While all projects are different depending on the configuration of the fuel site, there are some
key milestones that most fuel system installations share.
Using time-lapse photography, the Veeder-Root team of field engineers have captured the
installation of a new retail fueling system. This video documents the installation process from the
lowering of two underground fuel storage tanks to the completed installation of four fuel
dispensers.
A large project like updating a gas station or convenience store’s fueling equipment requires a
well-managed schedule to properly coordinate the sequence of events. This ensures that each
team is on-site only when needed, and they can get to work on their portion of the job with no
delays.
Here are the basic steps involved in updating fueling equipment at a convenience store: