Daily Report Friday 02/09/2024 by Julio Quintero

Working hours 8:00 am to 04:42 pm. 5-minute break at 10 o'clock and 30 minutes at 1:00 pm.

SUBCONTRACTOR: Builder Choice Co.:


1 Sr. Project Manager

1 Supervisor

11 Carpenters

1 Excavator operator

1 Loader operator

INSPECTIONS: Inspection today by Eng. Fabiana. Cabana steel structure.

ACTIVITIES: Building wall wood forms, backfilling on the ground, taken dirt out.

The weather: Cloudy, Mostly sunny day.

I arrived at 7:22 am

7:20 am Eleven carpenters came in, ready to work, two excavator operators.
Backfilling on the ground
11: am the toilet truck was cleaning
11: am Debri's truck took some trash out

before

after
Taken the dirt out
All of the carpenters were working on wall forms and backfilling.
2:40 pm Inspection of the cabana steel columns, by Eng. Fabiana

4:35 pm The workers finished

4:41 pm Everybody left

4:42 I left the site