Professional Documents
Culture Documents
Technical Write-up/Drawings
Instructions To Vendors
1. FUELS
Testing & Analysis for Hazard and Operability Study of new filling system, as per specifications
in annexure-1
Offered
Sl No Specification Value Compliance Specification Remark
Testing & Analysis
for Hazard and
Operability Study of
1 new filling system, -
as per specifications
in annexure-1
After thorough
understanding,
HAZOP analysis can
be carried out and
2 two or three -
iterations can be
done before making
preliminary report
After review and
approval of
preliminary report
3 only, final report can -
be submitted to the
Department
Two sets of hard
copy shall be
provided and the soft
4 copy also shall be -
submitted to the
Department
Common Specifications (Applicable for all items)
1. Analysis Report
VALIDITY OF OFFER: -
6 The validity of offers/tenders should Yes / No / Explain
be 90 days.
Sl. No. Item Quantity Unit Price Currency Total Price Remark
FUELS
Testing &
Analysis for
Hazard and
Operability
1 Study of new 1.00 Lot -
filling system,
as per
specifications
in annexure-1