QTZ50(4810)
Tower Crane
O p e r a t i o n M a n u a l
GENERAL INTRODUCTION
QTZ50(4810)crane is a new type tower crane designed according to
better than the National Standard. The rated load moment is 50t•m .The effective
2. The tower crane has steady working, high speed and frequency.
Low speed for heavy load and high speed for light load are used in lifting
mechanism. Trolley mechanism has three speeds that can meet the working
can make the tower crane take its place accurately for safe operation
conveniently.
3. QTZ50 tower crane is equipped with all kinds of safety devices, including
weight limiter, load moment limiter, height limiter, slewing limiter, grip block
and trolley brake etc, which are all mechanical or Mechanical & Electrical
Integration products, sensitive and reliable, which can adapt to bad construction
environments and ensure the safety and reliability of the tower crane working. At
the same time it is equipped with rest platform and guardrail,etc,labor and safety
- 2 -
QTZ50(4810) Tower Crane DAHAN
protective facilities for protecting the assembly, disassembly and inspection of the
tower crane and the driver’s personal safety when moving up and down.
convenient and safe operation. The driver can operate the movement of each
maintenance.
relevant national standard. During the design of this crane, from the steel structure
conventional designing operation and entire charting work are all finished by the
As to the above characteristics, this tower crane can meet not only the
normal civil construction requirements for the medium and small cities but also
the civil construction requirements of high-rise or very tall buildings for the big
and medium cities. At the same time it can be also used for bridges, water
conservancy construction, long span industrial factories and tall chimneys that
- 3 -
QTZ50(4810) Tower Crane DAHAN
1.1.1 Freestanding
- 4 -
QTZ50(4810) Tower Crane DAHAN
1.1.2 Attached
- 5 -
QTZ50(4810) Tower Crane DAHAN
3~
R(m) 14 15 16 17 18 19 20 21 22 23 24
13.55
2fall 2000
Q(Kg)
4fall 4000 3864 3590 3350 3138 2950 2782 2630 2493 2368 2254 2150
R(m) 25 26 27 28 29 30 31 32 33 34 35 36
2fall 1965 1885 1810 1740 1675 1614 1557 1502 1451 1403
Q(Kg)
4fall 2054 1965 1883 1807 1736 1670 1608 1550 1495 1444 1396 1350
R(m) 37 38 39 40 41 42 43 44 45 46 47 48
2fall 1358 1315 1274 1235 1198 1163 1129 1097 1066 1037 1009 982
Q(Kg)
4fall 1307 1266 1227 1190 1155 1121 1090 1059 1030 1002 976 950
- 6 -
QTZ50(4810) Tower Crane DAHAN
Power kW 15/15/4
Type / YWZ3-300/45
Brake
Brake moment N.m 450
Type / JZQ-450
Reducer Center distance mm 450
Speed ratio / i=12.64
Rope / 6×37-11-1670-I-甲-右交
Type / YZR132M2-6
Slewing mechanism
Rope / 6×19-7.7-1570-I-甲-右交
Type / Y100L2-4-B5
Climbing mechanism
Motor Power kW 3
Rotating speed r/min 1440
Working temperature:-20~+40℃,
Power source:380±10﹪,50Hz
- 8 -
QTZ50(4810) Tower Crane DAHAN
load-lifting height is 29m. The bottom of tower connects with base pad by
embedded outrigger or underbed. The top of tower connects with the swing
bearing and upper bracket by lower bracket. Surface of swing tower connects with
top tower. The front surface of swing tower connects with lifting-jib and the back
connects with counter-jib. Hoisting box lies in the right-front of swing tower.
trolleying mechanism with back and forth movement along jib. The lifting-jib and
The climbing frame is below the lower bracket and surrounds tower. To meet
the requirements of construction, the upper section of tower can lifted by climbing
2.1.2 Attached
to 60m, rope of double or quadruple ratio is used to lift load. When the height
exceeds 60m, only rope of quadruple ratio is available. Independent and attaching
cranes have the same structure arrangement. Five sets of attaching devices are
arranged on the height of tower to enhance its stability and rigid. Therefore, the
- 9 -
QTZ50(4810) Tower Crane DAHAN
distance between the centre line of tower and building needs to be 4m. The
distance dimension among attaching devices must be strictly consistent with what
is shown in Fig.
Metal structures mainly include under frame, basic mast section, reinforced
mast section, tower, climbing frame, upper and lower bracket, slewing tower,
and two half beam,half beam and whole beam connected by pins.
Support bar:consist of steel tube welded with ear plates and clamps,one end
connected to foundation frame by pins,the other end fixed on support mast main
mast section by high strong bolt(sum.8 class S10.9 :M27×285 );and connected to
base mast by high strong bolt(sum.12 class S10.9 :M27×285 ).The dimension of
Mast Section: the tower body mast is welding by angle steel. It is connected
to support mast section by high strong bolt(sum.8 class S10.9 :M27×285 );and
- 10 -
QTZ50(4810) Tower Crane DAHAN
and three supporting rods. One end of supporting rods connect with tower crane
by frame and the other end contacts with ear-bracket by pins. The attaching
center and building. If any different, adding or cutting the length of supporting
hydraulic, climbing system and standard sections pulling-in device, etc. And the
direction of big window opposite to the direction of mast section with welding
The lower bracket has the structure of whole-box. The under part of lower
bracket is connected to tower standard section and climbing frame separately. The
top surface is tightly connected with the under surface of housing washer of swing
bearing which is not swing by high reinforcing bolts and the slewing bearing is
Cabin:
Cabin is outboard, and the under part of it connects with upper bracket by
supporting groove steel. If there is special requirements, also can incline the upper
of cabin to the main chord of tower head by tie bar to solid the cabin. There
Cat head:
- 11 -
QTZ50(4810) Tower Crane DAHAN
welded engineering type bow moment limiter on the forward of main chord, and
on the top of main chord there arranged hinge pin lifting lug of counter jib bar,
lifting jib bar and pulley seat, on the top of it there arranged assembling board,
safe signal lamp and lightning rod, and the grounding devices of lightning rod
Counter-jib: It is welded by channel steel [25 and angle steel with two
sections connected by ear plate pins. Guard-rail and aisle are arranged on
counter-jib is connected with swing tower by 2 pins. The other end is connected
with cat head by 2 combined rigid pull rods. There’re counter-weight and
electric control box are set up at the front side. Lifting mechanism has its
and pins.
Counter-jib tie bar: there are two kinds of counter-jib tie bars, which are used
to put the counter jib on the horizontal position by using the special pins to
connect the tower head and the ear plate of counter jib’s tail.
Lifting-jib tie bar: there are inner bar and outer bar, which used to connect
Lifting jib: the upper and lower chord of lifting jib are welded by steel tube
and angle iron, the whole jib is triangle section, which is six sections. And there
- 12 -
QTZ50(4810) Tower Crane DAHAN
are pins which used to joint these sections which is easy to disassemble. In order
to improve the lifting performance and alleviate the weight of lifting jib, so the jib
adopts double hinge point, changeable section space joist structure. The trolley is
arranged on the second section of lifting jib. The first section of the root of lifting
jib and slewing tower crane are connected by pins. In order to keep the lifting jib
level, there are two hinge points on the second and fourth section, which can be
used to connect with tower head. When assembling the lifting jib, make sure
Note: the upper chord, lower chord and tie bar pins of the lifting jib are
Trolley: there arranged nacelle on the trolley, so that easy to assemble and
maintain.
- 13 -
QTZ50(4810) Tower Crane DAHAN
Lifting mechanism is set on back of counter jib, which has different speed
for different lifting load to meet construction requirements. The type of motor in
the lifting mechanism is YZTD200L2-4/8/24. The mechanism can get the hoisting
feature of light load and high speed, heavy load and low speed. Height limiter is
set on the other side of drum. Rope guider is set beside drum to improve rope
effect.
- 14 -
QTZ50(4810) Tower Crane DAHAN
both sides of swing gearing. The type of motor is YZR132M2-6. The power
through hydraulic coupling to retarder makes the initiative retarder go around the
slewing bearing big retarder move as the planet and push in reverse the top move.
This tower crane adopts hydraulic coupling to make it slew, stop calm, small
precisely, there arranged inner electromagnetism brake to stop the slewing, this
brake starts working when the slewing motor stops working and the counter jib
stops slewing. The brake should open when stop working, that is to say applying
the brake when the power is on, open it when power is off.
- 15 -
QTZ50(4810) Tower Crane DAHAN
5.Motor
whole structure is compact. One end of two rope is separately fixed on the
winding drum and the other end is fixed on the load trolley to make the trolley
operate normally by tightening and loosing the rope when trolley traveling.
- 16 -
QTZ50(4810) Tower Crane DAHAN
Hydraulic system
- 17 -
QTZ50(4810) Tower Crane DAHAN
1. motor 2. Overflow valve 3. Manual diverter valve 4. Oil tank 5. oil mark 6.
Balance valve 7. cylinder 8. High pressure tube 9. oil tube 10. access 11. cross beam
Hydraulic climbing system is composed of electromotor driven gearing
cylinder, the oil transit to the valve and balanced valve to the hydraulic ram by
hand to make the ram flex, so make climb or assemble for the top of tower crane.
The hydraulic climbing system works together with two paws on the frame, and
the crane can climb up or down automatically. This system works stably, easy to
operate, safe and reliable, during the working, it can rest on any position, so it is
When assemble the tower crane, first assemble the cylinder and climbing
beam together and then connect with frame, In order to avoid the ram shake, the
station (including ram, motor and direction valve etc.) is hosted to the frame
board, and assembled with frame, then divide the hydraulic parts and frame and
⑴ Lightning rod should be arranged on the top of the tower head, and
bolts of each main chord and clear up the paint of bolts and sleeve.
⑶ The chassis which is connected with the rivet should not be used earth
there is other safety guarding device, for example, high delicacy relay(automatic
breaker).
earth resistivity has made a great changes that hinge upon the time and local
resistance.
⑺ The tower crane manufacturer will not supply lightning devices and the
- 19 -
QTZ50(4810) Tower Crane DAHAN
5000
4000
撑耳座
标准节踏步
180 180
5000 建筑物方向
building and the installation position of max.purchase parts to make full use of
effective radius of the hoisting jib and hoisting capacity, and should still consider
There is the place of impracticable power transmission line, any parts of the
tower crane and safety distance of the power transmission line should conform to
the stipulations in the following table to avoid the tower crane entering the
- 20 -
QTZ50(4810) Tower Crane DAHAN
below)
P1 P2 M Mk
Type
(KN) ( KN ) ( KN·m) ( KN·m)
The base foundation for the fixed tower crane is to guarantee the necessary
The counterweight adopt the reinforced concrete for casting, and the outline
Weighing A type 2.2t after using the concrete for casting, while B type is
1.15t.The allowable error for the weight is 2%, total 5 piece(3A+2B) 8.9t,and the
The users should read the instruction manual of this chapter in order to
- 21 -
QTZ50(4810) Tower Crane DAHAN
A 25t truck crane is needed when the crane is installed or other hoisting
equipment, It takes as less time to hoist with truck if we can coordinate the steps
a. Installation of crane should be carried out at the highest of the crane when
which are of proper length and reliable quality according to the weight of lifting
- 22 -
QTZ50(4810) Tower Crane DAHAN
parts.The weights of all kinds of lifting parts and lifting height are shown in the
following table:
etc.
strictly prohibited.
d The installation work is strictly prohibited when the wind power over 4
grades.
connecting the lower bracket mast sections, and frame and strengthening the
f Must install one piece 1.65t counter weight before install lifting jib.
h When the mast sections hoisting (or descending), they should be close as
prohibit rotating the hoisting jib, starting the trolley, or making the hook move up
and down. The above regulations will also adapt to crane disassembling and mast
sections reducing.
- 23 -
QTZ50(4810) Tower Crane DAHAN
b All bolts materials and specifications of tower crane parts are different,
c Before the installation for counter jib and hoisting jib, you should check
whether the connecting joint is solid or not, whether the tie bar is broken or not.
d While lifting counter jib or assembling lifting jib, lifting rope and wire
rope grips for assembling tower crane hook or shackles should be fixed firmly to
prevent the wire rope throwing off hook while wire rope angle is very big.
e Tighten the trolley wire rope, it is better not to be slippery in the case of load.
f Make sure to try to slewing and test run before assembling counter jib
g Adjust the position of height limiter, when the distance between the
upper limit of hook’s position and trolley pulley exceed 1000mm, stop hoisting.
h Assemble and adjust the moment limiter, weight limiter, radius limiter
i The main structure of tower crane, chassis of motor and metal shell of all
the electrical devices, guarding tube of wire should be well and reliably
grounding.
- 24 -
QTZ50(4810) Tower Crane DAHAN
l The upper pin and lower pin used for the connection among the lifting jib
represents the height from ground to the root of lifting jib) is allowable.
cross under frame, adjust the direction to make the mast section in the right
location. Use 8 pieces 10.9 level M27×285 high strength bolts(pre-tighten force
302KN,pre-tighten torque 1350 N·m) connect to the under frame. Put the one
with pedal to the opposite direction of guiding mast section when hoisting and
- 25 -
QTZ50(4810) Tower Crane DAHAN
b Lift another mast on the base mast, fixed with 8 pieces 10.9 level
out the dust, paint, oil stains and corrosion; High strengthen bolts
first nut should be up to the specified value, the second nut should be
mast and aim at the direction (put the one with pedal
installation
- 26 -
QTZ50(4810) Tower Crane DAHAN
b Install two layer controlling platform to the frame respectively, fix the
connecting bolts.
c Install the platform guard rail and open pins(separate and curve one end
of open pins).
d Connect the top of hydraulic ram with frame hoisting beam and screw
e Hoist the hydraulic bump station to the lower layer controlling platform
a Hoist the frame the top of tower mast to make the direction with ram is
slowly.
- 27 -
QTZ50(4810) Tower Crane DAHAN
a When tower crane is leaving the factory and transferring to another yard,
requirements.
pins to connect the cage with the lower table, and assemble
the platform, and lift to the front-end of the upper table and
- 28 -
QTZ50(4810) Tower Crane DAHAN
aim at the position of ear hole, and then use the bolts to connect firmly.
a Put the tower head platform, rails, ladder, and load moment limiter,
b Hoist the tower head to the transition section, note the direction
correspond to that of transition section, and use the special pins to connect the
tower head and transition section, and plug the cotter pin.
jib
3.3.4.6.1 Installation of
counter jib
Counter jib tie bars are composed of two groups, assemble them according
- 29 -
QTZ50(4810) Tower Crane DAHAN
to figure.
Note: remember to assemble the cotter pins and open them when assembling
b Continue to hoist the counter jib to make the end of it an angle, connect
c Slow down the counter jib to horizontal level, check the connection
among the counter jib tie bars, if they are in good condition, loose the hook and
mechanism).
- 30 -
QTZ50(4810) Tower Crane DAHAN
check if the connection pins among the sections are in place, if the cotter pins
are open, and if the weld seam is cracked,etc,if problem finding, we should
Refer to the attached drawing, assemble two groups of lifting jib tie bars. Tie
bar should be put in the hoisting jib and fixed properly. After tie bar
well-assembled, put two sets of tie bars with the special pin rolls separately to be
assembled between the two lifting lugs of the lifting jib and fixed by plywood.
should be hung on the lower chord of hoisting jib and maintenance platform
Attention: Upper and lower chord pin roll between two sections should
a Hoist lifting jib to a certain height, use the special pin roll to put the
lifting jib and earboard of transition section well-hinged and go through cotter pin
very well.
- 31 -
QTZ50(4810) Tower Crane DAHAN
b Continue to hoist lifting jib, and make the lifting jib upward at an angle
stop. And then use the chain block to put two sets of lifting bars lowering on the
top of the tower head, and use special pin roll to join pull block to the pull block
assembled on the top of the tower head and go through the cotter pin well.
c Decline the lifting jib to the horizontal level slowly, and check if the pin
of each connection point for the lifting jib tie bar and cotter pin are made well
- 32 -
QTZ50(4810) Tower Crane DAHAN
d After unmistakable inspection, Loose the hook and remove the steel rope
Hoist the rest of four counterweights to the tail of counter jib for installation.
Circle the hoisting steel rope as the following diagram, and the two ends of
steel rope respectively connects with the hoisting drum and the pulley of lifting
- 33 -
QTZ50(4810) Tower Crane DAHAN
and this progress can be done after the installation of transition section and tower
head.
a Put through the power and electro circuit of crane, according to principle
figures.
- 34 -
QTZ50(4810) Tower Crane DAHAN
After assembling, the weight limiter and moment limiter should be adjusted
4.1 When the users using it, if the hoisting height exceeds the Max.
4.2 This crane adopts steel performance attaching which is connected with
4.3 Attaching rods are produced and provided by our company, purchased by
the users. We supply standard attaching rods that attaching distance is within
3.5-4.0m,
capacity for building attaching point and the construction date, etc, factors, for the
- 35 -
QTZ50(4810) Tower Crane DAHAN
Estimation should be available in advance. The force for the tower crane attaching
point will vary according to the working conditions. Attaching force under
building attaching point should be not less than the value in the table.
attaching device can be reinforced at about 21.1 meters away from the installation
ground, as the tower crane higher, space between two anchorages should be add
according to the Fig., max. cantilever height for mast should be not more than 22
meters, the following is sketch map for the tower crane different heights.
- 36 -
QTZ50(4810) Tower Crane DAHAN
5.1.1 Check each item for the crane installation to see if they are complete
5.1.2 Carry out trial operation for hoisting, slewing, trolleying, etc
movements.
5.1.3 Before climbing work, hang all mast sections that are used for adding
to the position that hoisting jib at its square azimuth can hang when the tower
crane hoisting, and hang one mast section in the trolley hook of guide beam, and
then hang another mast section at the radius of 15m, and at this time, center of
gravity for the tower crane upper hoisting part through the hinge point of
hydraulic cylinder in order to keep balance, when jacking, friction for the roller
wheel is less.
b If the hydraulic climbing system has not been used for a very long time,
(over 6 months), oil must be checked if it has turned (the color is deep and muddy,
c Check if the hydraulic oil trademark is correct or not, which normally can
choose N68 antiwear hydraulic oil, and can use N32 antiwear hydraulic oil when
low temperature.
- 37 -
QTZ50(4810) Tower Crane DAHAN
right, don’t make an unauthorized change (It is prohibited for rotating the
car, and then operate manual selector valve. Make the hydraulic ram without load
stretch several times, exclude air in the system, and check if each moving part is
interference phenomenon or not, readjust the space among the roller wheels, after
5.2 Jacking
5.2.1 First use the hoisting hook to hoist a mast section, make the lower
connection set of the mast section assemble 4 guide wheels on the guide platform,
and then use the hook to hoist a mast section again, and move the trolley to the
5.2.2 When jacking, put the trunnion for the climbing beam at both ends in
the bearing pedal gap of the next mast section to the last overhead, disassemble all
the connecting bolts between the lower bracket and mast section, and then slightly
jack up the frame a bit more, at the same time observe the sleeve between the
lower bracket and mast section if contraposition can be more accurate., if not
5.2.3 Climbing frame about 1.20m, make the climbing pins support on the
pedal of the correspondent mast section, and then draw back the piston rod of
- 38 -
QTZ50(4810) Tower Crane DAHAN
hydraulic ram.
5.2.4 Draw back the piston rod of the hydraulic ram and make the trunnion
of climbing beam in the upper pedal of the last mast section but one, and put the
trunnion of climbing beam at both ends in the pedal gap. Continue to jack the
frame, about 1.2m, through the guide beam and guide wheel pulling in the mast
sections to be added to the above assembled mast sections in the frame, slowly
draw back the piston rod of hydraulic ram, make the mast sections to be added
aim at assembled mast sections falling, take the introduction of guide wheel.
Connect the mast sections and assembled mast sections with special bolts, tighten
- 39 -
QTZ50(4810) Tower Crane DAHAN
5.2.5 Draw back the piston rod for the next cycle of climbing
work.
5.2.6 After reaching the given height, when do not jacking any more,
slowly draw back the piston rod to make the frame downward for the counterpoint
of the lower bracket and well-assembled mast section, connected with the special
Condition after Climbing two trip and introducing one mast section
When hydraulic climbing and disassemble, we must strictly obey the rules
- 40 -
QTZ50(4810) Tower Crane DAHAN
a The weight of hoisting part for upper tower crane must keep balance.
disassemble, we must halt and check, failure for trouble shooting cannot continue
to climb or disassemble.
must reliably fall into the gap of mast section pedal, which can carry out climbing,
d When hydraulic device disassembling, we must keep all the parts and
entire system not polluted, high and low pressure pipes are not allowed to
misconnection.
piston rod of the hydraulic cylinder, put the trunnion of the beam at both ends in
the gap of the pedal, and make the hydraulic cylinder and climbing beam are not
f During climbing, when the lower bracket and new mast sections to be
added, new mast sections to be added and tower mast don’t tighten the connecting
bolts, it is prohibited for slewing and other running action, when wind speed at
more than 4 grade, we must stop climbing work, and will be well connected with
g After the tower crane install height exceeds the hoisting height 29m, we
should connect the tower mast with building attaching according to requirements.
- 41 -
QTZ50(4810) Tower Crane DAHAN
After the tower crane hoists to be added mast sections up to the stated height
every time, we must tightly connect lower bracket with mast sections.
It should be check completely before putting into use tower crane, check and
debug mechanism and safe device, in order to obstruct normal working order and
appear no-safe accident, ensure the normal using and safe operation of tower
crane.
Item of
Content of inspection
inspection
chassis Check the tightening condition of foot bolt.
Check fastening for mast section bolts.
Tower body
Check connection between the ladder and rest platform
Check the tightening condition of walkway and baluster
Check the connection between the frame and bottom support
Climbing
Check the connection between frame and mast section
cage
Check the installation of hydraulic system, debug it is
normal and reliable or not
Forbid preserving grease oil ,cotton oil and another tinder in
cabin
Cabin
Check the connection between the cabin and tower section,
it is reliable and stable or not.
Slewing Check the fastening situation between the upper bracket and
bearing bottom bracket
Check the installation situation between the hoisting jib and
Tower head counter jib tie bar
Check the twisting situation of hoisting steel rope.
Check installation of counter jib guardrail and walkway
Check the way have sundries or not, ensure the way
expediting.
Counter jib Check the installation situation of hoisting winch and
arranging rope device.
Check debugging situation of hoisting winch brake
Check fastening of counter jib
Check the installation of pins, washer and cotter pin.
Hoisting jib
Check trolleying trolley installation and operation situation.
- 42 -
QTZ50(4810) Tower Crane DAHAN
cabin installed in the upper tower mast. The cabin is wide-field, always make the
- 43 -
QTZ50(4810) Tower Crane DAHAN
reliable, which has weight, moment, height, trolley and slewing limiter, etc, safety
protective devices to ensure tower crane safe operation. The operator should be as
certificate. Learn the structure of tower crane, performance, use, familiar with the
tower crane operation, maintenance and use of a point of order, but also strictly
⑶ Tower crane hook shall not pull to the most significant heavy cranes to
go outside, that is, the scope of the most significant extent are not allowed to hook
hoist cable.
stopped, inertia force can be switched on after the disappearance of the reverse
⑸ Operate strictly in order, the stall speed of the body must be from the
and without more file operation, each stall duration should be more than 2-4
seconds.
⑹ Before the driver doing works , safety devices must be carried out to
- 44 -
QTZ50(4810) Tower Crane DAHAN
check the reliability of the sets ,it is absolutely not allowed when the safety
device is not reliable or failure to continue operation under the this status.
⑺ The inspection of all the security devices on the tower crane should be
regular checked and maintained, arbitrarily move, adjust and demolition are
prohibited.
⑻ Tower crane drivers should check the current, voltage , when the
the bolts is loosing, operating is well, the rope reel ranks good or bad, the
conditions for head rope compaction, the shortage for lubrication position. If so, it
⑽ The tower crane should appoint a professional to contact with the driver
and command
facilities.
⑿ At the construction site for more tower cranes, space collision should be
prevented.
⒀ The tower crane should avoid the assembly of high voltage transmission
line, and it should adopt a safety measures, and then work while hoisting jib, hook
⒁ Before the driver is off work, hook must be hoisted over the
- 45 -
QTZ50(4810) Tower Crane DAHAN
surrounding building’s height or hook must be avoided this radius. At last the
ground total power must be cut off, live maintenance not allowed.
⒅ After an overhaul of the tower crane or change the site to reinstall, the
interfere or not, metal structures damage or not, electrical equipment and safety
a Shut off the total power of electric cabinet and lock it, and take down the
connector plug of the ground electric cabinet and put it in the shelter.
b Under non-working conditions, tower crane can rotate freely in the wind,
when stopping the crane, guarantee that there should not be obstacles striking the
tower crane hoisting jib or hook with the range of hoisting jib.
7.2.1 Introduction
- 46 -
QTZ50(4810) Tower Crane DAHAN
b Tower crane adopt 50HZ, 380V AC power supply, the voltage error is
10%.
c When Tower crane power cables comes into the electrical control box,
via the air switch to each agencies DK1 electricity, control the interior from the
driver or three-speed motor, rotary ultrasonic motor and three frequency speed
motor, the jacking mechanism power provided by outside cable ,by the pump
d In order to ensure the safe use of tower crane, the machine set zero
position protection, height limit, trolley radius before and after limiter , and set
moment limiter, load capacity limiter as the overload protection. hoisting motor is
given short circuit overload protection by air switch ,slewing motor and trolleying
motor is protected with short and overload measures by air switch, and a starting
weight of torque limiter and limiter for overload protection, jacking motor is
trolleying motor control, slewing motor control, oil pump motor control, moment
- 47 -
QTZ50(4810) Tower Crane DAHAN
DK1 air switches to control the total power, protect the tower crane
starting and stopping buttons, as well as the zero controlling point switch ,
through their control trolleying, slewing, and hoisting electric power and the
tower crane's zero protection, emergency stop controlled by SB1. (See figure
below)
c Hoisting motor adopts hydraulic push rod brake, and controls brake
down at any speed or any position, brake motor switches on, brake releases.
When the switch is in a zero position, brake motor is cut off and brake brakes.
- 48 -
QTZ50(4810) Tower Crane DAHAN
Running Contactor
Running Contactor
Low KM21 KM23
Forward
High KM21 KM24 KM25
Low KM22 KM23
Back
High KM22 KM24 KM25
S3 Control KM10, KM11, KM12, KM13 for positive and high, moderate and
- 49 -
QTZ50(4810) Tower Crane DAHAN
Running Contactor
Low KM11
station.
limiter is single point, a middle motor should be added to the total electrical
Lighting power in all parts of tower crane use 220V AC , the control room
equipped with a ceiling, and at the end of the boom and the top of the tower
equipped with illumination lights, centralized control by the driver's cab and
equipped with bolt to serve as the electric socket fans, heating use.
50HZ, 380V AC power, when the voltage higher than 399V, lower than 361V, it
- 50 -
QTZ50(4810) Tower Crane DAHAN
c Before the tower crane goes into work, the total start-up KM does not
work, starting total job, components for each parts should be in non-work status,
the stopping buttons should close to the normal S1, S2, S3 handle back to zero,
switch.
f According to the total stop button SB1, you can turn off the power
machine.
g When jacking, turn on the hoisting switches DK2, at this time the control
parts is in power, worked by the hoisting control mechanism from the hydraulic
bump station.
i If the line is out of power caused by moment limiter, it should start the
switch again. The operation for hoisting and trolleying outward will be prohibited.
otherwise, move the trolleying car inwardly,(to reduce the nominal moment )so as
j The adjustable motor is not allowed to operate at the high speed. it should
starts from low level to high level. when stopping, it should operates from high
- 51 -
QTZ50(4810) Tower Crane DAHAN
a Tower crane sector mostly adopt the multi-speed starter motor to hoist
directly, so the requirements for voltage fluctuation does not exceed ± 10%.
b Operation for trolleying speed should rise and decline by ranks , do not
to the ground (grounding repeat), the shell of electric motor should be grounded,
accident.
e After the jacking ,the hoisting power should be turned off, unplug the
power from the total power station and power cable should be fixed firmly on the
- 52 -
QTZ50(4810) Tower Crane DAHAN
c Height limiter be installed next to hoisting winch reel, adjust touch action
of limiter switch gravity when the hook rise the allowed Max. height.
d When jacking, it should loosen all the main cable collets, the cable be
fixed to the tower section by the collets which installed each 5 meters after
jacking finished.
water-proof right.
book.
- 53 -
QTZ50(4810) Tower Crane DAHAN
Dismantle of crane should adhere strictly to the rules and be carried out
disassembly of crane, such as hoisting jib, counter jib, etc, should avoid the
remainder of the tower crane lose its balance from overturning the tower crane.
tower crane.
When dismantle of tower crane, we must strictly carry out according to the
tower crane installation and inverse process of jacking adding sections. Specific
defined position before tower crane jacking, then disassembly step by step
8.2.3 Disassembly of hoisting steel wire rope: put the hook pulley
block to the ground, take down the rope cappel of the steel wire rope at the end of
- 54 -
QTZ50(4810) Tower Crane DAHAN
hoisting jib, and put the hoisting steel wire rope winding on the hoisting drum, the
overall length of the steel wire rope should be inspected when disassembling the
rope.
8.2.4 Fix the trolley: drive the trolley to the jib root to be fixed,
disassemble the connection of trolleying steel wire rope, and wind on the trolley
drum.
a Lift the hoisting jib by means of a truck crane according to the stated
b Disassemble the hoisting jib tie bar from the tower head by means of
hand chain hoist, then loose it and put it on the hoisting jib upper chord bracket,
fixed well.
c Put the hoisting jib slowly down to the level, and spay the connecting pin
d Put down the hoisting jib on the ground that there is stow-wood.
a Roll the hoisting steel rope and disassemble hoisting winch cable.
b Lift the counterweight at the end to the ground, then lift the counter jib to
make it upturned.
c Disassemble the connection between counter jib tie bar and tower head
by means of the rope, then slightly place in the counter jib, and fixed properly.
d Descend the counter jib to the level and disassemble the connecting pin
- 55 -
QTZ50(4810) Tower Crane DAHAN
Hoist the cabin, disassemble the connecting tie bar and the connecting bolt of
Hoist the tower head, disassemble the connecting bolt of the transition
bracket.
Upper bracket is lifted by means of the rope, disassemble the connecting bolt
among lower bracket, frame and mast section, and then put them to the ground.
disassemble walkway, platform, hand rail and put them to the ground in turn.
8.2.12 Dismantle mast sections and basic sections: after disassembling the
8.2.13 Dismantle under frame: disassemble the foot bolts and the connecting
- 56 -
QTZ50(4810) Tower Crane DAHAN
working, it should change once a half year, and wash the inside, all the oil and oil
exceed steel wire diameter 5%, it should change new steel rope. It should change
c Tower head and guide wheel of transit section, trolleying pulley of jib、
trolleying trolley wheel and trolley 、 wheel of hook group should be infuse
lubricating oil once. Arrange line pulley axis should be have lubricating oil at any
time. For example seal roll bearing, such as trolleying reel bearing、hook flat ball
bearing、 each motor bearing swing support, should infuse oil once a time after
and so on, it should adjust timely if using process have abrasion, if the abrasion
e Hoisting steel wire rope and trolleying steel wire rope be prolong several
times, so the hoisting steel wire rope should adjust the high limiter 、 trolleying
steel wire rope should anew firming ,and adjust trolleying limiter.
harmful and switch failure or not, it should restore timely and instead, especially
- 57 -
QTZ50(4810) Tower Crane DAHAN
tighten.
h Each part connect bolt, pressure board of steel rope or line bolt or nut
ot not when using tower crane, such as root of hoisting jib、balance root、tie bar of
hoisting jib and hinge joint of counter jib tie bar 、 pulley seat, it should stop
l Each limiter should be adjusted when divert locale every time, otherwise
n Each part should be blasted and painted after using the tower crane one
project.
crack or not、rod piece or distortion .after the project finished, it should inspect
- 58 -
QTZ50(4810) Tower Crane DAHAN
⑴ Reason:
b Oil holder of hydraulic handspike brake has oil whether or not or the oil
is little.
⑵ Eliminate method:
b Rule the oil capacity by the hydraulic handspike brake, adjust spring
The reasons for the trolley brake slipping and failure and solutions are
⑴ Reason:
a Check the reducer that the oil or oil capacity is more or less.
- 59 -
QTZ50(4810) Tower Crane DAHAN
⑵ Eliminate method:
a Use oil and oil capacity which ruled by reducer using specification.
b Check the gap of each bearing, it should change if the bearing have
problem.
⑴ Reason:
a It has block things and interfere things or not between the big gear the
small gear.
b Hydraulic coupling oil accord with the requirement or not, oil capacity is
enough or not.
⑵ Eliminate methods:
a Observe and eliminate the interfere things between the big gear and small
gear.
⑴ Main reason:
- 60 -
QTZ50(4810) Tower Crane DAHAN
line.
g The clearness is very small between the brake and transmission parts.
measures to eliminate.
- 61 -
QTZ50(4810) Tower Crane DAHAN
⒈ Height limiter
Function
⑵ How it works
a Hoist hoisting hook up to the hook top 1.5 meters away from the trolley
bottom.
b Loosen the hoisting drum bearing support, cover the M5 tightening nut
c Adjust the cam that can control hook hoisting, make the cam just push
off the micro switch (that is in a broken state.) and tighten M5 tightening nut.
d After the hook dropping some distance, hoist the hook up to hoisting
mechanism with slow speed for automatic parking (Attention: when the distance
between the hook and trolley is less than 1 meter, it still cannot stop, turn off the
- 62 -
QTZ50(4810) Tower Crane DAHAN
power immediately for man-made parking. And then carry out the above several
steps again.)
e Observe the distance between the hook and trolley, if within a range of
f Several times, if the distance between the hook and trolley is all within a
range of 1.2-1.8 meters, and adjustment satisfies the requirements. (if the tower
crane height is enough or hoisting mechanism uses high speed more, and the
When dropping, hook stop position is decided by the user according to the
scene requirements.
⒉ Radius limiter
Function
Principle
The working principle of trolley radius limiter is basically the same as the
working principle of hoisting height limiter. Hoisting limit is upper and lower end
position for hook moving, but trolley radius limit is front and back end position
⑶ Adjustment method
- 63 -
QTZ50(4810) Tower Crane DAHAN
② Drive the trolley to about 1.5m away from hoisting jib front part or back
③ Adjust the correspondent cam position, press the micro switch to make
rubber buffer increased, and then make trolley move slowly toward the rubber
⑤ Observe the distance between the trolley and rubber buffer within a
range of 0.5-1m.
⑥ Act of repeating several times and carry out fine-turning, and when
making the trolley move to hoisting jib front and back part near rubber buffer, it
can turn off power automatically and stop moving, finish adjusting.
Adjustment method of trolley front and back limiter is completely the same.
Tension the trolley rope every time, it should be readjusted after replacing the
⒊ Slewing limiter
Function
right.
⑵ Principle
- 64 -
QTZ50(4810) Tower Crane DAHAN
The limiter is installed in the tower crane upper bracket, and small gear
meshed slewing big gear ring is installed in the input shaft(shown in the following
ring(angle)carries out limiter, when the tower crane slews 1.5 rings to the left and
to the right, the correspondent cam presses the dynamic contact of the micro
switch for cutting off this direction’s control circuit and making the slewing
① Operate the action of the tower crane to turn to the left(or to the
park automatically to ensure the movement which the micro switch controls.
② Put the tower crane to slew back to the median (that is the position that
tower crane.
③ Put the tower crane turn to the left one and a half circles(540°),adjust
the correspondent cam to make it press the dynamic contact of the microswitch
and separate normally close contact, after repeated experiments several times, turn
to the left at the position that can automatically turn off power and stop slewing,
④ Put the tower crane turn to the right three circles(compared with the
median one and a half circles),use the above method to adjust and try the repeated
- 65 -
QTZ50(4810) Tower Crane DAHAN
⒋ Moment limiter
Function
calculation. In use don’t allow to exceed this rated load moment, this moment
limiter is to make the tower crane at a certain radius only hoist the load within a
inside the tower head. Under the load action, the back trunk of tower head(next to
the balance arm) will appear stretching following the X-X direction and become a
little bit longer, after the steel plate (1)action, the mid spacing between the steel
plates will be smaller evidently following the Y-Y direction. To alter the distance
properly between the adjusting bolt (2) head and travel switch (3),and the load
moment right in scope 100-105% of the hoist rated load moment, and the travel
switch will be opened, then close the relevant control circuit, finally, to stop the
hoisting up and trolley travelling outward work. At the same time, the hoisting
down and trolley travelling inward both in normal, for unloading or reducing the
load timely and conveniently, to avoid the hoist overload and make sure the
⑶ Adjust
- 66 -
QTZ50(4810) Tower Crane DAHAN
a. Hoisting the rated load 0.8t at the max point 48m, and adjust the
adjusting switch on the moment limiter, which matching with the travelling
switch(B),and when it nearly open the travelling switch closed-type touch spot,
unloading and reuse first speed, second speed to hoist, everywhere should be in
normal.
b. After unloading, to add 5% on the load (it is 0.84t now) and hoist up
again, the hoist work should be stopped itself when the load almost leave the
ground or leave a little from the ground, if not please adjust the adjusting switch
tight, repeat several time, to make sure a and b ways in right condition, then screw
a At the radius of 35m, hoist this rated load (check the load
characteristics table).
automatic deceleration and stopped between range of 35m and 36m, if not please
d Repeat b、c two actions several times and no error, and screw the nut
tightly.
The adjusting of moment limiter has business with the load attack and the
- 67 -
QTZ50(4810) Tower Crane DAHAN
⒌ Max.load limiter
⑴ Function
Lots of structure fittings, structure and parts of tower crane are all designed
and worked out in the max load capacity condition when design the whole crane,
the max loading limiter is to avoid the over load working and destroy the crane
Working principle:
The load limiter is the special component named dynamometer, which fixed
on the top of tower head, the hoisting cable across through the pulley groove, the
load tension work on the cable pass on to the dynamometer which fixed on the
the amplifier in the dynamometer, when the load equal to the rated load, the
adjustable bolt, which fixed on the metal plate of the amplifier, will open the
travel switch and stop the hoist mechanism working in a given speed, then to limit
load under a certain speed, according to adjust the four adjustable bolts of the
⑶ Adjust:
screw driver to touch each travel switch touch point, if some one stop the hoisting
③ To adjust the matching bolt and make sure the rated load will be hoisted
- 68 -
QTZ50(4810) Tower Crane DAHAN
normally under the certain speed, it is could not hoist up if it exceeds 5% of rated
load, after operate the bolt several times and satisfy demand, to screw the nut
tightly.
- 69 -
QTZ50(4810) Tower Crane DAHAN
1 .Wire rope
2.1 The installation, maintenance, check and scrap should comply with GB/T
5972-2009.
2.2.Fixation of steel wire rope end should comply with below requirement:
a)Comply with GB/T 5976-2006 when fixed by rope cramp, fixed strength
b)Knitting length should not less than 20 times of rope diameter when fixed
by knitting, and not less than 300mm, solid joint strength should not less than
comply with GB/T 5973-2006, fixed strength should not less than 75% of
d)When fixed by casting taper, fixed strength should reach to breaking force
of rope;
e)When fixed by aluminum alloy joint, fixed strength should not less than
f)When fixed by pressing plate, pressing plate should comply with GB/T
- 70 -
QTZ50(4810) Tower Crane DAHAN
Installation
No. Name Specifications Location
location
Hook,trolley,tower
10 Roller Φ260 head,hoisting jib
Freestanding length
11 Hoist wire rope φ11
L=205m
- 71 -
QTZ50(4810) Tower Crane DAHAN
No. Name of parts Name of lubrication part Variety of lubricant Lubricating method and cycle
Hoisting rope Graphite calcium grease Oil boiling when repairing it
1 Rope
Trolley rope ZG-SSY1405-65 completely every time
Summer(higher than 10℃):
N220 Moderate load
Add oil every 240 hours of working
Hoisting gear-box industrial gear oil
time
Slewing retarder Winter(not less than 10℃):
2 Retarder Change the oil once every 1500
N150 Moderate load
hours
industrial gear oil
Molybdenum disulfide-2 or
trolleying retarder
ZL-2 or Lithium grease
Remark:The mentioned working time in this table is practical cumulating working time of the parts.
- 72 -
QTZ50(4810) Tower Crane DAHAN
-0.12
Strut tie φ45 φ40 115 83 8
-0.28
-0.13
Tower head φ55 φ50 350 311 2
-0.29
-0.12
Back rod φ45 φ40 115 83 12
-0.28
-0.080
Tower head+jib 200 165 8
φ55 φ50 -0.119
end
-0.13
Hanging point φ50 φ45 160 105 4
-0.29
-0.13
Cage φ55 φ50 160 105 4
-0.29
-0.050
Upper chord φ45 φ45 110 70 5
-0.112
Maintenance -0.11
φ25 φ19.5 110 85 2
platform -0.24
Pulling rod of -0.11
φ32 φ22 80 54 4
cage -0.24
-0.12
Cabin platform φ45 φ40 95 60 4
-0.28
Back connection φ40
φ45 168 130 4
pins -0.12
- 73 -
QTZ50(4810) Tower Crane DAHAN
- 74 -
QTZ50(4810) Tower Crane DAHAN
36.8 3A 6600
A=2200Kg、B=1150Kg
- 75 -
QTZ50(4810) Tower Crane DAHAN
- 76 -
QTZ50(4810) Tower Crane DAHAN
- 77 -
QTZ50(4810) Tower Crane DAHAN
- 78 -
QTZ50(4810) Tower Crane DAHAN
- 79 -
QTZ50(4810) Tower Crane DAHAN
- 80 -
QTZ50(4810) Tower Crane DAHAN
- 81 -
QTZ50(4810) Tower Crane DAHAN
起升电机
M1
QTZ315/40/50
起升制动
M4
顶升电机
VM5
- 84 -
QTZ50(4810) Tower Crane DAHAN
速
升
高
降
速
升
降
中
速
低
升
降
下
降
上
升
顶升用旁路
量40%
控
制
重
控
总
制
电
- 85 -
QTZ50(4810) Tower Crane DAHAN
速
三
转
回
速
转
二
回
右
转
左
转
M2
- 86 -
QTZ50(4810) Tower Crane DAHAN
速
高
低
速
顶升用旁路
度
变
小
幅
度
变
大
幅
M3
- 87 -
QTZ50(4810) Tower Crane DAHAN
插
座
铃
电
碍
灯
三
障
碍
灯
障
二
碍
灯
一
障
驶
室
照
灯
驾
- 88 -
QTZ50(4810) Tower Crane
- 89 -
40% 上 上 下 左 右 变 变
重 升 升 降 转 转 幅 幅
量 限 限 限 限 限 外 内
位 位 位 位 位 限 限
位 位
DAHAN
QTZ50(4810) Tower Crane DAHAN
接线端子
槽 线
航插
槽 线
槽
槽
槽 线 线
线
槽 线
- 90 -
电源进线 空开 自动空气开关 相序继电器 顶升断路器 总接触器 风扇 室灯 塔臂.塔顶障碍灯 插座1.2 电笛
QTZ50(4810) Tower Crane
U5 V5 W5
- 91 -
DAHAN
电源 电机风机 液压推杆电机 低速 中速 高速 PLC电源 上升 下降 低速 中速 高速 制动器
2
L21
3
L22 PLC.220V电源
下降 21
L23 7 0 SS0
1
上升 2
3
QTZ50(4810) Tower Crane
QF2
71
X26
X27
X30
X31
X32
MF
L
N
COM
X26
X27
X30
X31
X32
3~
IN
U8 FX1N-60MR PLC
V8 OUT
W8
Y0
Y1
Y2
Y3
Y4
COM0
COM1
COM2
COM3
Y0
Y1
Y2
Y3
Y4
7 72 0
U9
V9
- 92 -
W9 19
U4 V4 W4
307 310
300 302 304
M4 312
308
3~
305
313
309
301 303 306 314
M1
3~
25
A B C D 1 2 3 4 5 6 7 8 9
DAHAN
czg
电源 回转电机 回转制动器供电回路 回转控制 制动
2
L21
4
3
L22 右旋 2
1
L23 SB3 SB4 SH0
1
左旋 2
3
4
QF3
QTZ50(4810) Tower Crane
+ -
X16
X17
X33
X34
X35
X36
X37
X16
X17
X33
X34
X35
X36
X37
IN
FX1N-60MR
KA16 OUT
U10
V10
W10
Y5
Y6
Y7
Y10
Y11
Y17
D2 R2
COM4
Y5
Y6
Y7
Y10
Y11
Y17
72 0
U5
V5
W5
U5
V5
W5
- 93 -
19
M2-1 M2-2
3~ 3~
315 317 319 320 321
HR1 HR2
1 2 3 4 5 6 7 8
A B
DAHAN
电源 小车电机 小车制动器供电回路 小车控制
2
L21
L22 向内 2
1
L23 SV0
1
向外 2
QF4
QTZ50(4810) Tower Crane
X40
X41
X42
X43
QF6
X40
X41
X42
X43
~ 380V IN
U12 V12 W12
TC1 FX1N-60MR
OUT
~ 27V
Y12
Y13
Y14
Y15
Y16
COM5
Y12
Y13
Y14
Y15
Y16
V1 V2
V3 V4
U11 V11 W11 72 0
19
- 94 -
D1 R1
U6
W6
V6
U7
W7
V7
328
M3
25
3~
A B C 1 2 3 4 5 6
DAHAN
- 95 -
电
源
关
开
1
9
0
72
2
GPS
2
IN
OUT
FX1N-60MR
2 X0
COM X0 GPS.脉冲信号
ACC X1
24+ X1 100%力矩
X2
X2 80%力矩
X3
X3 100%重量
X4
X4 40%重量
X5
X5 回转左限
报警信号控制
X6
X6 回转右限
X7
COM6 X7 起升下限
X10
COM7 X10 起升上限
Y23 X11
100%力矩 Y23 X11 变幅外限位
Y24 X12
80%力矩 Y24 X12 变幅内限位
Y25 X13
100%重量 Y25 X13 超高减速
Y26 X14
40%重量 Y26 X14 变幅后减速
Y27 X15
蜂鸣器 Y27 X15 变幅前减速
DAHAN QTZ50(4810) Tower Crane
32芯 接线排 接线排
编 线 编 线
向外 向内 左旋 右旋 下降 上升 编 线
号 号 号 号 号 号
QTZ50(4810) Tower Crane
- 96 -
欠过压 100%力矩 80%力矩 100%重量 40%重量
向外 下降
左旋 右旋
注:用32芯(中心出线)矩形插件
注:柜内32芯(底部出线)矩形插件
- 97 -
140.33(至电铃) 司机室驾配箱
漏
电
开
关
左联动台 右联动台
驾驶室联动台
DAHAN
QTZ50(4810) Tower Crane DAHAN
排 线
槽 线
槽 线
插座 插座
圆 圆
槽 线
槽 线
槽
槽 线
槽
线
线
槽 线
槽 线
- 98 -
29 XS1 XS2 单相插座 1 ZM13-15A 52
28 SEC.SES.SEB 三联开关 3 118-10A 250V 51
27 断路器 1 DZ47-60 3P Ie:20A 50
26 断路器 1 DZ47-60 1P Ie:16A 49
25 QF1 空气开关 1 Ie:100A 48 HA1 电笛 1
24 47 HL1.HL2.HL3 塔臂/顶障碍灯 3 HZA1 220V 40W
QTZ50(4810) Tower Crane
- 99 -
12 KA15.KA16 接触器 2 LC1-D09 M5C 220V 35 YBS1-2 制动器 2 DC24V
11 KA1~KA14 中间继电器 14 220V 34 HR1.HR2 电阻器 2
10 小车接触器 5 LC1-D18 Q5C 380V 33 M2-1.2 回转电机 2 YZR132M2-6 3.7KW
9 QF4 断路器 1 DZ47-60 3P Ie:25A 32 YBH 起升制动器 1 YT1 - 45Z/5
8 回转接触器 6 LC1-D18 Q5C 380V 31 M4 液压推杆电动机 1 ASF32A
7 KM11.KM12 回转接触器 2 LC1-D40 Q5C 380V 30 M1 起升电机 1 24/24/5.4KW
6 QF3 断路器 1 DZ47-60 3P Ie:32A 序号 代 号 名 称 数量 型 号 备 注
5 KM1.KM8 接触器 2 LC1-D09 Q5C 380V
4 KM4.KM5.KM6 起升接触器 3 380V
3 KM2.KM3.KM7 起升接触器 3 LC1-D65 Q5C 380V
2 KM 主接触器 1 LC1-D80 Q5C 380V
1 QF2 断路器 1 DZ158-125/3P Ie:80A
序号 代 号 名 称 数量 型 号 备 注
DAHAN
czg
81
80
79
78
77
76
75
QTZ50(4810) Tower Crane
74
73
72
71
70
69
68
67
66
65
64
- 100 -
63
62 FM 蜂鸣器 1 二工/220V 联动台
61 HL6.HL7 重量指示灯 2 施耐德/220V 联动台
60 HL4.HL5 力矩指示灯 2 施耐德/220V 联动台
59 HL 欠过压指示灯 1 施耐德/380V 联动台
58 SB2 启动按钮 1 施耐德 联动台
57 SB1 停止按钮 1 施耐德 联动台
56 SAL 电笛按钮 1 施耐德 联动台
55 SB4 应急开关 1 施耐德 联动台
54 SB3 回转制动开关 1 施耐德 联动台
53 SV0.SH0.SS0 联动开关 2 WLK3 联动台
序号 代 号 名 称 数量 型 号 备 注
DAHAN
czg
29 KM25 前后高速 1 29
28 KM24 前后高速 1 28
27 KM23 前后低速 1 27
26 KM22 小车向后 1 26
25 KM21 小车向前 1 25 KA16 回转制动 1
24 QF4 小车断路器 1 24 KA15 小车制动 1
23 QF6 变压器电源 1 23 KA14 前后高速 1
22 R1.R2 电阻 1 22 KA13 前后低速 1
QTZ50(4810) Tower Crane
- 101 -
11 QF2 升降断路器 1 11 KA2 下降 1
10 KM8 起升制动器 1 10 KA1 上升 1
9 KM1 零位接触器 1 9 KM05 旋转四速 1
8 QF8 GPS电源 1 8 KM15 旋转四速 1
7 QF7 PLC总电源 1 7 KM04 旋转三速 1
6 QF0 控制断路器 1 6 KM14 旋转三速 1
5 VM 相序保护器 1 5 KM03 旋转二速 1
4 QF5 顶升断路器 1 4 KM13 旋转二速 1
3 TC2 控制变压器 1 3 KM12 右旋 1
2 KM 总接触器 1 2 KM11 左旋 1
1 QF1 总断路器 1 1 QF3 回转断路器 1
序号 代 号 名 称 数量 序号 代 号 名 称 数量
DAHAN