Building Section & Elevation Plan

The document contains construction notes and drawings for external wall finishes and stair details. Specifically: 1. External wall finishes and facades must be non-combustible and the system must be verified during detailed design and construction. 2. Drawings show existing and proposed external wall assemblies, including waterproofing membranes, concrete slabs, and cement screed and tile finishes. 3. Stair section drawings indicate ceramic tile finishes, reinforced concrete, and mesh for the treads and risers, with dimensions provided.

Uploaded by

Akbar Dahri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views1 page

Building Section & Elevation Plan

The document contains construction notes and drawings for external wall finishes and stair details. Specifically: 1. External wall finishes and facades must be non-combustible and the system must be verified during detailed design and construction. 2. Drawings show existing and proposed external wall assemblies, including waterproofing membranes, concrete slabs, and cement screed and tile finishes. 3. Stair section drawings indicate ceramic tile finishes, reinforced concrete, and mesh for the treads and risers, with dimensions provided.

Uploaded by

Akbar Dahri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NOTES:

1. CONSTRUCTION MATERIALS & EXTERNAL WALL FINISHES (EXTERNAL


FACADE SYSTEM) SHALL BE OF NON-COMBUSTIBLE NATURE.
EXTERNAL WALL FINISH/FACADE SYSTEM MUST BE VERIFIED AT
DETAILED DESIGN/ CONSTRUCTION STAGE.

EXISTING
WHITE CEMENT TILES
CEMENT SCREED ON SLOPE
WATER PROOFING MEMBRANE
R.C.C SLAB

WHITE CEMENT TILES


CEMENT SCREED ON SLOPE
570

WATER PROOFING MEMBRANE


R.C.C SLAB

DESCENT AND EXPANSION INTERVAL


3000

1380
WHITE CEMENT TILES WHITE CEMENT TILES
CEMENT SCREED ON SLOPE CEMENT SCREED ON SLOPE
WATER PROOFING MEMBRANE WATER PROOFING MEMBRANE
R.C.C SLAB R.C.C SLAB
3570

3570
11730
4080

4080
510

510
TREAD 30 C.M.
RISER 17 C.M.

SECTION ON X -X

SECTION
CERAMIC TILES SKIRTING CERAMIC TILES SKIRTING
CERAMIC TILES FLOORING CERAMIC TILES FLOORING
P.C.C 1:3:6 ,10cmTHK.WITH P.C.C 1:3:6 ,10cmTHK.WITH
A142MESH+1000GAUGE A142MESH+1000GAUGE
POLYTHINE SHEET POLYTHINE SHEET
ANTITERMITE TREATMENT ANTITERMITE TREATMENT
HARD CORE PACKING HARD CORE PACKING
WELL COMPACTED EARTH WELL COMPACTED EARTH

ADDITION
570
3000

1380
MODIFICATION & ADDITION
3570

3570
11730

PREVIOUSLY APPROVED

01 23.03.2023 ISSUED FOR CDAA APPROVAL MARIA TAMADHAR.Y WASAN


4080

4080
Reviewed by Aman Fire Protection Consultants WAHEED
By: MARIA AL BUSAIDI 00 01.11.2022 ISSUED FOR CDAA APPROVAL WASAN HAYA
/BUTHAINA
Date: 23 MAR 2023
Life safety Fire Alarm Fire Protection LPG REV
DATE DESCRIPTION DSGN DRWN CHKD
The documents are not to be issued for construction. No.
Aman Fire Protection Consultants has performed a review based on the
available information at this time and has been performed to ensure that MAIN CONSULTANT:­
510

510
the basis of design is in compliance with the applicable codes and

LEFT SIDE ELEVATION


standards. Aman Fire Protection makes no representation by this review
as to the accuracy or completeness of these plans at this time. This
review shall not be construed to be a permit for, or approval of any
violation of applicable codes or standards by the designer or installation
contractor. This review does not relieve the designer or installation
contractor of responsibility for complying with all applicable codes and
standards as stipulated in their contract.

OWNER:­
Civil Defence and Ambulance Authority

MS. NADAYAH SULAIMAN MAL ALLAH


570

570
PROJECT:­
3000

3000
COMMERCIAL BUILDINGS

JOB NUMBER:­ 6083


USE:­ FLOORS:­
3570

3570
11730

COMM. G+1
LOCATION:­ PLOT No.:­
AL MUDHAIBI 81
FIRE CONSULTANT:­
4080

4080
510

510
FRONT ELEVATION Fire Protection Consultants
3RD FLOOR | AL MUZN MALL | AL MAWALEH NORTH
AL SEEB | MUSCAT | SULTANATE OF OMAN
P.O BOX 169 | P.C. 101 | WWW.AMANFEC.COM
CR. No 1313271

TITLE:­

SECTION & ELEVATION VIEWS

SHEET:­ SCALE:­ DATE:­


A2 1:200 01.11.22
DSGN MARIA RELEASED FOR:­
PRELIMINARY APPROVAL
DRWN TAMADHAR.Y
DRAWING NUMBER:­
CHKD WASAN 226083-GN-NA-004