Professional Documents
Culture Documents
153
153
153
1540
6
153
8
4
2
1528
1529
1531
153
1537
5
1539
1538
15
42
153
1530
1541
4
1540
1536
Leg C
153
2
Leg B
1542
Leg A&B
1538
1533
1537
1541
9
153
0
153
42
15
0
34
154
5
15
5.
153
Leg C&D
1531
38
41
37
39
15
15
15
15
1534
6
1529
40
153
1532
15
7
153
15
0 4
1533
15
38 15
39
1535
1530
Leg D Leg A
Legends:
1. Major Contour Rev. 1 05.01.23 Revised as per shifted location U. Bhatta HBA -----
2. Minor Contour Rev. 0 26.12.19 Submission for Approval U. Bhatta HBA -----
Rev. No. Date Description Prepared By Checked By Approved By
CLIENT: CONTRACTOR:
NEPAL ELECTRICITY AUTHORITY, NEPAL PINGGAO GROUP CO.,LTD
Notes:
1. The quantity of revetment shall be confirmed before the commencement of the
CONSULTANT: PROJECT:
foundation works.
2. The pit size has been considered for all pit as +9.0m approved foundation size which POWER GRID CORPORATION OF INDIA LTD. 220 kV Chilime Hub – Trishuli-3B Hub
may vary with respect to the approved foundation design of the raised chimney. Transmission Line under 220kV Chilime
3. The lowering/raising of RL (CPG)/Change in Body Extension is confirmed with profile and SURVEYED BY: -Trishuli Transmission System Project
weight span and ground clearance is found O.K. DESIGNER'S CONSORTIUM
PREPARED BY
TITLE: LOCATION CONTOUR & LEG PROFILE REPORT
CHECKED BY
APPROVED BY SHEET NO :
DWG.NO.:PG/NEA/220KV/CHI-TRI/
Print Size: ISO A3 Scale: 1:200 (V:H)