Objectives
Encourage national and Earning profits
international initiatives to while being
invest in health services to competitive in the
improve the nation's local market.
overall well-being.
.
02
Client’s Requirements
03
Problems with Typical Health Infrastructure in Sri Lanka
Limited Inefficient
resources management
(human/physical)
Lack of
Overcrowding Poor
specialized
and high waiting infrastructure
services
times
.
04
Strengths
SWOT Analysis • High-end technology and partnerships with technology
companies
• Convenient location near the Galle road and Ratmalana
THREATS airport
• Having a helipad is extremely useful in emergency cases
T • Attraction of foreign exchange through medical tourism
• Potential for high profits and increased land and property
STRENGTHS
values.
SWOT O
S OPPORTUNITIES
Weaknesses
WEAKNESS
W •
•
Facilities may not be accessible for low-income people
Limited space availability
• Potential for increased traffic and noise
• Potential disruptions to the local community during the
construction and operation
05
Opportunities
SWOT Analysis • Enhancing public health and well-being
• Attracting people who would typically go abroad for
medical treatments
THREATS • Growth of the local economy.
• Creating new job opportunities for healthcare
T professionals Earning LEED certification by adopting
sustainable practices, which can improve the hospital's
STRENGTHS
reputation.
SWOT O
S OPPORTUNITIES
Threats
• Competition with other hospitals
WEAKNESS
W • Negative perceptions of the hospital's impact on the
surrounding community
• Legal or regulatory issues.
• The limited accessibility for low-income people can lead
to criticism
06
Site Location
09
Site Analysis
Urban Context
10
Site Analysis
Accessibility
Front access
Back access
11
Hospitals in 5km Range
12
Reconnaissance Survey
16
Guidelines
Manual on management
Health Building Notes (HBN) of teaching, provincial,
- by National Health base and special hospitals
Services (NHS), UK – Ministry of health,
highways & social
services, 1995
17
Guidelines
19
Three different alternatives are proposed based on three
different concepts.
Smart Hospital
It helps to streamline hospital
operations through Internet of
Things (IoT), big data analytics, and
artificial intelligence (AI),
eventually resulting in better
patient experience.
21
Special Features
23
Alternative 1
Master plan
Main building
24
Alternative 1
Vertical floor arrangement
RF Helipad
F11-F12 Theatre complex
F10 Central Stereline Service Department (CSSD) Drug store
F7-F9 Patient rooms Patient care centre
F5-F6 ICU HDU Patient care center Multi bed rooms
F4 Gynecology & obstetrics Pediatrics
F3 laboratories Radiology
F2 Consultation rooms Telemedicine rooms
F1 Consultation rooms Administration Cafeteria
Accident & emergency X-ray Mortuary
GF
unit
CT room Laboratory OPD Pharmacy
room
B2-B1 Car park
25
Alternative 1
Floor plans
27
Alternative 2
Concept
• Provide wide range of healthcare services to
patients of all ages and with various medical
conditions
• Create a space that is functional, efficient and
comfortable for patients and staff
Special Features
• Offers a high level of comfort, convenience and a
personalized service
• Roof top gardens available at two levels
• Comfortable and stress free environment for patients
• Using high-end technologies and delivering top- quality
medical care
28 30
Alternative 2
Manual sketches
29
Alternative 2
Master plan
N
2
1. Proposed hospital building
6
2. MOH-Dehiwela
3
3. Residential building
5
4. Commercial building
1 5. Temple
3
6. Generator, transformer
7. Water pretreatment-unit
8. Channel
4
7
8
30
Alternative 2
Vertical floor arrangement
RF Helipad
F8-F15 IPD wards and suits Nurse station
F7 ward Suits Nurses station Rooftop garden
F6 Labor room Post natal rooms NICU Kids play Family area
area
F5 Physical therapy Medical longue Cafeteria Rooftop garden
31
Alternative 2
Plan views
32
Alternative 2
3D and Section view
33
Alternative 2
Information on buildings
• Vehicle movement has been done between the Basement and the ground using rampers.
• Staff parks and emergency parking vehicles situate near the vertical circulation point and
entrance.
• Separate parking slots allocated for 2-wheel vehicles.
• Emergency unit placed near the 2nd front entrance.
• Cohort ward situated isolated with separate entrance at ground floor.
• On the 1st floor have a lobby area with a balcony.
• 2 Bed lifts, 2 normal lifts, service lift, fireman lift and 3 staircases with fire staircase use for
vertical circulation.
• There are 7 suites with V.I.P, standard and normal condition per floor inpatient zone.
• Rooftop gardens with footpaths are used to facilitate physical therapy treatments and as a
sustainable solution.
34
Alternative 3
Concept
35
Alternative 3
Special Features
36
Alternative 3
Master plan
• Main building
• No. of stories – 13 (including 2 basements)
• Height of the building – 49.600 m (FFL)
• Building 2
• No. of stories – 6 (including 2 basement)
• Height of the building – 17.600 m (FFL)
• Service building
• No. of stories – 3
• Height of the building – 13.600 m (FFL)
• Side space = 7m
37
Alternative 3
Vertical floor arrangement
H Helipad 49.600 m FFL
39
Alternative 3
Floor plans
Building 1- Building 1-
First floor Eighth floor
40
Alternative 3
Section views
Transverse section
Main building-Longitudinal view
41
Alternative 3
3D view
42
Alternative 3
Rendered view
43
Feasibility Study
An assessment conducted to determine the
viability and potential success of various
alternatives, aiding in the selection of the
most optimal option for a project or decision-
making process.
Environmental Feasibility
Social Feasibility
Financial Feasibility
44
Feasibility Study cont.
Methodology
Positive and negative attributes which were relevant to the project were selected
Assign weightages for the attributes using Analytic hierarchy Process (AHP)
AHP method is a decision making method that can be used in feasibility studies to symmetrically evaluate and
prioritize alternatives based on multiple criteria. It involves breaking down the decision making process into a
hierarchy, comparing the relative importance of criteria and alternatives, and deriving overall priority scores to
rank and compare the alternatives.
45
Feasibility Study cont.
Methodology
Relevance scores will be assigned to each attribute separately for positive and negative impacts
46
Feasibility Study cont.
Environmental Feasibility – Positive Impact
No Attributes
1 Uses energy efficient building materials
2 Storm water management & rainwater harvesting
3 Demotivates paper work
4 Use renewable energy
5 Wastewater treatment
Step 3 :- Divide each element of A1 matrix by sum of A1 elements and formulate A2 matrix
A2
0.2601
0.2601 ❑ A2 matrix gives the weightage for attributes
0.0819
0.2601
0.1378
Sum 1.0000
48
Feasibility Study cont.
Environmental Feasibility – Positive Impact
Step 4 :- Consistency check
➢ Multiply the A0 matrix and A2 (result is A3)
➢ Divide each element in A3 matrix by corresponding element of A2 matrix and formulate A4
(𝑎𝑖,𝑗)3
A3 = A 0 x A2 A4 = Consistency Index =
𝜆𝑚𝑎𝑥 − 𝑛
(𝑎𝑖,𝑗)2 𝑛 −1
49
Feasibility Study cont.
Environmental Feasibility – Positive Impact
Step 5 :- If consistency ratio less than 0.1, weightages can be taken as per A2 matrix
50
Feasibility Study cont.
Environmental Feasibility – Negative Impact
51
Feasibility Study cont.
Social Feasibility – Positive Impact
1 Enhance public health & well being 3 3 3 0.2011 0.6032 0.6032 0.6032
2 Uses high-end technology for patient care 3 1 2 0.0880 0.2640 0.0880 0.1760
3 Accessible for emergency treatments (ETU & helipad) 3 3 3 0.1676 0.5028 0.5028 0.5028
4 Attract people who seek to travel abroad for medical treatments 3 2 3 0.0859 0.2577 0.1718 0.2577
5 New employment opportunities within hospital premises 1 3 2 0.0248 0.0248 0.0745 0.0497
6 Property and land value increase 3 3 3 0.0248 0.0745 0.0745 0.0745
7 Design is oriented to reduce waste (eg: waiting times, movement) 3 2 3 0.0765 0.2296 0.1531 0.2296
8 Floor plans are well designed to ensure patient safety 3 3 3 0.0792 0.2375 0.2375 0.2375
9 Enhance patient experience and mentality 2 3 3 0.1361 0.2722 0.4083 0.4083
10 Provides a friendly environment for hospital staff 2 2 2 0.0466 0.0932 0.0932 0.0932
11 New employment opportunities outside the hospital premises 2 2 2 0.0253 0.0506 0.0506 0.0506
12 Treatment for multiple diseases 2 3 1 0.0440 0.0880 0.1320 0.0440
1.0000 2.6983 2.5896 2.7272
52
Feasibility Study cont.
Social Feasibility – Negative Impact
Score Score x Normalized Weightage
Attributes
Alt.1 Alt. 2 Alt. 3 weightage Alt.1 Alt. 2 Alt. 3
Disturbances to nearby people during
-2 -2 -2 0.1795 -0.3590 -0.3590 -0.3590
construction stage
Social discrimination -2 -2 -2 0.3422 -0.6844 -0.6844 -0.6844
Health issues arising from hazardous chemicals
-1 -1 -1 0.2538 -0.2538 -0.2538 -0.2538
& radiation
Trigger the traffic congestion in area -1 -1 -1 0.0554 -0.0554 -0.0554 -0.0554
53
Feasibility Study cont.
Environmental & Social Feasibility - Summary
54
Financial Feasibility
Step 4
A cash flow diagram was
Step 3 plotted. Net present value
(NPV) calculation was used
The revenue generated by to evaluate the financial
Step2 each facility within the performance of the project
Operational and project was analyzed to by discounting the cash
Step 1 maintenance cost determine its financial flows to their present
The calculation of capital calculations were contribution and potential value and assessing the
cost involved assessing the performed to estimate the profitability. profitability of the
various expenses involved recurring expenses needed investment
in the project's for the continuous
development, such as operation and upkeep of
construction materials, the facilities.
labor, and equipment.
.
55
Estimation of O & M cost for the hospital building Project for improvement of
Anuradhapura Teaching Hospital
(2010) was taken as base project to
calculate the cost by using cost per
square meter method
Clinical - surgery, ENT, dental OB&GYN 1044.85 Electricity without smart 6832320 59411.48
56
Calculation Assumed that the average exchange
rate between the US dollar (USD) and
Results
Estimation of NPV, IRR & Benefit/ Cost ratio
𝑃=
𝐹
1+𝑖 𝑁
Internal Rate of Return (IRR) and Benefit/Cost Ratio (BCR) using the available data on capital
cost, operational and maintenance cost, administrative cost, and revenue
• Cash flows: Calculate the net cash flows for each year by subtracting the total expenses (including capital cost,
operational and maintenance cost, and administrative cost) from the total revenue generated.
• Cumulative cash flows: Sum up the net cash flows for each year to calculate the cumulative cash flows.
• IRR: Use a financial calculator or software to find the discount rate that makes the net present value (NPV) of
the cumulative cash flows equal to zero. This discount rate is the Internal Rate of Return (IRR).
• BCR: Divide the total discounted cash inflows by the total discounted cash outflows. The resulting ratio is the
Benefit/Cost Ratio (BCR).
59
Estimation of NPV, IRR & Benefit/ Cost ratio
Expenses/yr 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Income/yr
Income 0 0 0 7601.25 7601.25 8209.35 8209.35 8866.098 8866.098 9575.386 9575.386 10341.42 10341.42 11168.73 11168.73 12062.23 12062.23 13027.21 13027.207 14069.38 14069.38 15194.93 15194.93 16410.53 16410.53 17723.37
Salvage 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Net income 0 0 0 7601.25 7601.25 8209.35 8209.35 8866.098 8866.098 9575.386 9575.386 10341.42 10341.42 11168.73 11168.73 12062.23 12062.23 13027.21 13027.207 14069.38 14069.38 15194.93 15194.93 16410.53 16410.53 17723.37
Net amount -5000 -8899.3 -6299.3 6255.894 6121.358 6581.469 6418.681 6896.362 6699.389 7192.006 6953.668 7457.527 7169.138 7679.223 7330.272 7839.925 7417.695 7918.22 7407.3208 7887.509 7269.321 7714.866 6966.859 7359.646 6454.558 6771.803
MARR 0.22
present value -5000 -7294.51 -4232.262833 3445.164 2763.176 2435.139 1946.645 1714.357 1365.075 1201.19 951.9532 836.8289 659.4 578.9479 452.9836 397.1133 307.9723 269.47 206.62564 180.3446 136.2377 118.5146 87.72447 75.95928 54.60477 46.95789
NPV 3869.742
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
4974.616 5472.078 6019.286 6621.214 7283.336 8011.67 8812.836 9694.12 10663.53 11729.89 12902.87 14193.16 15612.48 17173.73 18891.1 20780.21 22858.23 25144.05 27658.46 30424.3 33466.73 36813.41 40494.75 44544.22 48998.64
7072.108 7779.319 8557.251 9412.976 10354.27 11389.7 12528.67 13781.54 15159.69 16675.66 18343.23 20177.55 22195.3 24414.84 26856.32 29541.95 32496.15 35745.76 39320.34 43252.37 47577.61 52335.37 57568.9 63325.79 69658.37
12046.72 13251.4 14576.54 16034.19 17637.61 19401.37 21341.51 23475.66 25823.22 28405.55 31246.1 34370.71 37807.78 41588.56 45747.42 50322.16 55354.37 60889.81 66978.79 73676.67 81044.34 89148.77 98063.65 107870 118657
-12046.7 -13251.4 -14576.5 -16034.2 -17637.6 -19401.4 -21341.5 -23475.7 -25823.2 -28405.5 -31246.1 -34370.7 -37807.8 -41588.6 -45747.4 -50322.2 -55354.4 -60889.8 -66978.8 -73676.7 -81044.3 -89148.8 -98063.6 -107870 -118657
17723.37 19141.24 19141.24 20672.54 20672.54 22739.79 25013.77 27515.15 30266.67 33293.33 36622.67 40284.93 44313.43 48744.77 53619.24 58981.17 64879.29 71367.21 78503.94 86354.33 94989.76 104488.7 114937.6 126431.4 139074.5
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48007.71
17723.37 19141.24 19141.24 20672.54 20672.54 22739.79 25013.77 27515.15 30266.67 33293.33 36622.67 40284.93 44313.43 48744.77 53619.24 58981.17 64879.29 71367.21 78503.94 86354.33 94989.76 104488.7 114937.6 126431.4 187082.2
5676.646 5889.844 4564.704 4638.35 3034.931 3338.424 3672.266 4039.492 4443.442 4887.786 5376.565 5914.221 6505.643 7156.207 7871.828 8659.011 9524.912 10477.4 11525.14 12677.66 13945.42 15339.97 16873.96 18561.36 68425.21
32.26534 27.44027 17.4316 14.51872 7.786707 7.020801 6.330231 5.707585 5.146183 4.640001 4.183608 3.772105 3.401079 3.066546 2.764919 2.49296 2.24775 2.02666 1.827317 1.647581 1.485523 1.339406 1.207661 1.088875 3.290217
60
Calculation
Results
Estimation of NPV, IRR & Benefit/ Cost ratio
Cash Flow Diagram - Alternative 01
250000
200000
150000
100000
LKR MN
50000
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
-50000
-100000
-150000
Years
61
Calculation
Results
Estimation of NPV, IRR & Benefit/ Cost ratio
Alternative 3 has been identified as the optimal choice, meeting all client requirements and feasibility
parameters. Extensive evaluations confirm its financial viability and functionality.
62
Multi-Criteria Analysis (MCA)
What is MCA?
• Useful when there are many choices and different factors to consider.
63
Multi-Criteria Analysis (MCA)
Methodology
64
Multi-Criteria Analysis (MCA)
Methodology
• Financial aspect
▪ Given the highest weightage (0.45) due to private ownership and investment in the
project.
▪ Need to ensure the financial feasibility, profit return, and capital allocation.
• Environmental aspect
▪ Given the second largest attribute (0.35) due to the location (municipal zone)
requires adherence to development guideline and limits.
▪ Need to ensure the environmental sustainability and need of LEED Certification.
• Social aspect
▪ Assigned a comparative weightage (0.20).
▪ Project aims to serve diverse social groups with different needs.
65
Multi-Criteria Analysis (MCA)
Methodology
• Calculate the net score by multiplying the previous summations with the weightages and
its summation which is the net impact.
• Selected the best alternative which is having the highest net positive impact.
66
Environmental
Imapct
Assessment
Environmental Impact Assessment (EIA)
What is EIA?
✓ Environmental Impact Assessment (EIA) is a systematic process used to evaluate the
potential impact of a proposed development project on the environment.
✓ It helps decision-makers understand the likely consequences on the environment and
consider them alongside social, economic, and other factors before commencing and
implementing the proposed project.
68
Baseline information of the study area
Topography
1. Topography
➢The proposed project site is located
on mostly flat and level terrain
69
73
Baseline information of the study area
Climatic & Meteorological Conditions
• Precipitation
• Temperature
• Average humidity
70
74
Environmental Monitoring Plan
Cost
Impact Mitigation measure Frequency Responsibility
implementation
Pre construction stage
Construction stage
Assume 2.5 m2/person in waiting areas 02) Estimate the number Water Wash
Urinal
of appliances required. Closet Basin
No.of persons in waiting areas 27
Male 3 3 2
Female 5 5 _
Assume rest of 67.5 m2 is for lobby & circulation
Assume 10 m2/person Ref: BS6465-1 : 2006
No. of persons in circulation area 7
Area Population
Emergency unit 32
Lobby area 34
Catheter lab 15
Anesthesic room 4
Reception area 12
Preparation & ECG room 4
101
72
Design of Water supply scheme
Assumptions
73 IS – 1172:1993 Standards
Design of Water supply scheme
Detailed breakdown calculation of needed water for 1st floor
MRI Unit – 2 staffs + 1 technician
X-ray Unit – 2 staffs + 1 technician
Haematology lab – 2 lab technicians + 2 supporting staffs
Clinic chemistry lab – 2 lab technicians + 2 staffs
Cardiac operation theatre – 1 cardiac surgeon + 1 Anaesthesiologist + 1 perfusionist + 2 Nurses + 2 technicians
Pulmonary function lab – 1 physician + 1 therapist + 1 technician + 1 supporting staff
Anaesthetic room – 1 anaesthesiologist +1 nurse
Cardio bio maker lab – 1 lab scientist + 1 lab supervisor + 1 supporting staff
MLT room – 1 technician + 2 nurses
Receptionists – 2
8 beds + 1 nurse per bed
Consulting room – 2 consultants + 10 visitors per day
75
Design of Water supply scheme
Design of break-pressure tanks and water sump
Water sump
Total water demand for sump with fire allocations = 113.18 m3/day
77
Horizontal Circulation
78
Vertical Circulation
T + 2 R = 630 mm
The clear width of a stair = 1400 mm
Take T = 330 mm,
Handrails are provided on both sides
top handrail → 1000 mm from surface
330 mm + 2 R = 630 mm
second handrail → 600 mm from surface
2 R = 300 mm
R = 150 mm
1800 𝑚𝑚
Angle of staircase = tan-1 = 24.40
3960 𝑚𝑚
79
Vertical Circulation
Lifts for Bed movements
For the vertical circulation of patient beds, two separate lift cars will be
provided for the bed movement. Since they are not used frequently, they can
be used for normal passengers' movements also. According to the Health
Building Note 00-04, the dimensions of lifts for bed movements are as follows.
80
Vertical Circulation
Lifts for Bed movements
81
Vertical Circulation
Lifts for passenger movements
The project is located in the Dehiwala area which is a suburban area. Therefore, the building type is investment-
suburban
The area allocated for a person 8 - 9 m2/person (take 9 m2 / person)
Population handled in 5 minutes 12 % - 14 % (take 14 %)
Average interval 30 s - 45 s (take 40 s)
Rentable floor area (taken from Revit model) = 1284 m2 per floor
1284
Population per floor = = 142.67 persons
9
82
Vertical Circulation
Lifts for passenger movements
Assume the lift car speed is 4 m/s. From the graph,
round trip time = 120 s
120 𝑠
no. of cars = 40 𝑠
=3
83
Electricity Supply System
01) Determine required illumination 02) Obtain efficacy & luminous flux
levels for each areas values of proposed fixtures
Recommended Efficacy Luminous
Area Area
Illuminance (lm/W) flux (lm)
(Lux)
Reception 110 1150
Consulting areas, general 300
Corridors 126 4300
Consulting areas, examination 500 Waiting rooms 120 2025
Corridors, general 150
Examination rooms 88 3500
Ward corridors, day 200
Ward corridors, night _ Imaging rooms 149 2200
Laboratories, general 300 Patient rooms 139 3400
Laboratories, examination 500 Office area 139 3400
Nurses station 300
Nurses station 110 1150
Ward bed head _
Ward bed head, reading 150 Parking area 144 2700
Surgeries, general 300 Ref: "Designing people-centric hospitals using Philips lighting
solutions“
Surgeries, waiting rooms 150
https://www.lighting.philips.co.uk/prof
Ref: Energy Efficiency Building code for Commercial Buildings in SL
84
Electricity Supply System
03) Determine the number of luminaires required by the Lumen method, and the power consumption by lights
Area Power No. of
Usage E (lux) F (lm) N Amphere
(m2) (Watts) sockets
Emergency unit 165 300 3500 21 39.77 3.63 16
ECG room 37 500 2200 13 14.77 0.83 4
Store 21 100 1300 2 13 0.11 2
Mortuary 64 300 3500 8 39.77 1.38 10
Catheter lab 64 500 3500 14 39.77 2.42 8
Anesthesia room 29 200 3400 3 24.46 0.32 4
Washroom 49 150 1300 9 13 0.51 2
Corridor 95.82 150 4300 5 34.13 0.74 4
Waiting area 73 150 2025 8 16.88 0.59 8
Reception 73 150 1150 14 10.45 0.64 6
Lobby 206 150 1150 40 10.45 1.82 2
12.99 66
85
Electricity Supply System
86
Building Services Design
Thermal Comfort
For people in unconditioned (free-running) buildings, the centre point is given by a simple linear function:
Tn = 17.6 + 0.31 T0 ; Where T0 is the mean annual temperature
neutrality temperature = 17.6 + 0.31 × 26.5 = 25.815 (Let the neutrality temperature as 26 0C)
Data: 1991 - 2021 Min. Temperature °C (°F), Max. Temperature °C (°F), Precipitation / Rainfall mm (in), Humidity, Rainy days.
Data: 1999 - 2019: avg. Sun hours
87
Building Services Design
Thermal Comfort
The cooling system at the hospital building is designed to make use of these
zones.
88
Ground floor
Description Condition Units Amoun 90F Cooling (SI)
t (factor) load
95
Preliminary Structural Layout
97
Structural Design
Load Calculation
❑ Calculated loads for beam along grid line 19
98
Structural Design
Moment Distribution Method
Joint A Joint B Joint C Joint D
A0 A2 AB BA B0 B2 BC CB C0 C2 CD DC D0 D2
Length 3.6 3.6 7.689 7.689 3.6 3.6 3.902 3.902 3.6 3.6 6 6 3.6 3.6
UDL 80.9 80.9 37.46 37.46 64.46 64.46
DF 0.4475 0.4475 0.105 0.044 0.435 0.435 0.086 0.085 0.43 0.43 0.055 0.13 0.435 0.435
FEM 0 0 -398.572 398.572 0 0 -47.529 47.529 0 0 -193.388 193.388 0 0
Balancing Moment 178.361 178.361 41.85 -15.446 -152.704 -152.704 -30.19 12.398 62.719 62.719 8.022 -25.14 -84.124 -84.124
COM -7.723 20.925 6.199 -15.095 -12.57 4.011
Balance Moment 7.723 -27.12402812 27.66505314 -4.011109837
Balancing Moment 3.456 3.456 0.811 -1.193 -11.799 -11.799 -2.333 2.352 11.896 11.896 1.522 -0.521 -1.745 -1.745
COM -0.597 0.405 1.176 -1.166 -0.261 0.761
Balance Moment 0.597 -1.581 1.427 -0.761
Balancing Moment 0.267 0.267 0.063 -0.07 -0.688 -0.688 -0.136 0.121 0.614 0.614 0.078 -0.099 -0.331 -0.331
COM -0.035 0.031 0.061 -0.068 -0.049 0.039
❑ Calculated
Balance Moment 0.035 -0.092 0.117 -0.039
Balancing Moment 0.016 0.016 0.004 -0.004 -0.04 -0.04 -0.008 0.01 0.051 0.051 0.006 -0.005 -0.017 -0.017
moments will be
COM -0.002 0.002 0.005 -0.004 -0.003 0.003 used to verification
Balance Moment 0.002 -0.007 0.007 -0.003 of the 3D model
Balancing Moment 0.001 0.001 0 0 -0.003 -0.003 -0.001 0.001 0.003 0.003 0 0 -0.001 -0.001
COM 0 0 0 0 0 0
0 0 0.001 0
Moment (kNm) 182.101 182.101 -364.201 403.223 -165.234 -165.234 -72.755 46.077 75.282 75.282 -196.642 172.436 -86.218 -86.218
99
Structural Design
Wind load calculation for the main building
100
Structural Design
Wind load calculation for the main building
101
Design of service building
Structural design
• Columns are located such a way that minimize the number of
columns, optimizing space and enhance aesthetics appearance
• initial member sizes of structural members
• Column – 300mm x 450mm
• Beam – 300mm x 450mm
• Slab thickness – 200mm
• Loads acting on the structure
▪ Dead load
Self weight = 25 kN/m3 (Concrete density)
Floor finishes= 1 kN/m2
Partition wall= 0.5 kN/m2
▪ Imposed load = 7 kN/m2
▪ Roof load
Roof dead load = 1kN/m2
Imposed load = 0.4 kN/m2
• Develop a finite element model for the service building using
SAP2000
102
Substructure Design
Determination of Shear Strength Parameters of Soil Layers
N’70 =CN x η1 x η2 x η3 x η4 x N
CN → Adjustment of effective stress
η1 → Average energy ratio GWL = 2.0 m
η2 → Rod length correction
Weak alluvial deposits = 2.5 m
η3 → Sampler correction
Highest Basement rock level = 12.3 m
η4 → Borehole diameter
Assumed Er of 50%
Bore hole of diameter 75 mm without liner.
Soil strength parameters were calculated for the soils and the values are as bellows
103
Substructure Design
Determination of Shear Strength Parameters of Soil Layers
N
Depth Overburde Eff. 𝜼𝟐 Round
Soil type N PWP CN correct c' 𝝓' c_u 𝝓_u
(m) n Stress N
ed
0.5 Clayey 5 8 0 8 3.460 0.75 9.267 9 50 0
1.5 sand 6 24 0 24 1.997 0.75 6.421 6 25 0
2.5 (fine) 11 40.6 5.886 34.714 1.661 0.85 11.093 11 58 0
3.5 20 60.6 15.696 44.904 1.460 0.85 17.733 18 0 33
4.5 23 80.6 25.506 55.094 1.318 0.95 20.577 21 0 34
Fine sand
6 29 110.6 40.221 70.379 1.166 0.95 22.955 23 0 35
7.5 39 140.6 54.936 85.664 1.057 0.95 27.981 28 0 37
Clayey 102.44
9 >50 172.1 69.651 0.967 1 50.000 50 0 50
sand 9
with 119.23
10.5 42 203.6 84.366 0.896 1 26.886 27 0 40
gravel 4
102.02 141.17
12.3 HWR >50 243.2 0.824 1 50.000 50 0 50
4 6
104
Geotechnical Design
Modeling the excavation
105
Geotechnical Design
Modeling the excavation
BH-01 and BH-03 are located near to the Section A-A. From
them, BH-01 seems to be the worst case. Therefore, subsurface
profile obtained through sections A–A based on BH-01 is as
follows
106
Geotechnical Design
Modeling the excavation
107
Geotechnical Design
Modeling the excavation
Mesh Details
Deformed Mesh
108
Geotechnical Design
Modeling the excavation
Results obtained through the FEM analysis,
Parameter Result
Maximum horizontal movement of retaining wall 44.52 mm
Maximum bending moment acting on retaining wall 152.61 kN m / m
Maximum shear force acting on retaining wall 246.17 kN / m
Maximum axial force acting on retaining wall - 165.11 kN / m
Maximum vertical settlement at ground level of the retained side - 67.42 mm
Maximum axial force of Lateral support at - 0.8 m - 126.60 kN / m
Maximum axial force of Lateral support at - 4.0 m - 443.70 kN / m
109
Sustainable Design
WATER EFFICIENCY
Location and Transportation 9 Materials and Resources 19
Credit LEED for Neighborhood Development Location 9 Prereq Storage and Collection of Recyclables Required
Credit Sensitive Land Protection 1 Prereq PBT Source Reduction- Mercury Required
Credit High Priority Site and Equitable Development 2 Credit Building Life-Cycle Impact Reduction 5
Credit Surrounding Density and Diverse Uses 1 Credit Environmental Product Declarations 2
Credit Access to Quality Transit 2 Credit Sourcing of Raw Materials 2
Credit Bicycle Facilities 1
Credit Material Ingredients 2
Credit Reduced Parking Footprint 1
Credit PBT Source Reduction- Mercury 1
Credit Electric Vehicles 1
Credit PBT Source Reduction- Lead, Cadmium, and Copper 2
Credit Furniture and Medical Furnishings 2
Sustainable Sites 9
Credit Design for Flexibility 1
Prereq Construction Activity Pollution Prevention Required
Credit Construction and Demolition Waste Management 2
Prereq Environmental Site Assessment Required
Credit Site Assessment 1
Credit Protect or Restore Habitat 1 Indoor Environmental Quality 16
Credit Open Space 1 Prereq Minimum Indoor Air Quality Performance Required
Credit Rainwater Management 2 Prereq Environmental Tobacco Smoke Control Required
Credit Heat Island Reduction 1 Credit Enhanced Indoor Air Quality Strategies 2
Credit Light Pollution Reduction 1 Credit Low-Emitting Materials 3
Credit Places of Respite 1 Credit Construction Indoor Air Quality Management Plan 1
Credit Direct Exterior Access 1
Credit Indoor Air Quality Assessment 2
Credit Thermal Comfort 1
Water Efficiency 11
Credit Interior Lighting 1
Prereq Outdoor Water Use Reduction Required Credit Daylight 2
Prereq Indoor Water Use Reduction Required
Credit Quality Views 2
Prereq Building-Level Water Metering Required
Credit Acoustic Performance 2
Credit Outdoor Water Use Reduction 1
Credit Indoor Water Use Reduction 7
Credit Optimize Process Water Use 2 Innovation 6
Credit Water Metering 1 Credit Innovation 5
Credit LEED Accredited Professional 1
Energy and Atmosphere 35
Prereq Fundamental Commissioning and Verification Required Regional Priority 4
Prereq Minimum Energy Performance Required Credit Regional Priority: Specific Credit 1
Prereq Building-Level Energy Metering Required Credit Regional Priority: Specific Credit 1
Prereq Fundamental Refrigerant Management Required
Credit Regional Priority: Specific Credit 1
Credit Enhanced Commissioning 6
Credit Regional Priority: Specific Credit 1
Credit Optimize Energy Performance 20
Credit Advanced Energy Metering 1
Credit Grid Harmonization 2 TOTALS Possible Points: 110
Credit Renewable Energy 5
Credit Enhanced Refrigerant Management 1
110
Sustainable Design
WATER EFFICIENCY
Water Efficiency 11
P1 Prereq Outdoor Water Use Reduction Required
P2 Prereq Indoor Water Use Reduction Required
P3 Prereq Building-Level Water Metering Required
C1 Credit Outdoor Water Use Reduction 2
C2 Credit Indoor Water Use Reduction 6
C3 Credit Cooling Tower Water Use 2
C4 Credit Water Metering 1
111
Sustainable Design
WATER EFFICIENCY Points – 11/11
Outdoor water use reduction- P1 & C1 Point - 01
112
Sustainable Design
WATER EFFICIENCY
Indoor Water Use Reduction – P2 & C2 Point - 07
113
Sustainable Design
WATER EFFICIENCY
Indoor Water Use Reduction – P2 & C2
Gross area of the hospital building = 14214 m2. Baseline case - Female
No of usage Water per usage Total per person(gal)
Gross Square feet per Occupant for Medical Office;
Water Closet 3 1.6 4.8
Employee = 20.9032 m2/occupant Lavatory faucet -15 3 (15/60) x 0.5 0.375
seconds and 0.5 gpm
Transient = 30.6580 m2/occupant Kitchen- Sink 15 1 (15/60) x 2.2 0.55
seconds
Employee =680 shower - 300 0.1 (300/60) x 2.5 1.25
Transients =464 seconds and 2.5 gpm
Total per person (FTE- female) 6.975
Part-time(5h) = 100
No of usage Water per usage Total per person(gal)
Let female: male = 3:2 for employee, 1:1 for transients Water Closet 0.5 1.6 0.8
Lavatory faucet – 0.5 (15/60) x 0.5 0.0625
total occupancy male female
FTE 303 439 15 seconds and
Visitors 182 182
0.5 gpm
Total per person (Visitors- female) 0.8625
114
Sustainable Design
WATER EFFICIENCY
Indoor Water Use Reduction – P2 & C2
Baseline case - Male Design Case – Female
No of usage Water per usage Total per person(gal) No of usage Water per usage Total per person(gal)
Water Closet 1 1.6 1.6 HET Dual flush Water 1 1.6 1.6
Urinals 2 1.0 2.0 Closet – full flush
Lavatory faucet -15 3 (15/60) x 0.5 0.375 HET - Low flush 2 1.1 2.2
seconds and 0.5 gpm Lavatory faucet -12 seconds 3 (12/60) x 0.5 0.3
Kitchen- Sink 15 1 (15/60) x 2.2 0.55 and 0.5 gpm
Low flow kitchen- Sink 15 1 (15/60) x 1.8 0.45
seconds
shower - 300 0.1 (300/60) x 2.5 1.25 seconds
seconds and 2.5 gpm shower - 300 seconds and 0.1 (300/60) x 1.8 0.9
Total per person(FTE- male) 5.775 1.8 gpm
Total per person (FTE- Female) 5.45
No of usage Water per usage Total per person(gal)
Water Closet 0.1 1.6 0.16 No of usage Water per usage Total per person(gal)
Urinals 0.4 1.0 0.4 HET - Low flush 0.5 1.1 0.55
Lavatory faucet –15 0.5 (15/60) x 0.5 0.0625 Lavatory faucet -12 seconds 0.5 (12/60) x 0.5 0.05
seconds and 0.5 gpm and 0.5 gpm
Total per person (Visitors- male) 0.6225 Total per person (Visitors – Female) 0.6
115
Sustainable Design
WATER EFFICIENCY
Indoor Water Use Reduction – P2 & C2
Design case - Male
116
Sustainable Design
WATER EFFICIENCY
Indoor Water Use Reduction – P2 & C2
Rainwater harvesting
The water-saving potential is improved by up to 45%, it is possible to gain five points. This means a further 13.5% water
saving must be achieved (45% - 25.98% = 19.02%). The quantity is 5082.12 x 0.192 x 3.75 x 10-3 = 3.659 m3/day
It is necessary to capture sufficient water so that it is possible to assure at least 3.7 m3 of captured water is available per
day. Since it is not possible to have 100% efficiency in harvesting rainwater, it is advisable to have a target of 60-80%.
Hence, it is necessary to set the demand as about (3.7/0.7) = 5.285 (say, 5.3 m3 per day)
Determination of rainwater harvesting potential.
The quantity of rainwater that can be harvested depends on the rainfall intensity (R), the roof area (A), the capacity of the
storage tank (S) and the demand (D)
R =rainfall intensity - m/year
A = roof area – 1284 m2
S = capacity of storage tank - 90 m3
D = water demand – 1934.5 m3 /year (for 365 days)
117
Sustainable Design
WATER EFFICIENCY
Indoor Water Use Reduction – P2 & C2
Average water-saving efficiency in Dehiwela = 77.5%
At 5.3 m3 per day, the total demand is 5.3 x 365 = 1934.5 m3
With 77.5 % water-saving efficiency, the total quantity of water saved = 1499.24 m3
Water requirement of baseline = 5082.12 gal/day or (5082.12 x 3.75/1000) x 365 = 6956.15 m3 /year
Water saving with better fixtures = (5082.12-3761.34) x (3.75/1000) x 365 = 1807.82 m3 /year
Water saved due to rainwater harvesting = 1499.24 m3
Total water saving = 1807.82 +1499.24 = 3307.06 m3
Percentage water saving with respect to baseline case = (3307.06/6956.15) x 100 = 47.54 %
Hence, it is possible to claim 5 points under WE when rainwater harvesting is used for flushing W/C and urinals.
118
Sustainable Design
WATER EFFICIENCY
Indoor Water Use Reduction – P2 & C2
The healthcare building must meet the percentage reduction requirements above and appliance and process water
install equipment that meets the minimum requirements in Tables 2, 3, 4, or 5.
119
Sustainable Design
WATER EFFICIENCY
Cooling Tower Water Use - C3 Point - 02
120
Sustainable Design
WATER EFFICIENCY
Water metering- Building Level (P3) & Submetering (C4) Point - 01
In addition to the requirements above; install water meters: purified water systems (reverse-osmosis, de-ionized), water use in
the dietary department; water use in laundry; water use in the laboratory; water use in the surgical suite.
121
Special Provisions for
Disabled People
Grab bars/safety bars in washroom areas
122
Special Provisions for Disabled People
123
Acknowledgement
We would like to express our sincere gratitude toward,
• Prof. Chintha Jayasinghe, Head of the Department
• Prof. Nalin de silva, Coordinator & supervisor of CDP project
• Dr. Sampath Hewage, Supervisor of CDP project
• All staff members of civil engineering department
• Eng. Madusanka Jayasinghe (Project Manager, LAMCH site)
• Eng. Jude Gayan (Planning Manager, LAMCH site)
• Architect Mr. Nishantha (CECB, hospital design section)
• All others who helped us during the project
124
References
• City of Colombo Development Plan (Compiled edition) – Urban Development
Authority, Ministry of Megapolis and Western Development, 2018
• Dehiwala – Mount Lavinia Municipal Council Area Development Plan 2022–2031,
Urban Development Authority, Ministry of Urban Development & Housing
• Health Building Notes (HBN) - by National Health Services (NHS), UK
• Manual on management of teaching, provincial, base and special hospitals –
Ministry of health, highways & social services, 1995
• Challenges for health care in Sri Lanka, Dr. Ranga Sabhapathige
• Sustainable Healthcare Architecture, Robin Guenther and Gail Vittori
• Understand The Design of General Hospital, Mazen Fani
• Building type basics for healthcare facilities, R.L. Kobus, R.L. Skaggs, M.Bobrow, J.
Thomas, T.M. Payette
125
References
126
References
127 132