Professional Documents
Culture Documents
march month
Persent Of Produced
Details Of Material Q uantity Of Produced materials materials
Discription Units Day shift Night Shift Total Qty Day shift Night Shift
A). WHEAT FLOUR
1). Special Types
1.1). Special (50Kgs) Qts 82.50 0.00 82.50 81.68% 0.00%
1.2). Special (25Kgs) Qts - - - ---- ----
1.3). Special (10Kgs) Qts - - - ---- ----
1.4). Special (5Kgs) Qts - - - ----- -----
TOTAL SUMMERY Qts 82.50 0.00 82.50 81.68% 0.00%
2). Standard Types
2.1). Standard (50Kgs) Qts '------ '------ ------ '------ '------
2.2). Standard (25Kgs) Qts '------ '------ ------ '------ '------
2.3). Standard (10Kgs) Qts '------ '------ ------ '------ '------
2.4). Standard (5Kgs) Qts '------ '------ ------ '------ '------
TOTAL SUMMERY Qts 0.00 0.00 0.00 0.00 0.00
B). By Product
1). Special Types
1.1). Furushika (50Kgs) Qts 12.00 0.00 12.00 11.88% 0.00%
1.2). Furushikelo (50Kgs) Qts 6.50 0.00 6.50 6.44% 0.00%
1.3). Furnacho (50Kgs) Qts '------ '------ ------ '------ '------
1.4). Geleba (50Kgs) Qts '------ '------ ------ '------ '------
1.4). Binagn (50Kgs) Qts '------ '------ ------ '------ '------
TOTAL SUMMERY Qts 18.50 0.00 18.50 18.32% 0.00%
GRAND SUMMERY Qts 101.00 0.00 101.00 100% 0%
የስቶር ተቆጣጣሪው ስም_____________________ የስቶር ኃላፊው ስም_________________ ድርጅቱ ዋናው ኃላፊ ስም___________________
ፊርማ______________ ፊርማ______________ ፊርማ______________
Persent Of Produced
Details Of Material Q uantity Of Produced materials materials
Discription Units Day shift Night Shift Total Qty Day shift Night Shift
A). WHEAT FLOUR
1). Special Types
1.1). Special (50Kgs) Qts 60.00 177.00 237.00 28.95% 85.40%
1.2). Special (25Kgs) Qts 99.75 0.00 99.75 48.13% ----
1.3). Special (10Kgs) Qts - 0.00 - ---- ----
1.4). Special (5Kgs) Qts - 0.00 - ----- -----
TOTAL SUMMERY Qts 159.75 177.00 336.75 77.08% 85.40%
2). Standard Types
2.1). Standard (50Kgs) Qts 0.00 0.00 ------ '------ '------
2.2). Standard (25Kgs) Qts 0.00 0.00 ------ '------ '------
2.3). Standard (10Kgs) Qts 0.00 0.00 ------ '------ '------
2.4). Standard (5Kgs) Qts 0.00 0.00 ------ '------ '------
TOTAL SUMMERY Qts 0.00 0.00 0.00 0.00 0.00
B). By Product
1). Special Types
1.1). Furushika (50Kgs) Qts 31.00 33.50 64.50 14.96% 14.50%
1.2). Furushikelo (50Kgs) Qts 16.50 20.50 37.00 7.96% 8.87%
1.3). Furnacho (50Kgs) Qts '------ '------ ------ '------ '------
1.4). Geleba (50Kgs) Qts '------ '------ ------ '------ '------
1.4). Binagn (50Kgs) Qts '------ '------ ------ '------ '------
TOTAL SUMMERY Qts 47.50 54.00 101.50 22.92% 23.38%
GRAND SUMMERY Qts 207.25 231.00 438.25 100% 109%
የስቶር ተቆጣጣሪው ስም_____________________ የስቶር ኃላፊው ስም_________________ ድርጅቱ ዋናው ኃላፊ ስም___________________
Persent Of Produced
Details Of Material Q uantity Of Produced materials materials
Discription Units Day shift Night Shift Total Qty Day shift Night Shift
A). WHEAT FLOUR
1). Special Types
1.1). Special (50Kgs) Qts 116.00 89.00 205.00 63.39% 48.63%
1.2). Special (25Kgs) Qts 25.00 113.25 138.25 13.66% ----
1.3). Special (10Kgs) Qts - 0.00 - ---- ----
1.4). Special (5Kgs) Qts - 0.00 - ----- -----
TOTAL SUMMERY Qts 141.00 202.25 343.25 77.05% 48.63%
2). Standard Types
2.1). Standard (50Kgs) Qts 0.00 0.00 ------ '------ '------
2.2). Standard (25Kgs) Qts 0.00 0.00 ------ '------ '------
2.3). Standard (10Kgs) Qts 0.00 0.00 ------ '------ '------
2.4). Standard (5Kgs) Qts 0.00 0.00 ------ '------ '------
TOTAL SUMMERY Qts 0.00 0.00 0.00 0.00 0.00
B). By Product
1). Special Types
1.1). Furushika (50Kgs) Qts 28.00 45.00 73.00 15.30% 16.53%
1.2). Furushikelo (50Kgs) Qts 14.00 25.00 39.00 7.65% 9.18%
1.3). Furnacho (50Kgs) Qts '------ '------ ------ '------ '------
1.4). Geleba (50Kgs) Qts '------ '------ ------ '------ '------
1.4). Binagn (50Kgs) Qts '------ '------ ------ '------ '------
TOTAL SUMMERY Qts 42.00 70.00 112.00 22.95% 25.71%
GRAND SUMMERY Qts 183.00 272.25 455.25 100% 74%
የስቶር ተቆጣጣሪው ስም_____________________ የስቶር ኃላፊው ስም_________________ ድርጅቱ ዋናው ኃላፊ ስም___________________
2). By Product
2.1). Furushika (50Kgs 81.50 10.50 0060 92.00 47.50 0073 44.50 44.50 100.00 0062 144.50 54.00 0073 90.50
2.2). Furnacho (50Kgs) 0.00 0.00 ------ 0.00 0.00 ------ 0.00 0.00 0.00 ------ 0.00 0.00 ------ 0.00
2.3). Geleba (50Kgs) 0.00 0.00 ------ 0.00 0.00 ------ 0.00 0.00 0.00 ------ 0.00 0.00 ------ 0.00
2.4). Binagn (50Kgs) 0.00 0.00 ------ 0.00 0.00 ------ 0.00 0.00 0.00 ------ 0.00 0.00 ------ 0.00
99.00 210.50 309.50 207.25 102.25 102.25 250.00 352.25 231.00 121.25
የስቶር ተቆጣጣሪው ስም___________________________________ ፊርማ______________ ቀን__________________
2). By Product
2.1). Furushika (50Kgs 90.50 0.00 ------ 90.50 42.00 0073 48.50 48.50 100.00 0065 148.50 70.00 0074 78.50
2.2). Furnacho (50Kgs) 0.00 0.00 ------ 0.00 0.00 ------ 0.00 0.00 0.00 ------ 0.00 0.00 ------ 0.00
2.3). Geleba (50Kgs) 0.00 0.00 ------ 0.00 0.00 ------ 0.00 0.00 0.00 ------ 0.00 0.00 ------ 0.00
2.4). Binagn (50Kgs) 0.00 0.00 ------ 0.00 0.00 ------ 0.00 0.00 0.00 ------ 0.00 0.00 ------ 0.00
121.25 269.25 390.50 183.00 207.50 207.50 200.00 407.50 272.25 135.25
የስቶር ተቆጣጣሪው ስም___________________________________ ፊርማ______________ ቀን__________________
የዕቃው ዝርዝር መግለጫ የዕቃው መጠን ዝርዝር መግለጫ ያራገፈው መኪና የአቅራቢው
I/We here by certifiy that the above figures are correct and that the total value of work executed to date is Eth.birr(426778.12) four hundred twenty six
thousand seven hundred severity eight and twelve cents only) and (percentage of work progress to date is thirty four and zero two percent only)
1.1 Clear the site and remove top soil to an average depth of 20cm
with include 1m for work space. 1.19% 0.94% 0.93%
M2 547.20 23.77 13,006.94 0.00 0.00 432.0 10,268.64 425.60 10,116.51 425.60 10,116.51
0.2 Bulck excavation at a depth 60cm 1.64% 1.38% 1.38%
M3 225.60 79.25 17,878.80 0.00 0.00 190.35 15,085.24 190.35 15,085.24 190.35 15,085.24
1.2 Trench excavation at a depth 153cm for masonry stones 15.39% 12.15% 11.97%
M3 706.40 237.74 167,939.77 0.00 0.00 557.69 132,584.03 549.42 130,619.82 549.42 130,619.82
1.3 Backfill around masonry wall foundation to maintain the
desired level with selected material from borrowed quarry site 7.58% 3.03% 3.03%
& compacted in layers not exceeding 200mm. 0.5m work space. M3 169.72 487.56 82,748.07 0.00 0.00 67.75 33,031.82 67.75 33,031.82 67.75 33,031.82
1.4 Cart away surplus material to adistance not exceeding 1km
from the site. 15.01% 0.00% 0.98%
M3 1041.44 157.25 163,766.60 0.00 0.00 0.00 0.00 67.75 10,653.57 67.75 10,653.57
TOTAL CARRED TO SUMMARY IN BIRR 445,340.19 40.82% - 190,969.734 199,506.967 199,506.967 17.50% 18.28%
2, MASONRY WORK
50cm thick stone basalite or trachytic stone masonary
2.1 foundation wall to the depth of 148cm bedded & jointed in 1:3 37.05% 14.72% 15.19%
cement mortar in double face. M3 303.88 1330.21 404,224.88 0.00 0.00 120.73 160,596.92 124.64 165,791.39 124.64 165,791.39
TOTAL CARRED TO SUMMARY IN BIRR 404,224.88 37.05% - 160,596.92 165,791.39 165,791.39 14.72% 15.19%
3. CONCRETE WORKS
5cm lean concrete quality C-5, with minimum cement content of
2.2
150 kg /m3, of concrete: under masonary wall. 3.35% 0.76% 0.76%
M2 376.20 97.07 36,517.73 0.00 0.00 85.20 8,270.36 85.20 8,270.36 85.20 8,270.36
GRAND TOTAL TO SUMMARY IN BIRR 36,517.73 3.35% - 8,270.36 8,270.36 8,270.36 0.76% 0.76%
TOTAL 886082.80 81.21% 0.00 0.00 359837.02 373568.72 373568.72 32.98% 34.24%
EXECUTED
DISCREPATION
UNIT Qty UNIT RATE AMOUNT
1, EXCAVATION & EARTH WORK
1.1 Clear the site and remove top soil to an average depth of 20cm
with include 1m for work space. M2 425.60 23.77 10,116.5120
1.2 Bulkexcavation at a depth 55cm M3 190.35 79.00 15,037.6500
1.2 Trench excavation at a depth 153cm for masonry stones M3 549.42 237.74 130,619.8240
1.3 Backfill around masonry wall foundation to maintain the
desired level with selected material from borrowed quarry site
& compacted in layers not exceeding 200mm. 0.5m work space. M3 67.75 487.56 33,031.8243
1.4 Cart away surplus material to adistance not exceeding 1km
from the site. M3 67.75 157.25 10,653.5696
TOTAL CARRED TO SUMMARY IN BIRR 199,459.380
2, MASONRY WORK
50cm thick stone basalite or trachytic stone masonary
2.1 foundation wall to the depth of 148cm bedded & jointed in 1:3
cement mortar in double face. M3 124.64 1330.2100 165,791.3885
TOTAL CARRED TO SUMMARY IN BIRR 165,791.3885
3. CONCRETE WORKS
5cm lean concrete quality C-5, with minimum cement content
2.2
of 150 kg /m3, of concrete: under masonary wall. M2 85.20 97.07 8,270.36
GRAND TOTAL TO SUMMARY IN BIRR 8,270.364
1 117.50 m
2.70 m
0.60 m
190.35 m3 total volume of pit excavation start from reducing level
1.03 Trench excavation
Trench excavation at a depth 153cm for masonry stones
1 133.00 m
2.70 m
1.53 m
549.42 m3 total volume of pit excavation start from reducing level
1.03 back fill
Backfill around masonry wall foundation to maintain the desired level
with selected material from borrowed quarry site & compacted in layers
not exceeding 200mm.
2 71.00 m
0.25 m
1.53 m
54.32 m3
2 71.00 m
0.05 m
1.53 m
10.86 m3
2 9.35 m
0.25 m
0.55 m
2.57 m3
67.75 m3 total volume of back fill both sides of masonry wall
1.07.CARTAWAY
Cart away surplus material to adistance not exceeding 1km from the site.
1 67.75 m
takeoff sheet FOR open DITCH works
Project: masonry wall open ditch works Procurement Ref.no: CH/UHDP/004/CW-2012
Client: chiro town municipality office Contract Amount: 1254763.05 Eth.birr
Location: chiro town kebele 01 Commencement Date: 19/06/2012 E.C
Contructor: zamzam G/C works p.l.c Complletion Date: 18/07/2012 E.C
2 71.00 m
0.60 m
85.20 m2 total area of lean under masonry
3.Masonry Work
50cm thick stone basalite or trachytic stone masonary foundation wall to the
depth of 148cm bedded & jointed in 1:3 cement mortar in double face.
2 71.00 m
1.53 m
0.55 m
119.49 m3 volume of masonry wall below and above ground lavel
2 9.35 m
0.55 m
0.50 m
5.14 m3
124.64 m3 volume of masonry wall below and above ground lavel
31158.875
968.875
I/We here by certifiy that the above figures are correct and that the total amount remain from advance payment is One thousand
nine hundred fifty two birr and sixty two cents only
I/We here by certifiy that the above figures are correct and that the total amount remain from advance payment is One thousand nine hundred fifty
two birr and sixty two cents only
FROM MUHABA
FROM WAZIR
FROM WAZIR
1) I Abdurahim nasir here by confirm and certify that the above cash amount mentioned in figures are One hundred thirty one
thousand one hundred twenty birr only is under belongs to the ________ and the documents are true and correct.
2) We are certifiy that the above figures are correct and that the total amount is One hundred thirty one thousand one hundred
twenty birr only under belongs to the __________ from advance payment the documents are true and correct.
Cashier Name__________________________ Signature_________________ Date_______________
Debit Amount
Err:509
90000.00
50000.00
10350.00
1,300.00
Err:509
5000.00
14670.00
1800.00
1800.00
11,500.00
10,000.00
10,000.00
0.00
54,770.00
Err:509
Debit Amount
Err:509
Err:509
_____________
1) I Shamshaddin sultan here by confirm and certify that the above cash mentioned
in figures are received from Account And Staff members is Eth. Birr (104,370.00)
One Hundred four thousand three hundred seventy birr only and the documents
are true and correct.
Name__________________________ Signature_________________ Date_______________
1) I Shamshaddin sultan here by confirm and certify that the above cash mentioned in figures are Fifty
thousand five hundred birr only is under belongs to the ________ and the documents are true and
correct.
I/We are certifiy that the above figures are correct and that the total net amount received by
shamshaddin sultan nasir from advance payment is Fifty thousand five hundred thirty birr
only
1) I Shamshaddin sultan here by confirm and certify that the above cash mentioned in figures are Two thousand ten birr only is under
belongs to the ________ and the documents are true and correct.
We SHAMSHADDIN SULTAN NASIR here by certifiy that the above figures are correct and that the total net amount remain on me is Two thousand ten birr and
fifty cents only
1) I Wazir juhar here by confirm and certify that the above cash mentioned in figures are Sixty seven thousand three hundred birr
only is under belongs to the ________ and the documents are true and correct.
2) We are certifiy that the above figures are correct and that the total amount is Sixty seven thousand three hundred birr only under
belongs to the __________ from advance payment the documents are true and correct.
የገዜው ድርጅት ወጪ ያደረገው ሹፌር ወጪ የተደረገበት መኪና የዕቃው መጠን ዝርዝር መግለጫ
ወጪ የተደረገበት
ቀን
ወጪ የተደረገው
የመ/ቁ ስም ስልክ ቁጥር ስም ስልክ ቁጥር አይናት/ስም ታርጋ ቁጥር መለኪያ Unit የተጠየቀው ብዛት
ብዛት
We are certifiy that the above figures are correct and that the total expense amount of subcontract cost to date is Eth.birr (68,267.00 ) Sixty eight thousand two
hundred sixty seven birr only
Remarks
Date_______________
Date_______________
Date_______________
material Expense from advance payment
Project: masonry wall open ditch works Procurement Ref.no: CH/UHDP/004/CW-2012
Client: chiro town municipality office Contract Amount: 1254763.05 Eth.birr
Location: chiro town kebele 01 Commencement Date: 19/06/2012 E.C
Contructor: zamzam G/C works p.l.c Complletion Date: 18/07/2012 E.C
8 cement Qts Err:509 - - - - 83.00 - - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Tot. mat.
amount on site
Total amount of material expense Err:509 ### ### ### ### Err:509 Err:509
I/We here by certifiy that the above figures are correct and that the total valueis materials expense to date is Eth.birr (116,650. ) Three hundred eighteen thousand five hundred eighty three birr and thirty eight cents
only and remain amount of material on the site is Eth. birr (237410.5 ) Three hundred eighteen thousand five hundred eighty three birr and thirty eight cents only
Remark
Date_______________
Date_______________
Date_______________
OVERHEAD Expense from advance payment
Project: masonry wall open ditch works Procurement Ref.no: CH/UHDP/004/CW-2012
Client: chiro town municipality office Contract Amount: 1254763.05 Eth.birr
Location: chiro town kebele 01 Commencement Date: 19/06/2012 E.C
Contructor: zamzam G/C works p.l.c Complletion Date: 18/07/2012 E.C
We are certifiy that the above figures are correct and that the total valueis of over head expense to date is Eth.birr (47,195.50 ) Fourty seven thousand one
hundred ninth five birr andfifty cents only
We are certifiy that the above figures are correct and that the total valueis advance payment received from total contract amount is birr (250,952.61 )
Three Two hundred fifty thousand nine hundred fifty two birr and sixty one cents only
S/n Expense Description Advance payment 1st payment 2nd payment 3rd payment 4th payment
1 Day work labor expenses
1.1 Treanch excavation Err:508 - - - -
1.2 Backfilling Err:509 - - - -
Total Day work Labor expense Err:508 - - - -
2 Subcontract
2.1 Trench Excavation SC 36,647.00 - - - -
2.2 Backfilling sc - - - - -
2.3 Masonry work S.C 31,160.00 - - - -
2.4 Reinforcement SC Err:509 - - - -
2.5 Cement screed S.C - - - - -
2.6 Pointing S.C - - - - -
Total Subcontract expense Err:509 - - - -
3 Material Expense (consumed)
3.1 Cement Err:509 - - - -
3.2 Sand Err:509 - - - -
3.3 Aggregate Err:509 - - - -
3.4 Stone Err:509 - - - -
Total Material expense Err:509 - - - -
4 Equipment Expenses
4.1 Tools rental - - - - -
4.2 Fuel& lubricant - - - - -
4.3 Spare parts - - - - -
4.4 Machine rental - - - - -
Total Equipment expense - - - - -
5 Indirect/Over head Expenses
5.1 Site over head cost
a) Misc day work expense Err:509 - - - -
b) Bonus Err:509 - - - -
c) Water Curing Err:509 - - - -
d) Water utility Err:509 - - - -
e) specific transport Err:509 - - - -
f) project Miscelaneous Err:509 - - - -
g) Miscelaneous project Material Err:509 - - - -
Total site over head expense Err:509 - - - -
5.2 General over head cost -
a) Miscelaneous general Material Err:509 - - - -
b) Staff Payroll Err:509 - - - -
c) Communication & utility Err:509 - - - -
d) general Miscelaneous Err:509 - - - -
e) General Transport Err:509 - - - -
f) Gift Err:509 - - - -
Total general over head expense Err:509 - - - -
Grand Total of project expense Err:509 - - - -
I/We are certifiy that the above figures are correct and that the total expense value of labor cost ,materials cost ,and over head cost to date is birr (240402.5 ) Three hundred eighteen
thousand five hundred eighty three Two hundred fourty thousand four hundred two birr and fifty cents only
Remark
Date_______________
Date_______________
Date_______________
net CASH FLOW from advance payment
Project: masonry wall open ditch works Procurement Ref.no: CH/UHDP/004/CW-2012
Client: chiro town municipality office Contract Amount: 1254763.05 Eth.birr
Location: chiro town kebele 01 Commencement Date: 19/06/2012 E.C
I/We are certifiy that the above figures are correct and that the total value of Net cash flow to date is Eth. birr (10550.11 ) Ten thousand five hundred
fifty birr and elven cents only.
Item Advance
Description 1st payment 2nd payment 3rd payment 4th payment Remark
No. payment
A PAYMENT FOR EXECUTED WORKS
1 Actual Work Executed amount 276185.20
2 Add VAT (15%) 41427.78
3 Grand sum of work executed amount 317612.97
B DIRECT COST
1 Advance repaymt(20%) 63,522.59
2 Retention(5%) 15,880.65
3 release of retention(2.5%) at ending of project -
4 release of retention(2.5%) after one year -
5 TOT=(2%)=== [C11-(C13+C14)]x0.02 4,764.19
Total Sum of (B) 84,167.44
Net Payment Due to company=(A-B) 233,445.54
C DIRECT COST
1 Day work Labor expense Err:508
2 Material Expense Err:509
3 Equipment Expenses -
4 Subcontract Expenses 50,723.44
Total Sum of (C) Err:508
D INDIRECT COST
1 Site over head cost Err:509
2 General over head cost Err:509
Total Sum of (D) Err:509
E CASH UNDER BELONG TO COMPANY
2 Have to be Payable Cash for siyume 968.00
8 Have to be Payable Cash for siyume dare delalaw Err:509
Total Sum of (E) Err:509
Grand Total Amount of (C+D+E) Err:508
Gross earning/ Gross profit=[(A-B)-(C+D+E)] Err:508
F OUTSTANDING CASH
1 Actual Work Executed amount
a) Cash on Shamshaddin hand Err:509
b) Cash on Wazir hand Err:509
c) ash on Abdurehim hand Err:509
1 Actual Work Executed amount
a) Site clearance 6,417.90
b) Treanch excavation 98,210.39
c) bulk excavation 15,037.65
d) Cartaway 10,653.57
1 Actual Work Executed amount
a) Cement Err:509
b) Sand Err:509
c)Stone Err:509
d) Aggregate Err:509
Total Sum of (F) Err:509
Net earning/ Net profit=[((A-B)-(C+D+E))+F] Err:508
I/We are certifiy that the above figures are correct and that the total value of Net cash flow to date is Eth. birr (10550.11 ) Ten thousand five hundred fifty birr and elven cents only.
Furushika or Furushikelo 100kgs ----- ----- ----- ----- ----- Pcs\Qts ----- -----
- -
Furnacho 50kgs ----- ----- ----- ----- ----- Pcs\Qts ----- -----
TOTAL SUMMERY Pcs\Qts - -
ፊርማ______________ ቀን__________________
ፊርማ______________ ቀን__________________
ፊርማ______________ ቀን__________________
3). By Product
Furushika or Furushikelo 100kgs ----- ----- ----- ----- ----- Pcs\Qts ----- -----
- -
Furnacho 50kgs ----- ----- ----- ----- ----- Pcs\Qts ----- -----
TOTAL SUMMERY Pcs\Qts - -
ፊርማ______________ ቀን__________________
ፊርማ______________ ቀን__________________
ፊርማ______________ ቀን__________________
3). By Product
Furushika or Furushikelo 100kgs ----- ----- ----- ----- ----- Pcs\Qts ----- -----
- -
Furnacho 50kgs ----- ----- ----- ----- ----- Pcs\Qts ----- -----
TOTAL SUMMERY Pcs\Qts - -
ፊርማ______________ ቀን__________________
ፊርማ______________ ቀን__________________
ፊርማ______________ ቀን__________________
daily STOKE BALANCE of RAW WHEAT & PACKING PACKAGE recording FORM
daily STOKE BALANCE of RAW WHEAT & PACKING PACKAGE recording FORM
daily STOKE BALANCE of RAW WHEAT & PACKING PACKAGE recording FORM
1). Typs of Soft\Hard\Mixed 223.00 234.00 0.00 457.00 150.00 127.00 277.00 180.00 180.00 -
daily STOKE BALANCE of RAW WHEAT & PACKING PACKAGE recording FORM
OBSINAN FOOD PROCESSING DATE 18/11/15
DAILY BEGINNING INVENTORY REPORT REPORT No._______________
1). Typs of Soft\Hard\Mixed 180.00 557.80 0.00 737.80 245.00 135.00 380.00 357.80 357.80 -
daily STOKE BALANCE of RAW WHEAT & PACKING PACKAGE recording FORM
OBSINAN FOOD PROCESSING DATE 19/11/15
DAILY BEGINNING INVENTORY REPORT REPORT No._______________
1). Typs of Soft\Hard\Mixed 357.80 181.70 0.00 539.50 256.00 251.00 507.00 32.50 32.50 -