NOTE
1. DO NOT USE CERAMIC SCREW CAP.
325 [1"] THK. 8#/ft³ CERAMIC FIBER BLANKET 1260 C W/RIGIDIZER
RUN BLANKET IN HORIZONTAL STRIPS
71 75 2. MIN. 3 (THREE) NOTCHES ARE REQUIRED.
3. ALL CERAMIC FIBER BLANKET SHOULD BE INSTALLED IN FIELD.
600 [1'11 5/8"] WIDE BY 7200 LONG 4. RIGIDIZER SPRAY SHALL BE APPLIED AS FINAL COAT ON CERAMIC FIBER INSULATION AFTER COMPLETION OF
INSTALLATION OF CERAMIC FIBER INSULATION.
[1 15/16"]
APPROX. 300 [11 13/16"] 50 [1 15/16"] 50 [1 15/16"] 5. INSTALL THE CERAMIC CUP ON ANCHORS AFTER THE CERAMIC FIBER BLANKET IS INSTALLED CAREFULLY.
"A"
50
(TYP.) (TYP.) (TYP.) END OF INSUATION
EL. +21640 [70'11 15/16"] PER FIELD ADJUSTMENT
50 [1 15/16"]
(TYP.)
250
50 [1 15/16"]
(TYP.)
325 [1"] THK. 8#/ft³ CERAMIC
71 75
[1'11 5/8"]
FIBER BLANKET 1260 C
600
W/RIGIDIZER
73 72
@250 [9 13/16"]x76=18998 [62'3 15/16"]
[2 3/8"]
60
3 [1/8"]
73 72
VIEW "A"
REFERENCE DRAWINGS
3 [1/8"]
6
[1/4"] DWG# DWG TITLE
ANCHOR DETAIL
58 (SCALE : NONE)
SAES-H-001 COATING SELECTION & APPLICATION REQUIREMENTS
[2 5/16"] (NOTE.6)
12-SAMSS-007 FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL
[1 1/4"]
SE-3603 Enclosed Ground Flare GA Drawing
32
SE-3597 KOD Detail Drawings
RAIN CAP
8
[5/16"]
SE-3593 EGF Combustion Chamber Drawing
20
250 [9 13/16"]
[13/16"]
SE-3589 Enclosed Ground Flare Detail Drawings
(TYP)
TOP ANGLE
CERAMIC CUP DETAIL
(SCALE : NONE)
LDS MOLDABLE SE-3587 Interconnecting Piping Detail Drawings
(NOTE.1)
74
THIS REVISION NO. 002 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
XXX
002
THIS INFORMATION IS SUBMITTED IN CONFIDENCE AND