.3 67.0 64.0 58.7 14.8 20.7 23.8
A1
22.1 18.3 15.2 13.6
MECHANICAL
13.3 14.3 16.5 19.7 21.9 20.4 15.6 FOR PANEL LP1 SCHEDULE. CONDUIT SHALL BE 3/4" EMT
APPROVED
1.7 1.7 1.6 1.4 1.0
A2 A1 5.7 6.2 5.7 4.5 3.4
WHEN INSIDE THE FACILITY, AND SHALL TRANSITION TO
A252.2 JUNCTION BOX 0-3
50.2 52.2 53.3 53.9 54.2 54.2 54.3 54.4 54.4 54.1 53.3 51.8 47.0 55.8 59.1 62.1 64.8 A2
67.2 68.1 67.9 66.4 63.4 58.0 17.0 23.9 28.0 26.9 23.5 20.5 18.8 18.5 19.7 22.3 4c
26.3 29.3 26.9 19.9
H2 8c,d MOUNTED UNDER MTD. 10'-0" AFF 3/4" RMC WHEN OUTSIDE OF THE FACILITY. FOR COMMANDER NAVFAC
1.5 1.5 1.4 1.2 0.9 O 5.5 6.2 5.7 4.6 3.4
MEZZ. (TYPICAL) (TYPICAL)
49.5 51.6 52.9 53.6 53.9 54.1 54.3 54.4 54.3 54.0 53.1 51.5
5a
46.0 51.1 54.8 58.0 61.0 63.6 5a
65.9 66.6 66.3 64.7 5a61.6 56.3 17.7 24.7 29.4 30.3 28.8 26.7 25.0 25.0 26.2 28.2 31.3 33.5 30.3 22.3 H3 ACTIVITY
MOUNTED ABOVE CRANE E X2 4. NEW WALL MOUNTED INTERIOR LIGHTS IN PROCESS
1.5 1.3 1.2 1.1 0.8 4 5.37 6.0 5.6 4.5 3.4
H3 (TYPICAL)
48.2 50.6 52.0 52.9 53.3 53.6 53.8 53.9 53.7 53.2 52.2 50.5 44.1 49.0 52.7 56.0 58.9 61.3 63.3 63.9 63.4 61.7 58.5 53.5 18.0 25.5 4c31.0 33.3 A1 32.3
33.7 30.3 30.3 31.6 32.1 33.4 34.3 30.5 22.3 ROOM SHALL NOT HAVE PHOTOCELL AND MOTION
E A2
1.4 1.4 1.1 0.9 0.7 9b H2
8c,d H2 H2 H2 H2 3 E 4c 4c E 4c 5.0 5.9 5.4 4.3 3.3 SENSOR INTERNAL TO UNIT (TYPICAL).
46.6 49.1 50.7 51.7 52.2 52.5 52.8 52.8 52.4 51.6 50.5 48.6 41.5 46.2 49.8 52.9 55.6 57.9 59.6 59.9 59.2 57.5 54.5 49.6 17.5 25.4
A1 31.3 33.6 34.0 32.9 30.9 30.8 31.8
A1 31.4 31.2 31.1
A1 27.3 Sc
19.9
8c,d SCREENING 8c,d A2 8c,d 8c,d A2
1.5 1.5 1.4 0.8 0.7 TABLES SCREENING DRYING CARTS 4.4 5.3 5.1 4.1 3.2
44.4 47.0 48.7 49.7 50.39b50.7H350.8 50.8 50.2 TABLES
49.2 47.7 45.7 38.1 9b
42.3H345.7 48.7 51.1 53.2 54.6 54.7 53.9 52.1 49.2 44.9 15.2 21.7 26.6 28.3 28.2 27.2 25.8 25.6 25.9 25.3 24.7 23.9 20.8 15.5 SATISFACTORY TO DATE
LP1(7)
1.5 1.6 1.6 1.5 0.6 E 3.7 4.7 4.6 3.8 3.0 DES DRW CHK
41.6 44.2 45.9 46.9 47.6 47.9 48.1 47.9 47.2 45.9 44.3 42.2 J 34.1 37.8 40.9 43.6 45.8 47.4 48.5 48.5 47.7 45.9 43.3 39.5 11.4 15.6 18.8 20.0 19.9 19.3 18.5 18.2 18.1 17.7 17.0 16.1 13.9 10.8 C
10 X1
2.0 2.1 2.2 2.2 2.1 4.5 4.9 4.7 3.9 3.1
10 10 H3
2.3 1.9 2.0 2.1 2.2 2.3 2.3 2.4 2.5 2.5 2.7 2.9 3.0 3.2 3.5 3.8 H3
7 H3
4.3 4.6 10 4.7 4.8 4.9 5.0 5.3 5.9 6.6 7.0 7.0 7.2 7.1 6.9 6.8 6.9 6.8 6.6 6.2 5.9 5.1 4.4 3.9 3.4 4.7
H3 H3 7
B B
2.4 2.1 2.2 2.4 2.5 2.6 2.7 2.8 3.0 3.1 3.3 3.6 3.9 4.3 4.8 5.3
5.5 5.9 6.1 6.2 6.1 6.0 6.3 6.7 7.1 7.3 7.3 7.3 7.1 7.0 7.0 7.1 7.1 7.0 6.8 6.4 5.8 5.3 4.8 4.4 5.2
2.4 2.1 2.2 2.3 2.4 2.6 2.7 2.9 3.1 3.4 3.6 3.9 4.2 4.5 4.9 5.3
5.5 5.9 6.2 6.4 6.1 5.6 5.4 5.6 5.7 5.7 5.7 5.6 5.5 5.3 5.3 5.2 5.2 5.1 5.0 4.8 4.5 4.2 3.9 3.8 4.0
2.2 2.0 2.1 2.2 2.3 2.4 2.6 2.8 3.0 3.3 3.6 3.9 4.2 4.5 4.8 5.2
5.5 5.9 6.2 6.3 6.0 5.5 5.1 5.2 5.3 5.3 5.2 5.1 5.0 4.8 4.7 4.6 4.6 4.5 4.4 4.2 4.0 3.7 3.5 3.3 3.4
2.0 1.8 1.9 2.0 2.2 2.3 2.4 2.6 2.8 3.1 3.4 3.7 4.0 4.4 4.8 5.2
BUILDING 3069
5.5 5.9 6.3 6.3 6.1 4.8 4.9 5.1 5.1 5.1 5.1 4.9 4.7 4.6 4.4 4.3 4.2 4.1 4.0 3.8 3.6 3.3 3.1 2.9 2.8
1.8 1.7 1.7 1.8 1.9 2.1 2.2 2.3 2.5 2.8 3.0 3.4 3.8 4.2 4.6 5.1
5.4 5.8 6.3 6.4 6.1 4.8 4.9 5.1 5.2 5.2 5.0 4.8 4.6 4.4 4.2 4.1 3.9 3.8 3.7 3.5 3.3 3.0 2.7 2.4 2.4
5.0 5.5 6.0 6.3 6.1 4.6 4.9 5.1 5.1 5.1 5.0 4.7 4.5 4.2 4.0 3.8 3.6 3.5 3.4 3.2 2.9 2.5 2.2 2.0 1.9
6 E Sd
3.5 3.2 3.5 3.7 3.5 8.8 12.6 16.5 20.0 23.3 26.7 27.7 23.6 16.8
X2 6d
6d
2.7 3.1 3.5 3.6 3.2 11.6 17.4 23.3 27.5 30.3 33.4A1 33.9 28.6 20.2
O
2.4 3.0 3.5 3.7 3.6 15.4 23.0 30.5 35.1 2-1
37.3 38.6 37.7 31.9 23.4
EPROJECT NO.:
A1 A1
9.5 13.9 19.2 24.8 30.7 35.1 35.7 31.9 24.4 CONSTR. CONTR. NO.
2.0 2.4 2.8 3.0 2.9
MCC2
1.8 2.2 2.6 2.8 2.5 6.9 9.8 13.3 17.5 21.9 25.2 25.9 23.3 18.3 0' 4' 8' 12' NAVFAC DRAWING NO.
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.
DATE
-
-
2. FOR NEW LIGHTING FIXTURE AND EXIT SIGN SCHEDULE, SEE DRAWING E-501.
3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY ALL NEW LIGHTING CIRCUITS WHERE
APPLICABLE. REFER TO DRAWINGS E-103 AND E-104 FOR NEW LIGHTING PLAN.
4. ALL NEW WIRING FOR LIGHTING CIRCUITS SHALL CONSIST OF INSULATED #12 AWG THHN
D STRANDED COPPER CONDUCTORS. D
5. EXIT SIGNS SHALL BE MOUNTED ABOVE DOORWAYS IN ACCORDANCE WITH NFPA 101.
DESCRIPTION
-
-
H3 10 NEW WORK KEYNOTES
SYM
-
-
1. LIGHTS SHALL BE WIRED IN PARALLEL WITH LIGHTS ON THE SAME CIRCUIT ONLY. REFER TO
H1 3a X1 DRAWING E-604 FOR PANEL LP1 SCHEDULE. CONDUIT SHALL BE RMC AND SHALL INCLUDE
EQUIPMENT SEALS WITHIN 18" OF ALL FIXTURES AND BOUNDARY SEALS WHEN TRANSITION
45.2 47.7 49.3 50.2 50.4 50.2 49.5 48.4 46.8 44.6 41.9 38.9 28.3 30.8 32.9 34.8 36.3 10 37.8
37.3 37.2 35.8 34.0 31.7 29.0 FROM A CLASSIFIED TO AN UNCLASSIFIED AREA. REFER TO DRAWING E-306 FOR ARE
H1 3a H1 3a H1 3a TO WALL LIGHTS CLASSIFICATION DETAILS.
PALLET 1
EXPLOSION PROOF (DRAWING E-103)
47.9 50.4 51.8 52.6 52.8 52.5 51.7 50.6 49.0 46.9 44.2 41.1 31.5 34.5 37.0 39.2 41.1 42.5 43.4 42.7 41.4 39.4 36.8 33.6
HIGH BAY LED WRAPPING
FIXTURE (TYPICAL) 8c,d MACHINE 8c,d
49.4 51.9 53.2 53.9 54.1 53.7 53.0 51.9 50.4 48.3 45.8 42.9 34.7 38.1 40.9 43.4 45.7 47.4 48.6 48.2 47.0 44.9 42.1 38.5
H2 H2 H2 H2 H2 H2 H2
H1
3a
PALLET
49.7 52.0 53.4 54.1 54.3 54.1 53.5 52.7 51.5 49.8 47.7 45.3 40.6 44.8 47.9 50.7 53.4 55.8 57.7 57.9 57.1 55.4 52.5 48.0
H1
H2 8c,d STAIRS
DRYING CARTS
49.5 51.6 53.0 53.8 54.0 53.9 53.5 52.8 51.8 50.4 48.6 46.4 42.9 47.3 50.7 53.7 56.5 58.9 60.9 61.5 61.1 59.5 56.5 51.9
H2 8c,d PROCESS
49.5 51.5 52.8 53.6 53.9 53.8 53.6 53.0 52.2 51.1 49.6 47.6 45.0 49.6 53.0 56.01-158.8 61.5 63.9 64.5 64.3 62.9 60.1 55.1 APPROVED
3a
FOR COMMANDER NAVFAC
H2 8c,d 8c,d57.7
ACTIVITY
49.6 51.7 52.9 53.6 53.9 53.9 53.8 53.4 52.8 52.0 50.7 48.9 46.3 51.2H254.6 60.6 63.4 65.9 66.7 66.6 65.2 62.4 57.2
H1
H2 8c,d H2 8c,d
H2 8c,d 8c,d H2
50.0 51.9 53.1 53.7 54.0 54.1 54.0 53.9 53.5 52.8 51.8 50.2 47.1 52.1 55.6 58.8 61.8 64.5 67.1 68.0 67.9 66.6 63.7 58.4
SATISFACTORY TO DATE
3a
50.2 52.2 53.3 53.9 54.1 54.2 54.2 54.2 54.0 53.6 52.8 51.2 47.3 52.4 56.0 59.3 62.3 65.0 67.5 68.4 68.3 67.0 64.0 58.7
H1
H1
H1
3a
B B
3a
48.2 50.6 52.0 52.9 53.3 53.6 53.8 53.9 53.7 53.2 52.2 50.5 44.1 49.0 52.7 56.0 58.9 61.3 63.3 63.9 63.4 61.7 58.5 53.5
H1
8c,d H2 H2 H2 H2 H2
H2
BUILDING 3069
8c,d 8c,d8c,d H1 MOUNTED BELOW
46.6 49.1 50.7 51.7 52.2 52.5 52.8 52.8 52.4 51.6 50.5 48.6 41.5 46.2 49.8 52.9 55.6 57.9 59.6 59.9 59.2 57.5 54.5 49.6
8c,d 8c,d
SCREENING 3a MEZZANINE (TYPICAL)
TABLES SCREENING DRYING CARTS
44.4 47.0 48.7 49.7 50.3 50.7 50.8 50.8 50.2 TABLES
49.2 47.7 45.7 38.1 42.3 45.7 48.7 51.1 53.2 54.6 54.7 53.9 52.1 49.2 44.9
H1 3a H1 3a H1 3a 1 H1 3a H1 3a H1 3a
X1
41.6 44.2 45.9 46.9 47.6 47.9 48.1 47.9 47.2 45.9 44.3 42.2 34.1 37.8 40.9 43.6 45.8 47.4 48.5 48.5 47.7 45.9 43.3 39.5
1 10
A H3 H3 10 A
EPROJECT NO.:
3/8"=1'-0" SHEET OF
E-104
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
GENERAL NOTES
-
C B A
15'-2" 15'-2"
DATE
1. FOR LEGEND AND GENERAL NOTES, SEE
-
DRAWING E-001.
DESCRIPTION
101.
SYM
-
-
H3
H3 H3
PROCESS AREA - MEZZANINE LEVEL
A1 A1 A1 A1
X2 X2
A2 A2
ACTIVITY
A B C
SATISFACTORY TO DATE
B B
H3 H3 H3
MEZZANINE
EL. 14'-6"(T.O.GRATING)
H1 H1 H1 H1
A2
SCALE:
NEW LIGHTING PLAN - SOUTH ELEVATION NEW LIGHTING PLAN - WEST ELEVATION SHEET OF
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
2. FOR DETAILS OF DEMO WORK IN ELECTRICAL AND
1 2 EXISTING 3 4
DISCONNECT ACU-1
MECHANICAL ROOMS, SEE DRAWING E-401.
RP1(5) SWITCH
TOULENE 3 WP 22
DOOR 05 VAPOR KW 3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY
9
EXHAUST FAN ALL NEW POWER CIRCUITS WHERE APPLICABLE. REFER
1/6 TO DRAWINGS E-203, E-204, AND E-402 FOR NEW POWER
D EF-4
PLAN. D
AGV AIR LOCK 4. ALL EXISTING WIRING TO BE DEMOLISHED AND
DESCRIPTION
0-2 P33 REMOVED BACK TO PANEL/SOURCE.
-
~
5. REFER TO DRAWING E-601 FOR POWER CIRCUIT
DESIGNATIONS AND CONDUIT SIZES.
SYM
-
-
P54
P54
~
~
DOOR 03 BIN CAPPING STATION
CONTROL CABINET
11 9
P51 MCC1MCC1 A
RP1
DEMOLITION KEYNOTES
~
WALL-MOUNTED MCC1
(9,11) TELEPHONE (TYPICAL) P46 EF-1
RP1(13) 12 ELECTRICAL 0-4
EPO 1
~
~
~ RECIEVER MOUNTING LOCATION 20
CONTROL RELAY 120V COIL
FOR TRIPOD MOUNTED CAMERA #7 12
2 N.O. & 2 N.C. RP1(1)
CONTACTS MTD IN A MCC1 1. CONDUIT TO BE LEFT IN PLACE FOR CONNECTION TO
P2 P108 4"x4"x4" NEMA 1 ENCLOSURE
NEW MECHANICAL EQUIPMENT.
STAIRS P8
P4
P31
MOUNTED ON STEEL GRIT C
22'-4" AFF SEE NOTE 2 P3 C265 P45
PROCESS
P29 ZVD PP1
C 0-1 30 KVA TRANS. RP1(15)
MOUNTED ON P51 DRIVES 15 KVA TRANS.
UPS BATT. WALL MTD. MCC1
COL. B/1 6"x6"x4" NEMA 4X P14 EPO MCC1 P9
HOFFMAN A606CHNF CAMERA #7 MCC1
PP1 IP1 UPS1 LP1 RP1
P16 P5 P7 J
FOR MINI CAMERAS TRIPOD 12 10
P28
C RECEIVER MOUNTING LOCATION
MOUNTED 8'-0" AFF
(TYPICAL) MOUNTED
14
P13 P15 P10
RP1(3)
B
SEAL
C
RP1 7 WP 7
5 P108 P4
CAMERA #3
C P26 (14,16) 1
20
P31 RP2(7) EF-2
TRIPOD EXP FLEX METAL COUPLING 250 1
MOUNTED WITH 1 INTERCOM 1 CABLE C266 16 721
P3
C267
XXX
14 16 C
WP 7 7
PELLETIZER P52 FIRE ALARM
PATCH PANEL: CAMERA #5 P53 POWER SUPPLY PANEL
CONTROL TRIPOD
POWER MOUNTED P32
60
KW SATISFACTORY TO DATE
22 ACU-2
1 KW
PULLBOX
6"x6"x36" LONG
B B
VACP-1
CONTROL PANEL
BUILDING 3069
215 P11 5
KW GFP-1
P34
CH-1 30 TCCH-2 TCCH-1
VACP-1
KW P41
RP2(1) EUH-1 3
AHU-1 P47
7.5 RUN
KW P36 BESIDE
WP 3 UTILITY BLDG.
3 PIPING
~
2-1 P35
P43
30
P40 AR-1 AC-1 KW
CHP-1
P39
EPROJECT NO.:
B3069 & B3090 POWER DEMO PLAN 0' 4' 8' 12' NAVFAC DRAWING NO.
3/16" = 1'-0"
3/16"=1'-0" SHEET OF
E-201
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.
DATE
-
-
2. FOR DETAILS OF DEMO WORK IN ELECTRICAL AND MECHANICAL ROOMS, SEE DRAWING E-401.
3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY ALL NEW POWER CIRCUITS WHERE
APPLICABLE. REFER TO DRAWINGS E-203, E-204, AND E-402 FOR NEW POWER PLAN.
D 5. REFER TO DRAWING E-601 FOR POWER CIRCUIT DESIGNATIONS AND CONDUIT SIZES. D
6'-0"
DESCRIPTION
CRANE FESTOON CONTROL JUNCTION BOX
-
CAMERA #1
CRANE FESTOON POWER JB-1 DEMOLITION KEYNOTES
SYM
C
-
11
1. FOR CCTV DEMOLITION DETAILS, SEE DRAWINGS T-101 AND T-701.
MOUNTED ON P17
RECIEVER MOUNTING LOCATION
STEEL GIRT MOUNTED 6'-0" AFF
FOR TRIPOD MOUNTED CAMERA #6
1 CAMERA #6 C CROUSE-HINDS
C TRIPOD BHR DEAD FRONT INTERLOCKED SEAL
C
MOUNTED RECEPTACLE WITH FACTORY
LOSS-IN-WEIGHT P29 SEALED SWITCH & BHP PLUG
PATCH PANELS: AG-3
3 480V, 4P, 3W, 30A
TYPICAL FOR AG-1, AG-2 & AG-3
1
PROCESS
4/C#12
1-1 LFP-3 WITH PLUG INSTALLED
1 P28
16 ON RECEPTACLE END APPROVED
3 P21 ACTIVITY
BUILDING 3069
CAMERA #2
C P53
14 P52
LOSS-IN-WEIGHT IOP-PB1
PATCH PANELS:
CONTROL
A A
POWER DEMO PLAN MEZZANINE
3/8" = 1'-0"
EPROJECT NO.:
3/8"=1'-0" SHEET OF
E-202
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
CANOPY
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
2. FOR DETAILS OF NEW WORK IN ELECTRICAL AND
1 2 3 4
MECHANICAL ROOMS, SEE DRAWING E-402.
DESCRIPTION
AGV AIR LOCK 1 RATED UNITS TO MATCH THE HAZARDOUS RATING OF
-
0-2 THE SPACE (SEE DRAWING E-306 FOR DETAIL). ALL
OTHER RECEPTACLES SHALL BE 120V, 20A RATED
4 DUPLEX DEVICES.
SYM
-
-
16W
WP, GFCI 10
DOOR 03
11 P51
9 RP1 (9,11) 10 10
EF-1 A NEW WORK KEYNOTES
~
1
9W 20
6W 10 P46 12
6W PALLET MCC1 RP1(1)
EPO RP1 (10)
8W
12W 12 WP, GFCI 1. CONDUIT SHALL BE 3/4" RMC. RECEPTACLES ON CIRCUIT
WRAPPING 15W
10 MCC1
9 SHALL SHARE A GROUND, AND RECEPTACLES ON
MACHINE
RP1 (12)
CIRCUIT 11 SHALL SHARE A GROUND. SEAL FITTINGS
ELECTRICAL P8
STAIRS SHALL BE INSTALLED WITHIN 18" OF NEW RECEPTACLES
11 0-4 12W
PALLET
9
2 6W
AND FILLED. SEAL FITTINGS SHALL BE REPLACED,
INSTALLED WITHIN 18" OF EXISTING RECEPTACLES, AND
PROCESS IP1(13,15) FILLED.
0-1 11 30 KVA TRANS. RP1(15)
15 KVA TRANS. NEW IU-1
WALL MTD. MCC1
WALL MTD. 0.1
MCC1 P9
2. CONDUIT SHALL BE 1" RMC. CONDUIT SHALL BE
MCC1 KW
PP1 P5 IP1 LP1 RP1 PERMITTED TO BE REDUCED TO 3/4" EMT WHEN FEWER
C 14
12
P7 J
12 THAN 16 WIRES WILL BE IN THE CONDUIT. RECEPTACLES SEAL
C
DRYING CARTS
RP1 (14,16) P13 P10 B ON CIRCUIT 14 SHALL SHARE A GROUND, AND
RP1(3)
18W
7 0.1 6W RP1 (7)
7 RECEPTACLES ON CIRCUIT 16 SHALL SHARE A GROUND.
14W NEW IU-2 KW
1
SEAL FITTINGS SHALL BE INSTALLED WITHIN 18" OF NEW
DRYING CART DRYING CART RP1(19,21) 15W EF-2
DRYING CART 20 RECEPTACLES AND FILLED. SEAL FITTINGS SHALL BE
14 NEW
EWH-1 IP1(17,19) REPLACED, INSTALLED WITHIN 18" OF EXISTING
RECEPTACLES, AND FILLED.
6W
12W
FIRE ALARM
SCREENING TABLE SCREENING TABLE SCREENING TABLE POWER SUPPLY PANEL 3. CONDUIT SHALL BE 1" EMT WHEN INSIDE THE FACILITY,
AND SHALL TRANSITION TO 1" RMC WHEN OUTSIDE OF
DRYING CARTS MECHANICAL 5 THE FACILITY. CONDUIT SHALL BE PERMITTED TO BE APPROVED
0-3
REDUCED TO 3/4" EMT WHEN FEWER THAN 16 WIRES
RP1(4)
WILL BE IN THE CONDUIT. EACH RECEPTACLE SHALL FOR COMMANDER NAVFAC
4.2 4.2 5. CONDUIT SHALL BE 3/4" EMT WHEN INSIDE THE FACILITY,
KW KW
AND SHALL TRANSITION TO 3/4" RMC WHEN OUTSIDE OF
NEW OU-1 NEW OU-2
THE FACILITY. EACH RECEPTACLE SHALL HAVE ITS OWN
PULLBOX GROUND WIRE.
B 6"x6"x36" LONG
B
P37
BUILDING 3069
WP, GFCI 3
52.5 P11 5
RP2 (3,5) GFP-1
KW P34
21.5 24W VACP-1
NEW CU-1 KW
21W RP2(1) 3
NEW IDS EUH-1
7.5
WP 3 UTILITY BLDG. KW
3
2-1 6W
~
18W P43
30
AC-1 KW WP, GFCI
~
P40 AR-1 ~
12W 5
RP2
GRAPHIC SCALE SCALE:
EPROJECT NO.:
3/16" = 1'-0"
E-203
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
DATE
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.
-
2. FOR DETAILS OF NEW WORK IN ELECTRICAL AND MECHANICAL ROOMS, SEE DRAWING E-402.
4. ALL RECEPTACLES IN THE PROCESS AREA SHALL BE EXPLOSION PROOF RATED UNITS TO
MATCH THE HAZARDOUS RATING OF THE SPACE (SEE DRAWING E-306 FOR DETAIL).
D D
CRANE FESTOON CONTROL JUNCTION BOX
DESCRIPTION
CRANE FESTOON POWER JB-1
-
11 NEW WORK KEYNOTES
SYM
-
-
1. REFER TO DRAWING E-203 FOR EXPLOSION PROOF RECEPTACLE CONDUIT AND WIRING
REQUIREMENTS.
1 P17
C SEAL
C
1
PROCESS
1-1
16
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
BUILDING 3069
14
EPROJECT NO.:
B3069 NEW MEZZANINE POWER PLAN CONSTR. CONTR. NO.
3/8" = 1'-0"
1' 0 1' 5' 10' NAVFAC DRAWING NO.
3/8"=1'-0" SHEET OF
E-204
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GROUNDING & BONDING DETAILS GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
2. FOR ADDITIONAL GROUNDING AND BONDING DETAILS,
POLYMER (HDPE) BOLTED
SEE DRAWING E-502.
NOMINAL 17"x12" BOX COVER-ENGRAVED
"GROUND ROD"
D D
12"
DEMOLITION KEYNOTES
24"
27" TO 30"
#4/0 COPPER GROUND
DESCRIPTION
GIRDLE (CONTINUOUS)
-
1. REMOVE HATCHED PORTION OF EXISTING SECONDARY
~
#4/O COPPER GROUNDING GIRDLE (SGG) TO MAKE ROOM FOR NEW
1 GROUND GIRDLE
SYM
GRAVEL
CONCRETE PAD. SEE DRAWING E-302 FOR NEW
-
(CONTINUOUS)
REMOVABLE
SGG SGG GROUND
12' x 3/4" Ø COPPER-CLAD GROUND ROD ADDITION TO SGG.
EXISTING #4/0 FOR ROD CLAMP
CONNECTION TO 2. REMOVE COPPER BUS BARS FROM DEMOLISHED
NOTE:
TRANS. GND. SYSTEM EQUIPMENT.
~
CONNECTIONS TO GROUND GIRDLE OTHER THAN AT
EXISTING 1/4"x1" COPPER EXISTING COUNTERPOISE TEST POCKET SHALL BE WITH HIGH STRENGTH
BUS BAR MOUNTED 6" AFF AGV AIR LOCK SGG CONNECTED TO GROUNDING (TYPICAL) COMPRESSION CONNECTION.
(TYPICAL) TP 3. LOCATION OF EXISTING SGG IS APPROXIMATE.
SEE DETAIL 2
SGG
0-2 MCC2 GND BUS CONTRACTOR TO VERIFY SGG ROUTING IN FIELD USING
SEE DETAIL 3 ACCESSIBLE GROUND ROD-TEST POCKET DETAIL
#4/0 ELECTRONIC METHODOLOGY.
DETAIL
SGG SGG
#4/0 NOT TO SCALE 1
#4/0 #4/0
~
"MATCON IBC"
3 BIN CAPPING STAIRS MCC1 CAP CONDUITS
SGG
STATION 2" ABOVE SLAB
C PROCESS ELECTRICAL
(TYPICAL) SEAL
C
EXISTING STRUCTURAL
~
COLUMN GROUNDING 0-1 0-4 TO GROUND GIRDLE
PELLETIZER #4/0 BARE COPPER
GROUND WIRE
CONNECTION (TYPICAL)
~
SEE DETAIL 1, DWG E-303 EXTRUDER EXOTHERMIC
CONNECTION
MECHANICAL
ROTARY INDEXING 2
COPPER GROUND ROD
TURNTABLE 0-3 3/4"DIA. x 10'-0" LG.
SGG
SGG
TO GROUND GIRDLE
#4/0 BARE COPPER
10'-0"
GROUND WIRE
EXISTING GROUNDING
PIGTAIL (TYPICAL) EXOTHERMIC CONNECTION
~
APPROVED
~~~
#4/0 BARE COPPER GROUND WIRE. FOR COMMANDER NAVFAC
ACTIVITY
~
~
COUNTERPOISE GROUNDING
CHILLER #4/0 EXISTING #4/0 BARE COPPER
#4/0 GROUND CABLE BURIED 30" BELOW DETAIL
~ ~
SGG
~ ~ ~ ~ ~ ~ ~
TP
~ ~ ~ ~ ~ ~ ~ ~
SGG
~ GRADE AT A MINIMUM OF 3'-0" FROM NOT TO SCALE 2
#4/0 THE OUTSIDE WALL OF BUILDING
~
SATISFACTORY TO DATE
#4/0 CONNECTED DES DRW CHK
TO PIPE BRIDGE
SGG
SGG
~ ~
B B
CH1 AHU1
~
C7 x 9.8
#4/0 MCC2
BUILDING 3069
WALL GIRT
TP MCC2 PREFABRICATED
PROVIDE WASHER
INSULATED 3/8" 1"
SANDWICH WALL
PANEL
CHP1
#4/0 COPPER BUS BAR
SGG
DETAIL
CONNECTED TO
NOT TO SCALE 3
MCC2 GND BUS
EPROJECT NO.:
1/8"=1'-0" SHEET OF
E-301
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
2. GROUND ALL NEW INTERIOR METALS, INCLUDING BUT
NOT LIMITED TO PLATFORMS, AIR HANDLING UNITS
(AHU), DOORS, FANS, PIPING, TANKS, STEEL DUCTS,
JACKETING, GRATING, AND CONDUIT TO SECONDARY
SGG 1 GROUNDING GIRDLE (SGG) PIGTAILS WITH #6 AWG THHN
BARE SOLID COPPER WIRE UNLESS INDICATED
D REBAR OF NEW CONCRETE
OTHERWISE. D
LOADING DOCK SHALL TP TP
BE BONDED TO SGG. ROADWAY 3. GROUND ALL EXTERIOR METALLIC PIPING, METAL
DESCRIPTION
SEE CIVIL PLAN DWG C-003 JACKETING, SUPPORTS/STANDS, AND CONDUIT TO SGG
-
CANOPY
WITH #4/0 AWG THHN BARE STRANDED COPPER WIRE
UNLESS INDICATED OTHERWISE. ALSO BOND ALL METAL
OBJECTS WITHIN 6'-0" OF PIPING OR CONDUIT.
SYM
-
-
TP TP SGG
4. FOR ADDITIONAL GROUNDING AND BONDING DETAILS,
EXISTING TEST POCKET (TYPICAL) EXISTING #4/0 FOR SEE DRAWING E-502.
SEE DETAIL 1, DWG E-301 CONNECTION TO
TRANS. GND. SYSTEM 5. BOND ALL DOORS TO DOOR FRAMES IN TWO PLACES
EXISTING 1/4"x1" COPPER SGG
AGV AIR LOCK USING FLEXIBLE BONDING STRAPS CONSISTING OF #30
BUS BAR MOUNTED 6" AFF TP
SGG
0-2 AWG TINNED STRANDED COPPER WIRES.
(TYPICAL)
SEE DETAIL 3, DWG E-301 #4/0
6. NSWC GROUNDING TEAM TO TEST GROUNDING SYSTEM
SGG SGG
#4/0 PRIOR TO AND AFTER COMPLETION OF CONSTRUCTION
#4/0 #4/0 TO ENSURE CONDUCTIVITY READINGS ARE IN
ACCORDANCE WITH ALL NAVSEA OP-5 REQUIREMENTS.
CONTRACTOR AND NAVFAC CONSTRUCTION MANAGER
PALLET
WRAPPING
SHALL WITNESS ALL TESTS AND DOCUMENT THE
MACHINE RESULTS.
STAIRS MCC1
SGG
PALLET
C PROCESS ELECTRICAL
SEAL
C
EXISTING STRUCTURAL COLUMN
NEW IU-2 NEW WORK KEYNOTES
~
GROUNDING CONNECTION GROUNDING PIGTAIL TO BE 0-1 0-4
BONDED TO CONDUCTIVE FLOORING
DRYING CARTS
(TYPICAL)
~
SEE DETAIL 1, DWG E-303 NEW IU-1 1. EXTEND SGG AROUND NEW CONCRETE LOADING DOCK
DRYING CART
DRYING CART DRYING CART
MECHANICAL AND BOND THE REBAR IN THE LOADING DOCK RAMP AND
0-3 NEARBY PAVEMENT TO THE SGG WITH #4/0 AWG THHN
SGG
SGG
BARE STRANDED COPPER WIRE. THE CANOPY
SCREENING TABLE SCREENING TABLE SCREENING TABLE
STRUCTURE, GATE, AND REBAR FOR THE STRUCTURE'S
DRYING CARTS
EXISTING GROUNDING BASE SHALL BE BONDED TO THE SGG AS WELL. GROUND
PIGTAIL (TYPICAL)
RODS TO BE INSTALLED IN TEST POCKETS AND PLACED APPROVED
ACTIVITY
2. RECONNECT GROUNDING CONNECTIONS/PIGTAILS TO
NEW OU-1 #4/0 EXISTING #4/0 BARE COPPER NEW MECHANICAL EQUIPMENT AND BOND
#4/0 NEW OU-2 GROUND CABLE BURIED 30" BELOW APPROPRIATELY.
SGG TP SGG GRADE AT A MINIMUM OF 3'-0" FROM
THE OUTSIDE WALL OF BUILDING
EXISTING COUNTERPOISE #4/0
GROUNDING (TYPICAL) #4/0 CONNECTED
SATISFACTORY TO DATE
SGG
SGG
2
B B
BUILDING 3069
TP MCC2
#4/0
SGG
GROUNDING PLAN
A A
EPROJECT NO.:
1/8"=1'-0" SHEET OF
E-302
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
2. GROUND ALL NEW INTERIOR METALS, INCLUDING BUT
FOR GROUNDING NOT LIMITED TO PLATFORMS, AIR HANDLING UNITS
METAL STUD WALL (AHU), DOORS, FANS, PIPING, TANKS, STEEL DUCTS,
JACKETING, GRATING, AND CONDUIT TO SECONDARY
SEE DETAIL 1 GROUNDING GIRDLE (SGG) PIGTAILS WITH #6 AWG THHN
BARE STRANDED COPPER WIRE UNLESS INDICATED
D OTHERWISE. D
3. GROUND ALL EXTERIOR METALLIC PIPING, METAL
DESCRIPTION
JACKETING, AND CONDUIT TO SGG WITH #4/0 AWG THHN
-
BARE STRANDED COPPER WIRE UNLESS INDICATED
OTHERWISE. ALSO BOND ALL METAL OBJECTS WITHIN
6'-0" OF PIPING OR CONDUIT.
SYM
-
-
4. FOR ADDITIONAL GROUNDING AND BONDING DETAILS,
SEE DRAWING E-502.
FOR GROUNDING
METAL STUD WALL
SEE DETAIL 1
~
APPROVED
(TYPICAL)
SATISFACTORY TO DATE
B B
BUILDING 3069
#6 GROUND WIRE
TO GROUND BUS
INSTALL COPPER GROUNDING LUG
ON EACH METAL STUD (TYPICAL)
DETAIL
1
CONSTR. CONTR. NO.
3/16"=1'-0" SHEET OF
E-303
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
AIR TERMINAL
-
1 2 3 4
SEE DETAIL 1 COL. 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.
DATE
-
-
LP 2. THE EXISTING LIGHTNING PROTECTION SYSTEM SHALL BE TESTED
AND REPAIRED BY THE CONTRACTOR AS NECESSARY (INCLUDING
LP
1 THE NEW ADDITION ON TOP OF THE NEW CANOPY) TO MEET ALL
LP NAVSEA OP-5 AND NFPA 780 REQUIREMENTS.
CANOPY
3. FOR ADDITIONAL GROUNDING AND BONDING DETAILS, SEE DRAWING
E-502.
D D
LP LP
A AIR TERMINALS TO BE ADHESIVE
DESCRIPTION
TESTED AND REPAIRED
BASE
-
LP LP LP
A NEW WORK KEYNOTES
SYM
-
-
GUTTER W/
DOWNSPOUTS 1. EXTEND INTEGRAL LIGHTNING PROTECTION SYSTEM TO COVER NEW
MAIN ROOF
ACTIVITY
B B
BUILDING 3069
LIGHTNING PROTECTION ROOF CONDUCTOR
37 STRAND 4/0 GAUGE COPPER WIRE
UL-APPROVED FOR LIGHTNING PROTECTION
4 COPPER ADHESIVE
CABLE FASTENER
GRADE GRADE
DETAIL
NOT TO SCALE 1
LIGHTNING PROTECTION NEW CANOPY ELEVATION 1 LIGHTNING PROTECTION NEW CANOPY ELEVATION 2 EPROJECT NO.:
1/8"=1'-0" SHEET OF
E-304
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.
DATE
-
-
2. THE EXISTING LIGHTNING PROTECTION SYSTEM SHALL
BE TESTED AND REPAIRED BY THE CONTRACTOR AS
NECESSARY (INCLUDING THE NEW ADDITION ON TOP OF
THE NEW CANOPY) TO MEET ALL NAVSEA OP-5 AND NFPA
780 REQUIREMENTS.
DESCRIPTION
DRAWING E-304.
-
1 2 3 4
LP
LP LP
CANOPY
SYM
-
-
LP LP
LP LP LP
A
GUTTER W/
DOWNSPOUTS
MAIN ROOF
LP LP LP
LOW ROOF
100'-0" B
LP LP LP
C
LP LP LP
GUTTER W/
DOWNSPOUTS
UTILITY BLDG.
APPROVED
ACTIVITY
SATISFACTORY TO DATE
B B
BUILDING 3069
TOP OF STEEL (L.P.)
EL. 38'-3"
MEZZANINE
EL. 14'-6"(T.O.GRATING)
EPROJECT NO.:
0' 20' 40' 60' 80' 100' 120' NAVFAC DRAWING NO.
1/32"=1'-0"
SHEET OF
E-305
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
ROLL-UP DOOR WIDTH
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
10'-0" RADIUS (TYP.)
2. EVERYTHING WITHIN THE HATCHED AREA IS
ENCOMPASSED BY A HAZARDOUS ATMOSPHERE RATED
AS A CLASS I, DIVISION 1, GROUPS C & D AND CLASS II,
DIVISION 1, GROUPS E, F, & G ENVIRONMENT.
DESCRIPTION
ARTICLE 500 OF NFPA 70.
-
CANOPY
SYM
-
-
1 2 3 4
EMERGENCY
SLIDE
C STAIRS SEAL
C
PROCESS ELECTRICAL
O-1 O-4
MECHANICAL
O-3
APPROVED
ACTIVITY
SATISFACTORY TO DATE
DOOR WIDTH
B B
3/16" = 1'-0"
E-306
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
FOR DETAILS SEE
-
DRAWING T-701
B MCC1
TELEPHONE
TERMINAL BOX 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
4"x4"x4" WIREWAY 1" TELEPHONE 2. FOR DETAILS OF DEMO WORK OF THE REST OF THE
WITH REMOVABLE COVER CCTV 2 6 PAIR #22 ELECTRICAL SYSTEM, SEE DRAWINGS E-201 AND E-202.
EQUIPMENT
P29
P17 P26 P73 3. EXISTING CONDUIT TO REMAIN IN PLACE FOR USAGE BY
P75 ALL NEW POWER CIRCUITS WHERE APPLICABLE. REFER
P2 1" FIBER OPTICS/
TO DRAWINGS E-203, E-204, AND E-402 FOR NEW POWER
D P2
P22 VIDEO CABLE
PLAN. D
P100 P30
P6 4. ALL EXISTING WIRING TO BE DEMOLISHED AND
~
DESCRIPTION
C222 P99 P97 REMOVED BACK TO PANEL/SOURCE.
-
P98
~ ~
SYM
CRANE 1"C-17#12
-
C221 DISPLAY DISPLAY CONSOLE
C219 C218 MOTOR DESIGNATIONS AND CONDUIT SIZES.
IOPER STARTERS
ANALOG CONVERTER WITH HMIER
BARRIER (TYP. FOR 2) PELLETIZER
K-TRON (PLC)
EXTRUDER P34 FEEDER (PLC) 1" P.A. CABLE 1
CONTROL
PANEL P1
P24
8/C GAI-TRONICS
MODEL NO. 60038-101 DEMOLITION KEYNOTES
P5 P12 ELECTRICAL P16
P18 P27 P20 P53 0-4 1"-11/C#12
P97 P7 P9
P52 CONTROL 1. EXISTING P.A. SYSTEM TO BE LEFT IN PLACE. DO NOT
P23
IOPER
DEMOLISH AND REMOVE.
P11
3/4"C-6#12 2. CCTV SYSTEM TO BE REPLACED IN KIND. SEE DRAWINGS
P14 UPS
UP TO WEIGH TRANSMITTER
P28 BATT. SUMMING BOX MEZZANINE LEVEL E-402 AND T-701 FOR DETAILS.
A P44 P22 P50
P51 3/4"C-6#12
FOR CONTINUATION SEE DWG CI-102
P21 C225 C226
J C224
PP1
IP1 UPS1 EPO LP1 RP1
1 SEAL FITTING (TYPICAL) 1"
BLH I.S.
P10 BARRIER BOX
C P56
PP1(1)
P19 P25 P13 P15 EXTRUDER
CONTROL P103 C227 (TYP. FOR 3) SEAL
C
PANEL
J ZVD'S 15 KVA TRANS. T-2 30 KVA TRANS. T-1 C230 C228
C233 C229
C231
3/C#4 W/GND 3/4" TELEPHONE IOPER J
P.A. SYSTEM SWITCH P104
3/4" FIRE ALARM MATRIX CONTROLLER C232
3/4" INSTRUMENTATION IP1 J
TCU-1 3/4" CONTROL P106 P105 WEIGH TRANSMITTER
BLH-LCP-100
INDICATOR
(TYP. FOR 3)
P34
P23
P1
MECHANICAL
P11
P30
0-3
P1
APPROVED
P57
PP1(3) FOR COMMANDER NAVFAC
B
J
3/C#4 W/GND
SECTION ACTIVITY
3/4"C-8#12
SATISFACTORY TO DATE
3/4"C, 11#12 DES DRW CHK
P58
PP1(2)
B B
BUILDING 3069
P7 P12 P27 P28
P9 P44
TO
P21 PUMPS
X
X
X
X
P10 15 KVA TRANS. P25
P20
X
P19
X
WALL MTD. T-2 X
X
VSD DRIVE
X
X
X P13 X
X FOR LFP-2
RP1 LP1 EPO UPS1 IP1 PP1
EPROJECT NO.:
SECTION
NOT TO SCALE A VSD DRIVE FOR LFP-4 1/8"=1'-0" SHEET
E-401
OF
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
FOR DETAILS SEE
DRAWING T-701
TELEPHONE
CCTV 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
MCC1 TERMINAL BOX
DATE
EQUIPMENT
~
E-001.
-
4"x4"x4" WIREWAY 1" TELEPHONE 2. FOR DETAILS OF NEW WORK OF THE REST OF THE
WITH REMOVABLE COVER 6 PAIR #22 ELECTRICAL SYSTEM, SEE DRAWING E-203 AND E-204.
DESCRIPTION
FOR CONTINUATION OF
-
CCTV SYSTEM DIAGRAM
SEE DWG T-701
SYM
CRANE
-
CONSOLE CRANE 1"C-17#12 9-COAX RG-59/U
MOTOR BELDEN #9259
STARTERS
4"x4"x4" WIREWAY 7-2PR SHLD #18
WITH REMOVABLE COVER BELDEN # 9368 BUILDING
P34 1" P.A. CABLE STEEL
P1 P12
8/C GAI-TRONICS
MODEL NO. 60038-101
NEW WORK KEYNOTES
P5 ELECTRICAL
TO TELEPHONE TERMINAL BOX
0-4 1" CONDUIT
P7 P9 WITH FIBER
TO FIRE ALARM PANEL DOOR 1. EXISTING CCTV SYSTEM TO BE REPLACED IN KIND WITH
OPTICS CABLE NEW SYSTEM. SEE DRAWING T-701 FOR DETAILS.
TO BLDG. 1424
FTU
~
FIBER OPTOCS
A CABINET MCC
SUPPLIED BY
TO REVIEW FOE
~
PP1 EMX
IP1 LP1 RP1 STATION
C P13
P10
3/4" CONDUIT
19" RACK
SEAL
C
WITH ETHERNET
15 KVA TRANS. T-2 30 KVA TRANS. T-1
CABLE
P.A. SYSTEM SWITCH 1" CONDUIT
MATRIX CONTROLLER WITH FIBER
3/4" TELEPHONE
3/4" FIRE ALARM OPTICS CABLE
P34
P1
MECHANICAL
P11
APPROVED
0-3
P1
SECTION
NOT TO SCALE B FOR COMMANDER NAVFAC
ACTIVITY
B B
BUILDING 3069
B3069 ELECTRICAL AND MECHANICAL ROOMS NEW PLAN P5
1/8" = 1'-0" P7 P12
P9
X
X
X
X
P10 15 KVA TRANS.
X
X
WALL MTD. T-2 X
X
X
X
X P13 X
X
EPROJECT NO.:
SECTION
NOT TO SCALE A 1/8"=1'-0" SHEET
E-402
OF
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
3 POSITION PUSH BUTTON
OPEN, CLOSE & STOP 1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
NEMA 4, LOCKABLE ENCLOSURE 3 POSITION PUSH BUTTON E-001.
-
OPEN, CLOSE & STOP
2 NEMA 7, LOCKABLE ENCLOSURE 2. FOR DETAILS OF NEW WORK OF THE REST OF THE
ELECTRICAL SYSTEM, SEE DRAWING E-203 AND E-204.
SAFETY EDGE 2 1
TO REVERSE 3. REFER TO DRAWINGS E-601, CI-601, AND CI-602 FOR
SAFETY EDGE POWER, CONTROL, AND INSTRUMENTATION CIRCUIT
DOOR 05 TO REVERSE
D 3/4"C-3#14
3 POSITION
PUSH BUTTON DOOR 05
DESIGNATIONS AND CONDUIT SIZES.
D
OPEN, CLOSE 3 POSITION
& STOP 3/4"C-3#14 PUSH BUTTON
DESCRIPTION
3/4"C-5#14 NEMA 4 OPEN, CLOSE
LIMIT SWITCH
-
ENCLOSURE ENCLOSURE & STOP
3/4"C-5#14 NEMA 7
LIMIT SWITCH
ENCLOSURE
SYM
1/2 ENCLOSURE
-
MOTOR
3/4"C-6#14
1/2 2
MOTOR
EP ENCLOSURE
P74 3/4"C-6#14
3/4"C-4#12 EP ENCLOSURE DEMOLITION KEYNOTES
SEAL FITTING P74
AGV AIR LOCK (TYPICAL) 3/4"C-4#12
G-2 SEAL FITTING 1. EXISTING FLEX CONNECTIONS TO BE DEMOLISHED AND
P73 AGV AIR LOCK (TYPICAL)
3/4"C-4#12 REMOVED.
G-2 P73
TO MCC 3/4"C-4#12 2 2. EXISTING PUSH BUTTON STATIONS TO BE DEMOLISHED
AND REMOVED.
TO MCC
C 3/4"C-3#14
SEAL
C
(INTERLOCK)
FLEX (TYPICAL) 3/4"C-3#14
(INTERLOCK)
1 EXPLOSION PROOF FLEX (TYPICAL) NEW WORK KEYNOTES
DOOR 03
1. NEW EXPLOSION PROOF FLEX CONNECTIONS TO
DOOR 03 REPLACE DEMOLISHED FLEX CONNECTIONS AND NEW
TRACK MOUNTED
LIMIT SWITCH EXPLOSION PROOF PUSHBUTTON STATIONS TO
1 TRACK MOUNTED REPLACE DEMOLISHED PUSHBUTTON STATIONS. NEW APPROVED
SATISFACTORY TO DATE
DOOR 05 DOOR 05
DES DRW CHK
BUILDING 3069
AGV AIR LOCK
G-2 G-2
3/4"C-6#14 3/4"C-6#14
SEAL FITTING SEAL FITTING
(TYPICAL) MOTOR (TYPICAL) MOTOR
P76 P76
3/4"C-4#12 3/4"C-4#12
EP ENCLOSURE 3 POSITION PUSH BUTTON EP ENCLOSURE
1/2 OPEN, CLOSE & STOP 1/2 3 POSITION PUSH BUTTON
3 POSITION NEMA 4, ENCLOSURE 3 POSITION OPEN, CLOSE & STOP
& STOP
~
~
A NEMA 4 NEMA 7 A
ENCLOSURE 3/4"C-3#14 ENCLOSURE 3/4"C-3#14
DOOR 03 DOOR 03
3/4"C-5#14 SAFETY EDGE 3/4"C-5#14 SAFETY EDGE 2
2
TO REVERSE
1
TO REVERSE GRAPHIC SCALE SCALE:
EPROJECT NO.:
TO MCC TO MCC
P75 2 P75 1 CONSTR. CONTR. NO.
3/4"C-4#12 3/4"C-4#12
0' 1' 2' 4' NAVFAC DRAWING NO.
POWER DEMO PLAN FOR M.O. DOOR 03 NEW POWER PLAN FOR M.O. DOOR 03 1/2"=1'-0" SHEET OF
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
LUMINAIRE REQUIREMENTS:
D LUMINAIRE REQUIREMENTS: D
1. HOUSING - DIE-FORMED, COLD ROLLED STEEL, WITH ONE-PIECE LOWER
REFLECTOR HAVING TEXTURED, HIGH REFLECTANCE, WHITE POLYESTER 1. HOUSING - HIGH IMPACT AND SCRATCH RESISTANT DIE CAST ALUMINUM
POWDER-COATED FINISH. HOUSING AND POLYCARBONATE COVER. OPTIONAL SIZES OF 2FT LONG AND 4FT
DESCRIPTION
LONG VERSIONS AVAILABLE.
-
2. LIGHT SOURCE - UPWARD-FACING LEDS WITH DIFFUSE LENS TO ELIMINATE
DIRECT VIEW OF LIGHT SOURCE. 4000K COLOR TEMPERATURE UON, MAXIMUM 2. LIGHT SOURCE - LED AREA LIGHT WITH CRI OF AT LEAST 80.
BINNING TOLERANCE OF A 4-STEP MCADAM ELLIPSE, MINIMUM EFFICACY OF 120
SYM
-
-
LUMENS/WATT, WITH A MINIMUM CRI OF 80. INITIAL LUMEN OUTPUT AS 3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9
LUMINAIRE REQUIREMENTS:
INDICATED IN LUMINAIRE SCHEDULE. PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL
HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN
LUMINAIRE REQUIREMENTS: 1. HOUSING/TRIM - IMPACT AND SCRATCH RESISTANT DIE CAST ALUMINUM
3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9 LUMINAIRE SCHEDULE.
HOUSING FOR BACK MOUNTING WITH RED UNIVERSAL, DIRECTIONAL CHEVRON
PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL
1. HOUSING/TRIM - IMPACT AND SCRATCH RESISTANT DIE CAST ALUMINUM INSERTS. DOUBLE-FACED MODEL.
HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN 4. CONTROL - AUTOMATIC ON/OFF CONTROL WITH MOTION DETECTION BY
HOUSING FOR BACK MOUNTING WITH RED UNIVERSAL, DIRECTIONAL CHEVRON
LUMINAIRE SCHEDULE. OCCUPANCY SENSOR AND MANUAL ON/OFF CONTROL.
INSERTS. DOUBLE-FACED MODEL. 2. LETTERS/CHEVRONS - MINIMUM 6" HIGH WITH 3/4" STROKE AND RED LETTERS.
PROVIDE CHEVRONS AS EITHER LEFT, RIGHT, OR BOTH DIRECTIONS AS
4. CONTROL - AUTOMATIC ON/OFF CONTROL WITH MOTION DETECTION BY 5. EMERGENCY BATTERY PACK - SOLID-STATE, CONSTANT-CURRENT TYPE
2. LETTERS/CHEVRONS - MINIMUM 6" HIGH WITH 3/4" STROKE AND RED LETTERS. INDICATED ON PLAN.
OCCUPANCY SENSOR AND MANUAL ON/OFF CONTROL. BATTERY CHARGER WITH MAINTENANCE-FREE, NICKEL-CADMIUM BATTERY,
PROVIDE CHEVRONS AS EITHER LEFT, RIGHT, OR BOTH DIRECTIONS AS
AC-ON INDICATOR LAMP AND TEST SWITCH.
INDICATED ON PLAN. 3. EMERGENCY PACK - SOLID-STATE, CONSTANT-CURRENT TYPE BATTERY
5. EMERGENCY BATTERY PACK - SOLID-STATE, CONSTANT-CURRENT TYPE
CHARGER WITH MAINTENANCE-FREE NICKEL-CADMIUM BATTERY, AC-ON
BATTERY CHARGER WITH MAINTENANCE-FREE, NICKEL-CADMIUM BATTERY, 6. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II,
3. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II, INDICATOR LAMP, AND TEST SWITCH. INCLUDES TWO LED LIGHTS SUPPORTED
AC-ON INDICATOR LAMP AND TEST SWITCH. DIVISION 1, GROUPS E, F, & G ENVIRONMENTS.
DIVISION 1, GROUPS E, F, & G ENVIRONMENTS. BY BATTERY PACK.
6. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS 7. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS
4. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS 4. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS
COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL
COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL
924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN 924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN
924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN 924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN
INDICATED. INDICATED. INCLUDES NEC TEMPERATURE CLASSIFICATION OF T4.
INDICATED. INCLUDES NEC TEMPERATURE CLASSIFICATION OF T4. INDICATED.
LINEAR LED LIGHT HAZARDOUS LINEAR LED LIGHT HAZARDOUS EXIT LIGHT EXIT AND EMERGENCY LIGHT
TYPE: A1 TYPE: A2 REVISED: TYPE: X1 REVISED: TYPE: X2
APPROVED
ACTIVITY
SATISFACTORY TO DATE
BUILDING 3069
3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9 LUMINAIRE SCHEDULE.
PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL 3. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9
X2 LED - 120VAC - CEILING EXIT SIGN
HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN PF, OPERATING VOLTAGE OF 120-277V, THERMAL MANAGEMENT, < 20% TOTAL 4. CONTROL - AUTOMATIC ON/OFF CONTROL OPERATED BY PHOTOCELL FOR
LUMINAIRE SCHEDULE. HARMONIC DISTORTION. STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED IN DAYLIGHT SENSING.
LUMINAIRE SCHEDULE. H1 LED 4000 277VAC WALL 2'x4', HAZARDOUS RATED
104
4. CONTROL - AUTOMATIC ON/OFF CONTROL WITH FOR MOTION DETECTION BY 5. EMERGENCY BATTERY PACK - SOLID-STATE, CONSTANT-CURRENT TYPE
OCCUPANCY SENSOR AND MANUAL ON/OFF CONTROL. 4. CONTROL - AUTOMATIC ON/OFF CONTROL WITH MOTION DETECTION BY BATTERY CHARGER WITH MAINTENANCE-FREE, NICKEL-CADMIUM BATTERY,
OCCUPANCY SENSOR AND MANUAL ON/OFF CONTROL. AC-ON INDICATOR LAMP AND TEST SWITCH. H2 LED 4000 277VAC 92 CEILING HAZARDOUS RATED
5. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II,
DIVISION 1, GROUPS E, F, & G ENVIRONMENTS. 5. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II, 6. RATED FOR USAGE IN CLASS I, DIVISION 1, GROUPS C & D AND CLASS II, 120VAC
DIVISION 1, GROUPS E, F, & G ENVIRONMENTS. DIVISION 1, GROUPS E, F, & G ENVIRONMENTS. H3 LED 4000 120 WALL HAZARDOUS RATED
277VAC
6. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS
COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL 6. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS 7. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS
924 WHEN EQUIPPED WITH EMERGENCY BATTERY BACK-UP. IC RATED WHEN COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL COMPLIANT. COMPLIES WITH LM79, LM80 AND TM21 TESTING STANDARDS. UL
HAZARDOUS LED TASK LIGHT HAZARDOUS HIGH BAY LED LIGHT HAZARDOUS LED WALL LIGHT EPROJECT NO.:
SHEET OF
E-501
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
A
B
C
D
1
1
2
2
3
3
4
4
5
SHEET
SCALE:
- - - -
EPROJECT NO.:
- - - -
DRW
OF
SATISFACTORY TO DATE
BUILDING 3069 - - - -
FOR COMMANDER NAVFAC
- - - -
E-502
- - - -
A
B
C
D
1 2 3 4 5
APPR
-
DATE
-
-
EXISTING CONDUIT AND WIRE SCHEDULE EXISTING CONDUIT AND WIRE SCHEDULE EXISTING CONDUIT AND WIRE SCHEDULE
CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION
FROM TO FROM TO FROM TO
NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING
P1 3" 3-250Kcmil #1 600V MCC1 CH-1 P50 1" 10#14 #14 600V PELLETIZER CONTROL PANEL PELLETIZER POWER PATCH PANEL P97 3/4" 2#12 #12 600V JB IP1
P2 3" 3-350Kcmil #1 600V MCC1 EXTRUDER CONTROL PANEL P51 3/4" 2#12 #12 600V RP1 EF4 P98 3/4" 2#12 #12 600V CONVERTER #2 JB
D P3 3" 3-500Kcmil #1 600V EXTRUDER CONTROL PANEL EXTRUDER P52 1 1/4" 30#12 #12 600V K-TRON CONTROL PANEL PATCH PANEL MEZZ. LEVEL P99 3/4" 2#12 #12 600V CONVERTER #1 JB
D
P4 3/4" 3#12 #12 600V EXTRUDER CONTROL PANEL CIRCULATING PUMP P53 1 1/4" 30#12 #12 600V K-TRON CONTROL PANEL PATCH PANEL MEZZ. LEVEL P100 3/4" 2#12 #12 600V JB JB
DESCRIPTION
-
-
P5 2" 3#4/0 #6 600V MCC1 PANEL PP1 P54 3/4" 3#12 #12 600V MCC1 TOULENE VAPOR EXHAUST FAN P101 3/4" 2#12 #12 600V DC POWER SUPPLY #2 JB
P6 1" 3#4 #8 600V MCC1 K-TRON CONTROL PANEL P55 P102 3/4" 2#12 #12 600V DC POWER SUPPLY #1 JB
SYM
-
-
P7 1 1/4" 4#2 #8 600V MCC1 PANEL LP1 P56 1" 3#4 #8 600V PP1 (1) JB P103 3/4" 2#12 #12 600V BLH-LCP-100 JB
INDICATOR
P8 3/4" 3#10 #10 600V MCC1 CRANE MOTOR STARTERS P57 1" 3#4 #8 600V PP1 (3) JB P104 3/4" 2#12 #12 600V BLH-LCP-100 JB
INDICATOR
P9 3/4" 3#8 #10 600V MCC1 TRANSFORMER T-1 P58 1" 3#4 #8 600V PP1 (2) JB P105 3/4" 2#12 #12 600V BLH-LCP-100 JB
INDICATOR
IP1
P10 1 1/4" 4#2 #8 600V TRANSFORMER T-1 PANEL RP1 P59 P106 3/4" 6#12 #12 600V JB
(CKT'S 4, 6 & 8)
P11 1" 4#6 #10 600V PANEL RP1 PANEL RP2 P60 P107 3/4" 8#14 #14 600V POWER PATCH PANEL NO. 2 IOPER
P12 3/4" 3#10 #10 600V MCC1 TRANSFORMER T-2 P61 P108 3/4" 3#12 #12 600V EXTRUDER CONTROL PANEL COOLING FAN
P13 1" 4#6 #10 600V TRANSFORMER T-2 PANEL IP1 P62
P14 3/4" 2#6 #10 600V PANEL IP1 UPS P63 3/4" 2#12 #12 600V JB IOPPBO
P15 3/4" 2#6 #10 600V UPS PANEL UPS1 P64 3/4" 2/C#16 SHLD 600V JB IOPPBO PSL1050
P16 3/4" 3#12 #12 600V PELLETIZER CONTROL PANEL PELLETIZER POWER PATCH PANEL P65 3/4" 4#12 #12 600V IP1 (3, 4) JB FOR WT0506, FT0501
C P17 1 1/2"
24#12
10#10
#10 600V CRANE MOTOR STARTERS PANEL CRANE FESTON POWER JB-1 P66 3/4" 2#12 #12 600V JB FT0501 SEAL
C
P18 3/4" 3#12 #12 600V MCC1 VFD P67
P19 3/4" 3#12 #12 600V VFD LIQUID TANK #1 PUMP #1 P68 3/4" 2#12 #12 600V JB FT0521
P20 3/4" 3#12 #12 600V MCC1 VFD P69 3/4" 6#12 #12 600V IP1 (7, 8 & 9) JB FOR WT0526, FT0523, FT0524
P21 3/4" 3#12 #12 600V VFD LIQUID TANK #1 PUMP #4 P70 3/4" 2#12 #12 600V IP1 FT0523
P24 3/4" 3#12 #12 600V MCC1 VFD P73 3/4" 3#12 #12 600V MCC1 M.O. DOOR CONTROL PANEL FOR COMMANDER NAVFAC
ACTIVITY
P25 3/4" 3#12 #12 600V VFD LIQUID FEED TANK #2 PUMP #2 P74 3/4" 3#12 #12 600V M.O. DOOR CONTROL PANEL M.O. DOOR MOTOR
P26 3/4" 3#12 #12 600V MCC1 LIQUID FEED TANK #2 AGITATOR P75 3/4" 3#12 #12 600V MCC1 M.O. DOOR CONTROL PANEL
P27 3/4" 3#12 #12 600V MCC1 VFD P76 3/4" 3#12 #12 600V M.O. DOOR CONTROL PANEL M.O. DOOR MOTOR
SATISFACTORY TO DATE
P28 3/4" 3#12 #12 600V VFD LIQUID FEED TANK #3 PUMP #3 P77
DES DRW CHK
P29 3/4" 3#12 #12 600V MCC1 LIQUID FEED TANK #3 AGITATOR P78 3/4" 4#12 #12 600V IOPER (POWER) JB
P30 1 1/4" 3#1 #6 600V EXTRUDER CONTROL PANEL EXTRUDER CHILLER P79 3/4" 2#12 #12 600V JB IOPPB1
P31 3/4" 3#12 #12 600V EXTRUDER CONTROL PANEL LUBE OIL PUMP P80 3/4" 2-2/C#16 600V IOPER JB FOR
B B
P36 3/4" 3#12 #12 600V MCC2 VACUUM PUMP CONTROL PANEL P85
BUILDING 3069
P37 1" 3#4 #8 600V MCC2 AHU-1 CONTROL PANEL P86
P40 3/4" 3#8 #10 600V AHU-1 CONTROL PANEL CHP-1 P89
P41 3/4" 3#12 #12 600V VACUUM PUMP CONTROL PANEL VACUUM PUMP VACP-1 P90
P48
SCALE:
P49 EPROJECT NO.:
SHEET OF
E-601
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
NEW CONDUIT AND WIRE SCHEDULE NEW CONDUIT AND WIRE SCHEDULE
CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION
FROM TO FROM TO
NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING
DESCRIPTION
-
-
P5 P54
P6 P55
SYM
-
-
P7 1 1/4" 4#2 #8 600V MCC1 PANEL LP1 P56
P11 1" 4#6 #10 600V PANEL RP1 PANEL RP2 P60
P13 1" 4#6 #10 600V TRANSFORMER T-2 PANEL IP1 P62
P14 P63
P15 P64
P16 P65
C P17 1 1/2"
24#12
10#10
#10 600V CRANE MOTOR STARTERS PANEL CRANE FESTOON POWER JB-1 P66 SEAL
C
P18 P67
P19 P68
P20 P69
P21 P70
P22 P71
P24 P73 3/4" 3#12 #12 600V MCC1 M.O. DOOR CONTROL PANEL FOR COMMANDER NAVFAC
ACTIVITY
P25 P74 3/4" 3#12 #12 600V M.O. DOOR CONTROL PANEL M.O. DOOR MOTOR
P26 P75 3/4" 3#12 #12 600V MCC1 M.O. DOOR CONTROL PANEL
P27 P76 3/4" 3#12 #12 600V M.O. DOOR CONTROL PANEL M.O. DOOR MOTOR
SATISFACTORY TO DATE
P28 P77
DES DRW CHK
P29 P78
P30 P79
P31 P80
B B
P35 P84
P36 P85
BUILDING 3069
P37 1" 3#4 #8 600V MCC2 NEW CU2 P86
P41 P90
P45
A P46 A
P47
P48
SCALE:
P49 EPROJECT NO.:
NEW CIRCUIT
NAVFAC DRAWING NO.
SHEET OF
E-602
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
D PANEL SCHEDULE LP1 PANEL SCHEDULE RP1 PANEL SCHEDULE PP1 D
NO. RP1 LOCATION: ELECTRICAL ROOM (G-4) NO. PP1 LOCATION: ELECTRICAL ROOM (G-4)
NO. LP1 LOCATION: ELECTRICAL ROOM (G-4)
DESCRIPTION
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 100 A MCB 480 V, 3 PH., 3 W 225 A MAINS, 200 A MCB
480/277 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 100 A MCB
-
10,000 AIC AT 120 V GND. BUS SURFACE MTG. 14,000 AIC AT 277 V GND. BUS SURFACE MTG.
14,000 AIC AT 277 V GND. BUS SURFACE MTG.
LOAD CKT. BKR PHASE CKT. BKR LOAD LOAD CKT. BKR PHASE CKT. BKR LOAD
LOAD CKT. BKR PHASE CKT. BKR LOAD SERVES EQUIPMENT SERVES EQUIPMENT
SYM
SERVES EQUIPMENT SERVES EQUIPMENT WATTS WATTS SERVES EQUIPMENT SERVES EQUIPMENT
POLES TRIP NO. A B C NO. TRIP POLES WATTS NO. TRIP POLES WATTS
-
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS POLES TRIP NO. A B C
EXHAUST FAN EF-1, ELEC ROOM 100 1 20 1 300 2 20 1 200 EXIT SIGNS 30433
PROCESS 1-1 AIR LOCK 0-2 2700 1 20 1 2800 2 20 1 100 LIGHTING ELECTRIC ROOM 0-4
EXHAUST FAN EF-2, MECH ROOM 100 1 20 3 600 4 20 1 500 FIRE ALARM CONTROL PANEL TEMPERATURE CONTROL TCU-1 45,650 3 80 1 30433 2 80 3 45,650 TEMPERATURE CONTROL TCU-3
LIGHTING MEZZANNE 1-1 1600 1 20 3 2350 4 20 1 750 LIGHTING MECH ROOM 0-3
EXHAUST FAN EF-4, AIR LOCK 528 1 20 5 708 6 20 1 180 RECEPTACLES ELECTRIC ROOM 30433
LIGHTING UNDER MEZZANNE 0-1 2050 1 20 5 2900 6 20 1 850 LIGHTING UTILITY BUILDING 2-1
RECEPTACLES MECH ROOM 720 1 20 7 2529 8 20 1 1809 RECEPTACLES ELECTRIC ROOM 15217
SPARE 1 20 7 8 20 1 SPARE
RECEPTACLES PROCESS ROOM 360 1 20 9 900 10 20 1 540 RECEPTACLES ELECTRIC ROOM TEMPERATURE CONTROL TCU-2 45,650 3 80 3 15217 4 30 3 PELLETIZER CONTROL PANEL
SPARE 1 20 9 10 20 1 SPARE
RECEPTACLES PROCESS ROOM 360 1 20 11 720 12 20 1 360 RECEPTACLES ELECTRIC ROOM 15217
SPARE 1 20 11 12 20 1 SPARE
BIN CAPPING STATION 100 1 20 13 640 14 20 1 540 RECEPTACLES PROCESS ROOM
SPACE 13 14 SPACE
P.A. SYSTEM 100 1 20 15 460 16 20 1 360 RECEPTACLES PROCESS ROOM SPARE 3 20 5 6 20 3 SPARE
SPACE 15 16 SPACE
MINI-CAMERAS 200 1 20 17 200 18 20 1 SPARE
SPACE 17 18 SPACE
SPARE 1 20 19 20 20 1 SPARE
SPACE 19 20 SPACE
SPARE 1 20 21 22 20 1 SPARE SPARE 3 20 7 8 SPACE
SPACE 21 22 SPACE
SPARE 1 20 23 24 20 1 SPARE
SPACE 23 24 SPACE
SPACE 25 26 20 1 SPARE
TOTALS 6350 2800 2350 2900 1700 TOTAL
SPACE 27 28 SPACE SPACE 9 10 SPACE
TOTAL CONNECTED LOAD 8050 WATTS
SPACE 29 30 SPACE
SPACE 31 32 SPACE
SPACE 33 34 SPACE SPACE 11 12 SPACE
BUILDING 3069
FT-0521 100 1 20 5 200 6 20 1 100 WT-0516
FT-0523 100 1 20 7 200 8 20 1 100 WT-0526
FT-0524 100 1 20 9 600 10 20 1 500 FIRE ALARM DELUGE SYSTEM
SPARE 1 20 11 500 12 20 1 500 SURGE PROTECTOR
SPARE 1 20 13 200 14 20 1 200 PORTABLE SCALES
SPARE 1 20 15 16 20 1 SPARE
SPARE 20 17 18 SPACE
SPARE 20 19 20 SPACE
SPACE 20 21
22 50 2 UPS
SPACE 20 23
TOTALS 500 1500 800 700 2500 TOTAL
TOTAL CONNECTED LOAD 3000 WATTS
SCALE:
EPROJECT NO.:
SHEET OF
E-603
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
-
PANEL SCHEDULE LP1 PANEL SCHEDULE RP1
DATE
-
-
NO. RP1 LOCATION: ELECTRICAL ROOM (G-4)
NO. LP1 LOCATION: ELECTRICAL ROOM (G-4)
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 100 A MCB
480/277 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 100 A MCB
10,000 AIC AT 120 V GND. BUS SURFACE MTG.
14,000 AIC AT 277 V GND. BUS SURFACE MTG.
LOAD CKT. BKR PHASE CKT. BKR LOAD
LOAD CKT. BKR PHASE CKT. BKR LOAD SERVES EQUIPMENT SERVES EQUIPMENT
D SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
SERVES EQUIPMENT WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
D
EXHAUST FAN EF-1, ELEC ROOM 100 1 20 1 300 2 20 1 200 EXIT SIGNS
PROCESS 1-1 AIR LOCK 0-2 2700 1 20 1 3700 2 20 1 1000 LIGHTING ELECTRIC ROOM 0-4
EXHAUST FAN EF-2, MECH ROOM 100 1 20 3 600 4 20 1 500 FIRE ALARM CONTROL PANEL
MEZZANINE TASK LIGHTING 0-1 1100 1 20 3 1800 4 20 1 700 LIGHTING MECH ROOM 0-3
DESCRIPTION
EXHAUST FAN EF-4, AIR LOCK 528 1 20 5 528 6 20 1 SPARE
LIGHTING UNDER MEZZANINE 0-1 1600 1 20 5 1600 6 20 1 SPARE
-
6300 5200 RECEPTACLES MECH ROOM 900 1 20 7 900 8 20 1 SPARE
LIGHTS OUTSIDE ROOMS 0-3, 0-4 1100 1 20 7 8 20 1 HIGH BAY LIGHTING 0-1
RECEPTACLES PROCESS ROOM 540 1 20 9 1440 10 20 1 900 RECEPTACLES ELECTRIC ROOM
WALL LIGHTS PROCESS AREA 0-1 1540 1 20 9 3640 10 20 1 2100 LIGHTS OUTSIDE ROOMS 0-1, 1-1
SYM
720 1 20 11 1440 12 20 1 720
-
60 1 20 11 860 12 20 1 RECEPTACLES PROCESS ROOM RECEPTACLES ELECTRIC ROOM
RED STROBE WARNING LIGHT 800 CANOPY LIGHTS
1 20 SPARE 1 20 13 900 14 20 1 900 RECEPTACLES PROCESS ROOM
SURGE PROTECTOR 500 13 500 14 SPACE
P.A. SYSTEM 100 1 20 15 640 16 20 1 540 RECEPTACLES PROCESS ROOM
SPACE 15 16 SPACE
MINI-CAMERAS 200 1 20 17 200 18 20 1 SPARE
SPACE 17 18 SPACE
19 3016 20 20 1 SPARE
SPACE 19 20 SPACE NEW EWH-1 6032 2 40
21 3016 22 20 1 SPARE
SPACE 21 22 SPACE
SURGE PROTECTOR 500 1 20 23 500 24 20 1 SPARE
SPACE 23 24 SPACE
SPACE 25 26 20 1 SPARE
TOTALS 8600 10500 5440 2460 9800 TOTAL
SPACE 27 28 SPACE
TOTAL CONNECTED LOAD 18400 WATTS
NEW CIRCUIT TO BE RUN FROM PANEL SPACE 29 30 SPACE
SPACE 31 32 SPACE
SPACE 33 34 SPACE
SPACE 35 36 SPACE
PANEL SCHEDULE RP2 SPACE 37 38
C NO. RP2 LOCATION:UTILITY BUILDING
SPACE 39 40 60 3 PANEL RP2, UTILITY BUILDING SEAL
C
SPACE 41 42
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 60 A MCB TOTALS 9720 5616 5696 2168 3760 TOTAL
10,000 AIC AT 120 V GND. BUS SURFACE MTG. TOTAL CONNECTED LOAD 13480 WATTS
BREAKER SHALL BE PROVIDED WITH LOCKABLE ON HANDLE
LOAD CKT. BKR PHASE CKT. BKR LOAD NEW CIRCUIT TO BE RUN FROM PANEL
SERVES EQUIPMENT SERVES EQUIPMENT
WATTS POLES TRIP NO. A B C NO. TRIP POLES WATTS
LIGHTING UTILITY BUILDING 2-1 1130 1 20 1 1130 2 20 1 SPARE
RECEPTACLES UTILITY BUILDING 720 1 20 3 1248 4 20 1 528 EXHAUST FAN EF-3
APPROVED
RECEPTACLES UTILITY BUILDING 720 1 20 5 820 6 20 1 100 M.O. DAMPER MD-1
AD-1 CONTROL POWER 75 1 20 7 375 8 20 1 300 M.O. DAMPER MD-2A, 2B, AND 2C FOR COMMANDER NAVFAC
SPACE 19 20 SPACE 480 V, 3 PH., 3 W 225 A MAINS, 200 A MCB DES DRW CHK
BUILDING 3069
208/120 V, 3 PH., 4 W 100 A MAINS, 100 A SOLID NEUTRAL 60 A MCB 167
SHEET OF
E-604
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
-
EXISTING 4" RSC, 3#1/0, 15KV CABLE
DATE
-
-
1000kVA 13.2kV - 480/277V
3Ø., 4W., 60Hz
EXISTING PAD MOUNTED TRANSFORMER
D EPO
P46
E 1200AF
D
1200AT
L-S-I-GR
DESCRIPTION
3
1200/5
-
POWER MOTOR CONTROL CENTER MCC1
METER
SYM
-
-
480/277V., 3Ø 4W., 1200A. BUS 42,000 AIC
600AS 600AS 30AS 30AS 200AS 100AS 100AS 30AS 60AS 30AS 100AS 30AS 30AS 30AS 30AS 30AS 60AS 30AS 30AS 100AS 30AS
500AF 500AF 20AF 30AF 200AF 80AF 100AF 30AF 45AF 25AF 70AF 6AF 10AF 10AF 6AF 10AF 60AF 6AF 10AF 70AF 15AF
1 1 1 1
PROTECTOR
R R R R
G G G G
SURGE
H H H H
O O O O
A A A A
(2) P1 (2)P2 P5 P6 P7 P8 P9 P12 P18 P20 P22 P26 P P27 P29 P P54
30kVA 15kVA P24 L L
C C
T-1 480-208/120V T-2 480-208/120V
3Ø., 4W. 3Ø., 4W.
P14
UPS 7.5 KVA
C CONT. CONT. CRANE
P10 P13
208V IN
208/120V OUT
P
L
P
L
P
L
P
L
P
L
SEAL
C
PANEL PANEL MOTOR C C C C C
STARTERS P11 P15
30A
VFD P VFD P VFD P VFD P P VFD P P
P52, P53, L L L L L L L WP
P3 P31 P4 P30 P17 C C C C C C C
P19 P21 P44 P25 P28
CRANE FESTON S S S S S S S
(TEMP CONTROLS)
215 60 15 S S
UTILITY BUILDING
250 5 7 1/2 2 S 3 S 3 S 1 S 3 S 1 3 3
208/120V, 3Ø, 4W
208/120V, 1Ø, 3W
LIGHTING PANEL
480/277V, 3Ø, 4W
208/120V, 3Ø, 4W
KW KW KW POWER JB
DISTRIBUTION
MISC. POWER
INST. POWER
FLUID FILTER
LIQUID FEED
LIQUID FEED
480V, 3Ø, 3W
LIQUID FEED
LIQUID FEED
LIQUID FEED
LIQUID FEED
LIQUID FEED
UPS POWER
HVAC EXTRUDER
HYDRAULIC
PANEL PP1
EXTRUDER
AGITATOR
AGITATOR
AGITATOR
CHILLER
FEEDERS
TOULENE
EXHAUST
LUBE OIL
PUMP #3
PUMP #1
PUMP #4
PUMP #2
TSECH-1
CHILLER
TANK #3
TANK #3
TANK #1
TANK #1
TANK #1
TANK #2
TANK #2
K-TRON
POWER
VAPOR
CRANE
SPARE
SPARE
SPARE
SPARE
SOLID
PUMP
PUMP
UPS1
APPROVED
FAN
RP1
RP2
LP1
IP1
FOR COMMANDER NAVFAC
ACTIVITY
MOTOR CONTROL CENTER MCC2
30AS 30AS 30AS 100AS 30AS 60AS 30AS 60AS 100AS 30AS 60AS 400AS 60AS 60AS 30AS 30AS 30AS 30AS 60AS 30AS 60AS SATISFACTORY TO DATE
15AF 15AF 20AF 100AF 30AF 60AF 30AF 60AF 70AF 6AF 50AF 250AF 40AF 40AF 3AF 3AF 20AF 20AF 60AF 30AF 60AF
DES DRW CHK
P34
1 2 1 1 2
R R R R R
B G G
B
BUILDING 3069
LIQUID FEEDLIQUID FEED
LIQUID FEED LINE
LP1 SPARE CRANE 7.5 7.5 30 25 30AS 22 22
TANK #1 TANK #2 TANK #2 15 10 15 5 2 1/2 1/2
KW KW KW KW 15AF KW KW
ROTOR WHEEL
REACTIVATION
PUMP #1 PUMP #2 AGITATOR
AIR COMPRESSOR
AGV AIRLOCK
AGV AIRLOCK
WATER PUMP
UNIT HEATER
UNIT HEATER
MECH. ROOM
TCU CHILLER
BLOWER
BLOWER
POWER TOULENE TRANS. T-1
ELEC. ROOM
LIQUID FEED
LIQUID FEED
METER ACU-2
M.O. DOOR
M.O. DOOR
TANK #3 TANK #3 VAPOR RP1 60AS 100AS
OIL-FREE
VACUUM
200AS PUMP #3 AGITATOR 60ASEXHAUST FAN 60AS 50AF 70AF
TCCH-2
VACP-1
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EUH-1
EUH-2
ACU-1
ACU-2
CHP-1
PUMP
200AF 30AS 6AF 40AF 45AF OIL-FREE
AC-1
EPROJECT NO.:
E-701
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
-
4" RSC, 3#1/0, 15KV CABLE
DATE
-
-
1000kVA 13.2kV - 480/277V
3Ø., 4W., 60Hz
PAD MOUNTED TRANSFORMER
D P46
D
EPO E 1200AF
1200AT
DESCRIPTION
L-S-I-GR
3
-
1200/5
SYM
-
-
480/277V, 3Ø, 4W, 1200A BUS 42,000 AIC
600AS 600AS 30AS 30AS 200AS 100AS 100AS 30AS 60AS 30AS 100AS 30AS 30AS 30AS 30AS 30AS 60AS 30AS 30AS 100AS 30AS
*150AF 500AF 20AF 30AF 200AF 80AF 100AF 30AF 45AF 25AF 70AF 6AF 10AF 10AF 6AF 10AF 60AF 6AF 10AF 70AF 15AF
1 1 1 1
PROTECTOR
R R R R
G G G G
SURGE
H H H H
O O O O
A A A A
P1 P5 P7 P8 P9 P12
30kVA 15kVA
T-1 480-208/120V T-2 480-208/120V
3Ø., 4W. 3Ø., 4W.
C CRANE
SEAL
C
P10 P13
MOTOR
STARTERS P11
52.5 P17
*SPD *SPD *SPD *SPD *SPD
KW
15 CRANE FESTON
(TEMP CONTROLS)
UTILITY BUILDING
POWER JB
208/120V, 3Ø, 4W
LIGHTING PANEL
480/277V, 3Ø, 4W
208/120V, 3Ø, 4W
KW
HVAC CHILLER
DISTRIBUTION
MISC. POWER
INST. POWER
480V, 3Ø, 3W
PANEL PP1
NEW CU-1
POWER
SPARE
CRANE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
APPROVED
RP1
RP2
LP1
IP1
FOR COMMANDER NAVFAC
ACTIVITY
EXISTING MOTOR CONTROL CENTER MCC2
30AS 30AS 30AS 100AS 30AS 60AS 30AS 60AS 100AS 30AS 60AS 400AS 60AS 60AS 30AS 30AS 30AS 30AS 60AS 30AS 60AS SATISFACTORY TO DATE
15AF 15AF 20AF *6AF 30AF 60AF 30AF 60AF *50AF 6AF 50AF 250AF 40AF 40AF 3AF 3AF 20AF 20AF 60AF 30AF 60AF
DES DRW CHK
P34
1 2 1 1 2
R R R R R
G G G G G
B B
CONT.
PANEL
21.5 P74 P76
KW
BUILDING 3069
7.5 7.5 5
11.5 3 1/2 1/2
SPARE SPARE SPARE LP1 SPARE CRANE KW KW KW INCOMING EUH-1
31.5
30AS 100AS 100AS 30AS KW LINE 30AS
AIR COMPRESSOR
30AS
6AF 6AF 100AF 70AF 30AF 15AF
PP1
ROTOR WHEEL
REACTIVATION
HVAC CHILLER
POWER
AGV AIRLOCK
AGV AIRLOCK
TRANS. T-1
UNIT HEATER
UNIT HEATER
RP1
M.O. DOOR
M.O. DOOR
PROCESS
OIL-FREE
NEW CU-2
BLOWER
BLOWER
200AS 30AS 60AS 60AS 60AS 100AS
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EUH-1
EUH-2
OIL-FREE
SPARE SPARE SPARE COMP. AC-1 SPARE
SPARE
INCOMING 30AS 100AS NEW IDS 100AS 30AS
LINE 10AF 70AF *6AF 30AF
1200A NEW CU-2
MAIN SPARE M.O. DOOR SPARE SPARE SPARE NOTES:
SPARE
TRANS. T-2
SPD SPARE EUH-2 SPARE
A 30AS
IP1
30AS
SPARE
60AS 60AS 30AS
A
30AF 25AF 60AF 40AF 15AF
15'-5" 3'-4"
NAVFAC DRAWING NO.
FRONT VIEW-SWITCHGEAR/MOTOR CONTROL CENTER MCC1 FRONT VIEW-MOTOR CONTROL CENTER MCC2
SHEET OF
E-702
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
ACU-1
DESCRIPTION
EMERGENCY
-
SHUTDOWN
BIN CAPPING STATION PUSHBUTTON
CONTROL CABINET HS-0010 TELEPHONE
SYM
TERMINAL BOX
-
A
~
C206
C272 MCC1
J
C205 EPO C189 C190
CRANE FESTOON
C204 C191
CONTROL JUNCTION BOX
EXTRUDER (PLC) C274 CRANE
PROCESS MOTOR
J AT0400
0-1 C273 STARTERS
C175 IOPER CRANE ASH0400
C174 PORTABLE P78 P80
CONSOLE
15'-2"
ASHH0400
C173 SCALE HMIER FSLL0415
K-TRON CONTROL
C176 EQUIPMENT PANEL
C177
~~
~ ~ ~~~~
PELLETIZER (PLC)
~ ~~~
~~~
FV1106 FV1104 FV1108 PSL1045
~ ~ ~~
IOPPBI
~~
~
C178
C181 J
ELECTRICAL
IOPPBO
P79 P63 UPS1(4)
C180 P81 J 0-4
C179 P64 FOR ADDITIONAL ELECTRICAL
P23 C243 WORK IN ELECTRICAL ROOM
EPO
J SEE ENLARGED PLAN DWG E-401 AND E-402
3/4" CONTROLNET
B
DPT-0404 CABLE
C244
C80 C79 C78 C88 C250
C C66
~
J
C245
SEAL
C
VV1040 J
FV1126
C68 C69 C71 TO UTILITY BLDG
15'-2"
C246
TT0630 J C152 SPARE CONDUIT
VT0401 J
PT1201 PT0500 C70 ~
J MECHANICAL
C81 VT0416 ~
C56 C55
PY1201A J PT0511 J 0-3
C82 C151C150 C72
C257 TT0803 IOPER IOPER
PY1201B C83 PT0522 C247 C202
TT0806 J
CV1202 IOPPBO C75 C73 C58
TT0818 PT-0030
C186 C201 ZSO0541 C74 C248
UP TO IOPPB1 J ~ C57
C184 C182 C249
ZSO0542 J
C185 C183
ZSO0543 C APPROVED
POWER TSECH-1
CONTROL
PANEL
ACU-2
FOR CONDUIT PENETRATING EXTERIOR WALL
SEE DRAWING E-701. SATISFACTORY TO DATE
CONTROL DES DRW CHK
PANEL
P23 A B
B B
BUILDING 3069
CONTROL 3/4"C, 3#12 C98 P100
PANEL TT0810 C223
UTILITY BLDG. C95 RUN
2-1 J J C222
C203 C187 BESIDE
C96 PIPING
C97 P101
AR-1 TE15502 CONTROL PANEL C221
C253 (HS-1200A)
CONTROL PANEL P102
C91 (HS-1000A) C251
CHP-1 CH-1 AHU-1 PT1002
C90 AC-1 J C252
X
FS-15301 J DC
C254 POWER
X
CONTROL SUPPLY
PANEL C92 STAIRS X X
AD-1 C94 LT1101
X
PT1100 LN-1 IOPPBO
#1
X
PT1007 MCC2 C99 C100
X
3/4"C, 3#12 X
F RP2 RP2(2) IOPUT X
X X
#2
A A
X X X X X X
X X X X X
SCALE
INDICATOR
EPROJECT NO.:
SCALE #1 SCALE #2
CONSTR. CONTR. NO.
CI-101
OF
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING E-001.
DATE
-
-
FIBER OPTICS CABINET 2. REFER TO DRAWINGS CI-601 AND CI-602 FOR SCHEDULES OF CIRCUITS TO BE DEMOLISHED.
3. ALL CONDUIT, FITTINGS, AND WIRING ASSOCIATED WITH CIRCUITS MARKED FOR DEMOLITION
CCTV
EQUIPMENT SHALL BE DEMOLISHED AND REMOVED FROM SITE.
UPS1(8)
MCC1 C168 C167 C166 1"C WITH (2) FIBER OPTICS CABLE
D 3/4"
ETHERNET
3/4"
2 ETHERNET
D
CABLE CABLES
DESCRIPTION
HMIER
EXTRUDER C258 MOUNTED ON SUPPORT
-
CONTROL FOR MONITORS
PANEL 3/4" ETHERNET
UPS1(7) EXTRUDER KSC
CABLE
CONSOLE DISPLAY
SYM
CRANE MOTOR
-
IOPER RACK CONSOLE
SYSTEM 9 11 STARTERS
J HMIER
(PLC) PELLETIZER
K-TRON FEEDER (PLC) UPS1(1) 13 (PLC)
C172 C236
3/4"
C237
C260 UPS1(2) ETHERNET
HMIER CABLE C238
UPS1(5) ELECTRICAL UPS1(3)
IP1(2)
C242 C241 C240 G-4
J J
C239
C171 C170 C169 C235 30 KVA
TRANS.
C261 C255 UPS1(6) WALL MTD.
C255 BATT.
C262 UPS
UPS1
C259 C263 (9,11,13)
C264 15 KVA
~
TRANS.
PP1 IP1 WALL MTD. UPS1 EPO LP1 RP1
IOPER
C3
IOPER
TT0609 IOPER
ZVD
C19 DRIVES
C C
C2 J C1
SEAL
TT0623
C20
~
~
J
C62
C22 C4
TT0607
C21
~
J
~
J
TT0622 C63
C61
C6
TT0605
C5 J
TT0621
IOPER
IOPER C9
TT0603 IOPER
C31 J C7
C8
TT0620 C32 B3069 MECH. AND ELEC. ROOM CONTROL AND INST. PLAN - DEMO
~
~
J APPROVED
C34 C65
TT0601
C10
C33
3/8" = 1'-0"
~
J
~
J
CRANE FESTON POWER JUNCTION BOX FOR COMMANDER NAVFAC
TT0619 C115
C64 ACTIVITY
C12
TT0617 EMERGENCY SHUTDOWN
J PUSHBUTTON HS-0010 C206
C11
TT0618
IOPER DOWN TO CRANE
MECHANICAL C190 C189
DOWN TO CRANE
FESTOON CONTROL MOTOR STARTERS
IOPER C14
TT0700 IOPER JUNCTION BOX 0-3 C191
C43 J C13
C15 SATISFACTORY TO DATE
TT0701 C44
J
~
~
J
~
J
TT0703 C173
C140 C123
C174
C17 SFDR-2
TT0704 C175
PROCESS (CONTROL) KTRON
B B
~
C277 PSH0504 ~
CONTROL C110 HS0503A SECTION B
~~~
PANEL FE0501 C104
J J J
IOPPB1 C101 C103 C106
LFT-1 C105 PSH0534
C146 HS0536A
C138 HS0529A
BUILDING 3069
SFDR-5 C139 PTO528
C137 C145
J TTO525
IOPPB1 J
C136
P70 ~ C141
FT0523 PSH0531 IOPPB1
~
C148 IP1
C59 ~
C132 FE0523 C134 HS0532A
J J
IOPPB1 C133 C135
SFDR-1
PSH0514
C116 C118 C119 HS0513A
IOPPB1 J J
C117 LFT-2 C121
C155 C126 FT0521 C125
AT0400 C156 C129 HS0519A
KTRON FE0521 PTO518
CONTROL ASH0400 J ~
C128 J TTO515
PANEL ASHH0400 C153 ~
A FV1106
C165
J FV1104
C162
J FV1108 J PSL1045
C159
C157 IOPPB1
IOPER
IOPPBI C257
A
C184
C183
P107
GRAPHIC SCALE
C182 P79
P81 3/4" ETHERNET
LOSS-IN-WEIGHT
PATCH PANELS: POWER PATCH
CABLE
0' 2' 4' 8' SCALE:
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
CONDUIT AND WIRE SCHEDULE CONDUIT AND WIRE SCHEDULE CONDUIT AND WIRE SCHEDULE
CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION
FROM TO FROM TO FROM TO
NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING
C1 1 1/4" 6-2/C#16 SHLD 600V IOPER TCU-1 SECTION 1 JB C55 1" 3-2/C#16 SHLD 600V IOPER JB C109 3/4" 3/C#16 SHLD 600V JB HS0509A
D C2 3/4" 2/C#16 SHLD 600V JB TT0623 C56 1/2" 2/C#16 SHLD 600V JB TT0803 C110 3/4" 2/C#16 SHLD 600V FT0501 FE0501
D
C3 3/4" 2/C#16 SHLD 600V JB TT0609 C57 1/2" 2/C#16 SHLD 600V JB TT0806 C111
DESCRIPTION
C4 1" 4-2/C#16 SHLD 600V JB JB C58 3/4" 2/C#16 SHLD 600V JB TT0818 C112 3/4" 2-2/C#16 SHLD 600V IOPPB1 JB
-
C5 3/4" 2/C#16 SHLD 600V JB TT0621 C59 3/4" 2/C#16 SHLD 600V FT0523 FE0523 C113 3/4" 2/C#16 SHLD 600V JB PT0508
SYM
C6 3/4" 2/C#16 SHLD 600V JB TT0605 C60 3/4" 2/C#16 600V JB TT0803 C114 3/4" 2/C#16 SHLD 600V JB TT0505
-
C7 1 1/4" 6-2/C#16 SHLD 600V IOPER JB C61 3/4" 2/C#16 SHLD 600V JB TT0622 C115 3/4" 2-2/C#16 SHLD 600V JB JB
2-2/C#16 SHLD
C8 3/4" 2/C#16 SHLD 600V JB TT0620 C62 3/4" 2/C#16 SHLD 600V JB TT0607 C116 1 1/4" 600V IOPPB1 JB
2-3/C#16 SHLD
C9 3/4" 2/C#16 SHLD 600V JB TT0603 C63 3/4" 2-2/C#16 SHLD 600V JB JB C117 3/4" 2/C#16 SHLD 600V JB FT0521
2/C#16 SHLD
C10 1" 4-2/C#16 SHLD 600V JB JB C64 3/4" 2/C#16 SHLD 600V JB TT0619 C118 1" 600V JB JB
2-3/C#16 SHLD
C11 3/4" 2/C#16 SHLD 600V JB TT0618 C65 3/4" 2/C#16 SHLD 600V JB TT0601 C119 3/4" 2/C#16 SHLD 600V JB PSH0514
C12 3/4" 2/C#16 SHLD 600V JB TT0617 C66 1" 3-2/C#16 SHLD 600V IOPPBO JB C120 1" 2-3/C#16 SHLD 600V JB JB
C13 1 1/4" 6-2/C#16 SHLD 600V IOPER JB C67 C121 3/4" 3/C#16 SHLD 600V JB HS0513A
C14 3/4" 2/C#16 SHLD 600V JB TT0700 C68 3/4" 2/C#16 SHLD 600V JB VV1040 C122
C15 3/4" 2/C#16 SHLD 600V JB TT0701 C69 3/4" 2/C#16 SHLD 600V JB FV1126 C123 3/4" 2-2/C#16 SHLD 600V JB JB
C16 1" 4-2/C#16 SHLD 600V JB JB C70 1" 3-2/C#16 SHLD 600V IOPPBO JB C124
C17 3/4" 2/C#16 SHLD 600V JB TT0704 C71 3/4" 2/C#16 SHLD 600V JB PT0500 C125 3/4" 3/C#16 SHLD 600V JB HS0519A
C C18 3/4" 2/C#16 SHLD 600V JB TT0705 C72 3/4" 2/C#16 SHLD 600V JB PT0511 C126 3/4" 2/C#16 SHLD 600V FT0521 FE0521 SEAL
C
C19 1" 3-2/C#16 SHLD 600V IOPER JB @ TCU-1 C73 3/4" 2/C#16 SHLD 600V JB PT0522 C127
C20 1" FLEX 3-2/C#16 SHLD 600V JB @ TCU-1 TCU-1 C74 1" 3-2/C#16 SHLD 600V IOPPBO JB C128 3/4" 2-2/C#16 SHLD 600V IOPPB1 JB
C21 1" FLEX 20#14 600V JB @ TCU-1 TCU-1 C75 3/4" 2/C#16 SHLD 600V JB ZSO0541 C129 3/4" 2/C#16 SHLD 600V JB PT0518
C22 1" 20#14 600V IOPER JB @ TCU-1 C76 3/4" 2/C#16 SHLD 600V JB ZSO0542 C130 3/4" 2/C#16 SHLD 600V JB TT0515
C23 C77 3/4" 2/C#16 SHLD 600V JB ZSO0543 C131 3/4" 2/C#16 SHLD 600V JB TT0702
2-2/C#16 SHLD
C24 C78 1" 4-2/C#16 SHLD 600V IOPPBO JB C132 1" 600V IOPPB1 JB
2-3/C#16 SHLD
2/C#16 SHLD APPROVED
C25 C79 3/4" 2/C#16 SHLD 600V JB PT1201 C133 1" 600V JB JB
2-3/C#16 SHLD
C26 C80 3/4" 2/C#16 SHLD 600V JB TT0630 C134 3/4" 2/C#16 SHLD 600V JB PSH0531 FOR COMMANDER NAVFAC
ACTIVITY
C27 C81 3/4" 3-2/C#16 SHLD 600V JB JB C135 3/4" 3/C#16 SHLD 600V JB HS0532A
C28 C82 3/4" 2/C#16 SHLD 600V JB PY1201A C136 3/4" 3/C#16 SHLD 600V JB HS0529A
C29 C83 3/4" 2/C#16 SHLD 600V JB PY1201B C137 3/4" 2-2/C#16 SHLD 600V IOPPB1 JB
C31 1" 3-2/C#16 SHLD 600V IOPER JB @ TCU-2 C85 3/4" 2/C#16 SHLD 600V IOPUT CONTROL PANEL (CHP-1) C139 3/4" 2/C#16 SHLD 600V JB TT0525 DES DRW CHK
C32 1" FLEX 3-2/C#16 SHLD 600V JB @ TCU-2 TCU-2 C86 3/4" 2-2/C#16 SHLD 600V IOPUT CONTROL PANEL (AHU-1) C140 3/4" 2/C#16 SHLD 600V JB TT0703
2/C#16 SHLD
C33 1" FLEX 20#14 600V JB @ TCU-2 TCU-2 C87 C141 1" 600V IOPPB1 JB
3/C#16 SHLD
C34 1" 20#14 600V IOPER JB @ TCU-2 C88 3/4" 2/C#16 SHLD 600V JB DPT-0404 C142
B B
C37 C91 3/4" 2/C#16 SHLD 600V JB PT1002 C145 3/4" 3/C#16 SHLD 600V JB HS0536A
C38 C92 3/4" 2/C#16 SHLD 600V JB PT1007 C146 3/4" 2/C#16 SHLD 600V JB PSH0534
C40 C94 3/4" 14#14 600V IOPUT CONTROL PANEL (HS-1000A) C148 3/4" 2/C#16 SHLD 600V JB FT0523
BUILDING 3069
2/C#16 SHLD
C41 C95 3/4" 600V IOPUT CONTROL PANEL (HS1200A) C149
3/C#16 SHLD
C42 C96 3/4" 7#14 600V IOPUT CONTROL PANEL (HS-0805A) C150 3/4" 2-2/C#16 SHLD 600V IOPPBO JB
C43 1" 3-2/C#16 SHLD 600V IOPER JB @ TCU-3 C97 1 1/4" 1-3/C#16 SHLD 600V IOPUT JB (TCCH-2) C151 3/4" JB VT0416
5-2/C#16 SHLD 2/C#16 SHLD 600V
C44 1" FLEX 3-2/C#16 SHLD 600V JB @ TCU-3 TCU-3 C98 3/4" 2/C#16 SHLD 600V JB (TCCH-2) TT0810 C152 3/4" 2/C#16 SHLD 600V JB VT0401
2-3/C#16 SHLD
C45 1" FLEX 20#14 600V JB @ TCU-3 TCU-3 C99 3/4" 2/C#16 SHLD 600V IOPUT PT1100 C153 1" 600V IOPER JB
4/C#16 SHLD
C46 1" 20#14 600V IOPER JB @ TCU-3 C100 3/4" 2/C#16 SHLD 600V IOPUT LT1101 C154 3/4" 3/C#16 SHLD 600V JB FSLL0415
C48 C102 3/4" 2/C#16 SHLD 600V JB FT0501 C156 3/4" 3/C#16 SHLD 600V JB AT0400
C50 C104 3/4" 2/C#16 SHLD 600V JB PSH0504 C158 3/4" 2-2/C#16 SHLD 600V JB JB
A C51 C105 1" 2-3/C#16 SHLD 600V JB JB C159 3/4" 2/C#16 SHLD 600V JB FV1108 A
C52 C106 3/4" 3/C#16 SHLD 600V JB HS0503A C160 3/4" 2-2/C#16 SHLD 600V JB JB
SCALE:
C54 C108 C162 3/4" 2/C#16 SHLD 600V JB FV1104
EPROJECT NO.:
SHEET OF
CI-601
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
APPR
-
DATE
-
-
CONDUIT AND WIRE SCHEDULE CONDUIT AND WIRE SCHEDULE CONDUIT AND WIRE SCHEDULE
CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION CONDUIT CONDUIT WIRE GROUND INSULATION
FROM TO FROM TO FROM TO
NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING NUMBER SIZE NO. & SIZE WIRE SIZE RATING
C163 C217 C271 3/4" 4#14 #14 600V EXTRUDER CONTROL PANEL CHILLER CONTROL PANEL
D C165 3/4" 2/C#16 SHLD 600V JB FV1106 C219 3/4" 2/C#16 SHLD 600V CONVERTER #2 JB C273 3/4" 3#14 #14 600V EXTRUDER CONTROL PANEL JB
D
C166 3/4" 2/C#16 SHLD 600V IOPER MCC1 C220 3/4" 2/C#16 SHLD 600V CONVERTER #1 JB C274 3/4" 3#14 #14 600V PELLETIZER (PLC) JB
DESCRIPTION
C167 3/4" 2/C#16 SHLD 600V IOPER MCC1 C275 3/4" 6/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-2
C221 3/4"
** 600V SCALE INDICATOR #2 CONVERTER #2
-
C168 3/4" 2/C#16 SHLD 600V IOPER MCC1 C222 3/4"
** 600V SCALE INDICATOR #1 CONVERTER #1 C276 3/4" 6/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-3
C169 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR LFP-4 TCCH-1 1PS, 2PS, &
C223 3/4" 7#14 600V TCCH-2 CONTROL PANEL C277 3/4" 6/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-4
SYM
SOLENOID VALVE
-
C170 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR AG-1 BLH-LCP-100 SUMMING BOX
C224 1" 6/C#16 SHLD 600V C278 3/4" 6/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-1 & 5
INDICATOR WY0516
C171 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR LFP-1 BLH-LCP-100 SUMMING BOX
C225 1" 6/C#16 SHLD 600V C279 3/4" 2/C#16 SHLD 600V IOPPB1 PSL1046
INDICATOR WY0526
C172 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR LFP-2 BLH-LCP-100 SUMMING BOX
C226 1" 6/C#16 SHLD 600V C280 3/4" 2/C#16 SHLD 600V IOPPB1 PSL1045
INDICATOR WY0506
C173 1 1/4" 7-2/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-2 BLH I.S. BLH-LCP-100
C227 1" 6/C#16 SHLD 600V C281 3/4" 2#14 #14 600V AG-1 VSD (SP500) JB ON MEZZANINE
BARRIER BOX INDICATOR
C174 3/4" 15#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-2 BLH I.S. BLH-LCP-100
C228 1" 6/C#16 SHLD 600V
BARRIER BOX INDICATOR
C175 3/4" 12#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-2 BLH I.S. BLH-LCP-100
C229 1" 6/C#16 SHLD 600V
BARRIER BOX INDICATOR
C176 1 1/4" 7-2/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-3 BLH-LCP-100
C230 3/4" 2/C#16 SHLD 600V JB
INDICATOR
C177 3/4" 15#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-3 BLH-LCP-100
C231 3/4" 2/C#16 SHLD 600V JB
INDICATOR
C178 3/4" 12#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-3 BLH-LCP-100
C232 3/4" 2/C#16 SHLD 600V JB
INDICATOR
C179 1 1/4" 7-2/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-4 C233 3/4" 3-2/C#16 SHLD 600V JB IOPER
C180 3/4" 15#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-4 C234
C C181 3/4" 12#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-4 C235 3/4" 8#14 #14 600V EPO JB
SEAL
C
C182 1 1/4" 7-2/C#16 SHLD 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-1 & 5 C236 3/4" 2#14 #14 600V JB CRANE MOTOR STARTER
C183 3/4" 15#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-1 & 5 C237 3/4" 2#14 #14 600V JB PELLETIZER INDEXER
C184 3/4" 12#14 600V K-TRON CONTROL PANEL PATCH PANEL SFDR-1 & 5 C238 3/4" 4#14 #14 600V JB HMIER
3-CAT 5 CABLE PELLETIZER CONTROL
C185 1" 1-BELDEN 9463 600V PELLETIZER CONTROL PANEL PATCH PANEL C239 3/4" 14#14 #14 600V EPO JB
PELLETIZER CONTROL
C186 1" 11#14 #14 600V PELLETIZER CONTROL PANEL PATCH PANEL C240 3/4" 14#14 #14 600V JB K-TRON SOLID FEEDER
C187 3/4" 4#14 600V IOPUT CONTROL PANEL (HS-1200A) C241 3/4" 6#14 #14 600V JB IOPER APPROVED
1-3/C#16 SHLD
C188 1 1/4" 4-2/C#16 SHLD 600V JB (TCCH-2) CONTROL PANEL (HS-0805A) C242 3/4" 4#14 #14 600V JB EXTRUDER FOR COMMANDER NAVFAC
C192 1" 4/C#16 SHLD 600V EXTRUDER CONTROL PANEL #2 ST1304 C246 3/4" 2#14 #14 600V JB TCU-2 SATISFACTORY TO DATE
B B
C200 1 1/4" 40#14 600V EXTRUDER CONTROL PANEL #1 LOCAL CONTROL PANEL C254 3/4" 2#14 #14 600V JB TCU CHILLER IOPUT
C201 3/4" 2/C#16 SHLD 600V IOPPBO CV-1202 C255 3/4" 4#14 #14 600V EPO JB
BUILDING 3069
C202 3/4" 2/C#16 SHLD 600V IOPER PT-0030 C256 3/4" 2#14 #14 600V JB IOPPBO
C203 3/4" 2#14 #14 600V CHILLER CONTROL PANEL FS-15301 C257 3/4" 2#14 #14 600V JB IOPPB1
C204 3/4" 4#14 #14 600V EPO JB C258 3/4" 8#14 #14 600V IOPER HMIER
C205 3/4" 2#14 #14 600V JB HS-0010 C259 3/4" 2-2/C#16 SHLD 600V IOPER ZVD DRIVE FOR LFP-3
C206 3/4" 2#14 #14 600V JB HS-0011 C260 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR LFP-2
C207 C261 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR LFP-3
C208 C262 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR LFP-1
C209 C263 3/4" 4#14 #14 600V IOPER ZVD DRIVE FOR LFP-4
C211
A C212
C265 3/4" 15#14
2/C#16 SHLD
#14 600V EXTRUDER CONTROL PANEL EXTRUDER CONSOLE
A
C266 3/4" (TCJ) 600V EXTRUDER CONTROL PANEL TB1302
C213 C267 3/4" 10#14 SHLD #14 600V EXTRUDER CONTROL PANEL TB1302
4/C#16 SHLD
C214 C268 1" 3/C#16 SHLD #14 600V EXTRUDER CONTROL PANEL TB1318 SCALE:
2/C#16 SHLD
EPROJECT NO.:
C215 C269 1 1/2" 76#14 #14 600V EXTRUDER CONTROL PANEL TB1318 CONSTR. CONTR. NO.
2/C#16 SHLD
C216 C270 3/4" (TCJ) 600V EXTRUDER CONTROL PANEL CHILLER CONTROL PANEL
NAVFAC DRAWING NO.
SHEET OF
CI-602
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
COLUMN A/2
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
R
DATE
E-001.
-
RECIEVER MOUNTING LOCATION
FOR TRIPOD MOUNTED CAMERA #7 3/4" RIGID METAL CONDUIT, 1 COAX CABLE TO ELECTRIC ROOM RECIEVER MOUNTING LOCATION
2. FOR CCTV SYSTEM DETAILS, SEE DRAWING T-701.
FOR TRIPOD MOUNTED CAMERA #7
3/4" RIGID METAL CONDUIT, 3 - #12 AWG TO IP1(1)
D D
DEMOLITION KEYNOTES
DESCRIPTION
C
C
COLUMN B/1
-
1. NOTE EXISTING LOCATIONS OF CAMERAS FOR
CAMERA #7 PROCESS
PROCESS REPLACEMENT IN KIND.
3/4" RIGID METAL CONDUIT, 3 - #12 AWG CAMERA #6
SYM
TRIPOD 0-1
-
MOUNTED IP1(1) TRIPOD 0-1
MOUNTED
R
6"x6"x4" NEMA 4X PELLETIZER 3/4" RIGID METAL CONDUIT
HOFFMAN A606CHNF 1 COAX CABLE
FOR MINI CAMERAS 1 TO ELECTRIC ROOM
EXP FLEX METAL COUPLING
(TYPICAL)
WITH 1 INTERCOM 1 CABLE
XXX
APPROVED
B3069 GROUND FLOOR CCTV DEMO PLAN B3069 GROUND FLOOR CCTV NEW PLAN
1/4" = 1'-0" 1/4" = 1'-0" FOR COMMANDER NAVFAC
ACTIVITY
6'-0"
6'-0"
CAMERA #1
CAMERA #1
SATISFACTORY TO DATE
C
C DES DRW CHK
MOUNTED ON COLUMN A/2
STEEL GIRT R R
MOUNTED ON RECIEVER MOUNTING LOCATION 3/4" RIGID METAL CONDUIT, 1 COAX CABLE
STEEL GIRT IP1(1) RECIEVER MOUNTING LOCATION
B B
BUILDING 3069
PROCESS
PROCESS
1-1
1-1
1
C
MINI-CAM
EPROJECT NO.:
C R C CONSTR. CONTR. NO.
C
COLUMN C/2
0' 2' 4' 8' NAVFAC DRAWING NO.
MEZZANINE CCTV DEMO PLAN MEZZANINE CCTV NEW PLAN 1/4"=1'-0" SHEET OF
1 2 3 4 5
1 2 3 4 5
CCTV CAMERA DETAILS GENERAL NOTES
APPR
-
-
SEAL FITTING TO BE 1. FOR LEGEND AND GENERAL
DATE
PROVIDED BY THIS NOTES, SEE DRAWING E-001.
-
CONTRACTOR (TYPICAL) EXPLOSION PROOF
13/C CCTV CABLE BELDEN JUNCTION BOX FOR
RECEIVERS FOR 2. CCTV SYSTEM TO BE REPLACED
PANEL IP1(1) #9254 CONNECTED TO THE
TYPICAL WIRING FOR CAMERA #5, IN KIND WITH NEW SYSTEM. THE
3 - #12 AWG EXPLOSION PROOF HOUSING CAMERA #6,
CAMERAS 1, 2, & 3 CAMAREA #7, EXISTING FIBER OPTIC CABLE
120V AC (TYPICAL RUN TO THE SYSTEM FROM
ALL RECEIVERS) BUILDING 1424 MAY BE REUSED
PROVIDED IT IS TESTED AND
D RECEIVER
#1
CAMERA #1
MEZZ. COLUMN A/2
SEALING FITTING
(TYPICAL) VERIFIED TO BE ABLE TO MEET D
ALL CONTINUITY AND
SEALING FITTING PROVIDED
WITH HOUSING ATTENUATION REQUIREMENTS.
DESCRIPTION
P/T DRIVE (TYPICAL) EXPLOSION OTHERWISE, THE EXISTING
PROOF
-
HOUSING
CABLE SHALL BE REPLACED IN
CCTV KIND WITH A NEW ONE.
11/C SIGNAL CABLE
TYPICAL WIRING FOR CABLE PAN/TILT
4'-0"
SYM
BELDEN #27602AS
-
DRIVE
CAMERAS 1, 2, & 3 3. ALL PORTIONS OF THE NEW CCTV
CONNECTED TO P/T DRIVE
SEALING FITTING SYSTEM SHALL BE RATED FOR
PROVIDED WITH
P/T DRIVE THE ELECTRIC HAZARDOUS
SIGNAL MOUNTING PLATE
CLASSIFICATION OF THE AREA IN
RECEIVER WHICH THEY WILL BE INSTALLED
CAMERA #2 CABLE
#2 MEZZ. LEVEL 0, COLUMN C/2 AS IDENTIFIED ON DRAWING
FLOOR
COLUMN C/2 E-306.
RECEIVER
CAMERA #4
#4
TRIPOD MOUNT CAMERA DETAIL
NO SCALE
1"
120V, AC
C LIGHT SOURCE
RP1(17) SEAL
C
MEZZ. COLUMN A/2
C
L COLUMN
MINI RECEIVER
#1 CAMERA #5
CAM #5 EXPLOSION PROOF
2'-0"
JUNCTION BOX
24"L x 8" DP
FOR RECEIVER
PROVIDE 30'-0" OF EACH CABLE MEZZANINE
120V, AC WITH SEALING FITTING ON EACH END LEVEL 1 SEALING FITTING
RECEIVER RP1(17) (TYPICAL)
CAMERA #3 APPROVED
#3 LEVEL 0 LIGHT SOURCE
COLUMN B/1 SEALING FITTING PROVIDED FOR COMMANDER NAVFAC
@21'-0" AFF MINI WITH HOUSING ACTIVITY
#2 EXPLOSION
CAM
PROOF
HOUSING
CCTV
2'-9"
3/4"C WITH PAN/TILT
3/4"C WITH CABLE
1-COAX RG-59/U DRIVE
1-COAX RG-59/U 13/C CCTV CABLE BELDEN #9254 CONNECTED
BELDEN #9259 3/4"C WITH SATISFACTORY TO DATE
BELDEN #9259 TO THE EXPLOSION PROOF HOUSING (TYPICAL) DES DRW CHK
1-2PR SHLD #18 1-COAX RG-59/U SEALING FITTING
SIGNAL CABLE
BELDEN # 9368 BELDEN #9259 11/C SIGNAL CABLE BELDEN #27602AS PROVIDED WITH
1-2PR SHLD #18 CONNECTED TO PT DRIVE P/T DRIVE
BELDEN # 9368
EL. 22'-4 1/2"
B B
BUILDING 3069
PLAN OF WIREWAY
FROM DWG E-402
19" RACK
4"x4"x4" WIREWAY TO CONTROL SYSTEM CAMERA
WITH REMOVABLE COVER PAN/TILT
ETHERNET NETWORK
9-COAX RG-59/U DRIVE C8x11.5
FIBER OPTIC OVERHEAD SUPPORT CHANNEL
BELDEN #9259 TRANSMITTERS FTU DISTRIBUTION
7-2PR SHLD #18 FIBER OPTICS TO BUILDING
BELDEN # 9368 CABINET 1424
PC BASED
A FOE REVIEW
STATION
EXPLOSION PROOF A
JUNCTION BOX
ETHERNET FOR RECEIVER
CAT. #5
SCALE:
MONITOR EPROJECT NO.:
NO SCALE
T-701
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
GENERAL NOTES
APPR
-
-
1. FOR LEGEND AND GENERAL NOTES, SEE DRAWING
DATE
E-001.
-
2. TELEPHONE SYSTEM TO BE TESTED AND VERIFY
PROPER OPERATION. ALL TELEPHONES IN BUILDING
3069 AND BUILDING 3090 TO BE REPLACED IN KIND.
DESCRIPTION
-
-
EXISTING OVERHEAD
PROCESS 1"C-6PR#22 2"C-6PR#22 TELEPHONE DISTRIBUTION
SYM
BAY UTILITY MECHANICAL ELECTRICAL
-
SYSTEM
0-1 BUILDING ROOM ROOM MODEM MOV
TELEPHONE
3/4"C-4PR#22 SPLICE BOX
CAT. 3 CABLE AT POLE #13
TELEPHONE
CONTROL
BOX
SEALING
FITTING
C SEAL
C
APPROVED
ACTIVITY
MECHANICAL/ELECTRICAL ROOM
FRP SURFACE
PROCESS AREA
FRP SURFACE
GYPSUM WALLBOARD
INSULATED METAL PANEL
SATISFACTORY TO DATE
B B
BUILDING 3069
INTO OPENING. RECESS FROM
BOTH SURFACES OF WALL. EXTERIOR INTERIOR
EXTERIOR INTERIOR
MINERAL WOOL SHALL BE 4 pcf MINERAL WOOL BATT INSULATION
CAULK SHALL BEAR THE UL CLASSIFICATION MARKING
SCALE:
EPROJECT NO.:
SHEET OF
T-702
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
1 2 3 4 5
' ' ' ' ' ' ' t
GENERAL NOTES FIRE SUPPRESSION NOTES FIRE SUPPRESSION NOTES (CONT'D) FIRE SUPPRESSION LEGEND
D 1. DRAWING ACCURACY: LOCATIONS AND SIZES OF EXISTING EQUIPMENT, PIPING, 1. PROVIDE WET-PIPE SPRINKLER SYSTEM, OVERHEAD DELUGE SYSTEM, AND AN NEW SPRINKLER PIPE D
DUCTWORK, OUTLETS, DIMENSIONS, FIXTURES, WALLS/PARTITIONS, AND DEVICES ULTRA HIGH SPEED DELUGE SYSTEM TO PROTECT THE BUILDINGS. SYSTEM A. THE FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED AND INSTALLED BY
SHOWN ON DRAWINGS ARE APPROXIMATE. VERIFY AT THE PROJECT SITE. DRAWINGS COMPONENTS SHALL INCLUDE, BUT NOT BE LIMITED TO PIPES, FITTINGS, DESIGNERS, ENGINEERS, AND INSTALLERS WHO HAVE AT LEAST TWO
SPRINKLER, SPRAY NOZZLES, HANGERS, DRAINS, TEST ASSEMBLY, AND ALL
0 PIPE TURNED DOWN (AWAY FROM VIEWER)
ARE DIAGRAMMATIC AND NOT INTENDED TO BE SCALED. YEARS' RECENT EXPERIENCE WITH ULTRA HIGH SPEED DELUGE SYSTEMS.
NECESSARY COMPONENTS FOR A COMPLETE AND USEABLE SYSTEM.
2. COORDINATION: COORDINATE AND SEQUENCE THE WORK PRIOR TO FABRICATION B. ALL COMPONENTS AND ASSEMBLIES USED IN THIS FIRE PROTECTION 0 PIPE TURNED UP (TOWARD VIEWER)
AND INSTALLATION OF EQUIPMENT. MAKE NECESSARY ACCOMMODATIONS TO MEET 2. FEED THE FIRE SUPPRESSION SYSTEM FROM THE BASE FIRE PROTECTION SYSTEM MUST BE SPECIFICALLY UL LISTED OR FM APPROVED FOR THEIR
THE INTENT OF THE DRAWINGS AND ENSURE A COORDINATED INSTALLATION. WATER SYSTEM.
3. SUBMITTALS: PROVIDE PRODUCT INFORMATION, SHOP DRAWINGS, DOCUMENTS AND 3. COORDINATE ALL REQUIRED SYSTEMS TO THE SATISFACTION OF THE
INTENDED USE.
[g STRAINER
---
WARRANTIES FOR MATERIALS AND SERVICES PROVIDED ON THIS PROJECT. CONTRACTING OFFICER AND AUTHORITY HAVING JURISDICTION. ANY DEFICIENCIES, NOT USED
THE HAZEN-WILLIAMS FORMULA WITH 'C' VALUE OF 120 FOR STEEL �
INCONSISTENCIES, OR POORLY COORDINATED INSTALLATIONS SHALL BE PIPING, AND 140 FOR NEW CEMENT-LINED DUCTILE-IRON PIPING. USE
4. INSTALLATION OF NEW WORK: PERFORM INSTALLATION IN A NEAT AND CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST. N CHECK VALVE
PROFESSIONAL MANNER IN ACCORDANCE WITH INDUSTRY STANDARD MATERIALS, 100 FOR EXISTING UNDERGROUND PIPING. VELOCITY IN THE SPRINKLER
TOOLS, AND METHODS. PIPING SHALL BE LIMITED TO A MAXIMUM OF 25 FT/SEC.
4. FINAL DESIGN REQUIREMENTS (DEVICE QUANTITY, SIZE, AND LOCATIONS) ARE
THE SOLE RESPONSIBILITY OF THE FIRE SUPPRESSION CONTRACTOR. DRAWINGS D- FLOW SWITCH
5. MOUNTING HEIGHTS: COORDINATE MOUNTING HEIGHTS OF DEVICES ON FINISHED D. FLOW TEST DATA (FOR REFERENCE ONLY)
INDICATE MINIMUM REQUIREMENTS; THE FIRE SUPPRESSION CONTRACTOR WILL PRESSURE GAUGE
WALLS TO PROVIDE A NEAT AND SYMMETRICAL APPEARANCE.
"
BE RESPONSIBLE FOR VERIFYING AND COORDINATING FINAL DESIGN �
REQUIREMENTS WITH THESE CONSTRUCTION DOCUMENTS, SPECIFICATIONS, DATE-8/30/22
6. CLEANING & MATERIAL DISPOSITION: CLEAR ALL DEBRIS FROM THE AREA OF WORK REFERENCE DOCUMENTS, APPLICABLE CODES, MANUFACTURER REQUIREMENTS, STATIC-160 PSI NOT USED
AND LEAVE SITE IN CLEAN CONDITION. CLEAN ALL EQUIPMENT ENCLOSURES, INSIDE AND FACILITY USER REQUIREMENTS. RESIDUAL-98 PSI
AND OUTSIDE. FLOW-2,700 GPM �
RISER ASSEMBLY
7. CONTRACT DRAWINGS MUST BE USED WITH THE SPECIFICATIONS TO OBTAIN 5. ALL DRAIN PENETRATIONS THROUGH EXTERIOR WALL SHALL BE NO GREATER
C COMPLETE CONSTRUCTION INFORMATION. CONTRACTOR SHALL COORDINATE ALL THAN 2'-0" ABOVE FINISHED GRADE.
ABBREVIATIONS
DRAWINGS AND SPECIFICATIONS PRIOR TO COMMENCING WORK. QUESTIONS
REGARDING DESIGN INTENT OR SYSTEM OPERATION SHALL BE PROMPTLY BROUGHT 6. SPRINKLER PIPES 3" AND LARGER SHALL BE SUPPORTED FROM THE EXISTING
TO THE OWNER'S REPRESENTATIVES ATTENTION. TRUSSES AT EVERY 1O' MAXIMUM. PIPES 2 1/2" AND SMALLER SHALL BE AFF ABOVE FINISHED FLOOR
SUPPORTED PER NFPA 13 REQUIREMENTS.
8. ANY CONFLICTS BETWEEN SPECIFICATIONS AND DRAWINGS SHALL BE BROUGHT TO AHJ AUTHORITY HAVING JURISDICTION
THE GOVERNMENT'S ATTENTION IMMEDIATELY. THE CONTRACTOR SHALL NOT 7. WHERE POSSIBLE, PITCH ALL PIPES BACK TO THE RISER TO AVOID INSTALLING DN DOWN
PROCEED WITH ANY WORK EXCEPT AT THEIR OWN RISK, UNTIL CLARIFICATIONS OF LOW POINT DRAINS. EX EXISTING
CONFLICTS ARE ISSUED TO THE CONTRACTOR BY THE COTR OR HIS/HER FDC FIRE DEPARTMENT CONNECTION
AUTHORIZED REPRESENTATIVE. 8. ALL VALVES INCLUDING CONTROL AND TRIM VALVES SHALL BE WITHIN 6'-0" FM FM GLOBAL
AFF. JJ-38 FP FIRE PROTECTION
9. CONTRACTOR SHALL BE RESPONSIBLE FOR AVOIDING ALL CONFLICTS WITH LIGHT
FIXTURES, HVAC DIFFUSERS, GRILLS, DUCTS, CONDUIT AND OTHER PIPING OR GPM GALLONS PER MINUTE
9. SPRINKLER SYSTEM SHALL BE GROUNDED PER NFPA 70.
OTHER OBSTRUCTIONS ENCOUNTERED. COORDINATE ALL WORK WITH FIELD NC NORMALLY CLOSED
CONDITIONS. CONTRACTOR SHALL PROMPTLY NOTIFY COTR PRIOR TO INITIATING 10. ALL SPRINKLER SYSTEM PIPING SHALL BE SCHEDULE 40.
., 1 NEC NATIONAL ELECTRICAL CODE
WORK, IF ANY MOUNTING LOCATIONS ARE OBSTRUCTED AND/OR IF ANY MOUNTING NO NORMALLY OPEN
CONFLICTS OR PROBLEMS ARE DISCOVERED. 11. WHERE PROVIDED, SPRINKLER PIPE SIZES SHOWN ON THESE DRAWINGS SHALL • Flow Hydrant -3 8 RN RISER NIPPLE
'\
NOT BE REDUCED (NO EXCEPTIONS). 3 0
FT SQUARE FOOT
Indian Head
SQ -
10. INSTALL SPRINKLERS IN CENTER OF CEILING TILES. SPRINKLERS SHALL BE SATISFACTORY TO DATE
SYMMETRICAL OR OTHERWISE ALIGNED ON CENTERLINES OTHER SPRINKLERS AND UL UNDERWRITERS LABORATORIES JDK JDK CHK JIJK
12. FIRE SUPPRESSION DESIGN CRITERIA: DES DRW
WITH CONSIDERATION TO ARCHITECTURAL FEATURES (SOFFITS, ETC.) WITHOUT PM/DM W. O'BRIEN, E.I.T.
VIOLATING REFERENCED STANDARDS OR THIS SPECIFICATION. BRANCH MANAGER T. LNER�. P.E.
CHIEF ENG/ARCH T. COX. P.E.
A. CONNECT THE FIRE SUPPRESSION SYSTEM TO EXISTING SPRINKLER
11. DESIGN LAYOUT AND DRAWING BACKGROUNDS ARE FOR BIDDING PURPOSES ONLY INFRASTRUCTURE. PERFORM A HYDRANT FLOW TEST. AND INCORPORATE STANDARDS AND CODE REFERENCES FIRE PROTECTION
"'
J. KILPAlRICK, P.E.
B B
□ C Cl
AND ARE NOT TO BE USED FOR CONSTRUCTION. DRAWING BACKGROUNDS MAY THE MOST CURRENT TEST RESULTS INTO THE HYDRAULIC CALCULATIONS. "' z -
z
en
NOT MATCH FIELD CONDITIONS. CONTRACTOR SHALL VERIFY ALL FIELD UNLESS THE EXISTING TEST RESULTS PROVIDED ON THIS DRAWING IS 1. APPLICABLE CODES AND STANDARDS: THE PROJECT INSTALLATION MUST �o� �
_J
DIMENSIONS PRIOR TO FABRICATION/INSTALLATION OF ANY EQUIPMENT. LOWER. HYDRANT FLOW TESTING SHALL BE IN ACCORDANCE WITH NFPA SATISFY THE MOST CURRENT EDITIONS OF THE FOLLOWING CODES AND CJ I
800 I- Cf)
0
m
z a!!:
z ::::!!:>-
�
291, AND THE RESULTS OF THE TESTING SHALL BE SUBMITTED AS STANDARDS USING THE MOST STRINGENT REQUIREMENT WHEN THERE IS ai>--
12. PENETRATIONS IN MASONRY WALLS AND FLOOR/CEILING SLABS SHALL BE A CONFLICT BETWEEN THEM. �I c:i I
PROPERLY CORE DRILLED. ALL WALLS AND FLOORS SHALL BE EXAMINED FOR
INDICATED IN NFPA 291 FIGURE 4.11.2. HYDRAULIC CALCULATIONS SHALL 00 Cl) � i:5
:::c 0 en
BE BASED ON A WATERFLOW TEST THAT WAS PERFORMED NO MORE THAN 6
HIDDEN OBSTRUCTIONS PRIOR TO CORE DRILLING. SCAN FLOORS WITH GROUND MONTHS PRIOR TO SUBMISSION OF THE CALCULATIONS. DOD UNIFORM FACILITIES CRITERIA DOCUMENTS w <( � z
"
��
< �
a:
�
PENETRATING RADAR FOR OBSTRUCTION.
B. BUILDING SHALL BE DESIGNED TO MEET THE ORDINARY AND EXTRA HAZARD
A.
B.
UFC 1-200-01, GENERAL BUILDING REQUIREMENTS
FC 1-300-09N, NAVY AND MARINE CORPS DESIGN PROCEDURES �oi
�z z
w 5
Cl
w en
w
ma.
o
13. REFERENCE ARCHITECTURAL DRAWINGS FOR CEILING TYPES AND HEIGHTS. IB <(
:::i!: f-
co
REQUIREMENTS OF UFC 3-600-01, NFPA 13, NFPA 15, AS WELL AS THE C. UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES
ULTRA HIGH SPEED DELUGE AREA REQUIREMENTS OF NAVSEA OP-5 AND UFC j �r:ilI;; 0
z
14. ALL PENETRATIONS THROUGH THE FLOOR/CEILING ASSEMBLY SHALL BE PROPERLY
PROTECTED IN ACCORDANCE WITH PROJECT SPECIFICATION SECTION 07 84 00,
3-600-01. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES
A. NFPA 1, FIRE CODE
13
:le O �
0
;;!> CJ !s
gl- _J
"'z z VJ
UC)::) <(
w �zO z
FIRE STOPPING. B. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS O'.'.
�-�
C. ORDINARY HAZARD OCCUPANCY AREAS (OH) SHALL BE HYDRAULICALLY - ;;a!
,. w
DESIGNED BASED ON A MINIMUM 0.20 GPM/SF OVER THE HYDRAULICALLY SPRINKLER SCHEDULE C. NFPA 15, INSTALLATION OF WATER SPRAY SYSTEMS a: ;:Ii
w
z �00
15. ONLY DESIGNERS, ENGINEERS, AND INSTALLERS WHO HAVE AT LEAST TWO MOST REMOTE 2,500 SF. MAXIMUM SPRINKLER HEAD SPACING SHALL BE 130 D. NFPA 24, INSTALLATION OF PRIVATE FIRE SERVICE MAINS w
YEARS' RECENT EXPERIENCE WITH ULTRA HIGH SPEED DELUGE SYSTEMS CAN SF. HOSE STREAM ALLOWANCE SHALL BE 250 GPM. E. NFPA 25, STANDARD FOR THE INSPECTION, TESTING AND CJ :::c_j<( C)
AREA OF APPLICATION TYPE FINISH ORIFICE TEMP. ::, :::>
1--a_ z
DESIGN AND INSTALL ULTRA HIGH SPEED DELUGE SYSTEMS AND THEIR
RELEASING SYSTEMS. D. EXTRA HAZARD OCCUPANCY AREAS (EH) SHALL BE HYDRAULICALLY DESIGNED
MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS
F. NFPA 70, NATIONAL ELECTRIC CODE
z
w� si rco 0
en
ORDINARY HAZARD UPRIGHT BRASS K 8.0 INTERMEDIATE G. NFPA 72, NATIONAL FIRE ALARM CODE w
Cl) :c
i I-
BASED ON A MINIMUM 0.30 GPM/SF OVER THE ENTIRE AREA OF THE -c �
>
en
H. NFPA 101, LIFE SAFETY CODE Cf) w
DELUGE ZONE. MAXIMUM SPRINKLER SPACING SHALL BE 1OOSF. HOSE
STREAM ALLOWANCE SHALL BE MINIMUM 500 GPM.
HIGH HAZARD UPRIGHT BRASS K 11.2 HIGH
I. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION,
ALTERNATION, AND DEMOLITION OPERATIONS
�
�offi
I- ii,I
::::! G
< -
a: O'.'.
<(
ie, b:: a.
w
J. NFPA 291, RECOMMENDATIONS FOR FIRE FLOW TESTING AND F IL
w
<( 0 :::)
E. ULTRA HIGH SPEED DELUGE (UHSD) AREAS SHALL BE HYDRAULICALLY a. en
A DESIGNED TO 0.50 GPM/SF OVER THEIR LOCALIZED APPLICATION AREAS, ULTRA HIGH SPEED LOCAL APPLICATION BRASS K 5.6 N/A
MARKING OF HYDRANTS 0 ...J
u.
IH##I-H-1-##H
NAVFAC DRAWING NO.
13145474
SHEET 70 OF 77
FX-001
1 2 3 4 5
DRAWFORM REVISION: 5EP2021
1 2 3 4 5
n : ··· ·• . ·. •n
. . .. 4;_. -· .
t=l �-- 4-,.. -.•-·
�
·--Ld-
... . ..
_ ..,
i-
·7r:�
�- �- � __- ...�
-
�- .·. "4' ... !I. -· . .·
· .4 -
�-----:-::..,-, -,t-- _-_. � -
..
. . . •
. .
. . .4
ORDINARY ORDINARY HAZARD DESIGN AREA - WET PIPE SPRINKLER SYSTEM WITH 0.20
HAZARD GPM/SQ.FT DESIGN DENSITY OVER MAXIMUM 2500 SQUARE FEET. OUTSIDE
HOSE STREAM ALLOWANCE OF 250 GPM. MAXIMUM SPRINKLER SPACING OF
130 SQ.FT PER SPRINKLER. MINIMUM K-FACTOR 8.0 SPRINKLER HEADS.
I I HIGH HIGH HAZARD DESIGN AREA - DELUGE SPRINKLER SYSTEM WITH 0.30
HAZARD GPM/SQ.FT DESIGN DENSITY OVER THE ENTIRE AREA. OUTSIDE HOSE STREAM
---------
I ALLOWANCE OF 500 GPM. MAXIMUM SPRINKLER SPACING OF 100 SQ.FT PER
SPRINKLER. MINIMUM K-FACTOR 11.2, HIGH TEMPERATURE SPRINKLER HEADS.
---------
BOUNDARY OF MEZZANINE
---AVG AI R LOCK
I=,-' -- 7 UHSD HIGH HAZARD DESIGN AREA - ULTRA HIGH SPEED DELUGE SYSTEM WITH 0.50
( I 0 -2 I ' GPM/SQ.FT DESIGN DENSITY OVER THE HAZARD AREAS INDICATED. MINIMUM
K-FACTOR 5.6 SPRINKLER HEADS.
-====I'!::,..
--- ---
\ \
"�--------
�f-���
/ :- - - - - HAZARD --- -
1�----�---=--�---=--���!��_::�------1-�_=_==_�_u_�
- HAZARD -- - --
1
______________
10_11
__ FIRE SUPPRESSION KEYED NOTES
r - - -
T1 REMOVE ALL EXISTING SPRINKLER COMPONENTS BACK TO THE STUB-OUT FLANGE;
I RETURN ALL DELUGE VALVES AND COMPONENTS TO THE GOVERNMENT. PROVIDE NEW APPROVED
r---------------- ------------- -- - -
6" STRAINER, 6" MANIFOLD, 6" FDC FEED. PROVIDE NEW WET PIPE ZONE CONTROL
r � -- - - VALVE ASSEMBLY; PROVIDE TWO DELUGE ZONE CONTROL VALVE ASSEMBLIES; PROVIDE
---,.....=--=,
CART
_
- - - ......-=---,
CART
_
- - - ---,.....=--=,
CART --------- DRY
- I NG
DRYING , _
_ ____,
DRYI NG , __
_ _,DRYI NG II---------- CARTS---+-1---1--1-----< ONE WET FEED TO THE ULTRA HIGH SPEED DELUGE ZONE.
-
ORDINARY
f-----++--_,
I
f---- - ---'=-- -
r = =.I_--=-- = = = -='---- -- - = =
-=-�--'= -- - - - -DiA���\ - - - - - ���- �
-- -- HAZARD io PROVIDE NEW WET PIPE RISER TO MECHANICAL AND ELECTRICAL ROOM. EXISTING PIPE
----- \- ---- - --
--'
c=
:;; �� - -
l---1- -=-'--j
r = = �-
,-----,_;=SC RE =i G - = �
+----,:s=CR =EEN =,- -+-�s
EN G ENI : G PENETRATIONS TO BE REUSED TO THE MAXIMUM EXTENT PRACTICAL; ALL PENETRATIONS
- --
TABLE
l
t- TABLE
1
TA E ,_-_J=:__ -_=_:__=_-;_:;__=_-;_:;__=_...::._ ;;;;_;;;;;_ ;;;;_;;;;_ ;;;;;;;;;_�j--U-::��� �
��-� �
r
�-tf+-;;;;;_ M ECHANI CAL
Indian Head
=I-+�+- ;;;;;_ TO BE RE-SEALED WITH 2-HOUR FIRE RESISTANCE RATED FIRE CAULK.
�-+�+- �-+�+-
_ _ _
..,...- SATISFACTORY TO DATE -
-- +
+ � - - =-=-=-=- \ ' �-- � -- t - �--
-
- -
��
0 -3 I
PROVIDE NEW DELUGE VALVE RISER FOR OVERHEAD AND UNDER-MEZZANINE DELUGE
DES JOK DRW ..OK CHK
w. O'BRIEN, £.1.T.
SP\\'
: ��
PM/DM
---.,....._.... + L--....J, t-- --t'-1 SYSTEM. EXISTING PIPE PENETRATIONS TO BE REUSED TO THE MAXIMUM EXTENT
----c
IL...l!l--t------1 -----tt-------t- _____,_, BRANCH MANAGER T. LNERMAN, P.E.
�' PRACTICAL; ALL PENETRATIONS TO BE RE-SEALED WITH 2-HOUR FIRE RESISTANCE
CHIEF ENG/ARCH T. cox.
P.E.
I I I \ FIRE PROTECTION J. KIIPAlRICK, P.E.
RATED FIRE CAULK.
B B
Cl Cl Cl
z
� zg � "' z
::. 0 >-
0 I- :c e:::
PROVIDE NEW AIRLOCK DELUGE VALVE RISER TO EXTEND OVER THE LOADING DOCK. (.) <:
EXISTING PIPE PENETRATIONS TO BE REUSED TO THE MAXIMUM EXTENT PRACTICAL; "' C, iii: Cl) 0::
1 ifi z ii,
t,-1ci'
0 :::;;
Z
ALL PENETRATIONS TO BE RE-SEALED WITH 2-HOUR FIRE RESISTANCE RATED FIRE �a5��
0
CAULK. � <( la! :::r:
0
-
g
LL
o::?;� <:z I-�
f-
UJ
PROVIDE NEW HIGH SPEED DELUGE FIRE SUPPRESSION RISER. PROVIDE NEW �05O Cl
mz
(/)
EXPLOSION PROOF ISOLATION VALVES TO EACH ZONE. EXISTING PIPE PENETRATIONS TO
(0
c:e � -
Z
w o::
LL
BE REUSED TO THE MAXIMUM EXTENT PRACTICAL; ALL PENETRATIONS TO BE fil::i!:- 0,0..
RE-SEALED WITH 2-HOUR FIRE RESISTANCE RATED FIRE CAULK. THE UHSD SYSTEM §�= c.oo
SPRAY NOZZLES SHALL BE PROPERLY POSITIONED AND INSTALLED IN ACCORDANCE �Oi
� C,
J
:::,
u
gl-
CJ _, z
WITH NFPA 15, HAZARD TYPE, HAZARD LOCATION(S), AND MANUFACTURER'S
.....,.
��1 � z�
II)
INSTALLATION REQUIREMENTS. COORDINATE WITH BUILDING OPERATOR FOR THE HAZARD (l_
TYPE AND EXACT LOCATION OF THE HAZARD. INSTALL CUSTOM PIPE/NOZZLE SUPPORT ltlz � 00 z
:::r: ...J <(
SYSTEMS. CUSTOM SUPPORT SHALL NOT OBSTRUCT OPERATIONS. -
C,
z I- ::::, ::::) a.. (/)
-----+II- AREA UNDER THE MEZZANINE ALSO TO BE PROTECTED BY OVERHEAD DELUGE SYSTEM. w��coo w
CJ) :c
(/)
1- 0::
W f �
I-�> Cl)
(l_
CONCEPTUAL LAYOUT/LOCATION OF THE WET-PIPE FEED TO THE ULTRA HIGH SPEED !;..J10 a: (l_
�LLi � W
15 � !!i 8::
a_ w
0::
A ��i � a: LL A
UTILITY BUILDING �zi _J
ill �
� u �
[BJ Cl
SCALE,
o.
<
Z
l>S NOTED
EPROJECTNO., 1701966
HHIHH-IIH
NAVFAC DRAWING NO.
13145475
SHEET 71 OF n
FX-101
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
D D
□� .• �□
·•·
: _.,
• •. .. •
.. •
.
•.. . .
fl-4 • ,4"
• • ., ,d :
. .. .., . . .if 4
. ..
•• .. . •. •
-
•· ..• ....
• •
- •• . . .
(1__, • •. •: •• .
2 3 4
�
----------
�
EXISTING BRIDGE �
CRANE TO REMAIN
+
-- ---------
I s AIRS}
I ULTRA HIGH SPEED DELUGE
�-
HIGH �---
+ 0.5 GPM/SQFT
APPROVED
OPEN
TO BELOW
�
- HAZARD �--- -----
�
-I
io
1-1 I
---------- -----
�
-
LOW ROOF
'
FIRE SUPPRESSION KEYED NOTES
1� -
-- - 7 � - - Indian Head
SATISFACTORY TO DATE -
I �---------- -----
I AREA UNDER THE MEZZANINE ALSO TO BE PROTECTED BY OVERHEAD DELUGE SYSTEM. DES JDK DRW JD K CHK SPW
✓
PM/DM w. O'BRIEN, E.I.T.
I / --...__ r \ - - - - --------
-
BRANCH MANAGER T. l.JVERIWI, P.E.
T. cox, P.E.
=r
CHIEF ENG/ARCH
I ( -I \ I I
' - ----- FlRE PROTECTION J. KILPATRICK, P.E.
--- -
��
J
OPEN I
B B
C,
z
0
,. z
"'
\ "'t/L
TO BELOW -- ----- �
- -
:.o�
:liZ " :'.5
..i.__
- --
>-
'--.. / �
---------- -----
o I- :c 0:::
C) ;j:<C
,,,.
LL.
iiiti; z Cl) 0
z g
Cl) � Q :::.
iE
-------- ::CI O
7
I I �C/)lll i:5 0
- LL
-
�<(f,! :r:
ffi :S: � �
----Ye
I I
0
'- ,/
� z
I I
'a\' □� z
'
- -
rl � z!i!
i5
a: o
w<(1:: W U
ffl::::1:5 a,O.. W
s::::1:� coo Cf)
l)� �81 gl-
1 � � � u rl"i ::::) z
�zi�.....,z
a:�o O �
w 0....
1:,-0
w a.. 0
z :r:...J <( z
�
z I- =. a.. 0
::, __,
w�SllllQ Cf)
C/) :c 1- w
Cf)
w� �
I- iE >
a:::
Cl) 0....
�....1,t,
�(.) <C
a:- 0....
=>
w<C
ffi 1- <( Cf)
�LL�
j!
g§ a_
A ��!!l & w w A
��i vl a: a:::
� z i -' LL
� g �
0. ID <(
� ic z
SCALE, /IS NOTED
EPROJECT NO., 1701966
Hlff#-H-#-1#11
NAVFAC DRAWING NO.
13145476
SHEET 72 OF 77
FX-102
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
NOTE: BASKET STRAINER EQUIPPED WITH FLUSH LINE AND ISOLATION VALVE FOR THE
BASKET STRAINER. PIPE FLUSH LINE DISCHARGE TO THE EXTERIOR.
1 11<===:::f=:::;;1
SEAL WITH SILICONE RUBBER SEAlANT
HANGER RINJJ (lYP. BOTH SIDES)
_.r-----LOCAL INSPECTORS TEST ASSEMBLY WITH MAIN ALL THREAD ROD ALL THREAD ROD
P,\CK l'ITTli OAKUM
(TIP. BOTl1 SIDES)
DRAIN AND PRESSURE RELIEF VALVE RETAINING STRAJ· •• ,.. ·�ETAINING STRAP GROUT s:JLID
(m'. som SIDES)
3 / 8' STEEL PLl,TI
SIZE: (O.S. PIPE DIA. + 4: MIN.) SD
PIPE THROUGH CONCRm WALL (lYP. BOIB SIDES)
GENERAL NOTES
....,-- - -
- VANE TYPE FLOW SWITCH HANGER RING
\ 1. IF THE HOLES CAN BE DRILLED CLOSE TO PIPE DIA., NO
SLEEVE IS REQUIRED. IF HOLE IS MADE WITH AIR HAMMER
OR CHISEL SLEEVE MUST BE USED AS SHOWN AND ANY
�---- TAMPER SWITCH REBARS CUT OR REMOVED SHALL BE WELDED BACK IN
LJ PIPE, SIZED PER NFPA 13 HANGER RIN PLACE.
AS BASED ON SUPPORTED PIPE SIZE
AND SPAN DISTANCE 2. LOCATE HOLES 8 FEET MINIMUM ABOVE FLOOR.
CHECK VALVE
3. PROVIDE MINIMUM I" DEEP CAULK WITH A MINIMUM SLEEVE
----s�::::-?t;;::-----.....
DELUGE VALVE AND TRIM GAP OF 1" ON ALL SIDES.
PIPE SLEEVE THROUGH CONCRETE WALL
NOT TO SCALE
BUTTERFLY VALVE
C BASKET STRAINER C
◊
8" FIRE SERVICE STUB-OUT
/
I�
"
8" FIRE SERVICE LATERAL I>.
� FIRE STOPPIN I
I
I
I
I
I " Indian Head
I � SATISFACTORY TO DATE
I DES JDK DRW JDK CHK SPW
I PM/DM W, O'BRIEN, E.I.T.
BRANCH �ANAGER T. UI/ERIMN, P.E.
FIRE STOPPIN/ CHIEF ENG/ARCH T. COX, P.E.
◊
Q6 GUAGE GALV. SNAP SHEET SLEEVE J. KILPAlRICK, P.E.
ALV SCH40 PIPE SLEEVE FIRE PROTECTION
B Cl
B
0 0
z z
z
::E
<
" ACKUP MATERIAL ::;
::; 0 ::c
�
:'.:S
en
�
8en C:, o
i
�z� i
I> I-
t- -
�I ci I z
en Cl) � c5
::c 0
<(
� �
"' � z
5
w
<( (/)
PIPE RESTRAINER � Cl Cl
�z � z
w
�
PIPE C
w
A B IB <( -
� !§
coo
0)0..
SIZE �
B - U-BOLT DIAMETER §��
ALL-THREAD
ROD
ALL-THREAD ROD ½ ¾ 3Ys 2% 0 0 Ii
;oi
"> Cl
gl-
�=>
z
0
¾ ¾ u
en
3Ys < z ;I_
=>
SADDLE (GUSSETS USED FOR 8" AND LARGER) 2½
1 ¾ 3¾ 2%
a: lE
z -
""
UJ
�z�
I- -
(/)
(/)
w
A B SWIVEL NUT UJ
z �00 O::'.
PIPE PIPE BOLT SADDLE PLATFORM BOLT 1¼ ¾ 3¾ 2½ Cl
::ca..
<(...J
-
Q_
Q_
SIZE DIAMETER DIAMETER SIZE SIZE SIZE z
I-
:::> =>
ADJUSTABLE BAND
1 ¾ ¼ ¼ X 1½ ¼ X 6 X 6 % HANGER 1½ ¾ 3½ 2½ UJ � �CDO (/)
¼ X2 ¼ X 6
Cl)::c
UJ i I- w
1¼ ¾ ¾ X 6 % 2 ¾ 4½ 3 -o
en O::'.
PRINKLER PIPING
I 1½
2
¾
¾
¾
¾
¼ X2
¼ X2
¼
¼
X 6
X 6
X 6
X 6
%
% AT LEAST ONE FULL 2½ ¾ 5% 4½ <
z 0 !z
I- ,!;
?;; _J I �
<(
a:
L_J <(
iIll
""
�zi
"'
18 X 3½
-'
5 2½ ½ 18 X 12 X 12 ¾ 5 ½ 9½ 6¼
"' u
ti. ii! �
i---A (SCH. 40) 6 2½ % ½ X 3½ 18 X 12 X 12 ¾ w
0
:::,
"- z
8 2½ % ½ X 3½ 18 X 12 X 12 ¾ 6 ½ 1 QYs 6¾ SCALE: />S NOTED
10 2½ ¾ ½ X 3½ 18 X 12 12 ¾ 1701966
EPROJECT NO.
¼"WELD X
8 ½ 13½ 8¾ CONSTR. CONTR. NO.
12 2½ ½ ½ X 3½ 18 X 12 X 12 ¾ IHHf-H-1-1111
ALL SIZES ARE IN INCHES ALL SIZES ARE IN INCHES NAVFAC DRAWING NO
SPRINKLER PIPING 13145477
NOTE: PIPE RESTRAINERS MUST BE PROVIDED ON ALL FIRE SUPPRESSION PIPING 2" AND
SMALLER. RESTRAINERS MUST BE PLACED IN ACCORDANCE WITH NFPA 13. SHEET 73 OF n
PLATFOR BOLT TYPICAL
FX-201
1
DRAWFORM REVISION: 5EP2021
2 3 4 5
1 2 3 4 5
GENERAL NOTES FIRE ALARM NOTES FIRE ALARM NOTES (CONT'D) FIRE ALARM LEGEND
1. DRAWING ACCURACY: LOCATIONS AND SIZES OF EXISTING EQUIPMENT, PIPING, DUCTWORK, 1. PROVIDE SYSTEM DESIGN AND INSTALLATION OF A NEW FULLY CODE COMPLIANT, SUPERVISED, C. PROVIDE A MINIMUM SOUND POWER OF 70 DBA AND 15 DB OVER THE AVERAGE
OUTLETS, DIMENSIONS, FIXTURES, WALLS/PARTITIONS, AND DEVICES SHOWN ON DRAWINGS ADDRESSABLE FIRE ALARM SYSTEM. THE NEW SYSTEM SHALL INCLUDE, BUT NOT BE LIMITED TO AMBIENT SOUND LEVEL AT THE MOST REMOTE LOCATION WITHIN THE ROOM/AREA
ARE APPROXIMATE. VERIFY AT THE PROJECT SITE. DRAWINGS ARE DIAGRAMMATIC AND THE FOLLOWING COMPONENTS: NEW FIRE ALARM CONTROL PANEL, SNUB WIRELESS ALARM MEASURED AT 5 FT AFF. THE FOLLOWING CRITERIA WILL BE USED FOR REVIEW FIRE ALARM/MASS NOTIFICATION CONTROL PANEL
NOT INTENDED TO BE SCALED. TRANSMITTER/ANTENNA, TERMINAL CABINETS, MANUAL PULL STATIONS, SMOKE DETECTORS, AND APPROVAL OF SHOP DRAWINGS.
ADDRESSABLE INTERFACE DEVICES, OTHER INITIATING DEVICES, RELAYS, NOTIFICATION APPLIANCES, NOT USED
2. COORDINATION: COORDINATE AND SEQUENCE THE WORK PRIOR TO FABRICATION AND CONDUIT, SOFTWARE, CUSTOM PROGRAMMING, SYSTEM CHECK OUT AND TESTING, AND ALL 1.) REDUCE THE SOUND POWER BY 6 DB EACH TIME THE DISTANCE BETWEEN THE
INSTALLATION OF EQUIPMENT. MAKE NECESSARY ACCOMMODATIONS TO MEET THE INTENT ACCESSORIES NECESSARY FOR A COMPLETE AND USEABLE SYSTEM. HEAT DETECTION SHALL BE
D OF THE DRAWINGS AND ENSURE A COORDINATED INSTALLATION. PROVIDED AT THE CEILING FOR RELEASE OF THE OVERHEAD DELUGE SYSTEM; ALSO LOCATED
APPLIANCE AND THE LISTENER IS DOUBLED. STARTING DISTANCE IS PER
MANUFACTURER'S DATASHEET, TYPICALLY 10 FT.
FIRE ALARM COMMUNICATOR (WIRELESS RF TRANSMITTER)
D
UNDER MEZZANINE FOR RELEASE OF THE OVERHEAD DELUGE SYSTEM. COMBINATION ULTRAVIOLET
3. SUBMITTALS: PROVIDE PRODUCT INFORMATION, SHOP DRAWINGS, DOCUMENTS AND INFRARED {UV/IR) FLAME DETECTORS SHALL BE PROVIDED FOR RELEASING OF ULTRA HIGH I TXT I NOT USED
WARRANTIES FOR MATERIALS AND SERVICES PROVIDED ON THIS PROJECT. SPEED DELUGE FIRE SUPPRESSION SYSTEMS. UV/IR FLAME DETECTORS SHALL ALSO HAVE A 2.) REDUCE THE SOUND POWER IN ACCORDANCE WITH THE MANUFACTURER'S
DEDICATED ZONE TO RELEASE OVERHEAD DELUGE SUPPRESSION SYSTEM. DATASHEET FOR SOUND POWER DISTRIBUTION NOT PERPENDICULAR TO THE NOT USED
4. INSTALLATION OF NEW WORK: PERFORM INSTALLATION IN A NEAT AND PROFESSIONAL FACE OF THE APPLIANCE. REFER TO MANUFACTURER'S TYPICAL SOUND OUTPUT
MANNER IN ACCORDANCE WITH INDUSTRY STANDARD MATERIALS, TOOLS, AND METHODS. 2. ALL DEVICES, JUNCTION BOXES, BACK BOXES, AND CONDUITS IN ELECTRICAL HAZARDOUS AREAS DISTRIBUTION DIAGRAM. SURGE SUPPRESSOR {TRANSIENT VOLTAGE SURGE SUPPRESSOR)
SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70, ARTICLE 501. ELECTRICAL HAZARDOUS
5. MOUNTING HEIGHTS: COORDINATE MOUNTING HEIGHTS OF DEVICES ON FINISHED WALLS AREAS ARE IDENTIFIED ON SHEET E-308 FOR REFERENCE. 3.) IN LIEU OF THE MANUFACTURER'S PUBLISHED DB LOSS, ASSUME A MINIMUM 15 MANUAL PULL STATION
TO PROVIDE A NEAT AND SYMMETRICAL APPEARANCE. DB LOSS THROUGH A STANDARD CLOSED DOOR. IT]
3. COORDINATE ALL REQUIRED SYSTEMS TO THE SATISFACTION OF THE CONTRACTING OFFICER AND NOT USED
6. CLEANING & MATERIAL DISPOSITION: CLEAR ALL DEBRIS FROM THE AREA OF WORK AND AUTHORITY HAVING JURISDICTION. ANY DEFICIENCIES, INCONSISTENCIES, OR POORLY COORDINATED OAIM
LEAVE SITE IN CLEAN CONDITION. CLEAN ALL EQUIPMENT ENCLOSURES, INSIDE AND INSTALLATIONS SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST. 13. VISUAL NOTIFICATION DESIGN CRITERIA: HEAT DETECTOR
OUTSIDE. CD
4. THE FIRE ALARM DRAWINGS ARE SCHEMATIC IN NATURE AND SHOW A MINIMAL QUANTITY OF A. PROVIDE VISIBLE NOTIFICATION APPLIANCES AS REQUIRED TO ACHIEVE THE
7. CONTRACT DRAWINGS MUST BE USED WITH THE SPECIFICATIONS TO OBTAIN COMPLETE
CONSTRUCTION INFORMATION. CONTRACTOR SHALL COORDINATE ALL DRAWINGS AND
DEVICES. DETERMINE THE FINAL QUANTITY AND LOCATION OF ALL DEVICES IN ACCORDANCE WITH COVERAGE INDICATED. CD SMOKE DETECTOR
THE SPECIFICATIONS, CONTRACT DRAWINGS, AND MANUFACTURER'S WRITTEN RECOMMENDATIONS TO B. SPACE STROBES IN ACCORDANCE WITH THE CRITERIA OUTLINED IN NFPA 72,
SPECIFICATIONS PRIOR TO COMMENCING WORK. QUESTIONS REGARDING DESIGN INTENT
OR SYSTEM OPERATION SHALL BE PROMPTLY BROUGHT TO THE OWNER'S
BE COMPLIANT WITH ALL APPLICABLE CODES AND STANDARDS. PROVIDE ADDITIONAL DEVICES
WHEN REQUIRED FOR A FULLY FUNCTIONING FIRE ALARM SYSTEM AS REQUIRED BY NFPA 72,
UNLESS OTHERWISE NOTED. ®F NOT USED
REPRESENTATIVES ATTENTION. AND UFC 3-600-01.
CD NOT USED
8. ANY CONFLICTS BETWEEN SPECIFICATIONS AND DRAWINGS SHALL BE BROUGHT TO THE 'cf
, '
5. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN METALLIC CONDUIT. ONLY SYSTEM WIRING OF
GOVERNMENT'S ATTENTION IMMEDIATELY. THE CONTRACTOR SHALL NOT PROCEED WITH THE SAME VOLTAGE MAY BE RUN IN THE SAME CONDUIT. MINIMUM CONDUIT SIZE SHALL BE ¾ @J<]CD NOT USED
ANY WORK EXCEPT AT THEIR OWN RISK, UNTIL CLARIFICATIONS OF CONFLICTS ARE INCH. RUN ALL CONDUIT IN THE VERTICAL OR HORIZONTAL PLANE, AND MAKE TURNS AT 90
C
WP
ISSUED TO THE CONTRACTOR BY THE COTR OR HIS/HER AUTHORIZED REPRESENTATIVE. DEGREE ANGLES.
9. "PROVIDE" SHALL MEAN CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE AND 6. WHERE AVAILABLE, ALL EXPOSED FIRE ALARM JUNCTION BOXES, COVERS AND CONDUITS IN D<J FIRE ALARM HORN (WP=WEATHERPROOF)
READY FOR INTENDED USE. UNFINISHED AREAS ARE TO BE PROVIDED PRE-FINISHED RED FROM THE FACTORY. PAINT
EXPOSED CONDUIT AND JUNCTION BOXES IN FINISHED AREAS TO MATCH ADJACENT SURFACES. U1 WALL MOUNTED STROBE
10. "REMOVE" SHALL MEAN CONTRACTOR SHALL DISCONNECT AND CLEAR FROM SITE, UNLESS JUNCTION BOXES INSIDE COVER LABELED, "FIRE ALARM". WHERE CONDUIT PENETRATES A WALL,
SPECIFICALLY NOTED OR SPECIFIED OTHERWISE. RED 3/4 INCH WIDE BANDS SHALL BE PAINTED EVERY 20FT AND BOTH SIDES OF PENETRATIONS. NOT USED
11. CONTRACTOR SHALL BE RESPONSIBLE FOR AVOIDING ALL CONFLICTS WITH LIGHT 7. PROVIDE CONDUIT IN ACCORDANCE WITH THE REQUIREMENTS OF THE ELECTRICAL SPECIFICATIONS, SPRINKLER VALVE TAMPER {MODULE ONLY)
FIXTURES, HVAC DIFFUSERS, GRILLS, DUCTS, CONDUIT AND OTHER PIPING OR OTHER UNLESS OTHERWISE NOTED. SUPPORT CONDUIT IN ACCORDANCE WITH THE NEC SUCH AS
OBSTRUCTIONS ENCOUNTERED. COORDINATE ALL WORK WITH FIELD CONDITIONS. MAXIMUM 10 FT SUPPORT INTERVALS AND 3 FT FROM A TERMINATION. TENSION ONLY HANGERS APPROVED
CONTRACTOR SHALL PROMPTLY NOTIFY COTR PRIOR TO INITIATING WORK, IF ANY SPRINKLER FLOW SWITCH (MODULE ONLY)
ARE NOT PERMITTED SUCH AS BATWINGS. FLEXIBLE CONDUIT IS ONLY PERMITTED WHEN
MOUNTING LOCATIONS ARE OBSTRUCTED AND/OR IF ANY MOUNTING CONFLICTS OR CONNECTING TO THE FOLLOWING DEVICES AND APPLIANCES: DEVICES LOCATED ON FIRE
PROBLEMS ARE DISCOVERED. SUPPRESSION EQUIPMENT SUCH AS FLOW/PRESSURE SWITCHES, SOLENOIDS, AND TAMPER *EX* SUBNOTATION DENOTES EXPLOSION-PROOF DEVICE.
SWITCHES. DEVICES AND APPLIANCES LOCATED IN REMOVABLE CEILING TILES, OR WHERE
12. LAYOUT AND INSTALLATION OF CEILING-MOUNTED DEVICES IN "PUBLIC OR COMMON SPECIFICALLY NOTED. ULTRAVIOLET/IFRARED FLAME DETECTOR
AREAS" FINISHED CEILINGS SHALL BE SYMMETRICAL (ALIGNED WITH OTHER FIRE ALARM
CEILING-MOUNTED DEVICES) WITHOUT VIOLATING REFERENCED STANDARDS OR THIS 8. SEE PROJECT SPECS FOR FIRE ALARM WIRING/CONDUCTOR REQUIREMENTS. PROVIDE ALL FIRE SUPPRESSION RELEASING PANEL Indian Head
SPECIFICATION. CIRCUITS WITH LABELING AT THE POINT OF TERMINATION SUCH AS SLC 1, NAC 8, IDC 4. SATISFACTORY TO DATE
13. DESIGN LAYOUT AND DRAWING BACKGROUNDS ARE FOR BIDDING PURPOSES ONLY AND 9. RUN CONDUCTORS FROM DEVICE TO DEVICE WITHOUT SPLICES. WIRE NUTS ARE PROHIBITED. PM/DM w. O'BRIEN, E.I.T.
ARE NOT TO BE USED FOR CONSTRUCTION. DRAWING BACKGROUNDS MAY NOT MATCH UTILIZE TERMINAL STRIPS WHERE CONDUCTORS CANNOT BE DIRECTLY TERMINATED AT THE DEVICE BRANCH MANAGER T, �, p,[
FIELD CONDITIONS. CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS PRIOR TO SUCH AS PIGTAILS OFF A HEAT DETECTOR.
CHIEF ENG/ARCH T. cox. P.E.
FIRE PROTECTION J. KILPATRICK, P.E.
FABRICATION/INSTALLATION OF ANY EQUIPMENT.
B 10. DO NOT USE FIRE ALARM EQUIPMENT PANELS AS RACEWAY FOR ROUTING POWER WIRING OR LOW B
14. ALL PENETRATIONS THROUGH THE FLOOR/CEILING ASSEMBLY SHALL BE PROPERLY VOLTAGE WIRING. ONLY ROUTE WIRING TERMINATING WITHIN THE PANEL INTO THE PANEL. PROVIDE
PROTECTED IN ACCORDANCE WITH PROJECT SPECIFICATION SECTION 07 84 00, FIRE
STOPPING.
1/4 INCH SEPARATION BETWEEN POWER-LIMITED FIRE ALARM CIRCUITS AND POWER CIRCUITS.
STANDARDS AND CODE REFERENCES ABBREVIATIONS
11. SURGE SUPPRESSION:
15. ONLY DESIGNERS, ENGINEERS, AND INSTALLERS WHO HAVE AT LEAST TWO YEARS' 1. APPLICABLE CODES AND STANDARDS: THE PROJECT INSTALLATION MUST SATISFY THE MOST AFF ABOVE FINISHED FLOOR
RECENT EXPERIENCE WITH ULTRA HIGH SPEED DELUGE SYSTEMS CAN DESIGN AND A. PROVIDE SURGE SUPPRESSION (SPD) FOR ALL SIGNALING LINE CIRCUITS, INDICATING DEVICE
CIRCUITS, OR NOTIFICATION APPLIANCE CIRCUITS THAT LEAVE OR ENTER A FACILITY'S EXTERIOR CURRENT EDITIONS OF THE FOLLOWING CODES AND STANDARDS USING THE MOST STRINGENT AHJ AUTHORITY HAVING JURISDICTION
INSTALL ULTRA HIGH SPEED DELUGE SYSTEMS AND THEIR RELEASING SYSTEMS. REQUIREMENT WHEN THERE IS A CONFLICT BETWEEN THEM.
ENCLOSURE. SPD IS NOT REQUIRED FOR DEVICES CONNECTED DIRECTLY TO THE FACILITY AWG AMERICAN WIRE GAGE
EXTERIOR WHEN THE FACILITY ITSELF IS PROVIDED WITH LIGHTNING PROTECTION. DOD UNIFORM FACILITIES CRITERIA DOCUMENTS CD CANDELA
A. UFC 1-200-01, GENERAL BUILDING REQUIREMENTS CFM CUBIC FEET PER MINUTE
B. SPD MUST BE PROVIDED AT THE FIRST LOCATION WHERE CONNECTIONS ARE MADE THAT IS CLOSE
TO WHERE THE CIRCUIT ENTERS OR LEAVES THE FACILITY, PRIOR TO CONNECTION TO ANY OTHER
B. FC 1-300-09N, NAVY AND MARINE CORPS DESIGN PROCEDURES co CARBON MONOXIDE
DEVICES WHEN FEASIBLE. C. UFC 3-410-01, HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS DB DECIBEL
D. UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES DBA DECIBEL A-WEIGHTED
C. PROVIDE SURGE SUPPRESSORS TO PROTECT ALL POWER SUPPLY CIRCUITS TO ALL FIRE E. UFC 3-601-02, OPERATIONS AND MAINTENANCE: INSPECTION, TESTING, AND
MAINTENANCE OFFIRE PROTECTION SYSTEMS FAMN FIRE ALARM MASS NOTIFICATION
ALARM SYSTEM EQUIPMENT (FACP, ACU, & NACP). SURGE SUPPRESSOR MUST HAVE BOTH A FA FIRE ALARM
UL 1449 AND 1283 LISTING. IT MUST BE LOCATED IN AN ADJACENT HINGED TERMINAL BOX. FDC FIRE DEPARTMENT CONNECTION
12. AUDIBLE NOTIFICATION DESIGN CRITERIA: NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES FM FM GLOBAL
A. NFPA 1, FIRE CODE IDC INITIATING DEVICE CIRCUIT
A. PROVIDE AUDIBLE NOTIFICATION APPLIANCES AS INDICATED TO ACCOMPLISH THE FOLLOWING B. NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS LED LIGHT EMITTING DIODE
DESIGN CRITERIA WITH ALL DOORS AND WINDOWS CLOSED. WHERE THIS DESIGN CRITERIA C. NFPA 70, NATIONAL ELECTRIC CODE
D. NFPA 72, NATIONAL FIRE ALARM CODE NAC NOTIFICATION APPLIANCE CIRCUIT
IS NOT ACCOMPLISHED DURING COMMISSIONING, PROVIDE ADDITIONAL DEVICES TO MEET E. NFPA 90A, AIR CONDITIONING AND VENTILATION SYSTEMS NEC NATIONAL ELECTRICAL CODE
A THE MINIMUM DESIGN CRITERIA WITHOUT EXCEEDING THE LIMITATIONS OF THE FACP AND
NACP. (INCLUSIVE OF PRESCRIBED SAFETY FACTORS).
F. NFPA 101, LIFE SAFETY CODE NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION A
RF RADIO FREQUENCY
B. PROVIDE AUDIO NOTIFICATION THROUGHOUT THE ENTIRE BUILDING THAT MEET THE SLC SIGNALING LINE CIRCUIT
REQUIRED SOUND LEVELS OUTLINED IN THESE CONTRACT DOCUMENTS. TYP TYPICAL SCALE AS NOTED
UL UNDERWRITERS LABORATORY EPROJECTNO., 1701966
WP WEATHER PROOF (NEMA 250, TYPE 3R) CONSTR. CONTR. NO.
HHH-H+II##
NAVFAC DRAWING NO.
1.3145478
SHEET 74 OF 77
FA-001
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
I """ I
INSTALLATION REQUIREMENTS. COORDINATE WITH BUILDING OPERATOR FOR THE HAZARD
TYPE AND EXACT LOCATION OF THE HAZARD. INSTALL CUSTOM STRUCTURE TO
WRAPPING SUPPORT DETECTORS, WHERE NECESSARY. CUSTOM SUPPORT SHALL NOT OBSTRUCT
w
MACHINftx,
OPERATIONS.
C EMERGENCY
SHOWER & EYEWASH
ELECTRICAL NEW CONDUIT SHALL BE RUN BETWEEN MAIN BUILDING AND UTILITY BUILDING. PROVIDE
*EX*
I o-4 I SURGE PROTECTION ON BOTH ENDS OF THE CIRCUITS BOTH INSIDE THE MAIN
BUILDING AND THE UTILITY BUILDING.
PROCESS
I o-1 I
• x•
CD
*EX'
2 FIRE ALARM RADIO TRANSMITTER SHALL BE AN AES BRAND TRANSMITTER. PROVIDE
-@....---- --+----+-I® TRANSMITTER WITH BUILT-IN STUB ANTENNA TO "MESH" WITH THE EXISTING AES MESH
NETWORK IN THE AREA.
MECHANICAL
I o-3 I HEAT DETECTORS LOCATED UNDER THE MEZZANINE FOR ACTIVATION OF THE OVERHEAD
DRYING DRYING DRYING
4 DELUGE SYSTEM. HEAT DETECTORS SHALL BE PROPERLY POSITIONED AND INSTALLED IN
CART CART CART DRYING ACCORDANCE WITH NFPA 72, HAZARD TYPE, HAZARD LOCATION(S), AND
®®®®
CARTS
MANUFACTURER'S INSTALLATION REQUIREMENTS.
w
*EX' \
SCREENI G
□□
TABLE
JDK
Indian Head
JDK
-
SPW
<ZS> ..__..... <ZS> <ZS>
DR W CHK
FACP FAC
DES
B B
C Q Cl
z ,. z
:i:zg :5
"0:c >-
8 I- � e:::
"' CJ i5 ::Ii en
ill z;:;
g
1
t��
t;;I,
ffiS:� �
:r:
Z
Q g§
� 0
3 �Cl� Cl CI: �
�ziii z
W
w<(s
(/)
a.. f
coo
[fj ::i: - 0)
-o
§�� -
0:::
�(.) � i.:
g f-
;;: CJ ill (..) (!J ::::)
LL
��l�z� z
tl1z � 0 (.) ::i
:r:....J<(
a_ 0..
CJ 1- -
F SS z :::::, ::::) �
w��lllO 0:::
(/) :c I- 4'.
W[i � _J
s 1-i� en <(
t, a: w
�5ii::g§
...J -;-
c.) icLL�
<(
a_
0:::
LL
� :z
SCALE /IS NOTED
EPROJECTNO., 1701966
##IH#-##-1-#IH
NAVFAC DRAWINGNO.
13145479
SHEET 75 OF 77
FA-101
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
D D
2
24 ' - Q
"
29'-
6"
FIRE ALARM KEYED NOTES
COMBINATION UV/IR FLAME DETECTOR FOR RELEASE OF OVERHEAD DELUGE ZONE. NOT
TO ACTIVATE ANY UHSD ZONE. INSTALL CUSTOM STRUCTURE TO SUPPORT DETECTORS,
C WHERE NECESSARY. CUSTOM SUPPORT SHALL NOT OBSTRUCT OPERATIONS.
1
AIR LOCK ROOF
APPROVED
ff?
EXl9'11NG BRIDGE *EX* *EX*
Cl)
Indian Head
TO REMAIN
SATISFACTORY TO DATE
B
PROCESS
B I1-1 I
*EX* *EX* *EX' *EX* LOW ROOF
1
*EX*
1
OPEN
TO BELOW 'N
I
*EX* *EX* .LC)
Cl) Cl)
+---+--
1
A A
SCALE, AS NOTED
EPROJECT NO., 1701966
NAVFAC DRAWING NO
1.3145480
SHEET 76 OF n
FA-102
1 2 3 4 5
DRAWFORM REVISION: SEP 2021
1 2 3 4 5
FIRE ALARM RISER GENERAL NOTES FIRE ALARM RISER KEYED NOTES CIRCUIT LEGEND
1. ALL WIRING AND CONDUIT SIZES AND QUANTITIES SHALL BE DEDICATED POWER CIRCUIT(S) FOR THE FIRE ALARM SIGNALING LINE CIRCUIT (CLASS B)
IN ACCORDANCE WITH THE FIRE ALARM SYSTEM EQUIPMENT PANELS, AND AES RADIO TRANSMITTER. SEE
MANUFACTURE'S RECOMMENDATIONS, UFC 3-600-01, NFPA ELECTRICAL PLANS FOR ADDITIONAL INFORMATION. NOTIFICATION APPLIANCE CIRCUIT (CLASS B)
70 AND NFPA 72. COORDINATE ALL WORK WITH THE ONE DEDICATED CIRCUIT PER FLOOR
ELECTRICAL AND SPRINKLER CONTRACTORS. INSTALL SURGE SUPPRESSOR ON ALL CIRCUITS LEAVING THE
D BUILDING. SPEAKER CIRCUIT (CLASS B) D
2. FIRE ALARM RISER DIAGRAM IS DIAGRAMMATIC. RUNS OF
CONDUIT AND MANNER OF CONNECTION SHALL BE MOUNT RADIO TRANSMITTER ANTENNA PER MANUFACTURER'S
DETERMINED BY THE CONTRACTOR AND IN ACCORDANCE RECOMMENDATION FOR OPTIMUM SIGNAL STRENGTH.
WITH THE FIRE ALARM SYSTEM MANUFACTURER'S
RECOMMENDATIONS, UFC 3-600-1, NFPA 70, NFPA 72
AND THE CONTRACT SPECIFICATIONS.
(i)
SYSTEM OUTPUTS
............
,------------u--V-�--@}- WP
C •-•-•-•�•_rN D<J
CONTROL UNIT CONTROL
ANNUNCIATION NOTIFICATION FUNCTION
FAC FACP
120 VAC
G)
1ST FLOOR
_ _A_M_S-CA- -: -0-
LE N NE
Indian Head
------¥
SATISFACTORY TO DATE
12" TO CEILING
FIRE PROTECTION J. KILPAlRICK, P.E.
SYSTEM INPUT J K L M
•• •• •• •• •
A B C D E F G H I N O P Q R
1 MANUAL PULL STATION ACTIVATION
2 SMOKE DETECTOR ACTIVATION
DUCT DETECTOR
COMBINATION
3
4
SPRINKLER WATERFLOW SWITCH ACTIVATION
SPRINKLER CONTROL VALVE TAMPER SWITCH ACTIVATION
•• •• ••• • 2
3
MANUAL PULL REMOTE INDICATING
STATION----..
TO TO 0
LAMP/TEST SWITCH 5
6
FIRE ALARM SYSTEM TROUBLE
FIRE ALARM SYSTEM PRIMARY POWER LOSS
•• •• •
••
4
5
BOTTOM BOTTOM
80" 80" 6
7
(i)
OF LENS OF LENS 7
8 8
SIDEWALL
9 9
5'-0" 44" TO 66" TO 10
CENTER
10
OPERATING 11 11
MAX HANDLE 12 12
13 13
A FLOOR 14 14 A
15 15
16 16
17 17
A B C D E F G H I J K L M N O P Q R
SCALE />S NOTED
IHHHl-1-HH
WALL M OUNTED D EVICES
SCALE: ON NE
NAVFAC DRAWING NO.
13145481
SHEET 77 OF 77
FA-201
1 2 3 4 5
DRAWFORM REVISION: SEP 2021