ADDITIONAL QUESTIONS - Additional questions related to Health, Safety, Environment, Social Responsibility, Competen
In collaborations with IOGP member companies and Industry partners additional questions have been collected for when a
It's IOGP ambition to keep the list of additional questions up to date and ensure industry alignment to lower audit burdon
Company name: Date: Location: PROPOSAL Use:
A/B/
Fill in blank fields only. Tick off A, B, C, or D as appropriate.
C/D
1.1 Commitment and g) 1) Provide evidence to show that the HSE-MS is in place across the Please provide proof of a documented Management System (Service A = We have more in place/available then listed in below
accountability to HSE organization, with priorities established, authorities and Provider system registration number or Certificate number) B = Available:
aspects accountabilities assigned, and resources allocated. (E1.1) System data to be assessed and verified when needed AND/OR - Registration with Achilles, Avetta, ISN or EPIM
Latest audit report to be verfified when needed. - ISO45001 or OSHA18001 or VCA*/SCC*or VCA**/SCC** or VCA Petro or MASE
(France) or STOW (T&T) certificate is in place
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic
2.2 HSE Objectives a) Does your company have HSE objectives which include measurable Does your company have HSE objectives and an associate plan? A = We have more in place/available then listed in below
success criteria based on continuous improvement; maintaining Explain how they are developed, reviewed and implemented. If yes, B = Available:
standards; or compliance with policy, regulatory or other requirements? please provide a copy. (and/or provide details, context, evidence) - HSE Policy
(E2.4) (OGUK 3.1) - HSE Objectives
If the answer is yes, please attach a copy. - HSE Improvement plans
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic
3.3 Competence a) Does your organization have a competence assurance process in Describe the scope and content of your competency validation and A = We have more in place/available then listed in below
assurance place? If yes, please describe the scope and content of your assurance process including ongoing verification (UKOG.3.3a) B = Available:
competence assurance process. (E3.3) - HSE training plans/programs/matrix and/or Job descriptions and competence
requirements are available
- HSE introduction program for new-employees & Competence assurance
process or system is in place
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic
4.1 Stakeholders and b1) What processes does your company have to assess, manage and Describe your process to assess, manage and proactively engage with A = We have more in place/available then listed in below
customers engage with customers and other stakeholders regarding life cycle risks your company's interested parties or stakeholders (UKOG.4.1a) B = Available:
and opportunities associated with the company’s products, assets and - Stakeholders overview/mapping is available
activities? (E4.2) - Communication process (internal and external stakeholders) and Engagement
plan is available
- Grievance register and Compliance register is kept up to date
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic
5.1 Risk assessment and a) 1) What processes and methods does your company have in place to Describe your HSE risk management process. (UKOG.5.1a) A = We have more in place/available then listed in below
control manage risks to an acceptable level for the scope of your activities? B = Available:
(E5.1) - A Procedure how we manage Risks is available
- HSSE Risks are registered and include mitigating actions
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic
6.1 Asset design and e1) Briefly describe the processes in place to maintain, replace, test, Describe the processes in place to operate, maintain, replace, test, A = We have more in place/available then listed in below
integrity inspect, calibrate, certify and verify performance of facilities and inspect, calibrate, certify and verify performance of facilities and B = Available:
equipment? (E6.5) equipment (UKOG.6.1c) - An equipment overview/register with maintenance status is kept up to date
- An inspection and test plan is available
- Equipment Manufacturer manuals and recommendations are followed
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic
7.2 Contingency, a) 1) What arrangements does your company have for: What arrangements does your company have for: • Contingency A = We have more in place/available then listed in below
emergency, crisis and • Contingency planning • Emergency response • Crisis management • Continuity B = Available:
continuity management • emergency management (OGUK.11.1a) - An Emergency response plan or training plan is available
• crisis - Risk scenarios covering both business and community element are present
• continuity management planning? (E7.5) - Critical suppliers are identified as part of business continuity plan
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic
8.1 Execution and a) 1) What processes does your company use to prepare for activities How does your company ensure consistent application of processes to A = We have more in place/available then listed in below
control of activities and ensure operational readiness and integrity of systems before confirm work is executed in accordance with plans? (UKOG.9.1a) B = Available:
commencing work? (E8.1) - Organisational charts and job descriptions are available
- Roles and responsibilities are defined
- Examples of tool box talks, safe job analysis, permits to work are available
- Management of change process is defined
- A Stop Work policy is present
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic
9.2 Incidents, events c) Please provide the following Company work-related activities Please provide the following Company work-related activities
and non-conformities statistics for each year for the last five years, including work performed statistics for each year for the last five years, including work
by Contractor personnel: performed by Contractor personnel:
9.2 Incidents, events a. Number of fatalities
and non-conformities
9.2 Incidents, events g. Fatal Accident Rate (per 100 million hours worked)
and non-conformities
9.2 Incidents, events h. Lost Time Injury Frequency (per million hours worked)
and non-conformities
9.2 Incidents, events i. Total Recordable Incident Rate (per million hours worked).
and non-conformities
10.1 Assurance process, a) 1) Briefly describe your company’s assurance process to evaluate a) Describe your management system assurance process and how it is A = We have more in place/available then listed in below
including audits conformity with expectations; organizational capability; effectiveness implemented? (UKOG.13.1a) B = Available:
of the HSE-MS in meeting objectives, stakeholder and business needs; - Assurance process and plans are in place
and also identify areas for improvement? (E10.1) - Audit are executed according to plan
- Findings are managed and close-out is reported regular
C = Not all from what is listed is in place/available
D = We have nothing in place/nothing available on this topic