ITY AUTHORITY
DISTRIBUTION AND CONSUMER SERVICE DIRECTORATE SUDUR
PASCHIM PROVINCIAL OFFICE ATTARIYA
ATTARIYA, KAILALI
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF 33/11 KV, 3 MVA SUBSTATION AT
SUGARKHAL OF KAILALI DISTRICT
NCB NO.: NEA/SPO-—2076/377-08
CIVIL WORK DRAWINGS
TCHYARD EQUIPMENT STRUCTURE AND FOUNDATIONS
S
Submitted by:
M/S BIBHANSHU INDRADHANU JV
KATHMANDU, NEPAL.GENERAL NOTES:
FOR R.C.¢. STRUCTURES
DIMENSIONS TO SE READ ONLY.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE
3. CHANGE IN’ DIMENSION TO SE NOTIFIED TO THE CONSULTANCY IMMEDIATELY.
4. ALL DRAWINGS AND SPECIFICATIONS REMAIN THE OF THE NEA.
5. THE STRUCTURAL DRAWINGS SHALL BE READ IN JON WITH ARCHITECTURAL DR: S,
IF ANY. SHALL BE REPORTED TO SITE ENGINEER,
6. CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING FIELD DIMENSIONS AND SITE CONDITIONS.
7. GRADE OF CONCRETE MIX SHALL BE1:1.5:3 FOR ALL MEMBERS
8. REINFORCEMENT SHALL BE OF GRADE Fe : 415/500
9. CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS
FOOTING | 50. mm
COLUMN 40 mm
BEAM: 25 mm
SLAB: 15mm
10. LAP LENGTH SHALL BE 60 TIMES THE DIAMETER OF THE BAR,
11. DEVELOPMENT LENGTH SHALL SE 60 TIMES THE DIAMETER OF THE BAR,
12, UNLESS OTHERWISE INDICATED ALL CONSTRUCTION JOINTS SHALL BE ROUGHENED JOINTS WITH MINIMUM AMI
MUDE OF 8 mm
FOR STEEL STRUC
ES
ALL STEEL PLATES, ANGLES CONFIRM TO IS 2062
NUTS, BOLTS ANO' WASHERS MILD STEEL THAT CONFIRMS TO IS 1367 PROPERTY CLASS 4.6.
TOLERANCE IN FABRICATION AS PER IS 7215.
ALL STRUCTURES ARE HOT DIP GALVANIZED @ 610gm/sqm. AS PER Si
CATION
9]TRENCH WEA
casud Taencel
4 - -___B
{or use cer a
aT st - ~ Se -
Gor er aa
@ a 1 1
Gormte a
Qoretaa I _ _
1 be foe Hl
{or usa comer aie PEAS
RD WT
or we,
or come ee
ss UNE SKY UNE
b— - 48 - + — - 8 - — + 2 —__4
NEPAL ELECTRICITY AUTHORITY
oe
=F]
feEW ROW FRONT OF THE NOOMNG CANTYVW ROW FRONT OF THE NCOUNG CANTY8
Ter Freas ETEl
i
:
i
i
EW FROM SDE OF INCOMNNG cavTz®oO
JOINTI=1
BEER
Re
To) T
ol e|f
Ee +t
+, | o <|
7.
&VEIN FROM TOP OF THE CT GANTRY
VEIW FROM FRONT OF THE CT GANTRY VEW FROM SIDE OF THE cT Garey
4
FRR
+
|
hE SERN AMOFEL
fretant
ere
Wie Se 50
ie
m
Las
WNeI
\VEW FROM TOP OF THE pT canTey
EW FROM FRONT OF THE PT GANTRY VEW FROW SIDE OF THE =T GANTRY
een
ite
rer! Sere [we [enon [e feSECTION - AA
eo
BASE PLATE PLANEW FROM FRONT OF THE PI GANTRY VEN FROM SIDE OF THE PI cANTRYVEWW FROM FRONT OF THE LA GANTRY VEN FROM SIDE OF THE La caNTRySECTION - AA
Paige |*e.__#_} =f ecre
s
|
I
IK
I
|
t
2}
B or oF FoNcEN oot
-——$ $+ ———
SECTION - As SECTION - BB
AUTHORITY.Fes Poa [felITY_AUTHORITY
Poe Fone [ETE
PAL ELE:WO
JOINT J—1ojo
FSSeL,
ee
x
ERE
ase |_ oot pe A
je
Tat
aah
BASE PLATE LAYOUT DETAIL 3BASE PLATE LAYOUT DETAIL
NEPAL ELECTRICITY AUTHORITY
' eae =,
“DOA FRONT AND I YEW_OF THE ee peers
HG NST RNTRT =WO
JOINT J—1¢
Eg] i
yal 5
i 2
AiFoe Fone [Te
= +
BASE PLATE LAYOUT DETAILBASE PLATE LAYOUT DETAIL
us
Afates
He)
pw." 4
r ve eon oe
ell
HT se PoE
spe sewn acre
SECTON ~ 6DETAIL OF — STATION TRANSFORMER FOUINDATION
1
DETAIL OF - CABLE TRENCH
SECTION OF TYPE-A