You are on page 1of 37
ITY AUTHORITY DISTRIBUTION AND CONSUMER SERVICE DIRECTORATE SUDUR PASCHIM PROVINCIAL OFFICE ATTARIYA ATTARIYA, KAILALI DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF 33/11 KV, 3 MVA SUBSTATION AT SUGARKHAL OF KAILALI DISTRICT NCB NO.: NEA/SPO-—2076/377-08 CIVIL WORK DRAWINGS TCHYARD EQUIPMENT STRUCTURE AND FOUNDATIONS S Submitted by: M/S BIBHANSHU INDRADHANU JV KATHMANDU, NEPAL. GENERAL NOTES: FOR R.C.¢. STRUCTURES DIMENSIONS TO SE READ ONLY. 2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE 3. CHANGE IN’ DIMENSION TO SE NOTIFIED TO THE CONSULTANCY IMMEDIATELY. 4. ALL DRAWINGS AND SPECIFICATIONS REMAIN THE OF THE NEA. 5. THE STRUCTURAL DRAWINGS SHALL BE READ IN JON WITH ARCHITECTURAL DR: S, IF ANY. SHALL BE REPORTED TO SITE ENGINEER, 6. CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING FIELD DIMENSIONS AND SITE CONDITIONS. 7. GRADE OF CONCRETE MIX SHALL BE1:1.5:3 FOR ALL MEMBERS 8. REINFORCEMENT SHALL BE OF GRADE Fe : 415/500 9. CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS FOOTING | 50. mm COLUMN 40 mm BEAM: 25 mm SLAB: 15mm 10. LAP LENGTH SHALL BE 60 TIMES THE DIAMETER OF THE BAR, 11. DEVELOPMENT LENGTH SHALL SE 60 TIMES THE DIAMETER OF THE BAR, 12, UNLESS OTHERWISE INDICATED ALL CONSTRUCTION JOINTS SHALL BE ROUGHENED JOINTS WITH MINIMUM AMI MUDE OF 8 mm FOR STEEL STRUC ES ALL STEEL PLATES, ANGLES CONFIRM TO IS 2062 NUTS, BOLTS ANO' WASHERS MILD STEEL THAT CONFIRMS TO IS 1367 PROPERTY CLASS 4.6. TOLERANCE IN FABRICATION AS PER IS 7215. ALL STRUCTURES ARE HOT DIP GALVANIZED @ 610gm/sqm. AS PER Si CATION 9] TRENCH WEA casud Taencel 4 - -___B {or use cer a aT st - ~ Se - Gor er aa @ a 1 1 Gormte a Qoretaa I _ _ 1 be foe Hl {or usa comer aie PEAS RD WT or we, or come ee ss UNE SKY UNE b— - 48 - + — - 8 - — + 2 —__4 NEPAL ELECTRICITY AUTHORITY oe =F] fe EW ROW FRONT OF THE NOOMNG CANTY VW ROW FRONT OF THE NCOUNG CANTY 8 Ter Freas ETEl i : i i EW FROM SDE OF INCOMNNG cavTz® oO JOINTI=1 BEER Re To) T ol e|f Ee +t +, | o <| 7. & VEIN FROM TOP OF THE CT GANTRY VEIW FROM FRONT OF THE CT GANTRY VEW FROM SIDE OF THE cT Garey 4 FRR + | hE SERN AMO FEL fretant ere Wie Se 50 ie m Las WN eI \VEW FROM TOP OF THE pT canTey EW FROM FRONT OF THE PT GANTRY VEW FROW SIDE OF THE =T GANTRY een ite rer! Sere [we [enon [e fe SECTION - AA eo BASE PLATE PLAN EW FROM FRONT OF THE PI GANTRY VEN FROM SIDE OF THE PI cANTRY VEWW FROM FRONT OF THE LA GANTRY VEN FROM SIDE OF THE La caNTRy SECTION - AA Paige |* e.__#_} =f ecre s | I IK I | t 2} B or oF FoNcEN oot -——$ $+ ——— SECTION - As SECTION - BB AUTHORITY. Fes Poa [fel ITY_AUTHORITY Poe Fone [ETE PAL ELE: WO JOINT J—1 ojo FSSeL, ee x ERE ase | _ oot pe A je Tat aah BASE PLATE LAYOUT DETAIL 3 BASE PLATE LAYOUT DETAIL NEPAL ELECTRICITY AUTHORITY ' eae =, “DOA FRONT AND I YEW_OF THE ee peers HG NST RNTRT = WO JOINT J—1 ¢ Eg] i yal 5 i 2 Ai Foe Fone [Te = + BASE PLATE LAYOUT DETAIL BASE PLATE LAYOUT DETAIL us A fates He) pw." 4 r ve eon oe ell HT se PoE spe sewn acre SECTON ~ 6 DETAIL OF — STATION TRANSFORMER FOUINDATION 1 DETAIL OF - CABLE TRENCH SECTION OF TYPE-A

You might also like