You are on page 1of 1

12 11 10 9 8 7 6 5 4 3 2 1

This drawing is the property of L&T Construction ,B&F-EDRC and must not be passed on to any person or body not authorised by
us to receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission
in writing.
BUILDING KEYPLAN (NOT NO SCALE)

H H
WEST PROC. EAST PROC.
06-11 12-18

29 35 48 55 62 68 75

Za
08 09 14 15
V

02 03 P 07 10 13 16 21 22

01 04 05 06 11 12 17 18 19 20 23

G ZONE 1 TO 05 ZONE 06 TO 18 ZONE 19 TO 23 G


WEST PIER PROCESSOR EAST PIER

ABBREVIATIONS : FLOORING LEGEND :


WALL MORTAR
FFL - FINISHED FLOOR LEVEL
FPL - FINISHED PAVEMENT LEVEL RC SLAB PCC
FRL - FINISHED ROAD LEVEL
LVL - LEVEL SCREED MORTAR
THK. - THICK / THICKNESS
PLASTER TILE
01 VITRIFIED TILE FLOORING DETAIL (WET AREA) 02 GRANITE TILE FLOORING DETAIL (FOH AREA) 03 VACUUM DEWATERED FLOORING DETAIL 04 KOTAH TILE FLOORING DETAIL
F F1 Scale 1:5 F3 OFFICES IN BASEMENT Scale 1:5 F4 Scale 1:5 F6 OFFICES IN BASEMENT Scale 1:5 NOTES: F

1.ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS.


2.THE DRAWING IS TO BE READ AND NOT TO BE SCALED.
3.ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO START OF WORK AND ANY DISCREPANCY
SHALL BE BROUGHT TO THE NOTICE OF THE DESIGN ARCHITECT.
4.THE DRAWING SHALL BE READ ALONG WITH FLOOR PLAN(10-1000) SERIES.
5.FLOOR SLAB SUNKEN DETAILS REFER RELEVANT STRUCTURAL DRAWINGS.
6.IN CERAMIC TILE WALL CLADDING PVC CORNER BEADS SHALL BE USED.
7.REQUIRED CONTROL JOINT WILL BE PROVIDED AS PER APPROVED LAYOUT.
8.BETWEEN TILE SPACER TO BE AS PER SPECIFICATION.
8.THE LAYING SHOULD BE FOLLOWED AS PER APPROVED METHOD STATEMENT.

FLOORING LEGEND :
F1- VITRIFIED TILES
E F3-GRANITE TILES E
F4-VACUUM DEWATERED FLOORING
F6-KOTAH STONES-600MMX600MM
F8-VINYL FLOORING
F9-RAISED ACCESS FLOORING
F10-CARPET TILES
F11-EPOXY COATING
F12-PAVER BLOCK
F13-STONE FLOORING

A&B
92-0002

D D

06 F10-CARPET FLOORING DETAIL 07 EPOXY FLOOR COATING DETAIL


F11 STAIRCASES Scale 1:5
F10 OFFICES IN BASEMENT Scale 1:5

INSIDE OUTSIDE
05 F9-ACCESS RAISED FLOORING DETAIL
F8/F9 Scale 1:5
FFL FPL FRL

C ROAD DG JP
C
MANISH GS
0 ISSUED FOR APPROVAL
MANISH 2.03.2020 DG 2.03.2020 JP 2.03.2020 GS 3-03-2020

REV.NO. DESCRIPTION DSGN DRWN CHKD APPD


SEC
01

CHECKED BY SIGN DATE CHECKED BY SIGN DATE CHECKED BY SIGN DATE

ARCHITECTURE HVAC GIS


08 SECTION-01
Scale 1:20 CIVIL & STRUCTURE FPS GIOTECH
F12
ELECTRICAL PIPING

ELV SYSTEMS PHE

B B
CLIENT : GMR HYDERABAD CONCEPT :
INTERNATIONAL AIRPORT LIMITED. Mechanical, Electrical, Civil, Structural, Geotechnical

PROJECT: O18151 - EXPANSION OF RAJIV GANDHI PROJECT Engineering Design and Research Center (EDRC),
INTERNATIONAL AIRPORT CONSULTANT: L&T Construction - Buildings & Factories
L&T INFRASTRUCTURE
ENGINEERING LTD.
SUPPLIER/ CONTRACTOR : SUPPLIER/CONTRACTOR:
02 SECTION/
JOB No : JOBNO. TITLE:
SEC ELEVATION
NAME SIGN DATE MARKING
EXPANSION OF RAJIV GANDHI INTERNATIONAL AIRPORT:
DSGN MANISH 2.03.2020
DRAWING
DRWN DG 2.03.2020 TYPICAL FLOORING DETAIL
RAMP UP
NUMBER
CHKD JP 2.03.2020 SCALE
A 3-03-2020 A
APPD GS SCALE
PROJECTION SIZE REV
DRAWING No. GHIAL-LNT-D-PTD-A-92-0001 A1 0
08 ENTRY RAMP DETAIL 08 SECTION-02 09 TILE MOVEMENT CONTROL JOINT SHEET: 1 OF 2 FIRST ANGLE
F13 Scale 1:5
F12 Scale 1:5 F12 Scale 1:5

RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION

12 11 10 9 8 7 6 5 4 3 2 1

You might also like