Professional Documents
Culture Documents
P a g e 1| 11
MISSION
To make clean energy universally available by building a
distributed and intelligent solar and energy storage grid,
managed via the Internet, across the world.
VISION
To make clean, reliable and affordable energy more
available to the developing world through energy
innovation.
VALUES
Innovation
Sincerity
Sense of Responsibility
Trust Worthiness
Excellence in Design
Diligence
Commitment
P a g e 2| 11
Respected Sir,
Thank you for approaching "FOBROS TECHNOLOGIES (PRIVATE) LIMITED" for Solar System Services. We provide you
best services with an efficient of engineers, technicians, helpers and all other sporting staff. Solar Energy as far as a
source of saving & energy independence in current economic conditions of nation & interaction energy crisis.
We provide economical solution for your Domestic/Commercial/Industrial and Agricultural Installation with Off
Grid/On grid (Net metering)/ Hybrid Solutions. One time investment which will be pay back approximately within 2-
3 years will let your huge savings, we provide warranted solutions as PV Panels (Solar Plates) cover under 12 year of
replacement & 25 year of high linear power output warranty.
Our inverter are the new generation alternate energy smart solar solutions, more reliable, long life for complete
systems. We also provide real time monitoring systems. FOBROS TECHNOLOGIES (Pvt.) Ltd. strongly believe in good
corporate citizenship in pursuit of prosperity with our community, society and nation. We ensure quality of work.
Hope to join hand with you toward Energy Independence Economic & Earth Saving Step.
TEAM
P a g e 3| 11
AC Breaker AC SPD
Specification: 7/36
Accessories: Rawl Bolts, Screws, Anchor Screws, Washers, Nut-Bolts,
Silicon Tubes, Thimbles (U/I/O types), Insulators, Anchor Bolts,
6 Connectors, PVC Tapes, Cable Ties 1 Set
Insulation: PVC Pipes, Cable Ducts, Sockets & Bends
P a g e 4| 11
Note: This quotation is valid for current Dollar rate. (1$USD = 268.15)
P a g e 5| 11
DESIGN ASSUMPTIONS
The available space for solar installation is considered without any obstruction and
1 shading which might significantly alter the overall performance and cost of the
system.
Unless there is a significant change in the design of the system, the AC/DC Cable costs
2 will be covered in this offer. In case of a drastic change in wiring lengths, all extra cost
will be discussed and justified with the client and adjusted accordingly.
Azimuth angle is at a bearing of 180 Degrees. Solar modules are South Facing and
3 placed as such for optimum performance during first-half.
4 Tilt angle of modules is according to the chamfered roof available.
Inverters will be installed as mentioned in the PQ. In-case of any changes, the
5 deviations will be discussed and justified with the customer and adjusted accordingly.
Existing LV/LT Panels will be used to interconnect/terminate the Solar PV System at the
6 premises. However, if the existing LT/LV Panels are not suitable for safe installation of
the system, a separate LT/LV Panel(s) will be required.
7 The system is purely on-grid type and the output will be dispatched as Priority Load.
8 All grounding and protection equipment on both DC & AC Side are NEC Compliant.
Suitable access to the site is to be provided by the client, in-case of any requirements
for Crane/Scaffolding, the costs will be charged in the offer. For any extra requirement
9 arising later, the deviations will be discussed and justified with the client and costs will
be adjusted accordingly.
Site Survey and Site Hazards Identification will be carried out accordingly by FOBROS’s
technical team and all the requisite costs have been included. For any extra
10 requirement arising later, the deviations will be discussed and justified with the client
and costs will be adjusted accordingly.
P a g e 6| 11
DISTRIBUTION BOX
CONNECTORS
Two type of connectors are used in whole project to connect DC wires in between Strings.
Y Connectors are used for making parallel connections of strings
MC4 connectors are used to connect b/w PV panel arrays.
P a g e 7| 11
The solar photovoltaic system will perform best when there are simple and periodic maintenance tasks
carried out to ensure safe, efficient and reliable operation.
SOLAR MODULES
To increase the average output, solar panels should be cleaned at least once a day if environment is dusty.
Following considerations must be followed when cleaning the solar panels:
Solar panel should be cleaned at dawn or at dusk, to ensure optimum operation of the solar panel during
daytime hours and accurate energy generation metering.
Moist cloth or a sponge with rod should be used to clean solar panels evenly.
Gloves should be worn while cleaning to avoid any cuts from sharp edges of solar panel frames or
structural steel.
Do not splash water on solar panels, as water spots maybe stay on surface of glass and reduce solar
panel efficiency. Be sure to evenly clean the surface.
Do not use commercial or industrial grade cleaning agents. If required, use a mild soapy mixture to
clean hardened spots or superficial debris.
Viper with enhancement rod should be used to clean panels if installed at heights that are not readily
accessible.
Keep yourself at a reasonable distance from the safety railings while cleaning to avoid any dizziness
felt, if installed at heights.
P a g e 8| 11
Price Validity Prices are valid for 03 days only (May vary with fluctuation in Dollar Rate)
Scope of Work Not Civil Work, Customized structure, Energy Meter name Change, Sanction Load change,
Included Conversion of energy meter type.
Operation & Free-of-cost O&M service from NOC. Client will be provided with the basic level
Maintenance maintenance manual. Customer will be charged for O&M at site and Travel charges.
Company’s Scope:
The company will assist in net metering process by providing all necessary documents
like application forms, inspection certificate, installation layout, SLDs, and site plan that
are required for net-metering.
Net Metering 1 - Earth points for earthing of electrical equipment.
Dual Direction Energy Meter Purchasing and installation.
Customer’s Scope:
Sanction load change (if required).
Conversion from single Phase meter to 3 phase Meter (if required).
Relocation of System Client will be charged for relocation of system from one site to another, as per actual.
WARRANTY TERMS
Warranty of PV modules: 12 Years performance warranty, 25 years linear power output warranty.
Warranty of Inverter: 5 years warranty
Warranty will be void if damaged by customer's carelessness or fault.
Inverter warranty will be approved after fault test report.
Damage occurred due to grid will not be claimed in inverter warranty.
P a g e 9| 11
ACKNOWLDGEMENT
I, hereby agree to the price and proposal terms mentioned above. I have read the complete document
and fully aware of all conditions. I would also adhere to payment timelines and scope of work mentioned.
______________________ ___________________________
NOTE:
P a g e 10| 11
TEAM FOBROS
P a g e 11| 11