Location No.

: AP-21/2
Tower Type: DDS+12.0

+3.0m

+4.5m

+6.0m

+7.5m
Leg A
Leg D
+9.0m

+10.5m

+12.0m

+13.5m

+15.0m
Leg B Leg A 9.43M 9.43M Leg D Leg C
+16.5m

+18.0m

+19.5m

+21.0m
Leg B 10.91M 10.91M Leg C
+23.0m

+25.0m

+26.5m

+27.0m

+28.5m

Notes:
1. The pit size has been considered for all pit as +9.0m approved foundation size which may vary with respect to
the approved foundation design of the raised chimney.
2. The lowering/raising of RL (CPG) is confirmed with profile, weight span and ground clearance is found O.K.
3. The given benching quantity shall be submitted after the final design of the foundation

C C B B

Rev. 1 16.01.23 Revised as per actual Fdn. Size U.Bhatta HBA -----
Rev. 0 26.10.22 Submission for Approval U.Bhatta HBA -----
D

B
im

:A

Leg C Leg B Rev. No. Date Description Prepared By Checked By Approved By


:O

im

C
C

B
D

CLIENT: CONSULTANT:
A Vision Energy and Power Pvt. Ltd. EI Maven Pvt. Ltd.
D
D

CONTRACTOR: PROJECT:
im
D
:O

:O

POWERCHINA SEPCO1 ELECTRIC POWER Nupche Likhu Hydropower Project (57.5) MW


im

CONSTRUCTION CO., LTD


A

132 kV D/C Transmission Line


D

DESIGNED BY:
N.TECH POWER PVT. LTD., NEPAL
Leg D Leg A PREPARED BY H AYER
TITLE: LEG PROFILES OF THE TOWER FOUNDATION
CHECKED BY LI YUANHAI
D D A A
APPROVED BY ZHAO LEI SHEET NO :-----------
DWG.NO.:NLHP-LEG-132KV-001
Print Size: ISO A4 Scale: 1:200 (V:H) 68 of 79