Low Cost Sample Door Schedule and Their Information dada

Count
Family and Type Size
Assembly Code Type Mark Level Function Cost Total Cost Cost % Buy Date Guarantees Manufacturer Shop Name Door Hardware Shop Address
Family Type Width Height

Level 1
C1020 D1 16 Single-Decorative 2 36" x 84" 3' - 0" 7' - 0" Level 1 Exterior $12.00 $4032.00 12% 12.10.2020 1 years ABC Co.,Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Thailand and Construction Yangon.
C1021 D2 8 Single-Flush Vision 36" x 84" 3' - 0" 7' - 0" Level 1 Interior $10.00 $1680.00 5% 12.10.2020 1 years AAA Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Singapore and Construction Yangon.
C1022 D3 8 Single-Flush 30" x 80" 2' - 6" 6' - 8" Level 1 Interior $7.00 $933.33 3% 12.10.2020 6 months BBB Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Myanmar and Construction Yangon.
D4 8 Door-Opening 36" x 84" 0' - 0" 0' - 0" Level 1 Interior $0.00 0%
Level 1: 40 $6645.33 20%
Level 2
C1020 D1 16 Single-Decorative 2 36" x 84" 3' - 0" 7' - 0" Level 2 Exterior $12.00 $4032.00 12% 12.10.2020 1 years ABC Co.,Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Thailand and Construction Yangon.
C1021 D2 8 Single-Flush Vision 36" x 84" 3' - 0" 7' - 0" Level 2 Interior $10.00 $1680.00 5% 12.10.2020 1 years AAA Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Singapore and Construction Yangon.
C1022 D3 8 Single-Flush 30" x 80" 2' - 6" 6' - 8" Level 2 Interior $7.00 $933.33 3% 12.10.2020 6 months BBB Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Myanmar and Construction Yangon.
D4 8 Door-Opening 36" x 84" 0' - 0" 0' - 0" Level 2 Interior $0.00 0%
Level 2: 40 $6645.33 20%
Level 3
C1020 D1 16 Single-Decorative 2 36" x 84" 3' - 0" 7' - 0" Level 3 Exterior $12.00 $4032.00 12% 12.10.2020 1 years ABC Co.,Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Thailand and Construction Yangon.
C1021 D2 8 Single-Flush Vision 36" x 84" 3' - 0" 7' - 0" Level 3 Interior $10.00 $1680.00 5% 12.10.2020 1 years AAA Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Singapore and Construction Yangon.
C1022 D3 8 Single-Flush 30" x 80" 2' - 6" 6' - 8" Level 3 Interior $7.00 $933.33 3% 12.10.2020 6 months BBB Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Myanmar and Construction Yangon.
D4 8 Door-Opening 36" x 84" 0' - 0" 0' - 0" Level 3 Interior $0.00 0%
Level 3: 40 $6645.33 20%
Level 4
C1020 D1 16 Single-Decorative 2 36" x 84" 3' - 0" 7' - 0" Level 4 Exterior $12.00 $4032.00 12% 12.10.2020 1 years ABC Co.,Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Thailand and Construction Yangon.
C1021 D2 8 Single-Flush Vision 36" x 84" 3' - 0" 7' - 0" Level 4 Interior $10.00 $1680.00 5% 12.10.2020 1 years AAA Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Singapore and Construction Yangon.
C1022 D3 8 Single-Flush 30" x 80" 2' - 6" 6' - 8" Level 4 Interior $7.00 $933.33 3% 12.10.2020 6 months BBB Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Myanmar and Construction Yangon.
D4 8 Door-Opening 36" x 84" 0' - 0" 0' - 0" Level 4 Interior $0.00 0%
Level 4: 40 $6645.33 20%
Level 5
C1020 D1 16 Single-Decorative 2 36" x 84" 3' - 0" 7' - 0" Level 5 Exterior $12.00 $4032.00 12% 12.10.2020 1 years ABC Co.,Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Thailand and Construction Yangon.
C1021 D2 8 Single-Flush Vision 36" x 84" 3' - 0" 7' - 0" Level 5 Interior $10.00 $1680.00 5% 12.10.2020 1 years AAA Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Singapore and Construction Yangon.
C1022 D3 8 Single-Flush 30" x 80" 2' - 6" 6' - 8" Level 5 Interior $7.00 $933.33 3% 12.10.2020 6 months BBB Co,.Ltd. Main Ma Chaw Decoration No.123, Mark St, Hlaing Township,
Myanmar and Construction Yangon.
D4 8 Door-Opening 36" x 84" 0' - 0" 0' - 0" Level 5 Interior $0.00 0%
Level 5: 40 $6645.33 20%
Grand total: 200 $33226.67 100%