Professional Documents
Culture Documents
This drawing is the property of L&T Construction, B&F-EDRC and must not be passed on to any person or body not authorised by
us to receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission
in writing.
BUILDING KEYPLAN (NOT NO SCALE)
10
10
25 25
30
20
30
V
30
20 25
100
100
100
100
02 03 07 10 13 16 21 22
100
P
70
80
70
70
50
35
01 04 05 06 11 12 17 18 19 20 23
10
6.IN CERAMIC TILE WALL CLADDING PVC CORNER BEADS SHALL BE USED.
20
25 25
30
25 25
8.BETWEEN TILE SPACER TO BE AS PER SPECIFICATION.
100
100
100
100
9.THE LAYING SHOULD BE FOLLOWED AS PER APPROVED METHOD STATEMENT.
70
50
30
FLOORING LEGEND :
F1- VITRIFIED TILES
E F3-GRANITE TILES E
F4-VACUUM DEWATERED FLOORING
F6-KOTAH STONES-600MMX600MM
F8-VINYL FLOORING
F9-RAISED ACCESS FLOORING
F10-CARPET TILES
F11-EPOXY COATING
R.C SLAB,BEAM DETAILS REFER
F12-PAVER BLOCK
STRUCTURAL DRAWING F13-STONE FLOORING
CEMENT SCREED
25
20
100
55
C C
25mm THK, GRANITE THERSHOLD
20 25
CIVIL & STRUCTURAL FPS GEOTECH
ELECTRICAL PIPING AIRPORT SYSTEMS
100
Ø 6mm REINFORCEMENT
55
25mm THK, GRANITE THERSHOLD @200mm C/C ON BOTHWAYS ELV SYSTEM PHE VHT
PROJECT: O18151 - EXPANSION OF RAJIV GANDHI PROJECT Engineering Design and Research Center (EDRC),
R.C SLAB,BEAM DETAILS REFER INTERNATIONAL AIRPORT. CONSULTANT: L&T Construction - Buildings & Factories.
STRUCTURAL DRAWING
SUPPLIER / CONTRACTOR : Larsen & Toubro Limited, Construction, Buildings & Factories
SECTION/
9
DETAIL - 7 (F2 - F6) JOB No : O18151 TITLE: ELEVATION
100
1:5 NAME SIGN DATE EXPANSION OF RAJIV GANDHI INTERNATIONAL AIRPORT MARKING
DETAIL - B (F8/F9 - F4/F11) RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
8
1:2
12 11 10 9 8 7 6 5 4 3 2 1