Working hours 8:00 am to 04:42 pm. 5-minute break at 10 o'clock and 30 minutes at 1:00 pm.
1 Supervisor
11 Carpenters
1 Excavator operator
1 Loader operator
ACTIVITIES: Building wall wood forms, backfilling on the ground, taken dirt out.
I arrived at 7:22 am
7:20 am Eleven carpenters came in, ready to work, two excavator operators.
Backfilling on the ground
11: am the toilet truck was cleaning
11: am Debri's truck took some trash out
before
after
Taken the dirt out
All of the carpenters were working on wall forms and backfilling.
2:40 pm Inspection of the cabana steel columns, by Eng. Fabiana