Method Statement for Repair of SWPP 52 Pile

SWPP 52
Descrip on
There is a pile in the seawater intake pump house. The pile number is SWPP 52. In this pile,
spiral reinforcement can be seen. Therefore, we have proposed to remove loose par cles and
use concrete to fill the gap.
We are reques ng you to approve this method to overcome this error.
Method
Remove loose par cles.
Here we remove loose par cles such as bentonite concrete, mud, and granular materials (sand,
clay, gravel). removal methods,

 Manual removing – using a crowbar or hammer.


 Mechanical excava on – Using an excavator to dig the mud around the piles
 Air or water je ng – Cleaning pile surface using a compressor.

Using excavator, crowbar, and hammer


Fixing the casing
Install a casing with a diameter of 0.8 meters around the pile using either an excavator or a
crane. Ensure that the casing is fixed securely in place.
casing may be used to facilitate the concre ng process. It helps ensure that the concrete is
placed uniformly and that the pile sha is properly formed. In this area, having a high water
table or where groundwater is present, the casing can prevent water.

Casing
Applying construc on concrete.
We prepare the concrete as per recommended specifica ons, ensuring precise propor ons and
thorough mixing to achieve the desired consistency. Employ a suitable concrete pump or
injec on system to introduce the concrete from the bo om of the casing, gradually filling the
void between the casing and the pile. Monitor the flow of concrete to guarantee uniform
distribu on within the annular space of the casing. Periodically assess the level to verify that it
reaches the specified cutoff point, ensuring accurate and effec ve concre ng.

Concrete